Electrical Data for 2011 - 2012

SSR NO

Description

1.4.1

Supply and Fixing of 20mm dia 1.5mm thick P.V.C.


pipe (ISI MARK) concealed in wall with all required
accessories including masonary work for light, fan and
separate plug point with well seasoned wooden deep
box including all labour charges etc., complete

Units

Qty

Rate\Rs

Amount

100 M

1,650.00

100 Nos

40.00

80.00

12 Modular metel box ELEC 1.3.6

Each

198.70

198.70

20mm dia 1,2,3 & 4 way deep Junction Box 1.2.38

Each

12
18.70

224.40

20mm dia 1.5mm thick PVC pipe ELEC 1.2.1


U' Links 8.1.10

1,650.00

Each

12

4.40

52.80

Cement

kg

50

5.00

250.00

Skilled Electrician ELEC 8.1.77

day

297.00

594.00

Semi skilled ELEC 8.1.78

day

260.00

520.00

Helper ELEC 8.1.85

day

260.00

520.00

Mason Ist class 8.1.79

day

297.00

594.00

20mm PVC bends 1.2.48

Add 20% M / A For labourcharges

445.60
5,129.50

C) Cost for 100 RM

718.13

Contract profit 14%

5,847.63
58.48

Rate per each


1.4.2

Supply and Fixing of 25mm dia 1.5mm thick PVC pipe


(ISI MARK) concealed in wall with all required
accessories including masonary work and labour
charges etc., complete.
100 M

2,200.00

2,200.00

100 Nos

40.00

80.00

25mm dia 1,2,3 & 4 way deep Junction Box 1.2.39

Each

12
22.00

264.00

25mm PVC bends 1.2.44

Each

12

5.50

66.00

Cement

kg

50

5.00

250.00

Skilled Electrician ELEC 8.1.77

day

297.00

594.00

Semi skilled ELEC 8.1.78

day

260.00

520.00

Helper ELEC 8.1.85

day

260.00

520.00

Mason Ist class 8.1.79

day

297.00

594.00

25mm dia 1.5mm thick PVC pipe ELEC 1.2.3


U' Links

Add 20% M / A For labourcharges

445.60
5,533.60

C) Cost for 100 RM

774.70

Contract profit 14%

6,308.30
63.08

Rate per each


2.1.1

Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire


Retardant (FR) P.V.C. insulated flexible copper cable
(ISI MARK) in existing pipe with 6A switch, Ceiling
rose and Modularplate covering to switch control box
including all labour charges etc., complete for
100 M

1,001.00

1,001.00

6A Modularswitch 1.9.1

each

92.00

552.00

6A 2 way Ceiling Rose 1.7.15

each

21.00

126.00

6 Modular cover plate 1.9.44

each

108.00

108.00

Skilled Electrician ELEC 8.1.77

day

0.6

297.00

178.20

Semi skilled ELEC 8.1.78

day

1.2

260.00

312.00

Helper ELEC 8.1.85

day

0.6

260.00

156.00

14/0.3mm PVC FR flexible copper wire

Add 20% M / A For labourcharges

1.5.1

129.24

Remarks

2,562.44

C) Cost for 6 Points

358.74

Contract profit 14%

2,921.18
486.86

Each point Rate


2.1.3

Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C.


insulated F.R. flexible copper cable (ISI MARK) in
existing pipe with 6A switch control and 3/2 pin
sockets fixing on separate board including all labour
charges etc., complete.
14/0.3mm PVC FR flexible copper wire 1.5.1

100 M

1,001.00

1,001.00

6A Modularswitch 1.9.1

each

15

92.00

1,380.00

Modular 6A 3 pin / 2 Pin Socket 1.9.4

each

15

141.00

2,115.00

Skilled Electrician ELEC 8.1.77

day

1.5

297.00

445.50

Semi skilled ELEC 8.1.78

day

1.5

260.00

390.00

Helper ELEC 8.1.85

day

1.5

260.00

390.00

Add 20% M / A For labourcharges

245.10

Rate per 15Pts

5,966.60
835.32

Contract profit 14%

6,801.92
453.46

Each point Rate


2.1.4

Supply and fixing of 6A 3 pin wall plug socket with 6A


switch control on a common switch board with earth
continuity including wire leads, earth connections
along with all labour charges etc., complete.
Modular 6A 3 pin / 2 Pin Socket 1.9.4

each

141.00

141.00

6A Modularswitch 1.9.1

each

92.00

92.00

Skilled Electrician ELEC 8.1.77

day

0.067

297.00

19.90

Helper ELEC 8.1.85

day

0.067

260.00

17.42

Add 20% M / A For labourcharges

7.46
277.78
38.89

Contract profit 14%

324.14
324.14

Each point Rate


2.1.6

Supply and Fixing of 16A 3pin and 6A 3pin plug socket


with indicator lamp and 16A switch control duly
recessed in wall with Metel deep box of covered with
Modular covering plate including earth connections
and all lab
3 modular metelbox 1.3.2

each

72.60

3 modular covering plate 1.9.42

each

69.00

69.00

16A modular Switch 1.9.7

each

126.00

126.00

16A 3 pin / 6A 3pin plug socket 1.9.12

each

169.00

169.00

Skilled Electrician

day

0.1

297.00

29.70

Semi Skilled Electrician

day

0.1

260.00

26.00

Helpers

day

0.1

260.00

26.00

Add 20% M / A For labourcharges

72.60

16.34
534.64
74.85

Contract profit 14%

625.83
625.83

Rate per each


3.1.2

Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR


P.V.C. insulated flexible copper cable in existing pipe
for earth continuity including all labour charges etc.,
complete.
14/0.3mm PVC FR flexible copper wire
Skilled Electrician ELEC 8.1.78

1.5.1

100 M

1,001.00

1,001.00

day

0.34

297.00

100.98
260.00
88.40

Semi skilled ELEC 8.1.79

day

260.00

Helper ELEC 8.1.84

day

0.34

260.00

Add 20% M / A For labourcharges

89.88

1,540.26

C) Cost for 100 RM

215.64

Contract profit 14%

1,755.89
17.56

Rate per Metre = C/100


3.1.4 (a) Supply and run of 1 of 36/0.3mm (2.5 Sq.mm) F.R
P.V.C. insulated flexible copper cable in existing pipe
for earth continuity inlcuding all labour charges etc.,
complete.
36/0.3mm (2.5 sqmm) FR PVC copper wire 1.5.3

100 M

2,389.20

2,389.20

Skilled Electrician

day

0.34

297.00

100.98

Semi Skilled Electrician

day

1.00

260.00

260.00

Helpers

day

0.34

260.00

88.40

Add 20% M / A For labourcharges

89.88
2,928.46

C) Cost for 100 RM

409.98

Contract profit 14%

3,338.44
33.38

Rate per Metre = C/100


3.1.4

Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R


P.V.C. insulated flexible copper cable in existing pipe
for mains inlcuding all labour charges etc., complete.
36/0.3mm (2.5 sqmm) FR PVC copper wire R R make
ELEC 1.5.3

100 M

2
2,389.20

4,778.40

Skilled Electrician ELEC 8.1.78

day

0.67

297.00

198.99

Semi skilled ELEC 8.1.79

day

260.00

520.00

Helper ELEC 8.1.84

day

0.67

260.00

174.20

Add 20% M / A For labourcharges

178.64
5,850.23

Rate 100 meter

819.03

Contract profit 14%

6,669.26
66.69

Rate per Metre = C/100


3.1.5

Supply and run of 2 of 56/0.3mm (4 Sq.mm) FR


P.V.C. insulated flexible copper cable in existing pipe
for mains inlcuding all labour charges etc., complete.
100 M

