Vous êtes sur la page 1sur 43

TB-332-607-016

REV-02

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 1-1


For detail of section TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

1.625 m

Assuming max. length of trench as 55m with longitudinal slope of 1 : 750 (length upto section 1-1&4-4)
Depth of trench wall due to slope
Max depth of trench Wall(from GL)

55

1.625

750

0.073 m

0.073

1.698 m (MAX.)

Max. Total Height of cable Trench wall

1.823

Surcharge pressure

q =

2000 kg/m2

Soil density

1800 kg/m3

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

(refer email dated 26.06.13)

80 kg/m length
of wall

Width of tray

0.75 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)

2000.00

Active thrust due to Backfill (P2=1/2*Ka**H^2)

1.70

0.5*1800*1*1.698^2

Total active thrust (Pa)


3396.67
+
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

2595.90

5992.57*y=3396.67*1.698/2+2595.9*1.698/3
Bending moment at the base of wall

5992.6

2000.00 kg/m2

3396.67 kg/m

2595.90 kg/m

5992.6 kg/m

y =
0.727

0.727 m

4353.91 kg-m/m

4503.91 kg-m

6755.86 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment
Design moment, Mu1

0.75

)/2x5

4353.91

150.0

1.50

4503.91

150.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water

1.698

Active thrust due to water

0.5 x

Bending moment at the base of wall

1000 x

1.698 ^2

1442.1681

1.698

1.50

816.43

1.698 m

/3

1442.168 kg/m

816.43 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

1224.64 kg-m
250

GL

GL

P1
1.698

1698

P2
y

H/3

750
H/2

A
Design moment for wall

6755.9 kg-m

Required thickness of wall


d = (Mu / .138x fck x b)0.5

6755.86

* 104 / 0.138

*25*1000)^0.5

139.94 mm

Providing, D

400 mm

Effective depth, d

400 -40-5

355 mm

Reinforcement
Mu/bd2

6755.86

x 104 /

1000 x

355

Required % of steel, Pt

=
=

0.54
0.152 (Refer SP16,tab;
Table 1)

Required area of steel

269893988.xls

0.152

x 1000 x

355

)/100

540.84 mm2

Page 1

TB-332-607-016
REV-02

400 kV Switchyard at Yeramarus

12 @140C/C

Providing main reinforcement


Area of steel provided

807.4 mm2

Minimum reinforcement = 0.12% (As per IS 456)

480.0 mm2

10 @200 C/C

Providing distribution reinforcement


Area of distribution steel provided

Check for Uplift

392.5 mm2

(for max. depth)

Pressure due to trench (Only Dead Loads) =


Uplift pressure due to water =

2489.37 kg/m2/m
2198.33 kg/m2/m

F.O.S. for Uplift =

(0.9 times the vertical load)

1.132

< 1.2, Fails

Design of bottom slab.


Assuming thickness of slab

400 mm

Width of cable trench

2900 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench

Bearing Pressure check for bottom slab


CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

2.9

0.125 x 2500

Live load on cover slab

906.25 kg

500.0 kg

Wt of tray+cable

160

x5

800 kg

Wt of bottom slab

0.4

2.90

x 2500

2900.00 kg

Wt of side walls

0.4

1.823

x 2500 x2

3646.67 kg

Wt of bottom slab projected

0.4

0.30

x 2500 x2

600.00 kg

Wt of soil on projected slab

1.698

0.30

x 1800 x2

1834.20 kg

0.1

3.500

x 2000

700.00 kg

11887.12 kg

Wt of PCC
Total wt

906.25+500+800+2900+3646.67+700

Pressure at the base of slab

11887.12

3.50

x 1)

Net bearing capacity of soil

=
= <

3396.32 kg/m2
10000 kg/m2
Hence O.K.

Net upward pressure

3396.32

Maximum bending moment at

2396.32

2900.00

/(2.9*1)

2.90

2396.32 kg/m2/m slab

/8

2519.13 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

2519.13

Design moment from slab(Ms1)

1.5

=-

4503.9 kg-m

-1984.77 kg-m
-2977.16 kg-m

4503.9

-1984.77

1000

1823 kg

1823

13710.45 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

1.823

Total wt

x
11887.12

Pressure at the base of slab

13710.45

2.9

x 1)

Net bearing capacity of soil

=
=<

4727.74 kg/m2
10000 kg/m2
Hence O.K.

Net upward pressure

4727.74

Maximum bending moment at

3099.01

2900.00

+1823.33)
2.9

/(2.9*1)

3099.01 kg/m2

/8

3257.83 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab
Design moment for slab(Ms2)

816.4 kg-m

3257.83

816.4

4074.26 kg-m

1.5

4074.26

6111.39 kg-m

6111.39 kg-m

Design moment for slab

Required thickness of slab


d = (Mu / .138x fck x b)0.5

6111.39

x 104 / 0.138 x

25

x 1000).5 =

Providing, D

133.09 mm
400 mm

Effective depth, d

400 - 40-4

356 mm

Reinforcement
Mu/bd2
Required % of steel, Pt

269893988.xls

6111.39

x 104 /

1000 x

356

=
=

0.48
0.137 (Refer SP16

Page 2

TB-332-607-016
REV-02

400 kV Switchyard at Yeramarus

Table 2)
Required area of steel

( 0.1366752

x 1000 x

356

)/100

486.56 mm2

12 @180 C/C

Providing main reinforcement (at top and bottom)


Area of steel provided
Minimum reinforcement = 0.12% (As per IS 456)

0.12*400*1000/100

628.0 mm2

480 mm2

10 @200 C/C

Providing distribution reinforcement


Area of distribution steel provided

392.5 mm2

125
250

750

400

GL
750

12 @ 140 C/C

1698

600
10 @ 200 C/C
400
12 @ 180 C/C
2900

Detail of Trench Sec 1-1


Design of cable trench cover

250

2900
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2

Total UDL/m

100 kg/m

Self wt. of slab

0.125 /1000x2.9

Total wt. of slab

906.25

2500

906.25 kg/m/m-width

0.25

226.56 kg/m

Total UDL

326.6 kg/m

Span

ly =

2900 mm

lx =

300 mm

ly / lx =

9.67 >2

As per IS 456 Slab shall be design as one way slab


Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*2900/1000)/4+(326.56*(2900/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.5

125 mm
705.80 kg-m

705.80

(1058.7*10^4/0.138*25*250)^0.5

1058.70 kg-m
110.79 mm

Providing, D

125 mm

Effective depth, d

125 - 15-4

106 mm

Reinforcement
Mu/bd2

1058.70

250

x 104 /

106

Required % of steel, Pt

Required area of steel (

1.3462445

250

106

)/100

3.77

1.346 (Refer SP16


Table 1)
356.75 mm2

Providing main reinforcement

8 @150 C/C

Area of steel provided

334.9 mm2

Minimum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Providing atleast 3 nos of steel bars
A
8 @ 200 C/C
250

125
250
8 @ 200 C/C
A

269893988.xls

2900

Section A-A

Page 3

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 1-1 & 1-1


For detail of section Refer drg no. TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

(end of section 1-1 &4-4)

1.770 m

Assuming max. length of trench as 45m with longitudinal slope of 1 : 750


Depth of trench wall due to slope
Max depth of trench Wall(from GL)

45

1.7703333333

750

0.06 m

0.060

1.83 m (MAX.)

Max. Total Height of cable Trench wall

1.955

Surcharge pressure
Soil density

q =
=

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

2000 kg/m2
1800 kg/m3

(refer email dated 26.06.13)

80 kg/m length
of wall( Assumed)

Width of tray

0.75 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)
Active thrust due to Backfill (P2=1/2*Ka**H^2)

2000.00

1.83

0.5*1800*1*1.83^2

Total active thrust (Pa)


3660.67
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

3015.11

6675.77*y=3660.67*1.83/2+3015.11*1.83/3
Bending moment at the base of wall

2000.00 kg/m2

3660.67 kg/m

3015.11 kg/m

6675.8 kg/m

y =

6675.8

0.777

0.777 m

5189.67 kg-m/m

5339.67 kg-m

8009.51 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment
Design moment, Mu1

0.75

)/2x5

5189.67

150.0

1.50

5339.67

150.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water(Assuming 75mm thk trench cover)

1.83

Active thrust due to water

0.5 x

Bending moment at the base of wall

1000 x

1.830 ^2

/3

1675.0600555556

1.830

1.50

1021.97

1.830 m
1675.060 kg/m
1021.97 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

1532.96 kg-m

250
GL

GL

P1
1.830

1830

P2
y

H/3

750
H/2

A
Design moment for wall

8009.5 kg-m

Required thickness of wall


d = (Mu / .138x f ck x b)0.5

8009.51

* 104 / 0.138

*25*1000)^0.5

152.37 mm

Providing, D

450 mm

Effective depth, d

450 -40-5

405 mm

Reinforcement
Mu/bd2

8009.51

x 104 /

1000 x

405

Required % of steel, Pt

=
=

0.49
0.138 (Refer SP16
Table 1)

Required area of steel

269893988.xls

0.138

x 1000 x

405

)/100

560.70 mm2

Page 4

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

12 @160C/C

Providing main reinforcement


Area of steel provided

Minimum reinforcement = 0.12% (As per IS 456)

540.0 mm2
10 @140C/C

Providing distribution reinforcement


Area of distribution steel provided

Check for Uplift

706.5 mm2

560.7 mm2

(for max. depth)


Pressure due to trench (Only Dead Loads) =

2501.39 kg/m2/m

Uplift pressure due to water =

2380.33 kg/m2/m

F.O.S. for Uplift =

(0.9 times the vertical load)

1.051

< 1.2, Fails

Design of bottom slab.


