Vous êtes sur la page 1sur 159

IV.

FORMULACION DEL PROYECTO


I. ANALISIS DE OFERTA Y DEMANDA DE AGUA PARA RIEGO
3. Anlisis de la demanda de agua para riego

CALCULO DEL MODULO DE RIEGO ALTERNATIVA 1


ESPECIFICACIONES

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

N de das/mes
Temperatura (C)
Temperatura (F)
Factor Mensual de Latitud MF
Humedad Relativa HR (%)
Factor de Correccin de humedad CH
Factor de Correccin de Elevacin CE
Precipitacin 75% (mm)

31.00
10.61
51.09
2.67
91.00
0.50
1.07
112.61

28.00
10.74
51.34
2.31
93.00
0.44
1.07
88.54

31.00
10.93
51.67
2.34
94.00
0.41
1.07
97.38

30.00
11.10
51.98
1.97
95.00
0.37
1.07
21.55

31.00
10.21
50.37
1.75
93.00
0.44
1.07
7.67

30.00
10.00
50.00
1.55
93.00
0.44
1.07
1.30

31.00
9.13
48.43
1.76
82.00
0.70
1.07
3.00

31.00
10.00
50.01
2.12
81.00
0.72
1.07
8.05

30.00
11.05
51.89
2.13
84.50
0.65
1.07
13.14

31.00
11.38
52.49
2.14
87.50
0.59
1.07
27.15

30.00
11.32
52.37
2.10
86.00
0.62
1.07
36.65

31.00
10.53
50.95
2.17
88.50
0.56
1.07
72.16

2. ETP HARGREAVES

72.44
2.34

55.61
1.99

52.51
1.69

40.52
1.35

41.24
1.33

36.35
1.21

64.17
2.07

81.85
2.64

77.08
2.57

70.34
2.27

72.89
2.43

66.41
2.14

1.01

0.79

0.59

0.47

0.70

0.92

0.86

0.69

0.62

0.56

0.60

0.91

5. PRECIPITACION EFECTIVA 75%(mm)

73.04
2.36
81.82

43.72
1.56
84.99

30.74
0.99
110.99

18.95
0.63
20.35

28.74
0.93
0.00

33.57
1.12
0.00

54.90
1.77
0.00

56.28
1.82
2.30

47.45
1.58
13.09

39.60
1.28
20.57

43.91
1.46
30.66

60.51
1.95
60.80

6, DEFICIT DE HUMEDAD (mm)

-8.78

-41.27

-80.24

-1.40

28.74

33.57

54.90

53.98

34.36

19.04

13.25

-0.29

7. REQUERIMIENTO VOLUMETRICO
DE AGUA (Req. Vol.) m3/ha

-87.78

-412.67

-802.45

-13.97

287.40

335.67

549.04

539.85

343.61

190.36

132.55

-2.95

8. EFICIENCIA DEL RIEGO Gravedad

0.61

0.61

0.61

0.61

0.61

0.61

0.61

0.61

0.61

0.61

0.61

0.61

9, REQUERIMIENTO AGUA (m3/mes/ha)

-144.24

-678.08

-1318.56

-22.96

472.24

551.57

902.16

887.06

564.61

312.79

217.80

-4.84

10, MODULO DE RIEGO (lts/seg/ha) 24 hr

-0.05

-0.28

-0.49

-0.01

0.18

0.21

0.34

0.33

0.22

0.12

0.08

-0.00

11, MODULO DE RIEGO (lts/seg/ha) 18 hr

-0.07

-0.37

-0.66

-0.01

0.24

0.28

0.45

0.44

0.29

0.16

0.11

-0.00

12, MODULO DE RIEGO (lts/seg/ha) 16 hr

-0.08

-0.42

-0.74

-0.01

0.26

0.32

0.51

0.50

0.33

0.18

0.13

-0.00

13, MODULO DE RIEGO (lts/seg/ha) 12hr

-0.11

-0.56

-0.98

-0.02

0.35

0.43

0.67

0.66

0.44

0.23

0.17

-0.00

1. DATOS BASICOS

3. CALCULO Kc
Kc Ponderado
4. EVAPOTRANSPIRACION ACTUAL (mm)

70

FUENTES Y METODOS DE CALCULO :


Precipitacin:
Mtodo de calculo de ETP:
Coeficiente Kc:
Clculo de Precipitacin efectiva 75% (mm)

Estacin Meteorolgica de Cuchoquesera


Ecuacin de Hargreaves en base a la Temperatura
Manual del Cropwat
Interpolacin Tabla USDA Boletn Tcnico No. 21

Eficiencia de riego por gravedad:

61%

III. FORMULACION DEL PROYECTO


I. ANALISIS DE OFERTA Y DEMANDA DE AGUA PARA RIEGO
4. Anlisis de la demanda insatisfecha

BALANCE HIDRICO
PROYECTO: CONSTRUCCION REPRESA PALLCCA DISTRITO DE MARIA PARADO DE BELLIDO-CANGALLO-AYACUCHO

MESES / N Das
E
F
M
A
M
J
J
A
S
O
N
D
TOTAL

31
28
31
30
31
30
31
31
30
31
30
31

OFERTA
APORTE PARCIAL
SUB
OTROS
TOTAL
m3/seg
m3/seg
m3/seg
0.105
0.965
0.943
1.139
0.505
0.410
0.276
0.168
0.155
0.167
0.243
0.239

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.1046
0.9647
0.9434
1.1394
0.5053
0.4101
0.2759
0.1678
0.1552
0.1674
0.2434
0.2392

APORTE
TOTAL
MMC/mes

MODULO
RIEGO 24 hr
lt/seg/ha

0.140
1.167
1.263
1.477
0.677
0.532
0.369
0.225
0.201
0.224
0.315
0.320
6.91032

-0.05385
-0.28029
-0.49229
-0.00886
0.17632
0.21280
0.33683
0.33119
0.21783
0.11678
0.08403
-0.00181

DEMANDA
BALANCE
AREA
VOLUMEN
FINAL
A REGAR TOTAL REQ. DE AGUA
ha/mes
MMC/mes
MMC/mes
173.00
173.00
142.00
133.00
137.00
135.00
135.00
135.00
135.00
136.00
171.00
173.00

-0.02495
-0.11731
-0.18724
-0.00305
0.06470
0.07446
0.12179
0.11975
0.07622
0.04254
0.03724
-0.00084
0.53366

22.53

BALANCE HIDRICO DE LA OFERTA Y DEMANDA


1.600
1.400
1.200
1.000
0.800
0.600
0.400
0.200
0.000

DEMANDA DE AGUA
OFERTA DE AGUA

0.16502
1.04960
1.07618
1.47966
0.61199
0.45705
0.24767
0.10492
0.12489
0.18166
0.27814
0.32114
6.09791

III. FORMULACION DEL PROYECTO


I. ANALISIS DE OFERTA Y DEMANDA DE AGUA PARA RIEGO
5. Anlisis de la demanda

M M C de agua / me s

ANALISIS DE LA DEMANDA DE AGUA DE RIEGO


DEMANDA

0.14000
0.12000
0.10000
0.08000
0.06000
0.04000
0.02000
0.00000

MMC de agua

III. FORMULACION DEL PROYECTO


I. ANALISIS DE OFERTA Y DEMANDA DE AGUA PARA RIEGO
5. Anlisis de la demanda

ANALISIS DE LA OFERTA DE AGUA


1.600
1.400
1.200
1.000
0.800
0.600
0.400
0.200
0.000

1.000
0.800
0.600
0.400
0.200
0.000

PRECIOS EN CHACRA DE PRODUCTOS AGRICOLAS AYACUCHO


AOS: 2007 - 2011 (S/./Kg)
CULTIVO
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz

2007
0.49
0.40
0.85
0.70
0.89
0.90

2008
0.49
0.42
0.80
0.92
1.03
0.90

2009
0.50
0.43
0.86
0.87
0.93
0.90

2010
0.49
0.40
0.85
0.70
0.89
0.90

2011
0.49
0.42
0.80
0.92
1.03
0.90

Promedio
0.49
0.41
0.83
0.82
0.95
0.90

Trigo
Avena forrajera
Quinua
Alfalfa

0.66
0.20
1.28
0.08

0.88
0.20
1.59
0.08

0.69
0.20
1.53
0.08

0.66
0.20
1.28
0.08

0.88
0.20
1.59
0.08

0.75
0.20
1.45
0.08

FUENTE.- Agencia Agrarias de la DRA -Ayacucho

RENDIMIENTOS PRINCIPALES CULTIVOS PROVINCIA AYACUCHO


AOS: 2007 - 2011 (TM/ha)
CULTIVO
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz

2007
0.88
9.79
7.20
0.88
0.91
0.85

2008
0.92
13.73
7.15
0.85
0.94
0.85

2009
0.96
15.01
6.95
0.94
0.94
0.85

2010
0.90
19.07
7.00
1.05
0.92
0.85

2011
0.93
22.32
6.80
0.91
0.93
0.85

Promedio
0.92
15.98
7.02
0.92
0.93
0.85

0.90
13.72
0.88
20.00

0.88
12.11
0.91
20.00

0.98
13.21
0.98
20.00

0.91
12.53
0.84
20.00

0.94
13.06
1.00
20.00

0.92
12.92
0.92
20.00

0
0
Trigo
Avena forrajera
Quinua
Alfalfa

FUENTE.- Agencia Agrarias de la DRA -Ayacucho

SUPERFICIE COSECHADA PRINCIPALES CULTIVOS PROVINCIA AYACUCHO


AOS: 2007 - 2011 (Has)
CULTIVO
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz

2007
140.00
160.00
18.00
15.00
15.00
20.00

2008
150.00
150.00
16.00
18.00
18.00
22.00

2009
130.00
140.00
19.00
17.00
16.00
23.00

2010
125.00
160.00
20.00
16.00
14.00
19.00

2011
150.00
150.00
18.00
20.00
15.00
21.00

Promedio
139.00
152.00
18.20
17.20
15.60
21.00

24.00
15.00
14.00
15.00

25.00
18.00
16.00
17.00

27.00
16.00
18.00
16.00

23.00
18.00
15.00
13.00

23.00
16.00
15.00
12.00

24.40
16.60
15.60
14.60

0
0
Trigo
Avena forrajera
Quinua
Alfalfa

FUENTE.- Agencia Agrarias de la DRA -Ayacucho

VOLUMEN DE LA PRODUCCION PRINCIPALES CULTIVOS PROVINCIA CANGALLO


AOS: 2002 - 2006 (TM)
CULTIVO
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
0
0
Trigo
Avena forrajera
Quinua
Alfalfa

2007
123.62
1,566.72
129.60
13.23
13.68
17.00
0.00
0.00
21.55
205.76
12.26
300.00

2008
138.00
2,059.05
114.40
15.26
16.90
18.70
0.00
0.00
21.90
217.96
14.53
340.00

2009
124.15
2,100.84
132.05
15.90
14.99
19.55
0.00
0.00
26.41
211.33
17.64
320.00

2010
112.00
3,050.88
140.00
16.74
12.88
16.15
0.00
0.00
20.98
225.47
12.63
260.00

2011
139.65
3,348.15
122.40
18.16
13.92
17.85
0.00
0.00
21.69
208.99
15.00
240.00

Promedio
127.48
2,425.13
127.69
15.86
14.47
17.85
0.00
0.00
22.50
213.90
14.41
292.00

FUENTE.- Agencia Agrarias de la DRA -Ayacucho


VALOR BRUTO DE LA PRODUCCION PRINCIPALES CULTIVOS CANGALLO
AOS: 2002 - 2006 (MILES DE NUEVOS SOLES)
CULTIVO
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
0
0
Trigo
Avena forrajera
Quinua
Alfalfa

2007
60.57
626.69
110.16
9.26
12.18
15.30
0.00
0.00
14.22
41.15
15.70
24.00

2008
67.62
864.80
91.52
14.04
17.41
16.83
0.00
0.00
19.27
43.59
23.10
27.20

2009
62.08
903.36
113.56
13.83
13.94
17.60
0.00
0.00
18.22
42.27
26.99
25.60

FUENTE.- Agencia Agrarias de la DRA -Ayacucho


RENDIMIENTOS
CULTIVO

SIN
PROYECTO

Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
0
0
Trigo
Avena forrajera
Quinua
Alfalfa

0.92
15.98
7.02
0.92
0.93
0.85
0.00
0.00
0.92
12.92
0.92
20.00

CON
PROYECTO

1.564
19.176
9.126
1.196
1.209
1.105
#VALUE!
#VALUE!
1.38
23.256
1.38
30

2010
54.88
1,220.35
119.00
11.72
11.46
14.54
0.00
0.00
13.84
45.09
16.17
20.80

2011
68.43
1,406.22
97.92
16.71
14.34
16.07
0.00
0.00
19.09
41.80
23.85
19.20

Promedio
62.72
1,004.29
106.43
13.11
13.87
16.07
0.00
0.00
16.93
42.78
21.16
23.36

FORMULACION DE LA CEDULA Y CALENDARIO DE CULTIVO


A) FORMULACION DE LA CEDULA DE CULTIVO:
FACTORES:
Clima, Suelo, Cultivos, Disponibilidad de agua, Mercado.
Area de Cultivo (Has)
Cultivo
Campaa Grande
Campaa Chica
Total
Cebada
11.0
0.0
11.0
Papa
5.0
0.0
5.0
Hortalizas
6.0
0.0
6.0
Arveja
12.0
0.0
12.0
Haba
8.0
0.0
8.0
Maiz
12.0
0.0
12.0
Trigo
4.0
0.0
4.0
Avena forrajera
4.0
0.0
4.0
Quinua
4.0
0.0
4.0
Alfalfa
5.0
0.0
5.0
TOTAL
71.0
0.0
71.0
Mr
B) CALENDARIO AGRICOLA:
PROYECTO DE RIEGO :
UBICACIN :
CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL

AREA
(Has)
11.0
5.0
6.0
12.0
8.0
12.0
4.0
4.0
4.0
5.0
71.0

175.00 0.4057
3.40

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS
LIBERTADORES
DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
HUAYLLAPATA-SACSAMARCA

ENE
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

FEB
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

MAR
CG
CG
CG

CALENDARIO AGRCOLA SIN PROYECTO


ABR
MAY
JUN
JUL
AGO
SET

OCT
CG
CG
CG
CG

CG
CG
CG
CG
CG

CG
CG

CG
CG

CG

CG

CG

CG

CG

NOV
CG
CG
CG
CG
CG
CG
CG
CG
CG

DIC
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

CULTIVO
ROTAC.
Papa
Avena forrajera
Arveja
Cebada
Cebada
Haba
Hortalizas
Cebada
Alfalfa
TOTAL

(*) CH : Campaa Grande, CG, campaa grande


C) AREA DE CULTIVO:
CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL

AREA
(Has)
11.0
5
6
12
8
12
4
4
4
5
71.0

ENE
11
5
6
12
8
12
4
4
4
5
71.0

FEB
11
5
6
12
8
12
4
4
4
5
71.0

MAR
11
5
6

12
4
4
4
5
51.0

ABR
0
0
0
0
0
0
4
5
9.0

MAY
0
0
0
0
0
0
0
0
4
5
9.0

MESES
JUN
JUL
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
5
5.0
5.0

AGO
0
0
0
0
0
0
0
0
0
5
5.0

SET
0
0
0
0
0
0
0
0
0
5
5.0

OCT
11
5
0
12
8
0
0
0
5
41.0

NOV
11
5
6
12
8
12
4
4
5
67.0

D) CALCULO DE LA EVAPOTRANSPIRACION POTENCIAL (ETo): METODO DE HARGREAVES

ETo MF * TMF * CH * CE
Donde:

Eto = ETP = Evapotranspiracin potencial (mm/mes)


MF = Factor mensual de latitud, se obtiene de un cuadro
TMF = Temperatura media mensual (F):
CH = Factor de correccin para la humedad relativa
CE = Factor de correccin para la altura o elevacin del lugar.
1

CH =0 . 166( 100 HR ) 2
Donde:
HR = Humedad relativa media mensual (%)
La frmula anterior se emplea para valores de HR mayores de 64%. Para HR < 64%, CH = 1

CE 1.0 0.04 *
Donde:

E
2000

E = Altitud o Elevacin del lugar (m.s.n.m)

9
TMF * T (C ) 32
5
Donde:

T(C) = Temperatura media en grados celsius

DIC
11
5
6
12
8
12
4
4
4
5
71.0

CULTIVO
ROTAC.
Papa
Avena forrajera
Arveja
Cebada
Cebada
0
Haba
Hortalizas
Cebada
Alfalfa

PARAMETRO
TMM (C)
TMF
MF
HR
CH
CE
ETo (mm/mes)

ENE
10.61
51.09
2.67
91.00
0.50
1.07
72.44

FEB
10.74
51.34
2.31
93.00
0.44
1.07
55.61

MAR
10.93
51.67
2.34
94.00
0.41
1.07
52.51

ABR
11.10
51.98
1.97
95.00
0.37
1.07
40.52

MAY
10.21
50.37
1.75
93.00
0.44
1.07
41.24

JUN
10.00
50.00
1.55
93.00
0.44
1.07
36.35

JUL
9.13
48.43
1.66
82.00
0.70
1.07
60.53

AGO
10.00
50.01
1.91
81.00
0.72
1.07
73.62

SET
11.05
51.89
2.13
84.50
0.65
1.07
77.08

OCT
11.38
52.49
2.14
87.50
0.59
1.07
70.34

NOV
11.32
52.37
2.10
86.00
0.62
1.07
72.89

DIC
10.53
50.95
2.17
88.50
0.56
1.07
66.41

TOTAL

ABR

0.5
0.55

MAY
0.35
0.6
0.24
0.55
0.65

MESES
JUN
JUL
0.75
1.15
1.0
1.2
0.64
1.02
0.95
0.9
0.95
0.9

AGO
0.85
0.7
1.15
0.65
0.65

SET
0.55
0.4
0.65
0.35
0.35

OCT
0.35
0.35
0.35
0.36
0.37

1.02
1.1

0.55
0.55
1.15
1.1

0.95
0.95
0.65
1.1

0.65
0.65
0.35
1.1

0.35
0.35
0.75
1.1

0.24
0.24
0.95
1.1

NOV
0.73
0.73
0.35
0.72
0.76
0.37
0.36
0.64
0.9
1.1

DIC
1.05
1.05
0.75
1.15
0.85
0.76
0.72
1.02
0.65
1.1

719.53

E) DETERMINACION DEL COEFICIENTE DE CULTIVO (Kc):


CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Total
Kc ponderado

AREA
(Has)
11.0
5.0
6.0
12.0
8.0
12.0
4.0
4.0
4.0
5.0
71.0

ENE
1.15
1.15
1.15
1.05
0.95
0.85
1.15
1.15
0.35
1.1

FEB
0.82
0.82
0.85
0.65
0.65
0.95
1.05
0.65
0.24
1.1

MAR
0.35
0.35
0.55

0.65
0.65
0.35
0.64
1.1

0.2

0.9
0.9
0.35
1.1

1.01
0.79
0.56
1.06
1.12
1.10
1.10
1.10
1.10
0.45
0.57
0.93
1.01
0.79
0.56
1.06
1.12
1.10
1.10
1.10
1.10
0.45
0.63
0.93
E) DETERMINACION DE LA PRECIPITACION EFECTIVA PE EN LA ZONA DE RIEGO (mm):
Como se carece de datos de precipitacin, entonces tomamos una estacin de referencia, nuestro caso escogemos la estacin de Chiara
que se encuentra a la misma altitud que la zona de proyecto (3400 msnm)
ESTACION
CODIGO

: CHIARA
: 009

DISTRITO
: CHIARA
PROVINCIA
: HUAMANGA
DEPARTAMENTO : AYACUCHO

ALTITUD
LATITUD
LONGITUD

: 3400.0 msnm
: 1316'00"
: 7412'27"

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

1995
1996
1997

143.0
118.3
147.2

108.5
183.8
124.8

159.3
166.6
72.6

30.0
65.2
41.0

9.7
3.9
6.5

2.5
1.3
1.3

12.2
5.3
0.0

5.4
10.7
42.7

26.0
22.2
39.6

33.4
38.0
42.7

85.0
19.4
78.8

42.1
86.6
125.2

1998
1999

130.7
182.2

76.6
126.8

89.4
101.6

19.3
78.5

4.9
16.4

12.9
6.0

0.0
10.2

0.0
0.0

6.1
41.5

33.1
21.2

51.3
56.7

86.2
84.1

CULTIVO
ROTAC.
Papa
Avena forrajera
Arveja
Cebada
Cebada
0
Haba
Hortalizas
Cebada
Alfalfa

2000
2001

135.5
186.9

157.0
92.5

103.7
127.1

12.8
31.2

8.8
32.2

14.8
4.7

38.6
15.9

16.9
16.3

9.9
9.5

51.0
21.0

19.5
88.7

2002
2003
2004
2005
2006
MEDIA

MAX.
MIN.
DESV.
P50%
P75%
P90%
PE (mm)

95.6

93.8

100.0

23.1

24.1

4.2

28.2

19.1

60.6

71.3

111.8

74.6

27.5
56.3
133.1
139.0
124.6

160.8
65.7
74.9
109.7
119.0

163.7
80.9
119.1
164.8
116.5

50.7
22.3
42.5
0.0
37.4

15.1
10.5
13.5

0.0
8.4
0.0

0.7
26.2
6.1

32.3
20.8
16.7

16.4
27.4
33.3

15.6
33.7
106.9

36.2
54.0
37.1

102.9
162.6
125.9

13.2

5.6

13.7

16.4

25.9

36.1

60.1

89.6

186.89
27.50
46.18
134.30
112.61
60.23
81.82

183.80
65.70
37.37
109.10
88.54
75.07
84.99

166.60
72.60
34.89
111.41
97.38
81.75
110.99

78.50
0.00
22.26
30.62
21.55
13.44
20.35

32.16
3.90
8.55
10.50
7.67
4.90
0.00

14.76
0.00
5.04
4.22
1.30
0.00
0.00

38.62
0.00
12.94
10.20
3.00
0.00
0.00

42.70
0.00
12.90
16.70
8.05
0.00
2.30

60.63
6.10
16.46
26.00
13.14
9.49
13.09

DISTRIBUCION DE LA PE
Pp
%PE
5
0
30
95
55
90
80
82
105
65
130
45
155
25
>155
5

0.00
0.95
0.90
0.82
0.65
0.45
0.25
0.05

69.7
61.8

106.90 111.77 162.60


15.60 19.40 42.10
26.38 29.90 34.16
33.70 54.00 86.20
27.15 36.65 72.16
20.96 19.51 61.81
20.57 30.66 60.80

RIEGO POR GRAVEDAD


Eficiencias %
Conducc
0.75
Distribuc
0.75
Aplicac
0.62
Efic. Riego
0.35

RESUMEN

N de dias/mes
ETo (mm/da)
ETo (mm/mes)
P75%
(mm/mes)

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

31
2.34
72.44

28
1.99
55.61

31
1.69
52.51

30
1.35
40.52

31
1.33
41.24

30
1.21
36.35

31
1.95
60.53

31
2.37
73.62

30
2.57
77.08

31
2.27
70.34

30
2.43
72.89

31
2.14
66.41

112.61

88.54

97.38

21.55

7.67

1.30

3.00

8.05

13.14

27.15

36.65

72.16

Total
626.94
489.20
347.15
425.56

QUIERDA COMIT DE USUARIOS LOS

AREA
(Has)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0

AREA
(Has)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0

AREA
(Has)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.0
5.0

VI. FORMULACION DEL PROYECTO


I. ANALISIS DE LA OFERTA Y LA DEMANDA
1. Cdula de Cultivo

1.1 CEDULA DE CULTIVO AREA ATENDIDA


SITUACION SIN PROYECTO
Ha
CAMPAA PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
0
0
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL CAMPAA PRINCIPAL
CAMPAA DE ROTACION
Papa
Maiz Amilaceo
Arveja
Haba
Cebada
Avena
Hortalizas
TOTAL CAMPAA ROTACION

11.00
5.00
6.00
12.00
8.00
12.00
#REF!
#REF!
4.00
4.00
4.00
5.00
#REF!

0
0

0
0
0

PERMANENTE
Pasto Asociado

5.00

TOTAL AREA PERMANENTE

5.00

TOTAL AREA CULTIVADA

#REF!

AREA AGRICOLA TOTAL


AREA SIN USO
AREA FISICA CULTIVABLE
INTENSIDAD DE USO

630
#REF!
937.7
#REF!

IV. FORMULACION DEL PROYECTO


I. ANALISIS DE LA OFERTA Y LA DEMANDA
1. Cdula de Cultivo

1.2 CEDULA DE CULTIVO AREA ATENDIDA


SITUACION CON PROYECTO
Ha MEJORADAS Ha INCORPORADAS
CAMPAA PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
0
0
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL CAMPAA PRINCIPAL

16.00
20.00
16.00
15.00
16.00
16.00
#REF!
#REF!
18.00
18.00
16.00
22.00
#REF!

12
18
14
14
14
15
#REF!
#REF!
0
18
8
22
#REF!

28.00
38.00
30.00
29.00
30.00
31.00
#REF!
#REF!
18.00
36.00
24.00
22.00
#REF!

18
14
14
12
0
0
14

18
14
14
12
0
0
14

72

72

22.00

22.00

22

22

#REF!

#REF!

#REF!

CAMPAA CHICA DE ROTACIN


Papa
Arveja
Haba
Maiz Amilaceo
Cebada
Avena
Hortalizas
TOTAL CAMPAA ROTACION
PERMANENTE
Pasto asociado
TOTAL AREA PERMANENTE
TOTAL AREA CULTIVADA
AREA AGRICOLA TOTAL
AREA SIN USO
AREA FISICA CULTIVABLE
INTENSIDAD DE USO

TOTAL Ha

600
#REF!
600
#REF!

IV. FORMULACION DEL PROYECTO


I. ANALISIS DE LA OFERTA Y LA DEMANDA
2. Justificacin

JUSTIFICACION
AREA AFECTADA POR EL PROBLEMA
AREA ATENDIDA POR EL PROYECTO
HECTAREAS MEJORADAS
HECTAREAS INCORPORADAS
HECTAREAS MEJORADAS
DEMANDA DE AGUA PARA RIEGO TOTAL
OFERTA DE AGUA PARA RIEGO ACTUAL
DEFICIT DE DEMANDA DE AGUA PARA RIEGO
HECTAREAS INCORPORADAS
DEMANDA DE AGUA PARA RIEGO
OFERTA DE AGUA PARA RIEGO ACTUAL
DEFICIT DE DEMANDA DE AGUA PARA RIEGO
HECTAREAS TOTALES
DEMANDA DE AGUA PARA RIEGO TOTAL
OFERTA DE AGUA PARA RIEGO ACTUAL
DEFICIT DE AGUA PARA RIEGO TOTAL
DEMANDA TOTAL DE AGUA PARA RIEGO DEL PROYEC.

HECTAREAS

600
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
lps
#REF!
104.59
#REF!
lps
#REF!
0.00
#REF!
lps
#REF!
104.59
#REF!
#REF!

FORMULACION DE LA CEDULA Y CALENDARIO DE CULTIVO


A) FORMULACION DE LA CEDULA DE CULTIVO:
FACTORES:
Clima, Suelo, Cultivos, Disponibilidad de agua, Mercado.
Area de Cultivo (Has)
Cultivo
Campaa
Campaa Chica
Total
Grande
Cebada
8.0
6.0
14.0
Papa
10.0
10.0
20.0
Hortalizas
8.0
8.0
16.0
Arveja
8.0
8.0
16.0
Haba
8.0
8.0
16.0
Maiz
9.0
9.0
18.0
81.52
Trigo
8.0
0.0
8.0
Avena forrajera
10.0
10.0
20.0
Quinua
8.0
8.0
16.0
TIR
26.22%
Alfalfa
10.0
10.0
10.0
TOTAL
87.0
77.0
154.0
mr
46.93
B) CALENDARIO AGRICOLA:
PROYECTO DE RIEGO :
UBICACIN :
ALTITUD :
CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL

AREA
(Has)
8.0
10.0
8.0
8.0
8.0
9.0
8.0
10.0
8.0
10.0
87.0

SAC
HUAY

AREAS
58.62
82.47

MR
82.28

AREAS
173.0

0.0

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES D
HUASCAHURA
3350 m.s.n.m.

ENE
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

FEB
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

MAR
CG
CG
CG

CG
CG
CG
CG
CG

CALENDARIO AGRCOLA CON PROYECTO


ABR
MAY
JUN
JUL
AGO
SET
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CG
CG
CH
CH
CH
CH
CG
CG
CG
CG
CG
CG

OCT
CG
CG
CH
CG
CG
CH
CH
CH
CG

NOV
CG
CG
CG
CG
CG
CG
CG
CG
CH
CG

DIC
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

CULTIVO
ROTAC.
Arveja
Maiz
Arveja
Cebada
Hortalizas
Avena forra
Quinua
Papa
Haba
Alfalfa
TOTAL

AREA
(Has)
4.0
9.0
4.0
6.0
8.0
10.0
8.0
10.0
8.0
10.0
77.0

(*) CH : Campaa Grande, CG, campaa grande


C) AREA DE CULTIVO:
CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL

AREA
(Has)
8.0
10
8
8
8
9
8
10
8
10
87.0

ENE
8
10
8
8
8
9
8
10
8
10
87.0

FEB
8
10
8
8
8
9
8
10
8
10
87.0

MAR
8
10
8

ABR
9
6
8
10
10
10
8
10
71.0

9
8
10
8
10
71.0

MAY
4
9
4
6
8
10
8
10
8
10
77.0

JUN
4
9
4
6
8
10
8
10
8
10
77.0

MESES
JUL
4
9
4
6
8
10
8
10
8
10
77.0

AGO
4
9
4
6
8
10
8
10
8
10
77.0

SET
4
9
4
6
8
10
8
10
8
10
77.0

OCT
8
10
4
8
8
8
10
8
10
74.0

D) CALCULO DE LA EVAPOTRANSPIRACION POTENCIAL (ETo): METODO DE HARGREAVES

ETo MF * TMF * CH * CE
Donde:

Eto = ETP = Evapotranspiracin potencial (mm/mes)


MF = Factor mensual de latitud, se obtiene de un cuadro
TMF = Temperatura media mensual (F):
CH = Factor de correccin para la humedad relativa
CE = Factor de correccin para la altura o elevacin del lugar.
1

CH =0 . 166( 100 HR ) 2
Donde: HR = Humedad relativa media mensual (%)
La frmula anterior se emplea para valores de HR mayores de 64%. Para HR < 64%, CH = 1

CE 1.0 0.04 *
Donde:

E
2000

E = Altitud o Elevacin del lugar (m.s.n.m)

9
TMF * T (C ) 32
5
Donde:

T(C) = Temperatura media en grados celsius

NOV
8
10
8
8
8
9
8
10
8
10
87.0

DIC
8
10
8
8
8
9
8
10
8
10
87.0

CULTIVO
ROTAC.
Arveja
Maiz
Arveja
Cebada
Hortalizas
Avena forra
Quinua
Papa
Haba
Alfalfa

AREA
(Has)
4
9
4
6
8
10
8
10
8
10
77.0

PARAMETRO
TMM (C)
TMF
MF
HR
CH
CE
ETo (mm/mes)

ENE
10.61
51.09
2.67
91.00
0.50
1.07
72.44

FEB
10.74
51.34
2.31
93.00
0.44
1.07
55.61

MAR
10.93
51.67
2.34
94.00
0.41
1.07
52.51

ABR
11.10
51.98
1.97
95.00
0.37
1.07
40.52

MAY
10.21
50.37
1.75
93.00
0.44
1.07
41.24

JUN
10.00
50.00
1.55
93.00
0.44
1.07
36.35

JUL
9.13
48.43
1.76
82.00
0.70
1.07
64.17

AGO
10.00
50.01
2.12
81.00
0.72
1.07
81.85

SET
11.05
51.89
2.13
84.50
0.65
1.07
77.08

OCT
11.38
52.49
2.14
87.50
0.59
1.07
70.34

NOV
11.32
52.37
2.10
86.00
0.62
1.07
72.89

DIC
10.53
50.95
2.17
88.50
0.56
1.07
66.41

TOTAL

MAY
0.35
0.64
0.24
0.55
0.65
0.64
0.55
0.55
1.15
1.05

JUN
0.75
1.05
0.64
0.95
0.95
1.02
0.95
1.02
0.65
1.05

MESES
JUL
1.15
1.15
1.02
0.90
0.90
1.15
0.90
1.05
0.35
1.05

AGO
0.85
0.65
1.15
0.65
0.65
0.65
0.65
1.05
0.35
1.05

SET
0.55
0.35
0.65
0.35
0.35
0.35
0.35
1.02
0.75
1.05

OCT
0.35
0.35
0.35
0.36
0.37

NOV
0.73
0.73
0.35
0.72
0.76
0.37
0.36
0.64
0.90
1.05

DIC
1.05
1.05
0.75
1.15
0.85
0.76
0.72
1.02
0.65
1.05

731.40

E) DETERMINACION DEL COEFICIENTE DE CULTIVO (Kc):


CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Total
Kc ponderado

AREA
(Has)
8.0
10.0
8.0
8.0
8.0
9.0
8.0
10.0
8.0
10.0
87.0

ENE
1.15
1.15
1.15
1.05
0.95
0.85
1.15
1.15
0.35
1.05

FEB
0.82
0.82
0.85
0.65
0.65
0.95
1.05
0.65
0.24
1.05

MAR
0.35
0.35
0.55

0.65
0.65
0.35
0.64
1.05

ABR
0.35
0.50
0.55
0.24

1.02
1.05

0.24
0.66
0.95
1.05

1.01
0.78
0.58
0.44
0.68
0.92
0.85
0.68
0.59
0.54
0.60
0.91
1.01
0.78
0.58
0.44
0.68
0.92
0.95
0.75
0.59
0.54
0.67
0.91
E) DETERMINACION DE LA PRECIPITACION EFECTIVA PE EN LA ZONA DE RIEGO (mm):
Como se carece de datos de precipitacin, entonces tomamos una estacin de referencia, nuestro caso escogemos la estacin de Chiara
que se encuentra a la misma altitud que la zona de proyecto (3400 msnm)
ESTACION
CODIGO

: CHIARA
: 009

DISTRITO
: CHIARA
PROVINCIA
: HUAMANGA
DEPARTAMENTO : AYACUCHO

ALTITUD
LATITUD
LONGITUD

: 3400.0 msnm
: 1316'00"
: 7412'27"

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

1995
1996
1997

143.0
118.3
147.2

108.5
183.8
124.8

159.3
166.6
72.6

30.0
65.2
41.0

9.7
3.9
6.5

2.5
1.3
1.3

12.2
5.3
0.0

5.4
10.7
42.7

26.0
22.2
39.6

33.4
38.0
42.7

85.0
19.4
78.8

42.1
86.6
125.2

1998
1999

130.7
182.2

76.6
126.8

89.4
101.6

19.3
78.5

4.9
16.4

12.9
6.0

0.0
10.2

0.0
0.0

6.1
41.5

33.1
21.2

51.3
56.7

86.2
84.1

CULTIVO
ROTAC.
Arveja
Maiz
Arveja
Cebada
Hortalizas
Avena forra
Quinua
Papa
Haba
Alfalfa

AREA
(Has)
4.0
9.0
4.0
6.0
8.0
10.0
8.0
10.0
8.0
10.0
77.0

2000
2001

135.5
186.9

157.0
92.5

103.7
127.1

12.8
31.2

8.8
32.2

14.8
4.7

38.6
15.9

16.9
16.3

9.9
9.5

51.0
21.0

19.5
88.7

2002
2003
2004
2005
2006

PROM.
MAX.
MIN.
DESV.
P50%
P75%
P90%
PE (mm)