2
3,478.20

6,956.40

Skilled Electrician ELEC 8.1.78

day

297.00

297.00

Semi skilled ELEC 8.1.79

day

260.00

780.00

Helper ELEC 8.1.84

day

260.00

260.00

56 /0.3mm (4 sqmm)FR PVC flexible copper wire.R R


make 1.5.4

Add 20% M / A For labourcharges

267.40

Rate per Metre 100

8,560.80

Contract profit 14%

1,198.51
9,759.31
97.59

Rate per Metre = C/100


9.7.25

Supply and erecting 19/20mm steel tube down rod of


one meter length with bolts & nuts duly painted with
matching colour of fan complete
19mm steel tube down rod with bolts&nuts for fan with
maching colour. 8.1.27
Helper

M
day

1
0.1

60.00

60.00

260.00

26.00

Add 20% M / A For labourcharges

5.20
91.20
12.77

Contract profit 14%

109.17
109.17

Total
9.7.26

Supply and erecting step type Modular regulator for


ceiling fans 1200mm sweep complete erected on
existing board.
Step type Regulator 1.9.14
Semi skilled Electrician

473.00

473.00

day

0.1

237.00

23.70

Add 20% M / A For labourcharges

4.74
501.44
0.66

Contract profit 14%

506.84
506.84

Total
9.7.35

Supply and Fixing of Ceiling fan and regulator


including transportation and giving connections with
twin core wire etc., complete.
NO

1,840.00

9.00

9.00

Skilled Electrician

day

0.125

297.00

37.13

Helper

day

0.125

260.00

32.50

Ceiling Fan 5.1.3


23/0060 Twin Core wire

Add 20% M / A For labourcharges

1,840.00

13.93
1,932.55
270.56

Contract profit 14%

2,217.03
2,217.03

Total
3.3.7

Supply and run of 2 of 140 /0.3mm (10 Sq.mm) F.R


PVC insulated flexible copper cable in existing pipe for
mains including all labour charges etc., complete.
140/0.3 (10 Sq.mm) FR PVC flexible copper wire 1.5.6

100 M

2.00
8,223.60

16,447.20

Skilled Electrician ELEC 8.1.78

day

1.00

297.00

297.00

Semi skilled ELEC 8.1.79

day

3.00

260.00

780.00

Helper ELEC 8.1.84

day

1.00

260.00

260.00

Add 20% M / A For labourcharges

267.40
18,051.60
2,527.22

Contract profit 14%

20,578.82
205.79

Rate per Metre = C/100


4.4.4

Supply and fixing TPN Distribution board with IP-42


protection (Metal Door) suitable for 3 phase FP
Isolator as incomer and 10kA SP MCBs as outing
going including internal connection and labour
charges for surface / flush mounting etc., complete.

4 way TPN, D.B with IP-42 Protection (MD) suitable


for 3 phase FP Isolator as incommer. 2.12.24

each

1.00

80A, 4 Pole Isolator 2.10.17

each

1.00

862.20

862.20

10kA - 6-32A range SP MCBs 2.9.9

each

12.00

161.30

1,935.60

Skilled Electrician ELEC 8.1.78

day

0.50

297.00

148.50

Semi skilled ELEC 8.1.79

day

1.00

260.00

260.00

Helper ELEC 8.1.84

day

1.00

260.00

260.00

Sundries such as TW Plugs, Screws Cement etc,

LS

2,490.50

2,490.50

9.50
Add 20% M / A For labourcharges

133.70
6,100.00
854.00

Contract profit 14%

7,087.70
7,087.70

Rate per each


4.4.9

Supply and fixing Distribution board with 20A single


phase plug and Socket, in sheet steel enclosure with
10/16/20A SP MCB including internal connection and
labour charges for surface / flush mounting etc.,
complete
1 Phase Distribution board with 20A plug and socket.
2.12.55

Nos

1
650.00

650.00

10/16/20A SP MCB 2.9.9

Nos

161.30

161.30

Skilled Electrician ELEC 8.1.78

Nos

0.25

297.00

74.25

Semi skilled ELEC 8.1.79

Nos

0.25

260.00

65.00

Helper ELEC 8.1.84

Nos

0.25

260.00

65.00

Add 20% M / A For labourcharges

40.85
1,056.40
147.90

Contract profit 14%

1,245.15
1,245.15

Rate per each


4.4.8

Supply and fixing TPN - Vertical type Distribution


board with IP -42 Protection (Metal Door) with 125A,
4Pole 25 kA MCCB as incomer with 4Nos 32A TP
MCBs and 12 Nos. 10 kA SPMCBs as outgoing
including internal connection and labour charges for
surface /
8 Way TPN Vertical DB with IP -42 (Metal door)
protection suitable for 125A, 4 Pole, 16kA MCCB as
incomer. ELEC 2-12-36

Nos

1
7843.00

7843.00

125 Amps, 4 Pole , 25 kA MCCB ELEC 2-8-6

Nos

8698.20

8698.20
5908.00

10 kA, 40A TP MCBs: ELEC 2-9-6

Nos

1477.00

Skilled Electrician

day

297.00

297.00

Semi Skilled Electrician

day

260.00

260.00

Helpers

day

260.00

260.00

Add 20% M / A For labourcharges

163.40
23429.60
3,280.14

Contract profit 14%

26,873.14
26873.14

Rate per each


5.1.1

Providing independent earthling by excavating a


trench to a depth of 2.1 M in all soils, as per size
specified in the Data, using 40mm dia 'B' class GI pipe
of 2.5 Mtrs length with necessary accessories with
hume pipe ring duly providing staggered holes
Earth Work Excavation of Hard gravel Soil with small
boulder for trench 1st step of size 1.5 x 0.6 x 0.9 m
(5'x2'x3') 8.1.56

cum

200

25% extra for narrow trench & pit and back filling with
Sand, Coke, Salt etc., and leveling
40mm dia 'B' Class G.I pipe 8.1.62

0.85
170.00

1
34.00

34.00

332.00

830.00

5.00

80.00

Mtr

2.5

Each

16

Set

10.00

40.00

Each

200.00

200.00

Hard Coke 8.1.16

Kg

40

8.00

320.00

Salt 8.1.17

Kg

20

4.00

80.00

Semi skilled Electrician

Nos

0.5

260.00

130.00

Helpers

Nos

0.5

260.00

130.00

Drilling of 16 Nos through holes of 12mm dia to G.I


pipe 8.1.63
G.I Nuts, Bolts an Washers 8.1.64
18" dia hume pipe ring 8.1.65

Add 20% M / A For labourcharges

52.00
2066.00
289.24

Contract profit 14%

2,407.24
2407.24

Rate per each


5.3.2

Supply and Run of No. 8 SWG copper wire including


cost of all accessories and labour charges etc.,
complete.
8 SWG Copper wire (0.1155 Kg/Mtr.) 100 M L 8.1.41

Kg

11.55
549.00

6340.95

Skilled Electrician

Nos

297.00

297.00
260.00
260.00

Semi skilled Electrician

Nos

260.00

Helper

Nos

260.00

Add 20% M / A For labourcharges

163.40

Rate per each

7321.35

Contract profit 14%

1,024.99
8,346.34
83.46

Rate per mtr c/100


8.4.5

Supply and transportation of 2x36w CFL paralite


louvre (P5) recessed low glare mirror optic luminaire
comprising bright anodised Aluminium reflector with
VPIT Chokes and 36w CFL lamps.
3x36 CFL PS paralite Louvars fitting 3.6.38

each

3976.40

36w CFL

each

130.00

3.7.31

3976.40
260.00
4236.40

Contract profit 14%

593.10
5,089.50
5089.50

Rate per each


8.6.2

Supply and transportation of recessed mounting


2x13W CFL down light with all standard accessories
with 2No. 13W CFL lamp etc., complete.
2x13W CFL Down light fitting 3.6.54

each

1417.50

13W CFL

each

100.00

3.7.25

1417.50
200.00
1617.50

Contract profit 14%

226.45
2,043.95
2043.95

Rate per each


7.9.7

Fixing of mirror optic tube light luminaire in false


ceiling / pop with necessary arrangment including
giving connections and all labour charges etc.,
complete.
9.00