Assuming thickness of slab

450 mm

Width of cable trench

5550 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench


Bearing Pressure check for bottom slab
CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

5.55

0.125 x 2500

Live load on cover slab

1734.375 kg

500.0 kg

Wt of tray+cable

320

x5

1600 kg

Wt of bottom slab

0.45

5.550

x 2500

6243.75 kg

Wt of side walls

0.45

1.955

x 2500 x3

6599.25 kg

Wt of bottom slab projected

0.45

0.40

x 2500 x2

900.00 kg

Wt of soil on projected slab

1.83

0.40

x 1800 x2

2635.68 kg

0.1

6.35

x 2000

1270.00 kg

21483.06 kg

Wt of PCC
Total wt

1734.375+500+1600+6243.8+6599.25+900+2635.68+1270

Pressure at the base of slab

21483.06

6.35

x 1)

Net bearing capacity of soil

=
= <

3383.16 kg/m2
10000 kg/m2
Hence O.K.

Net upward pressure

3383.16

Maximum bending moment at

2258.16

6243.75

/(5.55*1)

5.55

2258.16 kg/m2/m slab


=

/10

6955.69 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

6955.69

Design moment from slab(Ms1)

1.5

=-

5339.7 kg-m

1616.02 kg-m
2424.03 kg-m

5339.7

1616.02

1000

1955 kg

23438.39 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

1.955

Total wt

21483.06

1955

Pressure at the base of slab

23438.39

5.55

x 1)

Net bearing capacity of soil

=
=<

4223.13 kg/m2
10000 kg/m2
Hence O.K.

Net upward pressure

4223.13

Maximum bending moment at

2745.82

6243.75

+1955.33)
5.6

/(5.55*1)

2745.82 kg/m2

/10

8457.81 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab
Design moment for slab(Ms2)

1022.0 kg-m

8457.81

1022.0

9479.79 kg-m

1.5

9479.79

14219.68 kg-m

14219.68 kg-m

Design moment for slab

Required thickness of slab


d = (Mu / .138x f ck x b)0.5

14219.68

x 104 / 0.138 x

25

x 1000).5 =

Providing, D

203.02 mm
450 mm

Effective depth, d

450 - 40-4

406 mm

Reinforcement
Mu/bd2

14219.68

x 104 /

1000 x

406

Required % of steel, Pt

=
=

0.86
0.249 (Refer SP16
Table 2)

Required area of steel

0.2492982807

x 1000 x

Providing main reinforcement (at top and bottom)


Area of steel provided
Minimaum reinforcement = 0.12% (As per IS 456)
Providing distribution reinforcement
Area of distribution steel provided

269893988.xls

406

)/100

1012.15 mm2
16 @220 C/C
=

0.12*450*1000/100

913.5 mm2

540 mm2
10 @140 C/C
=

560.7 mm2

Page 5

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

125

750

250

750

GL
750

12 @ 160C/C

1830

10 @ 140 C/C
450
16 @ 200 C/C

5550

Detail of Trench Sec 1-1 & 1-1

Design of cable trench cover

250

2775
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2

Total UDL/m

100 kg/m

Self wt. of slab

0.125 /1000x2.775

Total wt. of slab

867.1875

2500

867.19 kg/m/m-width

0.25

216.80 kg/m

Total UDL

316.8 kg/m

Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*2775/1000)/4+(316.8*(2775/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x f ck x b)0.5

125 mm
651.82 kg-m

651.82

(977.73*10^4/0.138*25*250)^0.5

977.73 kg-m
106.47 mm

Providing, D

125 mm

Effective depth, d

125 - 15-4

106 mm

Reinforcement
Mu/bd2

977.73

x 104 /

250

106

Required % of steel, Pt

3.48

1.207 (Refer SP16


Table 1)

Required area of steel (

1.2071539876

250

106

)/100

Providing main reinforcement

319.90 mm2
8 @150 C/C

Area of steel provided

334.9 mm2

Minimum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Provide atleast 3 nos of steel bars.
A
8 @ 200 C/C
250

125
250
8 @ 150 C/C
A

269893988.xls

2775

Section A-A

Page 6

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 3-3 & 3-3


For detail of section Refer drg no. TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

1.025 m

Assuming max. length of trench as 12m with longitudinal slope of 1 : 750


Depth of trench wall due to slope
Max depth of trench Wall(from GL)

12

1.025

750

0.016 m

0.016

1.041 m (MAX.)

Max. Total Height of cable Trench wall

1.166

Surcharge pressure

q =

2000 kg/m2

Soil density

1800 kg/m3

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

(refer email dated 26.06.13)

80 kg/m length
of wall( Assumed)

Width of tray

0.75 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)

2000.00

Active thrust due to Backfill (P2=1/2*Ka**H^2)

1.04

0.5*1800*1*1.041^2

Total active thrust (Pa)


2082.00
+
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

975.31

3057.31*y=2082*1.041/2+975.31*1.041/3
Bending moment at the base of wall

3057.3

2000.00 kg/m2

2082.00 kg/m

975.31 kg/m

3057.3 kg/m

y =
0.465

0.465 m

1422.11 kg-m/m

1512.11 kg-m

2268.17 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment

0.75

1422.11

90.0

1.50

1512.11

Design moment, Mu1

)/2x3

90.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water(Assuming 75mm thk trench cover)
Active thrust due to water

1.041
0.5 x

Bending moment at the base of wall

1000 x

1.041 ^2

541.8405

1.041

1.50

188.02

1.041 m

/3

541.841 kg/m

188.02 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

282.03 kg-m
250

GL

GL

P1
1.041

1041

P2
y

H/3

750
H/2

A
Design moment for wall

2268.2 kg-m

( 2268.17 * 104 / 0.138

Required thickness of wall


d = (Mu / .138x fck x b)0.5

*25*1000)^0.5

81.08 mm

Providing, D

375 mm

Effective depth, d

375 -40-5

330 mm

Reinforcement
Mu/bd2

2268.17

x 104 /

1000 x

330

Required % of steel, Pt

=
=

0.21
0.058 (Refer SP16
Table 1)

Required area of steel

269893988.xls

0.058

x 1000 x

330

)/100

192.24 mm2

Page 7

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

12 @300C/C

Providing main reinforcement


Area of steel provided

376.8 mm2

Minimum reinforcement = 0.12% (As per IS 456)

450.0 mm2

10 @250 C/C

Providing distribution reinforcement


Area of distribution steel provided

Check for Uplift

314.0 mm2

(for max. depth)

Pressure due to trench (Only Dead Loads) =

1634.26 kg/m2/m

Uplift pressure due to water =

1541.00 kg/m2/m

F.O.S. for Uplift =

(0.9 times the vertical load)

1.06

< 1.2, Fails

Design of bottom slab.


Assuming thickness of slab

400 mm

Width of cable trench

5325 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench

Bearing Pressure check for bottom slab


CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

2.6625

0.125 x 2500 x 2

Live load on cover slab

1664.0625 kg

500.0 kg

Wt of tray+cable

320

x3

960 kg

Wt of bottom slab

0.4

5.325

x 2500

5325.00 kg

0.375

1.166

x 2500 x3

3279.38 kg

0.1

5.325

x 2000

1065.00 kg

12793.44 kg

Wt of side walls
Wt of PCC
Total wt

1664.0625+500+960+5325+3279.38+1065

Pressure at the base of slab

12793.44

5.33

x 1)

Net bearing capacity of soil

=
= <

2402.52 kg/m2
10000 kg/m2
Hence O.K.

Net upward pressure

2402.52

Maximum bending moment at

1402.52

5325.00

/(5.325*1)

5.33

1402.52 kg/m2/m slab

/10

3976.94 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

3976.94

Design moment from slab(Ms1)

1.5

=-

1512.1 kg-m

2464.83 kg-m
3697.24 kg-m

1512.1

2464.83

1000

1166 kg

13959.44 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

1.166

Total wt

12793.44

1166

Pressure at the base of slab

13959.44

5.325

x 1)

Net bearing capacity of soil

=
=<

2621.49 kg/m2
10000 kg/m2
Hence O.K.

