Vous êtes sur la page 1sur 20

Pearl GTL

Project
Shell Project No: HP-3000-QAT
Project Document Number: T- 4.234.144

Purchase Order Number:

2MH127

Tag/Item Number(s):

N/A

Unit(s):

ASU

PCWBS:

LINDE ENGINEERING

Contractor Project No :
Project Rev.: B

Page 2 of 19

5887

QATAR SHELL GTL PROJECT (PEARL)


C2 AIR SEPARATION UNITS CONSTRUCTION

28.01.2008

Ready For Construction

SB

UA

MC/ZG

RFC

25.11.2007

Company Comments Incorporated

IU

UA/IO

MC/ZG

CCI

Issued for Company Comments

MS

MC

ZG

ICC

Issued for Review

MS

MC

ZG

IFR

Issued for Internal Review

MS

MC

ZG

IIR

GAMA
Rev.
No.

Project
Rev
No.

Date

Prepared Checked Approved


By
By
By
ORIGINATOR

Description

Status

Document Title:

PROCEDURE FOR EARTHWORKS


LINDE ENGINEERING AG
Document No.

Contractor

Gama Qatar Co. W. L. L.

LOC470
GAM

PRO

QAC

GTL

021

Org.
Code

Doc.
Type

Disc.
Code

Geogr.
Area

Seq.
No

Rev.
No

Project Document Number: T-4.234.144

Vendor Code

Rev No: B

Q A T A R

Doc. Title

GAM-PRO-QAC-GTL-021 Rev. E
Procedure For Earthworks

Date

28.01.2008

TABLE OF CONTENTS
1.

SCOPE ________________________________________________________________________5

2.

PURPOSE _____________________________________________________________________5

3.

REFERENCES _________________________________________________________________5

4.

DEFINITIONS _________________________________________________________________5

5.

RESPONSIBILITIES ____________________________________________________________6

6.

PROCEDURE __________________________________________________________________7

7.

6.1.

Materials _________________________________________________________________________7

6.2.

Type A Fill Material ________________________________________________________________7

6.3.

Type B Fill Material ________________________________________________________________8

6.4.

Type C Fill Material ________________________________________________________________9

Excavation _____________________________________________________________________9
7.1.

Sub-grade Preparation_____________________________________________________________10

7.2.

Backfilling/Filling and Final Grading_________________________________________________10

8.

Testing _______________________________________________________________________11

9.

ATTACHMENTs _______________________________________________________________11

T-4.234.144 Rev. B

Page 4 of 19

Q A T A R

Doc. Title

GAM-PRO-QAC-GTL-021 Rev. E
Procedure For Earthworks

Date

28.01.2008

1. SCOPE
This Quality Control Procedure relates to the verification of all construction activities for
Earthworks.

2. PURPOSE
This Quality Control Procedure defines the documentation to be collated and the
inspections to be carried out in order to verify and record that all earthwork activities are
conformant to the requirements in the Project Specification.

3. REFERENCES
T-13.376.490

Project Specification for Site Preparation

DEP 34.11.00.11 Site Preparation and Earthworks, including tank Foundations and
Tank Farms
T.13.376.352

Amendments and/or Supplements to Site Preparation and


Earthworks, including tank Foundations and Tank Farms

T-4.234.573

ITP for Site Preparation and Earth Works.

4. DEFINITIONS
Company
Contractor or Linde
Sub Contractor or Gama
Contract
QCE
QCI
ITP

T-4.234.144 Rev. B

:
:
:
:
:
:
:

QSGTL and/or its PMC


Linde Engineering AG
Gama QATAR
QSGTL Pearl Plant-C2 ASU Construction Works
Quality Control Engineer
Quality control Inspector
Inspection Test Plan

Page 5 of 19

Q A T A R

Doc. Title

GAM-PRO-QAC-GTL-021 Rev. E
Procedure For Earthworks

Date

28.01.2008

5. RESPONSIBILITIES
Site Engineer is responsible for the following:

Excavation
Backfilling/Filling
Final grading/levelling
Compaction
To ensure that the surveyor has completed setting out reference points
complying with the approved drawing.
To ensure that all parties who are required to make any kind of test or
inspections are properly informed of the programme of the works and
inspection and testing requirements.
Initiating the Request for Inspection and transmitting in a timely manner to
QA/QC department.
The QCE will be responsible for the following:

To ensure that all QCI's and Lab Technicians are properly informed as to the daily
work programme and delegating actions to QCI.