9.00

0.125

297.00

37.13

day

0.125

260.00

32.50

day

0.125

260.00

32.50

28/0060 twin core flexible copper cable

Aluminium flat (as per requirment)

LS

Skilled Electrician

day

Carpenter
Semi skilled Electrician / Helper

0.00

20.43

20% MA for labourcharges

131.55
18.42

Contract profit 14%

170.39
170.39

Rate per each


15.6.3

Supply and Labour charges for run of 50sqmm U.G


cable on wall / existing pipe with necessary fixing
arrangments such as saddles, clamps,wooden
separators etc., (as directed by departmental official)
with No.10 SWG G.I wire for eath connections for the
cables.
M

100

279.70

27970.00

each

200

15.00

3000.00

saddles of required size

100 nos

305.00

610.00

12mm screws

100 nos

50.00

200.00

No.10 SWG GI wire 8.1.45

kg

61.60

431.20

Skilled Electrician

day

297.00

297.00

Helper

day

260.00

1040.00

50 Sqmm 3.5 core UG Cable 4-1-29


Wooden separators 8.1.8

20% MA for labourcharges


C) Cost for 100 RM
Contract profit 14%

267.40
33815.60
4,734.18
38,549.78

Rate per each

385.50

Assistant Engineer,
Amalapuram Municipality,

14.1.1

4.2.5

Deputy Executive Engineer,


Amalapuram Municipality

Supply, Transportation, fabrication and erection of


following guage CRCA sheet steel enclosure for
power control cubicle panel / boxes etc., including
cutting, bending drilling, welding and reveting etc.,
complete
with cleaning with 7 tank process
and painting with powder coating including cost and
conveyance of all materials and labour charges.
6.2.2
Sq.inch

2.20

400A, 4 Pole, 415V, 50 Hz. On load cubical type


C.O.S 2.2.5

each

Skilled Electrician

day

0.25

297.00

74.25
130.00
130.00

Supply and erection of Panel mounting cubical type


L.T heavy duty ON LOAD change over switch of 400A,
4 pole, 415V, 50 Hz. with all accessories etc.,
complete on existing control panel.

22,711.50

Semi Skilled Electrician

day

0.5

260.00

Helpers

day

0.5

260.00

Sundries such as hardware etc.,

LS

7.40
23,120.00

Rate per each


Supply and erection of Panel mounting 63A, 4 Pole,
10 / 16kA, MCCB with thermal magnetic setting /
Microprocessor based release arrangement with all
connections etc., complete on existing panel.

Cost of 60 / 63A, 4 Pole Panel mounting 10 / 16 kA,


MCCB 2.8.13

each

1
5,668.00

5,668.00

Skilled Electrician

day

0.167

297.00

49.60
43.42
86.58

Semi Skilled Electrician

day

0.167

260.00

Helpers

day

0.333

260.00

Sundries such as hardware etc.,

LS
35.92

20 % M A for labourcharges

5,883.52

Rate per each

4.3.6

Supply and erection of Panel mounting 400A, 4 Pole,


35 /36kA, MCCB with thermal magnetic setting /
Microprocessor based release arrangement with all
connections etc., complete on existing panel.

400A, 4 Pole, 36/35kA panel mounting MCCB 2.8.8

each

Skilled Electrician

day

0.2

297.00

59.40
104.00
104.00

22,890.00
Semi Skilled Electrician

day

0.4

260.00

Helpers

day

0.4

260.00

Sundries such as hardware etc.,

LS

22,890.00

53.40

20 % M A for labourcharges

23,210.80

Rate per each


14.2.6

22,711.50

66.85

20 % M A for labourcharges

4.3.2

2.20

Supply and erection of selector switch for voltmeter /


Ammeter on the existing box / panel including
connections etc., complete.
Selector switch for Ammeter / Voltmeter. 6.3.8

each

175.00

175.00

Skilled Electrician

day

0.2

297.00

59.40

11.88

20 % M A for labourcharges

246.28

Rate per Each


14.2.7

Supply and erection of LED indicator lamps on the


existing box / panel board.
LED indicator lamp Analog 6.3.9

each

135.00

135.00

Skilled Electrician

day

0.1

297.00

29.70
11.88

20 % M A for labourcharges

176.58

Rate per Each


14.2.8

Supply and erection of LT current transformer with bar


primary 100/5A to 1000 / 5A ratio in the existing box /
panel including connections etc., complete.
L.T. C.T with bar primary 100 / 5A to 1000 / 5A 6.3.10
Skilled Electrician

each
day

1
0.1

450.00

450.00

297.00

29.70
11.88

20 % M A for labourcharges

491.58

Rate per Each


4.3.4

Supply and erection of Panel mounting 125A, 4 Pole,


25kA, MCCB with thermal magnetic setting /
Microprocessor based release arrangement with all
connections etc., complete on existing panel.

Cost of 125A, 4 Pole, 25 kA panel mounting MCCB.


2.8.14
Skilled Electrician

each

day

0.167

Semi Skilled Electrician

day

0.167

Helpers

day

0.333

Sundries such as hardware etc.,

LS

20 % M A for labourcharges
Rate per Each

6322.00
297.00
260.00
260.00

6322.00
49.60
43.42
86.58
35.92

6537.52

Electrical Data for 2010 - 2011


SSR NO

Description

1.4.1

Supply and Fixing of 20mm dia 1.5mm thick P.V.C.


pipe (ISI MARK) concealed in wall with all required
accessories including masonary work for light, fan and
separate plug point with well seasoned wooden deep
box including all labour charges etc., complete

Units

Qty

Rate\Rs

Amount

100 M

1,500.00

100 Nos

40.00

80.00

12 Modular metel box ELEC 1.3.6

Each

184.00

184.00

20mm dia 1,2,3 & 4 way deep Junction Box

Each

12

17.00

204.00

20mm PVC bends

20mm dia 1.5mm thick PVC pipe ELEC 1.2.1


U' Links

1,500.00

Each

12

4.00

48.00

Cement

kg

50

4.30

215.00

Skilled Electrician ELEC 8.1.78

day

258.00

516.00

Semi skilled ELEC 8.1.79

day

237.00

474.00

Helper ELEC 8.1.84

day

237.00

474.00

Mason Ist class

day

258.00

516.00

0.00

Add 20% M / A For labourcharges

396.00
4,607.00

C) Cost for 100 RM

46.00
1.4.2

Supply and Fixing of 25mm dia 1.5mm thick PVC pipe


(ISI MARK) concealed in wall with all required
accessories including masonary work and labour
charges etc., complete.
100 M

2,000.00

100 Nos

40.00

80.00

25mm dia 1,2,3 & 4 way deep Junction Box

Each

12

20.00

240.00

25mm PVC bends

25mm dia 1.5mm thick PVC pipe ELEC 1.2.3


U' Links

2,000.00

Each

12

5.00

60.00

Cement

kg

50

4.30

215.00

Skilled Electrician ELEC 8.1.78

day

258.00

516.00

Semi skilled ELEC 8.1.79

day

237.00

474.00

Helper ELEC 8.1.84

day

237.00

474.00

Mason Ist class

day

258.00

516.00

Add 20% M / A For labourcharges

396.00
4,971.00

C) Cost for 100 RM

49.70
2.1.1

Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire


Retardant (FR) P.V.C. insulated flexible copper cable
(ISI MARK) in existing pipe with 6A switch, Ceiling
rose and Modularplate covering to switch control box
including all labour charges etc., complete for

14/0.3mm PVC FR flexible copper wire R R Make


ELEC 1.5.1

100 M

1
910.00

910.00

6A Modularswitch Vimal make ELEC

each

63.00

378.00

6A 2 way Ceiling Rose Vimal make

each

16.00

96.00

6 Modular plate

each

108.00

108.00

Skilled Electrician ELEC 8.1.78

day

0.6

258.00

154.80

Semi skilled ELEC 8.1.79

day

1.2

237.00

284.40

Helper ELEC 8.1.84

day

0.6

237.00

142.20

Add 20% M / A For labourcharges

116.28
2,189.68

C) Cost for 6 Points

365.00

Each point Rate


2.1.3

Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C.


insulated F.R. flexible copper cable (ISI MARK) in
existing pipe with 6A switch control and 3/2 pin
sockets fixing on separate board including all labour
charges etc., complete.
14/0.3mm PVC FR flexible copper wire R R Make

100 M

6A Modularswitch Vimal make

each

15

63.00

945.00

Modular 6A 3 pin / 2 Pin Socket Vimal make

each

15

93.00

1,395.00

Skilled Electrician ELEC 8.1.78

day

1.5

258.00

387.00

Semi skilled ELEC 8.1.79

day

1.5

237.00

355.50

Helper ELEC 8.1.84

day

1.5

237.00

355.50

910.00

Add 20% M / A For labourcharges

219.60

Rate per 15Pts

4,567.60

Rate per each


2.1.4

304.50

Supply and fixing of 6A 3 pin wall plug socket with 6A


switch control on a common switch board with earth
continuity including wire leads, earth connections
along with all labour charges etc., complete.

