CHAPTER VI
IMPLEMENTATION PLAN
Implementation Plan
In this chapter, the implementation plan describes how the information system
will be deployed, installed and transitioned into an operational system. This developed
system or website was implemented once approved.
Deliverable Items
The group decided to remake some revisions on how the user will take
quizzes.
To make other resources such as video tutorials to be able the user to cope
with each lesson.
Milestone Description
The following milestones or checkpoints marked the completion of some phase
of project implementation. This includes but, unlimited to;
62
Evaluate prototype: On the develop prototype, the overall system flow and
content/design has been evaluated.
Develop Software:
Validate System: Right after the website was developed it was tested first
by conducting alpha testing. The bugs and errors surrounding the
software, as well as to determine the functionality of the system. Errors
and some bugs were corrected during this point. On the second phase of
testing (white box testing), the researchers allowed gamers to use ad play
with game to come up with some suggestions from the gamers and
players. The suggestion and reaction was then carried over and noted,
and finally, the software was evaluated with the number of respondents
(users and IT experts) using the PhilWeb Awards software quality criteria
to determine the level of content, design, usability, functionality of the
system.
63
Milestone/Checkpoints
a.) Outline Requirements
Criteria/Determinants
Detailed website/system requirements
must be delivered.
64
Milestone/checkpoint
Outline Requirements
a.) Study existing
systems
b.) Identify
website/system
requirements
Develop Prototype
a.) Conceptualize l
project flow and
design
Evaluate Prototype
a.) Assessment of
overall project flow,
content and design
Develop Software
a.) Coding and
designing of
website and
database
b.) Review and
debugging
Validate a System
a.) Operation and
Testing
b.) System evaluation
c.) Implementation
plan
Delivered Software
a.) Deployment
Novembe
r 2014
3 4 5
December
January
February
2014
2014
2014
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5