Académique Documents
Professionnel Documents
Culture Documents
DAS Consulta nt
a. Straw-based
Densified Feed
Blocks as a
complete feed
b . How we
p re p a re P la n
Docume nts
c. Commercial
Dairy Farming
d. Dairy Farm
Manual
e. Milk Processing
Plant (500 liter to
10000 liter per
hour)
f. Ice Cream
Manufacturing Unit
g. Panchgavya
h. Opportunities in
setting up
Warehouse /
Godown
i. Godown for FCI
j. Rural Godown
Scheme /
Grameen
Bhandaran Yojana
k. Agricultural
Marketing
Infrastructure
l. Commercial Goat
Farm (100 and
500 goat farm)
m. Vermicompost
Production Unit
(3000 MT p.a.)
n. Vegetables
Fruits Packing
House
o. Bakery
p. Automatic Rice
Milling Plant
q. Mango
Processing Plant
r. Tomato
Processing Plant
s. Whole Egg
Powder Plant
t. Architectural
Layout Plans
u. Maternity
Nursing Home
DAS Consultant
>
w. Completed
Projects
Site ma p
d) Growth envis aged. Hope you have understood why we wish to know
promoters margin money investment and the nature of investment. We
endeavor for maximum possible utilization of government subsidies &
assistance. We conclude what would be the final exposure to bank term
loan. Then after within the total investment budget (taking into account
term loan, subsidy & margin money) we plan according to the growth
envisaged during projected 7-10 years.
In the livestock farms e.g. dairy farm & goat farm the development of
breeds of animals goes hand-in-hand with envisaged growth. If you are
planning to setup 100 cow dairy farm, then dont take it as its face value of
only 100 cows. In-house breed development is important to maintain longterm viability of dairy farm. Certainly it is not advisable to sell the female
calves either upon birth or after one year. Such female calves should be
retained till they become milch animals.
In the goat farm too, we plan for adequate housing, feeding & care
arrangements for total number of adults & kids as per growth projected
during projected years. Successful goat farm takes minimum 2 years to
establish and the income from goat farm begins after 9 months-1 year of
implementation.
When the goal is certain that we are going to develop the breed as per
growth envisaged in proposed livestock farms; we endeavor for:
- adequate housing & welfare plan for adults & kids as per projected
growth
- optimum arrangement of green fodder (with less dependence upon
concentrates & dry feeds)
- maintaining utmost hygiene, ease of daily operations and for best
practice for artificial insemination
- adopting best practices for animal care, welfare, medication, vaccination,
etc.
- ease in managing daily routine affairs of livestock farms with minimum
possible manual labor involvement
In case of milk processing plant too, if we are planning for 10000 lpd plant
then we plan for the civil construction as if we have to work for 20000 lpd
plant. In case if you want to expand later on then the same building will be
useful to you. Now-a-days main processing line equipments are available
which has in-built facilities to expand. We demonstrate flexibility to
increase the capacity later on while we plan for the total equipment budget
Role of any consultant is to devote needed time & efforts and then
delivering bespoke (i.e. unique as per case) plan documents & technical
guidelines. Payment of service fee is spread as per following schedule:
- Initial commitment amount in advance
- Second installment at the time of submission of plan documents as per
bank norms
- Third installment at the time of sanction of project by financing bank
- Final installment within 30 days of bank sanction
We can work for select project setup and hence informing below relevant
information for following:
a) Commercial Dairy Farm 100 cows or more
b) Commercial Goat Farm 100 breeding goats or more
c ) 3000 ton p.a. Vermicompost Production Unit
d) 10000 birds or more Poultry Layer Farm
e) Bakery producing 500 kg Bread, Biscuit & Rusk per day
f) 10000 lpd or more Milk Processing Plant
g) 2 ton paddy per hour or more Rice Milling Unit
h) 3000 ton or more Food Grains Warehouse as per scheme guidelines
3840
(A) Civil c ons truc tion layout des igns . Let us have a look for how we
have designed the overall facilities in total and what are the subject matter
of our studies during initial 1-2 months before we finalize. We strongly
suggest you to study these files along with your shed construction
supervisor. Right from beginning he should understand what facilities are
going to be constructed at site.
a) Floor Plan, b) Internal roads , open platform & c ) Floor Plan with
outer dimens ions . Plan (a) & (b) are complimentary to each other; former
describes the facilities and later the internal movement paths. Plan (c) tells
the outer dimensions of the facilities planned (whereas plan (a) tells the
inside dimensions).
issues are described clearly. Here with reference of column position you
can understand roofing also. Roof truss and roof sheets are lighter in
weight than conventional gi/asbestos sheets.
estimated for waste pond & biogas digesters (including pipelines & stoves).
