p
Hydropower potential study (1983) has identified 1,249
l ti
location
with
ith total
t t l capacity
it off 75,000
75 000 MW.
MW Review
R i
study
t d (
1999) identified 21,480 MW passed the 3rd screening.
The result of Hydropower master plan study ( 2011),
2011) 12,900
12 900
MW ( 89 location ) plan to develope for the next 15 years. PLN
propossed 4,425 MW ( 35 %) as an IPP schemes.
Current status of Hydropower development 3,762 MW in
operation. ( 5 % of the potential, excluding own use
h d
hydropower
b private
by
i t investor
i
t )
552 MW total capacity of Mini hydropower development by
IPP using FIT scheme,
scheme consist of 335 MW of PPA signed ( 44
MW in operation ) and 217 MW under PPA preparation.
ACEH:
5.062 MW
KALSELTENGTIM:
16.844 MW
SUMUT:
3.808 MW
KALBAR:
MALUKU:
SULUTTENG:
4.737 MW
430 MW
3.967 MW
PAPUA:
22 371 MW
22.371
SUMSEL, JAMBI,
BENGKULU & LAMPUNG:
3.102 MW
JABAR:
2.861 MW
JATENG:
SULSELRA:
813 MW
6.340 MW
JATIM:
525 MW
BALI NUSRA:
624 MW
PLN ElectricityDevelopmentPlan
PLN Plan & Polic (20112020)
2020
NonReNEW
Hydro
Geothermal
8%
11%
81%
New Plants Expansion : 55,3 GW
8,000
6,000
7,164
6,877
7,000
5,583
HSD
6,436
MFO
5,941
4,971
5 000
5,000
4,271
5,034
4,882
2019
2020
4,181
4,000
3,000
2,000
1,000
2011
2012
2013
PLTU
2014
PLTA
PLTP
2015
2016
PLTGU
PLTG
2017
PLTLain
2018
Total
RenewableEnergy DevelopmentPlan
The utillisation of Renewable Energy has been planned, mainly hydro power :
5,722 MW, geothermal : 6,247 MW and other small RE ( 253 MW ).
Total capacity of Green energy: 12,223
12 223 MW,
MW 55 % of the total capacity of
Green energy expected from IPP.
5
HydropowerDevelopmentProgram 20112020
1200
1102
MW
WestIndonesia
EastIndonesia
Java Bali
968
1000
800
600
493
450
405
400
257
254
200
0
29 9
235
145
95 78
68
77 93
18
296
252
62 43
132
37
119
0
0
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
COD /Capacity(MW)
Region
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Grand
Total
WestIndonesia
95
77
62
493
405
132
1264
East Indonesia
EastIndonesia
29
254
78
93
43
252
145
235
296
119
1544
68
18
257 1102
37
450
968
2914
38
258
241
188
362 1847
587
367
746 1087
5722
Java Bali
GrandTotal
HydropowerPumpStoragePowerPlant
To meet the electricity demand during the peak load in Java-Bali system, a total
of 2
2,440
440 MW Pump Storage Power Plant has been planned for the next ten
years, consist of:
Upper Cisokan P/S : 1,040 MW ( pre-construction stage, expected COD:
2016 )
Matenggeng P/S : 900 MW ( expected COD : 2019/2020 )
p
COD : 2020 )
Grindulu P/S : 500 MW ( expected
75,5 m height of upper dam and 98 m height of lower dam will be build using
RCC dam for Upper Cisokan P/S . 4 units of adjustable speed pump turbine and
generator will be install in the underground
g
g
p
powerhouse.
Pump Srorage with capacity of 400 MW in Sumatera and 800 MW Sea water
Pump Storage in East Java has been identified for future study
ImplementationSchemesforIPPparticipation
Government Regulation no 14/2012, MEMR Decree no 04/2007:
9 The project should be listed in General Plan of Electricity Development (RUPTL)
9 Procurement process can be through direct appointment for renewable energy (
MEMR Decree no 04/2007 ) as far as no others Developer at a certain proposed
project location.
9 Pre Qualification required
required.
President Regulation no. 56/2011 jo no. 13/2010 concerning Public Private Partnership (
PPP ) :
9 Solicited Project (listed in RUPTL) or unsolicited ( not listed in RUPTL ).
9 The Project listed in the PPP Book
9 Government Support through IIGF ( Indonesia Infrastructure Guarantee Fund )
9 Procurement process through competitive bidding with right to match for the
Project Iniciator.
9 Pre qualification required.
8
RegulationforFeedinTariffs (FIT)
MEMRDecreeno.4/2012forsmallandmediumscaleREupto10MW
MEMR Decree no 4/2012 for small and medium scale RE up to 10 MW
capacity hasbeenissued:
9 656IDR /Kwh forMinihydroinJawaBalisystem (connectedto
mediumvoltageline,with incentive factorof1.2 1.5foroutside
JavaBali)
9 975IDR/KwhforBiomass,
975 IDR / Kwh for Biomass 850IDR/kwhforlandfillmunicipal
850 IDR/kwh for landfill municipal
wasteand 1050IDR/Kwh forzero wastepowerplant inJawaand
Sumaterasystem(connectedtomediumvoltageline,with
incentive factorof1.2 1.3 foroutsideJavaSumatera)
9 Itsalsoappliedforexcesspowerenergytransaction.
9 TariffhigherthanFIT:BtoBmechanism
T iff hi h th FIT B t B
h i andsubjecttoGOI
d bj t t GOI
approval
p
p g
PreparationofFITforsolarPVandWindPoweronprogress.
FITforsmallandmediumscaleREaimstoaccelerateandattract
9
privateinvestoronREdevelopment.
SummaryandConclusion
To meet electricity demand, a total of 5.7 GW new additional hydropower
plant has been planned for the next ten years and 20% expected to be
developed by private ( IPP ).
Indonesia has abundant hydropower potential, as for supporting the
energy conservation policy , development plan as a peak power plant will
reduce oil consumption.
PLN has identified a total of 12.9 GW of hydropower plant for the next
15 years development and 35 % propossed to be developed by IPP.
FIT for small and medium scale renewable energy ( RE ) will accelerate
the development of renewable energy and attract private participation.
.