93.00

93.00

63.00

63.00

0.067

258.00

17.29

237.00

15.88

Modular 6A 3 pin / 2 Pin Socket Vimal make

each

6A Modularswitch Vimal make

each

Skilled Electrician

day

Helpers

day

0.067

Add 20% M / A For labourcharges

6.63
195.80

Rate per each


3.1.4

910.00

Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R


P.V.C. insulated flexible copper cable in existing pipe
for mains inlcuding all labour charges etc., complete.
100 M

2
2,172.00

4,344.00

Skilled Electrician ELEC 8.1.78

day

0.67

258.00

172.86

Semi skilled ELEC 8.1.79

day

237.00

474.00

Helper ELEC 8.1.84

day

0.67

237.00

158.79

36/0.3mm (2.5 sqmm) FR PVC copper wire R R make


ELEC 1.5.3

Add 20% M / A For labourcharges


Rate 100 meter
Rate per Metre = C/100

207.00
5,356.65
53.57

13

Electrical Data for 2011 - 2012


SSR NO

Description

1.4.1

Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI
MARK) concealed in wall with all required accessories
including masonary work for light, fan and separate plug point
with well seasoned wooden deep box including all labour
charges etc., complete

Units

Qty

Rate\Rs

100 M

1,650.00

100 Nos

40.00

80.00

12 Modular metel box ELEC 1.3.6

Each

198.70

198.70

20mm dia 1,2,3 & 4 way deep Junction Box 1.2.38

Each

12

18.70

224.40

20mm PVC bends 1.2.48

Each

12

4.40

52.80

Cement

kg

50

5.00

250.00

Skilled Electrician ELEC 8.1.77

day

297.00

594.00

Semi skilled ELEC 8.1.78

day

260.00

520.00

Helper ELEC 8.1.85

day

260.00

520.00

Mason Ist class 8.1.79

day

297.00

594.00

20mm dia 1.5mm thick PVC pipe ELEC 1.2.1


U' Links 8.1.10

Add 20% M / A For labourcharges

445.60
51.30

Rate per each


Supply and Fixing of 25mm dia 1.5mm thick PVC pipe (ISI
MARK) concealed in wall with all required accessories
including masonary work and labour charges etc., complete.
1

2,200.00

2,200.00

100 Nos

40.00

80.00

25mm dia 1,2,3 & 4 way deep Junction Box 1.2.39

Each

12

22.00

264.00

25mm PVC bends 1.2.44

Each

12

5.50

66.00

Cement

kg

50

5.00

250.00

Skilled Electrician ELEC 8.1.77

day

297.00

594.00

Semi skilled ELEC 8.1.78

day

260.00

520.00

Helper ELEC 8.1.85

day

260.00

520.00

Mason Ist class 8.1.79

day

297.00

594.00

25mm dia 1.5mm thick PVC pipe ELEC 1.2.3


U' Links

100 M

Add 20% M / A For labourcharges

445.60
5,533.60

C) Cost for 100 RM

55.33

Rate per each


2.1.1

Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant


(FR) P.V.C. insulated flexible copper cable (ISI MARK) in
existing pipe with 6A switch, Ceiling rose and Modularplate
covering to switch control box including all labour charges etc.,
complete for
100 M

1,001.00

1,001.00

6A Modularswitch 1.9.1

each

92.00

552.00

6A 2 way Ceiling Rose 1.7.15

each

21.00

126.00
108.00

14/0.3mm PVC FR flexible copper wire

1.5.1

6 Modular cover plate 1.9.44

each

108.00

Skilled Electrician ELEC 8.1.77

day

0.6

297.00

178.20

Semi skilled ELEC 8.1.78

day

1.2

260.00

312.00

Helper ELEC 8.1.85

day

0.6

260.00

156.00

Add 20% M / A For labourcharges


C) Cost for 6 Points
Each point Rate
2.1.3

1,650.00

5,129.50

C) Cost for 100 RM


1.4.2

Amount

Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R.


flexible copper cable (ISI MARK) in existing pipe with 6A switch
control and 3/2 pin sockets fixing on separate board including
all labour charges etc., complete.

129.24
2,562.44
427.07

100 M

1,001.00

1,001.00

6A Modularswitch 1.9.1

each

15

92.00

1,380.00

Modular 6A 3 pin / 2 Pin Socket 1.9.4

each

15

141.00

2,115.00

Skilled Electrician ELEC 8.1.77

day

1.5

297.00

445.50

Semi skilled ELEC 8.1.78

day

1.5

260.00

390.00

Helper ELEC 8.1.85

day

1.5

260.00

390.00

14/0.3mm PVC FR flexible copper wire

1.5.1

Add 20% M / A For labourcharges

2.1.4

245.10

Rate per 15Pts

5,966.60

Each point Rate

397.77

Supply and fixing of 6A 3 pin wall plug socket with 6A switch


control on a common switch board with earth continuity
including wire leads, earth connections along with all labour
charges etc., complete.
Modular 6A 3 pin / 2 Pin Socket 1.9.4

each

141.00

141.00

6A Modularswitch 1.9.1

each

92.00

92.00

Skilled Electrician ELEC 8.1.77

day

0.067

297.00

19.90

Helper ELEC 8.1.85

day

0.067

260.00

17.42

Add 20% M / A For labourcharges

7.46
277.78

Each point Rate


2.1.6

Supply and Fixing of 16A 3pin and 6A 3pin plug socket with
indicator lamp and 16A switch control duly recessed in wall
with Metel deep box of covered with Modular covering plate
including earth connections and all lab
3 modular metelbox 1.3.2

each

72.60

3 modular covering plate 1.9.42

each

69.00

69.00

16A modular Switch 1.9.7

each

126.00

126.00

16A 3 pin / 6A 3pin plug socket 1.9.12

each

169.00

169.00
29.70

Skilled Electrician

day

0.1

297.00

Semi Skilled Electrician

day

0.1

260.00

26.00

Helpers

day

0.1

260.00

26.00

Add 20% M / A For labourcharges

16.34
534.64

Rate per each


3.1.2

72.60

Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.


insulated flexible copper cable in existing pipe for earth
continuity including all labour charges etc., complete.
100 M

1,001.00

1,001.00

Skilled Electrician ELEC 8.1.78

day

0.34

297.00

100.98

Semi skilled ELEC 8.1.79

day

260.00

260.00

Helper ELEC 8.1.84

day

0.34

260.00

88.40

14/0.3mm PVC FR flexible copper wire

1.5.1

Add 20% M / A For labourcharges

89.88
1,540.26

C) Cost for 100 RM

15.40

Rate per Metre = C/100


3.1.4 (a) Supply and run of 1 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.
insulated flexible copper cable in existing pipe for earth
continuity inlcuding all labour charges etc., complete.
36/0.3mm (2.5 sqmm) FR PVC copper wire 1.5.3

2,389.20

0.34

297.00

100.98

1.00

260.00

260.00

0.34

260.00

88.40

Skilled Electrician

day

Semi Skilled Electrician

day

Helpers

day

Add 20% M / A For labourcharges


C) Cost for 100 RM
Rate per Metre = C/100
3.1.4

2,389.20

100 M

Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.


insulated flexible copper cable in existing pipe for mains
inlcuding all labour charges etc., complete.