Review of all Documentation and Reports.

Rising of relevant Request for Inspections and transmission to the CONTRACTOR


Quality Department 24 hours before the scheduled inspection or test.

The QCI will be responsible for the following:

To ensure that he is fully aware of the daily construction programme.

To ensure that he attends all inspection points in a timely manner and records the
results of his inspections on the appropriate forms.

Completion and filing of all inspection records under his responsibility and reporting to
QCE.

T-4.234.144 Rev. B

Page 6 of 19

Q A T A R

Doc. Title

GAM-PRO-QAC-GTL-021 Rev. E
Procedure For Earthworks

Date

28.01.2008

The Lab. Technician will be responsible for the Following:

To ensure that he is fully aware of the daily construction programme.

To ensure that he attends and performs the required test properly in a timely manner
and records the results accordingly.

Reviewing and issuing all relevant lab. test reports to the QCE in a timely manner.

6. PROCEDURE
6.1. MATERIALS
Suitable fill materials shall be free from refuse or other waste materials, large (> 100 mm)
cobble or boulder sized fragments, or other material which might prevent proper
compaction or cause the compacted fill to perform inadequately or have insufficient stability
or bearing capacity for the loads to which it is likely to be subjected.

6.2. TYPE A FILL MATERIAL


Type A material shall be used under all foundations and shall comply with the following
specification: Type of soil: Inorganic and free draining with no more than trace amounts of organic matter,
gypsum or other salts.
Particle size: 50mm max.
Fines content: 15% max.
Gradation: Well graded
Liquid Limit: 25% max.
The fill shall be placed at optimum moisture content, in loose layers not exceeding 225mm
thick, each layer should be compacted with suitable equipment to not less than 95% of the
maximum dry density (MDD) as determined from the modified Proctor test.
Quality control of compaction operations shall be made by field density testing; using
approved means, at an initial frequency of one test every 300 m2 per layer.

T-4.234.144 Rev. B

Page 7 of 19

Q A T A R

Doc. Title

GAM-PRO-QAC-GTL-021 Rev. E
Procedure For Earthworks

Date

28.01.2008

6.3. TYPE B FILL MATERIAL


Type B material may be used as fill for the following purposes:
1. Roadway and paving sub-grade
2. Embankments
3. Grading of general areas to be used by construction or plant operation
Preferred properties of Type B fill shall meet the following criteria:
Type of soil: - Inorganic and free draining with no more than trace amounts of organic
matter, gypsum or other salts.
Particle size: 75mm max.
Fines content: 30% max.
Gradation: Well graded
Liquid Limit: 40% max.
The fill shall be placed at optimum moisture content, in loose layers not exceeding 300mm
thick. Each layer should be compacted using appropriate equipment to not less than 90% of
the MDD, with the exception of the top 300mm, which shall be compacted to a minimum of
95% maximum dry density (MDD) as determined from the modified Proctor test.
Quality control of compaction operations shall be made by field density testing; using
approved means, at an initial frequency of one test every 750 m2 per layer.

T-4.234.144 Rev. B

Page 8 of 19

Q A T A R

Doc. Title

GAM-PRO-QAC-GTL-021 Rev. E
Procedure For Earthworks

Date

28.01.2008

6.4. TYPE C FILL MATERIAL


Type C material shall only be used as fill at locations where the installation of structures or
equipment is not planned or in open areas where only grading is required.
Properties and characteristics of Type C fill should satisfy or exceed the criteria given below:
Type of soil: Inorganic, granular or silty soil with low to negligible gypsum/salt content
Particle size: 100mm max.
Fines content: 50% max.
Gradation: Well graded
Liquid Limit: 50% max.
Type C material should be placed in loose layers not exceeding 600mm and may be
compacted using bulldozers and/or other types of grading equipment.

