AUDIT CRITERIA
Issued 2006-11
Revised 2014-10
SCOPE
These audit criteria are to be used as a Nadcap User supplement to PRI AC7114 for suppliers with
Nondestructive Testing Facilities that are seeking Nadcap NDT accreditation. Only the questions that pertain to
User supplemental criteria will be found within this checklist. Only those suppliers, who are approved by or have
specific written authorization from, a particular user, shall be permitted to be audited to that Users supplemental
criteria.
GENERAL INFORMATION
In completing this assessment, auditors are instructed to respond with a "Yes or No" to address compliance with
each statement of requirement. (For any negative responses, the auditor must clearly indicate in the NCR if the
No" reflects noncompliance with respect to existence, adequacy, and/or compliance. Existence relates to
evidence of a documented procedure or policy, adequacy relates to the completeness of the procedure or policy,
and compliance relates to evidence of effective implementation).
The auditor shall only apply the questions in this checklist to the suppliers who specify the end Users identified
herein.
U1 - Honeywell
U2 - P&W
U3 - Rolls Royce Plc
U4 - Lockheed Martin
U5 - Eurocopter
U6 - Rolls Royce Corporation (refer to U3
Supplemental questions)
U7 - MTU
U8 - Airbus
U9 - Hawker Beechcraft
U10 - GE Aviation
U11 - The Boeing Company
U14 - SAFRAN
U16 - Bell Helicopter
U17 - Sikorsky Aircraft
U18 - Hamilton Sundstrand
U19 - Triumph/Vought
U21- Eaton
U22- AgustaWestland
Each question in this checklist must be addressed only in so far as it pertains to each applicable User Member
who is represented at that question, and only needs to be answered once. All negative responses require a
Nonconformance Report (NCR) with the auditor indicating the specific User requirement that was violated. Not
PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and quality
sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent
infringement arising there from, is the sole responsibility of the user."
PRI values your input. To provide feedback on this document, please contact the appropriate commodity staff engineer.
(Contact information is located at http://www.eauditnet.com under Contact Us.)
Copyright 2012 Performance Review Institute. All rights reserved.
t-frm-15
2-Jan-13
PRI
AC7114S Rev. J
-2-
Applicable (N/A) responses do not require an explanation as they indicate that no User Member requirement is
addressed at that question or that the process identified is not utilized.
INFORMATION
3.2
U1
U5
YES NO N/A
Is there evidence the quality system meets AS/EN/JISQ 9100, or for independent
NDT labs ISO 17025, AS9003 or AC7004? (See SPOC Manual Section 1.13)
Is there evidence the quality systems meets the correct revision of AS/EN9100
or ISO17025?
4.1
Customer Requirements
4.1.1 Has a Level 3 been given accountability for identifying and assuring
implementation of customer NDT requirements for the following?
U1
4.2
Procurement
YES NO N/A
U8
4.3
Procedure
Is there a procedure requiring an annual internal audit of the NDT System and
does it address a review of the NDT inspection process, the associated
documentation, personnel certifications, NDT process procedure adequacy and
equipment?
U18
YES NO NA
YES NO N/A
If the supplier uses a Corporate (not located on site) or Contract Level 3, does
the procedure address on-site internal audits to be performed at least every six
(6) months? (See HSM17, section 9.0)
4.3.2
YES NO N/A
PRI
AC7114S Rev. J
-3-
U18
If the supplier uses Corporate, Non-Resident and/or Contractor SCA(s) that are
not located at the site, has a semi-annual audit using an internal or Nadcap audit
checklist been conducted and has a copy of the audit results for all categories
been filed at the supplier and sent to the Honeywell when requested? (See
SPOC 165.7, Section 5)
Does the scope of the internal NDT audit include a review of NDT techniques to
assure approval by the company Level 3, and Hamilton Sundstrand as required?
(See HSM17, Section 9.0)
4.3.3
U1
U22
4.4
Are internal audits performed by the Honeywell approved NDT SCA? Is there
evidence that internal NDT auditors are approved by the responsible Level 3 and
have completed, as a minimum, the required formal NDT classroom training
equivalent to a Level 2 in the applicable method, objective evidence of 8 hours
of auditor training (AS9100, ISO, etc.) and two training audits in each method
they are auditing? (See SPOC 165.7, Section 6 item 6)
Is there evidence that the internal NDT auditors are qualified to EN4179/NAS410
in the method?
Performance Review
4.4.2
U2
U3
YES NO N/A
Is there evidence the customer-certified Level 3 has performed the annual over
inspection / audit of all certified Level 1 and Level 2 inspectors? (See NDTQ
para 6.1.6.8 and 6.1.6.12)
Does the performance review include individual defect rate monitoring?
(RRP58005 3.5.2)
5.1
Written Practice
5.1.1
U1
YES NO N/A
YES NO N/A
PRI
AC7114S Rev. J
U3
U22
Have the details of the supplier Responsible Level 3 been approved by the
AgustaWestland NDI Unit?
5.1.5
U1
U3
-4-
YES NO N/A
Are there provisions to prevent any NDT Level 1 from interpreting / evaluating
results? ( SPOC 165.7 section 6 Item 1)
Is inspection conducted by personnel who hold level 2 or level 3 certification or
if a certified level 1 is used for the inspection task has this task been determined
by the level 3 and does this task have clearly defined acceptance and rejection
criteria requiring no interpretation?
If a certified level 1 is used for the inspection task is this detailed in the written
practice? (RRP58005 3.1.5) This is only applicable to new manufacture
U7
U8
U10
Examination Requirements
Does the written practice address the examination requirements?
U1
U22
YES NO N/A
Are the examination practices as outlined in SPOC Manual, Section 165.7? (See
SPOC 165.7, Section 6)
Are the examination practices as outlined in AWPS009X Appendix A para A3?
5.1.11 Loss / Reinstatement of Certification
Does the written practice address the following:
5.1.11.1 Expiration?
U1
Does the written practice require that certification shall expire when
employment is voluntarily terminated by the employee; i.e., the employee quits
their position with their current employer to accept a position with another
employer. (See SPOC 165.7, Section 6, Item 5)
YES NO N/A
PRI
AC7114S Rev. J
5.2
Personnel Records
5.3
Examinations
5.3.1
U1
U2
If a NANDTB is utilized for examinations, does the Customer Certified Level 3 provide
the 10 accept reject type questions on P&W standards. NDTQ paragraphs 6.4.3.2 and
6.6.6?
5.3.7
U18
YES NO N/A
U1
-5-
YES NO N/A
When points are utilized for Level 3 re-certification; is there evidence that
documentation for recertification shall be submitted to the Responsible Level 3
at least 14 days prior to the expiration date of the certification. Application for
recertification by the Responsible Level 3 shall be submitted to an internal or
external qualified Level 3 as applicable. (See SPOC 165.7, Section 6, Item 4)
Does the procedure for qualification and certification require the Level 3 to recertify by examination? (See HSM17, section 9.0)
5.3.8
YES NO N/A
YES NO N/A
Is there evidence that the candidate for certification has achieved a minimum
grade of 80% on the general and specific qualification examinations; and the
candidate must achieve a minimum grade of 90% for the processing portion of
the practical as demonstrated to the satisfaction of the Certifier? (See NDTQ
para 7.2.3)
5.3.11 General Examination Questions
Do the examinations have the minimum number of questions and does the
question content cover the subject material for the level and method for which certification
is sought?
YES NO N/A
PRI
AC7114S Rev. J
-6-
U18
YES NO N/A
U1
YES NO N/A
Practical examination for all NDT methods and levels of certification shall be
comprised of the equipment, procedures, standards and hardware of the facility
the candidate is seeking certification (and/or recertification for). (See SPOC
165.7, Section 6 Item 2)
5.3.15 Level 2 Practical Examinations
Do the Level 2 practical examinations provide evidence that at least one test
sample per technique, with a minimum of two test configurations for each
method, were processed?
U1
YES NO N/A
Practical examination for all NDT methods and levels of certification shall be
comprised of the equipment, procedures, standards and hardware of the facility
the candidate is seeking certification (and/or recertification for). (See SPOC
165.7, Section 6 Item 2)
5.3.17 Level 3 Practical Examinations
If the Level 3s duties include processing and/or accepting hardware, does the
practical examination provide evidence that at least one test sample per
technique (as defined by the written practice) with a minimum of two test
samples of differing configurations for each method were evaluated?
U1
Practical examination for all NDT methods and levels of certification shall be
comprised of the equipment, procedures, standards and hardware of the facility
the candidate is seeking certification (and/or recertification for). (See SPOC
165.7, Section 6 Item 2)
5.5
YES NO N/A
YES NO N/A
PRI
AC7114S Rev. J
-7-
U1
U2
U3
U11
U17
849A PT
848A MT
851A UT
850A RT
If the supplier performs NDT on Class 1, 1A or 1B parts per SS8813 or Flight Safety
per SS9211, is there evidence that the Level 3 is a full time employee of the
company, and has been administered a Sikorsky Aircraft Specific Examination for
each applicable method?
(contractors may be certified on a case by case basis. Evidence should be a letter)
(See SS8813, paragraph 3.4.2)
5.5.3 Qualification / Certification Record for Outside Agents
Does the facility have documentation on file to verify the adequacy of the
qualification / certification for the outside Level 3?
U1
U11
YES NO N/A