Project Title:

PROPOSED TWO (2) STOREY LTO BUILDING

Project Location:

BRGY. POBLACION, URDANETA CITY, PANGASINAN

Owner:

LAND TRANSPORTATION OFFICE (Urdaneta Branch)

GENERAL REQUIREMENTS
Qty

1.00 lot

1.0 Mobilization/Demobilization
2.0 Temporary Facilities
a.) Bunkhouse/Office/Warehouse
b.) Temporary Lightings
c.) Temporary Water
II.

EARTHWORKS
1.0 Excavation Works/Backfill and Compaction
Qty
A.

52.13 cu.m
LABOR COST
1

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

H.E. Operator

Php

400.00

/day

Laborer

Php

250.00

/day

Php
B.

2,950.00

1.5

day

EQUIPMENT EXPENSES (RENTAL)


1 unit

Backhoe/Loader

Php

7,000.00

/day

Fuel, oil, lub.,etc

Php

1,750.00

/day

Php

8,750.00

1.5 days

SUMMARY
A.

LABOR COST

B.

EQUIPMENT EXPENSES (RENTAL)

plus:

7% OCM
8% CP
12% VAT

III.

Unit Cost =

Php

20,182.50 /

52.13 cu.m

Total Item Cost =

Php

387.15 x

52.13 cu.m

CONCRETE WORKS
Qty

30.22 cu.m

A. MATERIAL COST
303.0 bags

Portland Cement

Php

225.00

32.0 cu.m

Screened Gravel

Php

400.00 /cu.m

/bag

16.0 cu.m

Washed Sand

Php

450.00 /cu.m

B. LABOR COST
1.0

Project Engineer

1.0

Php

600.00

/day

Construction Foreman

Php

450.00

/day

2.0

Mason

Php

375.00

/day

8.0

Laborer

Php

250.00

/day

Php

3,800.00

8.0 days

C. EQUIPMENT EXPENSES (RENTAL)


1 unit

One Bagger Concrete Mixer

Php

400.00

/day

Fuel, oil, lub.,etc

Php

100.00

/day

Php

500.00

8.0 days

SUMMARY
A. MATERIAL COST
B. LABOR COST
C. EQUIPMENT EXPENSES (RENTAL)

plus:

7% OCM
8% CP
12% VAT

IV.

Unit Cost =

Php

140,961.25 /

30.22 cu.m

Total Item Cost =

Php

4,665.27 x

30.22 cu.m

REINFORCE STEEL BARS


Qty

4,171.30 kgs

A. MATERIAL COST
2,157.6 kgs

16mm Def. bars

Php

40.00

/kg

381.9 kgs

12mm Def. bars

Php

40.00

/kg

1,631.8 kgs

10mm Def. bars

Php

40.00

/kg

# 16 G.I. tie wire

Php

60.00

/kg

Php

600.00

/day

75.2 kgs
B. LABOR COST
1.0

Project Engineer

1.0

Construction Foreman

Php

450.00

/day

4.0

Steelman

Php

300.00

/day

9.0

Laborer

Php

250.00

/day

Php

4,500.00

12.0 days

C. EQUIPMENT EXPENSES (RENTAL)


1 unit

Bar cutter
Php

Php
200.00

200.00

/day
12.0 days

SUMMARY
A. MATERIAL COST
B. LABOR COST
C. EQUIPMENT EXPENSES (RENTAL)

plus:

7% OCM
8% CP
12% VAT

V.

Unit Cost =

Php

261,926.60 /

4,171.30 kgs

Total Item Cost =

Php

62.79 x

4,171.30 kgs

FORMS AND SCAFFOLDINGS


Qty

1.00 lot

A. MATERIAL COST
25.0 pcs
4,000.0 bd.ft

1/2"x4'x8' Form Plywood

Php

560.00

/pc

Asst. Form lumber

Php

24.00 /bd.ft

80.0 kgs

Asst. CWNail

Php

75.00

/kg

20.0 bd.ft

# 16 G.I. tie wire

Php

60.00

/kg

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

B. LABOR COST

Carpenter

Php

375.00

/day

Laborer

Php

250.00

/day

Php

3,300.00

12.0 days

SUMMARY
A.

MATERIAL COST

B.

LABOR COST

plus:

7% OCM
8% CP
12% VAT

VI.

Unit Cost =

Php

180,320.00 /

1.00 lot

Total Item Cost =

Php

180,320.00 x

1.00 lot

MASONRY WORKS (CHB laying w/ Plastering)


Qty

185.14 sq.m

A. MATERIAL COST
350.0 bags

Portland Cement

Php

225.00

Washed sand

Php

400.00 /cu.m

5" CHB

Php

10.50

/pc

10mm Def. bars

Php

40.00

/kg

# 16 G.I. tie wire

Php

60.00

/kg

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

Mason

Php

375.00

/day

Laborer

Php

250.00

/day

29.0 cu.m
2,450.0 pcs
518.0 kgs
6.0 bd.ft

/bag

B. LABOR COST

Php

4,050.00

12.0

SUMMARY
A.

MATERIAL COST

B.

LABOR COST

plus:

7% OCM
8% CP
12% VAT

Unit Cost =

Php

213,618.25 /

185.14 sq.m

Total Item Cost =

Php

1,153.82 x

185.14 sq.m

VII. TILE WORKS


Qty

82.40 sq.m

A. MATERIAL COST
15.0 bags

Tile Adhessive

Php

190.00

3.0 cu.m

Washed sand

Php

400.00 /cu.m

4.0 pc

4" Diamond cutter

Php

450.00

/pc

16"x16" Granite tile

Php

85.00

/pc

428.0 pcs

/bag

day

60.0 pcs

16"x16" Outdoor tile

Php

65.00

/pc

20.0 kgs

Tile Grout

Php

25.00

/kg

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

Mason

Php

375.00

/day

Laborer

Php

250.00

/day

B. LABOR COST

Php

3,175.00

5.0

day

C. EQUIPMENT EXPENSES (RENTAL)


1 unit

Electric Grinder
Php

Php
150.00

150.00

/day
5.0 days

SUMMARY
A.

MATERIAL COST

B.

LABOR COST

C.

EQUIPMENT EXPENSES (RENTAL)

plus:

7% OCM
8% CP
12% VAT

Unit Cost =

Php

72,743.25 /

82.40 sq.m

Total Item Cost =

Php

882.81 x

82.40 sq.m

VIII. CARPENTRY AND JOINERY WORKS (2ND Floor Ceiling only)


Qty

82.40 sq.m

A. MATERIAL COST
16.0 pcs

Hardiflex ceiling board

Php

420.00

/pc

48.0 pcs

0.40mm 19mm x 50mm x 5m

Php

115.00

/pc

Php

140.00

/pc

Php

85.00

/pc

W-Clip

Php

8.00

/pc

1.0 kgs

1-1/2" Concrete nail

Php

90.00

/kg

2.0 pcs

4" Diamond grinding disc

Php

65.00

/pc

2.0 box

Blind rivets

Php

500.00

/box

Asst. Form lumber (Scaffoldings)

Php

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

Carpenter

Php

375.00

/day

Laborer

Php

250.00

/day

Double furring channel


8.0 pcs

0.80mm 12mm x 38mm x 5m

15.0 pcs

0.40mm 25mm x 25mm x 3m

Carrying Channel
Wall angle
290.0 pcs

800.0 bd.ft

24.00 /bd.ft

B. LABOR COST

Php

2,675.00

5.0 days

C. EQUIPMENT EXPENSES (RENTAL)


1 unit

Electric Grinder
Php

Php
150.00

150.00

/day
5.0 days

SUMMARY
A.

MATERIAL COST

B.

LABOR COST

C.

EQUIPMENT EXPENSES (RENTAL)

plus:

7% OCM
8% CP
12% VAT

IX.

Unit Cost =

Php

59,225.00 /

82.40 sq.m

Total Item Cost =

Php

718.75 x

82.40 sq.m

DOORS AND WINDOWS


Qty

1.00 lot

A. MATERIAL COST
2.0 sets

D-1, Panel type door w/ 2"x 6" jamb with

Php

5,300.00

/set

Php

4,000.00

/set

Php

3,780.00

/set

Php

2,520.00

/set

Complete accessories (0.90x2.10mts.)


1.0 sets

D-2, Flush type door w/ 2"x 5" jamb with


Complete accessories (0.80x2.10 mts.)

2.0 sets

W-1, Steel casement window with 3/16"


thk. Clear glass (1.80x1.40mts)

2.0 sets

W-2, Steel casement window with 3/16"


thk. Clear glass (1.20x1.40mts)

B. LABOR COST (Installation only)


1

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

Carpenter

Php

375.00

/day

Welder

Php

375.00

/day

Glass Installer

Php

300.00

/day

Laborer

Php

250.00

/day

Php

3,350.00

2.0 days

C. EQUIPMENT EXPENSES (RENTAL)


1 unit

Electric Grinder
Php

Php
150.00

150.00

/day

2.0 days
SUMMARY

A.