Commercial Hydroponic machines are costly and here with Racks we have
planned as best as possible for low cost substitute of hydroponic
machines.
B4: Shed for 448 Milc h Cows . Here the entire columns & beams are of
Steel fitted over rcc foundations. Roofing is of steel roof truss & metal roof
sheets. Here we have planned for minimum brick walls and for adverse
weather we have planned for tarpaulin curtains. Inside feeders & drinkers
are also planned for.
B5: Shed for 156 Calves , H eifers & Dry Cows . Here the entire
columns & beams are of Steel fitted over rcc foundations. Roofing is of
steel roof truss & metal roof sheets. Here we have planned for minimum
brick walls and for adverse weather we have planned for tarpaulin curtains.
Inside feeders & drinkers are also planned for.
You are getting the entire segment-wise estimate in bankable format and in
clear terms so that you can understand each segment easily. Civil
construction cost estimate is in bankable format and it justifies the total
civil construction cost as per norms and at the rate specified as per norms.
This document puts the monetary value to each segment as per norms. It is
useful document over which your financing bank takes opinion from
empanelled valuers.
It is accompanied with inves tment s c hedule before sanction of term loan
and investment schedule after sanction of term loan. Most of the margin
money investment is towards civil construction; hence this schedule is
prepared with clear segments of investments. It helps bank to value your
investments. It will also help you to submit Utilization Certificate to
financing bank time to time.
(C) Des c ription, Guidelines and Manuals . This description file is quite
elaborate. It includes snapshots & descriptions. Initial few pages describes
all the layout plans cited above in Section A. We suggest pasting all the
layout plans over the wall and then start reading this description file. While
reading you will understand daily routines & movement of men, materials &
animals. You will understand how regular feeding, cleaning, milking &
regular animal care exercises will be performed. You will learn area
earmarked for silage making, biogas digesters & azolla cultivation. You will
learn how animals will be given fresh green fodder, silage & grazing grass.
After describing all the layout plans we probe each segments with
snapshots. Entire civil construction schedule along with erection of all
desired facilities are explained with the help of pictures. Foundations &
structures accompanied by partition walls & inside facilities are explained
clearly with snapshots.
After that with the help of Operation Manuals we study relevance of
various animal welfare activities. We have emphasized for proper dairy farm
training along with contact particulars of few reputed training institutes.
regard. Your staffs who will complete dairy training program will be
the great asset for you.
13. Finally how we are going to sell raw milk at maximum possible price
will be the subject matter of initial studies period.
14. Overall initial studies period focuses a lot over establishing
necessary infrastructure at minimum possible cost before we
purchase dairy animals, and then profitable vending of raw milk.
15. As per investment capacity we will decide the phases of establishing
necessary infrastructure and purchasing dairy animals thereof. Our
ultimate goal is 500 cow dairy farm. Even if we are beginning with
200 animals then how soon we are achieving the ultimate target.
(F) Let us s ummarize what plan doc uments you are getting: Initial
studies and discussions for around 1-2 months are important before we
finalize DPR. Above lists for our studies (1) to (15) are not exhaustive, but
indicates that we have to arrive at meaningful conclusions over each
relevant area before we prepare the final DPR. Here we are summarizing
what plan documents we are providing you for this purpose and then after
spending adequate time & efforts for resolving your case-to-case inquiries.
We will continue our studies till we are ready to prepare the DPR. Please
note down following components we are delivering upon your order:
Arc hitec tural layout
plans
a. Floor plan in A2
size color
b. Internal road &
open area in A2 size
color
c. Floor plan with
outer dimensions in A2
size color
d. Columns superimposed over floor
plan in A2 size color
e. Columns positions & height and array of plinth beams in A2 size color
f. Elevations in A1 size color
g. Partition walls in A2 size color
h. Lintel Beams in A2 size color
i. Roof truss & purlin tubes in A2 size color
j. Drainage lines in A3 size color
k. Water pipelines in A3 size color
l. Electrical wiring in A3 size color
Des c riptions and explanations
m. Shed construction schedule and erection description in color
n. Shed construction estimate with quantity breakup, margin money
investment schedule as per bankable format. This estimate helpful in
preparing Utilization Certificate.
