MIS CO. LTD. INC.

, QATAR OPERATIONS

Job Description
Chairman
Participants

No.

RISK ASSESSMENT PROCEDURE

: Geotechnical Survey
: Sa'aed Habib
Ammar Al Hamad
:
Ahmad Abdul Rahim
HAZARD

Emergency Situation / Evacuation

HAZARD EFFECT

Harm to People

PROB Vs. HAZARD


EFFECT = RISK
H
M
L

MITIGATION/CONTROLS

Conduct Safety Toolbox Talk daily and prior


start of work in order to highlight any
expected hazard related to location of
equipment set-up and how to control.
2

Slip / Trip / Falls

Moving material or parts of machinery


(Manual Handling).

Working around drilling rig

Harm to People

Harm to People

Harm to People

Doc. No.

: JSA-Q-019

ACTION BY

Ensure that the Housekeeping procedure is


implemented at all times.
All workers to be wearing site applicable
PPE (Plus good visibility safety glasses and
safety shoes with good tread).
Conduct Safety Toolbox Talk daily and prior
start of work.
Ensure size of material or parts of
machinery is below 35Kg for one person.
All workers to be wearing gloves and site
applicable PPE.
Ear plugs/muffs shall be worn if required.
Machinery to be fitted with reverse horn
and pass MIS inspection prior allowed to
commence work.

Page 1 of 3

6/1/2005

RESIDUAL RISK
H

Follow the Emergency Evacuation


Procedure (Contact 474-8888)
HSE Officer/Supervisor to be available on
site full time.
Communication means to be available on
site all times.

R/A Date

HSE
HSE

All

Supervisor

All

All
Supervisor
All

All
All
Supervisor

MIS CO. LTD. INC., QATAR OPERATIONS

Job Description
Chairman
Participants

No.

RISK ASSESSMENT PROCEDURE

: Geotechnical Survey
: Sa'aed Habib
Ammar Al Hamad
:
Ahmad Abdul Rahim
HAZARD

Use of Hand Tools

Noise

Dust

HAZARD EFFECT

PROB Vs. HAZARD


EFFECT = RISK
H
M
L

Harm to People

Harm to People

Harm to People

MITIGATION/CONTROLS

Drilling Crane Operations

Harm to People Asset


Damage
Harm to
Environment

Doc. No.

: JSA-Q-019

ACTION BY

Crane to be MIS inspected.


Crane to be QP/RLC approved.
Operator to be certified by contractor
Conduct Safety Toolbox Talk prior start of
work.
No one allowed to stand/move under
suspended load.
All workers to be wearing gloves and site
applicable PPE.
All lifting gear must be inspected and
QP/RLC Approved.

Page 2 of 3

6/1/2005

RESIDUAL RISK
H

All workers to be wearing site applicable


PPE.
Hand tools and equipment to be inspected
daily.
Conduct Safety Toolbox Talk prior start of
work.
Ear plugs/muffs shall be worn if noise is
higher than 85db.
Conduct noise survey if suspect much
noise.
Conduct Safety Toolbox Talk prior start of
work.
All workers to be wearing site applicable
PPE (Plus goggles and dust masks where
required).
Use of dust suppression system.
Crane to be third party inspected.

R/A Date

All
HSE

Supervisor
All
HSE

Supervisor
all

Supervisor
Supervisor
HSE
HSE
HSE
Supervisor
All
All
HSE

MIS CO. LTD. INC., QATAR OPERATIONS

Job Description
Chairman
Participants

No.

: Geotechnical Survey
: Sa'aed Habib
Ammar Al Hamad
:
Ahmad Abdul Rahim
HAZARD

Excavation

RISK ASSESSMENT PROCEDURE

HAZARD EFFECT

Harm to People Asset


Damage
Harm to
Environment

PROB Vs. HAZARD


EFFECT = RISK
H
M
L

MITIGATION/CONTROLS

R/A Date

Doc. No.

: JSA-Q-019

ACTION BY

RESIDUAL RISK
H

Ensure CPW approved and on site and


that all requirements are implemented.
Conduct Safety Toolbox Talk prior start of
work.
Supervisor to be available during
excavation work
Hole to be barricaded to avoid personnel
falling into trench.
Regular check and maintenance to be
applied on the drilling rig.
All workers to be wearing site applicable
PPE.

Page 3 of 3

6/1/2005

All
Supervisor
Construction
Manager
Supervisor
Supervisor
All