7. EXCAVATION
Excavation shall be carried out generally, in accordance with the lines, levels and profiles
shown on latest RFC drawings.
Prior to commencement of excavation work,
Survey/setting out of area to be excavated.
Establish control or reference point to check the extent or depth of excavation.
Dewatering system shall be provided if necessary to remove water from the work or ensure
the stability of excavation during construction.

T-4.234.144 Rev. B

Page 9 of 19

Q A T A R

Doc. Title

GAM-PRO-QAC-GTL-021 Rev. E
Procedure For Earthworks

Date

28.01.2008

7.1. SUB-GRADE PREPARATION


After excavations are completed to the specified elevation, or after the removal of top soil or
the unsuitable material, the sub-grade shall be checked for soft spots or depressions prior to
the construction of facilities or the placement of any fill material. The excavated area shall be
backfilled with suitable material. Below the proposed facilities, under certain conditions, lean
concrete may be used as an alternative to compacted soil.

Ground water shall be controlled during sub-grade preparation in order to evaluate the
condition of the sub-grade or to achieve the required degree of compaction of fill material being
used.
Sub-grade material shall be scarified to a depth of 150mm prior to placing fill material to
provide intermixing of fill and sub-grade materials and to avoid stratification of the two
materials.

7.2. BACKFILLING/FILLING AND FINAL GRADING


Backfilling/Filling and final grading shall be carried out generally in accordance
with the lines, levels and profiles shown on drawings.

No fill material shall be placed until the area has been cleared and prepared to receive
filling operation.

All fill material shall be tested and approved prior to use.

Correct type of fill material is being used, layer thickness and compaction method
properly observed.

Appropriate types of equipment or tools are available for the work.

Compaction tests are carried out satisfactorily as required.

Final surfaces, elevations and slopes in various areas shall be as shown on drawing
with the tolerances in accordance with the Project Specifications are completed,

Final elevations shall be checked on a specific record sheet.

T-4.234.144 Rev. B

Page 10 of 19

Q A T A R

8.

Doc. Title

GAM-PRO-QAC-GTL-021 Rev. E
Procedure For Earthworks

Date

28.01.2008

TESTING

Testing of materials will be as per sec. 11.3 and 11.4 of T- 13.376.490.

One test for every 1000m3 or change in source.

Compaction Test will be done for every 400 m3 for Type A, B, C.

Area/Location to be decided with Contractor/Company.

9. ATTACHMENTS

GAM-QCR-QAC-GTL-001
GAM-QCR-QAC-GTL-002
GAM-QCR-QAC-GTL-003
GAM-QCR-QAC-GTL-004
GAM-QCR-QAC-GTL-005
GAM-QCR-QAC-GTL-006
GAM-QCR-QAC-GTL-007
GAM-QCR-QAC-GTL-008

T-4.234.144 Rev. B

:
:
:
:
:
:
:
:

Checklist Initial Earthworks


Atterberg Limits
Density - test
Partical Size Distribution Soil
Laboratory - Compaction
Checklist Surveyors Report
Checklist Backfill Foundations Utilities
Checklist Excavation Foundations Utilities

Page 11 of 19

INSPECTION CHECKLIST

EARTHWORKS
CLEARING AND GRADING
FORM NO: GAM-QCR-QAC-GTL-001
Rev.0
Location Bldg/Area :

ITP: GAM-ITP-QAC-GTL-

Date :

Drawing Reference Nos :

1
2
3
4
5
6
7
8
9
10
11
12
13

Check work site, stock pile haul roads, disposal areas and any existing utilities clearly identified
Check that the Surveyor has established bench marks and confirmed elevations
Check work site and any existing utilities staked out (confirmed by surveyor or attach
surveyor's report)
Check provisions for de-watering (if appl.)
Check provisions for demolition of existing structures. (if appl.)
Check valid work permits obtained for all areas
Check site cleared of all unsuitable soil & rubbish
Check all unsuitable material hauled away to designated disposal area.
Check any retained soils are properly stock piled
Check retained soils appear acceptable and sampled as required
Check site properly graded to designated levels (confirmed by surveyor or attach surveyor's
report)
Check base soil appears acceptable & sampled as required
Check base scarified (if required)

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

Comments:

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL

PEARL GTL ASU PROJECT


ATTERBERG LIMITS TEST FORM
ITP NO: GAM-ITP-QAC-GTL-

FORM NO: GAM-QCR-QAC-GTL-002


LIQUID LIMIT
Test No.