89.88
2,928.46
29.28

36/0.3mm (2.5 sqmm) FR PVC copper wire R R make ELEC


1.5.3

100 M

2
2,389.20

4,778.40

Skilled Electrician ELEC 8.1.78

day

0.67

297.00

198.99

Semi skilled ELEC 8.1.79

day

260.00

520.00

Helper ELEC 8.1.84

day

0.67

260.00

174.20

Add 20% M / A For labourcharges

178.64
5,850.23

Rate 100 meter

58.50

Rate per Metre = C/100


3.1.5

Supply and run of 2 of 56/0.3mm (4 Sq.mm) FR P.V.C.


insulated flexible copper cable in existing pipe for mains
inlcuding all labour charges etc., complete.
56 /0.3mm (4 sqmm)FR PVC flexible copper wire.R R make
1.5.4

100 M

2
3,478.20

6,956.40

Skilled Electrician ELEC 8.1.78

day

297.00

297.00

Semi skilled ELEC 8.1.79

day

260.00

780.00

Helper ELEC 8.1.84

day

260.00

260.00

Add 20% M / A For labourcharges

267.40

Rate per Metre 100

8,560.80
85.61

Rate per Metre = C/100


9.7.25

Supply and erecting 19/20mm steel tube down rod of one


meter length with bolts & nuts duly painted with matching
colour of fan complete
19mm steel tube down rod with bolts&nuts for fan with
maching colour. 8.1.27
Helper

day

0.1

60.00

60.00

260.00

26.00

Add 20% M / A For labourcharges

5.20
91.20

Total
9.7.26

Supply and erecting step type Modular regulator for ceiling


fans 1200mm sweep complete erected on existing board.
Step type Regulator 1.9.14
Semi skilled Electrician

473.00

473.00

day

0.1

237.00

23.70

Add 20% M / A For labourcharges

4.74
501.44

Total
9.7.35

Supply and Fixing of Ceiling fan and regulator including


transportation and giving connections with twin core wire etc.,
complete.
Ceiling Fan 5.1.3
23/0060 Twin Core wire

NO

1,840.00

9.00

9.00
37.13
32.50

Skilled Electrician

day

0.125

297.00

Helper

day

0.125

260.00

Add 20% M / A For labourcharges

13.93
1,932.55

Total
3.3.7

1,840.00

Supply and run of 2 of 140 /0.3mm (10 Sq.mm) F.R PVC


insulated flexible copper cable in existing pipe for mains
including all labour charges etc., complete.
100 M

2.00

8,223.60

16,447.20

Skilled Electrician ELEC 8.1.78

day

1.00

297.00

297.00

Semi skilled ELEC 8.1.79

day

3.00

260.00

780.00

Helper ELEC 8.1.84

day

1.00

260.00

260.00

140/0.3 (10 Sq.mm) FR PVC flexible copper wire 1.5.6

Add 20% M / A For labourcharges

267.40
18,051.60

Rate per Metre = C/100


4.4.4

Supply and fixing TPN Distribution board with IP-42 protection


(Metal Door) suitable for 3 phase FP Isolator as incomer and
10kA SP MCBs as outing going including internal connection
and labour charges for surface / flush mounting etc., complete.

180.50

4 way TPN, D.B with IP-42 Protection (MD) suitable for 3


phase FP Isolator as incommer. 2.12.24

each

1.00
2,490.50

2,490.50

80A, 4 Pole Isolator 2.10.17

each

1.00

862.20

862.20

10kA - 6-32A range SP MCBs 2.9.9

each

12.00

161.30

1,935.60

Skilled Electrician ELEC 8.1.78

day

0.50

297.00

148.50

Semi skilled ELEC 8.1.79

day

1.00

260.00

260.00

Helper ELEC 8.1.84

day

1.00

260.00

260.00

Sundries such as TW Plugs, Screws Cement etc,

LS

9.50

Add 20% M / A For labourcharges

133.70
6,100.00

Rate per each


4.4.9

Supply and fixing Distribution board with 20A single phase


plug and Socket, in sheet steel enclosure with 10/16/20A SP
MCB including internal connection and labour charges for
surface / flush mounting etc., complete
1 Phase Distribution board with 20A plug and socket. 2.12.55

Nos

1
650.00

650.00

10/16/20A SP MCB 2.9.9

Nos

161.30

161.30

Skilled Electrician ELEC 8.1.78

Nos

0.25

297.00

74.25

Semi skilled ELEC 8.1.79

Nos

0.25

260.00

65.00

Helper ELEC 8.1.84

Nos

0.25

260.00

65.00

Add 20% M / A For labourcharges

40.85
1,056.40

Rate per each


4.4.8

Supply and fixing TPN - Vertical type Distribution board with


IP -42 Protection (Metal Door) with 125A, 4Pole 25 kA MCCB
as incomer with 4Nos 32A TP MCBs and 12 Nos. 10 kA
SPMCBs as outgoing including internal connection and labour
charges for surface /
8 Way TPN Vertical DB with IP -42 (Metal door) protection
suitable for 125A, 4 Pole, 16kA MCCB as incomer. ELEC 2-1236

Nos

125 Amps, 4 Pole , 25 kA MCCB ELEC 2-8-6

Nos

10 kA, 40A TP MCBs: ELEC 2-9-6

Nos

Skilled Electrician

1
7843.00

7843.00

8698.20

8698.20

1477.00

5908.00

day

297.00

297.00

Semi Skilled Electrician

day

260.00

260.00

Helpers

day

260.00

260.00

Add 20% M / A For labourcharges

163.40
23429.60

Rate per each


5.1.1

Providing independent earthling by excavating a trench to a


depth of 2.1 M in all soils, as per size specified in the Data,
using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with
necessary accessories with hume pipe ring duly providing
staggered holes
Earth Work Excavation of Hard gravel Soil with small boulder
for trench 1st step of size 1.5 x 0.6 x 0.9 m (5'x2'x3') 8.1.56

cum

0.85
200

25% extra for narrow trench & pit and back filling with Sand,
Coke, Salt etc., and leveling
40mm dia 'B' Class G.I pipe 8.1.62
Drilling of 16 Nos through holes of 12mm dia to G.I pipe 8.1.63
G.I Nuts, Bolts an Washers 8.1.64

170.00

1
34.00

34.00

332.00

830.00

5.00

80.00

Mtr

2.5

Each

16

Set

10.00

40.00
200.00
320.00

Each

200.00

Hard Coke 8.1.16

Kg

40

8.00

Salt 8.1.17

Kg

20

4.00

80.00

Semi skilled Electrician

Nos

0.5

260.00

130.00

Helpers

Nos

0.5

260.00

130.00

18" dia hume pipe ring 8.1.65

Add 20% M / A For labourcharges

52.00

2066.00

Rate per each


5.3.2

Supply and Run of No. 8 SWG copper wire including cost of


all accessories and labour charges etc., complete.
8 SWG Copper wire (0.1155 Kg/Mtr.) 100 M L 8.1.41

