Hangingstone Project Update for

AER October 2012 to September 2013

Presented 2013-11-05

Hangingstone Project - Introduction


Project Background
Subsurface
Facilities
Compliance
Future Plans

Project Background

Hangingstone Project - Acquisition and


Delineation History
AOC Hangingstone

Hangingstone Regional Development Map

Lands outlined ( ) acquired and delineated


between July 2006 and February 2010
Fort McMurray

Lands outlined ( ) acquired in October 2010


and delineated by March 2011 as Hangingstone
Project 1 application submitted March 2011
Initial development area selected for its proximity
to Infrastructure and to act as a central
development node for the overall Hangingstone
Asset.

CPF

Lands outlined ( ) acquired in October 2011


and delineated over the following two winters
formulating the initial development for
Hangingstone Expansion submitted in March of
2013

Asset Statistics & Development


Overview

Sales pipeline
Fuel Gas

Enbridge
Cheecham

117 MMbbl reserves; 912 MMbbl contingent


resource
Asset planned to be developed in three phases:

Project 1 - 12,000 bbl/d (approved & in construction)


Project 2 - 40,000 bbl/d (current EIA application)
Project 3 - 30,000 bbl/d (current EIA application)

(1) Contingent resource best estimate

Hangingstone Project - Background


Objective
Construct, operate and reclaim a
bitumen recovery scheme using
SAGD technology to produce
bitumen up to a rate of 12,000 bpd.

Scope
20 km from Fort McMurray.
5 production pads.
25 horizontal well pairs.
CPF and associated facilities.
Offsite services and utilities.
Infrastructure:
Fuel Gas from TCPL.
Dilbit export to Enbridge
Cheecham Terminal.
Diluent commercial
negotiations ongoing.

Hangingstone Project Surface and Subsurface


Layout

Hangingstone Project Scheme Map

Subsurface

Hangingstone Project - Subsurface


Section Outline
Subsurface Data Overview
Stratigraphy and Reference Well from HS1
Depositional Environment of the McMurray Formation
McMurray Net Pay Map
McMurray Pay Structure and Fluid Isopach Maps
Caprock Geomechanics
Drilling and Completion
Scheme Performance

Hangingstone Project - Subsurface Data Overview


Hangingstone Lease
Vertical Wells

Area
(Km2)

MCMR
Cored
Wells

Image
Logs

Caprock
Core

Development
Area

5.1

26

30

Project Area

5.6

26

30

10

Hangingstone Project - Subsurface Data Overview


Seismic

2011 Hangingstone River 3D


2011 Hangingstone River North 3D
2012 Halfway Creek 3D
2012 Highway 3D

3D acquired in 2011 and 2012, merged in 2012.


Total Proprietary 2D ~ 450 km.
Total 3D Area ~98 km2 (Merged).
Covers Development Area.

Proprietary 2D

3D Parameters:
Source Line/Source Spacing: 60 m/
20m.
Receiver Line/Receiver Spacing:
60(40) m/20m.
11

Hangingstone Project - Stratigraphy and


Reference Well
1AA/03-31-086-09W4/00

Middle McMurray Target Reservoir


12

Hangingstone Project - Subsurface


Depositional Environment of Middle McMurray
Modern Analog Estuarine Environment
(Digul River Estuary, Papua New Guinea)

Middle McMurray Deposits


Reference Well

Formed dominantly in a mixed tide and


wave dominated estuary system.

Digul River

Outer
Fly River

Reservoir is composed of amalgamated


point bar deposits dominated by finemedium grained, channel sand. Mud clast
breccia is commonly found near the base
of the reservoir. The reservoir fines
upwards into interbedded sand and mud
(sandy and muddy IHS). Thin mud layers
are typical towards the top of the reservoir.

Wabiskaw

McMurray

Top Pay

IHS

CS
Breccia

Depositional Model
CS

Mud

CS
Mud

Base Pay

Fining Upward
Paleozoic

SIHS, MIHS
Breccia
Sand

Channel Sand (CS)

Breccia

SIHS (IHS)

MIHS

Mudstone

13

Hangingstone Project - Subsurface


Definition of Net Pay and Map

So

Middle McMurray
Gross Pay
definition:

Wabiskaw

McMurray

Top Pay

GR < 70 API
Density > 27%
Resistivity >18 ohm
Water Saturation < 50%
Includes less than 1 m thick
mud.
Net Pay thickness typically
excludes mud.

Base Pay

Paleozoic

14

Hangingstone Project - Subsurface


Structural Cross Section NW-SE Across HS1 Area
A

Wabiskaw

McMurray

Top Pay

Gross 36m
Net 26m

Gross 36m
Net 31m

Gross 38m
Net 22m

Gross 43m
Net 38m

Gross 44m
Net 39m

Gross 36m
Net 21m

Base Pay
Paleozoic

15

Hangingstone Project - Subsurface


Structural Cross Section W-E Across HS1 Area
B

B
B

B
Wabiskaw

McMurray

Top Pay

Gross 36m
Net 31m

Gross 36m
Net 27m

Gross 43m
Net 38m

Gross 38m
Net 30m

Gross 42m
Net 32m

Base Pay
Paleozoic

16

Hangingstone Project - Subsurface


Structure Map of Top of Bitumen Pay
Range of elevation from 260 to 295
masl, highest over drainage pads.

