Vous êtes sur la page 1sur 7

Pearl GTL

Project
Shell Project No: HP-3000-QAT
Project Document Number: T- 4.305.114

Purchase Order Number:

2MH127

Tag/Item Number(s):

N/A

Unit(s):

ASU

PCWBS:

LINDE ENGINEERING

Contractor Project No :
Project Rev.: A

Page 2 of 5

5887

QATAR SHELL GTL PROJECT (PEARL)


C2 AIR SEPARATION UNITS CONSTRUCTION

06.09.08

Ready for Construction

SK

EO

AG

RFC

22.07.08

Issued for Company Comments

SK

EO

AG

ICC

21.07.08

Issued for Review

SK

EO

AG

IFR

21.07.08

Issued for Internal Review

SK

EO

AG

IIR

Date

Description

GAMA
Rev.
No.

Project
Rev
No.

Prepared Checked Approved


By
By
By
ORIGINATOR

Status

Document Title:

LINDE ENGINEERING AG

ITP FOR FABRICATION OF EMBEDDED


PLATES
Document No.

Contractor

Gama Qatar Co. W. L. L.

LOC470
GAM

ITP

QAC

GTL

039

Org.
Code

Doc.
Type

Disc.
Code

Geogr.
Area

Seq.
No

Rev.
No

Project Document Number: T-4.305.114

Vendor Code

Rev No: A

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-039

ITP FOR FABRICATION OF EMBEDDED


PLATES
S. GAMA QATAR

X. CONTRACTOR QC

DATE: 06.09.08 REV. D

C. COMPANY

A. THIRD PARTY

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

1.0

1.1

2.0

Activity

Test
Frequency

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

METHOD STATEMENTS/PROCEDURES
Method Statement / Procedure
for fabrication of structural steel
(embedded items).

Applicable
method
statement

T.4.305.115

T-4.240.404 Rev.B

QA/QC

CONTROL OF INSPECTION, MEASURING AND TESTING EQUIPMENT

2.1

Inspection measuring and test


equipment calibration

3.0

MATERIALS CERTIFICATES

100%

T.4.250.915

QCI

Calibration certificate

100%

Material Test Certificates

Material Test Certificates

QC
INSPECTOR

Applicable Standards

Verification of applicable WPS,


Welder Qualifications

100%

34.28.00-31;
T.13.376.359E

AWSD1.1 / ASME IX

Welding
Engineer

WPS

Inspections of embedded items


weld preparation. Fit up, tack
welding, Pre Dimensional
Checks

100%

34.28.00-31;
T.13.376.359E

AWSD1.1

QC Inspector

GAM-QCR-QAC-GTL-035

3.1

Receiving of embedded
steel materials

4.0

INSPECTIONS
EMBEDDED PLATE FABRICATION

4.1

4.2

T-4.305.114 Rev. A

Page 4 of 5

C2 ASU PEARL GTL PROJECT


RAS LAFFAN INDUSTRIAL CITY

Document No.: GAM-ITP-QAC-GTL-039

ITP FOR FABRICATION OF EMBEDDED


PLATE
S. GAMA QATAR

X. CONTRACTOR QC

DATE: 06.09.08 REV. D

C. COMPANY

A. THIRD PARTY

I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item

4.3

4.4

Activity

Welded joints
Dimensional acceptance
Inspection of completed
embedded items &

Test
Frequency

Reference Document

Acceptance Criteria

Responsible
Party

Verifying Documents

100%

34.28.00-31;
T.13.376.359E

AWSD1.1& T-13-376.377

QC Inspector

GAM-QCR-QAC-GTL-035

100%

34.28.00-31;
T.13.376.359E

AWSD1.1& T-13-376.377

QC Inspector

GAM-QCR-QAC-GTL-035

EN ISO 1461:1999

Coating Certificates

QC Inspector

Coating Certificates

release for galvanizing


METALLIC COATINGS OF STRUCTURALS STEEL
4.6

Verify hot dip galvanizing


Coating thickness

T-4.305.114 Rev A.

100%

Page 5 of 5