1
I

2
I

3
I

4
I

Cone Penetration (mm)


Average Cone Penetration (mm)
Container Number
Weight of Wet Sample + Container (g)
Weight of Dry Sample + Container (g)
Weight of Container (g)
Weight of Dry Sample (g)
Weight of Moisture (g)
MOISTURE CONTENT (%)

PLASTIC LIMIT
Container Number
SAMPLE

Weight of Wet Sample + Container (g)

Air Dried
As Received
Oven Dried

Weight of Dry Sample + Container (g)


Weight of Container (g)

% + 425 mic

Weight of Dry Sample (g)


Weight of Moisture (g)
MOISTURE CONTENT (%)

PENETRATION
OF CONE (MM)

26

24

22

20

18
LIQUID LIMIT
16

PLASTIC LIMIT
PLASTICITY INDEX

14

MOISTURE CONTENT (%)

THE ABOVE DETERMINATION WERE PERFORMED IN ACCORDANCE WITH B.S 1377 PART 2
GAMA QATAR

LABORATORY TECHNICIAN :
CHECKED BY :

LINDE

PEARL GTL

DATE :

IN-SITU SOIL DENSITY TEST


NUCLEAR METHOD
FORM NO:
GAM-QCR-QAC-GTL003
Rev. 0

ITP REF. NO: GAM-ITP-QAC-GTL-

DATE:

REV. 0

Moisture Content Standard Count

C.P.M

Maximum Dry Density

Kg / m3

Date

Test
No.

Location of Testing

Layer Thickness =
Test
No.

Moisture
Content
(%)

Required Compaction % =

Location of Testing

Layer Thickness =
Test
No.

Wet
Density
Mg / m3

Req. No :

Wet
Density
Mg / m3

Layer Thickness =

Wet
Density
Mg / m3

Degree of
Compaction
(%)

Average :
Moisture
Content
(%)

Required Compaction % =

Location of Testing

Dry
Density
Mg / m3

Dry
Density
Mg / m3

Degree of
Compaction
(%)

Average :
Moisture
Content
(%)

Required Compaction % =

Dry
Density
Mg / m3

Degree of
Compaction
(%)

Average :

The above tests were performed using : ASTM D-2922 SOIL DENSITY & ASTM D-3107 MOISTURE CONTENT
GAMA QATAR

LABORATORY TECHNICIAN:

SIGN OFF RELEASE


LINDE

PEARL GTL

DATE:

PEARL GTL ASU PROJECT.

PARTICAL SIZE DISTRIBUTION SOIL


FORM NO:
GAM-QCR-QAC-GTL004
Rev.0

ITP REF. NO: GAM-QCR-QAC-GTL-

DATE:

REV. 0

COARSE MATERIAL
SIEVE SIZE
ASTM

WEIGHT
RETAINED
(g)

PERCENT
RETAINED
(%)

FINE MATERIAL
PERCENT
PASSING
(%)

WEIGHT
RETAINED
(g)

SIEVE SIZE

3 inch

75 mm

No. 10

2 mm

2 inch

50 mm

No. 20

850 mic.

1 inch

37.5 mm

No. 40

425 mic.

1 inch

25 mm

No. 50

300 mic.

inch

19 mm

No. 60

250 mic.

3/8 inch

9.5 mm

No. 140

106 mic.

No. 4

4.75 mm

No. 200

75 mic.

