Académique Documents
Professionnel Documents
Culture Documents
Project:
Tenant:
Space No.:
Completed by:
Data
Supplied
Submittal / Date
1
2
3
Not
Applicable
Data
Not Found
Clarify or
Amend
Tenant is responsible for completing "Data Supplied" and "Not Applicable" columns of form.
Page 1 of 16
Submittal / Date
1
2
3
Not
Applicable
Data
Not Found
Clarify or
Amend
MSR4b
Tenant is responsible for completing "Data Supplied" and "Not Applicable" columns of form.
Page 2 of 16
Submittal / Date
1
2
3
Not
Applicable
Data
Not Found
Clarify or
Amend
MSR4b
Tenant is responsible for completing "Data Supplied" and "Not Applicable" columns of form.
Page 3 of 16
Date:
Space:
Sq. Ft.:
Level:
DB
WB
Internal
Occupant
Sensible
Space
Total
Sensible
Lighting
Type:
Density:
Sq. Ft./Person
No. of Occupants:
Factor:
S
L
Lamp
Special
No.
Total
Watts:
Allowance
of
Watts:
Factor:
Fixtures
Hooded
(Y or N):
Area
Floor
Partition
Roof
Subtotal Skin Loads
Outside Air
No. of Occupants:
CFM per Occupant:
Total CFM:
Subtotal External Loads (Skin, Outside Air)
Subtotal Internal Loads (Occupant, Lights, Misc., Ex. Credit)
TOTAL
TSF1a - Load Calclt'n Summary
Revision:
Calculation:
Latent
Cooling
Heat Occ.
Heat Un.
Time:
Total
HVAC
Date:
Space:
Sq. Ft.
Total Load:
Sq. Ft. Per Ton:
Btuh Per Sq. Ft.
Space Sensible
Load:
Sensible Load:
Latent Load:
Glass
Sensible
Revision:
Rev. Date:
Latent
Total
Cooling Load
Component Totals
(All Zones)
Glass (Hor.)
Wall
Floor
Partition
Roof
Occupant
Lighting
Misc.
Process Equipment
Outside Air
Heat Loss
Occupied
Unoccupied
Air Balance
Grease Waste
Natural Gas
Lbs.
Min. Size Req.
Min. Size Req.
HVAC CFH
Makeup Air CFH
Equipment CFH
Dom. Water CFH
Total CFH
Length of Run
from Meter
Pressure
Min. Line Size
Regulator
Length of Run
Appliance Pressure
Min. Line Size
Meter Location
Service Type
Date:
Space:
Sq. Ft.
Revision:
Rev. Date:
Total Load
Sq. Ft. Per Ton
Btuh Per Sq. Ft.
Space Sensible
Load:
Sensible Load
Latent Load
Landlord GPM
Allocation
Total GPM Req.
GPM per 1,000 sq. ft.
Entering Water Temp.
Leaving Water Temp.
Supplemental Unit
Available Water
Pressure
Calculated Water
Pressure Loss
Glass
Sensible
Latent
Total
Cooling Load
Component Totals
(All Zones)
Glass (Hor.)
Wall
Floor
Partition
Roof
Occupant
Lighting
Misc.
Process Equipment
Outside Air
Heat Loss
Occupied
Unoccupied
Air Balance
Grease Waste
Natural Gas
Lbs.
Min. Size Req.
Min. Size Req.
HVAC CFH
Makeup Air CFH
Equipment CFH
Dom. Water CFH
Total CFH
Length of Run
from Meter
Pressure
Min. Line Size
Regulator
Length of Run
Appliance Pressure
Min. Line Size
Meter Location
Service Type
Date:
Space:
Sq. Ft.
Total Load:
Sq. Ft. Per Ton:
Btuh Per Sq. Ft.
Space Sensible
Load:
Sensible Load:
Latent Load:
Landlord Primary
Air Allocation:
Available Static
Pressure:
Calculated Static
Pressure Loss:
Total Primary
Supply CFM:
CFM Per Sq. Ft.
Primary Supply
Air Temperature:
Total Secondary
Supply CFM:
CFM Per Sq. Ft.
Secondary Supply
Air Temperature:
Sensible
Cooling Load
Component Totals
(All Zones)
Revision:
Rev. Date:
Latent
Total
Glass
Glass (Hor.)
Wall
Floor
Partition
Roof
Occupant
Lighting
Misc.
Process Equipment
Outside Air
Heat Loss
Occupied
Unoccupied
Air Balance
Plumbing
Grease Waste
Natural Gas
Interceptor Size
Location
Waste Fixture Units
Vent Fixture Units
Gal.
Lbs.
HVAC CFH
Makeup Air CFH
Equipment CFH
Dom. Water CFH
Total CFH
Length of Run
from Meter
Pressure
Min. Line Size
Regulator
Length of Run
Appliance Pressure
Min. Line Size
Meter Location
Service Type
Date:
Space:
Sq. Ft.:
Revision:
Rev. Date:
1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
12.
Supply
CFM
Outside
Air CFM
Return
CFM
Barometric
Relief
CFM
Powered
Relief
CFM
Exhaust
CFM
Replacement
CFM
Pressure
CFM
Powered
Relief
CFM
Exhaust
CFM
Replacement
CFM
Pressure
CFM
Transfer Fan
Gravity
Total
1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
12.
