CHAPTER VI
IMPLEMENTATION PLAN
Implementation Plan
In this chapter, the implementation plan describes how the information system
will be deployed, installed and transitioned into an operational system. This developed
system or website was implemented once approved.

Deliverable Items

The group decided to remake some revisions on how the user will take
quizzes.

The users can be viewed under maintenance by admin

To make other resources such as video tutorials to be able the user to cope
with each lesson.

Milestone Description
The following milestones or checkpoints marked the completion of some phase
of project implementation. This includes but, unlimited to;

Outline requirements: In this point, the proponents studied existing


technology and analyzed in detailed the system requirements.

Develop prototype: From the system or website requirements specified on


the above points, the overall project flow as well as the content has been
conceptualized.

62

Evaluate prototype: On the develop prototype, the overall system flow and
content/design has been evaluated.

Develop Software:

Right after the planning and after evaluation of

prototype has passed; it was designed and developed according to the


scope and functions stated. Integrating and normalizing of database as
well as optimization is being developed. As well as the structure of
programs inside the website to improve the websites loading time.

Validate System: Right after the website was developed it was tested first
by conducting alpha testing. The bugs and errors surrounding the
software, as well as to determine the functionality of the system. Errors
and some bugs were corrected during this point. On the second phase of
testing (white box testing), the researchers allowed gamers to use ad play
with game to come up with some suggestions from the gamers and
players. The suggestion and reaction was then carried over and noted,
and finally, the software was evaluated with the number of respondents
(users and IT experts) using the PhilWeb Awards software quality criteria
to determine the level of content, design, usability, functionality of the
system.

63

Delivered Software: Since the software was already evaluated, it was


already done through series of intensive testing. The website can now be
used and is already set for implementation and deployment.

Milestone Completion Criteria

Milestone/Checkpoints
a.) Outline Requirements

Criteria/Determinants
Detailed website/system requirements
must be delivered.

b.) Develop Prototype

Conceptualized program, structure,


design, and contents of the website

c.) Evaluate Prototype

Evaluate the developed prototype

d.) Develop Software

Develop the evaluated prototype

e.) Validate System

f.) Delivered System

Test and evaluate if the evaluated


prototype is a match to the developed
software
Implement the system or website

Table 15.0: Milestone Completion Criteria/Determinants


In this table, shows the milestone completion criteria and/or determinants:

64

Schedule of Milestone Completion

Milestone/checkpoint
Outline Requirements
a.) Study existing
systems
b.) Identify
website/system
requirements
Develop Prototype
a.) Conceptualize l
project flow and
design
Evaluate Prototype
a.) Assessment of
overall project flow,
content and design
Develop Software
a.) Coding and
designing of
website and
database
b.) Review and
debugging
Validate a System
a.) Operation and
Testing
b.) System evaluation
c.) Implementation
plan
Delivered Software
a.) Deployment

Novembe
r 2014
3 4 5

December
January
February
2014
2014
2014
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5

Table 16.0: Gantt Chart


In this figure, shows a Gantt chart that specifies the schedule of each
milestone/checkpoints.