So

Wabiskaw

McMurray

Top Pay

Base Pay

Paleozoic

17

Hangingstone Project - Subsurface


Structure Map of Base of Bitumen Pay
Range of elevation from 245 to 260
masl, low over drainage pads.

So

Wabiskaw

McMurray

Top Pay

Base Pay

Paleozoic

18

Hangingstone Project - Subsurface


Isopach Middle McMurray Gas Map
Middle McMurray gas has minimal
thickness and limited distribution
within the Development Area.
So

Wabiskaw

McMurray

M. McMurray
M. MCR Gas

Top Pay

Base Pay
Paleozoic

19

Hangingstone Project - Subsurface


Isopach Middle McMurray Bottom Water

Wabiskaw

McMurray

M. McMurray

Top Pay

Base Pay

Basal Mud

Basal Water Zone

The permeability measured from core within the muddy interval between the
bottom water and the bitumen reservoir through interval 193.80 to 193.85 m MD
is 4.30 millidarcy (kV) and 71.0 millidarcy (kMax). Denoted on photo by

Paleozoic

Interbedded mud and


water saturated sand

20

Hangingstone Project - Subsurface


OBIP and Reservoir Properties
Avg Porosity

Avg So

OBIP

(Vol Frac)

(Vol Frac)

(mln m)

Drainage Areas

0.35

0.75

13.0

Development Area

0.35

0.75

14.2

Project Area

0.35

0.75

14.3

Depth
Typical Producer

Pres Initial
@ 190mTVD

Tres Initial

Reservoir
Kh, avg

Reservoir
Kv, avg

Bitumen Viscosity
@ Tres Initial

(m TVD/masl)

(kPaa)

(C)

(mD)

(mD)

(cP)

190/255

600

10

4,000

3,200

>1 mln

21

Hangingstone Project - Subsurface


Caprock Description Core and Image Data

Primary Caprock

Caprock Core 1AA\10-30-86-9W4\00

Caprock is defined as the unit between the top of


the Clearwater Formation and Wabiskaw.
Two main units within the caprock; lower argillaceous and
upper silty mud.
Primary caprock is the lower argillaceous unit which ranges
from the top of the Clearwater Argillaceous to the top of
Wabiskaw.
Composed primarily of shales and siltstones
22

Hangingstone Project - Subsurface


Caprock Description Seismic Analysis
A

Wabiskaw

Devonian

Clearwater

Variance attribute time slices through


formations.

1AA\10-30

100\04-31

102\04-31

Clearwater
Clearwater Arg
Wabiskaw

Devonian

Seismic and image log analysis indicates


laterally continuous competent caprock
unit across the area.

23

Hangingstone Project - Subsurface


Caprock Geomechanics Mini-Frac
Mini-Hydraulic Fracture Test Summary,
Gauge Pressures (1AA/10-30-086-09 W4/00)

Mini-Frac test performed February 2011 on


1AA/10-30-086-09 W4/00.
Approval for 2,200 kPaa during circulation.
Approval for 2,000 kPaa during SAGD mode.
Safety factor of 33% with respect to base of
the Clearwater shale.
Safety factor of 13% with respect to top of
pay interval of the middle McMurray bitumen
sands.
Interval
Shale
CLWT Shale Base
Top Middle MCM Pay

Depth
Minimum
(m TVD)
136
155

Mini-Frac test depths

Fracture Gradient Fracture Pressure Operating Pressure Safety Factor


Mini-Frac Test, Smin Minimum (MFP) Maximum (MOP)
Minimum
(kPag/m)
(kPaa)
(kPaa)
(1 - MOP/MFP)
21.20
2,983
2,000
33%
14.17
2,296
2,000
13%

24

Hangingstone Project - Subsurface


Caprock Geomechanics Tri-Axial Testing & Model

Tri-axial tests showed thermally induced


mechanical hardening.
Beneficial to SAGD operations.
Geomechanical model created using only
RT tri-axial data. Model supported safe
operating pressure with respect to
caprock integrity.

Caprock Core 1AA\10-30-86-9W4\00

Primary Caprock

11 tri-axial tests performed.


7 at room temperature (RT).
4 at high temperature
o
(75 to 175 C).
XRD done on all samples.

Tri-axial lab samples


25

Hangingstone Project - Subsurface


HS1 Planned Well Layout
Example, Pad AA
100 m interwell spacing

650 to
850 m
slotted
lateral
section

Slotted
Liner
Lateral

Injectors
target
5 mTVD
above
producers
along
horizontal
lateral

ICP
75 m
Tangent

~350 m
(~450 mMD)
displacement
to ICP

Build

Delineation
Wells
Observation
Wells

AA P1 to AA I5

Well pairs are numbered 1 to 5 from left-to-right,


when facing down the well pairs trajectory.
26

Hangingstone Project - Subsurface


Typical SAGD Wellbore Schematic
Mechanical lift required to bring fluids to surface.
WHP of ~2000 kPaa (downhole MOP 2,000 kPaa).
Gas lift cannot bring fluids to surface.
All-metal PCPs will be run in the 25 producers,
with the option to trial ESPs at a future date.
Injector long string is a
continuous pipe size
(application showed a swedge
in lateral heel).

27

Hangingstone Project - Subsurface


Planned Instrumentation in SAGD Wells
Downhole Instrumentation
Injectors will have continuous real-time
monitoring at surface of casing (blanket)
gas pressure to determine downhole heel
pressure during SAGD phases.
Select injectors will also have downhole
instrumentation and/or adjacent
observation wells to monitor injection
temperature and pressure.