Kg

11.55

549.00

6340.95

Skilled Electrician

Nos

297.00

297.00

Semi skilled Electrician

Nos

260.00

260.00

Helper

Nos

260.00

260.00

Add 20% M / A For labourcharges

163.40
7321.35

Rate per each

73.20

Rate per mtr c/100


8.4.5

Supply and transportation of 2x36w CFL paralite louvre (P5)


recessed low glare mirror optic luminaire comprising bright
anodised Aluminium reflector with VPIT Chokes and 36w CFL
lamps.
3x36 CFL PS paralite Louvars fitting 3.6.38

each

3976.40

36w CFL

each

130.00

3.7.31

Supply and transportation of recessed mounting 2x13W CFL


down light with all standard accessories with 2No. 13W CFL
lamp etc., complete.
2x13W CFL Down light fitting 3.6.54

each

1417.50

13W CFL

each

100.00

3.7.25

Rate per each


7.9.7

200.00

Fixing of mirror optic tube light luminaire in false ceiling / pop


with necessary arrangment including giving connections and
all labour charges etc., complete.
9.00

9.00

0.125

297.00

37.13

day

0.125

260.00

32.50

day

0.125

260.00

32.50

28/0060 twin core flexible copper cable

Aluminium flat (as per requirment)

LS

Skilled Electrician

day

Carpenter
Semi skilled Electrician / Helper

0.00

20.43
131.55

Rate per each


Supply and Labour charges for run of 50sqmm U.G cable on
wall / existing pipe with necessary fixing arrangments such as
saddles, clamps,wooden separators etc., (as directed by
departmental official) with No.10 SWG G.I wire for eath
connections for the cables.
50 Sqmm 3.5 core UG Cable 4-1-29

100

279.70

27970.00

each

200

15.00

3000.00

saddles of required size

100 nos

305.00

610.00

12mm screws

100 nos

50.00

200.00

No.10 SWG GI wire 8.1.45

kg

61.60

431.20

Skilled Electrician

day

297.00

297.00

Helper

day

260.00

1040.00

Wooden separators 8.1.8

267.40

20% MA for labourcharges

33815.60

C) Cost for 100 RM

338.15

Rate per each

14.1.1

1417.50
1617.50

20% MA for labourcharges


15.6.3

260.00
4236.40

Rate per each


8.6.2

3976.40

Supply, Transportation, fabrication and erection of following


guage CRCA sheet steel enclosure for power control cubicle
panel / boxes etc., including cutting, bending drilling, welding
and reveting etc., complete
with cleaning with 7 tank
process and painting with powder coating including cost and
conveyance of all materials and labour charges.
6.2.2
Sq.inch

2.20

2.20

4.2.5

Supply and erection of Panel mounting cubical type L.T heavy


duty ON LOAD change over switch of 400A, 4 pole, 415V, 50
Hz. with all accessories etc., complete on existing control
panel.
400A, 4 Pole, 415V, 50 Hz. On load cubical type C.O.S 2.2.5

each

Skilled Electrician

day

0.25

297.00

74.25

Semi Skilled Electrician

day

0.5

260.00

130.00

Helpers

day

0.5

260.00

130.00

Sundries such as hardware etc.,

LS

22,711.50

7.40
66.85

20 % M A for labourcharges

23,120.00

Rate per each


4.3.2

Supply and erection of Panel mounting 63A, 4 Pole, 10 /


16kA, MCCB with thermal magnetic setting / Microprocessor
based release arrangement
with all connections etc.,
complete on existing panel.
Cost of 60 / 63A, 4 Pole Panel mounting 10 / 16 kA, MCCB
2.8.13

each

1
5,668.00

5,668.00

Skilled Electrician

day

0.167

297.00

49.60

Semi Skilled Electrician

day

0.167

260.00

43.42

Helpers

day

0.333

260.00

86.58

Sundries such as hardware etc.,

LS
35.92

20 % M A for labourcharges

5,883.52

Rate per each


4.3.6

Supply and erection of Panel mounting 400A, 4 Pole, 35 /


36kA, MCCB with thermal magnetic setting / Microprocessor
based release arrangement
with all connections etc.,
complete on existing panel.
22,890.00

each

Skilled Electrician

day

0.2

297.00

59.40
104.00
104.00

Semi Skilled Electrician

day

0.4

260.00

Helpers

day

0.4

260.00

Sundries such as hardware etc.,

LS
53.40
23,210.80

Rate per each


Supply and erection of selector switch for voltmeter / Ammeter
on the existing box / panel including connections etc.,
complete.
Selector switch for Ammeter / Voltmeter. 6.3.8

each

175.00

175.00

Skilled Electrician

day

0.2

297.00

59.40
11.88

20 % M A for labourcharges

246.28

Rate per Each


14.2.7

Supply and erection of LED indicator lamps on the existing box


/ panel board.
LED indicator lamp Analog 6.3.9

each

135.00

135.00

Skilled Electrician

day

0.1

297.00

29.70
11.88

20 % M A for labourcharges

176.58

Rate per Each


14.2.8

22,890.00

400A, 4 Pole, 36/35kA panel mounting MCCB 2.8.8

20 % M A for labourcharges

14.2.6

22,711.50

Supply and erection of LT current transformer with bar primary


100/5A to 1000 / 5A ratio in the existing box / panel including
connections etc., complete.
L.T. C.T with bar primary 100 / 5A to 1000 / 5A 6.3.10

each

450.00

450.00

Skilled Electrician

day

0.1

297.00

29.70

20 % M A for labourcharges
Rate per Each

11.88
491.58

4.3.4

Supply and erection of Panel mounting 125A, 4 Pole, 25kA,


MCCB with thermal magnetic setting / Microprocessor based
release arrangement with all connections etc., complete on
existing panel.
Cost of 125A, 4 Pole, 25 kA panel mounting MCCB. 2.8.14

each

Skilled Electrician

day

0.167

Semi Skilled Electrician

day

0.167

Helpers

day

0.333

Sundries such as hardware etc.,

LS

20 % M A for labourcharges
Rate per Each

6322.00
297.00
260.00
260.00

6322.00
49.60
43.42
86.58
35.92

6537.52

Electrical Data for 2010 - 2011


SSR NO

Description

1.4.1

Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI
MARK) concealed in wall with all required accessories
including masonary work for light, fan and separate plug point
with well seasoned wooden deep box including all labour
charges etc., complete

Units

Qty

Rate\Rs

Amount

100 M

1,500.00

100 Nos

40.00

80.00

12 Modular metel box ELEC 1.3.6

Each

184.00

184.00

20mm dia 1,2,3 & 4 way deep Junction Box

Each

12

17.00

204.00

20mm PVC bends

20mm dia 1.5mm thick PVC pipe ELEC 1.2.1


U' Links

1,500.00

Each

12

4.00

48.00

Cement

kg

50

4.30

215.00

Skilled Electrician ELEC 8.1.78

day

258.00

516.00

Semi skilled ELEC 8.1.79

day

237.00

474.00

Helper ELEC 8.1.84

day

237.00

474.00

Mason Ist class

day

258.00

516.00

0.00

Add 20% M / A For labourcharges

396.00
4,607.00

C) Cost for 100 RM

46.00
1.4.2

Supply and Fixing of 25mm dia 1.5mm thick PVC pipe (ISI
MARK) concealed in wall with all required accessories
including masonary work and labour charges etc., complete.
100 M

2,000.00

100 Nos

40.00

80.00

25mm dia 1,2,3 & 4 way deep Junction Box

Each

12

20.00

240.00

25mm PVC bends

Each

12

5.00

60.00
215.00

25mm dia 1.5mm thick PVC pipe ELEC 1.2.3


U' Links

2,000.00

Cement

kg

50

4.30

Skilled Electrician ELEC 8.1.78

day

258.00

516.00

Semi skilled ELEC 8.1.79

day

237.00

474.00

Helper ELEC 8.1.84

day

237.00

474.00

Mason Ist class

day

258.00

516.00

Add 20% M / A For labourcharges

396.00
4,971.00

C) Cost for 100 RM

49.70
2.1.1

Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant


(FR) P.V.C. insulated flexible copper cable (ISI MARK) in
existing pipe with 6A switch, Ceiling rose and Modularplate
covering to switch control box including all labour charges etc.,
complete for
14/0.3mm PVC FR flexible copper wire R R Make ELEC 1.5.1

100 M

1
910.00

910.00
378.00

6A Modularswitch Vimal make ELEC

each

63.00

6A 2 way Ceiling Rose Vimal make

each

16.00

96.00

6 Modular plate

each

108.00

108.00

Skilled Electrician ELEC 8.1.78

day

0.6

258.00

154.80

Semi skilled ELEC 8.1.79

day

1.2

237.00

284.40

Helper ELEC 8.1.84

day

0.6

237.00

142.20

Add 20% M / A For labourcharges

116.28
2,189.68

C) Cost for 6 Points

365.00

Each point Rate


2.1.3

Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R.


flexible copper cable (ISI MARK) in existing pipe with 6A switch
control and 3/2 pin sockets fixing on separate board including
all labour charges etc., complete.

