PWP05
GE ENERGY
GENERAL GUIDELINES
Purpose/Scope
This work package encompasses all
Contractor Representative
Customer Representative
GE Representative
Printed Name:
Printed Name:
Printed Name:
Printed Title:
Printed Title:
Printed Title:
GE Representative
Signature/Date:
Rev 0
Signature/Date:
Signature/Date:
Page 1 of 3
PWP05
TASKS
INITIALS
DATE
MECHANICAL CHECKS
1.
2.
Verify system piping to skid has been cleaned and free of debris.
3.
4.
5.
Check opening and closing of all drain, vent and shutoff valves.
6.
Verify gas blow has been performed in accordance with latest approved Engineering
Procedure No. 289644 and lines from customer interface have been cleaned.
7.
Verify all vent lines are installed according to the F&ID and have continuous
discharge to the atmosphere.
NOTICE
VERIFY FUEL MEETS GE SPECIFICATIONS PRIOR TO ADMITTING TO THE
TURBINE. INSERT ANALYSIS REPORT IN THIS SECTION.
8.
Verify sample has been taken and analysis results meets GE specifications.
9.
Check opening and position of gas fuel control valve; hydraulic pressure should be available (Turbine cranking
@ approximately 2200 rpm is needed to stroke valve).
Use calibration function on the HMI. Verify correct valve calibration.
Go to 0, 25, 50,100 and 0 % of travel. Check that demand and feedback match.
Physically check the valve movement in fuel skid.
Rev 0
Page 2 of 3
PWP05
INITIALS
DATE
ELECTRICAL CHECKS
11.
12.
13.
Check for adequate distance between power, control, and instrument cables.
14.
15.
16.
Check means of cable protection against mechanical damage at points where cables
leave cable trays or enter package.
17.
18.
19.
20.
Verify ranges and set points for all instrumentation listed in Gas Fuel System
Instrumentation Sheet. Mark each instrument as calibrated or verified in appropriate
column.
21.
22.
Rev 0
Page 3 of 3