Net upward pressure

2621.49

Maximum bending moment at

1402.52

5325.00

+1166)
5.3

/(5.325*1)

1402.52 kg/m2

/10

3976.94 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

188.0 kg-m

3976.94

188.0

4164.96 kg-m

1.5

4164.96

6247.44 kg-m

6247.44 kg-m

Design moment for slab(Ms2)


Design moment for slab

( 6247.44

Required thickness of slab


d = (Mu / .138x fck x b)0.5

x 104 / 0.138 x

25

x 1000).5 =

Providing, D

134.57 mm
400 mm

Effective depth, d

400 - 40-4

356 mm

Reinforcement
Mu/bd2

6247.44

x 104 /

1000 x

356

Required % of steel, Pt
Required area of steel

=
( 0.1397923

x 1000 x

Area of steel provided


Minimaum reinforcement = 0.12% (As per IS 456)
Area of distribution steel provided

269893988.xls

356

)/100

0.49
0.140 (Refer SP16
Table 2)
497.66 mm2

16 @250 C/C

Providing main reinforcement (at top and bottom)

Providing distribution reinforcement

=
0.12*400*1000/100

803.8 mm2

480 mm2
@250
C/C
10
=

314.0 mm2

Page 8

400 kV Switchyard at Yeramarus

269893988.xls

TB-332-607-016
REV-01

Page 9

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

375
125

750

250

GL
750

12 @ 300 C/C

1041

700
10 @ 250 C/C
400
16 @ 250 C/C

5325

Detail of Trench Sec 3-3 & 3-3

Design of cable trench cover

250

2663
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2

Total UDL/m

100 kg/m

Self wt. of slab

0.125 /1000x2.6625

Total wt. of slab

832.03125

2500

832.03 kg/m/m-width

0.25

208.01 kg/m

Total UDL

308.0 kg/m

Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*2662.5/1000)/4+(308.01*(2662.5/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.5

125 mm
605.74 kg-m

605.74

(908.61*10^4/0.138*25*250)^0.5

908.61 kg-m
102.64 mm

Providing, D

125 mm

Effective depth, d

125 - 15-4

106 mm

Reinforcement
Mu/bd2

908.61

250

x 104 /

106

Required % of steel, Pt

3.23

=
=

1.096 (Refer SP16


Table 1)

Required area of steel (

1.096473

250

106

)/100

290.57 mm2

Providing main reinforcement

8 @150 C/C

Area of steel provided

334.9 mm2

Minimum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Provide atleast 3 nos of steel bars.
A
8 @ 200 C/C
250

125
250
8 @ 150 C/C
A

269893988.xls

2662.5

Section A-A

Page 10

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 1-1 & 4-4


For detail of section Refer drg no. TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

(end of section 1-1)

1.698 m

Assuming max. length of trench as 54m with longitudinal slope of 1 : 750


Depth of trench wall due to slope
Max depth of trench Wall(from GL)

54

1.6983333333

750

0.072 m

0.072

1.770 m (MAX.)

Max. Total Height of cable Trench wall

1.895

Surcharge pressure

q =

2000 kg/m2

Soil density

1800 kg/m3

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

(refer email dated 26.06.13)

80 kg/m length
of wall( Assumed)

Width of tray

0.75 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)

2000.00

Active thrust due to Backfill (P2=1/2*Ka**H^2)

1.77

0.5*1800*1*1.77^2

Total active thrust (Pa)


3540.67
+
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

2820.67

6361.34*y=3540.67*1.77/2+2820.67*1.77/3
Bending moment at the base of wall

6361.3

2000.00 kg/m2

3540.67 kg/m

2820.67 kg/m

6361.3 kg/m

y =

0.754

0.754 m

4798.59 kg-m/m

4948.59 kg-m

7422.89 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment
Design moment, Mu1

0.75

)/2x5

4798.59

150.0

1.50

4948.59

150.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water(Assuming 75mm thk trench cover)

1.77

Active thrust due to water

0.5 x

Bending moment at the base of wall

1000 x

1.770 ^2

1567.0400555556

1.770

1.50

924.73

1.770 m

/3

1567.040 kg/m

924.73 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

1387.09 kg-m

250
GL

GL

P1
1.770

1770

P2
y

H/3

750
H/2

A
Design moment for wall

7422.9 kg-m

Required thickness of wall


d = (Mu / .138x fck x b)0.5

7422.89

* 104 / 0.138

*25*1000)^0.5

146.68 mm

Providing, D

350 mm

Effective depth, d

350 -40-5

305 mm

Reinforcement
Mu/bd2

7422.89

x 104 /

1000 x

305

Required % of steel, Pt

=
=

0.80
0.230 (Refer SP16
Table 1)

Required area of steel

269893988.xls

0.230

x 1000 x

305

)/100

700.95 mm2

Page 10

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

16 @180C/C

Providing main reinforcement


Area of steel provided

1116.4 mm2

Minimum reinforcement = 0.12% (As per IS 456)

420.0 mm2

10 @250 C/C

Providing distribution reinforcement


Area of distribution steel provided

Check for Uplift

314.0 mm2

(for max. depth)

Pressure due to trench (Only Dead Loads) =

2234.00 kg/m2/m

Uplift pressure due to water =

2120.33 kg/m2/m

F.O.S. for Uplift =

(0.9 times the vertical load)

1.05

< 1.2, Fails

Design of bottom slab.


Assuming thickness of slab

350 mm

Width of cable trench

4450 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench

Bearing Pressure check for bottom slab


CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

4.45

0.125 x 2500

Live load on cover slab

2781.25 kg

500.0 kg

Wt of tray+cable

320

x5

1600 kg

Wt of bottom slab

0.35

4.45

x 2500

3893.75 kg

Wt of side walls

0.35

2.370

x 2500 x3

6222.13 kg

Wt of PCC

0.1

4.650

x 2000

930.00 kg

15927.13 kg

Total wt

2781.25+500+1600+3893.8+6222.13+930

Pressure at the base of slab

15927.13

4.45

x 1)

Net bearing capacity of soil

=
= <

3579.13 kg/m2
10000 kg/m2
Hence O.K.

Net upward pressure

3579.13

Maximum bending moment at

2704.13

3893.75

/(4.45*1)

4.45

2704.13 kg/m2/m slab

/10

5354.85 kg-m

=-

4948.6 kg-m

406.26 kg-m
609.39 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

5354.85

Design moment from slab(Ms1)

1.5

4948.6

406.26

1000

2370 kg

2370

18297.46 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

2.370

Total wt

x
15927.13

Pressure at the base of slab

18297.46

4.45

x 1)

Net bearing capacity of soil

=
=<

4111.79 kg/m2
10000 kg/m2
Hence O.K.

Net upward pressure

4111.79

Maximum bending moment at

2704.13

3893.75

4.5

+2370.33)
2

/(4.45*1)

2704.13 kg/m2

/10

5354.85 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab
Design moment for slab(Ms2)

924.7 kg-m

5354.85

924.7

6279.58 kg-m

1.5

6279.58

9419.37 kg-m

9419.37 kg-m

Design moment for slab

Required thickness of slab


d = (Mu / .138x fck x b)0.5

9419.37

x 104 / 0.138 x

25

x 1000).5 =

Providing, D

165.23 mm
350 mm

Effective depth, d

350 - 40-4

306 mm

Reinforcement
Mu/bd2

9419.37

x 104 /

1000 x

306

Required % of steel, Pt

=
=

1.01
0.293 (Refer SP16
Table 2)

Required area of steel

0.292935457

x 1000 x

Area of steel provided


Providing distribution reinforcement
Area of distribution steel provided

269893988.xls

)/100

896.38 mm2

16 @220 C/C

Providing main reinforcement (at top and bottom)


Minimaum reinforcement = 0.12% (As per IS 456)

306

0.12*350*1000/100

913.5 mm2

420 mm2

10 @225 C/C
=

348.9 mm2

Page 11

400 kV Switchyard at Yeramarus

269893988.xls

TB-332-607-016
REV-01

Page 12

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

125

750

250

750

GL
750

16 @ 180 C/C

1770

10 @ 250 C/C
350

1300

2100

350

350
16 @ 220 C/C

4450

Detail of Trench Sec 1-1 & 4-4


Design of cable trench cover
I) COVER SLAB FOR TRENCH SECTION 1-1

250

2625
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2

Total UDL/m

100 kg/m

Self wt. of slab

0.125 /1000x2.625

Total wt. of slab

820.3125

2500

820.31 kg/m/m-width

0.25

205.08 kg/m

Total UDL

305.1 kg/m

Span

ly =

2625 mm

lx =

300 mm

ly / lx =

8.75 >2

As per IS 456 Slab shall be design as one way slab


Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*2625/1000)/4+(305.08*(2625/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.5

125 mm
590.90 kg-m

590.90

(886.35*10^4/0.138*25*250)^0.5

886.35 kg-m
101.37 mm

Providing, D

125 mm

Effective depth, d

125 - 15-4

106 mm

Reinforcement
Mu/bd2

886.35

x 104 /

250

106

Required % of steel, Pt

3.16

1.062 (Refer SP16


Table 1)

Required area of steel (

1.0621603

250

106

)/100

Providing main reinforcement

281.47 mm2
8 @150 C/C

Area of steel provided

334.9 mm2

Minimum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Provide atleast 3 nos of steel bars.
A
8 @ 200 C/C
250

125
250
8 @ 150 C/C
A

269893988.xls

2625

Section A-A

Page 13

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

II) COVER SLAB FOR TRENCH SECTION 4-4

250

1825

Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2

Total UDL/m

100 kg/m

Self wt. of slab

0.125 /1000x2.625

Total wt. of slab

820.640625

2501

820.64 kg/m/m-width

0.25

205.16 kg/m

Total UDL

305.2 kg/m

Span

ly =

2625 mm

lx =

301 mm

ly / lx =

8.72 >3

As per IS 456 Slab shall be design as one way slab


Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*2625/1000)/4+(305.16*(2625/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.6

125 mm
590.97 kg-m

590.97

(886.45*10^4/0.138*25*250)^0.5

886.45 kg-m
101.38 mm

Providing, D

125 mm

Effective depth, d

125 - 15-4

106 mm

Reinforcement
Mu/bd2

886.45

x 104 /

250

106

Required % of steel, Pt

3.16

1.062 (Refer SP17


Table 1)

Required area of steel (

1.0623222

250

106

)/100

281.52 mm2

Providing main reinforcement

8 @150 C/C

Area of steel provided

334.9 mm2

Minimum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Provide atleast 3 nos of steel bars.
A
8 @ 200 C/C
250

125
250
8 @ 150 C/C
A

269893988.xls

1825

Section A-A

Page 14

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 2-2


For detail of section Refer drg no.TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

1.3 m

Assuming max. length of trench as 55 m with longitudinal slope of 1 : 750


Depth of trench wall due to slope

55

Max depth of trench Wall(from GL)

1.3

750

0.073 m

0.073

1.373 m (MAX.)

Max. Total Height of cable Trench wall

1.523

Surcharge pressure

q =

2000 kg/m2

Soil density

1800 kg/m3

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

(refer email dated 26.06.13)

80 kg/m length
of wall( Assumed)

Width of tray

0.75 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)

2000.00

Active thrust due to Backfill (P2=1/2*Ka**H^2)

1.373

0.5*1800*1*1.373^2

Total active thrust (Pa)


2746.67
+
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

1697.44

4444.11*y=2746.67*1.373/2+1697.44*1.373/3
Bending moment at the base of wall

4444.1

2000.00 kg/m2

2746.67 kg/m

1697.44 kg/m

4444.1 kg/m

y =
0.599

0.599 m

2663.09 kg-m/m

2783.09 kg-m

4174.64 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment
Design moment, Mu1

0.75

)/2x4

2663.09

120.0

1.50

2783.09

120.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water(Assuming 100mm thk trench cover)
Active thrust due to water

1.373
0.5 x

Bending moment at the base of wall

1000 x

1.373 ^2

943.02

1.373

1.50

431.69

/3

1.373 m

943.02 kg/m

431.69 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

647.54 kg-m

250
GL

GL

P1
1.373

1373

P2
y

H/3

750
H/2

A
Design moment for wall

4174.6 kg-m

Required thickness of wall


d = (Mu / .138x fck x b)0.5

4174.64

* 104 / 0.138

*25*1000)^0.5

110.00 mm

Providing, D

350 mm

Effective depth, d

350 -40-5

305 mm

Reinforcement
Mu/bd2

4174.64

x 104 /

1000 x

305

Required % of steel, Pt

0.45
=

0.127 (Refer SP16


Table 1)

Required area of steel

269893988.xls

0.127

x 1000 x

305

)/100

387.30 mm2

Page 14

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

12 @275C/C

Providing main reinforcement


Area of steel provided

411.1 mm2

Minimum reinforcement = 0.12% (As per IS 456)

420.0 mm2

10 @175 C/C

Providing distribution reinforcement


Area of distribution steel provided

Check for Uplift

448.6 mm2

(for max. depth)

Pressure due to trench (Only Dead Loads) =

1837.23 kg/m2/m

Uplift pressure due to water =

1723.33 kg/m2/m

F.O.S. for Uplift =

(0.9 times the vertical load)

1.07

< 1.2, Fails

Design of bottom slab.


Assuming thickness of slab

350 mm

Width of cable trench

2800 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench

Bearing Pressure check for bottom slab


CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

2.8

0.1 x 2500

Live load on cover slab

700 kg

500.0 kg

Wt of tray+cable

160

x4

640 kg

Wt of bottom slab

0.35

2.80

x 2500

2450.00 kg

Wt of side walls

0.35

1.523

x 2500 x2

2665.83 kg

Wt of PCC

0.1

3.000

x 2000

600.00 kg

7555.83 kg

Total wt

700+500+640+2450+2665.83+600

Pressure at the base of slab

7555.83

2.80

x 1)

Net bearing capacity of soil

2698.51 kg/m2

= <

10000 kg/m2
Hence O.K.

Net upward pressure

2698.51

Maximum bending moment at

1823.51

2450.00

/(2.8*1)

2.80

1823.51 kg/m2/m slab

/8

1787.04 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

1787.04

Design moment from slab(Ms1)

1.5

=-

2783.1 kg-m

-996.05 kg-m
-1494.08 kg-m

2783.1

-996.05

1000

1523 kg

1523

9079.17 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

1.523

Total wt

x
7555.83

Pressure at the base of slab

9079.17

2.80

x 1)

Net bearing capacity of soil

3242.56 kg/m2

=<

10000 kg/m2
Hence O.K.

Net upward pressure

3242.56

Maximum bending moment at

1823.51

2450.00

+1523.33)
2.8

/(2.8*1)

1823.51 kg/m2

/8

1787.04 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab
Design moment for slab(Ms2)

431.7 kg-m

1787.04

431.7

2218.74 kg-m

1.5

2218.74

3328.10 kg-m

3328.10 kg-m

Design moment for slab

Required thickness of slab


d = (Mu / .138x fck x b)0.5

3328.10

x 104 / 0.138 x

25

x 1000).5 =

Providing, D

98.22 mm
350 mm

Effective depth, d

350 - 40-5

305 mm

Reinforcement
Mu/bd2

3328.10

x 104 /

1000 x

305

Required % of steel, Pt

0.36
=

0.101 (Refer SP16


Table 2)

Required area of steel

0.101

x 1000 x

Area of steel provided


Providing distribution reinforcement
Area of distribution steel provided

269893988.xls

)/100

307.39 mm2

12 @275 C/C

Providing main reinforcement (at top and bottom)


Minimum reinforcement = 0.12% (As per IS 456)

305

0.12*350*1000/100

411.1 mm2

420 mm2

10 @ 175 C/C
=

448.6 mm2

Page 15

400 kV Switchyard at Yeramarus

269893988.xls

TB-332-607-016
REV-01

Page 16

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

100
250

350

GL

750
12 @ 275 C/C
1373

10 @ 175 C/C
350
12 @ 275 C/C

2800

Detail of Trench Sec 2-2

Design of cable trench cover

250

2800
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2 (assumed)

Total UDL/m

100 kg/m

Self wt. of slab

0.1 /1000x2.8

Total wt. of slab

0.70

2500

0.25

0.7 kg/m/m-width
0.175 kg/m

Total UDL

100.2 kg/m

Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*2800/1000)/4+(100.18*(2800/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.5

100 mm
448.17 kg-m

448.17

(672.26*10^4/0.138*25*250)^0.5

672.26 kg-m
88.29 mm

Providing, D

100 mm

Effective depth, d

100 - 15-5

80 mm

Reinforcement
Mu/bd2

672.26

x 104 /

250

80

Required % of steel, Pt

4.20
=

1.580 (Refer SP16


Table 1)

Required area of steel (

1.5804094

250

80

)/100

316.08 mm2

Providing main reinforcement

8 @150 C/C

Area of steel provided

334.9 mm2

Minimum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Provide atleast 3 nos of steel bars.
A
8 @ 200 C/C
250

100
250
8 @ 150 C/C
A

269893988.xls

2800

Section A-A

Page 17

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 3-3


For detail of section 3-3 Refer drg no. TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

1.025 m

Assuming max. length of trench as 10m with longitudinal slope of 1 : 750


Depth of trench wall due to slope
Max depth of trench Wall(from GL)

10

1.025

750

0.013 m

0.013

1.038 m (MAX.)

Max. Total Height of cable Trench wall

1.163

Surcharge pressure

q =

2000 kg/m2

Soil density

1800 kg/m3

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

(refer email dated 26.06.13)

80 kg/m length
of wall( Assumed)

Width of tray

0.75 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)

2000.00

Active thrust due to Backfill (P2=1/2**H^2)

1.04

0.5*1800*1*1.038^2

Total active thrust (Pa)


2076.67
+
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

970.32

3046.99*y=2076.67*1.038/2+970.32*1.038/3
Bending moment at the base of wall

3047.0

2000.00 kg/m2

2076.67 kg/m

970.32 kg/m

3047.0 kg/m

y =

0.464

0.464 m

1413.98 kg-m/m

1503.98 kg-m

2255.96 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment
Design moment, Mu1

0.75

)/2x3

1413.98

90.0

1.50

1503.98

90.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water(Assuming 100mm thk trench cover)

1.038

Active thrust due to water

0.5 x

Bending moment at the base of wall

1000 x

1.038 ^2

539.07

1.038

1.50

186.58

/3

1.038 m

539.07 kg/m

186.58 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

279.87 kg-m

250
GL

GL

P1
1.038

1038

P2
y

H/3

750
H/2

A
Design moment for wall

2256.0 kg-m

Required thickness of wall


d = (Mu / .138x fck x b)0.5

2255.96

* 104 / 0.138

*25*1000)^0.5

80.86 mm

Providing, D

300 mm

Effective depth, d

300 -40-5

255 mm

Reinforcement
Mu/bd2

2255.96

x 104 /

1000 x

255

Required % of steel, Pt

0.35
=

0.098 (Refer SP16


Table 1)

Required area of steel

269893988.xls

0.098

x 1000 x

255

)/100

249.09 mm2

Page 17

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

12 @250C/C

Providing main reinforcement


Area of steel provided

452.2 mm2

Minimum reinforcement = 0.12% (As per IS 456)

360.0 mm2

10 @225 C/C

Providing distribution reinforcement


Area of distribution steel provided

Check for Uplift

348.9 mm2

(for max. depth)

Pressure due to trench (Only Dead Loads) =

1450.00 kg/m2/m

Uplift pressure due to water =

1338.33 kg/m2/m

F.O.S. for Uplift =

(0.9 times the vertical load)

1.08

< 1.2, Fails

Design of bottom slab.