14/0.3mm PVC FR flexible copper wire R R Make

100 M

910.00

910.00

15

63.00

945.00

6A Modularswitch Vimal make

each

Modular 6A 3 pin / 2 Pin Socket Vimal make

each

15

93.00

1,395.00

Skilled Electrician ELEC 8.1.78

day

1.5

258.00

387.00

Semi skilled ELEC 8.1.79

day

1.5

237.00

355.50

Helper ELEC 8.1.84

day

1.5

237.00

355.50

Add 20% M / A For labourcharges

219.60

Rate per 15Pts

4,567.60

Rate per each


2.1.4

304.50

Supply and fixing of 6A 3 pin wall plug socket with 6A switch


control on a common switch board with earth continuity
including wire leads, earth connections along with all labour
charges etc., complete.
Modular 6A 3 pin / 2 Pin Socket Vimal make

each

93.00

93.00

6A Modularswitch Vimal make

each

63.00

63.00

Skilled Electrician

day

0.067

258.00

17.29

0.067

237.00

15.88

Helpers

day

Add 20% M / A For labourcharges

6.63
195.80

Rate per each


3.1.4

Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.


insulated flexible copper cable in existing pipe for mains
inlcuding all labour charges etc., complete.
36/0.3mm (2.5 sqmm) FR PVC copper wire R R make ELEC
1.5.3

100 M

2
2,172.00

4,344.00

Skilled Electrician ELEC 8.1.78

day

0.67

258.00

172.86

Semi skilled ELEC 8.1.79

day

237.00

474.00

0.67

237.00

158.79

Helper ELEC 8.1.84


Add 20% M / A For labourcharges
Rate 100 meter
Rate per Metre = C/100

day

207.00
5,356.65
53.57

Remarks

13

SL NO

DESCRIPTION

Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI
MARK) concealed in wall with all required accessories including
masonary work for light, fan and separate plug point with well
seasoned wooden deep box including all labour charges etc.,
complete

Supply and Fixing of 25mm dia 1.5mm thick PVC pipe (ISI MARK)
concealed in wall with all required accessories including masonary
work and labour charges etc., complete.

Nos

QTY

RATE

AMOUNT

RMT

150

51.30

7695.00

RMT

400

55.33

22132.00

Nos

75

427.00

32025.00

Nos

20

397.77

7955.40

Nos

15

277.78

4166.70

Nos

534.64

2673.20

Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR)


P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe
with 6A switch, Ceiling rose and Modularplate covering to switch
control box including all labour charges etc., complete for

Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R.


flexible copper cable (ISI MARK) in existing pipe with 6A switch
control and 3/2 pin sockets fixing on separate board including all
labour charges etc., complete.

Supply and fixing of 6A 3 pin wall plug socket with 6A switch control
on a common switch board with earth continuity including wire
leads, earth connections along with all labour charges etc.,
complete.

Supply and Fixing of 16A 3pin and 6A 3pin plug socket with
indicator lamp and 16A switch control duly recessed in wall with
Metel deep box of covered with Modular covering plate including
earth connections and all lab

Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated


flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.

RMT

400

15.40

6160.00

Supply and run of 1 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated


flexible copper cable in existing pipe for earth continuity inlcuding
all labour charges etc., complete.

RMT

100

29.28

2928.00

Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated


flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.

RMT

350

58.50

20475.00

10

Supply and run of 2 of 56/0.3mm (4 Sq.mm) FR P.V.C. insulated


flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.

RMT

300

85.61

25683.00

11

Supply and erecting 19/20mm steel tube down rod of one meter
length with bolts & nuts duly painted with matching colour of fan
complete

RMT

105

91.20

9576.00

12

Supply and erecting step type Modular regulator for ceiling fans
1200mm sweep complete erected on existing board.

Nos

30

501.44

15043.20

13

Supply and Fixing of Ceiling fan and including transportation and


giving connections with twin core wire etc., complete.

Nos

30

1932.55

57976.50

14

Supply and run of 2 of 140 /0.3mm (10 Sq.mm) F.R PVC insulated
flexible copper cable in existing pipe for mains including all labour
charges etc., complete.

RMT

40

180.50

7220.00

Nos

6100.00

6100.00

15

Supply and fixing TPN Distribution board with IP-42 protection


(Metal Door) suitable for 3 phase FP Isolator as incomer and 10kA
SP MCBs as outing going including internal connection and labour
charges for surface / flush mounting etc., complete.

16

17

18

Supply and fixing Distribution board with 20A single phase plug
and Socket, in sheet steel enclosure with 10/16/20A SP MCB
including internal connection and labour charges for surface / flush
mounting etc., complete

Nos

10

1056.40

10564.00

Nos

23429.60

23429.60

Nos

2066.00

10330.00

RMT

50

73.20

3660.00

Supply and fixing TPN - Vertical type Distribution board with IP -42
Protection (Metal Door) with 125A, 4Pole 25 kA MCCB as incomer
with 4Nos 32A TP MCBs and 12 Nos. 10 kA SPMCBs as outgoing
including internal connection and labour charges for surface /

Providing independent earthling by excavating a trench to a depth


of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories
with hume pipe ring duly providing staggered holes

19

Supply and Run of No. 8 SWG copper wire including cost of all
accessories and labour charges etc., complete.

20

Supply and transportation of 2x36w CFL paralite louvre (P5)


recessed low glare mirror optic luminaire comprising bright
anodised Aluminium reflector with VPIT Chokes and 36w CFL
lamps.

Nos

18

4236.40

76255.20

21

Supply and transportation of recessed mounting 2x13W CFL down


light with all standard accessories with 2No. 13W CFL lamp etc.,
complete.

Nos

25

1617.50

40437.50

22

Fixing of mirror optic tube light luminaire in false ceiling / pop with
necessary arrangment including giving connections and all labour
charges etc., complete.

Nos

40

131.55

5262.00

23

Supply and Labour charges for run of 50sqmm U.G cable on wall /
existing pipe with necessary fixing arrangments such as saddles,
clamps,wooden separators etc., (as directed by departmental
official) with No.10 SWG G.I wire for eath connections for the
cables.

RMT

50

338.15

16907.50

24

Total

414654.80

DESCRIPTION

SL NO

Nos

QTY

RATE

AMOUNT

Supply, Transportation, fabrication and erection of following guage


CRCA sheet steel enclosure for power control cubicle panel /
boxes etc., including cutting, bending drilling, welding and reveting
etc., complete
with cleaning with 7 tank process and
painting with powder coating including cost and conveyance of all
materials and labour charges.
6.2.2

SQ.Inch 38000

2.20

83600.00

Supply and erection of Panel mounting cubical type L.T heavy duty
ON LOAD change over switch of 400A, 4 pole, 415V, 50 Hz. with all
accessories etc., complete on existing control panel.

Nos

23120.00

23120.00

Nos

5883.50

23534.00

Nos

23210.80

23210.80

Nos

246.28

492.56

Supply and erection of LED indicator lamps on the existing box /


panel board.

Nos

176.58

529.74

Supply and erection of LT current transformer with bar primary


100/5A to 1000 / 5A ratio in the existing box / panel including
connections etc., complete.