o. Animal & equipment budget, relevance & source along with guidance
Manuals with s piral binding
p. Plan for green fodder cultivation in open area
q. Plan for adequate number of silage pits
r. Plan for high protein content dense grass cultivation under rack system
s. Plan for making indigenous concentrate mix/treated straw
t. Strategies to keep total feed cost & overall routine expenses at
minimum optimum level without compromising daily dosage requirements
of adults & calves
u. Plan for installing small-size biogas digesters and vermicompost
production out of biogas slurry and other agricultural wastes
v. Dairy farm manual in color & regular vet care
Others
w. Reliable market for HF/Jersey Cows and Murrah Buffalos and Heifers of
2 year age
x. Understanding streams of income & expense
y. Strategies to fetch maximum possible sale price of raw milk
z. Proprietorship/partnership deed, lease agreement format, guidelines
for legal compliance & for registration with fssai
G) Detailed Projec t Report and Financ ial projec tions &
jus tific ations . Finally it is time now to deliver you the DPR after
thoughtful and meaningful studies & discussion period of around 1-2
months over above areas. Let us tell you the format of DPR which we are
submitting to your financing bank.
G1: Exec utive Summary. This section includes snapshot view of whole
business. Topics covered are Name of the promoter, Constitution of the
proposed company e.g. individual or firm or company, Nature of livestock
industry and commercial dairy farming in particular, Operation cycle of
proposed project in brief, Name & qualifications of the promoters and their
contribution to the proposed project, Cost of the project and Means of
finance.
G2: Promoters details . The business and family background of the
promoter(s) are mainly discussed under this heading. Their previous
business experience and performance, if any, will be explained here. The
auditor(s) report of the previous business and the reason for closure will
also be clarified. Whether, the proposed venture is related with existing
business and will help them do better, will also be noted here.
G3: Mark eting and Selling Arrangements for Raw Milk . What are the
critical factors that determines demand of raw milk and how the raw milk is
produced & marketed under the proposed project is explained in this
section. Future demand of organic milk is also discussed here. How we are
going to face the threats & competition in the market. What are the
economic benefits to the nearby community as a whole due to proposed
project? We will also explain how we are going to employ the Sales Agents
at various strategic points for selling raw milk. In addition we will also
demonstrate the selling agreement with institutional buyers of raw milk.
G4: Infras truc ture fac ilities and the produc tion proc es s of raw
milk . What infrastructure facilities e.g. civil structures & dairy equipment
facilities are being employed to produce clean raw milk at competitive cost?
What breeds of dairy animals are being planned for, their lifecycle,
characteristics of particular breeds? What measures are to be taken for in-
2010
1800
1865
(A) Civil c ons truc tion layout des igns . Let us have a look for how we
have designed the overall facilities in total and what are the subject matter
of our studies during initial 1-2 months before we finalize. We strongly
suggest you to study these files along with your shed construction
supervisor. Right from beginning he should understand what facilities are
going to be constructed at site.
a) Floor Plan & b) Internal roads , open platform. Plan (a) & (b) are
complimentary to each other; former describes the facilities and later the
internal movement paths.
columns & wire fencing over RCC Foundations, planting Creepers around
the fencing, Green Fodder Cultivation in separate 5-acre plot including
laying down irrigation facilities, supervisor remuneration, etc.
B2: Internal Fenc ing, Internal Kharanja Road, Internal Kharanja
Open Platform as planned in Floor Plan. Fencing includes steel columns &
wire fencing over RCC Foundations, Kharanja Road is planned from lowgrade bricks & sand, and the other components are Grazing Grass with
irrigation facilities, erection of Silage Pits, Azolla Pits, Shade Trees around
the periphery, supervisor remuneration, etc.
B3: Maternity Room, Offic e, Feed Room, Bath Tub, Labor Room.
Here we have planned the entire building out of Steel Columns over RCC
Foundations with use of brick wall wherever necessary. We have planned for
the rooftops of steel roof truss & metal roof sheets.
In this segment we have calculated cost of laying down water pipelines,
electrical wiring, drainage lines & waste pond. We have estimated the cost
of facilities needed for proper operations of goat farm. We have planned &
estimated for waste pond & biogas digesters (including pipelines & stoves).
B4: Shed for 600 animals (k ids & adults both). Here the entire
columns & beams are of Steel fitted over rcc foundations. Roofing is of
steel roof truss & metal roof sheets. Here we have planned for minimum
brick walls and for adverse weather we have planned for tarpaulin curtains.
Inside feeders & drinkers are also planned for.