Producers will have downhole temperature


and pressure instrumentation.

Producer Only:
Fiber (40 to 60pt temp FBG or DTS)
with 1 or 2 pressure sensors

SS SS
SS SS

Producers will also have casing gas


pressure monitored during all SAGD
phases.

Producer and Injector:


Fiber (40 to 60pt temp FBG or DTS)
with 1 or 2 pressure sensors
SS: 4 injectors with Steam Splitters

28

Hangingstone Project - Subsurface


Planned Instrumentation in Observation Wells
Typical Observation
Well Completion

15 observation (obs) wells in total.


15 observation wells will have thermocouples (TCs).
10 observation wells will have piezometers (piezo).
5 obs wells will have TCs in the upper McMurray,
Wabiskaw, and Clearwater for proactive caprock
monitoring.
102/03-31-086-09W4 also has piezos in these
zones.
100/07-31-086-09W4 will have TCs in isolated bottom
water.
100/11-30-086-09W4 has a piezo in isolated bottom
water.

29

Hangingstone Project - Subsurface


Planned Instrumentation in Observation Wells
AOC Hangingstone 100/03-31-086-09W4/0

AE
AD

AC

AA

AB

10 Vertical delineation well


5 Obs wells with 10 to 20 TCs
10 Obs well with 10 to 20 TCs
and 3-6 piezometers (installed)
Obs well also monitoring above pay
(U MCM, Wab, and CLW caprock)
Obs well also monitoring below pay
(basal zone)

Planned Producer Placement

Planned TC Sensor Interval


Piezometer

14 observation wells within drainage areas and


1 observation well adjacent to drainage area AC

30

Hangingstone Project - Subsurface


Hangingstone Project Drilling Status
Hangingstone Project Drilling Program

AE
AD

Consists of 2 SAGD slant drilling rigs.


AC

Drilling commenced August 4th, 2013.


Pad Drilling Order:
Rig 1 AA, AC, AE.
Rig 2 AD and AB.
As of September 30th, 2013:

AB
AA

Pad AA: Drilled 10 surface holes, 5 producer


intermediates and 3 producer laterals with
set liner.
Pad AD: Drilled 10 surface holes and 3
producer intermediates.

Red Line indicates Laterals Drilled with liner set

31

Hangingstone Project Pad AA


Pair 1 - Results
A

Actual Well Path

Total lateral length 846 mMD.


ICP Depth: 479 mMD and Total Depth 1,325
mMD.
Flat across the lateral section.
Well is placed low in reservoir in clean bitumen
rich sand with 100% reservoir along wellbore.
32

Hangingstone Project Pad AA


Pair 2 - Results
B

Actual Well Path

Total lateral length 850 mMD.

ICP Depth: 454 mMD and Total Depth 1,304 mMD.


Flat across the lateral section.
Well is placed low in reservoir in clean bitumen
rich sand with 85% reservoir along wellbore.
33

Hangingstone Project Pad AA


Pair 4 - Results

Actual Well Path

Total lateral length 851.5 mMD.


ICP Depth: 454.5 mMD and Total Depth 1,306
mMD.
Gradual rise across lateral section.
Well is placed low in reservoir in clean bitumen rich
sand with 95% reservoir along wellbore.
34

Hangingstone Project - Subsurface


Scheme Performance History
Production History:
No production history.
First steam anticipated end Q4 2014.

35

Hangingstone Project - Subsurface


Scheme Performance Pad Recoveries
Pad

Well Pairs

Well Pair
Length

OBIP

Predicted
RF

RBIP

(m)

(mln m3)

(%)

(mln m3)

AA

850

2.79

50

1.39

AB

650

1.87

50

0.94

AC

750

2.70

50

1.35

AD

750

2.78

50

1.39

AE

850

2.90

50

1.45

TOTAL

25

13.0

50

6.52

36

Hangingstone Project - Subsurface


Surface Heave Monitoring
AOC plans on monitoring surface heave.
Method and frequency are still being determined.

37

Hangingstone Project - Subsurface


Planned 4D Seismic
AOC plans on monitoring steam growth
and conformance using 4D seismic.
Geophones will be buried over the five
drainage areas to accommodate year
round shooting.
4D baseline survey planned to be acquired
in 2014.
3.72 km2 total area.

38

Surface Operations

Hangingstone Project - Approved Plot Plan


From D078 Amendment Application 1757038

Modifications from
D078 Amendment
Application:
Location and footprint
of admin and control
buildings,
communications
tower finalized

40

Hangingstone Project - Facility Schematic


TO STEAM
GENERATORS

FUEL GAS
GLYCOL

EDUCTED VAPOURS

TO PRODUCTION PADS
MIXED GAS
SEPARATOR
FUEL GAS

GLYCOL

FROM SUPPLY
PIPELINE

UTILITY
USERS

DILUENT
RECOV. SEP.

TANK VAPOURS

VAPOUR RECOVERY
UNIT

TO DIRTY
WATER
HEADER

VRU

PRODUCED GAS

DILUENT

PG
SEPARATOR
TO SLOP OIL
TANK

FROM PRODUCTION
PADS

DILUENT
TANK

GLYCOL
TO DIRTY
WATER
HEADER

TRUCK IN

VRU

EMULSION
TREATER

SEPARATOR

DILBIT
TANKS (x2)

FROM PRODUCTION
PADS
BFW

VRU

SLOP OIL

TRUCK OUT

VRU

VRU

TO NON-SALINE
WATER USERS

TO SEPARATOR
SKIM TANK

NON-SALINE WATER

SALES OIL

GLYCOL

BFW

SERVICE
WATER TANK

FROM NON-SALINE
WATER WELLS

GLYCOL

VRU

SLOP OIL
TANK

VRU LIQUIDS
INDUCED
STATIC
FLOTATION
PACKAGE

VRU

SLOP OIL
TREATING
PKG

TO DILBIT
TANKS
TO
DESAND/
DIRTY
WATER
SYSTEM

VRU
INTERMITTENT SOLIDS
CONTAINING STREAMS

DIRTY WATER HEADER

DESAND / DIRTY
WATER SYSTEM
PW TANK

SOLIDS TRUCKED OUT

EDUCTORS

INT.
BLOWDOWN
VENT

BFW TANK
HP STEAM

HEAT
EXCHANGE

EDUCTORS

TO PRODUCTION PADS
E-18
BLOWDOWN
TO DIRTY WATER
HEADER

MIXED GAS
HP STEAM GENERATOR
PACKAGES (x2)

WASTE WATER
TANKS (x2)

EVAPORATOR / CONCENTRATOR
PACKAGES (x2)
TRUCK OUT

41

Hangingstone Project - Facility Performance


The facility is not yet in operation. As designed:
Material Rates:

Gas Usage:

Bitumen: 1,908 m3/d.

Purchased: 475 103 m3/d.

Steam: 6,677 m3/d.

Produced Gas: 7.12 103 m3/d.

Produced Water: 6,243 m3/d.

Flared: 0.39 103 m3/d (purge gas).

Diluent: 616 m3/d.

Vented: 0.12 103 m3/d (truck loading).

Greenhouse Gas Emissions:


CO2E: 0.565 Mt/y (site-generated).

Expected Power Consumption:


8.6 MW operating load.
6,278 MWh monthly import.

Values are annual averages.


Solution gas is recovered and used as fuel in the steam generators.
42

Hangingstone Project - Measurement and


Reporting
Measurement, Accounting and Reporting Plan (MARP) approval received on
October 5, 2012.
MARP updated on February 11, 2013 to capture Directive 078 amendment
application design changes and to align the MARP with the requirements of
Directive 081.
Next MARP update to the AER on or before February 28, 2014 as per Approval.

43

Hangingstone Project - Measurement


Schematics Battery
TCPL
AB MS # # # # # # #

EDUCTOR MOTIVE GAS

TO WELL PADS

SEPARATOR, TREATER,
PG SEPARATOR,
DILUENT RECOVERY
SEPARATOR
BLANKET GAS

UTILITY FUEL GAS HEADER

MAKEUP FUEL GAS

TCPL
METER

FROM TCPL

RELIEVE TO
HP FLARE
SP

DILUENT
FLOW &
DENSITY

OIL WELL
STEAM INJECTION WELL
00-Z3300
GLYCOL HEATER
PACKAGE

GLYCOL EXPANSION
DRUM BLANKET RETURN

WATER SOURCE WELL

METER TYPES

FLARE PILOT

01-Z5040/ 5050
VRU
COMPRESSOR
PACKAGES

VORTEX METER
HP FKOD
PURGE

FE
55005

NC

HP FLARE HEADER

05-SF1000
HP FLARE
STACK

01-V5500
HP FKOD

RELIEVE TO
HP FLARE

HP FKOD
PUMP

VRU

01-V1100
TREATER

01-V1050
SEPARATOR

RAG LAYERS TO
SLOP OIL HEADER

VRU

SAND TO
SAND SLURRY HEADER

INJECTION FACILITY
AB IF # # # # # # # # (506)
19/ 30-86-09 W4M

NC
NC

BITUMEN
BUILDING SUMP
ESTIMATE

RECOVERABLE STEAM/ WATER

ESTIMATE
FROM
FE-21033

FRESH WATER

DECANT
RECYCLE
PUMPS
TRUCK
TICKETS

WATER
TRUCK OUT

SLOP OIL
HEADER

01-T1520
DECANT TANK
[WATER]

SKIM TANK
HEADER

SAND SLURRY
HEADER
SAND
QUENCH

RECYCLE

PRODUCTION BATTERY
SERVICE WATER

TO PUMP SEAL FLUSHES


TO BITUMEN BUILDING SUMP

01/ 02/ 13
05/ 06/ 12
28/ 03/ 12
DATE

SW
SW
SW
BY

DESAND
PUMP
FE
14001
FE
63007

M
SECONDARY

VRU
VRU

VRU

ISF SKIM OIL


PUMPS

01-T1400
PRODUCED
WATER TANK
[WATER]

01-VZ1330
ISF VESSEL
TRUCK
TICKETS

WATER
TRUCK OUT

ISF DISCHARGE
PUMPS

TO EVAPORATOR PACKAGE

FE
14102
14152

LI
14000A

01-T1300
SKIM TANK
[WATER]

MAKEUP

01-Z1800
SLOP OIL
TREATING
PACKAGE

NC

FE
00020

INJECTION FACILITY
UTILITY FSHWATER

RE-IFA
RE-IFA
IFA
DESCRIPTION

DESAND FLUSH WATER


TO SEPARATOR/
TREATER

OIL
TRUCKOUT

TRUCK
TICKETS

LI
15200A

FE
30102B

2
1
0
REV.