Nos

491.58

1474.74

Nos

6537.52

13075.04

RMT

60

180.50

10830.00
179866.88
25181.36
200000.00
20252.41

Supply and erection of Panel mounting 63A, 4 Pole, 10 / 16kA,


MCCB with thermal magnetic setting / Microprocessor based
release arrangement with all connections etc., complete on
existing panel.
Supply and erection of Panel mounting 400A, 4 Pole, 35 /36kA,
MCCB with thermal magnetic setting / Microprocessor based
release arrangement with all connections etc., complete on
existing panel.
Supply and erection of selector switch for voltmeter / Ammeter on
the existing box / panel including connections etc., complete.

Supply and erection of Panel mounting 125A, 4 Pole, 25kA, MCCB


with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
Supply and run of 2 of 140 /0.3mm (10 Sq.mm) F.R PVC insulated
flexible copper cable in existing pipe for mains including all labour
charges etc., complete.
Total
Contractor Profit @14%
Provison for 120Sqmm Cable with Electrical charges
ADD VAT @ 5%
TOTAL

LS

425300.66

SL NO

DESCRIPTION

Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI
MARK) concealed in wall with all required accessories including
masonary work for light, fan and separate plug point with well
seasoned wooden deep box including all labour charges etc.,
complete

Supply and Fixing of 25mm dia 1.5mm thick PVC pipe (ISI MARK)
concealed in wall with all required accessories including masonary
work and labour charges etc., complete.

Nos

QTY

RATE

AMOUNT

RMT

150

51.30

7695.00

RMT

400

55.33

22132.00

Nos

75

427.00

32025.00

Nos

20

397.77

7955.40

Nos

15

277.78

4166.70

Nos

534.64

2673.20

Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR)


P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe
with 6A switch, Ceiling rose and Modularplate covering to switch
control box including all labour charges etc., complete for

Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R.


flexible copper cable (ISI MARK) in existing pipe with 6A switch
control and 3/2 pin sockets fixing on separate board including all
labour charges etc., complete.

Supply and fixing of 6A 3 pin wall plug socket with 6A switch control
on a common switch board with earth continuity including wire
leads, earth connections along with all labour charges etc.,
complete.

Supply and Fixing of 16A 3pin and 6A 3pin plug socket with
indicator lamp and 16A switch control duly recessed in wall with
Metel deep box of covered with Modular covering plate including
earth connections and all lab

Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated


flexible copper cable in existing pipe for earth continuity including
all labour charges etc., complete.

RMT

400

15.40

6160.00

Supply and run of 1 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated


flexible copper cable in existing pipe for earth continuity inlcuding
all labour charges etc., complete.

RMT

100

29.28

2928.00

Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated


flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.

RMT

350

58.50

20475.00

10

Supply and run of 2 of 56/0.3mm (4 Sq.mm) FR P.V.C. insulated


flexible copper cable in existing pipe for mains inlcuding all labour
charges etc., complete.

RMT

300

85.61

25683.00

11

Supply and erecting 19/20mm steel tube down rod of one meter
length with bolts & nuts duly painted with matching colour of fan
complete

RMT

105

91.20

9576.00

12

Supply and erecting step type Modular regulator for ceiling fans
1200mm sweep complete erected on existing board.

Nos

30

501.44

15043.20

13

Supply and Fixing of Ceiling fan and including transportation and


giving connections with twin core wire etc., complete.

Nos

30

1932.55

57976.50

14

Supply and run of 2 of 140 /0.3mm (10 Sq.mm) F.R PVC insulated
flexible copper cable in existing pipe for mains including all labour
charges etc., complete.

RMT

40

180.50

7220.00

Nos

6100.00

6100.00

15

Supply and fixing TPN Distribution board with IP-42 protection


(Metal Door) suitable for 3 phase FP Isolator as incomer and 10kA
SP MCBs as outing going including internal connection and labour
charges for surface / flush mounting etc., complete.

16

17

18

Supply and fixing Distribution board with 20A single phase plug
and Socket, in sheet steel enclosure with 10/16/20A SP MCB
including internal connection and labour charges for surface / flush
mounting etc., complete

Nos

10

1056.40

10564.00

Nos

23429.60

23429.60

Nos

2066.00

10330.00

RMT

50

73.20

3660.00

Supply and fixing TPN - Vertical type Distribution board with IP -42
Protection (Metal Door) with 125A, 4Pole 25 kA MCCB as incomer
with 4Nos 32A TP MCBs and 12 Nos. 10 kA SPMCBs as outgoing
including internal connection and labour charges for surface /

Providing independent earthling by excavating a trench to a depth


of 2.1 M in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories
with hume pipe ring duly providing staggered holes

19

Supply and Run of No. 8 SWG copper wire including cost of all
accessories and labour charges etc., complete.

20

Supply and transportation of 2x36w CFL paralite louvre (P5)


recessed low glare mirror optic luminaire comprising bright
anodised Aluminium reflector with VPIT Chokes and 36w CFL
lamps.

Nos

18

4236.40

76255.20

21

Supply and transportation of recessed mounting 2x13W CFL down


light with all standard accessories with 2No. 13W CFL lamp etc.,
complete.

Nos

25

1617.50

40437.50

22

Fixing of mirror optic tube light luminaire in false ceiling / pop with
necessary arrangment including giving connections and all labour
charges etc., complete.

Nos

40

131.55

5262.00

23

Supply and Labour charges for run of 50sqmm U.G cable on wall /
existing pipe with necessary fixing arrangments such as saddles,
clamps,wooden separators etc., (as directed by departmental
official) with No.10 SWG G.I wire for eath connections for the
cables.

RMT

50

338.15

24
25
26
27
28

16907.50
414654.80

Total
Contractor Profit 14%

58051.60

ADD VAT @ 5%

23635.32
3658.28

Unforceen items
TOTAL

500000.00

DESCRIPTION

SL NO

Nos

QTY

RATE

AMOUNT

Supply, Transportation, fabrication and erection of following guage


CRCA sheet steel enclosure for power control cubicle panel /
boxes etc., including cutting, bending drilling, welding and reveting
etc., complete
with cleaning with 7 tank process and
painting with powder coating including cost and conveyance of all
materials and labour charges.
6.2.2

SQ.Inch 38000

2.20

83600.00

Supply and erection of Panel mounting cubical type L.T heavy duty
ON LOAD change over switch of 400A, 4 pole, 415V, 50 Hz. with all
accessories etc., complete on existing control panel.
Supply and erection of Panel mounting 63A, 4 Pole, 10 / 16kA,
MCCB with thermal magnetic setting / Microprocessor based
release arrangement with all connections etc., complete on
existing panel.
Supply and erection of Panel mounting 400A, 4 Pole, 35 /36kA,
MCCB with thermal magnetic setting / Microprocessor based
release arrangement with all connections etc., complete on
existing panel.

Nos

23120.00

23120.00

Nos

5883.50

23534.00

Nos

23210.80

23210.80

Supply and erection of selector switch for voltmeter / Ammeter on


the existing box / panel including connections etc., complete.

Nos

246.28

492.56

Supply and erection of LED indicator lamps on the existing box /


panel board.

Nos

176.58

529.74

Supply and erection of LT current transformer with bar primary


100/5A to 1000 / 5A ratio in the existing box / panel including
connections etc., complete.

Nos

491.58

1474.74

Nos

6537.52

13075.04

RMT

60

180.50

10830.00
179866.88
25181.36
200000.00
20252.41

Supply and erection of Panel mounting 125A, 4 Pole, 25kA, MCCB


with thermal magnetic setting / Microprocessor based release
arrangement with all connections etc., complete on existing panel.
Supply and run of 2 of 140 /0.3mm (10 Sq.mm) F.R PVC insulated
flexible copper cable in existing pipe for mains including all labour
charges etc., complete.
Total
Contractor Profit @14%
Provison for 120Sqmm Cable with Electrical charges
ADD VAT @ 5%
TOTAL

LS

425300.66