GAMA QATAR

LINDE

PERCENT
RETAINED
(%)

PERCENT
PASSING
(%)

PEARL GTL

CHECKED BY :
LABORATORY TECHNICIAN :

DATE :

PEARL GTL ASU PROJECT


LABORATORY COMPACTION TEST FORM
FORM NO: GAM-QCR-QAC-GTL-005
Initial Mass of Sample

ITP NO: GAM-ITP-QAC-GTL-

g
.Layers

Weight of Sample + Mould (g)

Test Method : ASTM D-1557


4.5 kg Hand Rammer
..Blows per Layer

Volume of Mould

Weight of Mould (g)


BULK DENSITY
Container NO.
Weight of Wet Sample + Container (g)
Weight of Dry Sample + Container (g)
Weight of Container (g)
Weight of Dry Sample (g)
Weight of Moisture (g)
MOISTURE CONTENT (%)

DRY DENSITY (%)

DRY DENSITY Mg / m3

MAXIMUM DRY DENSITY

Kg / m3

OPTIMUM MOISTURE CONTENT %

THE ABOVE DETERMINATION WERE PERFORMED IN ACCORDANCE WITH ASTM 1557


GAMA QATAR

LINDE

PEARL GTL

CHECKED BY :
LABORATORY
TECHNICIAN :

DATE :

INSPECTION CHECKLIST

SURVEYORS REPORT.
FORM NO:
GAM-QCR-QAC-GTL-006 ITP REF. NO: GAM-ITP-QAC-GTLRev. 0

REV. 0 DATE :

Location Bldg/Area:

No :

Briefly describe the intention of the Survey and purpose giving details of the utility/ excavation.

For Location give Marked up copy of Drawing:

Drawing Numbers

Calibration Cert No :

1. Confirm that surveying equipment is calibrated


2. Check that the drawings noted above are approved for use.
3. Check all existing utilities are clearly identified and staked out
4. Confirm that the proposed excavation is clearly staked/ Marked out.
5. Confirm depth of excavation.

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

Surveyors Comments plus any additional survey information.

SIGN OFF WILL CONFIRM RELEASE TO EXCAVATE.


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL

INSPECTION CHECKLIST

BACKFILL
UTILITIES / FOUNDATIONS
FORM NO: GAM-QCR-QAC-GTL007
Rev. 0
Location Bldg/Area:

ITP REF. NO: GAM-ITP-QAC-GTL-

REV. 0

DATE:

Drawing Reference Nos

ITEM DESCRIPTION

BACKFILL UTILITY
1
2
3
4
5
6

Confirm that Utility is completed tested and released for BACKFILL


Confirm that sand fill is completed
Confirm that fill is being laid in layers as required by the specification.
Confirm that compaction test have been performed and results recorded.
If the Utility requires tiles to be laid confirm that this has been done.
If warning tape is required confirm that it has been laid

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

BACKFILL FOUNDATIONS
7
8
9
10
11

Confirm that the foundation has been released for Coating and Backfill
Confirm that the foundation has been coated with liquid membrane as require by specification
Confirm that the foundation has been covered with hardboard and overlain with polyethylene.
Confirm that fill is being laid in layers as required by the specification.
Confirm that compaction test have been performed and results recorded.

COMMENTS :

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL

INSPECTION CHECKLIST

EXCAVATION FOR UTILITIES AND


FOUNDATIONS
FORM NO: GAM-QCR-QAC-GTL008
Rev.0
Location Bldg/Area:

ITP REF. NO: GAM-ITP-QAC-GTL-

REV. 0

DATE:

Drawing Reference Nos:

ITEM DESCRIPTION

1 Check route/area is clearly staked / Marked out by Surveyor


2 Check all existing utilities clearly identified and staked out

N/A YES NO

3 If Utility trench check that it complies with depth & width shown on drawing.
If foundation Base confirm size and depth are correct to approved drawings/ surveyors
4
report.
5 Check bedding material for foundation or Utility trench is clean and free of stones and
laid to proper depth
For drainage confirm levels falls etc mark on drawing (show levels Manhole to
6
Manhole).
7 If Geotextile is to be used confirm that it is positioned to the correct requirements.

N/A YES NO

N/A YES NO

N/A YES NO
N/A YES NO
N/A YES NO
N/A YES NO

8 Confirm base compaction test have to be performed prior to bedding.


9 Check de-watering properly maintained (if required)

N/A YES NO

10 Check trench is properly battered, framed or sheeted (if required)

N/A YES NO

N/A YES NO

1. Stage completion release to lay UTILITY or


2. Blinding for Foundation Base.
COMMENTS :

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL