Vous êtes sur la page 1sur 25

Pearl GTL

Project
Shell Project No: HP-3000-QAT
Project Document Number: T- 4.234.543

Purchase Order Number:

2MH127

Tag/Item Number(s):

N/A

Unit(s):

ASU

PCWBS:

LINDE ENGINEERING

Contractor Project No :
Project Rev.: A

Page 2 of 22

5887

QATAR SHELL GTL PROJECT (PEARL)


C2 AIR SEPARATION UNITS CONSTRUCTION

16.07.08

Ready for Construction

SB

EO

AG

RFC

11.06.08

Issued for Company Comments

FB

EO

AG

ICC

05.06.08

Issued for Company Comments

FB

EO

AG

ICC

Issued for Review

FB

EO

AG

IFR

Issued for Internal Review

FB

EO

AG

IIR

GAMA
Rev.
No.

Project
Rev
No.

Date

Prepared Checked Approved


By
By
By
ORIGINATOR

Description

Status

Document Title:

LINDE ENGINEERING AG

QUALITY CONTROL PROCEDURE FOR SEWER &


DRAINAGE
Document No.

Contractor

LOC470
Gama Qatar Co. W. L. L.

GAM

PRO

QAC

GTL

025

Org.
Code

Doc.
Type

Disc.
Code

Geogr.
Area

Seq.
No

Rev.
No

Project Document Number: T-4.234.543

Vendor Code

Rev No: A

Q A T A R

Doc. Title

QUALITY CONTROL PROCEDURE FOR SEWER & DRAINAGE

Doc No:

GAM-PRO-QAC-GTL-025 Rev. E

Date:

16.07.08

TABLE OF CONTENTS
1.

SCOPE ________________________________________________________________________ 5

2.

PURPOSE _____________________________________________________________________ 5

3.

REFERENCES _________________________________________________________________ 5

4.

DEFINITIONS _________________________________________________________________ 6

5.

RESPONSIBILITIES ____________________________________________________________ 6

6.

7.

5.1.

The Section or Site Engineer will be responsible for the following:__________________________ 6

5.2.

The QCE will be responsible for the following: __________________________________________ 7

5.3.

The QCI will be responsible for the following: __________________________________________ 7

5.4.

The Lab Technician will be responsible for the Following: ________________________________ 7

PROCEDURE __________________________________________________________________ 8
6.1.

Pre Activities _____________________________________________________________________ 8

6.2.

Procedure For Testing ______________________________________________________________ 8

6.3.

General Notes For cleaning & tightness (FSI) __________________________________________ 8

ATTACHMENTS ______________________________________________________________ 10

T-4.234.543 Rev. A

Page 4 of 22

Q A T A R

Doc. Title

QUALITY CONTROL PROCEDURE FOR SEWER & DRAINAGE

Doc No:

GAM-PRO-QAC-GTL-025 Rev. E

Date:

16.07.08

1. SCOPE
This QC Procedure defines the type and extent of inspection and testing to be carried
out to verify all activities related to the installation and testing of Manholes and Pits for
Sewers and atmospheric Drainage.

2. PURPOSE
The purpose of this procedure is to detail all inspections and testing to be conducted in
order to verify that Manholes, Joint Boxes, Catch Basins, Inspection Chambers, and Pits
for Sewers and Drainage conform to specified requirements. Drainage confirm to
specified project requirements and specification.

3. REFERENCES
DEP.34.14.20.31.GEN

: Drainage Facilities and Primary Treatment

T-4.234.074

: MTS for Back Filling Works

T-4.234.144

: QA/QC for Site Preparation and Earthworks

T-4.234. 575

: ITP for Concrete Works

T-4.234.144

: Procedure for Earth Works

DEP.31.40.10.19 GEN

: GRP Pipelines & piping systems.

T-4.234.087

: MTS for U/G GRP Piping

T-4.259.776 / 778

: AOC-PITS & Manholes plan view & sections

T-4.234.573

: ITP for site Preparation and Earth Works

T-4.231.172

: Engineering, Procurement, Prefabrication, Installation,


Testing and cleaning of U/G piping (Flawless Start-up)

T.13.377.360

: Flawless Start-up Initiative (FSI)

T-4.234.543 Rev. A

Page 5 of 22

Q A T A R

Doc. Title

QUALITY CONTROL PROCEDURE FOR SEWER & DRAINAGE

Doc No:

GAM-PRO-QAC-GTL-025 Rev. E

Date:

16.07.08

4. DEFINITIONS
Company

: QSGTL and/or its PMC

Contractor

: Linde Engineering AG

Sub Contractor

: Gama Qatar Co. W.L.L.

Contract

: QSGTL Pearl Plant C2 ASU Construction Works

CS

: Construction Supervisor

ITP

: Inspection and Test Plan

QCR

: Quality Control Record

QCP

: Quality Control Procedure

QCE

: Quality Control Engineer

QCI

: Quality Control Inspector

Lab. Tech.

: Lab Technician

QA/QC

: Quality Assurance / Quality Control

TPI

: Third Party Inspection

ITL

: Independent Testing Laboratory

5. RESPONSIBILITIES
5.1. THE SECTION OR SITE ENGINEER WILL BE RESPONSIBLE FOR THE FOLLOWING:

Ensure that the work is carried out to the required Project Specifications and drawings
as well as in accordance with the approved ITPs, QCPs.

Ensure that the surveyor has completed the setting out and reference points
complying with the RFC drawings.

Ensure that all parties who are required to make any kind of test or inspections are
suitably informed as to the overall programme of the works and daily inspection and
testing requirements.

T-4.234.543 Rev. A

Page 6 of 22

Q A T A R

Doc. Title

QUALITY CONTROL PROCEDURE FOR SEWER & DRAINAGE

Doc No:

GAM-PRO-QAC-GTL-025 Rev. E

Date:

16.07.08

5.2. THE QCE WILL BE RESPONSIBLE FOR THE FOLLOWING:

Review all relevant documentation & test reports issued by parties involved (Surveyor
and QC inspectors) and submit Records to the CONTRACTOR.

Ensure that all other discipline activities that require to be inspected have been
inspected and approved.

Organize and allocate inspection works to the quality control inspectors.

Ensure signatures are obtained from CONTRACTOR/COMPANY on the various


Forms as required.

Carry out statistical analysis of the test results to improve quality control operations on
site and to advise construction of the results.

Issue NCR's (non confirmation report) when and where required and to check that
construction provides the appropriate corrective action.

5.3. THE QCI WILL BE RESPONSIBLE FOR THE FOLLOWING:

To ensure that he is fully aware of the daily construction programme.

To ensure that he attends all inspection points in a timely manner and records the
results of his inspections on the appropriate forms.

Completion and filing of all inspection records under his responsibility and reporting to
QCE.

5.4. THE LAB TECHNICIAN WILL BE RESPONSIBLE FOR THE FOLLOWING:

To ensure that he is fully aware of the daily construction programme.

To ensure that he attends and performs the required test properly in a timely manner
and records the results accordingly.

Reviewing and issuing all relevant lab test reports to the QCE in a timely manner.

T-4.234.543 Rev. A

Page 7 of 22

Q A T A R

Doc. Title

QUALITY CONTROL PROCEDURE FOR SEWER & DRAINAGE

Doc No:

GAM-PRO-QAC-GTL-025 Rev. E

Date:

16.07.08

6. PROCEDURE
6.1. PRE ACTIVITIES

All materials to be used have been inspected and approved prior to their incorporation
into the works.

Before commencing any excavation, details and locations of existing underground pipes,
drains, cables, etc. shall be obtained and utmost precaution must be taken to prevent
damage.

The excavation has been carried, surveyed and compaction has been inspected and
released by the Contractor.

De-watering of all excavations, if necessary, is in place and operational. The de-watering


shall be continued until the excavation has been backfilled.

All Manholes, Joint Boxes, Catch Basins, Inspection Chambers and Pits have been
constructed in accordance with the RFC drawings and have been released for the next
stage of construction.

6.2. PROCEDURE FOR TESTING

Sewer pipelines will be water tested in sections based on DEP-34-14-20-31. GEN. The
HYDRO TEST will be perform as per Method Statement - T.4.234.553 (preparation
under progress)

Pipe lasers shall be used to ensure correct alignment and straightness of pipes.

6.3. GENERAL NOTES FOR CLEANING & TIGHTNESS (FSI)


Tightness:
During bolt tightening to flanges, to avoiding leaking flanges arising from
installation problems with the bolt, the wrong type of bolts and thread damaged
bolts will be neglected. The Joint Control Procedure (T.13.377.453) will be
followed and carry out detail line check prior to offer for acceptance as per FSI
Class 1.1.1.

T-4.234.543 Rev. A

Page 8 of 22

Q A T A R

Doc. Title

QUALITY CONTROL PROCEDURE FOR SEWER & DRAINAGE

Doc No:

GAM-PRO-QAC-GTL-025 Rev. E

Date:

16.07.08

Leaking valves will be observed and found if it is manufacturing defect, the valve
must be replaced. Or otherwise if found any debris in valve seat as a result of
transportation from production area; execute spot check to remove the debris
before tightening the valve as per FSI- T.13.377.360 Clause 1.2.6.
If leaks in pipe walls will be observed in U/G piping system due to insufficient
production, allowing heavy equipments to damage lines after installation, the
minimum depth will be ensured and the access way shall be shifted as per FSIClause 1.3.1 & 1.3.2. Apply the T.13.377.455 Amendments to DEP 61.10.08.11Gen & T.13.377.454, Amendments to DEP 70.10.70.11-Gen.
Cleanliness:
The pipe lines are plugged with construction debris during storage and at site
execution; it will be prevented by spot check on applied preservation prior to
storage at site and at site during execution; Ensure that removal of preservation
materials to the internal surface prior to installation, using such as steam,
compressor suction as per PS, Part IV, Ch.10, Flawless Start-up, Q2.
If the pipe line having ingress of debris due to insufficient capping of open pipe
spools during prefabrication and/or transportation from lay down areas for piping
erection, a) instill Built it clean policy at piping prefabrication shops, b) Ensure
that pipe capping materials are available at fabrication shop c) Ensure that the
pipe spool lay down area is properly drained and pipe supports off the ground in
a position not collecting water or flanges toughing the soil.
To avoiding dirt in lines (inadequate control(post-picking) during installation),
specify dedicated team responsible for the control and management of the pipe
spools during installation as per Clause 1.3 & 1.6 of T.13.377.360

T-4.234.543 Rev. A

Page 9 of 22

Q A T A R
7.

Doc. Title

QUALITY CONTROL PROCEDURE FOR SEWER & DRAINAGE

Doc No:

GAM-PRO-QAC-GTL-025 Rev. E

Date:

16.07.08

ATTACHMENTS
GAM-QCR-QAC-GTL-001 : Check list Initial Earth Work Cleaning & Grading
GAM-QCR-QAC-GTL-006 : Inspection Check list - Survey Report
GAM-QCR-QAC-GTL-007 : Inspection Check list - Backfill utilities / Foundations
GAM-QCR-QAC-GTL-008 : Inspection Check list Excavation utilities /
Foundations
GAM-QCR-QAC-GTL-012 : Inspection Check list Concrete
Foundations/Structures
GAM-QCR-QAC-GTL-013 : Inspection Check list - Blinding Concrete.
GAM-QCR-QAC-GTL-014 : Inspection Check list & Pre pour Card
GAM-QCR-QAC-GTL-015 : Inspection Check list & Post pour Card
GAM-QCR-QAC-GTL-024 : Inspection Check list - U/G Civil Pipe Lines.
GAM-QCR-QAC-GTL-026 : Inspection Check list Manhole Leak Test

T-4.234.543 Rev. A

Page 10 of 22

INSPECTION CHECKLIST

EARTHWORKS
CLEARING AND GRADING
FORM NO: GAM-QCR-QAC-GTL-001
Rev.0
Location Bldg/Area :

ITP: GAM-ITP-QAC-GTL-

Date :

Drawing Reference Nos :

1
2
3
4
5
6
7
8
9
10
11
12
13

Check work site, stock pile haul roads, disposal areas and any existing utilities clearly identified
Check that the Surveyor has established bench marks and confirmed elevations
Check work site and any existing utilities staked out (confirmed by surveyor or attach
surveyor's report)
Check provisions for de-watering (if appl.)
Check provisions for demolition of existing structures. (if appl.)
Check valid work permits obtained for all areas
Check site cleared of all unsuitable soil & rubbish
Check all unsuitable material hauled away to designated disposal area.
Check any retained soils are properly stock piled
Check retained soils appear acceptable and sampled as required
Check site properly graded to designated levels (confirmed by surveyor or attach surveyor's
report)
Check base soil appears acceptable & sampled as required
Check base scarified (if required)

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

Comments:

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL

INSPECTION CHECKLIST

SURVEYORS REPORT.
FORM NO:
GAM-QCR-QAC-GTL-006 ITP REF. NO: GAM-ITP-QAC-GTLRev. 0

REV. 0 DATE :

Location Bldg/Area:

No :

Briefly describe the intention of the Survey and purpose giving details of the utility/ excavation.

Drawing Numbers

For Location give Marked up copy of Drawing:

Calibration Cert No :

1. Confirm that surveying equipment is calibrated


2. Check that the drawings noted above are approved for use.
3. Check all existing utilities are clearly identified and staked out
4. Confirm that the proposed excavation is clearly staked/ Marked out.
5. Confirm depth of excavation.

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

Surveyors Comments plus any additional survey information.

SIGN OFF WILL CONFIRM RELEASE TO EXCAVATE.


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL

INSPECTION CHECKLIST

BACKFILL
UTILITIES / FOUNDATIONS
FORM NO: GAM-QCR-QAC-GTL007
Rev. 0
Location Bldg/Area:

ITP REF. NO: GAM-ITP-QAC-GTL-

REV. 0

DATE:

Drawing Reference Nos

ITEM DESCRIPTION

BACKFILL UTILITY
Confirm that Utility is completed tested and released for BACKFILL
Confirm that sand fill is completed
Confirm that fill is being laid in layers as required by the specification.
Confirm that compaction test have been performed and results recorded.
If the Utility requires tiles to be laid confirm that this has been done.
6 If warning tape is required confirm that it has been laid
1
2
3
4
5

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

N/A

YES

NO

BACKFILL FOUNDATIONS
7
8
9
10
11

Confirm that the foundation has been released for Coating and Backfill
Confirm that the foundation has been coated with liquid membrane as require by specification
Confirm that the foundation has been covered with hardboard and overlain with polyethylene.
Confirm that fill is being laid in layers as required by the specification.
Confirm that compaction test have been performed and results recorded.

COMMENTS :

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL

INSPECTION CHECKLIST

EXCAVATION FOR UTILITIES AND


FOUNDATIONS
FORM NO: GAM-QCR-QAC-GTL008
Rev.0
Location Bldg/Area:

ITP REF. NO: GAM-ITP-QAC-GTL-

REV. 0

DATE:

Drawing Reference Nos:

ITEM DESCRIPTION

1 Check route/area is clearly staked / Marked out by Surveyor


2 Check all existing utilities clearly identified and staked out

N/A YES NO

3 If Utility trench check that it complies with depth & width shown on drawing.
If foundation Base confirm size and depth are correct to approved drawings/ surveyors
4
report.
5 Check bedding material for foundation or Utility trench is clean and free of stones and
laid to proper depth
For drainage confirm levels falls etc mark on drawing (show levels Manhole to
6
Manhole).
7 If Geotextile is to be used confirm that it is positioned to the correct requirements.

N/A YES NO

8 Confirm base compaction test have to be performed prior to bedding.


9 Check de-watering properly maintained (if required)

N/A YES NO

10 Check trench is properly battered, framed or sheeted (if required)

N/A YES NO

N/A YES NO

N/A YES NO
N/A YES NO
N/A YES NO
N/A YES NO
N/A YES NO

1. Stage completion release to lay UTILITY or


2. Blinding for Foundation Base.
COMMENTS :

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date
0.

LINDE

PEARL GTL

QSGTL PEARL PROJECT


C2 ASU Construction Works
FORM NO:
GAM-QCR-QAC-GTL012

INSPECTION FORM FOR CONCRETE ITP GAM-ITP-QAC-GTLDate:


FOUNDATIONS / STRUCTURES

INSPECTION FORM FOR CONCRETE FOUNDATIONS / STRUCTURES

DRAWING & REVISION No.