INJECTION FACILITY
AB IF # # # # # # # # (506)
19/ 30-86-09 W4M

01-T1700
SLOP OIL TANK
[OIL]

SLOP OIL
PUMPS

AE ANALYZER
CBD CONTINUOUS BLOWDOWN
FE FLOW ELEMENT (ACCOUNTING METER)
H20 WATER CUT
IBD INTERMITTENT BLOWDOWN
LI LEVEL METER (RADAR TYPE)
NC NORMALLY CLOSED
NNF NORMALLY NO FLOW
NO NORMALLY OPEN
SP SAMPLE POINT

TRUCK OUT

LI
17000K

VRU

SALES OIL

OFFSPEC
PUMPS

VRU

DIRTY WATER
HEADER

RECOVERABLE UTILITY FSHWTR

TRUCK
TICKETS

LI
13100K

04-T1310
DILBIT TANK
[OIL]

OFFSPEC

METER NOT REPORTING


TO PETRINEX

ABBREVIATIONS

04-T1300
DILBIT TANK
[OIL]

FROM WELL PADS

V V-CONE METER

EQUIPMENT TAGS PRECEDED BY HCP-


INSTRUMENT TAGS PRECEDED BY HCP-XX- WHERE XX IS
THE UNIT IDENTIFIER

LI
13000K

EMULSION

M MAGNETIC METER

FE
XXXXX

TAGS
TO SLOP
OIL HEADER

RELIEVE TO
HP FLARE

PETRINEX ACCOUNTING
METER

CORIOLIS METER

PIPELINE TERMINAL
AB TM # # # # # # #
XXXXXXXX W4M

FROM PSVs (NNF)


NO

FE
XXXXX

ULTRASONIC METER
FE
55002

04-T1000
DILUENT TANK
[COND]
DILUENT
PUMPS

WELL TYPES

EST.

TO DIRTY WATER
HEADER

RECOVERED DILUENT
TRANSFER PUMPS

UNIT 01 FLARE
HEADER PURGE
UNIT 01 FLARE
SUBHEADER PURGE

LI
10000A

FE
10005

TRUCK IN

FE
00030

BLANKET GAS
RETURNS

STREAMS
WATER
BITUMEN
STEAM
GAS
DILUENT

UNIT 00 FLARE
HEADER PURGE

FE
00010

GLYCOL EXPANSION
DRUM BLANKET

01-V1220
DILUENT RECOVERY
SEPARATOR

LEGEND
TO STEAM GENERATORS

FE
16106

RELIEVE TO
HP FLARE

DILUENT SOURCE

TO STEAM GENERATORS

FE
B0370

BLANKET GAS TO TANKS


AND ISF VESSEL

01-V1700
MIXED
GAS
SEPARATOR
SP

TO DIRTY WATER
HEADER

FE
16101

FROM WELL PADS

VRU

FE
A0370

PRODUCED GASES
FROM EVAPORATORS
AND WW TRUCKOUT
TANKS
MIXED FUEL GAS

00-V1520
PRODUCED GAS
SEPARATOR

PRODUCED GAS

VENT CONDENSER
EDUCTOR

CRITICAL FUEL GAS HEADER


MP FUEL GAS HEADER

PURCHASED GAS

INJECTION FACILITY
AB IF # # # # # # # # (506)
19/ 30-86-09 W4M

BLANKET/ BUBBLE GAS

PRODUCTION BATTERY
AB BT # # # # # # # # (344)
19/ 30-86-09 W4M

PRIMARY

HANGINGSTONE PROJECT
MARP METERING SCHEMATIC

PRODUCED WATER
FE
A0201

SECONDARY
NC
PW TRANSFER
PUMPS

TO EXCESS TRUCK OUT


PRIMARY

Pr oduct ion Bat t er y


(Pg 1 of 3)

REV.
2

44

Hangingstone Project - Measurement


Schematics Injection Facility
INJECTION FACILITY
AB IF # # # # # # # # (506)
19/ 30-86-09 W4M

ESRD-LICENSED WATER SOURCE


AB WS # # # # # # # # (901)
ESRD LICENCE 00316166-00-00

PRODUCTION BATTERY
AB BT # # # # # # # # (344)
19/ 30-86-09 W4M

WA
FE
1010

AB WI # # # # # # # # # # # #
15-33-085-W4
SOURCE WATER WELL
FSHWTR
AB WI # # # # # # # # # # # #
06-12-086-09-W4
SOURCE WATER WELL
FSHWTR

AB WI # # # # # # # # # # # #
04-08-086-08-W4
SOURCE WATER WELL
FSHWTR

VRU
LI
30000A

WB
FE
1010

FE
30001

FE
30102B

04-T3000
WATER TANK
[FSHWTR]

