Académique Documents
Professionnel Documents
Culture Documents
Project:
Date:
Client
Type of
Design Engineer
Bu
ild
in
g
No.
Design
Parameters
Descriptions
A.
B.
Water Demand
B.1
B.2
Scale of Development
Total Water Demand
C.
Local Authority
C.1
C.2
Scale of Development
Total Water Demand
D.
Existing Pipeline
D.1
Location
D.2
D.3
Type of Pipe
Size of Pipe (mm)
E.
E.1
Location
E.2
E.3
Fee (Rm)
Pressure Available (meter/bar)
F.
Incoming Pipe
F.1
F.2
F.3
Location
Normal Tapping
Pipe Jacking
G.
Distribution Pipeline
G.1
G.2
G.3
G.3.1
G.3.2
Remarks
- Malaysian Water Association
(MWA)
- Panduan Teknik Air JKR 92/87
Refer to Appendix `B
10m = 1 bar
A4.1
Rev 05
ACE/TECHNICAL/DIWS*
No.
Design
Parameters
Descriptions
Remarks
G.4
G.4.1
G.4.2
G.4.3
G.4.4
Type of pipe
Under Roads & Paved Area
Marrine Area
Incoming
Others
G.5
G.5.1
G.5.2
G.5.3
Pipe Coefficient
M.S Pipe
D.I Pipe
HDPE
G.6
Minimum Cover
H.
Distribution System
H.1
H.2
12 hours
H.3
H.5
H.5.1
H.5.2
H.5.3
H.6
H.6.1
H.6.2
Capacity
Elevated Water Tank
Type
Size
Gallons/day
H.6.3
H.6.4
Capacity
Height of Elevated Structure
Gallons/day
Highest supply level +
minimum residual
head + losses
I.
Submission
I.1
Submission level
J.
Contribution
J.1
K.
Approval Validity
K.1
L.
Design Software
H.4
No.
D.I Pipe
D.I Pipe
D.I Pipe
G.5.1 110
G.5.2 110
G.5.3 - 130
- 1.2m for pipes buried at
the side and under road
- 0.9m for pipes buried in
ground, away from roads
2 years
CASIO Software for
pipe network (loop)
analysis
Appendix A
Water Demand
Appendix B
Local Authority
A4.2
Rev 05
ACE/TECHNICAL/DIWS*
12.
13.
Medium Industry
14.
Light Industry
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
15.
Office / Complex /
Commercial
(Domestic Usage)
Hotels (with dining
and laundry facility
Demestic Usage)
Hotel (3 star)
16.
Hotel (5 star)
17.
Schools /Education
Institutions
-Day School /
Institution
- Fully Residential
18.
19.
20.
21.
Hospitals (domestic
usage)
Mosque (domestic
usage)
Other place of
worship
Wet Market
Petrol Kiosk
Johor
Melaka
Negeri
Sembilan
Selangor
Perak
Pulau Pinang
Kedah
Perlis
Pahang
= 2270 lpd
(500gpd)
Terengganu
Kelantan
Sabah
Sarawak
1,360 lpd/room
(300 gpd /room)
2,000 lpd/room
(440
gpd/room)
55 lpd / student (12
gpd / student)
360 lpd / student
(80 gpd / student)
1,100 lpd / bed
(240 gpd / bed)
135 lpd / person (12
gpd / person)
55 lpd / person ( 12
gpd / person)
A4.3
Rev 05
ACE/TECHNICAL/DIWS*
820 lpd / store (180
gpd / store)
5000 lpd / service
bay (1080gpd /
service bay)
No.
22.
23.
Appendix A
Water Demand
Stadium
55 lpd / person ( 12
gpd / person )
Golf Course
5500 lpd / hole
(1200 gpd / hole )
Note:-
gpd
lpd
l/ha/day
Appendix B
Local Authority
=
Gallon per day
Liter per day
Liter/hectares/day
=
=
Appendix C
FIRE
RISK
Average Total Flow
( Litres )
( Per Minute )
Spanning
(Meters )
4100
90
3@ 1370 1 pm
2700
90
2 @ 1370 1 pm
1370
90
1140
120-terrace
150-detached /
semi detached
680
180
Class A Risk
Large buildings, shopping
complexes, high rise
buildings, large industrial
estate, warehouse and
ports.
Class B Risk
Congested areas with
buildings up to 5 storeys.
Class C Risk
Shophouse up to 3 storey,
light industry
Class D Risk
Residential terrace house,
detached, semi detached
Class E Risk
Others
A4.4
Rev 05
ACE/TECHNICAL/DIWS*
A4.5
Rev 05