MATERIAL COST

B.

LABOR COST

C.

EQUIPMENT EXPENSES (RENTAL)

plus:

7% OCM
8% CP
12% VAT

X.

Unit Cost =

Php

39,330.00 /

1.00 lot

Total Item Cost =

Php

39,330.00 x

1.00 lot

PAINTING WORKS (Concrete wall & Hardiflex Ceiling board)


Qty

460.08 sq.m

A. MATERIAL COST
5.0 tin

Flat Latex paint

Php

1,810.00

/tin

10.0 tin

Semi-gloss Latex paint

Php

2,370.00

/tin

4.0 lits

Latex color

Php

120.00

/lit

4.0 gal.

Masonry putty

Php

15.00

/gal

Patching compound

Php

15.00

/lit

8.0 lits

Stickwel

Php

195.00

/lit

7.0 pcs

Roller brush

Php

100.00

/pc

20.0 kgs

17.0 pcs

Paint brush

Php

45.00

/pc

100.0 pcs

Sandpaper

Php

25.00

/pc

15.0 pcs

Stupa Rag

Php

20.00

/kg

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

Painter

Php

350.00

/day

Laborer

Php

250.00

/day

B. LABOR COST

Php

3,100.00

5.0

day

SUMMARY
A.

MATERIAL COST

B.

LABOR COST

plus:

7% OCM
8% CP
12% VAT

XI.

Unit Cost =

Php

63,152.25 /

460.08 sq.m

Total Item Cost =

Php

137.26 x

460.08 sq.m

TRUSS WORKS
Qty

1.00 lot

A. MATERIAL COST

23.0 pcs

1.5mm x 2"x6" CEE purlins (truss)

Php

650.00

/pc

12.0 pcs

1.0mm x 2"x4" CEE purlins

Php

397.00

/pc

5.0 pcs

10mm Plain Round bar

Php

138.00

/pc

9.0 pcs

1/4" x 10"x10" Base plate

Php

250.00

/pc

3.0 box

Welding rod

Php

1,200.00

/box

Nut and washer

Php

120.00

/pc

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

Welder

Php

375.00

/day

Laborer

Php

250.00

/day

36.0 pcs

12mm x 10" Anchor bolts w/

B. LABOR COST

Php
1 unit

2,300.00

Welding Machine
Php

4.0
Php

450.00

450.00

MATERIAL COST

/day
4.0 days

SUMMARY
A.

day

B.

LABOR COST

C.

EQUIPMENT EXPENSES (RENTAL)

plus:

7% OCM
8% CP
12% VAT

Unit Cost =

Php

47,810.10 /

1.00 lot

Total Item Cost =

Php

47,810.10 x

1.00 lot

XII. ROOFING WORKS


Qty

48.50 l.m

A. MATERIAL COST
48.5 l.m

Rib-type Roofing sheet (.5mm thk.)

Php

420.00

/l.m

48.5 l.m

One sided Alum. Insulation (9mm thk)

Php

450.00

/l.m

5.0 pcs

Wall flashing

Php

450.00

/pc

5.0 pcs

3" PVC pipe

Php

460.00

/pc

6.0 pcs

3" PVC Elbow 1/4 bend

Php

53.00

/pc

3.0 pcs

Gutter

Php

450.00

/pc

Tekscrew

Php

1.75

/pc

4.0 tube

Silicon Sealant

Php

150.00

/tube

1.0 box

Blind Rivets

Php

500.00

/box

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

Roof Installer

Php

350.00

/day

Laborer

Php

250.00

/day

300.0 pcs

B. LABOR COST

Php

3,100.00

4.0
SUMMARY

A. MATERIAL COST
B. LABOR COST

plus:

7% OCM
8% CP
12% VAT

Unit Cost =

Php

71,803.70 /

48.50 l.m

Total Item Cost =

Php

1,480.49 x

48.50 l.m

XIII. TINSMITRY WORKS (Stair Railings)


Qty

1.00 lot

A. MATERIAL COST
4.0 pcs

2" Stainless Steel pipe

Php

3,250.00

/pc

4.0 pcs

3/16"x1" Flat bar

Php

235.00

/pc

3/4"x3/4" Square bar

Php

245.00

/pc

1.0 lot

Welding rod/Accessories

Php

3,000.00

/lot

2.0 pc

4" Grinding disk

Php

65.00

/pc

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

Welder

Php

375.00

/day

15.0 pcs

B. LABOR COST

day

Laborer
Php

@
2,175.00

Php

250.00

/day

3.0

day

C. EQUIPMENT EXPENSES (RENTAL)


1 unit

Welding Machine
Php

Php
450.00

450.00

/day

3.0 days

SUMMARY
A.

MATERIAL COST

B.

LABOR COST

C.

EQUIPMENT EXPENSES (RENTAL)

plus:

7% OCM
8% CP
12% VAT

Unit Cost =

Php

32,913.00 /

1.00 lot

Total Item Cost =

Php

32,913.00 x

1.00 lot

XIV. ELECTRICAL WORKS


Qty

1.00 lot

A. MATERIAL COST
6.0 sets

2x40W FL lamp w/ housing

Php

1,500.00

/set

5.0 sets

25W CFL

Php

60.00

/set

5.0 sets

4"x4" Pinlight

Php

250.00

/set

6.0 pcs

Receptacle 4"

Php

50.00

/pc

2.0 sets

Single pole switch

Php

120.00

/set

3.0 sets

Two pole switch

Php

165.00

/set

2.0 sets

3-Way switch

Php

210.00

/set

Main ACB/ 6-branches, w/ 1-20 AT, 2P, 5-20 AT, 2P

1,850.00

/set

11.0 pcs

4"x4" Junction box

Php

35.00

/pc

15.0 pcs

2"x4" Utility box

Php

35.00

/pc

34.0 pcs

1/2" PVC pipe x 3.00 mts.

Php

61.00

/pc

2.0 rolls

3.5mm THHN wire

Php

3,207.50

/roll

20.0 mts

14mm THHN wire

Php

85.84

/mt

4.0 pcs

1' PVC pipe x 3.00 mts.

Php

102.00

/pc

2.0 pcs

1" Long sweep elbow

Php

38.00

/pc

1/2" PVC Long sweep elbow

Php

25.00

/pc

1.0 pc

1" RSC pipe x 3.00 mts.

Php

420.00

/pc

1.0 sets

1" Entrance cap

Php

65.00

/set

1.0 set

3-Pole secondary rack

Php

285.00

/set

1.0 pc

1" Long sweep elbow (RSC)

Php

85.00

/pc

Electrical tape

Php

45.00

/roll

Project Engineer

Php

600.00

/day

Construction Foreman

Php

450.00

/day

Electrician

Php

325.00

/day

Laborer

Php

250.00

/day

1.00

sets

22.0 pcs

10.0 rolls

Php

B. LABOR COST

Php

2,125.00

4.0

C. EQUIPMENT EXPENSES (RENTAL)


1 unit

Electric drill

Php

150.00

/day

day

Php

150.00

4.0 days
SUMMARY

A.

MATERIAL COST

B.

LABOR COST

C.

EQUIPMENT EXPENSES (RENTAL)

plus:

7% OCM
8% CP
12% VAT

Unit Cost =

Php

41,871.27 /

1.00 sets

Total Item Cost =

Php

41,871.27 x

1.00 sets

TOTAL CONSTRUCTION COST

Php

20,000.00

Php

50,000.00

Php

30,000.00

Php

10,000.00

Php

110,000.00

Php

600.00

Php

450.00

Php

400.00

Php

1,500.00

Php

2,950.00

Php

4,425.00

Php

7,000.00

Php

1,750.00

Php

8,750.00

Php

13,125.00

Php

4,425.00

Php

13,125.00

Php

17,550.00

Php

1,228.50

Php

1,404.00

Php

2,106.00

Php

20,182.50

Php

387.15

Php

20,182.50

302.15
Php

68,175.00

Php

12,800.00

Php

7,200.00

Php

88,175.00

Php

600.00

Php

450.00

Php

750.00

Php

2,000.00

Php

3,800.00

Php

30,400.00

Php

400.00

Php

100.00

Php

500.00

Php

4,000.00

0.3447689254

Php

88,175.00

Php

30,400.00

Php

4,000.00

Php

122,575.00

Php

8,580.25

Php

9,806.00

Php

14,709.00

Php

140,961.25

Php

4,665.27

Php

140,961.25

Php

86,302.10

Php

15,276.32

Php

65,273.76

Php

4,510.08

Php

171,362.26

Php

600.00

Php

450.00

Php

1,200.00

Php

2,250.00

Php

4,500.00

Php

54,000.00

Php

200.00

Php

200.00

Php

2,400.00

Php

171,362.26

Php

54,000.00

Php

2,400.00

Php

227,762.26

Php

15,943.36

Php

18,220.98

Php

27,331.47

Php

261,926.60

Php

62.79

Php

261,926.60

Php

14,000.00

Php

96,000.00

Php

6,000.00

Php

1,200.00

Php

117,200.00

Php

600.00

Php

450.00

0.3151218972

Php

1,500.00

Php

750.00

Php

3,300.00

Php

39,600.00

Php

117,200.00

Php

39,600.00

Php

156,800.00

Php

10,976.00

Php

12,544.00

Php

18,816.00

Php

180,320.00

Php

180,320.00

Php

180,320.00

Php

78,750.00

Php

11,600.00

Php

25,725.00

Php

20,720.00

Php

360.00

Php

137,155.00

Php

600.00

Php

450.00

Php

1,500.00

Php

1,500.00

Php

4,050.00

Php

48,600.00

Php

137,155.00

Php

48,600.00

Php

185,755.00

Php

13,002.85

Php

14,860.40

Php

22,290.60

Php

213,618.25

Php

1,153.82

Php

213,618.25

Php

2,850.00

Php

1,200.00

Php

1,800.00

Php

36,380.00

0.337883959

0.3543436258

ground floor/second floor


12.50
13.00
20.00
20.00
14.70
15.00

260

Php

3,900.00

Php

500.00

Php

46,630.00

Php

600.00

Php

450.00

Php

1,125.00

Php

1,000.00

Php

3,175.00

Php

15,875.00

Php

150.00

Php

150.00

Php

750.00

Php

46,630.00

Php

15,875.00

Php

750.00

Php

63,255.00

Php

4,427.85

Php

5,060.40

Php

7,590.60

Php

72,743.25

Php

882.81

Php

72,743.25

Php

6,720.00

Php

5,520.00

Php

1,120.00

Php

1,275.00

Php

2,320.00

Php

90.00

Php

130.00

Php

1,000.00

Php

19,200.00

Php

37,375.00

Php

600.00

Php

450.00

Php

1,125.00

Php

500.00

Php

2,675.00

Php

13,375.00

Php

150.00

Php

150.00

Php

750.00

12.50
5.00
5.33

13.00
5.00
6.00

195
60

0.3404460648

ground floor/second floor


12.50
13.00
20.00
20.00

0.3578595318

14.70

15.00

12.50
5.00

13.00
5.00

5.00

5.00

5.33

6.00

35.42
17.71

Php

37,375.00

Php

13,375.00

Php

750.00

Php

51,500.00

Php

3,605.00

Php

4,120.00

Php

6,180.00

Php

59,225.00

Php

718.75

Php

59,225.00

Php

10,600.00

5,300.00

Php

4,000.00

4,000.00

Php

7,560.00

2.52

1500

3,780.00

Php

5,040.00

1.68

1500

2,520.00

Php

27,200.00

Php

600.00

Php

450.00

Php

375.00

Php

375.00

Php

300.00

Php

1,250.00

Php

3,350.00

Php

6,700.00

Php

150.00

Php

150.00

Php

300.00

Php

27,200.00

Php

6,700.00

Php

300.00

Php

34,200.00

Php

2,394.00

Php

2,736.00

Php

4,104.00

Php

39,330.00

Php

39,330.00

Php

39,330.00

Php

9,050.00

0.2463235294

12.342667

Php

23,700.00

Php

480.00

Php

60.00

Php

300.00

Php

1,560.00

Php

700.00

Php

765.00

Php

2,500.00

Php

300.00

Php

39,415.00

Php

600.00

Php

450.00

Php

1,050.00

Php

1,000.00

Php

3,100.00

Php

15,500.00

Php

39,415.00

Php

15,500.00

Php

54,915.00

Php

3,844.05

Php

4,393.20

Php

6,589.80

Php

63,152.25

Php

137.26

Php

63,152.25

Php

14,950.00

Php

4,764.00

Php

690.00

Php

2,250.00

Php

3,600.00

Php

4,320.00

Php

30,574.00

Php

600.00

Php

450.00

Php

750.00

Php

500.00

Php

2,300.00

Php

9,200.00

Php

450.00

Php

450.00

Php

1,800.00

Php

30,574.00

0.3932513003

16.57
9.94
6.62
3.31
1
37.44

0.3009092693

6.24

Php

9,200.00

Php

1,800.00

Php

41,574.00

Php

2,910.18

Php

3,325.92

Php

4,988.88

Php

47,810.10

Php

47,810.10

Php

47,810.10

Php

20,370.00

Php

21,825.00

Php

2,250.00

Php

2,300.00

Php

318.00

Php

1,350.00

Php

525.00

Php

600.00

Php

500.00

Php

50,038.00

Php

600.00

Php

450.00

Php

1,050.00

Php

1,000.00

Php

3,100.00

Php

12,400.00

Php

50,038.00

Php

12,400.00

Php

62,438.00

Php

4,370.66

Php

4,995.04

Php

7,492.56

Php

71,803.70

Php

1,480.49

Php

71,803.70

Php

13,000.00

Php

940.00

Php

3,675.00

Php

3,000.00

Php

130.00

Php

20,745.00

Php

600.00

Php

450.00

Php

375.00

0.2478116631

16.57
13.25
9.94
6.62
46.38

7.73

Php

750.00

Php

2,175.00

Php

6,525.00

Php

450.00

Php

450.00

Php

1,350.00

Php

20,745.00

Php

6,525.00

Php

1,350.00

Php

28,620.00

Php

2,003.40

Php

2,289.60

Php

3,434.40

Php

32,913.00

Php

32,913.00

Php

32,913.00

Php

9,000.00

Php

300.00

Php

1,250.00

Php

300.00

Php

240.00

Php

495.00

Php

420.00

Php
Php

0.3145336226

16.57
13.25
13.25
13.25
13.25
13.25
13.25

1,850.00
385.00

Php

525.00

Php

2,074.00

Php

6,415.00

Php

1,716.80

Php

408.00

Php

76.00

Php

550.00

Php

420.00

Php

65.00

Php

285.00

Php

85.00

Php

450.00

Php

27,309.80

Php

600.00

Php

450.00

Php

325.00

Php

750.00

Php

2,125.00

Php

8,500.00

Php

150.00

Php

150.00

96.07 16.011667

0.3112435829

Php

600.00

Php

27,309.80

Php

8,500.00

Php

600.00

Php

36,409.80

Php

2,548.69

Php

2,912.78

Php

4,369.18

Php

41,871.27

Php

41,871.27

Php

41,871.27

Php

###

stairs
80
2.4
82.4

26.25

53.13

0.625
8.333333

27
9

0.625
8.333333

27
9
3
1
0.333333
0.111111
0.037037

Project Title:

PROPOSED TWO (2) STOREY LTO BUILDING

Project Location:

BRGY. POBLACION, URDANETA CITY, PANGASINAN

Owner:

LAND TRANSPORTATION OFFICE (Urdaneta Branch)

BILL OF QUANTITIES
Item No.
DESCRIPTION
I
GENERAL REQUIREMENTS

UNIT
lot

QTY
1.00

UNIT COST
110,000.00

EARTHWORKS

cu.m

52.13

387.15

III.

CONCRETE WORKS

cu.m

30.22

4,665.27

IV

REINFORCE STEEL BARS

kgs

4,171.30

62.79

FORMS AND SCAFFOLDINGS

lot

1.00

180,320.00

VI

MASONRY WORKS

sq.m

185.14

1,153.82

VII

TILE WORKS

sq.m

82.40

882.81

VIII

CARPENTRY AND JOINERY WORKS sq.m

82.40

718.75

1.00

39,330.00

460.08

137.26

II

IX

DOORS AND WINDOWS

lot

PAINTING WORKS

XI

TRUSS WORKS

lot

1.00

47,810.10

XII

ROOFING WORKS

l.m

48.50

1,480.49

XIII

TINSMITRY WORKS

lot

1.00

32,913.00

XIV

ELECTRICAL WORKS
TOTAL PROJECT COST

lot

1.00

41,871.27

sq.m

AMOUNT
110,000.00
20,182.50
140,961.25
261,926.60
180,320.00
213,618.25
72,743.25
59,225.00
39,330.00
63,152.25
47,810.10
71,803.70
32,913.00
41,871.27
1,355,857.17

EARTHWORKS
EXCAVATION WORKS
FOR ONE (1) STRUCTURE
MARK

LENGTH (m.)

F-1
FTB

WIDTH

1.50
5.00
4.00
5.00
4.00

GB

(m.)

HEIGHT

1.50
0.25
0.25
0.20
0.20

(m.)
1.50
1.10
1.10
0.25
0.25

NO. OF SIMILAR
STRUCTURE
6.00
3.00
4.00
3.00
4.00

TOTAL
BACKFILL/COMPACTION
FOR ONE (1) STRUCTURE
MARK

LENGTH (m.)

F-1
FTB

WIDTH

1.50
5.00
4.00
5.00
4.00
0.30

GB
COLUMN
TOTAL

Excavation
Backfill/Compaction

(m.)

HEIGHT

1.50
0.25
0.25
0.20
0.20
0.30

(m.)
0.30
0.30
0.30
0.25
0.25
1.10

NO. OF SIMILAR
STRUCTURE
6.00
3.00
4.00
3.00
4.00
6.00

30.33
21.81 cu.m

GRAVEL BEDDING
FOR ONE (1) STRUCTURE
MARK
F-1
FTB
GB
Area-1
Area-2
TOTAL

LENGTH (m.)
1.50
5.00
4.00
5.00
4.00
8.00
2.00

WIDTH

(m.)
1.50
0.25
0.25
0.20
0.20
5.00
1.20

HEIGHT

(m.)
0.10
0.10
0.10
0.10
0.10
0.10
0.10

NO. OF SIMILAR
STRUCTURE
6.00
3.00
4.00
3.00
4.00
1.00
1.00

TOTAL
VOLUME (m)
20.25
4.13
4.40
0.75
0.80
30.33

5.00
16.67
13.33
16.67
13.33

TOTAL
VOLUME (m)
4.05
1.13
1.20
0.75
0.80
0.59
8.52

TOTAL
VOLUME (m)
1.35
0.38
0.40
0.30
0.32
4.00
0.24
6.99

5.00
16.67
13.33

1.00

V - MASONRY WORKS

GROUND FLOOR
perimeter wall

26.00

3.50

less opening

1.00
7.29

Total area

perimeter wall

26.00

3.50

1.00

4.40

1.00

1.00

5.00

3.00

1.00

less opening

8.97

Total area
No. of pcs 6 CHB
Cement
Sand

2,406.82

say

2,450.00

187.55

say

190.00

15.63

say

17.00

Vert. Reinforcement

394.35

Hor. Reinforcement

398.05
792.40 / 5.7m

GI Tie Wire

139.0174035088
say

140

4.44

say

83.71

101.43

1.00

159.22

say

160

9.26

say

12

Plastering
perimeter wall

Cement
Sand

Summary
Cement
Sand
No. of pcs 6 CHB
RSB Reinforcement
GI Tie Wire

350.00
29.00
2,450.00
518.00
6.00

91.00
7.29
83.71
185.14
91.00
4.40
15.00
8.97
101.43
pcs
bags
m

pcs 10mm

518.00 kgs

kgs

185.14
370.28
370.28
bags
cu.m.

0.616

6.00

0.616

7.50

0.616

9.00

0.616

10.50

0.616

12.00

REBAR WORKS
MARK
F1

LOCATION

BAR
SIZE

FOR 1 STRUCTURE
ONE BAR
LENGTH

NUMBER OF PCS

top-tranverse

16

1.50

8.00

bottom-longitudinal

12

1.50

8.00

vertical bar

Footing

C1

C2

C3

FTB

16

9.00

8.00

8.30 outer ties

10

1.20

49.80

inner ties

10

1.00

49.80

vertical bar

16

9.00

8.00

8.45 outer ties

10

1.20

50.70

inner ties

10

1.00

50.70

vertical bar

16

9.00

8.00

8.61 outer ties

10

1.20

51.66

inner ties

10

1.00

51.66

straight bars

16

6.00

6.00

10

1.10

36.00

16

4.50

6.00

10

1.20

27.00

16

6.00

4.00

10

0.90

36.00

16

4.50

4.00

10

0.90

27.00

5.00 stirrups
FTB

straight bars
4.00 stirrups

GB

straight bars
5.00 stirrups

GB

straight bars
4.00 stirrups

B-1

B-1

B-2

B-3

B-4

LB-1

straight bars

16

6.00

4.00

5.00 top cut bars

16

1.50

2.00

bott. Cut bars

16

3.00

1.00

stirrups

10

1.20

36.00

straight bars

16

4.50

4.00

4.00 top cut bars

16

1.20

2.00

bott. Cut bars

16

2.50

1.00

stirrups

10

1.20

27.00

straight bars

16

6.00

4.00

5.00 top cut bars

16

1.50

4.00

bott. Cut bars

16

3.00

2.00

stirrups

10

1.40

36.00

straight bars

16

6.00

4.00

5.00 top cut bars

16

1.50

2.00

bott. Cut bars

16

3.00

1.00

stirrups

10

1.10

36.00

straight bars

16

2.50

4.00

2.12 top cut bars

16

0.75

2.00

bott. Cut bars

16

1.50

1.00

stirrups

10

0.90

15.00

straight bars

12

2.50

4.00

10

1.00

15.00

12

1.50

4.00

2.00 stirrups
CB-1

straight bars
1.20 stirrups

RB-1

RB-2

RB-3

10

1.00

9.00

straight bars

12

6.00

4.00

5.00 top cut bars

12

1.50

2.00

bott. Cut bars

12

3.00

1.00

stirrups

10

0.90

36.00

straight bars

12

4.50

4.00

4.00 top cut bars

12

1.20

2.00

bott. Cut bars

12

2.50

1.00

stirrups

10

0.90

27.00

straight bars

16

6.00

4.00

5.00 top cut bars

16

1.50

2.00

bott. Cut bars

16

3.00

1.00

stirrups

10

1.10

36.00

straight bars

12

6.00

4.00

10

0.70

36.00

12

2.50

4.00

10

0.70

15.00

12

2.50

4.00

10

0.80

15.00

12

1.50

4.00

10

0.80

9.00

5.00 stirrups
straight bars
2.12 stirrups
LB-2

straight bars
2.00 stirrups

CB-2

straight bars
1.20 stirrups

SLAB ON FILL
SUSPENDED SLAB

two way

longitudinal

10

8.00

20.00

cross section

10

5.00

12.50

top bars(longitudinal)

10

5.00

16.67

top bars (cross section)

10

8.00

26.67

cut bars(longitudinal)

12

1.25

10.00

cut bars (cross section)

12

4.00

10.00

bent up bars(longitudinal)

10

5.00

16.67

bent up bars (cross section)

10

8.00

26.67

MB-1 (30.00m)

straight bars

16

30.83

4.00

@ GL A

web bars

12

30.83

2.00

stirrups

10

1.40

784.00

MB-2(20.00m)

straight bars

16

20.83

4.00

@ GL 1

web bars

12

20.83

2.00

stirrups

10

1.40

162.00

MB (30.00m)

straight bars

16

30.83

4.00

@ GL A

web bars

12

30.83

2.00

stirrups

10

1.40

184.00

RB-1 (20.00m)

straight bars

16

20.83

4.00

@ GL 1

web bars

12

20.83

2.00

top cut bars-end support

16

0.93

2.00

top cut bars-middle support

16

1.65

2.00

top cut bars-middle support

16

2.90

2.00

top cut bars-middle support

16

2.28

2.00

bottom cut bars

16

1.50

2.00

bottom cut bars

16

3.00

2.00

stirrups

10

1.40

162.00

straight bars

16

30.83

4.00

web bars

12

30.83

2.00

top cut bars-end support

16

1.98

2.00

top cut bars-middle support

16

1.78

2.00

top cut bars-middle support

16

1.90

2.00

top cut bars-middle support

16

1.55

2.00

bottom cut bars

16

1.80

2.00

bottom cut bars

16

1.50

2.00

stirrups

10

1.40

784.00

straight bars

16

20.83

4.00

web bars

12

20.83

2.00

top cut bars-end support

16

0.93

2.00

Midbeam

RB-1 (30.00m)

RB-2 (20.00m)

top cut bars-middle support

16

1.65

2.00

top cut bars-middle support

16

2.90

2.00

top cut bars-middle support

16

2.28

2.00

bottom cut bars

16

1.50

2.00

bottom cut bars

16

3.00

2.00

stirrups

10

1.40

162.00

S.Angle (20.00m)

straight bars

16

20.83

4.00

@ GL A

web bars

12

20.83

2.00

top cut bars-end support

16

0.93

2.00

top cut bars-middle support

16

1.65

2.00

bottom cut bars

16

1.50

2.00

stirrups

10

1.40

184.00

Ground Slab

transverse

12

92.00

41.00

92 x 20

longitudinal

12

20.00

185.00

Ground Slab

transverse

12

42.00

41.00

42 x 20

longitudinal

12

20.00

85.00

roofbeam

Ground Slab

10MM

12MM

3.70

0.888

6.00

5.33

4.62

0.888

7.50

6.66

5.54

0.888

9.00

7.99

6.47

0.888

10.50

9.32

7.39

0.888

12.00

10.66

NO. OF
SIMILAR
TOTAL
STRUCTUR NO.OF PCS
E
6.00

2.00

2.00

2.00

3.00
4.00

3.00
4.00

TOTAL NO. OF
COMML LENGTH

COMML
LENGTH

48.00

72.00

6.00

48.00

72.00

6.00

16.00

144.00

99.60

119.52

99.60

NO. OF
VER/LONG BAR

NO. OF
HOR/TRANS
BAR

TOTAL BAR
INTERSECTION

12.00

12.00

384.00

9.00

16.00

16.00

1,593.60

6.00

19.92

20.00

99.60

6.00

16.60

17.00

16.00

144.00

9.00

16.00

16.00

101.40

121.68

6.00

20.28

21.00

101.40

101.40

6.00

16.90

17.00

16.00

144.00

9.00

16.00

16.00

103.32

123.98

6.00

20.66

21.00

103.32

103.32

6.00

17.22

18.00

18.00

108.00

6.00

18.00

18.00

108.00

118.80

6.00

19.80

20.00

24.00

108.00

9.00

12.00

12.00

108.00

129.60

6.00

21.60

22.00

12.00

72.00

6.00

12.00

12.00

108.00

97.20

6.00

16.20

17.00

16.00

72.00

9.00

8.00

8.00

108.00

97.20

6.00

16.20

17.00

1,622.40

1,653.12

648.00
648.00

432.00
432.00

2.00

4.00

1.00

1.00

1.00

1.00
1.00
2.00

4.00

1.00

1.00
1.00
1.00
2.00

8.00

48.00

6.00

8.00

8.00

4.00

6.00

6.00

1.00

1.00

2.00

6.00

6.00

1.00

1.00

72.00

86.40

6.00

14.40

15.00

16.00

72.00

9.00

8.00

8.00

8.00

9.60

6.00

1.60

2.00

4.00

10.00

7.50

1.33

2.00

108.00

129.60

6.00

21.60

22.00

4.00

24.00

6.00

4.00

4.00

4.00

6.00

6.00

1.00

1.00

2.00

6.00

6.00

1.00

1.00

36.00

50.40

6.00

8.40

9.00

4.00

24.00

6.00

4.00

4.00

2.00

3.00

6.00

0.50

1.00

1.00

3.00

6.00

0.50

1.00

36.00

39.60

6.00

6.60

7.00

4.00

10.00

7.50

1.33

1.50

2.00

1.50

6.00

0.25

0.50

1.00

1.50

6.00

0.25

0.50

15.00

13.50

6.00

2.25

3.00

4.00

10.00

7.50

1.33

1.50

15.00

15.00

6.00

2.50

3.00

4.00

6.00

6.00

1.00

1.00

9.00

9.00

6.00

1.50

2.00

8.00

48.00

6.00

8.00

8.00

4.00

6.00

6.00

1.00

1.00

2.00

6.00

6.00

1.00

1.00

72.00

64.80

6.00

10.80

11.00

16.00

72.00

9.00

8.00

8.00

8.00

9.60

6.00

1.60

2.00

4.00

10.00

6.00

1.67

2.00

108.00

97.20

6.00

16.20

17.00

4.00

24.00

6.00

4.00

4.00

2.00

3.00

6.00

0.50

0.50

1.00

3.00

6.00

0.50

0.50

36.00

39.60

6.00

6.60

7.00

4.00

24.00

6.00

4.00

4.00

36.00

25.20

6.00

4.20

5.00

4.00

10.00

7.50

1.33

2.00

15.00

10.50

6.00

1.75

2.00

4.00

10.00

7.50

1.33

1.50

15.00

12.00

6.00

2.00

2.00

8.00

12.00

6.00

2.00

2.00

18.00

14.40

6.00

2.40

2.50

504.00

756.00

360.00

252.00

105.00

60.00
36.00
504.00

756.00

252.00

144.00
60.00
60.00
72.00

1.00
1.00

20.00

100.00

5.60

17.86

18.00

12.50

100.00

6.00

16.67

17.00

16.67

133.33

6.00

22.22

23.00

26.67

133.33

5.60

23.81

24.00

10.00

40.00

6.00

13.33

14.00

10.00

12.50

6.00

4.17

5.00

16.67

133.33

6.00

22.22

23.00

26.67

133.33

5.60

23.81

24.00

250.00
988.89

3.00

3.00

1.00

1.00

12.00

168.00

7.50

6.00

84.00

7.50

2,352.00

588.00

6.00

12.00

24.00

12.00

6.00

12.00

12.00

486.00

41.00

6.00

4.00

8.00

12.00

2.00

4.00

12.00

184.00

46.00

6.00

4.00

8.00

12.00

2.00

4.00

12.00

2.00

4.00

1.00

6.00

2.00

4.00

1.00

7.50

1.00

2.00

1.00

6.00

2.00

4.00

1.00

10.50

4.00

8.00

2.00

6.00

2.00

4.00

2.00

6.00

162.00

41.00

6.00

4.00

56.00

7.50

1.00

2.00

28.00

7.50

1.00

2.00

1.00

7.50

1.00

2.00

23.00

46.00

16.00

6.00

7.00

14.00

2.00

12.00

24.00

48.00

10.00

9.00

8.00

16.00

4.00

6.00

784.00

196.00

6.00

16.00

32.00

12.00

8.00

16.00

12.00

16.00

4.00

6.00

4.00
2.00

6.00

784.00

14,112.00

6.00

162.00

2,916.00

6.00

184.00

1,104.00

8.00

162.00

1,296.00

8.00

784.00

6,272.00

8.00

162.00

5,184.00

2.00

16.00

4.00

7.50

1.00

8.00

4.00

6.00

2.00

16.00

4.00

10.50

4.00

32.00

8.00

6.00

2.00

16.00

8.00

6.00

648.00

41.00

6.00

16.00

32.00

12.00

8.00

16.00

12.00

2.00

16.00

16.00

6.00

7.00

56.00

8.00

12.00

8.00

64.00

16.00

6.00

736.00

184.00

6.00

41.00

328.00

12.00

185.00

370.00

10.50

41.00

246.00

7.50

85.00

170.00

10.50

4.00

1.00
1.00

8.00

41.00

1,312.00

41.00

185.00

7,585.00

41.00

85.00

3,485.00

16MM
1.578

6.00

1.578

7.50

11.84

1.578

9.00

14.20

1.578

10.50

16.57

1.578

12.00

18.94

227.23

2.17

227.23

2.17

16MM

227.23

TIE WIRE
227.23

2.17
9.02

73.92
62.83
227.23

9.18

77.62
62.83
227.23

9.36

77.62
66.53
1,103.04

27.56

16MM

681.70

10MM

421.34

TIE WIRE
170.42

27.56
3.67

73.92
170.42

3.67

81.31
496.08

7.34

16MM

340.85

10MM

155.23

TIE WIRE
170.42

7.34
2.45

62.83
113.62

2.45

62.83
409.70

4.89

16MM

284.04

10MM

125.66

TIE WIRE

4.89

9.47

86

75.74

2.85

9.47
9.47
55.44
151.49

4.28

18.94
18.94
81.31
37.87

2.04

9.47
9.47
33.26
37.87

1.43

9.47
9.47
25.87
17.75

0.59

4.73
4.73
11.09
6.93

0.34

11.09
5.33

0.20

7.39
42.62

2.85

5.33
5.33
40.66
85.25

4.28

10.66
10.66
62.83
37.87

1.43

4.73
4.73
25.87
21.31

0.82

18.48
13.32

0.34

7.39
9.99

0.34

7.39
10.66
9.24

0.41

1,096.91

22.19

16MM

472.22

12MM

227.38

10MM

397.32

TIE WIRE
66.53

22.19
1.42

62.83
85.01

5.60

88.70
74.59
26.64
85.01

0.00

88.70
578.02

7.01

12MM

101.23

10MM

476.78

TIE WIRE

18.99
128.86

7.01

#REF!
#REF!
16MM

151.52

12MM

53.30

10MM

55.50

TIE WIRE

4.00

1,988.70

95.86

559.65
2,175.60
454.56

19.81

127.92
151.70
151.52

7.50

42.64
170.20
5,822.49

387.48

151.52

8.80

42.64
9.47
11.84
9.47
16.57
18.94
18.94
151.70
662.90

42.60

186.55
11.84
0.00
151.52
37.88
142.05
37.88
725.20
606.08
170.56
37.88

35.21

69

47.35
37.88
66.29
75.76
75.76
151.70
606.08

8.91

170.56
151.52
151.52
151.52
680.80
5,568.17

95.53

3,496.48

51.52

92

3,451.18
1,638.98

23.67

1,585.68
10,172.31

75.19

76

FINISHING WORKS
PLASTERING WORKS
MARK

LENGTH

NO. OF SIMILAR
STRUCTURES

HEIGHT

walls
Exterior/Interior Plastering

Computation:
Cement
Sand

834.98
46.39

say
say

835.00
50.00

TILE WORKS
MARK

LENGTH

WIDTH

(length) no. of pcs.

