Materials
Prepared by:
Bernabe T. Salazar Jr.
Roof Management Committee
Engineering
Design &
Development
OUTLINE
Engineering
Design &
Development
Engineering
Design &
Development
1.
2.
3.
4.
5.
6.
Surface Preparation
Surface should be sloped
Curing of Cement should be achieved (28days)
Loose concrete should be removed
Cracked should be repaired using epoxy injection
Water blast cleaning
Drying 24 hrs.
End lapping = 6
Side Lapping=4
Engineering
Design &
Development
1.
2.
3.
4.
5.
6.
Surface Preparation
Surface should be sloped
Curing of Cement should be achieved (28days)
Loose concrete should be removed
Cracked should be repaired using epoxy injection
Water blast cleaning
Drying 24 hrs.
End lapping = 6
Side Lapping=4
Engineering
Design &
Development
ELASTOMERIC SYSTEM
1.
2.
3.
4.
Surface Preparation
Removal od damage waterproofing
Cleaning the surface , removal of other
contaminants
Repair of cracks thru epoxy injection
Drying the surface for waterproofing
Engineering
Design &
Development
ELASTOMERIC SYSTEM
1.
2.
3.
4.
Surface Preparation
Removal od damage waterproofing
Cleaning the surface , removal of other
contaminants
Repair of cracks thru epoxy injection
Drying the surface for waterproofing
Engineering
Design &
Development
1.
2.
3.
4.
Surface Preparation
Surface should be sloped
Loose concrete should be removed
Cracked should be repaired using epoxy injection
Corner : install fillet
DFT = 1mm
Solvent Based
Engineering
Design &
Development
POLYUREA
Surface Preparation
1. Loose concrete should be removed
2. Cracked should be repaired using epoxy injection
3. Surface cleaning, loose particles removal
DFT = 1mm
DFT Roofdeck Parking = 2mm
Engineering
Design &
Development
PU FOAM
1.
2.
3.
4.
5.
Surface Preparation
Metal roof surface should cleaned
Tightening or replacement of loose text screw
Apply sealant (PU) on all text screw
Cleaning, removing rust.
Treatment of corroded area using Rust Converter
DFT = to 1 Thickness
Engineering
Design &
Development
Surface Preparation
1. Tightening or replacement of loose text
screw
2. Apply sealant (PU) on all text screw
3. Cleaning, removing rust using sand paper
4. Treatment of corroded area using Rust
Converter
5. Sealing all seams, overlaps, flashing, and
penetration with maxicryl and high tensile
strength fiber cloth
Engineering
Design &
Development
Surface Preparation
1. Removal of Dirt and other contaminants
2. Sealing of all seams and text screw using
sealant.
Engineering
Design &
Development
Surface Preparation
Engineering
Design &
Development
Engineering
Design &
Development
Problems in Malls
Concrete Slab
Metal roof
Concrete gutter
Flashing
Pipes, support and metal roofs
Engineering
Design &
Development
PHOTOS FOR
MEMBRANE
Engineering
Design &
Development
MORE PHOTOS
Engineering
Design &
Development
MORE PHOTOS
Engineering
Design &
Development
MORE PHOTOS
Engineering
Design &
Development
MORE PHOTOS
PU FOAM
CRACK ON WALLS
Engineering
Design &
Development
End of Report