Vous êtes sur la page 1sur 5

Tokyo Gas Engineering Solutions Corporation Corporate History

Corporate History

Tokyo Gas Engineering Solutions Corporation


2015

Tokyo Gas Engineering Solutions Corporation established by the merger


of Energy Advance Co., Ltd. and Tokyo Gas Engineering Co., Ltd.

History of Energy Advance

History

Co., Ltd.

Engineering Co., Ltd.

2014 Begins Energy Service by Smart

of

Tokyo

Gas

2014 40th Anniversary.

Energy Network in Tamachi


district.
2013 Establish GAS MALAYSIA

2013 Construction order for LNG

ENERGY ADVANCE Sdn. Bhd.

satellite and photovoltaic

(Malaysia), a joint venture

facility received from Morioka

company with Gas Malaysia

Gas.

Berhad.

Construction order for LNG

Begins exchanging scheme of

satellite received from

cold energy between the District

Kamaishi Gas.

Heating and Cooling Centers in

Construction order for heat

Shinjuku and Shinjuku Nishiguchi.

quantity adjustment facility for

Launch compact and high

Akita branch received from

efficiency gas cogeneration "XIA"

Tobu Gas.

2012 10th Anniversary of Energy

2012 Construction order for LNG

Advance Co., Ltd.

Storage Tank No. 2 for the

Launch of Shinjyuku Shintoshin

Ishikari LNG Terminal

District Project.

received from Hokkaido Gas.

Launch Tamachi- District Smart

Construction order for LNG

Energy Network Project.

Receiving Terminal for

Acquisition of an energy services

domestic vessel in Akita

company in Brazil.

received from Tobu Gas.

Supply electricity to the Tokyo

Support service request for

Metropolitan Government

expansion of Thai LNG

buildings.

Terminal received.

2011 Establish Overseas Business

2011 Construction order for port

Development Department .

factory rehabilitation received

40th Anniversary of Shinjuku

from Sendai Municipal Gas

District Heating and Cooling

Bureau.

Center.

Construction order for Hitachi


LNG Terminal received from
Tokyo Gas.

2010 Increasing the number of Gene-

2010 Construction order for the

light (a small gas cogeneration

stations of Shin Negishi Trunk

system) project at welfare

Line and Yokohama Trunk

facilities.

Line (second phase) received


from Tokyo Gas.

2009 Comprehensive Utility Service

2009 Merged with Tokyo Gas Plant

began for existing plants.

Tech Co., Ltd. (former Tokyo

Business alliance in energy

Plant Service).

saving analysis for steam boilers.

Construction order for the


Central Line for Shizuhama
Trunk Line received.

2008 Establish Regional Energy

2008 TGE Shanghai established.

Services Depertment.

Construction order for the

Relocate Head Office to the

Ishikari LNG Terminal

Tokyo Gas' Head Office Building.

received from Hokkaido Gas.


Construction order for the
Naoetsu LNG Terminal
received from International

Petroleum Exploration
Corporation (INPEX).
2007 Introduce boiler-based energy

2007 Construction order for Chiba-

service.

Kashima Line Station received

Install power generator to

from Tokyo Gas.

Makuhari District Heating and


Cooling Center.
2006 Begins Comprehensive Utility
Service

2006 Head Office moved from


Shinjuku-ku to Kamata in Otaku.
Engineering, Procurement and
Construction Management
(EPCM) order at the LNG
Peak Shaving Station received
from Shanghai Gas.

2005 Start operation of cogeneration

2005 Privacy mark obtained.

plant installing large capacity


Wrtsil gas engine.
2004 First LNG Satellite Project.

2004 30th Anniversary.


Sales of the Bottle Liquid
Checker began.

2003 First On-site Energy Service.

2003 Construction order for the


Minamifuji Trunk Line received
from Minamifuji Pipeline.

2002 "Establishment of Energy

2002 Construction order for the

Advance Co., Ltd. Primariy

Hakodate LNG Base received

business area focused on District

from Hokkaido Gas.

Heating and Cooling."


2001 Construction order for the
Onoda Satellite Base received

from Yamaguchi Gohdoh Gas.


2000 Construction order for the
LNG underground tank for the
Nagasaki Base received from
XIA

Seibu Gas.
Accumulated construction of
cogenerations reached
100,000 kW. Orders of
Regenerative Burners reached
1,000.
1998 ISO 9001 approval obtained.

Power supply to the Tokyo Metropolitan

1997 Construction order for the

Government Office building from the

LNG underground storage

Shinjuku District Heating and Cooling Center

tank received from Shimizu


LNG.
1994 Capital increased to 100
million yen
Head Office moved from
Minato-ku to Shinjuku Park

Large Wrtsil gas engine

Tower.
1993 Total construction order for the
LNG Receiving Base at the
port factory received from
Sendai Municipal Gas Bureau.
1989 Aqueduct Mapping System
Co., Ltd. established.
Sales of TES (central heating
system) began.
1986 Fields and sectors for
Geographic Information

System and Energy Facilities


Engineering established.
1983 Computer Mapping System
made more generic and
commercialized. Tokyo Plant
Service Co., Ltd. established.
1980 Construction order for gas
holders for Taiwan received as
the first order from overseas.
1978 Capital increased to 20 million
yen.
1976 Began taking full-scale
construction orders such as
large industrial furnaces.
1975 Capital increased to 10 million
yen.
1974 Tokyo Gas Engineering Co.,
Ltd. established with capital of
5 million yen.

Vous aimerez peut-être aussi