Assuming thickness of slab

300 mm

Width of cable trench

2700 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench

Bearing Pressure check for bottom slab


CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

2.7

0.125 x 2500

Live load on cover slab

843.75 kg

500.0 kg

Wt of tray+cable

160

x3

480 kg

Wt of bottom slab

0.3

2.70

x 2500

2025.00 kg

Wt of side walls

0.3

1.163

x 2500 x2

1745.00 kg

Wt of PCC

0.1

2.900

x 2000

580.00 kg

6173.75 kg

Total wt

843.75+500+480+2025+1745+580

Pressure at the base of slab

6173.75

2.70

x 1)

Net bearing capacity of soil

2286.57 kg/m2
= <

12000 kg/m2
Hence O.K.

Net upward pressure

2286.57

Maximum bending moment at

1536.57

2025.00

/(2.7*1)
2.70

1536.57 kg/m2/m slab

/8

1400.20 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

1400.20

Design moment from slab(Ms1)

1.5

1504.0

=-

1504.0 kg-m

-103.77 kg-m
-155.66 kg-m

-103.77

1000

1163 kg

1163

7337.08 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

1.163

Total wt

x
6173.75

Pressure at the base of slab

7337.08

2.7

x 1)

Net bearing capacity of soil

2717.44 kg/m2
=<

12000 kg/m2
Hence O.K.

Net upward pressure

2717.44

Maximum bending moment at

1536.57

2025.00

+1163.33)
2.7

/(2.7*1)

1536.57 kg/m2

/8

1400.20 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab
Design moment for slab(Ms2)

186.6 kg-m

1400.20

186.6

1586.78 kg-m

1.5

1586.78

2380.17 kg-m

2380.17 kg-m

Design moment for slab

Required thickness of slab


d = (Mu / .138x fck x b)0.5

2380.17

x 104 / 0.138 x

25

x 1000).5 =

83.06 mm

Providing, D

300 mm

Effective depth, d

300 - 40-5

255 mm

Reinforcement
Mu/bd2

2380.17

x 104 /

1000 x

255

Required % of steel, Pt
Required area of steel

0.103

x 1000 x

Area of steel provided


Minimum reinforcement = 0.12% (As per IS 456)
Area of distribution steel provided

269893988.xls

255

)/100

0.103 (Refer SP16


Table 2)
263.05 mm2

12 @250 C/C

Providing main reinforcement (at top and bottom)

Providing distribution reinforcement

0.37
=

0.12*300*1000/100

452.2 mm2

360 mm2

10 @225 C/C
=

348.9 mm2

Page 18

400 kV Switchyard at Yeramarus

269893988.xls

TB-332-607-016
REV-01

Page 19

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

125
250

300

750

GL
12 @ 250 C/C
1038

750
10 @ 225 C/C
300
12 @ 250 C/C

2700

Detail of Trench Sec 3-3

Design of cable trench cover

250

2700
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2(assumed)

Total UDL/m

100 kg/m

Self wt. of slab

0.125 /1000x2.7

Total wt. of slab

843.75

2500

0.25

843.75 kg/m/m-width
210.9375 kg/m

Total UDL

310.9 kg/m

Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*2700/1000)/4+(310.9375*(2700/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.5

125 mm
620.84 kg-m

620.84

(931.26*10^4/0.138*25*250)^0.5

931.26 kg-m
103.91 mm

Providing, D

125 mm

Effective depth, d

125 - 15-4

106 mm

Reinforcement
Mu/bd2

931.26

x 104 /

250

106

Required % of steel, Pt

3.32
=

1.132 (Refer SP16


Table 1)

Required area of steel (

1.132022

250

106

)/100

Providing main reinforcement

299.99 mm2
@
150
C/C
8

Area of steel provided

334.9 mm2

Minimum reinforcement = 0.12% (As per IS 456)

150 mm2

Providing distribution reinforcement

8 @ 200 C/C
=

251.2 mm2

A
8 @ 200 C/C
250

125
250
8 @ 150 C/C
A

269893988.xls

2700

Section A-A

Page 20

400 kV Switchyard at Yeramarus

269893988.xls

TB-332-607-016
REV-01

Page 21

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 5-5


For detail of section Refer drg no.TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

1.3 m

Assuming max. length of trench as 85m with longitudinal slope of 1 : 750


Depth of trench wall due to slope

85

Max depth of trench Wall(from GL)

1.3

750

0.113 m

0.113

1.413 m (MAX.)

Max. Total Height of cable Trench wall

1.563

Surcharge pressure

q =

2000 kg/m2

Soil density

1800 kg/m3

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

(refer email dated 26.06.13)

80 kg/m length
of wall( Assumed)

Width of tray

0.75 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)

2000.00

Active thrust due to Backfill (P2=1/2*Ka**H^2)

1.413

0.5*1800*1*1.413^2

Total active thrust (Pa)


2826.67
+
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

1797.76

4624.43*y=2826.67*1.413/2+1797.76*1.413/3
Bending moment at the base of wall

4624.4

2000.00 kg/m2

2826.67 kg/m

1797.76 kg/m

4624.4 kg/m

y =
0.615

0.615 m

2844.46 kg-m/m

2964.46 kg-m

4446.68 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment
Design moment, Mu1

0.75

)/2x4

2844.46

120.0

1.50

2964.46

120.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water(Assuming 100mm thk trench cover)
Active thrust due to water

1.413
0.5 x

Bending moment at the base of wall

1000 x

1.413 ^2

998.76

1.413

1.50

470.52

/3

1.413 m

998.76 kg/m

470.52 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

705.79 kg-m

250
GL

GL

P1
1.413

1413

P2
y

H/3

750
H/2

A
Design moment for wall

4446.7 kg-m

Required thickness of wall


d = (Mu / .138x fck x b)0.5

4446.68

* 104 / 0.138

*25*1000)^0.5

113.53 mm

Providing, D

275 mm

Effective depth, d

275 -40-5

230 mm

Reinforcement
Mu/bd2

4446.68

x 104 /

1000 x

230

Required % of steel, Pt

0.84
=

0.243 (Refer SP16


Table 1)

Required area of steel

269893988.xls

0.243

x 1000 x

230

)/100

558.07 mm2

Page 20

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

12 @200C/C

Providing main reinforcement


Area of steel provided

565.2 mm2

Minimum reinforcement = 0.12% (As per IS 456)

330.0 mm2

10 @200 C/C

Providing distribution reinforcement


Area of distribution steel provided

Check for Uplift

392.5 mm2

(for max. depth)

Pressure due to trench (Only Dead Loads) =

1863.95 kg/m2/m

Uplift pressure due to water =

1688.33 kg/m2/m

F.O.S. for Uplift =

(0.9 times the vertical load)

1.10

< 1.2, Fails

Design of bottom slab.


Assuming thickness of slab

275 mm

Width of cable trench

1850 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench

Bearing Pressure check for bottom slab


CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

1.85

0.1 x 2500

Live load on cover slab

462.5 kg

500.0 kg

Wt of tray+cable

80

x4

320 kg

Wt of bottom slab

0.275

1.85

x 2500

1271.88 kg

Wt of side walls

0.275

1.563

x 2500 x2

2149.58 kg

0.1

2.050

x 2000

410.00 kg

5113.96 kg

Wt of PCC
Total wt

462.5+500+320+1271.9+2149.58+410

Pressure at the base of slab

5113.96

1.85

x 1)

Net bearing capacity of soil

2764.30 kg/m2

= <

10000 kg/m2
Hence O.K.

Net upward pressure

2764.30

Maximum bending moment at

2076.80

1271.88

/(1.85*1)

1.85

2076.80 kg/m2/m slab

/8

888.48 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

888.48

Design moment from slab(Ms1)

1.5

=-

2964.5 kg-m

-2075.97 kg-m
-3113.96 kg-m

2964.5

-2075.97

1000

1563 kg

1563

6677.29 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

1.563

Total wt

x
5113.96

Pressure at the base of slab

6677.29

1.85

x 1)

Net bearing capacity of soil

3609.35 kg/m2

=<

10000 kg/m2
Hence O.K.

