RIEGO TINGO DE PO
V2 =
2.00 m/seg
NAZA
2.00 m/seg
g = 9.81 m/seg
(B) CLCULOS:
(6)
(7)
(8)
255.579 m
255.487 m
Gradiente de velocidad:
hv1= 0.2040 m
hv2= 0.2040 m
(9)
(10)
Di = 1.262 m
(11)
Concreto presforzado
2.5 m/seg
=
2.00 m/seg
50 pulg
Propiedades hidrulicas:
rea del tubo =
1.266 m
Velocidad en el tubo =
1.975 m/seg
R =
0.318 m
0.013
Sf =
Borde libre :
0.1987 m
3.988 m
(14)
= 1.250 m
Fb
normal
(concreto)
0.0013827114
0.60m
mnimo
Fb
Fb
adic
total
0.30m
adicional
0.90m
0.90 m
256.48 m
12
coseno 12 =
0.9781476
seno 12 =
0.2079117
(17)
Configuracion hidrulica de la transicin de entrada:
Abertura vertical
Ht= 1.298 m
0.1987 m
1.50
0.2040 m
-0.008m
C 255.58 m
1.298 m
0.076m
Elevacin C =
254.20 m
Diferencia de la elevaciones invertidas
en la transicin
p=
0.28 m
Elevacin
<
Di
B =
0.953 m
254.20 m
Elevacin D :
h1 = 4.657 m
Elevacin D =
Elevacin E :
Lhorizontal
y1 =
254.20 m
Elevacin
25.00 m
Elevacin
E =
= 254.49 m
0.968 m
0.968 m
+
= 253.24 m
0.281 m
25.00 m
0.007
253.24 m
=
+
S=
0.1750 m
0.1750 m
(18)
Configuracion hidrulica de la transicin de salida:
Ht = 1.298 m
Elevacin G :
254.49 m
Elevacin G
Elevacin F =
Elevacin G - p
p=
1.270 m
Elevacin F =
0.0015 m
x 46.11 m
254.42 m
=
0.635 m
254.42 m
h2 = 4.657 m
0.635 m
= 253.78 m
y2 = 0.968 m
0.635m
0.43 m
(19) Elevacin H =
1.298 m
< Ht / 6 = 0.216 m
254.42
Elevacin H =
= 0.43 m
0.0015 m
15.00 m
254.39 m
Ltotal = 34.31 m
255.49 m
0.0917 m
0.199 m
0.204 m
12/90
-0.0021 m
0.04745 m
0.199 m
0.2040 m
Hl = 0.086 m
255.58 m
254.49 m
0.90m
Dimensin a :
a =
a
(Elevacin B + y) - Elevacin C
=
254.49 m
2.00m
254.20 m
1.09m
hw
= 1.2hw
Dimensin C :
D =
D
Di
/ di hw
1.262m
C=
1.90Di
C =
2.00 m
Profundidad y espesor del detelln en la
transicion, segn tabla 2,item 2.2.6.2.2.2
e = 0.80m
Longitud de la transicin, Lt :
Lt =
4 x
Di
Lt =
tw = 0.20m
4 x
1.262 m =
Dimensin B :
B =
0.303 x
B =
0.303 x
Di
1.262 m
0.38m
14697.50 m
Dist. Horiz. =
4.56 m
14692.95 m
253.24 m
Distancia Vertical :
Dist. Vert. =
254.20 m
Dist. Vert. =
0.97 m
S1 =
Dist. Vert.
Dist. Horiz.
6.00m
S1 =
0.2125
tang-1
0.2125
11.997
14727.06 m
Dist. Horiz. =
4.56 m
14722.50 m
253.06 m
Distancia Vertical :
Dist. Vert. =
253.78 m
Dist. Vert. =
0.72 m
S2 =
Dist. Vert.
S1 =
0.158
tang-1
Dist. Horiz.
0.158
###
cos 1
0.978159
cos
0.987723
4.66 m
25.00 m
4.61 m
+
4.66 m
L =
4.61 m
34.27 m
0.204 m
0.199 m
0.00000 m
0.04738 m
C = 0.25
hc = 2C x
11.9968995125686/90
hc =
0.03627 m
d.-Prdida por salida, ho =
ho = 0.65 x
0.199 m
Hl = 0.088 m
0.204 m
0.199 m
-0.003 m
Tipo 1
2.73 m
NAZA
2.00 m/seg
255.579 m
255.487 m
da.
Concreto presforzado
1.250 m
0.1987 m
(concreto)
mnimo
adicional
ngitud
o.
n la Est. A:
n de entrada:
x
hv
-0.008m
76 m.
254.49 m
253.24 m
0.007
253.06 m
n de salida:
46.11 m
253.78 m
15.00 m
a en H
-0.0021 m
0.04745 m
0.036 m
y salida
+ F bt
2.00m
2.28m
, seccin 2.2.6.2.1
a
2.2
6.00m
Dist. Horiz.
11.997
Dist. Horiz.
###
cos 1
0.978159
cos
0.987723
0.00000 m
0.04738 m
0.199 m
-0.003 m
in de salida
2.5 x hw
2.73 m
d1 = 1.09 m
15.00 m
y1
=
0.97 m
###
h1
= 4
.66
m
4.56 m
Ubicacin:
Q =2.5 m/seg
Est. 14+692.95 @
S1
S2 = 0.007
25.00 m
Est. 14+727.06
6.00 m
N.A
###
4.56 m
1 m
4.6
=
h2
y2
Elev. G = 254.42m
Est. G =14+733.06
Elev. F = 253.78m
Est. F =14+727.06
Elev. E = 253.06m
Est. E = 14+722.50
Elev. J = 253.15m
Est. J = 14+710.00
Elev. D = 253.24m
Est. D = 14+697.50
Elev. C = 254.20m
Est. C = 14+692.95
Elev. B = 254.49m
Est. B = 14+686.95
Elev. A = 254.49m
Est. A = 14+671.95
CL
6.00 m
15.00 m
Elev. = 255.49m
S3
=
0.97 m
Elev. = 255.49m
0.97 m
d2 = 1.09 m
15.00 m
Elev. H = 254.39m
Est. H =14+748.06
1.5(y-0.15)=2.78m
tw=0.20m
6"
tw=0.20m
tw=0.20m
6"
e=0.80m
1.5(y-0.15)=2.78m e=0.80m
1.5(y-0.15)=2.78m
9.15 m
6"
C=2.00m
C=2.00m
tw=0.20m
1.5(y-0.15)=2.78m
9.15 m
Lt=6.00m
e=0.80m
e=0.80m
Lt=6.00m
e=0.80m
e=0.80m