You are getting the entire segment-wise estimate in bankable format and in
clear terms so that you can understand each segment easily. Civil
construction cost estimate is in bankable format and it justifies the total
civil construction cost as per norms and at the rate specified as per norms.
This document puts the monetary value to each segment as per norms. It is
useful document over which your financing bank takes opinion from
empanelled valuers.
It is accompanied with inves tment s c hedule before sanction of term loan
and investment schedule after sanction of term loan. Most of the margin
money investment is towards civil construction; hence this schedule is
prepared with clear segments of investments. It helps bank to value your
investments. It will also help you to submit Utilization Certificate to
financing bank time to time.
(C) Des c ription, Guidelines and Manuals . This description file is quite
elaborate. It includes snapshots & descriptions. Initial few pages describes
all the layout plans cited above in Section A. We suggest pasting all the
layout plans over the wall and then start reading this description file. While
reading you will understand daily routines & movement of men, materials &
animals. You will understand how regular feeding, cleaning & regular
animal care exercises will be performed. You will learn area earmarked for
silage making, biogas digesters & azolla cultivation. You will learn how
animals will be given fresh green fodder, silage & grazing grass.
After describing all the layout plans we probe each segments with
snapshots. Entire civil construction schedule along with erection of all
desired facilities are explained with the help of pictures. Foundations &
structures accompanied by partition walls & inside facilities are explained
clearly with snapshots.
After that with the help of Operation Manuals we study relevance of
various animal welfare activities. We have emphasized for proper goat farm
training along with contact particulars of few reputed training institutes.
We have informed fodder seeds providing companies as ready reference.
Finally we have discussed all the equipments & facilities along with
pictures and is explained with relevance and source.
This file is quite elaborate and is tailor-made as per unique requirements of
entrepreneurs.
(D) Quotation for des ired equipments .
When you have understood the civil designs,
the construction facilities, the fodder
cultivation schedule & strategies to be
followed, syllabus for staff training, need for
goat farm equipments, etc. as described in
above sections (A), (B) & (C) it is now time to
obtain the quotations of all relevant
equipments. We emphasize for obtaining quote
of all relevant & needed goat farm equipments.
As far as our analysis goes the total cost for
equipments necessary to operate the proposed
600 animal goat farm including equipments for
fodder cultivation, utilities, etc. will be around INR 20.00 lakh. Cost of
tractor-trailor, mechanized fodder harvester are high; rest are within
budget.
Budget for goat farm equipments include: equipment for green fodder
cultivation, equipment for material handling, equipment for goat farm
operations e.g. feeding, cleaning, watering, equipment for waste disposal,
equipment for veterinary care and for daily care of kids & adults, general
electrical equipments, etc.
(E) Quotation for Breeding Goats and Male Buc k s . Let us arrive at
proper budget for animals prudently. Most of the promoters take quotation
over internet quite comfortably. On our part we suggest for suitable
marketplace and care to be taken while purchasing.
Please note the quotations for animals and equipments has to be taken by
promoter himself as per his preferences and level of satisfaction. On our
part we provide relevant information.
To s ummarize (A), (B), (C), (D) and (E). These are the subject matters
of our initial studies & discussion for 1-2 months before we prepare &
finalize the DPR for you. Total budget for the proposed setup could be
around INR 60.00 lakh to 75.00 lakh. Either you proceed at once with whole
facilities or divide the total phase to be incurred during 2 phases. Plan
should be done in holistic & wholesome manner; however implementation
could be divided in phases as per investment preferences of promoter.
During the period of studies & discussion of around 1-2 months we will
resolve the following:
1. Negotiating with vendors for fodder seeds companies, agreement
with plantation labors, and arriving at proper schedule of fodder
cultivation schedule & for silage making schedule. We have to make
proper schedule for grazing grass cultivation also.
2. Arriving at proper schedule for azolla cultivation
3. Understanding each component and arriving at proper schedule for
construction boundary fencing, obtaining quotations needed for
materials, agreement with construction supervisor, etc.
4. Along the periphery of boundary fencing we have planned for
creepers and for azolla pits & shade trees. We have to arrive at proper
conclusion for what varieties of creepers & shade trees to develop.
5. We have to identify few staffs, preferably 1-2 staffs, who will
undergo various training programs. This may take 45-60 days, but
thorough training over various goat farm activities will increase the
effectiveness. Out of the many courses being conducted in India, we
have to select 2-3 courses.
6. We have to locate the main gate and area needed for waste pond,
biogas digesters.
7. Construction supervisor should understand the construction
methods well enough. We are using mostly Steel in construction.