TYPE OF STRUCTURE :
LOCATION :
No :
GAMA - QC
TYPE OF ACTIVITY
1.0
2
2.1
2.2
2.3
2.4

3
4
4.1

4.2
5
5.1
5.2
6
7
8
9
9.1
9.2
9.3
10

Surveying, Setting Out


& Excavation
Existing Ground /
Formation Level
Bottom Level Correct
Dimension checked
Strata acceptable
Excavation is
completed and
approved for next
activity
Blinding
Footing
Formworks / Rebars /
Dimensions /
Cleanliness / Oil /
Support
Inserts
Pedestal
Formworks & Rebars
Anchor Bolts & Inserts
Concrete Pouring (1)
Concrete Pouring (2)
Concrete Surface
Inspection
Concrete Protection
Epoxy Coating
Polyethylene Sheet
Hardboard
Backfilling

SIGN

DATE

LINDE
SIGN

DATE

COMPANY
SIGN

DATE

REMARKS

QSGTL PEARL PROJECT


C2 ASU Construction Works
FORM NO:
GAM-QCR-QAC-GTL012
10.1

INSPECTION FORM FOR CONCRETE ITP GAM-ITP-QAC-GTLDate:


FOUNDATIONS / STRUCTURES

Area free of deleterious


material prior to
backfilling
INSPECTION FORM FOR CONCRETE FOUNDATIONS / STRUCTURES

DRAWING & REVISION No.


TYPE OF STRUCTURE :
LOCATION :
No :
GAMA - QC
TYPE OF ACTIVITY
10.2

10.3

10.4
11.0

Layers for fill material


marked on the sides of
the excavation or with
pins.
Adjacent to below
ground structures
correctly coated and
protected in accordance
with project
specification
Compaction test done
Final Survey
Concrete As built

SIGN

DATE

LINDE
SIGN

DATE

COMPANY
SIGN

DATE

REMARKS

INSPECTION CHECKLIST

LEAN / BLINDING
CONCRETE
FORM NO: GAM-QCR-QACGTL-013
Location Bldg/Area:

ITP REF. NO: GAM-ITP-QAC-GTL- Date :

Drawing Reference Nos

No :

DESCRIPTION
1 Verify surveying setting out of Base location and blinding concrete level is as per drawings

N/A YES

NO

2 Verify Base Compaction results are conforming to Specifications.

N/A YES

NO

3 Confirm thickness is to be 50mm Minimum

N/A YES

NO

4 Confirm forms are in place

N/A YES

NO

5 Blinding Concrete receival & placement inspection.

N/A YES

NO

6 Verify Concrete Curing

N/A YES

NO

N/A YES

NO

N/A YES

NO

Check application of membrane / Polyethylene is in accordance with manufacturers


instructions and specification.

8 Compressive strength to be recorded by Laboratory

COMMENTS :

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date

LINDE

QSGTL

INSPECTION CHECKLIST

CONCRETE PRE POUR


INSPECTION
FORM NO: GAM-QCRQAC-GTL-014
Location Bldg/Area:

ITP REF. NO: GAM-ITP-QAC-GTL-

Date:
No:

Drawing Reference Nos :

ITEM DESCRIPTION
Check that existing concrete surface properly chipped & concrete pouring place is clean
1

N/A YES

NO

N/A YES

NO

Check that rebar free from rust, damage and installed as per drawings IF REQUIRED check
N/A YES
embedded items are compliant

NO

and construction joints, if any, are adequately prepared


2 Check that form work installation is proper and release agent applied properly
3

4 Check that reinforcement Bars are the correct size as drawing

N/A YES

NO

5 Check that reinforcement are spaced correctly

N/A YES

NO

6 Check adequacy of spacers and specified concrete cover

N/A YES

NO

7 Check that Embedded items are placed as per the construction Drawings

N/A YES

NO

8 Check that Anchor Bolts are placed as per the construction Drawings.

N/A YES

NO

9 Check that Waterstop is fixed correctly if required

N/A YES

NO

10 Check that all civil piping is fixed and ready for casting

N/A YES

NO

11 Check that all electrical items are fixed and ready for casting

N/A YES

NO

12 Check that all mechanical items are fixed and ready for casting

N/A YES

NO

13 Check that all Anchor bolts and embedded items are installed as required, if applicable.

N/A YES

NO

Comments:

SIGN OFF AS ACCEPTED


GAMA QATAR
Name
Position
Signature
Date

LINDE

QSGTL

INSPECTION CHECKLIST

CONCRETE
POST POUR INSPECTION
FORM NO: GAM-QCR-QAC-GTL-015

ITP REF. NO: GAM-ITP-QAC-GTL- Date :

Location Bldg/Area:

No :

Drawing Reference:

POST POUR INSPECTION


CAST DATE

CAST TIME Approximately

STRIPPING DATE / TIME

Confirm Dimensional Check taken: Attach sketch or marked up drawing of dimension


taken

NA

YES NO

Confirm surveyor has reported .

NA

YES NO

Confirm Embedded items have been check and accept by Mech.

NA

YES NO

EXAMINATION OF POUR AFTER STRIPPING


Describe any surface defects and their probable cause, and what remedial measures are
necessary :

REPAIRS
If major repairs are to be carried out give repair sheet No

CURING RECORD
4.

DAY

10

11

12

13

14

CHECKED
NOTE: Water Curing Check the curing daily tick the box.

If Curing Compound is used write below Curing Compound type

GENERAL COMMENTS

SIGN OFF AS ACCEPTED ONLY AFTER COMPLETION OF ALL WORKS & CURING
GAMA QATAR
Name
Signature
Date

LINDE

QSGTL

INSPECTION CHECKLIST

CONCRETE
POST POUR INSPECTION
FORM NO: GAM-QCR-QAC-GTL-015

ITP REF. NO: GAM-ITP-QAC-GTL- Date :

Location Bldg/Area:

No :

Drawing Reference:

THIS RECORD SHEET TO BE USED ONLY IF REQUIRED

CONCRETE REPAIR RECORD SHEET


Supervisor / Inspectors name

Date

RFI No.

Provide Sketch or photo and give brief description of repair and repair material.
Is the defect
1. HONEYCOMBING
2. SEPARATION
3. OTHER

1. Check bonding agent applied (if required)


2. Check only designated repair materials are utilised
3. Check repair materials properly applied
4. Check curing application (if required)

NA

YES NO

NA

YES NO

NA

YES NO

NA

YES NO

SIGN OFF AS ACCEPTED ONLY AFTER COMPLETION OF ALL WORKS & CURING
GAMA QATAR
Name
Signature
Date

LINDE

QSGTL

C2- ASU
PEARL GTL PROJECT

INSPECTION FORM FOR U/G LINES (CIVIL)


REPORT NO.:

DRAWING & REVISION No.


TYPE OF LINE

SYSTEM NO.:

LOCATION

Serial
No.

TYPE OF ACTIVITY

GAMA - CONSTRUCTION
SIGNATURE

Surveying, Setting Out and Excavation

Sand Bedding / Sand Bags Setting

Laying of Pipe / Alignment

Line Test

Wrapping&coating

holiday Test

Backfilling Sand

Backfilling above Sand

Form No.: GAM-QCR-QAC-GTL-024 REV.0

DATE

GAMA - Q.C.
SIGNATURE

DATE

REMARKS

CTJV

SIGNATURE

DATE

C2-ASU
PEARL GTL PROJECT

REPORT NO :
DATE
MANHOLE, CATCH BASINS & PITS LEAK TEST REPORT
NO :
AREA :

LEGEND:

MANHOLE

DWG. Number

CATCH BASIN
Item No.

Date

PIT
Time

Remarks

COMPLY
NOT COMPLY

TEST COMPLETED SUCCESFULLY WITHOUT ANY VISUAL LEAK.


NOTE :

OTHERS

LEAK TEST WILL START AFTER ABSORBING WATER BY STRUCTURE IS STABILIZE.

GAMA--CONSTRUCTION
NAME
SIGNATURE
DATE

FORM. NO.: GAM-QCR-QAC-GTL-026 REV.0

GAMA--QC

LINDE

COMPANY