WC
FE
1010

FRESH WATER

RECOVERABLE SERVICE WATER


if pump seal f l ushes

FSHWTR UTIL
evapor at ive l osses

STREAMS
WATER
BITUMEN
STEAM
GAS
DILUENT

FE
00020

FSHWTR
PLTUSE

ESTIMATE

LEGEND

WATER
PUMPS

WELL TYPES

ESTIMATE

OIL WELL
RECOVERABLE UTILITY FSHWTR
t o dir t y wat er header via sumps

ESTIMATE

PRODUCTION BATTERY
AB BT # # # # # # # # (344)
19/ 30-86-09 W4M

STEAM INJECTION WELL


WATER SOURCE WELL

FE
A4310
FE
A3530

FE
A0370

03-Z2100
HP STEAM
GENERATOR
PACKAGE

FE
A3040

METER TYPES
VORTEX METER

FE
XXXXX

PRIMARY

CBD

ULTRASONIC METER

PETRINEX ACCOUNTING
METER

NO

PRIMARY

CORIOLIS METER
SECONDARY

NC

M MAGNETIC METER
IBD

V V-CONE METER

HP STEAM
TO WELL PADS

FE
B3530

MIXED FUEL GAS

03-Z2200
HP STEAM
GENERATOR
PACKAGE

FE
B3040

FE
21033

NO

PRIMARY

SECONDARY

EQUIPMENT TAGS PRECEDED BY HCP-


INSTRUMENT TAGS PRECEDED BY HCP-XX- WHERE XX IS
THE UNIT IDENTIFIER

V
PRIMARY

CBD

HP STEAM
LETDOWN

NC

RECOVERABLE STEAM/ WATER


t o dir t y wat er header via
sumps

EDUCTOR

WATER UTIL
evapor at ive l osses

IBD
LI
10000A

LP STEAM LOSS

ESTIMATE

FE
A0201

02-Z1100/ 1300
EVAPORATOR
PACKAGES

PRODUCED WATER
PRIMARY

FROM PW TRANSFER PUMPS

IBD VENT

03-T1000
BFW
TANK
[WATER]

IBD
BFW PUMPS

ESTIMATE

BLOWDOWN

NC

FE
63007

METER NOT REPORTING


TO PETRINEX

TAGS

FE
B4310
FE
B0370

FE
XXXXX

ESTIMATE

ABBREVIATIONS
AE ANALYZER
CBD CONTINUOUS BLOWDOWN
FE FLOW ELEMENT (ACCOUNTING METER)
H20 WATER CUT
IBD INTERMITTENT BLOWDOWN
LI LEVEL METER (RADAR TYPE)
NC NORMALLY CLOSED
NNF NORMALLY NO FLOW
NO NORMALLY OPEN
SP SAMPLE POINT

2
1
0
REV.

03-V1500
INTERMITTENT
BD
VESSEL

RE-IFA
RE-IFA
IFA
DESCRIPTION

01/ 02/ 13
05/ 06/ 12
28/ 03/ 12
DATE

SW
SW
SW
BY

EXCESS PW
ESTIMATE

NNF
PRIMARY

EDUCTOR
LI
63000

NITROGEN SOURCE
ESTIMATE

BLANKET GAS

WASTE FACILITY
AB WP # # # # # # # # (# # # )
19/ 30-86-09 W4M

02-T6300
WW TRUCKOUT
TANK
[WATER]
EDUCTOR
LI
63100
TRUCK
TICKETS

NITROGEN
02-T6310
WW TRUCKOUT
TANK
[WATER]

WASTE WATER

TRUCK OUT

HANGINGSTONE PROJECT
MARP METERING SCHEMATIC
Inj ect ion Facil it y
(Pg 2 of 3)

REV.
2

45

Hangingstone Project - Measurement


Schematics Well Pads
INJECTION FACILITY
AB IF # # # # # # # # (506)
19/ 30-86-09 W4M

PRODUCTION BATTERY
AB BT # # # # # # # # (344)
19/ 30-86-09 W4M

LEGEND
STREAMS

TYPICAL WELL PAD AA

WATER
BITUMEN
STEAM
GAS
DILUENT

FE
00010

BLANKET/ BUBBLE GAS


FE
AA111

WELL TYPES
FE
AA121

AA01I
INJECTION WELL
STEAM

FE
AA211
FE
AA221

FE
AA321

HP STEAM

FE
AA411
FE
AA421

FE
AA521

AA02P
PRODUCTION WELL
EMULSION
PUMP JACK (ELECTRIC)

METER TYPES
VORTEX METER

NNF

FE
XXXXX

ULTRASONIC METER
AA-T3010
POP TANK

TEST
SEPARATOR

PRODUCED GAS

M MAGNETIC METER

AA-V3000

PETRINEX ACCOUNTING
METER

CORIOLIS METER
FE
XXXXX

EMULSION

V V-CONE METER

METER NOT REPORTING


TO PETRINEX

BUBBLE GAS

FE
30002

AA04I
INJECTION WELL
STEAM

FE
AA511

WATER SOURCE WELL


VENT
(ESTIMATE)

AA03P
PRODUCTION WELL
EMULSION
PUMP JACK (ELECTRIC)

OIL WELL
STEAM INJECTION WELL

TEST

BUBBLE GAS

AA03I
INJECTION WELL
STEAM

FROM CPF

AA01P
PRODUCTION WELL
EMULSION
PUMP JACK (ELECTRIC)

FE
30006

GROUP

BUBBLE GAS

AA02I
INJECTION WELL
STEAM

FE
AA311

FROM CPF

BUBBLE GAS

AA04P
PRODUCTION WELL
EMULSION
PUMP JACK (ELECTRIC)

TO CPF

SP
30002

TAGS

AE
30002

EQUIPMENT TAGS PRECEDED BY HAF-


INSTRUMENT TAGS PRECEDED BY HAF-AA- WHERE AA
IS THE WELL PAD IDENTIFIER (TYPICAL)

H20

BUBBLE GAS

AA05I
INJECTION WELL
STEAM

ABBREVIATIONS

AA05P
PRODUCTION WELL
EMULSION
PUMP JACK (ELECTRIC)

AE ANALYZER
CBD CONTINUOUS BLOWDOWN
FE FLOW ELEMENT (ACCOUNTING METER)
H20 WATER CUT
IBD INTERMITTENT BLOWDOWN
LI LEVEL METER (RADAR TYPE)
NC NORMALLY CLOSED
NNF NORMALLY NO FLOW
NO NORMALLY OPEN
SP SAMPLE POINT

2
1
0
REV.