Net upward pressure

3609.35

Maximum bending moment at

2076.80

1271.88

+1563.33)
1.9

/(1.85*1)

2076.80 kg/m2

/8

888.48 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab
Design moment for slab(Ms2)

470.5 kg-m

888.48

470.5

1359.01 kg-m

1.5

1359.01

2038.51 kg-m

2038.51 kg-m

Design moment for slab

Required thickness of slab


d = (Mu / .138x fck x b)0.5

2038.51

x 104 / 0.138 x

25

x 1000).5 =

Providing, D

76.87 mm
275 mm

Effective depth, d

275 - 40-5

230 mm

Reinforcement
Mu/bd2

2038.51

x 104 /

1000 x

230

Required % of steel, Pt
Required area of steel

0.109

x 1000 x

Area of steel provided


Minimum reinforcement = 0.12% (As per IS 456)
Area of distribution steel provided

269893988.xls

230

)/100

0.109 (Refer SP16


Table 2)
250.01 mm2

10 @225 C/C

Providing main reinforcement (at top and bottom)

Providing distribution reinforcement

0.39
=

0.12*275*1000/100

348.9 mm2

330 mm2

10 @ 225 C/C
=

348.9 mm2

Page 21

400 kV Switchyard at Yeramarus

269893988.xls

TB-332-607-016
REV-01

Page 22

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

100
250

275

GL

750
12 @ 200 C/C
1413

10 @ 200 C/C
275
10 @ 225 C/C

1850

Detail of Trench Sec 5-5

Design of cable trench cover

250

1850
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2 (assumed)

Total UDL/m

100 kg/m

Self wt. of slab

0.1 /1000x1.85

Total wt. of slab

0.46

2500

0.25

0.5 kg/m/m-width
0.116 kg/m

Total UDL

100.1 kg/m

Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*1850/1000)/4+(100.12*(1850/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.5

100 mm
274.08 kg-m

274.08

(411.12*10^4/0.138*25*250)^0.5

411.12 kg-m
69.04 mm

Providing, D

100 mm

Effective depth, d

100 - 15-5

80 mm

Reinforcement
Mu/bd2

411.12

x 104 /

250

80

Required % of steel, Pt

2.57
=

0.825 (Refer SP16


Table 1)

Required area of steel (

0.8253102

250

80

)/100

165.06 mm2

Providing main reinforcement

8 @ 200 C/C

Area of steel provided

251.2 mm2

Minimaum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Provide atleast 3 nos of steel bars.
A
8 @ 200 C/C
250

100
250
8 @ 200 C/C
A

269893988.xls

1850

Section A-A

Page 23

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 6-6


For detail of section Refer drg no.TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

1 m

Assuming max. length of trench as 45m with longitudinal slope of 1 : 750


Depth of trench wall due to slope
Max depth of trench Wall(from GL)

45

750

0.060 m

0.060

1.060 m (MAX.)

Max. Total Height of cable Trench wall

1.210

Surcharge pressure

q =

2000 kg/m2

Soil density

1800 kg/m3

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

(refer email dated 26.06.13)

80 kg/m length
of wall( Assumed)

Width of tray

0.75 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)

2000.00

Active thrust due to Backfill (P2=1/2*Ka**H^2)

1.060

0.5*1800*1*1.06^2

Total active thrust (Pa)


2120.00
+
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

1011.24

3131.24*y=2120*1.06/2+1011.24*1.06/3
Bending moment at the base of wall

3131.2

2000.00 kg/m2

2120.00 kg/m

1011.24 kg/m

3131.2 kg/m

y =

0.473

0.473 m

1480.90 kg-m/m

1570.90 kg-m

2356.36 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment
Design moment, Mu1

0.75

)/2x3

1480.90

90.0

1.50

1570.90

90.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water(Assuming 100mm thk trench cover)
Active thrust due to water

1.06
0.5 x

Bending moment at the base of wall

1000 x

1.060 ^2

561.80

1.060

1.50

198.50

/3

1.060 m

561.80 kg/m

198.50 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

297.75 kg-m

250
GL

GL

P1
1.060

1060

P2
y

H/3

750
H/2

A
Design moment for wall

2356.4 kg-m

Required thickness of wall


d = (Mu / .138x fck x b)0.5

2356.36

* 104 / 0.138

*25*1000)^0.5

82.64 mm

Providing, D

225 mm

Effective depth, d

225 -40-5

180 mm

Reinforcement
Mu/bd2

2356.36

x 104 /

1000 x

180

Required % of steel, Pt

0.73
=

0.209 (Refer SP16


Table 1)

Required area of steel

269893988.xls

0.209

x 1000 x

180

)/100

375.66 mm2

Page 23

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

12 @250C/C

Providing main reinforcement


Area of steel provided

452.2 mm2

Minimum reinforcement = 0.12% (As per IS 456)

270.0 mm2

Providing distribution reinforcement

8 @175 C/C

Area of distribution steel provided

Check for Uplift

287.1 mm2

(for max. depth)

Pressure due to trench (Only Dead Loads) =

1406.89 kg/m2/m

Uplift pressure due to water =

1285.00 kg/m2/m

F.O.S. for Uplift =

(0.9 times the vertical load)

1.09

< 1.2, Fails

Design of bottom slab.


Assuming thickness of slab

225 mm

Width of cable trench

1750 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench

Bearing Pressure check for bottom slab


CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

1.75

0.1 x 2500

Live load on cover slab

437.5 kg

500.0 kg

Wt of tray+cable

80

x3

240 kg

Wt of bottom slab

0.225

1.75

x 2500

984.38 kg

Wt of side walls

0.225

1.210

x 2500 x2

1361.25 kg

0.1

1.950

x 2000

390.00 kg

3913.13 kg

Wt of PCC
Total wt

437.5+500+240+984.4+1361.25+390

Pressure at the base of slab

3913.13

1.75

x 1)

Net bearing capacity of soil

2236.07 kg/m2

= <

10000 kg/m2
Hence O.K.

Net upward pressure

2236.07

Maximum bending moment at

1673.57

984.38

/(1.75*1)
1.75

1673.57 kg/m2/m slab

/8

640.66 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

640.66

Design moment from slab(Ms1)

1.5

=-

1570.9 kg-m

-930.24 kg-m
-1395.36 kg-m

1570.9

-930.24

1000

1210 kg

1210

5123.13 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

1.210

Total wt

x
3913.13

Pressure at the base of slab

5123.13

1.75

x 1)

Net bearing capacity of soil

2927.50 kg/m2

=<

10000 kg/m2
Hence O.K.

Net upward pressure

2927.50

Maximum bending moment at

1673.57

984.38

+1210)
1.8

/(1.75*1)

1673.57 kg/m2

/8

640.66 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab
Design moment for slab(Ms2)

198.5 kg-m

640.66

198.5

839.17 kg-m

1.5

839.17

1258.75 kg-m

1258.75 kg-m

Design moment for slab

Required thickness of slab


d = (Mu / .138x fck x b)0.5

1258.75

x 104 / 0.138 x

25

x 1000).5 =

Providing, D

60.40 mm
225 mm

Effective depth, d

225 - 40-5

180 mm

Reinforcement
Mu/bd2

1258.75

x 104 /

1000 x

180

Required % of steel, Pt

0.39
=

0.110 (Refer SP16


Table 2)

Required area of steel

0.110

x 1000 x

Area of steel provided


Providing distribution reinforcement

269893988.xls

)/100

197.29 mm2

10 @250 C/C

Providing main reinforcement (at top and bottom)


Minimum reinforcement = 0.12% (As per IS 456)

180

=
0.12*225*1000/100

314.0 mm2

270 mm2
10 @ 250 C/C

Page 24

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

Area of distribution steel provided

269893988.xls

314.0 mm2

Page 25

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

100
250

225

GL

750
12 @ 250 C/C
1060

8 @ 175 C/C
225
10 @ 250 C/C

1750

Detail of Trench Sec 6-6

Design of cable trench cover

250

1750
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2 (assumed)

Total UDL/m

100 kg/m

Self wt. of slab

0.1 /1000x1.75

Total wt. of slab

0.44

2500

0.25

0.4 kg/m/m-width
0.109 kg/m

Total UDL

100.1 kg/m

Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*1750/1000)/4+(100.11*(1750/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.5

100 mm
257.07 kg-m

257.07

(385.61*10^4/0.138*25*250)^0.5

385.61 kg-m
66.86 mm

Providing, D

100 mm

Effective depth, d

100 - 15-5

80 mm

Reinforcement
Mu/bd2

385.61

x 104 /

250

80

Required % of steel, Pt

2.41
=

0.765 (Refer SP16


Table 1)

Required area of steel (

0.765198

250

80

)/100

153.04 mm2

Providing main reinforcement

8 @ 200 C/C

Area of steel provided

251.2 mm2

Minimaum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Provide atleast 3 nos of steel bars.
A
8 @ 200 C/C
250

100
250
8 @ 200 C/C
A

269893988.xls

1750

Section A-A

Page 26

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 7-7


For detail of section 1-1 Refer drg no.TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

0.675 m

Assuming max. length of trench as 130m with longitudinal slope of 1 : 750


Depth of trench wall due to slope
Max depth of trench Wall(from GL)

130

0.675

750

0.173 m

0.173

0.848 m (MAX.)

Max. Total Height of cable Trench wall

1.023

Surcharge pressure

q =

2000 kg/m2

Soil density

1800 kg/m3

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

(refer email dated 26.06.13)

80 kg/m length
of wall( Assumed)

Width of tray

0.75 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)

2000.00

Active thrust due to Backfill (P2=1/2*Ka**H^2)

0.848

0.5*1800*1*0.848^2

Total active thrust (Pa)


1696.67
+
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

647.70

2344.37*y=1696.67*0.848/2+647.7*0.848/3
Bending moment at the base of wall

2344.4

2000.00 kg/m2

1696.67 kg/m

647.70 kg/m

2344.4 kg/m

y =

0.385

0.385 m

902.83 kg-m/m

962.83 kg-m

1444.24 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment
Design moment, Mu1

0.75

902.83

60.0

1.50

962.83

)/2x2

60.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water(Assuming 100mm thk trench cover)

0.848

Active thrust due to water

0.5 x

Bending moment at the base of wall

1000 x

0.848 ^2

359.83

0.848

1.50

101.75

/3

0.848 m

359.83 kg/m

101.75 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

152.63 kg-m

250
GL

GL

P1
0.848

848

P2
y

H/3

750
H/2

A
Design moment for wall

1444.2 kg-m

Required thickness of wall


d = (Mu / .138x fck x b)0.5

1444.24

* 104 / 0.138

*25*1000)^0.5

64.70 mm

Providing, D

150 mm

Effective depth, d

150 -40-5

105 mm

Reinforcement
Mu/bd2

1444.24

x 104 /

1000 x

105

Required % of steel, Pt

1.31
=

0.388 (Refer SP16


Table 1)

Required area of steel

269893988.xls

0.388

x 1000 x

105

)/100

407.32 mm2

Page 26

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

12 @225C/C

Providing main reinforcement


Area of steel provided

502.4 mm2

Minimum reinforcement = 0.12% (As per IS 456)

180.0 mm2

Providing distribution reinforcement

8 @225 C/C

Area of distribution steel provided

Check for Uplift

223.3 mm2

(for max. depth)

Pressure due to trench (Only Dead Loads) =

1178.18 kg/m2/m

Uplift pressure due to water =

998.33 kg/m2/m

F.O.S. for Uplift =

(0.9 times the vertical load)

1.18

< 1.2, Fails

Design of bottom slab.


Assuming thickness of slab

150 mm

Width of cable trench

1100 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench

Bearing Pressure check for bottom slab


CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

1.1

0.075 x 2500

Live load on cover slab

206.25 kg

500.0 kg

Wt of tray+cable

80

x2

160 kg

Wt of bottom slab

0.15

1.10

x 2500

412.50 kg

Wt of side walls

0.15

1.023

x 2500 x2

767.50 kg

Wt of PCC

0.1

1.300

x 2000

260.00 kg

2306.25 kg

Total wt

206.25+500+160+412.5+767.5+260

Pressure at the base of slab

2306.25

1.10

x 1)

Net bearing capacity of soil

2096.59 kg/m2

= <

10000 kg/m2
Hence O.K.

Net upward pressure

2096.59

Maximum bending moment at

1721.59

412.50

/(1.1*1)
1.10

1721.59 kg/m2/m slab

/8

260.39 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

260.39

Design moment from slab(Ms1)

1.5

=-

962.8 kg-m

-702.43 kg-m
-1053.65 kg-m

962.8

-702.43

1000

1023 kg

1023

3329.58 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

1.023

Total wt

x
2306.25

Pressure at the base of slab

3329.58

1.10

x 1)

Net bearing capacity of soil

3026.89 kg/m2

=<

10000 kg/m2
Hence O.K.

Net upward pressure

3026.89

Maximum bending moment at

1721.59

412.50

+1023.33)
1.1

/(1.1*1)

1721.59 kg/m2

/8

260.39 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab
Design moment for slab(Ms2)

101.8 kg-m

260.39

101.8

362.14 kg-m

1.5

362.14

543.22 kg-m

543.22 kg-m

Design moment for slab

Required thickness of slab


d = (Mu / .138x fck x b)0.5

543.22

x 104 / 0.138 x

25

x 1000).5 =

Providing, D

39.68 mm
150 mm

Effective depth, d

150 - 40-5

105 mm

Reinforcement
Mu/bd2

543.22

x 104 /

1000 x

105

0.49

Required % of steel, Pt

0.140 (Refer SP16


Table 2)

Required area of steel

0.140

x 1000 x

105

)/100

146.71 mm2

Providing main reinforcement (at top and bottom)

8 @225 C/C

Area of steel provided

223.3 mm2

180 mm2

Minimum reinforcement = 0.12% (As per IS 456)


Providing distribution reinforcement

269893988.xls

0.12*150*1000/100

8 @ 225 C/C

Page 27

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

Area of distribution steel provided

269893988.xls

223.3 mm2

Page 28

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

75
250

150

GL
750
12 @ 225 C/C
848

8 @ 225 C/C
150
8 @ 225 C/C

1100

Detail of Trench Sec 7-7

Design of cable trench cover

250

1100
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2 (assumed)

Total UDL/m

100 kg/m

Self wt. of slab

0.075 /1000x1.1

Total wt. of slab

0.21

2500

0.25

0.2 kg/m/m-width
0.052 kg/m

Total UDL

100.1 kg/m

Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*1100/1000)/4+(100.05*(1100/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.5

75 mm
152.63 kg-m

152.63

(228.95*10^4/0.138*25*250)^0.5

228.95 kg-m
51.52 mm

Providing, D

75 mm

Effective depth, d

75 - 15-5

55 mm

Reinforcement
Mu/bd2

228.95

x 104 /

250

55

Required % of steel, Pt

3.03
=

1.008 (Refer SP16


Table 1)

Required area of steel (

1.0080247

250

55

)/100

138.60 mm2

Providing main reinforcement

8 @ 200 C/C

Area of steel provided

334.9 mm2

Minimaum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Provide atleast 3 nos of steel bars.
A
8 @ 200 C/C
250

75
250
8 @ 200 C/C
A

269893988.xls

1100

Section A-A

Page 29

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 8-8


For detail of section 1-1 Refer drg no.TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

0.675 m

Assuming max. length of trench as 130m with longitudinal slope of 1 : 750


Depth of trench wall due to slope
Max depth of trench Wall(from GL)

130

0.675

750

0.173 m

0.173

0.848 m (MAX.)

Max. Total Height of cable Trench wall

1.023

Surcharge pressure

q =

2000 kg/m2

Soil density

1800 kg/m3

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

(refer email dated 26.06.13)

80 kg/m length
of wall( Assumed)

Width of tray

0.65 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)

2000.00

Active thrust due to Backfill (P2=1/2*Ka**H^2)

0.848

0.5*1800*1*0.848^2

Total active thrust (Pa)


1696.67
+
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

647.70

2344.37*y=1696.67*0.848/2+647.7*0.848/3
Bending moment at the base of wall

2344.4

2000.00 kg/m2

1696.67 kg/m

647.70 kg/m

2344.4 kg/m

y =

0.385

0.385 m

902.83 kg-m/m

954.83 kg-m

1432.24 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment
Design moment, Mu1

0.65

902.83

52.0

1.50

954.83

)/2x2

52.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water(Assuming 100mm thk trench cover)
Active thrust due to water

0.848
0.5 x

Bending moment at the base of wall

1000 x

0.848 ^2

359.83

0.848

1.50

101.75

/3

0.848 m

359.83 kg/m

101.75 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

152.63 kg-m

250
GL

GL

P1
0.848

848

P2
y

H/3

650
H/2

A
Design moment for wall

1432.2 kg-m

Required thickness of wall


d = (Mu / .138x fck x b)0.5

1432.24

* 104 / 0.138

*25*1000)^0.5

64.43 mm

Providing, D

150 mm

Effective depth, d

150 -40-5

105 mm

Reinforcement
Mu/bd2

1432.24

x 104 /

1000 x

105

Required % of steel, Pt

1.30
=

0.384 (Refer SP16


Table 1)

Required area of steel

269893988.xls

0.384

x 1000 x

105

)/100

403.69 mm2

Page 29

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

10 @150C/C

Providing main reinforcement


Area of steel provided

523.3 mm2

Minimum reinforcement = 0.12% (As per IS 456)

180.0 mm2

Providing distribution reinforcement

8 @200 C/C

Area of distribution steel provided

Check for Uplift

251.2 mm2

(for max. depth)

Pressure due to trench (Only Dead Loads) =

1282.50 kg/m2/m

Uplift pressure due to water =

998.33 kg/m2/m

F.O.S. for Uplift =

1.28

(0.9 times the vertical load)


> 1.2 Ok

Design of bottom slab.


Assuming thickness of slab

150 mm

Width of cable trench

950 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench

Bearing Pressure check for bottom slab


CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

0.95

0.075 x 2500

Live load on cover slab

178.125 kg

500.0 kg

Wt of tray+cable

80

x2

160 kg

Wt of bottom slab

0.15

0.95

x 2500

356.25 kg

Wt of side walls

0.15

1.023

x 2500 x2

767.50 kg

Wt of PCC

0.1

1.150

x 2000

230.00 kg

2191.88 kg

Total wt

178.125+500+160+356.3+767.5+230

Pressure at the base of slab

2191.88

0.95

x 1)

Net bearing capacity of soil

2307.24 kg/m2

= <

12000 kg/m2
Hence O.K.

Net upward pressure

2307.24

Maximum bending moment at

1932.24

356.25

/(0.95*1)
0.95

1932.24 kg/m2/m slab

/8

217.98 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

217.98

Design moment from slab(Ms1)

1.5

=-

954.8 kg-m

-736.84 kg-m
-1105.27 kg-m

954.8

-736.84

1000

1023 kg

1023

3215.21 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

1.023

Total wt

x
2191.88

Pressure at the base of slab

3215.21

0.95

x 1)

Net bearing capacity of soil

3384.43 kg/m2

=<

12000 kg/m2
Hence O.K.