Ground Floor
24"x24"Homogenous floor tiles
Library
Moot Court
SBO/SAS office
Deans office
12"x12"Homogenous floor tiles
Comport room (floor)
Comport room (floor)

10.00
9.30
4.25
6.75

7.00
7.00
7.00
5.00

16.67
15.50
7.08
11.25

6.75
6.75

5.00
5.00

22.50
22.50

Comport room (wall)


Comport room (wall)
Comport room (wall)
Comport room (wall)
24"x24"Homogenous floor tiles
Class room

14.00
10.00
4.60
5.00

2.20
2.20
2.20
2.20

46.67
33.33
15.33
16.67

10.00
4.00
9.30
9.30
3.00
5.15
2.00
10.00

7.00
10.00
7.00
7.00
50.00
7.00
6.00
4.20

16.67
6.67
15.50
15.50
5.00
8.58
3.33
16.67

hallways
lobbies
porch
platform

balcony
Entry along canopy area
fire scape areas
stair & landing

6.20
6.00
2.00
7.00
3.70

2nd Floor
24"x24"Ceramic floor tiles
area-1
cement fin. w/ h2o proofing
area-1
3rd Floor
24"x24"Ceramic floor tiles
area-1
cement fin. w/ h2o proofing
area-1
roof deck
cement fin. w/ h2o proofing
area-1

6.00
5.00
4.50
4.50

10.33
10.00
3.33
11.67
6.17

8.00

7.00

13.33

3.00

4.50

8.00

7.00

3.00

4.50

8.00
3.00

7.00
4.50

###

13.33

CEILING WORKS
MARK

LENGTH

2nd floor

hardiflex ceiling board


8.50
1.20

open ceiling

WIDTH

(length) no. of pcs.


5.00
2.00

total
MARK

LENGTH

2nd floor

double furring channel


8.50
1.20

open ceiling

WIDTH

(length) no. of pcs.


5.00
2.00

21.25
1.20

total
MARK
2nd floor

LENGTH

comm'l. length

(length) no. of pcs.

wall angle

open ceiling

42.40

3.00

14.13

total
MARK
2nd floor
open ceiling
total

LENGTH

WIDTH

(length) no. of pcs.

carrying channel
8.50

5.00

7.08

PAINTING WORKS

ceiling area

mark

89.80
1st coating

Flat latex paint


Masonry putty
latex color
sand paper
roller brush
paint brush
stupa rug

PAINTING WORKS

wall area

370.28
1st coating

Flat latex paint


Semi-gloss Latex
Easytite with hardener
latex color
sand paper
roller brush
paint brush
stupa rug

QDE paint
Easytite with hardener
Paint thinner
tinting color
sand paper
roller brush
paint brush
stupa rug

12.34

3.70
74.06

door area

27.00
1st coating

QDE paint
Easytite with hardener
Paint thinner
tinting color
sand paper
roller brush
paint brush
stupa rug

Painting

2nd coating
14.81
14.81

mark

mark

2.99

3.59
4.49
0.45
5.99

mark

Painting

2nd coating

2nd coating

0.54

0.90
0.36
0.50
0.11
5.40

Metal

336.34
1st coating

2nd coating
11.21
3.36
84.09

6.73

Painting

Exterior wall

1,640.16

mark

1st coating

Flat latex paint


Semi-gloss Latex
latex color
Patching Compound
sand paper
roller brush
paint brush
stupa rug
Painting

2nd coating
54.67
54.67
8.20

41.00

164.02

Exposed Conc.

56.89

mark

1st coating

Flat latex paint


Semi-gloss Latex
latex color
sand paper
roller brush
paint brush
stupa rug

2nd coating
1.90
1.90
0.28
5.69

1.42

TOILET PARTITIONS
MARK

LENGTH

WIDTH

total no. of unit

Phenolic board
female

1.50
0.20
0.40
1.50
0.20
0.40
0.45

male

urinal partitions

1.60
1.60
1.60
1.60
1.60
1.60
0.90

4.00
2.00
3.00
2.00
2.00
1.00
6.00

total
DOORS
MARK

LENGTH

WIDTH

total no. of unit

Phenolic board
female
male
total

DECORATIVE STONE

0.60
0.60

1.60
1.60

4.00
2.00

MARK

LENGTH

WIDTH

total Area (m)

wall angle
Area-1
Area-2
Area-3
Area-4
Area-5

9.00
1.75
9.50
9.50
9.00

36.00
17.50
38.00
19.00
10.80

1.00
5.00
2.00
1.00
0.60

total
ALUM. CLADDING
MARK

LENGTH

WIDTH

total Area (m)

wall angle
Area-1

5.70
5.70

1.50
0.50

34.20
11.40

Area-2

17.70

1.50

53.10

total

FINISHING WORKS(Second floor)


PLASTERING WORKS
MARK

LENGTH

NO. OF SIMILAR
STRUCTURES

HEIGHT

walls
Exterior/Interior Plastering

Err:509

Err:509

Err:509

Computation:
Cement
Sand

Err:509
Err:509

say
say

500.00
35.00

TILE WORKS
MARK

LENGTH

WIDTH

(length) no. of pcs.

Ground Floor
concrete pavers
24"x24"Granite tiles
gen. merch.
asessment area
souvinir area
photocopy/printing
300x300mm tile
Toilet
400x400mm tile
Stairs
Peeble washed out

27.50

2.40

10.00
5.00
7.00
12.00

4.00
5.20
4.20
8.00

16.67
8.33
11.67
20.00

1.60
5.90
1.60

1.50
1.60
1.50

5.33

11.00

2.00

5.33

mezz. Floor
concrete pavers
24"x24"Granite tiles
open room storage
1,2,3,4
Corridor
plain cement fin.
Stairs
Peeble washed out
2nd floor
plain cement fin.
corridor-1
corridor-2
24"x24"Granite tiles
dig./audio visual
photo studio
wellness room
office
300x300mm tile
toilet
Toilet

27.50

2.40

4.00
16.00

3.00
6.00

29.00

2.25

11.00

2.00

27.50
27.50

2.25
2.40

8.00
4.00
4.00
4.00

###
8.00
8.00
8.00

1.50
5.90

1.45
1.60

5.00

CEILING WORKS
MARK
4th floor

LENGTH

WIDTH

(length) no. of pcs.

.19mx3mts long
Hall way-1
Hall way-2
Hall way-3
Hall way-4
Hall way-5

37.40
20.70
32.00
13.00
10.00

1/4"thk. Hardiflex
hall way

2.00

2.00
2.00
2.00
2.00
4.00

###

total
MARK

LENGTH

double furring channel


hallway
total

MARK

WIDTH

280.00

LENGTH

total length (l.m)


2.00

comm'l. length(m)

2,800.00

total length (l.m)

wall angle
hallway

560.00

total
total area(m)
carrying channel
double furring clip
blind rivets

Painting
Flat latex paint
Semi-gloss Latex
Easytite with hardener
latex color
sand paper
roller brush
paint brush
stupa rug

186.67

length/sq.m

comm'l. length

24.00
5.00

1.50
15.00
total area(m)
no. of pcs./sq.m
24.00
20.00
total lenght(l.m)
kgs./l.m

1" conc. Nail

mark

3.00

560.00

560.00

5.00

0.03

ceiling area

24.00
1st coating

2nd coating
0.80
0.80
0.24
0.12
2.40

0.60

Painting

door area

#REF!

mark

1st coating

2nd coating

QDE paint
Easytite with hardener
Paint thinner
tinting color
sand paper
roller brush
paint brush
stupa rug

Painting

Metal

139.20

mark

1st coating

2nd coating

QDE paint
Easytite with hardener
Paint thinner
tinting color
sand paper
roller brush
paint brush
stupa rug

Painting

#REF!

#REF!
#REF!
0.75
#REF!
#REF!

2.78

4.64
1.39
0.46

Interior wall

Err:509

mark

1st coating

Flat latex paint


Semi-gloss Latex
latex color
sand paper
roller brush
paint brush
stupa rug

2nd coating
Err:509
Err:509
Err:509
Err:509

Err:509

TOILET PARTITIONS
MARK

LENGTH

WIDTH

total no. of unit

Phenolic board
female

male

urinal partitions
total

1.50
0.20
0.40
1.50
0.20
0.40
0.45

1.60
1.60
1.60
1.60
1.60
1.60
0.90

4.00
2.00
3.00
2.00
2.00
1.00
6.00

DOORS
MARK

LENGTH

WIDTH

total no. of unit

Phenolic board
female
male

0.60
0.60

1.60
1.60

4.00
2.00

total

DECORATIVE STONE
MARK

LENGTH

WIDTH

total Area (m)

wall angle
Area-1
Area-2
Area-3
Area-4
Area-5

9.00
1.75
9.50
9.50
9.00

1.00
5.00
2.00
1.00
0.60

36.00
17.50
38.00
19.00
10.80

total
ALUM. CLADDING
MARK

LENGTH

WIDTH

total Area (m)

wall angle
Area-1
Area-2
Area-3
total

1.50
1.50
7.00

16.00
14.00
4.00

48.00
42.00
28.00

Quantity of cement and sand for pla


Mixture
class
A
B
C
D
Sand

FACE

Total

AREA (m)

1,855.51

bags
m

say

(width) no. of
pcs.

say

total no. of
pcs.

17.00
16.00
8.00
12.00

11.67
11.67
11.67
8.33

12.00
12.00
12.00
9.00

204.00
192.00
96.00
108.00

23.00
23.00

16.67
16.67

17.00
17.00

391.00
391.00

47.00
34.00
16.00
17.00

7.33
7.33
7.33
7.33

8.00
8.00
8.00
8.00

376.00
272.00
128.00
136.00

17.00
7.00
16.00
16.00
5.00
9.00
4.00
17.00

11.67
16.67
11.67
11.67
83.33
11.67
10.00
7.00

12.00
17.00
12.00
12.00
84.00
12.00
10.00
7.00

204.00
119.00
192.00
192.00
420.00
108.00
40.00
119.00

total no. of pcs.

600.00
391.00
391.00
782.00

912.00

total area (m)

70.00
65.10
29.75
33.75
33.75
33.75
30.80
22.00
10.12
11.00
70.00
40.00
65.10
65.10
150.00
36.05
12.00
42.00

11.00
10.00
4.00
12.00
7.00

10.00
10.00
8.33
7.50
7.50

10.00
10.00
9.00
8.00
8.00

110.00
100.00
36.00
96.00
56.00

14.00

11.67

12.00

168.00
168.00

37.20
36.00
10.00
31.50
16.65

1,792.00

56.00

13.50

14.00

11.67

12.00

56.00

168.00
168.00
#REF!

13.50
56.00
13.50

(width) no. of
pcs.

say

say

69.50

total no. of
pcs.

total area (m)

42.50
2.40
44.90
(width) no. of
pcs.

say
22.00
2.00

21.25
1.20
(width) no. of
pcs.

say

say
22.00
2.00
say

total no. of
pcs.
44.00
4.00
48.00 pcs
total no. of
pcs.

furring clip
21.25
3.00

12.50
5.00
total area (m)

15.00

(width) no. of
pcs.

say
8.00

say

total no. of
pcs.

total area (m)

42.50
42.50

3rd coating
2.57

gal
9.15

3rd coating
12.34

say
4.00
4.00

0.90
-

4.00
4.00

3.70
9.87

gal
39.50

1.00
4.00
1.00
20.00
2.00
5.00
5.00

say

unit
4.00 tin
10.00 tin
4.00
80.00
5.00
12.00
10.00

3rd coating

gal/tin

say

1.44

3rd coating

lits
pcs
pcs
pcs
kg

unit
gal
gal
gal
lits
pcs
pcs
4.00 pcs
2.00 kg

2.00
1.00
1.00
0.50
20.00

gal/tin
17.94

unit
tin
gal
lits
pcs
pcs
pcs
kg

say
4.00

4.48

5.00
5.00
2.00
4.00
10.00
5.00

unit
tin
gal
gal
lits
pcs
pcs
pcs
kg

3rd coating
32.80

gal

4.46

say

20.16
1.34
4.03
10.08
1.34
1.34
5.10
43.41

total Area
(m)
8.06
4.03
12.10

13.67
32.12

gal

1.14

total Area
(m)

4.00
4.00

128.48

3rd coating

say

say

14.00
35.00
9.00
2.00
200.00
8.00
15.00
10.00

say
4.00
4.00

0.47
1.11

1.00
2.00
10.00
10.00
1.00
2.00
3.00

unit
tin
tin
lits
sacks
pcs
pcs
pcs
kg

unit
gal
gal
lits
pcs
pcs
pcs
kg

say

unit

36.00 m
18.00
18.00
19.00
11.00
102.00
25.50
say

26.00

6.80
7.00

917.40
811.80
224.40
1,953.60

unit

18.00 m
3.00 m
54.00
75.00

FACE

2.00
Total

AREA (m)

Err:509
Err:509
Err:509

bags
m

say

(width) no. of
pcs.

say

total no. of
pcs.

total no. of pcs.

total area (m)

66.00
17.00
9.00
12.00
20.00

6.67
8.67
7.00
13.33

7.00
9.00
7.00
14.00

119.00
81.00
84.00
280.00

40.00
26.00
29.40
96.00

6.00

5.00

5.00

30.00

6.00

5.00

5.00

30.00

2.40
9.44
2.40
22.00

66.00
12.00
96.00
65.25
22.00

61.88
66.00

64.00
32.00
32.00
32.00
5.00

4.83

5.00

2.18
9.44

25.00

Quantity of cement and sand for pla


Mixture
class
A
B
C
D
Sand
say

(width) no. of
pcs.

say

total no. of
pcs.

total area (m)

74.80
41.40
64.00
26.00
40.00
246.20
24.00
24.00

6.00

comm'l.
length(m)

total no. of pcs.

5.00

say

say

560.00

unit

area (m)

560.00 pcs
560.00 pcs

560.00

3,500.00

unit

187.00 pcs
187.00 pcs
7.20

4.00 pcs
75.00

480.00

240.00 pcs

14.00

0.50 kgs

3rd coating

gal

0.40

1.80

say
4.00
4.00

0.20
0.45

2.00
4.00
4.00
2.00
30.00
2.00
5.00
5.00

unit
gal
gal
gal
lits
pcs
pcs
pcs
kg

3rd coating

gal/tin
#REF!

3rd coating

3rd coating

4.00

1.86

4.00
4.00

Err:509
Err:509

Err:509

say

unit
tin
gal
gal
lits
pcs
pcs
8.00 pcs
10.00 kg
3.00
4.00
4.00
1.00
50.00

say

gal

Err:509

20.16
1.34
4.03
10.08
1.34
1.34
5.10
43.41

#REF!

gal/tin
7.42

total Area
(m)

say
4.00

unit
8.00 gal
3.00 gal
5.00 gal
lits
pcs
pcs
5.00 pcs
5.00 kg

say
10.00
22.00
6.00
330.00
15.00
20.00
20.00

unit
tin
tin
lits
pcs
pcs
pcs
kg

total Area
(m)

say

8.06
4.03
12.10

say

unit

36.00 m
18.00
18.00
19.00
11.00
102.00
25.50
say
48.00 m
42.00
28.00
118.00

26.00
unit

6.80
7.00

917.40
811.80
224.40
1,953.60

ty of cement and sand for plaster per square meter area

8 mm

Cement in bags Thickness of Plaster


12mm
16mm
20mm
25mm
0.144
0.096
0.072
0.06
0.008

0.216
0.144
0.108
0.09
0.012

0.288
0.192
0.144
0.12
0.016

0.36
0.24
0.18
0.15
0.02

0.45
0.3
0.225
0.188
0.025

58.23

59.00

3.67

4.00

472.00

182.00

#REF!

no. of pcs.

14.76
0.83

say
15.00
1.00
16.00 pcs

no. of pcs.

265.63
15.00

say
270.00
20.00
290.00 pcs

no. of pcs.

say
15.00
15.00

no. of pcs.

say
8.00
8.00

5,716.80

5,716.80

1
2
3

4
5

6
7
8
9
10
11
12
13

114.34

Acrylic semi-gloss latext paint finish, boysen white

114.34

Acrylic semi-gloss latext paint finish, boysen white


Flat latex paint boysen white
Flat wall enamel paint
Q.D.E. Paint Boysen
Masonry putty
Easytite w/ Hardiner
Perlite (patching compound)
Stikwel
Sand paper
Paint Rower
Paint Brush
Paint Thinner
Consumable like tinting colors

15.00
37.00

191.40 sq.m
sq.m
sq.m
sq.m
11.84
sq.m

108.00
65.25 sq.m
sq.m

127.88 sq.m

160.00 sq.m
sq.m
sq.m
11.62 sq.m

ty of cement and sand for plaster per square meter area


Cement in bags Thickness of Plaster
12mm
16mm
20mm
25mm

8 mm

0.144
0.096
0.072
0.06
0.008
no. of pcs.

say

0.216
0.144
0.108
0.09
0.012

0.288
0.192
0.144
0.12
0.016

0.36
0.24
0.18
0.15
0.02

0.45
0.3
0.225
0.188
0.025

131.23
72.63
112.28
45.61
70.18

132.00
73.00
113.00
46.00
71.00
435.00

8.33
8.33

9.00
9.00 pcs

907.00

5,716.80

1
2

114.34

Acrylic semi-gloss latext paint finish, boysen white


Flat latex paint boysen white

4
5

6
7
8
9
10
11
12
13

Flat wall enamel paint


Q.D.E. Paint Boysen
Masonry putty
Easytite w/ Hardiner
Perlite (patching compound)
Stikwel
Sand paper
Paint Rower
Paint Brush
Paint Thinner
Consumable like tinting colors

gals
gals
gals
gals
gals
ltrs
ltrs
lits
pcs
pcs
pcs
gals
lits

10.00
6.00
2.00
1.00
1.00
2.00
10.00
1.00
150.00
2.00
5.00
2.00
2.00

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

50.00
30.00
10.00
5.00
5.00
10.00
50.00
5.00
750.00
10.00
25.00
10.00
10.00

gals
gals

10.00
6.00

5.00
5.00

50.00
30.00

gals
gals
gals
ltrs
ltrs
lits
pcs
pcs
pcs
gals
lits

2.00
1.00
1.00
2.00
10.00
1.00
150.00
2.00
5.00
2.00
2.00

5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00

10.00
5.00
5.00
10.00
50.00
5.00
750.00
10.00
25.00
10.00
10.00

CONCRETE WORKS
FOR ONE (1) STRUCTURE
MARK

LENGTH (m.)

WIDTH

(m.)

HEIGHT

(m.)

NO. OF SIMILAR TOTAL VOLUME


STRUCTURE
(m)

F-1

1.50

1.50

0.30

6.00

4.05

FTB

5.00
4.00

0.25
0.25

0.30
0.30

3.00
4.00

1.13
1.20

GB

5.00
4.00

0.20
0.20

0.25
0.25

3.00
4.00

0.75
0.80

C-1
C-2
C-1

0.30
0.30
0.30

0.30
0.30
0.30

8.30
8.45
8.61

2.00
2.00
2.00

1.49
1.52
1.55

B-1
B-2
B-3
B-4

5.00
4.00
5.00
5.00
2.12

0.25
0.25
0.30
0.25
0.20

0.35
0.35
0.40
0.30
0.25

2.00
4.00
1.00
1.00
1.00

0.88
1.40
0.60
0.38
0.11

LB-1

2.00

0.20

0.30

1.00

0.12

CB-1

1.20

0.20

0.30

2.00

0.14

RB-1
RB-2
RB-3
RB-4

5.00
4.00
5.00
5.00
2.12

0.20
0.20
0.25
0.15
0.15

0.25
0.25
0.30
0.25
0.20

2.00
4.00
1.00
1.00
1.00

0.50
0.80
0.38
0.19
0.06

LB-2

2.00

0.15

0.25

1.00

0.08

CB-2

1.20

0.15

0.25

2.00

0.09

SLAB ON FILL

8.00
1.20

5.00
2.00

0.10
0.10

1.00
1.00

4.00
0.24

SUSPENDED SLAB

5.00
5.00
2.12
1.20
3.20
1.20

4.00
1.88
2.00
2.00
2.13
9.00

0.10
0.10
0.10
0.10
0.13
0.10

1.00
1.00
1.00
1.00
1.00
1.00

2.00
0.94
0.42
0.24
0.85
1.08

STAIRS

Total

27.98

4.05

36.45
37.00

2.03
2.50

4.05
5.00

2.33

20.93
21.00

1.16
1.50

2.33
3.00

1.55

13.95
14.00

0.78
1.00

1.55
2.00

4.56

41.08
42.00

2.28
2.50

4.56
5.00

3.36

30.20
31.00
1.08
2.00
1.30
2.00

1.68
2.00
0.06
0.10
0.07
0.10

3.36
4.00
0.12
0.20
0.14
0.20

17.33
18.00
0.68
1.00
0.81
1.00

0.96
1.00
0.04
0.05
0.05
0.05

1.93
2.00
0.08
0.10
0.09
0.10

4.24

38.16
39.00

2.12
2.50

4.24
5.00

3.60

32.44

1.80

3.60

1.93

17.39
39.00
302.15
303.00

0.97
2.50
15.11
16.00

1.93
5.00
30.22
32.00

0.12
0.14

1.93
0.08
0.09

30.22
say

351.00

Proj. Engineer
Construction Foreman
Mason
Carpenter
H.E. Operator
L.E. Operator
Driver
Steelman
Labor
Painter
Roof Installer

Welder
Glass Installer
Plumber
Electrician

Rate/day
Rate/hour
600.00
75.00
450.00
56.25
375.00
46.88
375.00
46.88
400.00
50.00
325.00
40.63
300.00
37.50
300.00
37.50
250.00
31.25
350.00
43.75
350.00
43.75
375.00
46.88
300.00
37.50
325.00
40.63
325.00
40.63

Road Grader
Payloader
Road Roller
Water Truck
Transit Mixer
One Bagger Mixer
Concrete Cutter
Concrete Vibrator
Welding Machine
Electric grinder
Bar cutter

Rate/day
Rate/hour
7,500.00
7,000.00
6,500.00
4,500.00
1,500.00
400.00
400.00
250.00
450.00
150.00
200.00

Description

Amount

Portland Cement

225.00

Screened Gravel

450.00

Washed Sand

400.00

Asphalt Sealant

110.00

Assorted Nails

75.00

16mm Def. bars

40.00

Form Lumber 2"x5"x12' Coco lumber


Aggregate Sub-Basecoarse
#16 G.I. tie wire
1/2"x4'x8' Form Plywood

24.00
400.00
60.00
560.00

Asst. Form lumber

24.00

6" CHB

10.50

Tile Adhessive

190.00

16"x16" Ceramic tile

85.00

16"x16" Outdoor tile

65.00

Tile Grout

25.00

Flat Latex paint

1,810.00

Semi-gloss Latex paint

2,370.00

Latex color
Patching compound

120.00
15.00

Stickwel

195.00

Roller brush

100.00

Paint brush

45.00

Sandpaper

25.00

Stupa Rag

20.00

unit
/bags
/cu.m
/cu.m
/lit
/kg
/kg
/bd.ft
/cu.m
/kg
/pc
/bd.ft
/pc
/bags
/pc
/pc
/kg
/tin
/tin
/lit
/kg
/lit
/pc
/pc
/pc
/kg

Tile Roof Roofing sheet (.5mm thk.)

420.00

/sq.m

Ridge roll

450.00

/pc

Gutter

450.00

/pc

1.75

/pc

Tekscrew
Silicon Sealant

150.00

/tube

Blind Rivets

500.00

/box

Touch-up paint

150.00

/lit

1.5mm x 2"x6" CEE purlins

650.00

/pc

1.2mm x 2"x4" CEE purlins

397.00

/pc

1.0mm x 2"x3" CEE purlins

400.00

/pc

10mm Plain Round bar

138.00

/pc

1/4" x 10"x10" Base plate

250.00

/pc

1,200.00

/box

Welding rod
12mm x 10" Anchor bolts w/

120.00

/pc

8"x8" Glazed tile

32.00

/pc

8"x8" Unglazed tile

32.00

/pc

Tile trim

78.00

/pc

Tile Grout

25.00

/kg

4" Diamond cutter

450.00

/pc

3" PVC pipe

460.00

/pc

53.00

/pc

3,250.00

/pc

235.00

/pc

3" PVC Elbow 1/4 bend


2" Stainless Steel pipe
3/16"x1" Flat bar
3/4"x3/4" Square bar
Welding rod/Accessories
4" Grinding disk

245.00

/pc

2,500.00

/lot

65.00

/pc

Water closets w/ Accessories

2,800.00

Wall hang lavatory w/ Accessories

1,800.00

Soap holder

250.00

Tissue holder

250.00

Towel holder

450.00

4"x4" Floor drain

350.00

Ordinary faucet

65.00

Clean water line pipes and accessories

2,000.00

Sewer pipe line and accessories

3,500.00

2x40W FL lamp w/ housing

1,500.00

25W CFL
4"x4" Pinlight
Receptacle 4"

60.00
250.00
50.00

Single pole switch

120.00

Two pole switch

165.00

3-Way switch

210.00

Main ACB 6-holes

1,850.00

4"x4" Junction box

35.00

2"x4" Utility box

35.00

1/2" PVC pipe x 3.00 mts.

61.00

3.5mm THHN wire

3,207.50

14mm THHN wire

85.84

1' PVC pipe x 3.00 mts.


1" Long sweep elbow
1/2" PVC Long sweep elbow
1" RSC pipe x 3.00 mts.
1" Entrance cap
3-Pole secondary rack

102.00
38.00
25.00
420.00
65.00
285.00

1" Long sweep elbow (RSC)

85.00

Electrical tape

45.00

Hardiflex ceiling board

420.00

0.40mm 19mm x 50mm x 5m


Double furring channel

115.00

0.80mm 12mm x 38mm x 5m


Carrying Channel
0.40mm 25mm x 25mm x 3m

140.00

Wall angle
W-Clip
1-1/2" Concrete nail

85.00
8.00
90.00

Mesh tape

150.00

Blind rivets

500.00