RE-IFA
RE-IFA
IFA
DESCRIPTION

01/ 02/ 13
05/ 06/ 12
28/ 03/ 12
DATE

SW
SW
SW
BY

AOC WELL NAMES AND UNIQUE IDs


AA01I

105/04-31-086-09W4/0

AB01I

106/03-31-086-09W4/0

AC01I

103/16-30-086-09W4/0

AD01I

100/02-30-086-09W4/0

AE01I

116/03-31-086-09W4/0

AA02I

106/04-31-086-09W4/0

AB02I

107/03-31-086-09W4/0

AC02I

100/16-30-086-09W4/0

AD02I

108/02-31-086-09W4/0

AE02I

114/04-31-086-09W4/0

AA03I

107/04-31-086-09W4/0

AB03I

108/03-31-086-09W4/0

AC03I

102/16-30-086-09W4/0

AD03I

118/03-31-086-09W4/0

AE03I

113/04-31-086-09W4/0

AA04I

108/04-31-086-09W4/0

AB04I

103/02-31-086-09W4/0

AC04I

102/15-30-086-09W4/0

AD04I

117/03-31-086-09W4/0

AE04I

112/04-31-086-09W4/0

AA05I

103/03-31-086-09W4/0

AB05I

104/02-31-086-09W4/0

AC05I

100/15-30-086-09W4/0

AD05I

105/03-31-086-09W4/0

AE05I

104/04-31-086-09W4/0

AA01P

103/04-31-086-09W4/0

AB01P

109/03-31-086-09W4/0

AC01P

106/16-30-086-09W4/0

AD01P

102/02-31-086-09W4/0

AE01P

104/03-31-086-09W4/0

AA02P

109/04-31-086-09W4/0

AB02P

110/03-31-086-09W4/0

AC02P

105/16-30-086-09W4/0

AD02P

107/02-31-086-09W4/0

AE02P

117/04-31-086-09W4/0

AA03P

110/04-31-086-09W4/0

AB03P

111/03-31-086-09W4/0

AC03P

104/16-30-086-09W4/0

AD03P

115/03-31-086-09W4/0

AE03P

118/04-31-086-09W4/0

AA04P

111/04-31-086-09W4/0

AB04P

105/02-31-086-09W4/0

AC04P

104/15-30-086-09W4/0

AD04P

114/03-31-086-09W4/0

AE04P

116/04-31-086-09W4/0

AA05P

112/03-31-086-09W4/0

AB05P

106/02-31-086-09W4/0

AC05P

103/15-30-086-09W4/0

AD05P

113/03-31-086-09W4/0

AE05P

115/04-31-086-09W4/0

HANGINGSTONE PROJECT
MARP METERING SCHEMATIC
Wel l Pads
(Pg 3 of 3)

REV.
2

46

Hangingstone Project - Measurement


Methodology
Well Production and Injection Volumes
Each well pad has a dedicated test separator with liquid flow meter and water cut
analyzer to determine well bitumen and water production.
Wells will be individually put on test for one valid testing hour for every 20 hours of
operation. Valid well test criteria per approved MARP.
Well gas production prorated from Battery Level GOR using a proration factor of 1.
Battery Level GOR will be updated monthly.
Steam injection is metered at each individual wellhead. Primary and secondary steam
production metering available at the central steam plant.
Battery Sales Oil
Sales oil will be trucked from the Hangingstone Battery. Custody transfer metering will
be done at the receiving facility.
Measurement Technology
Well testing uses standard method of test separators with microwave water cut
analyzers. New technologies such as multiphase flow meters may be evaluated later.
47

Hangingstone Project Water Production,


Injection and Uses
Fresh Water Wells
Water Diversion Licence 00316166-00-00 received on March 8, 2013 for
479,975 m3 annually.
ESRD-licenced fresh water source wells:

Well ID

Location

Formation

TDS (mg/L)

Maximum Rate of
Diversion (m3/d)

WSW153308508W400

15-33-085-08-W4

Quaternary

286

3,000

WSW061208609W400

06-12-086-09-W4

Quaternary

303

3,000

WSW040808608W400

04-08-086-08-W4

Quaternary

287

3,000

Wells are less than 150 m in depth and not licenced with the AER. Well IDs
are AOC internal identifiers, not UWIs.