Net upward pressure

3384.43

Maximum bending moment at

1932.24

356.25

+1023.33)
1.0

/(0.95*1)

1932.24 kg/m2

/8

217.98 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab
Design moment for slab(Ms2)

101.8 kg-m

217.98

101.8

319.73 kg-m

1.5

319.73

479.60 kg-m

479.60 kg-m

Design moment for slab

Required thickness of slab


d = (Mu / .138x fck x b)0.5

479.60

x 104 / 0.138 x

25

x 1000).5 =

Providing, D

37.28 mm
150 mm

Effective depth, d

150 - 40-5

105 mm

Reinforcement
Mu/bd2

479.60

x 104 /

1000 x

105

Required % of steel, Pt

0.44
=

0.123 (Refer SP16


Table 2)

Required area of steel

0.123

x 1000 x

105

)/100

129.16 mm2

Providing main reinforcement (at top and bottom)

8 @250 C/C

Area of steel provided

201.0 mm2

180 mm2

Minimum reinforcement = 0.12% (As per IS 456)


Providing distribution reinforcement

269893988.xls

0.12*150*1000/100

8 @ 250 C/C

Page 30

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

Area of distribution steel provided

269893988.xls

201.0 mm2

Page 31

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

75
250

150

GL
10 @ 150 C/C
848

650

8 @ 200 C/C
150
8 @ 250 C/C

950

Detail of Trench Sec 8-8

Design of cable trench cover

250

950
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2 (assumed)

Total UDL/m

100 kg/m

Self wt. of slab

0.075 /1000x0.95

Total wt. of slab

0.18

2500

0.25

0.2 kg/m/m-width
0.045 kg/m

Total UDL

100.0 kg/m

Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*950/1000)/4+(100.04*(950/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.5

75 mm
130.04 kg-m

130.04

(195.05*10^4/0.138*25*250)^0.5

195.05 kg-m
47.56 mm

Providing, D

75 mm

Effective depth, d

75 - 15-5

55 mm

Reinforcement
Mu/bd2

195.05

x 104 /

250

55

Required % of steel, Pt

2.58
=

0.829 (Refer SP16


Table 1)

Required area of steel (

0.8290306

250

55

)/100

113.99 mm2

Providing main reinforcement

8 @ 200 C/C

Area of steel provided

334.9 mm2

Minimum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Provide atleast 3 nos of steel bars.
A
8 @ 250 C/C
250

75
250
8 @ 200 C/C
A

269893988.xls

950

Section A-A

Page 32

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

DESIGN OF CABLE TRENCH SECTION 9-9


For detail of section Refer drg no.TB 0 332 316 004
Design of cable trench wall
Min depth of trench wall below ground level

0.375 m

Assuming max. length of trench as 210m with longitudinal slope of 1 : 750


Depth of trench wall due to slope
Max depth of trench Wall(from GL)

210

0.375

750

0.280 m

0.280

0.655 m (MAX.)

Surcharge pressure

q =

2000 kg/m2

Soil density

1800 kg/m3

Angle of internal friction

1.000

Coefficient of internal friction

Ka = (1-sin0)/(1+sin0)

Weight of tray+cable +connector(w1)

(refer email dated 26.06.13)

80 kg/m length
of wall( Assumed)

Width of tray

0.65 m

No. of trays

CASE-I : When no water in the trench and soil outside the wall
Lateral stress over the wall due to uniform surcharge pressure( Ka x q)
Total active thrust due to surcharge(P1)

2000.00

Active thrust due to Backfill (P2=1/2*Ka**H^2)

0.655

0.5*1800*1*0.655^2

Total active thrust (Pa)


1310.00
+
Pa acts at a distance 'y' above A and acts horizontally. Taking moment about A

386.12

1696.12*y=1310*0.655/2+386.12*0.655/3
Bending moment at the base of wall

1696.1

2000.00 kg/m2

1310.00 kg/m

386.12 kg/m

1696.1 kg/m

y =

0.303

0.303 m

513.33 kg-m/m

539.33 kg-m

808.99 kg-m

( Considering 1m length of wall)


Moment from tray (Connected from wall)

80

Total moment
Design moment, Mu1

0.65

513.33

26.0

1.50

539.33

)/2x1

26.00 kg-m

Concrete grade

M 25

CASE-II : When water in the trench and no soil outside the wall
Depth of water(Assuming 100mm thk trench cover)
Active thrust due to water

0.655
0.5 x

Bending moment at the base of wall

1000 x

0.655 ^2

214.51

0.655

1.50

46.84

0.655 m

/3

214.51 kg/m

46.84 kg-m/m

( Considering 1m length of wall)


Design moment, Mu2

70.25 kg-m

250
GL

GL

P1
0.655

655

P2
y

H/3

650
H/2

A
Design moment for wall

809.0 kg-m

Required thickness of wall


d = (Mu / .138x fck x b)0.5

808.99

* 104 / 0.138

*25*1000)^0.5

48.42 mm

Providing, D

150 mm

Effective depth, d

150 -40-5

105 mm

Reinforcement
Mu/bd2

808.99

x 104 /

1000 x

105

Required % of steel, Pt

0.73
=

0.211 (Refer SP16


Table 1)

Required area of steel

269893988.xls

0.211

x 1000 x

105

)/100

221.17 mm2

Page 32

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

12 @225C/C

Providing main reinforcement


Area of steel provided

502.4 mm2

Minimum reinforcement = 0.12% (As per IS 456)

180.0 mm2

Providing distribution reinforcement

8 @225 C/C

Area of distribution steel provided

Check for Uplift

223.3 mm2

(for max. depth)

Pressure due to trench (Only Dead Loads) =

1145.13 kg/m2/m

Uplift pressure due to water =

805.00 kg/m2/m

F.O.S. for Uplift =

1.42

(0.9 times the vertical load)


> 1.2 Ok

Design of bottom slab.


Assuming thickness of slab

150 mm

Width of cable trench

950 mm

Grade of concrete

M 25

Assuming Load per 'm' of cable trench

Bearing Pressure check for bottom slab


CASE-I : When no water in the trench and soil outside the wall
Wt of top cover slab

1 x

0.95

0.075 x 2500

Live load on cover slab

178.125 kg

500.0 kg

Wt of tray+cable

80

x1

80 kg

Wt of bottom slab

0.15

0.95

x 2500

356.25 kg

Wt of side walls

0.15

0.830

x 2500 x2

622.50 kg

Wt of PCC

0.1

1.150

x 2000

230.00 kg

1966.88 kg

Total wt

178.125+500+80+356.3+622.5+230

Pressure at the base of slab

1966.88

0.95

x 1)

Net bearing capacity of soil

2070.39 kg/m2

= <

10000 kg/m2
Hence O.K.

Net upward pressure

2070.39

Maximum bending moment at

1695.39

356.25

/(0.95*1)
0.95

1695.39 kg/m2/m slab

/8

191.26 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab

191.26

Design moment from slab(Ms1)

1.5

=-

539.3 kg-m

-348.07 kg-m
-522.10 kg-m

539.3

-348.07

1000

830 kg

830

2796.88 kg

CASE-II : When water in the trench and no soil outside the wall
Wt of water

0.830

Total wt

x
1966.88

Pressure at the base of slab

2796.88

0.95

x 1)

Net bearing capacity of soil

2944.08 kg/m2

=<

10000 kg/m2
Hence O.K.

Net upward pressure

2944.08

Maximum bending moment at

1695.39

356.25

+830)
1.0

/(0.95*1)

1695.39 kg/m2

/8

191.26 kg-m

mid span of bottom slab


End moment from wall
Net moment at mid span of slab
Design moment for slab(Ms2)

46.8 kg-m

191.26

46.8

238.10 kg-m

1.5

238.10

357.15 kg-m

357.15 kg-m

Design moment for slab

Required thickness of slab


d = (Mu / .138x fck x b)0.5

357.15

x 104 / 0.138 x

25

x 1000).5 =

Providing, D

32.17 mm
150 mm

Effective depth, d

150 - 40-5

105 mm

Reinforcement
Mu/bd2

357.15

x 104 /

1000 x

105

Required % of steel, Pt

0.32
=

0.091 (Refer SP16


Table 2)

Required area of steel

0.091

x 1000 x

105

)/100

95.66 mm2

Providing main reinforcement (at top and bottom)

8 @225 C/C

Area of steel provided

223.3 mm2

180 mm2

Minimum reinforcement = 0.12% (As per IS 456)

0.12*150*1000/100

Providing distribution reinforcement

8 @ 225 C/C

Area of distribution steel provided

269893988.xls

223.3 mm2

Page 33

TB-332-607-016
REV-01

400 kV Switchyard at Yeramarus

75
250

150

GL

650
12 @ 225 C/C
655

8 @ 200 C/C
150
8 @ 225 C/C

950

Detail of Trench Sec 9-9

Design of cable trench cover

250

950
Load
Live Load on cover slab(Concentrated)

500 kg

UDL on cover

400 kg/m2 (assumed)

Total UDL/m

100 kg/m

Self wt. of slab

0.075 /1000x0.95

Total wt. of slab

0.18

2500

0.25

0.2 kg/m/m-width
0.045 kg/m

Total UDL

100.0 kg/m

Concrete grade

M 25

Assuming thickness of slab

Bending moment at centre of span

(500*950/1000)/4+(100.04*(950/1000)^2)/8

Design moment, Mu

1.5

Required thickness of tench cover


d = (Mu / .138x fck x b)0.5

75 mm
130.04 kg-m

130.04

(195.05*10^4/0.138*25*250)^0.5

195.05 kg-m
47.56 mm

Providing, D

75 mm

Effective depth, d

75 - 15-5

55 mm

Reinforcement
Mu/bd2

195.05

x 104 /

250

55

Required % of steel, Pt

2.58
=

0.829 (Refer SP16


Table 1)

Required area of steel (

0.8290306

250

55

)/100

113.99 mm2

Providing main reinforcement

8 @ 200 C/C

Area of steel provided

251.2 mm2

Minimaum reinforcement = 0.12% (As per IS 456)


8 @ 200 C/C

Providing distribution reinforcement


Provide atleast 3 nos of steel bars.
A
8 @ 200 C/C
250

75
250
8 @ 200 C/C
A

269893988.xls

950

Section A-A

Page 34