Supply
CFM
Outside
Air CFM
Return
CFM
Barometric
Relief
CFM
Transfer Fan
Gravity
Total
Date:
Space:
Sq. Ft.:
Revision:
Rev. Date:
1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
Supply
CFM
Outside
Air CFM
Return
CFM
Exhaust
CFM
Replacement
CFM
Pressure
CFM
Replacement
CFM
Pressure
CFM
VAV VAV VAV VAV Kitchen HoodMakeup Air UnitKitchen HoodMakeup Air UnitDishwasher Hood
Toilet Exhaust
Trash Exhaust
TOTAL
Replacement Air from
the Common Area
Transfer Fan
Gravity
Total
1.
2.
3.
4.
5.
6.
7
8.
9.
10.
11.
Supply
CFM
Outside
Air CFM
Return
CFM
Exhaust
CFM
VAV VAV VAV VAV Kitchen HoodMakeup Air UnitKitchen HoodMakeup Air UnitDishwasher Hood
Toilet Exhaust
Trash Exhaust
TOTAL
Replacement Air from
the Common Area
Transfer Fan
Gravity
Total
Plumbing Calculations
Project:
Tenant Name:
Level:
Plumbing Fixtures
Date:
Space:
Sq. Ft.:
Quantity
Sanitary
F.U.
Each
Sanitary
F.U.
Total
Grease
F.U.
Each
Revision:
Rev. Date:
Grease
F.U.
Total
C.W.
F.U.
Each
C.W.
F.U.
Total
Water
Demand
Each
Vent
Sanitary
Waste
Grease
Waste
Water
Water Closet
Urinal
Lavatory
Service Sink
Water Cooler
Floor Drain
Floor Sink
TOTAL
Required
Service Connection
Water
Demand
Total
Date:
Space:
Sq. Ft.:
Equipment
Quantity
Revision:
Rev. Date:
BTU/HR
Total
Required
Pressure
Min/Max
Service
Pressure
Service
Line Size
TOTAL
Sizing Method:
Length of Run:
Pressure:
Line Size:
Regulator:
Location:
Length of Run:
Final Equipment
Pressure:
Line Size:
BTU/HR
Total Gas
Requirements
TSF5 - Gas Load Summary
CFH
Section
GPM
Date:
Space:
Sq. Ft.:
Size
Delta-P/
100 Ft.
Length
Fitting
Equivalent
Length
Revision:
Rev. Date:
Section
Delta-P
TOTAL
Accumulated
Equivalent
Length
Accumulated
Delta-P
Section
Date:
Space:
Sq. Ft.:
CFM
Size
Delta-P/
100 Ft.
Length
Fitting
Equivalent
Length
Revision:
Rev. Date:
Section
Delta-P
TOTAL
Accumulated
Equivalent
Length
Accumulated
Delta-P
Submittal / Date
1
2
3
Not
Applicable
Data
Not Found
Data
Not Found
Clarify or
Amend
5.
6.
7.
8.
9.
ESR 10/94
a. Service size
b. Transformer size
c. Voltage drop when applicable
Demolition plan and notes indicating removal of all systems
and components that are not reused. (No equipment or
components may be abandoned without written permission
of the Landlord.)
Note requiring field verification of existing conditions.
A power plan to scale including:
a. Service entrance
b. Location of all receptacles
c. Dedicated circuitry
d. Telephone outlets
e. Conduit runs
f. Conduit installed below slab
g. Transformer size and location
A reflected ceiling plan to scale including:
a. Lighting fixtures with lamp types
b. Exit lighting and emergency lighting
c. Night lighting
d. Conduit runs
e. Electrical sign wiring requirements
f. Fire alarm/smoke detection locations
Details, schedules and diagrams including:
a. Energy Code compliance forms (if applicable)
b. Landlord's Load Tabulation Schedule
c. Complete panel schedules
d. Fuse sizes and types
e. HVAC wiring diagram with temperature sensor location
f. Electrical riser diagram
1. Landlord distribution point
2. Tenant's main disconnect within demised Premises
3. Panel(s) and transformer size and location
4. Wire sizes
5. Transformer grounding
Tenant is responsible for checking "Data Supplied" and "Not Applicable" columns of form.
Page 14 of 2
Submittal / Date
1
2
3
Not
Applicable
Data
Not Found
Data
Not Found
Clarify or
Amend
Additional Comments
ESR 10/94
Tenant is responsible for checking "Data Supplied" and "Not Applicable" columns of form.
Page 15 of 2
Date:
Space:
Sq. Ft.:
Item
Voltage
Connected
KVA
Demand
KVA
Notes
Lighting
Receptacles
Air Handlers
Air Conditioning Units
Electric Space Heaters
Electric Water Heaters
Miscellaneous Other Loads
Total Connected Load
Design Demand Load
Estimated Billing Demand Load - Summer
Estimated Billing Demand Load - Winter
Time of Day Maximum Demand is Anticipated - Summer
Time of Day Maximum Demand is Anticipated - Winter
Store Business Hours
Additional Store Hours for Cleaning, Stocking, etc. - A.M.
Additional Store Hours for Cleaning, Stocking, etc. - P.M.
ELS 12/94
Page 16 of 1