48

Hangingstone Project Water Production,


Injection and Uses
Water volumes
Fresh Source Water
Time Bitumen
(Years) (m3/cd)

1
2
3
4
5
6
7
8
9
10
11

1,369
1,908
1,908
1,908
1,908
1,908
1,908
1,908
1,868
1,348
0

Steam
(m3/cd)

Produced
Water
(m3/cd)

Returned to
Environment
(m3/cd)

Unrecoverable
Utility
(m3/cd)

Makeup
(m3/cd)

TOTAL
(m3/cd)

Disposal
(m3/cd)

PW
Recycle

4,790
6,677
6,677
6,677
6,677
6,677
6,677
6,677
6,539
4,716
0

3,718
6,024
6,231
6,231
6,231
6,231
6,231
6,231
6,102
4,400
0

100
100
100
100
100
100
100
100
100
100
0

60
60
60
60
60
60
60
60
60
60
0

1,155
778
575
575
575
575
575
575
557
406
0

1,315
938
735
735
735
735
735
735
717
566
0

83
125
129
129
129
129
129
129
120
90
0

98%
98%
98%
98%
98%
98%
98%
98%
98%
98%
0%

Values are annual averages; Makeup includes recoverable utility water.


Evaporator blowdown (Disposal) is not recycled.
Disposal water will be 90oC at atmospheric pressure, trucked out.
Split sump concentrating evaporator design minimizes disposal volumes.
Waste will be sent to approved off-site disposal facilities.
Due to access restrictions AOC is currently obtaining water under TDLs to address water requirements
for drilling and construction.
49

Hangingstone Project Sulphur Production


Sulphur production under one tonne/day, no recovery.
Sulphur balance (from SIR 2):
Produced Gas

0.077 t/cd S
0.082 t/sd S

Bitumen

107 t/cd S
114 t/sd S

Produced Gas

0.077 t/cd S
0.082 t/sd S

Diluent

RESERVOIR

BITUMEN TREATING
Produced Water

1.0 t/cd S
1.1 t/sd S

Sales Oil
Emissions

0.077 t/cd S
0.082 t/sd S

Produced Water
HP Steam

Natural Gas
0 t/cd S
0 t/sd S

1.1 t/cd S for Gas Condensate


1.2 t/sd S for Gas Condensate

108.1 t/cd S for Gas Condensate


115.2 t/sd S for Gas Condensate

1.0 t/cd S
1.1 t/sd S

0 t/cd S
0 t/sd S

Boiler Feed Water 0 t/cd S


0 t/sd S
STEAM GENERATION

WATER TREATING

Disposal Water

Non-Saline Water

0 t/cd S
0 t/sd S

Saline Water

1.0 t/cd S
1.1 t/sd S

0 t/cd S
0 t/sd S

50

Hangingstone Project - Timeline


March 31, 2011

Filed Application.

September 30, 2011

Project Update and SIR 1 submitted.

March 6, 2012

Project Update and SIR 2 submitted.

October 3, 2012

Order in Council 307/2012 and AER Commercial


Approval 11888.

October 5, 2012

MARP Approval (AER) 1949359.

October 29, 2012

EPEA Approval 289664-00-00.

November 6, 2012

Historical Resources Act Clearance 003119951.

February 7, 2013

D78 Pad Shift Approval (AER) 11888A.

March 20, 2013

Water Act Licence Approval 00316166-00-00.

April 29, 2013

D78 Pad Shift Approval (AESRD) 289664-00-00.

51

Hangingstone Project - Timeline


May 24, 2013

CPF Amendment Approval (AER) 11888B.

May 31, 2013

Groundwater Management Proposal Approval


289664-00-00.

June 7, 2013

D56 Fuel Gas Pipeline (AER) Licence 55219.

June 20, 2013

D56 CPF Amendment ( AER) Licence F45426.

July 11, 2013

Caribou Monitoring and Mitigation Plan Approved.

July 2, 2013

Substation Application submitted 1609725.

July 30, 2013

Water Act Amendment received 00316166-00-01.

September 9, 2013

D56 Pad AA (AER) Licence F46483.

September 12, 2013

CPF Amendment approved (AESRD)


289664-00-01.

September 20, 2013

D56 Residue Fuel Gas Pipeline (AER) Licence


55432.
52

Compliance

Hangingstone Project - Compliance


Zero non-compliance instances related to EPEA Approval 289664-00-01.
3 trespass incidents were self disclosed to the AESRD Forestry Officer.
1 AER High Risk non-compliance for the filing of Fuel Gas Pipeline (AER) Licence
55219 prior to signed PLAs being issued.
Corrective action was taken on December 14, 2012 by filing an amendment to
change the status to non-construct.
A new application was filed on May 27, 2013 with the signed PLAs.
1 AER reportable spill.
5.5 m3 water based polymer drilling mud released while drilling 109/04-31-08609 W4M on Pad AA.
In compliance with DFO guidelines and regulations.
AOC has not started reclamation for the approved footprint as it is currently under
construction.
54

54

Hangingstone Project - Regional Initiatives


AOC is a funding member of:
Wood Buffalo Environmental Association,
Oil Sands Developers Group,
Alberta Biodiversity Monitoring Institute, and
Joint Oil Sands Monitoring Program.

55

55

Future Plans

Hangingstone Project - Future Plans


AOC filed an application for the Hangingstone Expansion Project in May 2013.
The Expansion includes:
increase the bitumen recovery capacity from the existing approved 1,908 m3/d
(12,000 bpd) to 13,037 m3/d (82,000 bpd) to be developed in two phases:
HS2 will add an incremental 6,360 m3/d (40,000 bpd) and
HS3 will add an incremental 4,770 m3/d (30,000 bpd).
Extension of the production life from 10 to 40 years,
CPF expansion from 35 ha to 76 ha,
Field facilities and,
Offsite and utility services.