Calculation
Output
Design of Staircases:
There were two staircases in the building to design. Design of main
staircase is detailed here.
Typical paln of the staircase is attached here with in figure 9-1.
Choice of layout:
Floor to floor height
No. of rises
Height of rise
Going (G)
2R+G
= 3500mm
= 22
= 3500
22
= 159mm <175mm and acceptable
for public buildings.
Rise=159mm
= 250mm
Going=250mm
= 2*159 +250
= 568mm
(Appro. 600mm )
Hence OK.
Nosing is not going to provide hence, tread and going are equal.
Stair span and Waist Thickness for Typical flights:
Staircase was supported between two landings and landings were
designed to span perpendicular to the span of flights.
BS8110
Cl.3.10.1.3
Effective span
Cl.3.10.2.2
61.70%
>60%
= 31*1.15
=
35.65
Effective depth
= 4050/35.65
= 114mm
Assume cover 25mm (mild exposure conditions and 2hr fire resistance)
and using 12mm bars, choose h=150mm and
Waist thickness
d=150-25-6
= 119mm
= 150mm
Hence waist thickness was selected as 150mm.
Project: Dahampaya
DESIGN UNIT
D
E
Feature
Designed
Design of staircase
Date
Reference
D
E
C
Calculation
Output
EPC DIVISION
Checked
Job Code
Date
D-676
Page
01 of 13
Loading:
Consider 1m wide strip
Factor for slope
= (R2+G2)0.5/G
= (1592+2502)0.5 /250
= 1.18
Waist
=
=
=
=
=
=
=
=
Steps
Top finishes
Soffit plaster
(0.15).(24).(1.18).1
4.25kN/m
(0.5).(0.159).(0.25).(24)
0.477kN/m
(0.5).1
0.5kN/m
(0.25).1.(1.18)
0.295kN/m
= 5.52kN/m
Imposed load
= 4.0kN/m2
Design load
= (1.4).(5.52)+(1.6).(4)
= 14.1kN/m
Design load
= 14.1kN/m
= (0.15).24
= (0.25).1.0
= (0.5).1.0
= 4.35kN/m
Imposed load
= 4.0kN/m2
Design load
= 3.6kN/m
= 0.25kN/m
= 0.5kN/m
= (1.4).(4.35)+(1.6).(4)
= 12.5kN/m
Landing load
= 12.5kN/m
Reference
Calculation
Project: Dahampaya
D
E
C
Output
Feature
Design of staircase
DESIGN UNIT
Designed
Date
EPC DIVISION
Checked
Date
Job Code
D-676
W1
W1
B
x
650m
m
2500mm
W1
W2
= 12.5kN/m
= 14.1kN/m
900m
m
RA
= (12.5*0.9*0.45)+(14.1*2.5*2.15)+(12.5*0.65*3.725)
4.05
= 27.4kN
RB
= (12.5*0.65*0.325)+(14.1*2.5*1.9)+(12.5*0.9*3.6)
4.05
= 27.2kN
= RA
- (12.5*.65*(x-0.325))- (14.1*(x-0.65)2/2)
- 8.125x- 14.1x+9.165
= 27.4-22.22x+9.165
x = 2.1m
Mmax
= (27.4*2.1)-(12.5*.65*1.775)-(14.1*1.05)
= 28.3kNm
Page
02 of 13
Reference
Calculation
Output
Project: Dahampaya
D
E
C
Feature
Design of staircase
DESIGN UNIT
Designed
Date
EPC DIVISION
Checked
Date
Job Code
BS 8110
Cl. 3.4.4.4
M
2
bd .fcu
D-676
Page
03 of 13
28.3x106
bd2.fcu
b = 1000 mm
d = 150-25-6
= 119mm
fcu = 25 N/mm2
k = 28.3x106
(1000) (119)2 .25
0.079 <
0.156 (k')
(0.25- k/0.9)1/2)
= d (0.5 +
(0.25- 0.079/0.9)1/2)
= 0.9d
< 0.95d
z = 0.9d
= 0.9x 119mm
= 107mm
As
M
0.87fy.z
= 28.3x106
0.87x460x107
Main steel
= 661mm2
(provide T12 @
150mm)
= 661 mm2
Provide T12@ 150 spacing (753mm2)
Check for deflection:
M/bd2
= 28.3*106
(1000*1192)
Table 3.11
fs
= 5*460*661
(8*753)
= 252N/mm2
Reference
Ft
Calculation
= 0.55+(477-252)/120(0.9+2)
=
1.19
Project: Dahampaya
D
E
C
Output
Feature
Design of staircase
DESIGN UNIT
Designed
Date
EPC DIVISION
Checked
Date
Job Code
Actual span
depth
<
Allowable span
depth
= Basic span x
depth
Basic span
depth
D-676
Page
04 of 13
Allowable span
depth
F1 x F2
= 26
Allowable span
depth
= 26 x1.19
=
31
Actual span
depth
Actual span
depth
>
4050
119
34
Allowable span
depth
Hence deflection check is not satisfied, and have to increase the tension
steel.
Assume T12 @ 125mm spacing (904mm2)
fs
= 5*460*661
(8*904)
= 210N/mm2
Ft
= 0.55+(477-210)/120(0.9+2)
=
1.32
Allowable span
depth
= 26 x1.32
= 34.3
> 34
= V
bd
= 27.4
(1000x119)
= 0.23N/mm2
Reference
BS 8110
Calculation
100As/bd
Output
= 100(904)/(1000*119)
=
0.76
Table 3.9
vc
= 0.77N/mm2
>
v , hence O.K.
Project: Dahampaya
D
E
C
Feature
Design of staircase
DESIGN UNIT
Designed
Date
EPC DIVISION
Checked
Date
Job Code
D-676
Distribution steel
No bending moment occurs at transverse direction.
100As/Ac
As
0.13
= (0.13x1000x150)
= 195 mm2
= 3*119
= 357mm >250mm
0.13
As
= 0.13*1000*150
100
= 195mm2/m
<
904mm2/m
BS8110
Cl.3.10.1.3
Effective span
Cl.3.10.2.2
76.00%
>60%
Page
05 of 13
Reference
Calculation
Output
Project: Dahampaya
D
E
C
DESIGN UNIT
EPC DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Feature
Designed
Checked
Job Code
Design of staircase
Date
Date
D-676
Page 06 of 13
Reference
Project
D
E
C
Calculation
Feature
DESIGN UNIT
Designed
EPC DIVISION
Checked
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECBJob Code
Output
Date
Date
Page
of
W1
W2
W1
(provide T12 @
Reference
Project
D
E
C
DESIGN UNIT
Calculation
Outputs
Feature
Designed
Date
D
E
C
EPC DIVISION
CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Checked
Job Code
Date
Page
of