Hence we need to understand the total bill of quantity and obtain the
quotation from nearest place. In fact all the quotations needed for
completing construction should be ready right at the beginning.
There should be agreement for labor payment & supervisor
remuneration.
8. Normally there are separate construction supervisor for water
pipelines, electrical wiring & drainage lines. There should be proper
agreement for materials needed, labor payment & supervisor
remuneration.
9. Practically we have seen that there is separate supervisor for roof
truss & roof sheets. We should have prior plan & agreement for
materials needed, labor payment & supervisor remuneration.
10. There are lots of equipment & facilities of varied nature we need for
proper operation of goat farm. We should develop thorough
understanding of the functions and should obtain quotation of all of
them. Here we have already prepared lots of explanations, lists &
budgets for civil infrastructure & for equipments. Our studies should
be directed towards meaningful conclusions with proper quote.
11. When the infrastructure is in place properly, then purchase of goats
should be planned for judiciously.
12. During studies period we should make proper schedule for animal
welfare activities also. We should develop proper chart for
medication and vaccination. We should ensure veterinary doctor is
Others
u. Reliable marketplace for various breeds of goats in India
v. Understanding streams of income & expense
w. Strategies to fetch maximum possible revenue
x. Proprietorship/partnership deed, lease agreement format, guidelines
for legal compliance
G) Detailed Projec t Report and Financ ial projec tions &
jus tific ations . Finally it is time now to deliver you the DPR after
thoughtful and meaningful studies & discussion period of around 1-2
months over above areas. Let us tell you the format of DPR which we are
submitting to your financing bank.
G1: Exec utive Summary. This section includes snapshot view of whole
business. Topics covered are Name of the promoter, Constitution of the
proposed company e.g. individual or firm or company, Nature of livestock
industry and commercial goat farming in particular, Operation cycle of
proposed project in brief, Name & qualifications of the promoters and their
contribution to the proposed project, Cost of the project and Means of
finance.
G2: Promoters details . The business and family background of the
promoter(s) are mainly discussed under this heading. Their previous
business experience and performance, if any, will be explained here. The
auditor(s) report of the previous business and the reason for closure will
also be clarified. Whether, the proposed venture is related with existing
business and will help them do better, will also be noted here.
G3: Mark eting and Selling Arrangements . What are the critical factors
that determines demand of live goats and how the live goats will be
marketed under the proposed project is explained in this section. How we
are going to face the threats & competition in the market. What are the
economic benefits to the nearby community as a whole due to proposed
project? We will also explain how we are going to employ the small Butcher
Shop at various strategic points. In addition we will also demonstrate the
selling agreement with institutional buyers.
G4: Infras truc ture fac ilities and the proc es s flowc hart. What
infrastructure facilities e.g. civil structures & equipment facilities are being
employed to produce healthy live goats at competitive cost? What breeds of
animals are being planned for, their lifecycle, characteristics of particular
breeds? What measures are to be taken for in-house breed development?
How effective the movement process of men, materials & animals are
visualized? What processes are involved for daily routine and for
maintaining high sanitary standards? All these issues are discussed here
with reference to complete justifications.
G5: Environmental As pec ts . The impact of discharging farm effluents in
the environment, as well as, precautions that have to be taken will be dealt
with, in this area of the report.
G6: Sc hedule of Implementation. Here we are describing how design
H 4: You have acknowledged the need for initial 1-2 months studies &
discussion over each relevant aspects before we finalize the Detailed
Project Report. During the studies & discussion period, the budget for Civil
Construction, Equipments & Animals could vary from what we have written
above. Each promoter has his own preferences, and hence we both will
study & arrive at what infrastructure facilities are needed and what would
be the cost in his local city conditions.
H 5: You have knowledgeable construction supervisor with you, who can
help you to understand our engineering drawings & estimations. He will
also help you to take the quote locally.
H 6: You have few staff members who will undergo commercial goat farm
training program. They can understand English language and willing to
learn varied aspects of goat farming.
H 7: Even before we submit the plan documents to financing bank, you
have to incur small portion of your margin money investment at very
beginning stage.
H 8: Your total margin money investment will spread during the whole
project implementation period. You have sensibly calculated your networth
and hence informed your margin money. Further you are having good
banking relationship with your local financing bank for soliciting term loan.
H 9: Following initial information is requested i.e.
