DATE
CLIENT
SCOPE OF WORK
26.05.2006
Bumifocus
Emergency work- Protection for exposed pipe at Jalan Johan Setia, Klang, Banting Selangor.
27.12.2007
Petronas Gas
31.12.2007
Petronas Gas
18.11.2009
Petronas Gas
Pipeline repair at Shah Alam, Sitiawan and Gurun regional offices - crane rental, visual inspection, holiday test,
adhesion test, coating thickness measurement, handling of line pipes.
25.03.2010
Petronas Gas
Line pipe preservation (PHASE I) for Pasir Gudang and Kuantan Regional Office.- crane rental, visual
inspection, holiday test, adhesion test, coating thickness measurement, handling of line pipes.
27.03.2010
Petronas Gas
Line pipe preservation (PHASE I) program for Sitiawan Regional Office.- crane rental, visual inspection, holiday
test, adhesion test, coating thickness measurement, handling of line pipes.
27.03.2010
Petronas Gas
Line pipe preservation (PHASE I) for Shah Alam Regional Office.- crane rental, visual inspection, holiday test,
adhesion test, coating thickness measurement, handling of line pipes.
27.03.2010
Petronas Gas
Line pipe preservation (PHASE I) for Gurun Regional Office.-. crane rental, visual inspection, holiday test,
adhesion test, coating thickness measurement, handling of line pipes.
13.08.2010
Petronas Gas
Line pipe preservation (PHASE II) for Kuantan Regional Office.- crane rental, visual inspection, holiday test,
adhesion test, coating thickness measurement, handling of line pipes.
13.08.2010
Petronas Gas
Line pipe preservation (PHASE II) for Pasir Gudang regional office.- crane rental, visual inspection, holiday
test, adhesion test, coating thickness measurement, handling of line pipes.
31.10.2010
Petronas Gas
Line Pipe Inspection (PHASE II) for Gurun, Pasir Gudang, Sitiawan and Shah Alam Regional Offices Crane
Rental.
18.11.2010
Petronas Gas
Pipeline repair at Shah Alam, Sitiawan and Gurun regional offices - crane rental, visual inspection, holiday test,
adhesion test, coating thickness measurement, handling of line pipes.
Page 1 of 3
CLIENT
SCOPE OF WORK
19.01.2011
Petronas Gas
Line pipe preservation programme (PHASE III) for Gurun, Sitiawan, Shah Alam, Seremban Pasir Gudang,
Kuantan, Gudang and Segamat Regional Office.- crane rental, visual inspection, holiday test, adhesion test,
coating thickness measurement, handling of line pipes.
29.05.2012
Petronas Gas
Provision of 45 ton crane and manpower to relocate line pipes at Shah Alam Regional Office.
11.10.2012
Petronas Gas
1.11.2012
Petronas Gas
14.11.2012
Petronas Gas
Provision of manpower, materials, consumables & equipment to undertake verification dig-up, pit-depth
measurement, coating inspection, STOPAQ application for NPS 24 PD Lateral.
26.11.2012
Petronas Gas
Provision of manpower, materials, consumables & equipment to undertake verification dig-up, pit-depth
measurement, coating inspection, STOPAQ application for NPS24 Prai Lateral.
29.11.2012
Petronas Gas
Provision of manpower, materials, consumables & equipment to undertake verification dig-up, pit-depth
measurement, coating inspection, STOPAQ application for NPS36 PGU 3 Sector 1 Sitiawan.
10.12.2012
Petronas Gas
Provision of 45 ton crane and manpower to relocate line pipes at Shah Alam Regional Office.
11.12.2012
Petronas Gas
Provision of manpower, materials, consumables & equipment to undertake verification dig-up, pit-depth
measurement, coating inspection, STOPAQ application for NPS 36 PGU3 Sector 1.
14.12.2012
Petronas Gas
Provision of manpower, materials, consumables & equipment to undertake magnetic particle inspection (MPI)
for NPS 24 Port Dickson Lateral.
29.04.2013
Petronas Ammonia
Provision of manpower & materials to do temporary STOP IT Pipe Repair Clamp at Vessel V3-1203 for
Petronas Chemicals Ammonia Sdn Bhd.
25.09.2013
Petronas Gas
Provision of manpower, materials, consumables & equipments to undertake verification dig-up, pit-depth
measurement, soil sampling & coating repair for NPS 36 PGU 2 Sector 1, Kuantan.
Page 2 of 3
CLIENT
SCOPE OF WORK
7.10.2013
Petronas Gas
Provision of manpower, materials, consumables & equipments to undertake verification dig-up, pit-depth
measurement, soil sampling & Clock Spring Enhancement composite repair & STOPAQ for NPS 4 Tioxide
Lateral, NPS 12 Optimal, NPS 4 ET & NPS 20 YTL, Terengganu.
11.12.2013
Petronas Gas
Provision of manpower, materials, consumables & equipments to undertake verification dig-up, pit-depth
measurement, NDT & Clock Spring Enhancement composite repair for NPS 36 PGU 2 Sector 1 Pipeline,
Johor.
Page 3 of 3