Proposed name of goat farm
Name of proprietor/managing partner
Complete residential address of proprietor or all partners
Complete location address of goat farm
Upon your answers we will inform service rendering schedule and
reasonable payment terms. Our professional fee is for technical guidance &
for plan documents only and we strongly assert that we dont take money
for liaison of subsidy/loan alone. If you have the credibility with your
banker for taking bank finance, then only we will take fee for technical
guidance and for making plan documents.
DAS Cons ultant
Patna Bihar
Web: https://sites.google.com/site/dasprojectconsultant/home
Mob: +91 93080 02664 Email: foodandagroconsultant@gmail.com
(A) Civil c ons truc tion layout des igns . Let us have a look for how we
have designed the overall facilities in total and what are the subject matter
of our studies during initial 1-2 months before we finalize. We strongly
suggest you to study these files along with your shed construction
supervisor. Right from beginning he should understand what facilities are
going to be constructed at site.
a) Floor Plan & b) Internal roads , open platform. Plan (a) & (b) are
complimentary to each other; former describes the facilities and later the
internal movement paths.
(B) Civil c ons truc tion c os t s ummary. In total we have budgeted INR
65.70 lakh for following segments:
B1: Boundary walls Entire produc tion pits & drying pits are covered
to prevent any predators e.g. birds, lizards, rats, cats, dogs, etc. to come
inside the premises. It is 4 feet high brick wall and above the brick wall we
have planned for net fencing till roof level. Roofing is also covered with net
fencing over the gable portion. It is important to safeguard the earthworms
from all predators.
B2: Produc tion pits and drying pits are planned out of bricks with
plaster on both side.
B3: Pac k hous e and warehous e. These too are planned out of brick wall
up to roof level, with provision for cement flooring, doors & windows.
Entire production pits, drying pits, pack house & warehouse have roofing
sheets on top supported over steel roof truss and steel lintel beams. We
have separately estimated the total quantity of steel, roof sheets and labor
contract payment. These are of Tata company having network throughout
India.
B4: Utilities and k haranja road. We have planned for water pipelines,
electrical wiring, and kharanja road out of low grade bricks & sand.
You are getting the entire segment-wise estimate in bankable format and in
clear terms so that you can understand each segment easily. Civil
construction cost estimate is in bankable format and it justifies the total
civil construction cost as per norms and at the rate specified as per norms.
This document puts the monetary value to each segment as per norms. It is
useful document over which your financing bank takes opinion from
empanelled valuers.
It is accompanied with inves tment s c hedule before sanction of term loan
and investment schedule after sanction of term loan. Most of the margin
money investment is towards civil construction; hence this schedule is
prepared with clear segments of investments. It helps bank to value your
investments. It will also help you to submit Utilization Certificate to
financing bank time to time.
(C) Des c ription, Guidelines and Manuals . This description file is quite
elaborate. It includes snapshots & descriptions. Initial few pages describes
all the layout plans cited above in Section A. We suggest pasting all the
layout plans over the wall and then start reading this description file. While
reading you will understand daily routines & movement. You will
understand how regular exercises from reception, production, drying,
packing & storage will be performed. You will learn area earmarked for each
activity.
With the help of Operation Manuals we study relevance of particular
species of earthworms and select agricultural waste & animal dung to
4.
5.
6.
7.
8.
9.
(F) Let us s ummarize what plan doc uments you are getting: Initial
studies and discussions for around 1-2 months are important before we
finalize DPR. Above lists for our studies (1) to (9) are not exhaustive, but
indicates that we have to arrive at meaningful conclusions over each
relevant area before we prepare the final DPR. Here we are summarizing
what plan documents we are providing you for this purpose and then after
spending adequate time & efforts for resolving your case-to-case inquiries.
We will continue our studies till we are ready to prepare the DPR. Please
note down following components we are delivering upon your order:
Arc hitec tural layout plans
a. Floor plan in A3 size color
b. Internal road & open area in A3 size color
c. Vermi wash drainage lines in A3 size color
d. Columns super-imposed over floor plan in A3 size color
e. Columns positions & height of each column in A3 size color
f. Elevations in A2 size color
g. Partition walls in A3 size color
h. Lintel Beams in A3 size color
i. Roof truss & roof sheets support tubes in A3 color
Des c riptions and explanations
j. Shed construction schedule and erection description along with
equipment budget
Manuals with s piral binding
k. Manual for Vermicompost including complete process flow
l. Information booklet for earthworms
Others
v.1 9:35 PM
Samagra Gavya Vikas Sameer Narayan, May 8, 2013,
Comments
You do not have permission to add comments.
Sign in | Recent Site Activity | Report Abuse | Print Page | Powered By Go o g le Sites