124.60
186.89
27.50
46.18
134.30
112.61
60.23
81.82

95.6

93.8

100.0

23.1

24.1

4.2

28.2

19.1

60.6

71.3

111.8

74.6

27.5
56.3
133.1
139.0

160.8
65.7
74.9
109.7

163.7
80.9
119.1
164.8

50.7
22.3
42.5
0.0

15.1
10.5
13.5

0.0
8.4
0.0

0.7
26.2
6.1

32.3
20.8
16.7

16.4
27.4
33.3

15.6
33.7
106.9

36.2
54.0
37.1

102.9
162.6
125.9

34.72
78.50
0.00
22.26
30.62
21.55
13.44
20.35

13.24
32.16
3.90
8.55
10.50
7.67
4.90
0.00

5.10
14.76
0.00
5.04
4.22
1.30
0.00
0.00

13.04
38.62
0.00
12.94
10.20
3.00
0.00
0.00

16.45
42.70
0.00
12.90
16.70
8.05
0.00
2.30

26.59
60.63
6.10
16.46
26.00
13.14
9.49
13.09

114.58 120.73
183.80 166.60
65.70
72.60
37.37
34.89
109.10 111.41
88.54
97.38
75.07
81.75
84.99 110.99

DISTRIBUCION DE LA PE
Pp
%PE
5
0
0.00
30
95
0.95
55
90
0.90
80
82
0.82
105
65
0.65
130
45
0.45
155
25
0.25
>155
5
0.05

69.7
61.8

42.53 58.04 92.88


106.90 111.77 162.60
15.60 19.40 42.10
26.38 29.90 34.16
33.70 54.00 86.20
27.15 36.65 72.16
20.96 19.51 61.81
20.57 30.66 60.80

RIEGO POR GRAVEDAD


Eficiencias %
Conducc
0.98
Distribuc
0.9
Aplicac
0.69
Efic. Riego
0.61

RESUMEN

N de dias/mes
ETo (mm/da)
ETo (mm/mes)
P75%
(mm/mes)

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

31
2.34
72.44

28
1.99
55.61

31
1.69
52.51

30
1.35
40.52

31
1.33
41.24

30
1.21
36.35

31
2.07
64.17

31
2.64
81.85

30
2.57
77.08

31
2.27
70.34

30
2.43
72.89

31
2.14
66.41

112.61

88.54

97.38

21.55

7.67

1.30

3.00

8.05

13.14

27.15

36.65

72.16

Total
626.94
489.20
347.15
425.56

135.0

COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO

FORMULACION DE LA CEDULA Y CALENDARIO DE CULTIVO


A) FORMULACION DE LA CEDULA DE CULTIVO:
FACTORES:
Clima, Suelo, Cultivos, Disponibilidad de agua, Mercado.
Area de Cultivo (Has)
Cultivo
Campaa
Campaa Chica
Total
Grande
Cebada
8.0
6.0
14.0
Papa
10.0
8.0
18.0
Hortalizas
8.0
6.0
14.0
Arveja
7.0
6.0
13.0
Haba
8.0
6.0
14.0
Maiz
7.0
6.0
13.0
Trigo
10.0
0.0
10.0
Avena forrajera
8.0
8.0
16.0
Quinua
8.0
0.0
8.0
TIR
26.22%
Alfalfa
12.0
12.0
12.0
TOTAL
86.0
58.0
132.0
mr
35.36
B) CALENDARIO AGRICOLA:
PROYECTO DE RIEGO :
UBICACIN :
ALTITUD :
CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL

AREA
(Has)
8.0
10.0
8.0
7.0
8.0
7.0
10.0
8.0
8.0
12.0
86.0

SAC
HUAY

58.62 HAS
82.47 HAS

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES D
HUASCAHURA
3350 m.s.n.m.

ENE
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

FEB
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

MAR
CG
CG
CG

CG
CG
CG
CG
CG

CALENDARIO AGRCOLA CON PROYECTO


ABR
MAY
JUN
JUL
AGO
SET
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CG
CG
CH
CH
CH
CH
CG
CG
CG
CG
CG
CG

OCT
CG
CG
CH
CG
CG
CH
CH
CH
CG

NOV
CG
CG
CG
CG
CG
CG
CG
CG
CH
CG

DIC
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

CULTIVO
ROTAC.
Arveja
Maiz
Arveja
Cebada
Hortalizas
Avena forra
Arveja
Papa
Haba
Alfalfa
TOTAL

AREA
(Has)
2.0
6.0
2.0
6.0
6.0
8.0
2.0
8.0
6.0
12.0
58.0

(*) CH : Campaa Grande, CG, campaa grande


C) AREA DE CULTIVO:
CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL

AREA
(Has)
8.0
10
8
7
8
7
10
8
8
12
86.0

ENE
8
10
8
7
8
7
10
8
8
12
86.0

FEB
8
10
8
7
8
7
10
8
8
12
86.0

MAR
8
10
8

ABR
6
6
6
8
8
8
8
12
62.0

7
10
8
8
12
71.0

MAY
2
6
2
6
6
8
2
8
8
12
60.0

JUN
2
6
2
6
6
8
2
8
6
12
58.0

MESES
JUL
2
6
2
6
6
8
2
8
6
12
58.0

AGO
2
6
2
6
6
8
2
8
6
12
58.0

SET
2
6
2
6
6
8
2
8
6
12
58.0

OCT
8
10
2
7
8
2
8
6
12
63.0

D) CALCULO DE LA EVAPOTRANSPIRACION POTENCIAL (ETo): METODO DE HARGREAVES

ETo MF * TMF * CH * CE
Donde:

Eto = ETP = Evapotranspiracin potencial (mm/mes)


MF = Factor mensual de latitud, se obtiene de un cuadro
TMF = Temperatura media mensual (F):
CH = Factor de correccin para la humedad relativa
CE = Factor de correccin para la altura o elevacin del lugar.
1

CH =0 . 166( 100 HR ) 2
Donde: HR = Humedad relativa media mensual (%)
La frmula anterior se emplea para valores de HR mayores de 64%. Para HR < 64%, CH = 1

CE 1.0 0.04 *
Donde:

E
2000

E = Altitud o Elevacin del lugar (m.s.n.m)

9
TMF * T (C ) 32
5
Donde:

T(C) = Temperatura media en grados celsius

NOV
8
10
8
7
8
7
10
8
6
12
84.0

DIC
8
10
8
7
8
7
10
8
8
12
86.0

CULTIVO
ROTAC.
Arveja
Maiz
Arveja
Cebada
Hortalizas
Avena forra
Arveja
Papa
Haba
Alfalfa

AREA
(Has)
2
6
2
6
6
8
2
8
6
12
58.0

PARAMETRO
TMM (C)
TMF
MF
HR
CH
CE
ETo (mm/mes)

ENE
10.61
51.09
2.67
91.00
0.50
1.07
72.44

FEB
10.74
51.34
2.31
93.00
0.44
1.07
55.61

MAR
10.93
51.67
2.34
94.00
0.41
1.07
52.51

ABR
11.10
51.98
1.97
95.00
0.37
1.07
40.52

MAY
10.21
50.37
1.75
93.00
0.44
1.07
41.24

JUN
10.00
50.00
1.55
93.00
0.44
1.07
36.35

JUL
9.13
48.43
1.76
82.00
0.70
1.07
64.17

AGO
10.00
50.01
2.12
81.00
0.72
1.07
81.85

SET
11.05
51.89
2.13
84.50
0.65
1.07
77.08

OCT
11.38
52.49
2.14
87.50
0.59
1.07
70.34

NOV
11.32
52.37
2.10
86.00
0.62
1.07
72.89

DIC
10.53
50.95
2.17
88.50
0.56
1.07
66.41

TOTAL

MAY
0.35
0.64
0.24
0.55
0.65
0.64
0.55
0.55
1.15
1.05

JUN
0.75
1.05
0.64
0.95
0.95
1.02
0.95
1.02
0.65
1.05

MESES
JUL
1.15
1.15
1.02
0.90
0.90
1.15
0.90
1.05
0.35
1.05

AGO
0.85
0.65
1.15
0.65
0.65
0.65
0.65
1.05
0.35
1.05

SET
0.55
0.35
0.65
0.35
0.35
0.35
0.35
1.02
0.75
1.05

OCT
0.35
0.35
0.35
0.36
0.37

NOV
0.73
0.73
0.35
0.72
0.76
0.37
0.36
0.64
0.90
1.05

DIC
1.05
1.05
0.75
1.15
0.85
0.76
0.72
1.02
0.65
1.05

731.40

E) DETERMINACION DEL COEFICIENTE DE CULTIVO (Kc):


CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Total
Kc ponderado

AREA
(Has)
8.0
10.0
8.0
7.0
8.0
7.0
10.0
8.0
8.0
12.0
86.0

ENE
1.15
1.15
1.15
1.05
0.95
0.85
1.15
1.15
0.35
1.05

FEB
0.82
0.82
0.85
0.65
0.65
0.95
1.05
0.65
0.24
1.05

MAR
0.35
0.35
0.55

0.65
0.65
0.35
0.64
1.05

ABR
0.35
0.50
0.55
0.24

1.02
1.05

0.24
0.66
0.95
1.05

1.01
0.79
0.60
0.50
0.73
0.93
0.85
0.69
0.64
0.58
0.60
0.91
1.01
0.79
0.60
0.50
0.73
0.93
0.95
0.77
0.64
0.58
0.67
0.91
E) DETERMINACION DE LA PRECIPITACION EFECTIVA PE EN LA ZONA DE RIEGO (mm):
Como se carece de datos de precipitacin, entonces tomamos una estacin de referencia, nuestro caso escogemos la estacin de Chiara
que se encuentra a la misma altitud que la zona de proyecto (3400 msnm)
ESTACION
CODIGO

: CHIARA
: 009

DISTRITO
: CHIARA
PROVINCIA
: HUAMANGA
DEPARTAMENTO : AYACUCHO

ALTITUD
LATITUD
LONGITUD

: 3400.0 msnm
: 1316'00"
: 7412'27"

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

1995
1996
1997

143.0
118.3
147.2

108.5
183.8
124.8

159.3
166.6
72.6

30.0
65.2
41.0

9.7
3.9
6.5

2.5
1.3
1.3

12.2
5.3
0.0

5.4
10.7
42.7

26.0
22.2
39.6

33.4
38.0
42.7

85.0
19.4
78.8

42.1
86.6
125.2

1998
1999

130.7
182.2

76.6
126.8

89.4
101.6

19.3
78.5

4.9
16.4

12.9
6.0

0.0
10.2

0.0
0.0

6.1
41.5

33.1
21.2

51.3
56.7

86.2
84.1

CULTIVO
ROTAC.
Arveja
Maiz
Arveja
Cebada
Hortalizas
Avena forra
Arveja
Papa
Haba
Alfalfa

AREA
(Has)
2.0
6.0
2.0
6.0
6.0
8.0
2.0
8.0
6.0
12.0
58.0

2000
2001

135.5
186.9

157.0
92.5

103.7
127.1

12.8
31.2

8.8
32.2

14.8
4.7

38.6
15.9

16.9
16.3

9.9
9.5

51.0
21.0

19.5
88.7

2002
2003
2004
2005
2006

PROM.
MAX.
MIN.
DESV.
P50%
P75%
P90%
PE (mm)

124.60
186.89
27.50
46.18
134.30
112.61
60.23
81.82

95.6

93.8

100.0

23.1

24.1

4.2

28.2

19.1

60.6

71.3

111.8

74.6

27.5
56.3
133.1
139.0

160.8
65.7
74.9
109.7

163.7
80.9
119.1
164.8

50.7
22.3
42.5
0.0

15.1
10.5
13.5

0.0
8.4
0.0

0.7
26.2
6.1

32.3
20.8
16.7

16.4
27.4
33.3

15.6
33.7
106.9

36.2
54.0
37.1

102.9
162.6
125.9

34.72
78.50
0.00
22.26
30.62
21.55
13.44
20.35

13.24
32.16
3.90
8.55
10.50
7.67
4.90
0.00

5.10
14.76
0.00
5.04
4.22
1.30
0.00
0.00

13.04
38.62
0.00
12.94
10.20
3.00
0.00
0.00

16.45
42.70
0.00
12.90
16.70
8.05
0.00
2.30

26.59
60.63
6.10
16.46
26.00
13.14
9.49
13.09

114.58 120.73
183.80 166.60
65.70
72.60
37.37
34.89
109.10 111.41
88.54
97.38
75.07
81.75
84.99 110.99

DISTRIBUCION DE LA PE
Pp
%PE
5
0
0.00
30
95
0.95
55
90
0.90
80
82
0.82
105
65
0.65
130
45
0.45
155
25
0.25
>155
5
0.05

69.7
61.8

42.53 58.04 92.88


106.90 111.77 162.60
15.60 19.40 42.10
26.38 29.90 34.16
33.70 54.00 86.20
27.15 36.65 72.16
20.96 19.51 61.81
20.57 30.66 60.80

RIEGO POR GRAVEDAD


Eficiencias %
Conducc
0.98
Distribuc
0.9
Aplicac
0.69
Efic. Riego
0.61

RESUMEN

N de dias/mes
ETo (mm/da)
ETo (mm/mes)
P75%
(mm/mes)

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

31
2.34
72.44

28
1.99
55.61

31
1.69
52.51

30
1.35
40.52

31
1.33
41.24

30
1.21
36.35

31
2.07
64.17

31
2.64
81.85

30
2.57
77.08

31
2.27
70.34

30
2.43
72.89

31
2.14
66.41

112.61

88.54

97.38

21.55

7.67

1.30

3.00

8.05

13.14

27.15

36.65

72.16

Total
626.94
489.20
347.15
425.56

COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO

FORMULACION DE LA CEDULA Y CALENDARIO DE CULTIVO


A) FORMULACION DE LA CEDULA DE CULTIVO:
FACTORES:
Clima, Suelo, Cultivos, Disponibilidad de agua, Mercado.
Area de Cultivo (Has)
Cultivo
Campaa
Campaa Chica
Total
Grande
Cebada
16.0
12.0
28.0
Papa
Hortalizas
Arveja
Haba

20.0
16.0
15.0
16.0

18.0
14.0
14.0
14.0

38.0
30.0
29.0
30.0

Maiz
Trigo
Avena forrajera

16.0
18.0
18.0

15.0
0.0
18.0

31.0
18.0
36.0

Quinua
Alfalfa
TOTAL

16.0
22.0
173.0

8.0
22.0

24.0
22.0
286.0

B) CALENDARIO AGRICOLA:
PROYECTO DE RIEGO :
UBICACIN :
CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL

AREA
(Has)
16.0
20.0
16.0
15.0
16.0
16.0
18.0
18.0
16.0
22.0
173.0

135.0

TIR

mr

26.22%

82.28

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS
LIBERTADORES
HUASCAHURADE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO

ENE
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

FEB
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

MAR
CG
CG
CG

CG
CG
CG
CG
CG

ABR
CH
CH
CH
CH

CG
CG

CALENDARIO AGRCOLA CON PROYECTO


MAY
JUN
JUL
AGO
SET
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CH
CG
CH
CH
CH
CH
CG
CG
CG
CG
CG

OCT
CG
CG
CH
CG
CG
CH
CH
CH
CG

NOV
CG
CG
CG
CG
CG
CG
CG
CG
CH
CG

DIC
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG

CULTIVO
ROTAC.
Arveja
Maiz
Arveja
Cebada
Hortalizas
Avena forrajera
Quinua
Papa
Haba
Alfalfa
TOTAL

(*) CH : Campaa Grande, CG, campaa grande


C) AREA DE CULTIVO:
CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL

AREA
(Has)
16
20
16
15
16
16
18
18
16
22
173.0

ENE
16
20
16
15
16
16
18
18
16
22
173.0

FEB
16
20
16
15
16
16
18
18
16
22
173.0

MAR
16
20
16

ABR
15
12
14
18
18
18
16
22
133.0

16
18
18
16
22
142.0

MAY
7
15
7
12
14
18
8
18
16
22
137.0

MESES
JUN
JUL
7
7
15
15
7
7
12
12
14
14
18
18
8
8
18
18
14
14
22
22
135.0
135.0

AGO
7
15
7
12
14
18
8
18
14
22
135.0

SET
7
15
7
12
14
18
8
18
14
22
135.0

D) CALCULO DE LA EVAPOTRANSPIRACION POTENCIAL (ETo): METODO DE HARGREAVES

ETo MF * TMF * CH * CE
Donde:

Eto = ETP = Evapotranspiracin potencial (mm/mes)


MF = Factor mensual de latitud, se obtiene de un cuadro
TMF = Temperatura media mensual (F):
CH = Factor de correccin para la humedad relativa
CE = Factor de correccin para la altura o elevacin del lugar.
1

CH =0 . 166( 100 HR ) 2
Donde: HR = Humedad relativa media mensual (%)
La frmula anterior se emplea para valores de HR mayores de 64%. Para HR < 64%, CH = 1

CE 1.0 0.04 *

E
2000

Donde: E = Altitud o Elevacin del lugar (m.s.n.m)

9
TMF * T (C ) 32
5
Donde: T(C) = Temperatura media en grados celsius

OCT
16
20
7
15
16
8
18
14
22
136.0

NOV
16
20
16
15
16
16
18
18
14
22
171.0

DIC
16
20
16
15
16
16
18
18
16
22
173.0

CULTIVO
ROTAC.
Arveja
Maiz
Arveja
Cebada
Hortalizas
Avena forrajera
Quinua
Papa
Haba
Alfalfa

PARAMETRO
TMM (C)
TMF
MF
HR
CH
CE

AGO
10.00
50.01
2.12
81.00
0.72
1.07
81.85

SET
11.05
51.89
2.13
84.50
0.65
1.07
77.08

OCT
11.38
52.49
2.14
87.50
0.59
1.07
70.34

NOV
11.32
52.37
2.10
86.00
0.62
1.07
72.89

DIC
10.53
50.95
2.17
88.50
0.56
1.07
66.41

TOTAL

MESES
JUL
1.15
1.15
1.02
0.90
0.90
1.15
0.90
1.05
0.35
1.05

AGO
0.85
0.65
1.15
0.65
0.65
0.65
0.65
1.05
0.35
1.05

SET
0.55
0.35
0.65
0.35
0.35
0.35
0.35
1.02
0.75
1.05

OCT
0.35
0.35
0.35
0.36
0.37

NOV
0.73
0.73
0.35
0.72
0.76
0.37
0.36
0.64
0.90
1.05

DIC
1.05
1.05
0.75
1.15
0.85
0.76
0.72
1.02
0.65
1.05

1.01
0.79
0.59
0.47
0.70
0.92
0.86
0.69
0.62
0.56
0.60
1.01
0.79
0.59
0.47
0.70
0.92
0.95
0.76
0.62
0.56
0.67
E) DETERMINACION DE LA PRECIPITACION EFECTIVA PE EN LA ZONA DE RIEGO (mm):
Como se carece de datos de precipitacin, entonces tomamos una estacin de referencia, nuestro caso escogemos la estacin de Chiara
que se encuentra a la misma altitud que la zona de proyecto (3400 msnm)

0.91
0.91

ETo (mm/mes)

ENE
10.61
51.09
2.67
91.00
0.50
1.07
72.44

FEB
10.74
51.34
2.31
93.00
0.44
1.07
55.61

MAR
10.93
51.67
2.34
94.00
0.41
1.07
52.51

ABR
11.10
51.98
1.97
95.00
0.37
1.07
40.52

MAY
10.21
50.37
1.75
93.00
0.44
1.07
41.24

JUN
10.00
50.00
1.55
93.00
0.44
1.07
36.35

JUL
9.13
48.43
1.76
82.00
0.70
1.07
64.17

ABR

MAY
0.35
0.64
0.24
0.55
0.65
0.64
0.55
0.55
1.15
1.05

JUN
0.75
1.05
0.64
0.95
0.95
1.02
0.95
1.02
0.65
1.05

731.40

E) DETERMINACION DEL COEFICIENTE DE CULTIVO (Kc):


CULTIVO
PRINCIPAL
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Total
Kc ponderado

AREA
(Has)
16.0
20.0
16.0
15.0
16.0
16.0
18.0
18.0
16.0
22.0
173.0

ESTACION
CODIGO

ENE
1.15
1.15
1.15
1.05
0.95
0.85
1.15
1.15
0.35
1.05

FEB
0.82
0.82
0.85
0.65
0.65
0.95
1.05
0.65
0.24
1.05

: CHIARA
: 009

MAR
0.35
0.35
0.55

0.65
0.65
0.35
0.64
1.05

0.35
0.50
0.55
0.24

1.02
1.05

DISTRITO
PROVINCIA
DEPARTAMENTO

: CHIARA
: HUAMANGA
: AYACUCHO

ALTITUD
LATITUD
LONGITUD

0.24
0.66
0.95
1.05

: 3400.0 msnm
: 1316'00"
: 7412'27"

AO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

1995
1996
1997

143.0
118.3
147.2

108.5
183.8
124.8

159.3
166.6
72.6

30.0
65.2
41.0

9.7
3.9
6.5

2.5
1.3
1.3

12.2
5.3
0.0

5.4
10.7
42.7

26.0
22.2
39.6

33.4
38.0
42.7

85.0
19.4
78.8

42.1
86.6
125.2

1998
1999

130.7
182.2

76.6
126.8

89.4
101.6

19.3
78.5

4.9
16.4

12.9
6.0

0.0
10.2

0.0
0.0

6.1
41.5

33.1
21.2

51.3
56.7

86.2
84.1

CULTIVO
ROTAC.
Arveja
Maiz
Arveja
Cebada
Hortalizas
Avena forrajera
Quinua
Papa
Haba
Alfalfa

2000
2001

135.5
186.9

2002
2003
2004
2005
2006

PROM.
MAX.
MIN.
DESV.
P50%
P75%
P90%
PE (mm)

157.0
92.5

103.7
127.1

12.8
31.2

8.8
32.2

14.8
4.7

38.6
15.9

16.9
16.3

9.9
9.5

51.0
21.0

19.5
88.7

95.6

93.8

100.0

23.1

24.1

4.2

28.2

19.1

60.6

71.3

111.8

74.6

27.5
56.3
133.1
139.0

160.8
65.7
74.9
109.7

163.7
80.9
119.1
164.8

50.7
22.3
42.5
0.0

15.1
10.5
13.5

0.0
8.4
0.0

0.7
26.2
6.1

32.3
20.8
16.7

16.4
27.4
33.3

15.6
33.7
106.9

36.2
54.0
37.1

102.9
162.6
125.9

34.72
78.50
0.00
22.26
30.62
21.55
13.44
20.35

13.24
32.16
3.90
8.55
10.50
7.67
4.90
0.00

5.10
14.76
0.00
5.04
4.22
1.30
0.00
0.00

13.04
38.62
0.00
12.94
10.20
3.00
0.00
0.00

16.45
42.70
0.00
12.90
16.70
8.05
0.00
2.30

26.59
60.63
6.10
16.46
26.00
13.14
9.49
13.09

124.60 114.58 120.73


186.89 183.80 166.60
27.50 65.70 72.60
46.18 37.37 34.89
134.30 109.10 111.41
112.61 88.54 97.38
60.23 75.07 81.75
81.82 84.99 110.99
DISTRIBUCION DE LA PE
Pp
%PE
5
0
0.00
30
95
0.95
55
90
0.90
80
82
0.82
105
65
0.65
130
45
0.45
155
25
0.25
>155
5
0.05

69.7
61.8

42.53 58.04 92.88


106.90 111.77 162.60
15.60 19.40 42.10
26.38 29.90 34.16
33.70 54.00 86.20
27.15 36.65 72.16
20.96 19.51 61.81
20.57 30.66 60.80

RIEGO POR GRAVEDAD


Eficiencias %
Conducc
0.98
Distribuc
0.9
Aplicac
0.69
Efic. Riego
0.61

RESUMEN

N de dias/mes
ETo (mm/da)
ETo (mm/mes)
P75%
(mm/mes)

Ene

Feb

Mar

Abr

May

Jun

Jul

Ago

Sep

Oct

Nov

Dic

31
2.34
72.44

28
1.99
55.61

31
1.69
52.51

30
1.35
40.52

31
1.33
41.24

30
1.21
36.35

31
2.07
64.17

31
2.64
81.85

30
2.57
77.08

31
2.27
70.34

30
2.43
72.89

31
2.14
66.41

112.61

88.54

97.38

21.55

7.67

1.30

3.00

8.05

13.14

27.15

36.65

72.16

Total
626.94
489.20
347.15
425.56

MIT DE USUARIOS LOS

AREA
(Has)
7.0
15.0
7.0
12.0
14.0
18.0
8.0
18.0
14.0
22.0
135.0

AREA
(Has)
7.0
15.0
7.0
12.0
14.0
18.0
8.0
18.0
14.0
22.0
135.0

AREA
(Has)
7.0
15.0
7.0
12.0
14.0
18.0
8.0
18.0
14.0
22.0
135.0

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE PAPA BAJO RIEGO
Cultivo

: Papa

Fertilizacin N-P-K

: 90 - 90 - 00

Variedades

: Canchn, Revolcin

Area

: 1 ha

Fecha de siembra

: Abril - Mayo

Tecnologa

: Baja

Fecha de cosecha

: Setiembre - Octubre

Tipo de siembra

: Surcos

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riegos
Segundo abonamiento y 1er. aporque
Raleo y deshaije
Segundo aporque
Control fitosanitario
COSECHA:
Desaporque
Clasificacin
Carguo
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta

3
4
4

25.00
25.00
25.00

75.00
100.00
100.00

jornal
jornal
yunta
yunta

2
4
6
4

25.00
25.00
25.00
25.00

50.00
100.00
150.00
100.00

jornal
jornal
jornal
jornal
jornal

2
15
0
12
3

25.00
25.00
25.00
25.00
25.00

50.00
375.00
0.00
300.00
75.00

jornal
jornal
jornal

10
10
2

25.00
25.00
25.00

250.00
250.00
50.00

kg
sacos
sacos
sacos
sacos
kg

2000
2
8
0
10
1000

0.80
65.00
95.00
85.00
12.00
0.20

1,600.00
130.00
760.00
0.00
120.00
200.00

kg
kg
ltr
ltr

4
4
1
4

60.00
80.00
20.00
30.00

240.00
320.00
20.00
120.00

TOTAL
S/.
275.00

400.00

800.00

550.00

2,810.00

700.00

5,535.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

0.00

TOTAL COSTO / HA

5,535.00

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

1,925.00
100.00
3,510.00
0.00
5,535.00

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

15,980
0.41
6,615.72
5,535.00
1,080.72
19.53
1.20

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE PAPA BAJO RIEGO
Cultivo

: Papa

Fertilizacin N-P-K

: 90 - 90 - 00

Variedades

: Canchn, Revolcin

Area

: 1 ha

Fecha de siembra

: Abril - Mayo

Tecnologa

: Baja

Fecha de cosecha

: Setiembre - Octubre

Tipo de siembra

: Surcos

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE CEBADA GRANO SECO
Cultivo

: Grano Seco

Fertilizacin N-P-K

:0-0-0

Variedades

: Ecotipo local

Area

: 1 ha

Fecha de siembra

: Octubre - Noviembre

Tecnologa

: Baja

Fecha de cosecha

: Marzo - Abril

Tipo de siembra

: Voleo

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riegos
1er. aporque
Raleo y deshaije
Segundo aporque
Control fitosanitario
COSECHA:
Siega
Despanque
Carguo
Tendal
Desgrane
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

1
0
4
0

25.00
25.00
25.00
25.00

25.00
0.00
100.00
0.00

jornal
jornal
yunta
yunta

1
0
4
2

25.00
25.00
25.00
25.00

25.00
0.00
100.00
50.00

jornal
jornal
jornal
jornal
jornal

0
6
2
6
0

25.00
25.00
25.00
25.00
25.00

0.00
150.00
50.00
150.00
0.00

jornal
jornal
jornal
jornal
jornal

8
8
5
2
5

25.00
25.00
25.00
25.00
25.00

200.00
200.00
125.00
50.00
125.00

kg
sacos
sacos
sacos
sacos
kg

500
0
0
0
10
300

0.80
65.00
95.00
85.00
10.00
0.20

400.00
0.00
0.00
0.00
100.00
60.00

kg
kg
ltr
ltr

0
0
0
0

60.00
80.00
20.00
30.00

0.00
0.00
0.00
0.00

TOTAL
S/.
125.00

175.00

350.00

700.00

560.00

0.00

1,910.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

0.00

TOTAL COSTO / HA

1,910.00

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

1,250.00
100.00
560.00
0.00
1,910.00

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

920
0.49
452.64
1,910.00
-1,457.36
-76.30
0.24

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE MAIZ
Cultivo

Maiz

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

Maiz

Area

: 1 ha

Tipo de siembra

: Cola de buey

Tecnologa

: Baja

Fecha de siembra

: Octubre - Noviembre

Fecha de cosecha

: Febrero - Marzo

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riego
Deshierbo
Raleo y deshaije
aporque
Control fitosanitario
COSECHA:
Primera Cosecha
Segunda Cosecha
Tercera Cosecha
Clasificacin
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Envases (costales de malla)
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID
MED

CANTIDAD

PRECIO UNIT. SUB TOTAL


S/.
S/.

jornal
jornal
Yunta
jornal

0
0
2
0

25.00
25.00
25.00
25.00

0.00
0.00
50.00
0.00

jornal
jornal
yunta
yunta

0
0
2
2

25.00
25.00
25.00
25.00

0.00
0.00
50.00
50.00

jornal
jornal
jornal
jornal
jornal

0
1
0
4
1

25.00
25.00
25.00
25.00
25.00

0.00
25.00
0.00
100.00
25.00

jornal
jornal
jornal
jornal
jornal

4
4
4
2
1

25.00
25.00
25.00
25.00
25.00

100.00
100.00
100.00
50.00
25.00

kg
sacos
sacos
sacos
sacos
unid
kg

100
0
0
0
0
0
0

0.90
65.00
95.00
85.00
10.00
0.50
0.15

90.00
0.00
0.00
0.00
0.00
0.00
0.00

kg
kg
ltr
ltr

0
0
0
0

60.00
80.00
20.00
30.00

0.00
0.00
0.00
0.00

TOTAL
S/.
50.00

100.00

150.00

375.00

90.00

0.00

765.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

0.00

TOTAL COSTO / HA

765.00

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

625.00
50.00
90.00
0.00
765.00

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

850
0.90
765.00
765.00
0.00
0.00
1.00

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE ARVEJA GRANO VERDE BAJO RIEGO
Cultivo

: Arveja

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Arveja verde,

Area

: 1 ha

Tipo de siembra

: Cola de buey

Tecnologa

: Baja

Remate, Alderman
Fecha de siembra

: Octubre - Noviembre

Fecha de cosecha

: Febrero - Marzo

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riego
Deshierbo
Raleo y deshaije
aporque
Control fitosanitario
COSECHA:
Primera paa
Segunda paa
Tercera paa
Clasificacin
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Envases (costales de malla)
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID
MED

CANTIDAD

PRECIO UNIT. SUB TOTAL


S/.
S/.

jornal
jornal
Yunta
jornal

1
2
4
0

25.00
25.00
25.00
25.00

25.00
50.00
100.00
0.00

jornal
jornal
yunta
yunta

0
0
3
2

25.00
25.00
25.00
25.00

0.00
0.00
75.00
50.00

jornal
jornal
jornal
jornal
jornal

1
0
1
6
1

25.00
25.00
25.00
25.00
25.00

25.00
0.00
25.00
150.00
25.00

jornal
jornal
jornal
jornal
jornal

5
10
7
4
3

25.00
25.00
25.00
25.00
25.00

125.00
250.00
175.00
100.00
75.00

kg
sacos
sacos
sacos
sacos
unid
kg

60
0
0
0
15
20
500

0.90
65.00
95.00
85.00
10.00
0.50
0.15

54.00
0.00
0.00
0.00
150.00
10.00
75.00

kg
kg
ltr
ltr

0.8
0.8
0.25
1

60.00
80.00
20.00
30.00

48.00
64.00
5.00
30.00

TOTAL
S/.
175.00

125.00

225.00

725.00

289.00

147.00

1,686.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

0.00

TOTAL COSTO / HA

1,686.00

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

1,150.00
100.00
436.00
0.00
1,686.00

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

920
0.82
756.24
1,686.00
-929.76
-55.15
0.45

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE HABA GRANO VERDE
Cultivo

: Haba

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Amarilla,

Area

: 1 ha

Tipo de siembra

: Cola de buey

Tecnologa

: Baja

Verde
Fecha de siembra

: Octubre - Noviembre

Fecha de cosecha

: Febrero - Marzo

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riego
Deshierbo
Raleo y deshaije
aporque
Control fitosanitario
COSECHA:
Primera paa
Segunda paa
Tercera paa
Clasificacin
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Envases
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

PRECIO UNIT. SUB TOTAL


S/.
S/.

UNID

CANTIDAD

jornal
jornal
Yunta
jornal

1
2
4
0

25.00
25.00
25.00
25.00

25.00
50.00
100.00
0.00

jornal
jornal
yunta
yunta

1
0
3
2

25.00
25.00
25.00
25.00

25.00
0.00
75.00
50.00

jornal
jornal
jornal
jornal
jornal

10
0
2
10
1

25.00
25.00
25.00
25.00
25.00

250.00
0.00
50.00
250.00
25.00

jornal
jornal
jornal
jornal
jornal

7
12
8
5
3

25.00
25.00
25.00
25.00
25.00

175.00
300.00
200.00
125.00
75.00

kg
sacos
sacos
sacos
sacos
unid
kg

60
0
0
0
10
15
500

0.80
65.00
95.00
85.00
10.00
0.50
0.15

48.00
0.00
0.00
0.00
100.00
7.50
75.00

kg
kg
ltr
ltr

0.8
0.8
0.25
1

60.00
80.00
20.00
30.00

48.00
64.00
5.00
30.00

TOTAL
S/.
175.00

150.00

575.00

875.00

230.50

147.00

2,152.50

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

0.00

TOTAL COSTO / HA

2,152.50

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

1,675.00
100.00
377.50
0.00
2,152.50

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

930
0.95
887.22
2,152.50
-1,265.28
-58.78
0.41

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE HABA GRANO VERDE
Cultivo

: Haba

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Amarilla,

Area

: 1 ha

Tipo de siembra

: Cola de buey

Tecnologa

: Baja

Verde
Fecha de siembra

: Octubre - Noviembre

Fecha de cosecha

: Febrero - Marzo

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE AVENA FORRAJERA
Cultivo

: Cebada

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Ecotipo local

Area

: 1 ha

Fecha de siembra

: Abril - Mayo

Tipo de siembra

: Voleo

Fecha de cosecha

: Setiembre - Octubre

Tecnologa

: Baja

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin y Seleccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riego
Deshierbo
Raleo y deshaije
Segundo abonamiento y aporque
Control fitosanitario
COSECHA:
Siega
Traslado
Trilla y ventilado
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Envases
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

PRECIO UNIT. SUB TOTAL


S/.
S/.

UNID

CANTIDAD

jornal
jornal
Yunta
jornal

1
0
4
0

25.00
25.00
25.00
25.00

25.00
0.00
100.00
0.00

jornal
jornal
yunta
yunta

0
0
0
0

25.00
25.00
25.00
25.00

0.00
0.00
0.00
0.00

jornal
jornal
jornal
jornal
jornal

0
2
0
0
0

25.00
25.00
25.00
25.00
25.00

0.00
50.00
0.00
0.00
0.00

jornal
jornal
jornal
jornal

6
4
2
2

25.00
25.00
25.00
25.00

150.00
100.00
50.00
50.00

kg
sacos
sacos
sacos
sacos
unid
kg

200
0
0
0
0
15
500

0.60
65.00
95.00
85.00
10.00
0.50
0.15

120.00
0.00
0.00
0.00
0.00
7.50
75.00

kg
kg
ltr
ltr

0
0
0
0

60.00
94.00
20.00
30.00

0.00
0.00
0.00
0.00

TOTAL
S/.
125.00

0.00

50.00

350.00

202.50

0.00

727.50

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

0.00

TOTAL COSTO / HA

727.50

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

425.00
100.00
202.50
0.00
727.50

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

12,920
0.20
2,584.00
727.50
1,856.50
255.19
3.55

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO ALFALFA
Cultivo

: Pasto Asociado

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Raygrass+dactilys

Area

: 1 ha

Fecha de siembra

: Enero

Tecnologa

: Baja

Fecha de cosecha

: P. Asociado a partir del 4to mes y luego c/3 meses

Tipo de siembra

: Melgas

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Siembra
Tapadores
LABORES CULTURALES:
Riegos
Segundo abonamiento y 1er. aporque
deshierbo
Segundo aporque
Control fitosanitario
COSECHA:
Siega
Traslado
INSUMOS:
Semilla ALFALFA
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

2
3
4
0

25.00
25.00
25.00
25.00

50.00
75.00
100.00
0.00

jornal
jornal
jornal
Yunta

0
0
4
0

25.00
25.00
25.00
25.00

0.00
0.00
100.00
0.00

jornal
jornal
jornal
jornal
jornal

1
0
4
0
0

25.00
25.00
25.00
25.00
25.00

25.00
0.00
100.00
0.00
0.00

jornal
jornal

4
4

25.00
25.00

100.00
100.00

kg
sacos
sacos
sacos
sacos
kg

25
0
0
0
10
400

5.00
65.00
95.00
85.00
12.00
0.20

125.00
0.00
0.00
0.00
120.00
80.00

kg
kg
ltr
ltr

0.5
0.5
0.4
0.8

60.00
94.00
20.00
30.00

30.00
47.00
8.00
24.00

TOTAL
S/.
225.00

100.00

125.00

200.00

325.00

109.00

1,084.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

0.00

TOTAL COSTO / HA

1,084.00

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

550.00
100.00
434.00
0.00
1,084.00

ANALISIS ECONOMICO
Rendimiento Alfalfa
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

20,000.00
0.08
1,600.00
1,084.00
516.00
47.60
1.48

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE TRIGO
Cultivo

: TRIGO

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Ecotipo local

Area

: 1 ha

Fecha de siembra

: Abril - Mayo

Tecnologa

: Baja

Fecha de cosecha

: Setiembre - Octubre

Tipo de siembra

: Voleo

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riego
Deshierbo
Raleo y deshaije
Segundo abonamiento y aporque
Control fitosanitario
COSECHA:
Siega
Traslado
Trilla y ventilado
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Envases
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

1
0
4
0

25.00
25.00
25.00
25.00

25.00
0.00
100.00
0.00

jornal
jornal
yunta
yunta

0
0
4
0

25.00
25.00
25.00
25.00

0.00
0.00
100.00
0.00

jornal
jornal
jornal
jornal
jornal

0
2
0
0
0

25.00
25.00
25.00
25.00
25.00

0.00
50.00
0.00
0.00
0.00

jornal
jornal
jornal
jornal

8
4
4
4

25.00
25.00
25.00
25.00

200.00
100.00
100.00
100.00

kg
sacos
sacos
sacos
sacos
unid
kg

200
0
0
0
10
15
400

0.75
65.00
95.00
85.00
10.00
0.50
0.15

150.00
0.00
0.00
0.00
100.00
7.50
60.00

kg
kg
ltr
ltr

0
0
0
0

60.00
94.00
20.00
30.00

0.00
0.00
0.00
0.00

TOTAL
S/.
125.00

100.00

50.00

500.00

317.50

0.00

1,092.50

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

0.00

TOTAL COSTO / HA

1,092.50

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

675.00
100.00
317.50
0.00
1,092.50

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

920.00
0.75
693.68
1,092.50
(398.82)
(36.51)
0.63

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE HORTALIZAS
Cultivo

: HORTALIZAS

Fertilizacin N-P-K

: 80 - 40 - 00

Variedades

: Ecotipos locales

Area

: 1 ha

Fecha de siembra

: Noviembre - Diciembre

Tecnologa

: Baja

Fecha de cosecha

: Marzo - Abril

Tipo de siembra

: Melgas

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riegos
Segundo abonamiento y 1er. aporque
deshierbo
Control fitosanitario
COSECHA:
Cosecha
Ensacado
Traslado
INSUMOS:
Semilla
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

1
4
5
0

15.00
15.00
25.00
15.00

15.00
60.00
125.00
0.00

jornal
jornal
yunta
yunta

0
4
4
2

25.00
25.00
25.00
25.00

0.00
100.00
100.00
50.00

jornal
jornal
jornal
jornal

2
4
4
0

25.00
25.00
25.00
25.00

50.00
100.00
100.00
0.00

jornal
jornal
jornal

8
2
4

25.00
25.00
25.00

200.00
50.00
100.00

kg
sacos
sacos
sacos
sacos
kg

5
0
0
0
25
400

8.00
65.00
95.00
85.00
12.00
0.20

40.00
0.00
0.00
0.00
300.00
80.00

kg
kg
ltr
ltr

1
1
1
2

60.00
94.00
20.00
30.00

60.00
94.00
20.00
60.00

TOTAL
S/.
200.00

250.00

250.00

350.00

420.00

234.00

1,704.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

0.00

TOTAL COSTO / HA

1,704.00

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

925.00
125.00
654.00
0.00
1,704.00

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

7,020.00
0.83
5,840.64
1,704.00
4,136.64
242.76
3.43

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE QUINUA - ACHITA
Cultivo

: QUINUA

Fertilizacin N-P-K

:0-0-0

Variedades

: Ecotipos locales

Area

: 1 ha

Fecha de siembra

: Agosto - Setiembre

Tecnologa

: Baja

Fecha de cosecha

: Enero - Febrero

Tipo de siembra

: Cola de buey

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin y Seleccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riegos
Segundo abonamiento y 1er. aporque
Raleo y deshaije
Segundo aporque
Control fitosanitario
COSECHA:
Siega
Traslado
Trilla y ventilado
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

1
2
4
0

25.00
25.00
25.00
25.00

25.00
50.00
100.00
0.00

jornal
jornal
yunta
yunta

0
0
3
3

25.00
25.00
25.00
25.00

0.00
0.00
75.00
75.00

jornal
jornal
jornal
jornal
jornal

0
0
2
4
0

25.00
25.00
25.00
25.00
25.00

0.00
0.00
50.00
100.00
0.00

jornal
jornal
jornal
jornal

6
2
4
2

25.00
25.00
25.00
25.00

150.00
50.00
100.00
50.00

kg
sacos
sacos
sacos
sacos
kg

40
0
0
0
10
540

0.90
65.00
95.00
85.00
10.00
0.20

36.00
0.00
0.00
0.00
100.00
108.00

kg
kg
ltr
ltr

0
0
0
0

60.00
94.00
20.00
30.00

0.00
0.00
0.00
0.00

TOTAL
S/.
175.00

150.00

150.00

350.00

244.00

0.00

1,069.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

0.00

TOTAL COSTO / HA

1,069.00

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

725.00
100.00
244.00
0.00
1,069.00

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

920
1.45
1,337.68
1,069.00
268.68
25.13
1.25

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO DE PAPA BAJO RIEGO
Cultivo

: Papa

Fertilizacin N-P-K

: 90 - 90 - 00

Variedades

: Canchn, Revolucin

Area

: 1 ha

Fecha de siembra

: Abril - Mayo

Tecnologa

: Media

Fecha de cosecha

: Setiembre - Octubre

Tipo de siembra

: Surcos

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riegos
Segundo abonamiento y 1er. aporque
Raleo y deshaije
Segundo aporque
Control fitosanitario
COSECHA:
Desaporque
Clasificacin
Carguo
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta

3
4
4

25.00
25.00
25.00

75.00
100.00
100.00

jornal
jornal
yunta
jornal

2
4
6
4

25.00
25.00
25.00
25.00

50.00
100.00
150.00
100.00

jornal
jornal
jornal
jornal
jornal

2
4
4
12
3

25.00
25.00
25.00
25.00
25.00

50.00
100.00
100.00
300.00
75.00

jornal
jornal
jornal

15
12
2

25.00
25.00
25.00

375.00
300.00
50.00

kg
sacos
sacos
sacos
sacos
kg

2000
2
8
2
15
3350

0.80
65.00
95.00
85.00
12.00
0.20

1,600.00
130.00
760.00
170.00
180.00
670.00

kg
kg
ltr
ltr

4
4
1
4

60.00
94.00
20.00
30.00

240.00
376.00
20.00
120.00

TOTAL
S/.
275.00

400.00

625.00

725.00

3,510.00

756.00

6,291.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

314.55
314.55

TOTAL COSTO / HA

6,605.55

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

1,925.00
100.00
4,266.00
314.55
6,605.55

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

19,176
0.41
7,938.86
6,605.55
1,333.31
20.18
1.20

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO DE CEBADA GRANO SECO
Cultivo

: Grano Seco

Fertilizacin N-P-K

: 90 - 90 - 00

Variedades

: Ecotipo local

Area

: 1 ha

Fecha de siembra

: Octubre - Noviembre

Tecnologa

:Media

Fecha de cosecha

: Marzo - Abril

Tipo de siembra

: Surcos

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riegos
Segundo abonamiento y 1er. aporque
Raleo y deshaije
Segundo aporque
Control fitosanitario
COSECHA:
Chocleado
Clasificacin
Carguo
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
yunta
jornal

0
0
4
0

25.00
25.00
25.00
25.00

0.00
0.00
100.00
0.00

jornal
jornal
yunta
yunta

1
0
2
2

25.00
10.00
25.00
25.00

25.00
0.00
50.00
50.00

jornal
jornal
jornal
jornal
jornal

2
6
0
0
2

25.00
25.00
25.00
25.00
25.00

50.00
150.00
0.00
0.00
50.00

jornal
jornal
jornal

4
4
2

25.00
25.00
25.00

100.00
100.00
50.00

kg
sacos
sacos
sacos
sacos
kg

500
2
4
0
10
500

1.25
65.00
95.00
85.00
10.00
0.15

625.00
130.00
380.00
0.00
100.00
75.00

kg
kg
ltr
ltr

1
1
0
0

60.00
94.00
20.00
30.00

60.00
94.00
0.00
0.00

TOTAL
S/.
100.00

125.00

250.00

250.00

1,310.00

154.00

2,189.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

109.45
109.45

TOTAL COSTO / HA

2,298.45

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

625.00
100.00
1,464.00
109.45
2,298.45

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

1,564
0.49
769.49
2,298.45
-1,528.96
-66.52
0.33

ESTIMADO DE COSTOS DE PRODUCCION SIN PROYECTO


CULTIVO DE OLLUCO
Cultivo

Maiz

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

Maiz

Area

: 1 ha

Tipo de siembra

: Cola de buey

Tecnologa

: Baja

Fecha de siembra

: Octubre - Noviembre

Fecha de cosecha

: Febrero - Marzo

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riego
Deshierbo
Raleo y deshaije
aporque
Control fitosanitario
COSECHA:
Primera paa
Segunda paa
Tercera paa
Clasificacin
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Envases (costales de malla)
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID
MED

CANTIDAD

PRECIO UNIT. SUB TOTAL


S/.
S/.

jornal
jornal
Yunta
jornal

0
2
4
0

25.00
25.00
25.00
25.00

0.00
50.00
100.00
0.00

jornal
jornal
yunta
yunta

1
1
2
6

25.00
25.00
25.00
25.00

25.00
25.00
50.00
150.00

jornal
jornal
jornal
jornal
jornal

0
2
0
8
2

25.00
25.00
25.00
25.00
25.00

0.00
50.00
0.00
200.00
50.00

jornal
jornal
jornal
jornal
jornal

12
0
0
4
2

25.00
25.00
25.00
25.00
25.00

300.00
0.00
0.00
100.00
50.00

kg
sacos
sacos
sacos
sacos
unid
kg

1200
2
4
0
15
20
500

0.95
65.00
95.00
85.00
10.00
0.50
0.15

1,140.00
130.00
380.00
0.00
150.00
10.00
75.00

kg
kg
ltr
ltr

0.8
0.8
0.25
1

60.00
80.00
20.00
30.00

48.00
64.00
5.00
30.00

TOTAL
S/.
150.00

250.00

300.00

450.00

1,885.00

147.00

3,182.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

159.10
159.10

TOTAL COSTO / HA

3,341.10

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

1,050.00
100.00
2,032.00
159.10
3,341.10

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

1,105
0.90
994.50
3,341.10
-2,346.60
-70.23
0.30

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO DE ARVEJA GRANO VERDE BAJO RIEGO
Cultivo

: Arveja

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Arveja verde,

Area

: 1 ha

Tipo de siembra

: Cola de buey

Tecnologa

: Media

Remate, Alderman
Fecha de siembra

: Octubre - Noviembre

Fecha de cosecha

: Febrero - Marzo

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riego
Deshierbo
Raleo y deshaije
Segundo abonamiento y aporque
Control fitosanitario
COSECHA:
Primera paa
Segunda paa
Tercera paa
Clasificacin
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Envases (costales de malla)
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

PRECIO UNIT. SUB TOTAL


S/.
S/.

UNID

CANTIDAD

jornal
jornal
Yunta
jornal

1
2
4
0

25.00
25.00
25.00
25.00

25.00
50.00
100.00
0.00

jornal
jornal
Yunta
Yunta

1
1
4
4

25.00
25.00
25.00
25.00

25.00
25.00
100.00
100.00

jornal
jornal
jornal
jornal
jornal

0
2
0
4
2

25.00
25.00
25.00
25.00
25.00

0.00
50.00
0.00
100.00
50.00

jornal
jornal
jornal
jornal
jornal

0
6
0
5
2

25.00
25.00
25.00
25.00
25.00

0.00
150.00
0.00
125.00
50.00

kg
sacos
sacos
sacos
sacos
unid
kg

60
2
4
0
10
35
300

0.90
65.00
95.00
85.00
10.00
0.50
0.20

54.00
130.00
380.00
0.00
100.00
17.50
60.00

kg
kg
ltr
ltr

0.8
0.8
0.25
1

60.00
94.00
20.00
30.00

48.00
75.20
5.00
30.00

TOTAL
S/.
175.00

250.00

200.00

325.00

741.50

158.20

1,849.70

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

92.49
92.49

TOTAL COSTO / HA

1,942.19

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

850.00
100.00
899.70
92.49
1,942.19

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

1,196.00
0.82
983.11
1,942.19
-959.07
-49.38
0.51

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO DE ARVEJA GRANO VERDE BAJO RIEGO
Cultivo

: Arveja

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Arveja verde,

Area

: 1 ha

Tipo de siembra

: Cola de buey

Tecnologa

: Media

Remate, Alderman
Fecha de siembra

: Octubre - Noviembre

Fecha de cosecha

: Febrero - Marzo

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO DE HABA BAJO RIEGO
Cultivo

: Haba

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Amarilla

Area

: 1 ha

Fecha de siembra

: Octubre - Noviembre

Tecnologa

: Media

Fecha de cosecha

: Febrero - Marzo

Tipo de siembra

: Surcos

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin y/o Seleccion de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riego
Deshierbo
Raleo y deshaije
Abonamiento y aporque
Control fitosanitario
COSECHA:
Primera paa
Segunda paa
Tercera paa
Clasificacin
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Envases
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

0
2
4
0

25.00
25.00
25.00
25.00

0.00
50.00
100.00
0.00

jornal
jornal
yunta
yunta

1
1
2
2

25.00
25.00
25.00
25.00

25.00
25.00
50.00
50.00

jornal
jornal
jornal
jornal
jornal

4
2
2
4
2

25.00
25.00
25.00
25.00
25.00

100.00
50.00
50.00
100.00
50.00

jornal
jornal
jornal
jornal
jornal

4
4
4
0
1

25.00
25.00
25.00
25.00
25.00

100.00
100.00
100.00
0.00
25.00

kg
sacos
sacos
sacos
sacos
unid
kg

60
2
4
0
20
15
1360

0.80
65.00
95.00
85.00
7.00
0.50
0.15

48.00
130.00
380.00
0.00
140.00
7.50
204.00

kg
kg
ltr
ltr

1
1
0.25
1.5

60.00
94.00
20.00
30.00

60.00
94.00
5.00
45.00

TOTAL
S/.
150.00

150.00

350.00

325.00

909.50

204.00

2,088.50

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

104.43
104.43

TOTAL COSTO / HA

2,192.93

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

875.00
100.00
1,113.50
104.43
2,192.93

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

1,209
0.95
1,153.39
2,192.93
-1,039.54
-47.40
0.53

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO DE HABA BAJO RIEGO
Cultivo

: Haba

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Amarilla

Area

: 1 ha

Fecha de siembra

: Octubre - Noviembre

Tecnologa

: Media

Fecha de cosecha

: Febrero - Marzo

Tipo de siembra

: Surcos

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO DE AVENA FORRAJERA
Cultivo

: Cebada

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Ecotipo local

Area

: 1 ha

Fecha de siembra

: Abril - Mayo

Tipo de siembra

: Voleo

Fecha de cosecha

: Setiembre - Octubre

Tecnologa

: Media

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego de machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riego
Deshierbo
Raleo y deshaije
Segundo abonamiento y aporque
Control fitosanitario
COSECHA:
Siega
Traslado
Trilla y ventilado
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Envases
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANTIDAD

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

0
0
4
0

25.00
25.00
25.00
25.00

0.00
0.00
100.00
0.00

jornal
jornal
yunta
yunta

0
0
0
4

25.00
25.00
25.00
25.00

0.00
0.00
0.00
100.00

jornal
jornal
jornal
jornal
jornal

0
4
0
0
0

25.00
25.00
25.00
25.00
25.00

0.00
100.00
0.00
0.00
0.00

jornal
jornal
jornal
jornal

8
4
4
2

25.00
25.00
25.00
25.00

200.00
100.00
100.00
50.00

kg
sacos
sacos
sacos
sacos
unid
kg

200
2
2
0
10
20
900

0.60
65.00
95.00
85.00
10.00
0.50
0.15

120.00
130.00
190.00
0.00
100.00
10.00
135.00

kg
kg
ltr
ltr

0
0
0
0

60.00
94.00
20.00
30.00

0.00
0.00
0.00
0.00

TOTAL
S/.
100.00

100.00

100.00

450.00

685.00

0.00

1,435.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

71.75
71.75

TOTAL COSTO / HA

1,506.75

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

650.00
100.00
685.00
71.75
1,506.75

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

23,256
0.20
4,651.20
1,506.75
3,144.45
208.69
3.09

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO ALFALFA
Cultivo

: Pasto Asociado

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Raygrass+dactilys

Area

: 1 ha

Fecha de siembra

: Enero

Tecnologa

: Media

Fecha de cosecha

: P. Asociado a partir del 4to mes y luego c/3 meses

Tipo de siembra

: Melgas

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Siembra
Tapadores
LABORES CULTURALES:
Riegos
Segundo abonamiento y 1er. aporque
deshierbo
Segundo aporque
Control fitosanitario
COSECHA:
Siega
Traslado
INSUMOS:
Semilla ALFALFA
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

0
2
4
2

25.00
25.00
25.00
25.00

0.00
50.00
100.00
50.00

jornal
jornal
jornal
Yunta

1
0
2
2

25.00
25.00
25.00
25.00

25.00
0.00
50.00
50.00

jornal
jornal
jornal
jornal
jornal

12
0
6
0
0

25.00
25.00
25.00
25.00
25.00

300.00
0.00
150.00
0.00
0.00

jornal
jornal

10
5

25.00
25.00

250.00
125.00

kg
sacos
sacos
sacos
sacos
kg

25
2
2
0
10
725

5.00
65.00
95.00
85.00
12.00
0.20

125.00
130.00
190.00
0.00
120.00
145.00

kg
kg
ltr
ltr

1
1
0.25
0.8

60.00
94.00
20.00
30.00

60.00
94.00
5.00
24.00

TOTAL
S/.
200.00

125.00

450.00

375.00

710.00

183.00

2,043.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

102.15
102.15

TOTAL COSTO / HA

2,145.15

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

1,050.00
100.00
893.00
102.15
2,145.15

ANALISIS ECONOMICO
Rendimiento Alfalfa
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

30,000.00
0.08
2,400.00
2,145.15
254.85
11.88
1.12

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO DE TRIGO BAJO RIEGO
Cultivo

: TRIGO

Fertilizacin N-P-K

: 00 - 00 - 00

Variedades

: Ecotipo local

Area

: 1 ha

Fecha de siembra

: Abril - Mayo

Tecnologa

: Baja

Fecha de cosecha

: Setiembre - Octubre

Tipo de siembra

: Voleo

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riego
Deshierbo
Raleo y deshaije
Segundo abonamiento y aporque
Control fitosanitario
COSECHA:
Siega
Traslado
Trilla y ventilado
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Envases
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

0
0
4
0

25.00
25.00
25.00
25.00

0.00
0.00
100.00
0.00

jornal
jornal
yunta
yunta

0
0
0
4

25.00
25.00
25.00
25.00

0.00
0.00
0.00
100.00

jornal
jornal
jornal
jornal
jornal

0
4
0
0
0

25.00
25.00
25.00
25.00
25.00

0.00
100.00
0.00
0.00
0.00

jornal
jornal
jornal
jornal

10
4
4
2

25.00
25.00
25.00
25.00

250.00
100.00
100.00
50.00

kg
sacos
sacos
sacos
sacos
unid
kg

200
2
2
0
10
15
350

0.75
65.00
95.00
85.00
10.00
0.50
0.15

150.00
130.00
190.00
0.00
100.00
7.50
52.50

kg
kg
ltr
ltr

0
0
0
0

60.00
94.00
20.00
30.00

0.00
0.00
0.00
0.00

TOTAL
S/.
100.00

100.00

100.00

500.00

630.00

0.00

1,430.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

71.50
71.50

TOTAL COSTO / HA

1,501.50

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

700.00
100.00
630.00
71.50
1,501.50

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

1,380.00
0.75
1,040.52
1,501.50
(460.98)
(30.70)
0.69

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO DE HORTALIZAS
Cultivo

: Hortalizas

Fertilizacin N-P-K

: 80 - 80 - 00

Variedades

: Ecotipos locales

Area

: 1 ha

Fecha de siembra

: Noviembre - Diciembre

Tecnologa

: Media

Fecha de cosecha

: Marzo - Abril

Tipo de siembra

: Melgas

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riegos
Segundo abonamiento y 1er. aporque
deshierbo
Control fitosanitario
COSECHA:
Cosecha
Ensacado
Traslado
INSUMOS:
Semilla
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

2
2
4
0

25.00
25.00
25.00
25.00

50.00
50.00
100.00
0.00

jornal
jornal
yunta
yunta

2
4
4
2

25.00
25.00
25.00
25.00

50.00
100.00
100.00
50.00

jornal
jornal
jornal
jornal

16
8
8
6

25.00
25.00
25.00
25.00

400.00
200.00
200.00
150.00

jornal
jornal
jornal

12
4
4

25.00
25.00
25.00

300.00
100.00
100.00

kg
sacos
sacos
sacos
sacos
kg

5
2
2
0
30
1705

8.00
65.00
95.00
85.00
12.00
0.20

40.00
130.00
190.00
0.00
360.00
341.00

kg
kg
ltr
ltr

1
1
0.25
1

60.00
94.00
20.00
30.00

60.00
94.00
5.00
30.00

TOTAL
S/.
200.00

300.00

950.00

500.00

1,061.00

189.00

3,200.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

160.00
160.00

TOTAL COSTO / HA

3,360.00

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

1,850.00
100.00
1,250.00
160.00
3,360.00

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

9,126.00
0.83
7,592.83
3,360.00
4,232.83
125.98
2.26

ESTIMADO DE COSTOS DE PRODUCCION CON PROYECTO


CULTIVO DE QUINUA - ACHITA BAJO RIEGO
Cultivo

: QINUA

Fertilizacin N-P-K

:0-0-0

Variedades

: Ecotipos locales

Area

: 1 ha

Fecha de siembra

: Agosto - Setiembre

Tecnologa

: Media

Fecha de cosecha

: Enero - Febrero

Tipo de siembra

: Cola de buey

I. COSTOS DIRECTOS:
RUBROS
PREPARACION DE TERRENO:
Limpieza de campo
Preparacin de terreno (riego machaco)
Arado, cruzado, rastra
Nivelacin
SIEMBRA:
Desinfeccin y Seleccin de semilla
Mezcla aplicacin de fertilizantes
Surcado, Siembra y abonamiento
Tapadores
LABORES CULTURALES:
Riegos
Segundo abonamiento y 1er. aporque
Raleo y deshaije
Segundo aporque
Control fitosanitario
COSECHA:
Siega
Traslado
Trilla y ventilado
Ensacado
INSUMOS:
Semillas
Urea agrcola
Fosfato dimonico
Cloruro de potasio
Materia orgnica
Transporte de insumos
PESTICIDAS:
Insecticidas
Fungicidas
Adherentes
Abomo foliar
TOTAL COSTOS DIRECTOS

UNID

CANT

PRECIO UNIT.
S/.

SUB TOTAL
S/.

jornal
jornal
Yunta
jornal

0
0
4
0

25.00
25.00
25.00
25.00

0.00
0.00
100.00
0.00

jornal
jornal
yunta
yunta

0
0
4
0

25.00
25.00
25.00
25.00

0.00
0.00
100.00
0.00

jornal
jornal
jornal
jornal
jornal

0
0
2
8
0

25.00
25.00
25.00
25.00
25.00

0.00
0.00
50.00
200.00
0.00

jornal
jornal
jornal
jornal

8
6
8
2

25.00
25.00
25.00
25.00

200.00
150.00
200.00
50.00

kg
sacos
sacos
sacos
sacos
kg

40
0
3
0
10
500

0.90
65.00
95.00
85.00
10.00
0.20

36.00
0.00
285.00
0.00
100.00
100.00

kg
kg
ltr
ltr

0
0
0
0

60.00
94.00
20.00
30.00

0.00
0.00
0.00
0.00

TOTAL
S/.
100.00

100.00

250.00

600.00

521.00

0.00

1,571.00

II. COSTOS INDIRECTOS


Asistencia Tcnica 5%
Costos Administrativos 5%
TOTAL COSTOS INDIRECTOS

78.55
78.55

TOTAL COSTO / HA

1,649.55

RESUMEN DE INVERSION POR RUBRO


Mano de obra
Yunta/Maquinaria
Insumos, materiales y equipos
Costos indirectos
COSTO TOTAL

950.00
100.00
521.00
78.55
1,649.55

ANALISIS ECONOMICO
Rendimiento
Precio unitario por kg en chacra
Ingreso Total
Costo Total / ha
Ingreso Neto o Utilidad
Rentabilidad %
Beneficio / Costo

1,380
1.45
2,006.52
1,649.55
356.97
21.64
1.22

SITUACION SIN PROYECTO


COSTO UNITARIO
Papa
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

0.00
2,025.00

0.41

0.00
0.00
0.00
3,510.00

TOTAL COSTO DE PRODUCCION

0.00
830.25
0.00
0.00

0.84

5,535.00

0.00
2,948.40
3,778.65

SITUACION SIN PROYECTO


COSTO UNITARIO
Cabada
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

0.00
1,350.00

0.41

0.00
0.00
0.00
560.00

TOTAL COSTO DE PRODUCCION

0.00
553.50
0.00
0.00

0.84

1,910.00

0.00
470.40
1,023.90

SITUACION SIN PROYECTO


COSTO UNITARIO
Pasto Asociado
Perenne

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables
TOTAL COSTO DE PRODUCCION

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL
0.00
650.00

0.41

0.00
0.00
0.00
434.00
1,084.00

0.00
266.50
0.00
0.00

0.84

0.00
364.56
631.06

SITUACION SIN PROYECTO


COSTO UNITARIO
Arveja
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

0.00
1,250.00

0.41

0.00
0.00
0.00
436.00

TOTAL COSTO DE PRODUCCION

0.00
512.50
0.00
0.00

0.84

1,686.00

0.00
366.24
878.74

SITUACION SIN PROYECTO


COSTO UNITARIO
Haba
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

0.00
1,775.00

0.41

0.00
0.00
0.00
377.50

TOTAL COSTO DE PRODUCCION

0.00
727.75
0.00
0.00

0.84

2,152.50

0.00
317.10
1,044.85

SITUACION SIN PROYECTO


COSTO UNITARIO
Avena Forrajera
Transitorio

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL
0.00
525.00

0.41

0.00
0.00
0.00
202.50

0.00
215.25
0.00
0.00

0.84

0.00
170.10

TOTAL COSTO DE PRODUCCION

727.50

385.35

SITUACION SIN PROYECTO


COSTO UNITARIO
Trigo
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

0.00
775.00

0.41

0.00
0.00
0.00
317.50

TOTAL COSTO DE PRODUCCION

0.00
317.75
0.00
0.00

0.84

1,092.50

0.00
266.70
584.45

SITUACION SIN PROYECTO


COSTO UNITARIO
Hortalizas
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

0.00
1,050.00

0.41

0.00
0.00
0.00
654.00

TOTAL COSTO DE PRODUCCION

0.00
430.50
0.00
0.00

0.84

1,704.00

0.00
549.36
979.86

SITUACION SIN PROYECTO


COSTO UNITARIO
Quinua - Achita
Transitorio

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

0.00
825.00

0.41

0.00
0.00
0.00
244.00

0.00
338.25
0.00
0.00

0.84

0.00
204.96

TOTAL COSTO DE PRODUCCION

1,069.00

543.21

SITUACION SIN PROYECTO


COSTO UNITARIO
Maiz
Transitorio

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables
TOTAL COSTO DE PRODUCCION

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

0.00
675.00

0.41

0.00
0.00
0.00
90.00
765.00

0.00
276.75
0.00
0.00

0.84

0.00
75.60
352.35

VALOR NETO DE LA PRODUCCION AGRICOLA SIN PROYECTO (PRECIOS PRIVADOS)


CONCEPTO

PROGRAMACION ANUAL
AO 5
AO 6

AO 1

AO 2

AO 3

AO 4

Nmero de Hectreas
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

Costos por Hectrea


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

1,910.00
5,535.00
1,704.00
1,686.00
2,152.50
765.00
1,092.50
727.50
1,069.00
1,084.00

2,101.00
6,088.50
1,874.40
1,854.60
2,367.75
841.50
1,201.75
800.25
1,175.90
1,192.40

2,101.00
6,088.50
1,874.40
1,854.60
2,367.75
841.50
1,201.75
800.25
1,175.90
1,192.40

2,101.00
6,088.50
1,874.40
1,854.60
2,367.75
841.50
1,201.75
800.25
1,175.90
1,192.40

Rendimiento por Hectrea


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

920.00
15,980.00
7,020.00
920.00
930.00
850.00
920.00
12,920.00
920.00
20,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

0.49
0.41
0.83
0.82
0.95
0.90
0.75
0.20
1.45
0.08

0.49
0.41
0.83
0.82
0.95
0.90
0.75
0.20
1.45
0.08

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

Valor Bruto de la Produccin


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

VALOR
ACTUAL

AO 7

AO 8

AO 9

AO 10

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

2,101.00
6,088.50
1,874.40
1,854.60
2,367.75
841.50
1,201.75
800.25
1,175.90
1,192.40

2,101.00
6,088.50
1,874.40
1,854.60
2,367.75
841.50
1,201.75
800.25
1,175.90
1,192.40

2,101.00
6,088.50
1,874.40
1,854.60
2,367.75
841.50
1,201.75
800.25
1,175.90
1,192.40

2,101.00
6,088.50
1,874.40
1,854.60
2,367.75
841.50
1,201.75
800.25
1,175.90
1,192.40

2,101.00
6,088.50
1,874.40
1,854.60
2,367.75
841.50
1,201.75
800.25
1,175.90
1,192.40

2,101.00
6,088.50
1,874.40
1,854.60
2,367.75
841.50
1,201.75
800.25
1,175.90
1,192.40

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

0.49
0.41
0.83
0.82
0.95
0.90
0.75
0.20
1.45
0.08

0.49
0.41
0.83
0.82
0.95
0.90
0.75
0.20
1.45
0.08

0.49
0.41
0.83
0.82
0.95
0.90
0.75
0.20
1.45
0.08

0.49
0.41
0.83
0.82
0.95
0.90
0.75
0.20
1.45
0.08

0.49
0.41
0.83
0.82
0.95
0.90
0.75
0.20
1.45
0.08

0.49
0.41
0.83
0.82
0.95
0.90
0.75
0.20
1.45
0.08

0.49
0.41
0.83
0.82
0.95
0.90
0.75
0.20
1.45
0.08

0.49
0.41
0.83
0.82
0.95
0.90
0.75
0.20
1.45
0.08

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

83,680.11
1,028.28
20,668.95
26,257.92
6,214.32
4,865.40
5,805.00
1,477.84
7,592.00
3,780.40
5,990.00

92,048.12
1,131.11
22,735.85
28,883.71
6,835.75
5,351.94
6,385.50
1,625.62
8,351.20
4,158.44
6,589.00

92,048.12
1,131.11
22,735.85
28,883.71
6,835.75
5,351.94
6,385.50
1,625.62
8,351.20
4,158.44
6,589.00

92,048.12
1,131.11
22,735.85
28,883.71
6,835.75
5,351.94
6,385.50
1,625.62
8,351.20
4,158.44
6,589.00

92,048.12
1,131.11
22,735.85
28,883.71
6,835.75
5,351.94
6,385.50
1,625.62
8,351.20
4,158.44
6,589.00

92,048.12
1,131.11
22,735.85
28,883.71
6,835.75
5,351.94
6,385.50
1,625.62
8,351.20
4,158.44
6,589.00

92,048.12
1,131.11
22,735.85
28,883.71
6,835.75
5,351.94
6,385.50
1,625.62
8,351.20
4,158.44
6,589.00

92,048.12
1,131.11
22,735.85
28,883.71
6,835.75
5,351.94
6,385.50
1,625.62
8,351.20
4,158.44
6,589.00

92,048.12
1,131.11
22,735.85
28,883.71
6,835.75
5,351.94
6,385.50
1,625.62
8,351.20
4,158.44
6,589.00

92,048.12
1,131.11
22,735.85
28,883.71
6,835.75
5,351.94
6,385.50
1,625.62
8,351.20
4,158.44
6,589.00

912,113.20

Costo Total
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

122,517.00
21,010.00
27,675.00
10,224.00
20,232.00
17,220.00
9,180.00
4,370.00
2,910.00
4,276.00
5,420.00

134,768.70
23,111.00
30,442.50
11,246.40
22,255.20
18,942.00
10,098.00
4,807.00
3,201.00
4,703.60
5,962.00

134,768.70
23,111.00
30,442.50
11,246.40
22,255.20
18,942.00
10,098.00
4,807.00
3,201.00
4,703.60
5,962.00

134,768.70
23,111.00
30,442.50
11,246.40
22,255.20
18,942.00
10,098.00
4,807.00
3,201.00
4,703.60
5,962.00

134,768.70
23,111.00
30,442.50
11,246.40
22,255.20
18,942.00
10,098.00
4,807.00
3,201.00
4,703.60
5,962.00

134,768.70
23,111.00
30,442.50
11,246.40
22,255.20
18,942.00
10,098.00
4,807.00
3,201.00
4,703.60
5,962.00

134,768.70
23,111.00
30,442.50
11,246.40
22,255.20
18,942.00
10,098.00
4,807.00
3,201.00
4,703.60
5,962.00

134,768.70
23,111.00
30,442.50
11,246.40
22,255.20
18,942.00
10,098.00
4,807.00
3,201.00
4,703.60
5,962.00

134,768.70
23,111.00
30,442.50
11,246.40
22,255.20
18,942.00
10,098.00
4,807.00
3,201.00
4,703.60
5,962.00

134,768.70
23,111.00
30,442.50
11,246.40
22,255.20
18,942.00
10,098.00
4,807.00
3,201.00
4,703.60
5,962.00

1,335,435.30

Valor Neto de la Produccin


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

-38,836.89
-19,981.72
-7,006.05
16,033.92
-14,017.68
-12,354.60
-3,375.00
-2,892.16
4,682.00
-495.60
570.00

-42,720.58
-21,979.89
-7,706.66
17,637.31
-15,419.45
-13,590.06
-3,712.50
-3,181.38
5,150.20
-545.16
627.00

-42,720.58
-21,979.89
-7,706.66
17,637.31
-15,419.45
-13,590.06
-3,712.50
-3,181.38
5,150.20
-545.16
627.00

-42,720.58
-21,979.89
-7,706.66
17,637.31
-15,419.45
-13,590.06
-3,712.50
-3,181.38
5,150.20
-545.16
627.00

-42,720.58
-21,979.89
-7,706.66
17,637.31
-15,419.45
-13,590.06
-3,712.50
-3,181.38
5,150.20
-545.16
627.00

-42,720.58
-21,979.89
-7,706.66
17,637.31
-15,419.45
-13,590.06
-3,712.50
-3,181.38
5,150.20
-545.16
627.00

-42,720.58
-21,979.89
-7,706.66
17,637.31
-15,419.45
-13,590.06
-3,712.50
-3,181.38
5,150.20
-545.16
627.00

-42,720.58
-21,979.89
-7,706.66
17,637.31
-15,419.45
-13,590.06
-3,712.50
-3,181.38
5,150.20
-545.16
627.00

-42,720.58
-21,979.89
-7,706.66
17,637.31
-15,419.45
-13,590.06
-3,712.50
-3,181.38
5,150.20
-545.16
627.00

-42,720.58
-21,979.89
-7,706.66
17,637.31
-15,419.45
-13,590.06
-3,712.50
-3,181.38
5,150.20
-545.16
627.00

-423,322.10

0.90

0.81

0.73

0.66

0.59

0.53

0.48

0.43

0.39

0.35

-34,988.19

-34,672.98

-31,236.92

-28,141.37

-25,352.58

-22,840.17

-20,576.73

-18,537.59

-16,700.53

-15,045.52

Precio de venta
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Porcentaje destinado al mercado
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

Factor de Actualizacin (11%)


Valor Actual Neto del VNP

0.00

-248,092.58

SITUACION OPTIMIZADA
COSTO UNITARIO
Papa
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

166.05
2,025.00

0.91
0.41

0.00
0.00
0.00
3,510.00

TOTAL COSTO DE PRODUCCION

151.11
830.25
0.00
0.00

0.84

5,701.05

0.00
2,948.40
3,929.76

SITUACION OPTIMIZADA
COSTO UNITARIO
Cabada
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

57.30
1,350.00

0.91
0.41

0.00
0.00
0.00
560.00

TOTAL COSTO DE PRODUCCION

52.14
553.50
0.00
0.00

0.84

1,967.30

0.00
470.40
1,076.04

SITUACION OPTIMIZADA
COSTO UNITARIO
Pasto Asociado
Perenne

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables
TOTAL COSTO DE PRODUCCION

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

32.52
650.00

0.91
0.41

0.00
0.00
0.00
434.00
1,116.52

29.59
266.50
0.00
0.00

0.84

0.00
364.56
660.65

SITUACION OPTIMIZADA
COSTO UNITARIO
Arveja
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

50.58
1,250.00

0.91
0.41

0.00
0.00
0.00
436.00

TOTAL COSTO DE PRODUCCION

46.03
512.50
0.00
0.00

0.84

1,736.58

0.00
366.24
924.77

SITUACION OPTIMIZADA
COSTO UNITARIO
Haba
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

64.58
1,775.00

0.91
0.41

0.00
0.00
0.00
377.50

TOTAL COSTO DE PRODUCCION

58.76
727.75
0.00
0.00

0.84

2,217.08

0.00
317.10
1,103.61

SITUACION OPTIMIZADA
COSTO UNITARIO
Avena Forrajera
Transitorio

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables
TOTAL COSTO DE PRODUCCION

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL
21.83
525.00

0.91
0.41

0.00
0.00
0.00
202.50
749.33

19.86
215.25
0.00
0.00

0.84

0.00
170.10
405.21

SITUACION OPTIMIZADA
COSTO UNITARIO
Trigo
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

32.78
775.00

0.91
0.41

0.00
0.00
0.00
317.50

TOTAL COSTO DE PRODUCCION

29.83
317.75
0.00
0.00

0.84

1,125.28

0.00
266.70
614.28

SITUACION OPTIMIZADA
COSTO UNITARIO
Hortalizas
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

51.12
1,050.00

0.91
0.41

0.00
0.00
0.00
654.00

TOTAL COSTO DE PRODUCCION

46.52
430.50
0.00
0.00

0.84

1,755.12

0.00
549.36
1,026.38

SITUACION OPTIMIZADA
COSTO UNITARIO
Quinua
Transitorio

CULTIVO
ETAPA

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

32.07
825.00

0.91
0.41

0.00
0.00
0.00
244.00

TOTAL COSTO DE PRODUCCION

1,101.07

SITUACION OPTIMIZADA

29.18
338.25
0.00
0.00

0.84

0.00
204.96
572.39

COSTO UNITARIO
Maiz
Transitorio

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables
TOTAL COSTO DE PRODUCCION

SITUACION SIN PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

95.46
1,150.00

0.91
0.41

0.00
0.00
0.00
2,032.00
3,277.46

86.87
471.50
0.00
0.00

0.84

0.00
1,706.88
2,265.25

VALOR NETO DE LA PRODUCCION AGRICOLA OPTIMIZADA (PRECIOS PRIVADOS)


CONCEPTO

PROGRAMACION ANUAL
AO 5
AO 6

AO 1

AO 2

AO 3

AO 4

Nmero de Hectreas
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

Costos por Hectrea


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

1,967.30
5,701.05
1,755.12
1,736.58
2,217.08
3,277.46
1,125.28
749.33
1,101.07
1,116.52

2,164.03
6,271.16
1,930.63
1,910.24
2,438.78
3,605.21
1,237.80
824.26
1,211.18
1,228.17

2,164.03
6,271.16
1,930.63
1,910.24
2,438.78
3,605.21
1,237.80
824.26
1,211.18
1,228.17

2,164.03
6,271.16
1,930.63
1,910.24
2,438.78
3,605.21
1,237.80
824.26
1,211.18
1,228.17

-72,386.52
-20,612.02
-7,836.30
15,727.20
-14,624.64
-12,871.20
-33,524.52
-3,023.26
4,594.70
-623.88
407.40

-79,625.17
-22,673.22
-8,619.93
17,299.92
-16,087.10
-14,158.32
-36,876.97
-3,325.59
5,054.17
-686.27
448.14

-79,625.17
-22,673.22
-8,619.93
17,299.92
-16,087.10
-14,158.32
-36,876.97
-3,325.59
5,054.17
-686.27
448.14

-79,625.17
-22,673.22
-8,619.93
17,299.92
-16,087.10
-14,158.32
-36,876.97
-3,325.59
5,054.17
-686.27
448.14

Valor Neto de la Produccin


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Factor de Actualizacin (09%)
Valor Actual Neto del VNP

AO 7

AO 8

AO 9

AO 10

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

2,164.03
6,271.16
1,930.63
1,910.24
2,438.78
3,605.21
1,237.80
824.26
1,211.18
1,228.17

2,164.03
6,271.16
1,930.63
1,910.24
2,438.78
3,605.21
1,237.80
824.26
1,211.18
1,228.17

2,164.03
6,271.16
1,930.63
1,910.24
2,438.78
3,605.21
1,237.80
824.26
1,211.18
1,228.17

2,164.03
6,271.16
1,930.63
1,910.24
2,438.78
3,605.21
1,237.80
824.26
1,211.18
1,228.17

2,164.03
6,271.16
1,930.63
1,910.24
2,438.78
3,605.21
1,237.80
824.26
1,211.18
1,228.17

2,164.03
6,271.16
1,930.63
1,910.24
2,438.78
3,605.21
1,237.80
824.26
1,211.18
1,228.17

-79,625.17
-22,673.22
-8,619.93
17,299.92
-16,087.10
-14,158.32
-36,876.97
-3,325.59
5,054.17
-686.27
448.14

-79,625.17
-22,673.22
-8,619.93
17,299.92
-16,087.10
-14,158.32
-36,876.97
-3,325.59
5,054.17
-686.27
448.14

-79,625.17
-22,673.22
-8,619.93
17,299.92
-16,087.10
-14,158.32
-36,876.97
-3,325.59
5,054.17
-686.27
448.14

-79,625.17
-22,673.22
-8,619.93
17,299.92
-16,087.10
-14,158.32
-36,876.97
-3,325.59
5,054.17
-686.27
448.14

-79,625.17
-22,673.22
-8,619.93
17,299.92
-16,087.10
-14,158.32
-36,876.97
-3,325.59
5,054.17
-686.27
448.14

-79,625.17
-22,673.22
-8,619.93
17,299.92
-16,087.10
-14,158.32
-36,876.97
-3,325.59
5,054.17
-686.27
448.14

0.92

0.84

0.77

0.71

0.65

0.60

0.55

0.50

0.46

0.42

-66,409.65

-67,018.91

-61,485.24

-56,408.48

-51,750.90

-47,477.89

-43,557.70

-39,961.19

-36,661.64

-33,634.53

VALOR
ACTUAL
0.00

-789,013.07

-504,366.13

SITUACION CON PROYECTO


COSTO UNITARIO
Papa
Transitorio

CULTIVO
ETAPA

SITUACION CON PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

314.55
2,025.00

0.91
0.41

0.00
0.00
0.00
4,266.00

TOTAL COSTO DE PRODUCCION

286.24
830.25
0.00
0.00

0.84

6,605.55

0.00
3,583.44
4,699.93

SITUACION CON PROYECTO


COSTO UNITARIO
Maiz Amilaceo
Transitorio

CULTIVO
ETAPA

SITUACION CON PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

0.00
1,464.00

TOTAL COSTO DE PRODUCCION

2,298.45

109.45
725.00

0.91
0.41

0.00
0.00

99.60
297.25
0.00
0.00

0.84

0.00
1,229.76
1,626.61

SITUACION CON PROYECTO


COSTO UNITARIO
Alfalfa
Perenne

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables
TOTAL COSTO DE PRODUCCION

SITUACION CON PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL
102.15
1,150.00

0.91
0.41

0.00
0.00
0.00
893.00
2,145.15

92.96
471.50
0.00
0.00

0.84

0.00
750.12
1,314.58

SITUACION CON PROYECTO


COSTO UNITARIO
Arveja
Transitorio

CULTIVO
ETAPA

SITUACION CON PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

92.49
950.00

0.91
0.41

0.00
0.00
0.00
899.70

TOTAL COSTO DE PRODUCCION

84.16
389.50
0.00
0.00

0.84

1,942.19

0.00
755.75
1,229.41

SITUACION CON PROYECTO


COSTO UNITARIO
Haba
Transitorio

CULTIVO
ETAPA

SITUACION CON PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

0.00
1,113.50

TOTAL COSTO DE PRODUCCION

2,192.93

104.43
975.00

0.91
0.41

0.00
0.00

95.03
399.75
0.00
0.00

0.84

0.00
935.34
1,430.12

SITUACION CON PROYECTO


COSTO UNITARIO
Cebada
Transitorio

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables
TOTAL COSTO DE PRODUCCION

SITUACION CON PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL
71.75
750.00

0.91
0.41

0.00
0.00
0.00
685.00
1,506.75

65.29
307.50
0.00
0.00

0.84

0.00
575.40
948.19

SITUACION CON PROYECTO


COSTO UNITARIO
Trigo
Transitorio

CULTIVO
ETAPA

SITUACION CON PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

71.50
800.00

0.91
0.41

0.00
0.00
0.00
630.00

TOTAL COSTO DE PRODUCCION

65.07
328.00
0.00
0.00

0.84

1,501.50

0.00
529.20
922.27

SITUACION CON PROYECTO


COSTO UNITARIO
Hortalizas
Transitorio

CULTIVO
ETAPA

SITUACION CON PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

160.00
1,950.00

0.91
0.41

0.00
0.00
0.00
1,250.00

TOTAL COSTO DE PRODUCCION

145.60
799.50
0.00
0.00

0.84

3,360.00

0.00
1,050.00
1,995.10

SITUACION CON PROYECTO


COSTO UNITARIO
Quinua - Achita
Transitorio

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables

SITUACION CON PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

78.55
1,050.00

0.91
0.41

0.00
0.00
0.00
521.00

71.48
430.50
0.00
0.00

0.84

0.00
437.64

TOTAL COSTO DE PRODUCCION

1,649.55

939.62

SITUACION CON PROYECTO


COSTO UNITARIO
Maiz
Transitorio

CULTIVO
ETAPA
CONCEPTO
MANO DE OBRA
Calificada
No calificada
EQUIPOS
Transables
No Transables
INSUMOS
Transables
No Transables
TOTAL COSTO DE PRODUCCION

SITUACION CON PROYECTO


P. PRIVADO FAC. CONVERSION
P. SOCIAL

159.10
1,150.00

0.91
0.41

0.00
0.00
0.00
2,032.00
3,341.10

144.78
471.50
0.00
0.00

0.84

0.00
1,706.88
2,323.16

VALOR NETO DE LA PRODUCCION AGRICOLA CON PROYECTO (PRECIOS PRIVADOS)


CONCEPTO

PROGRAMACION ANUAL
AO 5
AO 6

AO 1

AO 2

AO 3

AO 4

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

Valor Neto de la Produccin


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

65,562.16
-46,594.22
31,442.09
115,570.75
-29,830.47
-33,374.17
-75,366.08
-9,837.31
104,668.04
5,926.82
2,956.70

162,943.22
-51,807.11
64,403.70
154,543.44
-31,655.75
-35,138.94
-83,850.18
-9,593.94
136,259.35
11,367.44
8,415.21

162,943.22
-51,807.11
64,403.70
154,543.44
-31,655.75
-35,138.94
-83,850.18
-9,593.94
136,259.35
11,367.44
8,415.21

162,943.22
-51,807.11
64,403.70
154,543.44
-31,655.75
-35,138.94
-83,850.18
-9,593.94
136,259.35
11,367.44
8,415.21

Factor de Actualizacin (9%)

0.92

0.84

0.77

60,148.77

137,146.05

125,822.06

Nmero de Hectreas
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

Valor Actual Neto del VNP

AO 7

AO 8

AO 9

AO 10

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

162,943.22
-51,807.11
64,403.70
154,543.44
-31,655.75
-35,138.94
-83,850.18
-9,593.94
136,259.35
11,367.44
8,415.21

162,943.22
-51,807.11
64,403.70
154,543.44
-31,655.75
-35,138.94
-83,850.18
-9,593.94
136,259.35
11,367.44
8,415.21

162,943.22
-51,807.11
64,403.70
154,543.44
-31,655.75
-35,138.94
-83,850.18
-9,593.94
136,259.35
11,367.44
8,415.21

162,943.22
-51,807.11
64,403.70
154,543.44
-31,655.75
-35,138.94
-83,850.18
-9,593.94
136,259.35
11,367.44
8,415.21

162,943.22
-51,807.11
64,403.70
154,543.44
-31,655.75
-35,138.94
-83,850.18
-9,593.94
136,259.35
11,367.44
8,415.21

162,943.22
-51,807.11
64,403.70
154,543.44
-31,655.75
-35,138.94
-83,850.18
-9,593.94
136,259.35
11,367.44
8,415.21

0.71

0.65

0.60

0.55

0.50

0.46

0.42

115,433.08

105,901.91

97,157.72

89,135.52

81,775.71

75,023.58

68,828.98

VALOR NETO INCREMENTAL DE LA PRODUCCION AGRICOLA (PRECIOS PRIVADOS)

CONCEPTO
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL

AO 1
-25,982.20
39,278.39
99,843.55
-15,205.83
-20,502.97
-41,841.56
-6,814.05
100,073.34
6,550.70
2,549.30
137,948.68

AO 2
-29,133.89
73,023.63
137,243.52
-15,568.65
-20,980.62
-46,973.21
-6,268.35
131,205.18
12,053.71
7,967.07
242,568.39

AO 3
-29,133.89
73,023.63
137,243.52
-15,568.65
-20,980.62
-46,973.21
-6,268.35
131,205.18
12,053.71
7,967.07
242,568.39

AO 4
-29,133.89
73,023.63
137,243.52
-15,568.65
-20,980.62
-46,973.21
-6,268.35
131,205.18
12,053.71
7,967.07
242,568.39

PROGRAMACION ANUAL
AO 5
AO 6
-29,133.89
-29,133.89
73,023.63
73,023.63
137,243.52
137,243.52
-15,568.65
-15,568.65
-20,980.62
-20,980.62
-46,973.21
-46,973.21
-6,268.35
-6,268.35
131,205.18
131,205.18
12,053.71
12,053.71
7,967.07
7,967.07
242,568.39
242,568.39

AO 7
-29,133.89
73,023.63
137,243.52
-15,568.65
-20,980.62
-46,973.21
-6,268.35
131,205.18
12,053.71
7,967.07
242,568.39

CIOS PRIVADOS)

AO 8
-29,133.89
73,023.63
137,243.52
-15,568.65
-20,980.62
-46,973.21
-6,268.35
131,205.18
12,053.71
7,967.07
242,568.39

AO 9
-29,133.89
73,023.63
137,243.52
-15,568.65
-20,980.62
-46,973.21
-6,268.35
131,205.18
12,053.71
7,967.07
242,568.39

AO 10
-29,133.89
73,023.63
137,243.52
-15,568.65
-20,980.62
-46,973.21
-6,268.35
131,205.18
12,053.71
7,967.07
242,568.39

ESTUDIO DE MERCADO DE LA PRODUCCION FINAL


en Toneladas Mtricas
VOLUMEN DE LA PRODUCCION PARA VENTA

PRODUCTO
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL

SIN PROYECTO CON PROYECTO


TM
TM
10.12
43.79
79.90
728.69
42.12
273.78
11.04
34.68
7.44
36.27
10.20
34.26
3.68
24.84
51.68
837.22
3.68
33.12
100.00
660.00
319.86
2,706.65

INCREMENTO
TM
33.67
648.79
231.66
23.64
28.83
24.06
21.16
785.54
29.44
560.00
2,386.79

%
332.73
812.00
550.00
214.17
387.50
235.83
575.00
1,520.00
800.00
560.00
5,987.23

PRODUCCION AGRICOLA ESTIMADA SIN PROYECTO,


DESTINO DE LA PRODUCCION POR PRODUCTOS
PRODUCTOS
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL
%

PRODUCCION
TM
10.12
79.90
42.12
11.04
7.44
10.20
3.68
51.68
3.68
100.00
319.86
100.00

SEMILLA
TM
5.50
10.00
0.03
0.72
0.48
1.20
0.80
0.80
0.16
0.13
19.82
6.19

DESTINO DE LA PRODUCCION
CONSUMO
MERCADO
%
TM
TM
2.53
2.09
20.65%
19.98
49.93
62.48%
10.53
31.56
74.93%
2.76
7.56
68.48%
1.86
5.10
68.55%
2.55
6.45
63.24%
0.92
1.96
53.26%
12.92
37.96
73.45%
0.92
2.60
70.65%
25.00
74.88
74.88%
79.97
220.08
25.00
68.81

PRODUCCION AGRICOLA ESTIMADA CON PROYECTO,


DESTINO DE LA PRODUCCION POR PRODUCTOS
PRODUCTOS
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
TOTAL
%

PRODUCCION
TM
43.79
728.69
273.78
34.68
36.27
34.26
24.84
837.22
33.12
660.00
2,706.65
100.00%

SEMILLA
TM
5.50
10.00
0.03
0.72
0.48
1.20
0.80
0.80
0.16
0.13
19.82
0.73%

DESTINO DE LA PRODUCCION
CONSUMO
MERCADO
TM
TM
%
2.19
36.10
82.44%
36.43
682.25
93.63%
13.69
260.06
94.99%
1.73
32.23
92.92%
1.81
33.98
93.68%
1.71
31.34
91.50%
1.24
22.80
91.78%
41.86
794.56
94.90%
1.66
31.30
94.52%
33.00
626.88
94.98%
135.33
2,551.50
5.00%
94.27%

CALCULO DE LA TARIFA DE AGUA DE EQUILIBRIO


ALTERNATIVA 01 (Precios Privados)
AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y S
Tarifa de agua de equilibrio

0.01476612

Concepto

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

10
892,529.66

Ingresos por venta de agua


(a) m3 vendidos

892,529.66

892,529.66

892,529.66

892,529.66

892,529.66

892,529.66

892,529.66

892,529.66

892,529.66

(b) tarifa por m3

0.014766

0.014766

0.014766

0.014766

0.014766

0.014766

0.014766

0.014766

0.014766

0.014766

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.917

0.842

0.772

0.708

0.650

0.596

0.547

0.502

0.460

0.422

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total S/. ((a) x (b))

(1)

Egresos de la junta de usuarios


(c) operacin de la infraestructura
(d) mantenimiento de la infraestructura
Total S/. ((c) + (d))

(2)

FLUJO NETO = ((1)-(2))


FACTOR DE ACTUALIZACIN (9%)
VALOR ACTUAL NETO

0.00

m3 vendidos anuales
Total area regada (Has)
Volumen de agua vendido por hectrea (m3/ha/ao)

892,529.66
308.00
2,897.82

Tarifa de agua (S/. /m3)

0.015

Tarifa de agua (S/. /ha/ao)

42.79

CALCULO DE LOS INGRESOS POR VENTA DE AGUA


ALTERNATIVA 01 (Precios Privados)
AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y S
Tarifa de agua (S/. /ha/ao)

42.79

Concepto

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

10

Ingresos por venta de agua


(a) rea a incorporar (ha)

308.00

308.00

308.00

308.00

308.00

308.00

308.00

308.00

308.00

42.79

42.79

42.79

42.79

42.79

42.79

42.79

42.79

42.79

42.79

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

(b) tarifa por ha


Total S/. ((a) x (b))

(1)

308.00

Egresos de la junta de usuarios


(c) operacin de la infraestructura
(d) mantenimiento de la infraestructura
Total S/. ((c) + (d))

(2)

FLUJO NETO = ((1)-(2))


FACTOR DE ACTUALIZACIN (11%)
VALOR ACTUAL NETO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.901

0.812

0.731

0.659

0.593

0.535

0.482

0.434

0.391

0.352

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

INGRESOS INCREMENTALES POR VENTA DE AGUA


ALTERNATIVA 01 (Precios Privados)
AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y S
Concepto

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

10

Ingresos por venta de agua con proyecto


(a) rea a incorporar (ha)

308.00

308.00

308.00

308.00

308.00

308.00

308.00

308.00

308.00

42.79

42.79

42.79

42.79

42.79

42.79

42.79

42.79

42.79

42.79

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

(c) rea a incorporar (ha)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(d) tarifa por ha

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total S/. ((c) x (d))

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

(b) tarifa por ha


Total S/. ((a) x (b))

308.00

Ingresos por venta de agua sin proyecto

FLUJO NETO = ((1)-(2))


FACTOR DE ACTUALIZACIN (11%)
VALOR ACTUAL NETO

77,615.37

0.901

0.812

0.731

0.659

0.593

0.535

0.482

0.434

0.391

0.352

11,873.15

10,696.53

9,636.52

8,681.55

7,821.21

7,046.14

6,347.87

5,718.80

5,152.08

4,641.51

DE HUAYLLAPATA Y S

CALCULO DE LA TARIFA DE AGUA DE EQUILIBRIO


ALTERNATIVA 01 (Precios Sociales)

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUA
Tarifa de agua de equilibrio

0.014630473

Concepto

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

10

Ingresos por venta de agua


(a) m3 vendidos

892,529.66

892,529.66

892,529.66

892,529.66

892,529.66

892,529.66

892,529.66

892,529.66

892,529.66

(b) tarifa por m3

0.014630473

###

###

###

###

###

###

###

###

###

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

(c) operacin de la infraestructura

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

(d) mantenimiento de la infraestructura

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

0.909

0.826

0.751

0.683

0.621

0.564

0.513

0.467

0.424

0.386

1,775.83

1,614.39

1,467.63

1,334.21

1,212.91

1,102.65

1,002.41

911.28

828.44

753.12

Total S/. ((a) x (b))

(1)

892,529.66

Egresos de la junta de usuarios

Total S/. ((c) + (d))

(2)

FLUJO NETO = ((1)-(2))


FACTOR DE ACTUALIZACIN (10%)
VALOR ACTUAL NETO

12,002.86

m3 vendidos anuales
Total area regada (Has)
Volumen de agua vendido por hectrea (m3/ha/ao)
Tarifa de agua (S/. /m3)
Tarifa de agua (S/. /ha/ao)

892,529.66
308.00
2,897.82
0.014630473
42.40

DE HUAYLLAPATA Y S

DE HUAYLLAPATA Y S

CALCULO DE LOS INGRESOS POR VENTA DE AGUA


ALTERNATIVA 01 (Precios Sociales)

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUA
Tarifa de agua (S/. /ha/ao)

42.40

Concepto

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

10

Ingresos por venta de agua


(a) rea a incorporar (ha)

308.00

308.00

308.00

308.00

308.00

308.00

308.00

308.00

308.00

42.40

42.40

42.40

42.40

42.40

42.40

42.40

42.40

42.40

42.40

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

(c) operacin de la infraestructura

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

(d) mantenimiento de la infraestructura

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

1,953.41

0.901

0.812

0.731

0.659

0.593

0.535

0.482

0.434

0.391

0.352

1,759.83

1,585.43

1,428.32

1,286.77

1,159.25

1,044.37

940.88

847.64

763.64

687.96

(b) tarifa por ha


Total S/. ((a) x (b))

(1)

308.00

Egresos de la junta de usuarios

Total S/. ((c) + (d))

(2)

FLUJO NETO = ((1)-(2))


FACTOR DE ACTUALIZACIN (11%)
VALOR ACTUAL NETO

11,504.09

INGRESOS INCREMENTALES POR VENTA DE AGUA


ALTERNATIVA 01 (Precios Sociales)

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUA
Concepto

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

10

Ingresos por venta de agua con proyecto


(a) rea a incorporar (ha)

308.00

308.00

308.00

308.00

308.00

308.00

308.00

308.00

308.00

42.40

42.40

42.40

42.40

42.40

42.40

42.40

42.40

42.40

42.40

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

(c) rea a incorporar (ha)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(d) tarifa por ha

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total S/. ((c) x (d))

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

(b) tarifa por ha


Total S/. ((a) x (b))

308.00

Ingresos por venta de agua sin proyecto

FLUJO NETO = ((1)-(2))


FACTOR DE ACTUALIZACIN (11%)
VALOR ACTUAL NETO

76,902.36

0.901

0.812

0.731

0.659

0.593

0.535

0.482

0.434

0.391

0.352

11,764.08

10,598.27

9,547.99

8,601.80

7,749.37

6,981.41

6,289.56

5,666.27

5,104.75

4,598.87

UIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO

UIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO

UIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO

FLUJO DE CAJA A PRECIOS PRIVADOS


ALTERNATIVA 01 (en nuevos soles)

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACU
Concepto
Ingresos incrementales del proyecto

(1)

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Valor

10

Actual

0.00

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

131,792.00

Venta de agua para riego con proyecto

0.00

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

131,792.00

Venta de agua para riego sin proyecto

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(2)

0.00

137,948.68

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

2,321,064.19

0.00

137,948.68

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

0.00

(3)

1,498,901.79

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

1,630,693.79

40,000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

40,000.00

1,429,808.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,429,808.92

Incremento en el valor neto de la produccin


Agrcola
Costos incrementales del proyecto
Estudios
Infraestructura
Capacitacin y mitigacion ambiental
Operacin
Mantenimiento
FLUJO NETO = ((1+2)-(3))
FACTOR DE ACTUALIZACIN (12%)

(4)
(5)

29,092.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

29,092.87

0.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

100,400.00

0.00

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

31,392.00

-1,498,901.79

137,948.68

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

822,162.41

1.000

0.893

0.797

0.712

0.636

0.567

0.507

0.452

0.404

0.361

0.322

VALOR ACTUAL NETO ( 4 x 5)

(6)

-1,498,901.79

123,168.46

193,374.04

172,655.39

154,156.60

137,639.82

122,892.70

109,725.62

97,969.30

87,472.59

78,100.53

TASA INTERNA DE RETORNO

(7)

8.4%

RELACIN BENEFICIO/COSTO

(8)

0.86

255,747.59

Beneficios

-221,746.74

0.00

151,127.88

255,747.59

255,747.59

255,747.59

255,747.59

255,747.59

255,747.59

255,747.59

255,747.59

1,351,620.47

0.00

134,935.61

203,880.41

182,036.08

162,532.22

145,118.05

129,569.69

115,687.22

103,292.16

92,225.15

82,343.88 benefic. actualiz

1,573,367.21

1,498,901.79

11,767.14

10,506.38

9,380.69

8,375.62

7,478.23

6,676.99

5,961.60

5,322.86

4,752.55

4,243.35 costos actualiz

N IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO

benefic. actualiz

FLUJO DE CAJA A PRECIOS SOCIALES


ALTERNATIVA 01 (en nuevos soles)

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
Concepto
Ingresos incrementales del proyecto

(1)

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Valor

10

Actual

0.00

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

130,581.31

Venta de agua para riego con proyecto

0.00

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

13,058.13

130,581.31

Venta de agua para riego sin proyecto

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Incremento en el valor neto de la produccin (2)

0.00

213,617.21

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

3,257,945.43

Agrcola
Costos incrementales del proyecto

(3)

Estudios
Infraestructura
Capacitacin y mitigacin ambiental

0.00

213,617.21

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

0.00

1,072,418.75

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

1,183,465.95

36,400.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

36,400.00

1,013,873.78

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,013,873.78

22,144.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22,144.97

Operacin

0.00

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

84,364.00

Mantenimiento

0.00

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

26,683.20

-1,072,418.75

215,570.62

340,212.10

340,212.10

340,212.10

340,212.10

340,212.10

340,212.10

340,212.10

340,212.10

340,212.10

2,205,060.79

FLUJO NETO = ((1+2)-(3))

(4)

FACTOR DE ACTUALIZACIN

(5)

1.000

0.909

0.826

0.751

0.683

0.621

0.564

0.513

0.467

0.424

0.386

VALOR ACTUAL NETO ( 4 x 5)

(6)

-1,072,418.75

195,973.29

281,167.03

255,606.39

232,369.44

211,244.95

192,040.86

174,582.60

158,711.46

144,283.14

131,166.49

TASA INTERNA DE RETORNO

(7)

26.22%

RELACIN BENEFICIO/COSTO

(8)

1.79

Beneficios

904,726.90

0.00

226,675.34

351,316.82

351,316.82

351,316.82

351,316.82

351,316.82

351,316.82

351,316.82

351,316.82

351,316.82

2,045,379.35

0.00

206,068.49

290,344.48

263,949.53

239,954.12

218,140.11

198,309.19

180,281.08

163,891.89

148,992.63

135,447.84 benefic. actualiz

1,140,652.45

1,072,418.75

10,095.20

9,177.45

8,343.14

7,584.67

6,895.16

6,268.32

5,698.48

5,180.43

4,709.49

4,281.35 costos actualiz

UIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO

COSTOS DE LA SITUACIN OPTIMIZADA (SIN PROYECTO)


PRECIOS PRIVADOS (en nuevos soles)

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCH
Concepto

Unidad

Costo

Meta

P.U.

Total

Estudio definitivo

0.00

Estudio de Prefactibilidad

Unidad

0.00

0.00

Global

1.00

0.00

0.00

Infraestructura de riego

Ao

Ao

Ao

Ao

Ao
5

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

Ao

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

6.28

0.00

0.00

km

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

GASTOS GENERALES (10% CD)

Global

1.00

0.00

0.00

SUPERVISIN (3% CD)

Global

1.00

0.00

0.00

#REF!

Global

1.00

0.00

0.00

#REF!

Global

1.00

0.00

0.00

Global

0.00

0.00

0.00
511.48

511.48

511.48

511.48

511.48

Operacin de la infraestructura

Ao

10.00

350.00

3,500.00

350.00

350.00

350.00

350.00

350.00

Mantenimiento de la infraestructura

Ao

10.00

161.48

1,614.80

161.48

161.48

161.48

161.48

161.48

5,114.80

511.48

511.48

511.48

511.48

511.48

COSTOS DE INFRAESTRUCTURA

Capacitacin y Mitigacin ambiental


Capacitacin y Mitigacin ambiental

0.00

Operacin y mantenimiento

Presupuesto total del proyecto

5,114.80

0.00

ALTERNATIVA 01
COSTOS DE LA SITUACIN CON PROYECTO
PRECIOS PRIVADOS (en nuevos soles)

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCH
Concepto

Unidad

Costo

Meta

P.U.

Total

Estudio definitivo
Estudio de Prefactibilidad

Ao

Ao

Ao

Ao

Ao

40,000.00

40,000.00

40,000.00

40,000.00

Ao
5

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Unidad

1.00

40,000.00

#REF!

#REF!

Global

1.00

0.00

0.00

0.00

COSTOS DE INFRAESTRUCTURA

Global

1.00

1,250,214.32

1,250,214.32

1,250,214.32

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Km

6.28

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

GASTOS GENERALES (10% CD)

Global

1.00

129,303.54

129,303.54

129,303.54

Global

1.00

38,791.06

38,791.06

38,791.06

Global

1.00

#REF!

#REF!

#REF!

29,092.87

29,092.87

Global

1.00

29,092.87

29,092.87

29,092.87
0.00

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

Operacin de la infraestructura

Ao

10.00

10,040.00

0.00

0.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

Mantenimiento de la infraestructura

Ao

10.00

3,139.20

0.00

0.00

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

#REF!

#REF!

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

Infraestructura de riego
0

SUPERVISIN (3% CD)


#REF!

Capacitacin y Mitigacin ambiental


Capacitacin y Mitigacin ambiental

Operacin y mantenimiento

Presupuesto total del proyecto

ALTERNATIVA 01
COSTOS INCREMENTALES
PRECIOS PRIVADOS (en nuevos soles)

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCH
Concepto

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

CON PROYECTO
A. INVERSIN
Estudio de Prefactibilidad
Infraestructura
Capacitacin y Mitigacin ambiental
B. OPERACIN Y MANTENIMIENTO

1,501,129.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

1,418,308.92
42,821.05
0.00

Operacin
Mantenimiento
C. Costo total con proyecto (A+B)

0.00

40,000.00

1,501,129.97

SIN PROYECTO
D. OPERACIN Y MANTENIMIENTO

511.48

511.48

511.48

511.48

511.48

511.48

511.48

511.48

511.48

511.48

Operacin

350.00

350.00

350.00

350.00

350.00

350.00

350.00

350.00

350.00

350.00

Mantenimiento

161.48

161.48

161.48

161.48

161.48

161.48

161.48

161.48

161.48

161.48

E. Costo total sin proyecto = (D)

511.48

511.48

511.48

511.48

511.48

511.48

511.48

511.48

511.48

511.48

1,500,618.49

12,667.72

12,667.72

12,667.72

12,667.72

12,667.72

12,667.72

12,667.72

12,667.72

12,667.72

TOTAL COSTOS INCREMENTALES (C)-(E)


Factor de actualizacin (12%)
Valor actual de los costos incrementales

1.000

0.893

0.797

0.712

0.636

0.567

0.507

0.452

0.404

0.361

1,500,618.49

11,310.46

10,098.63

9,016.63

8,050.57

7,188.00

6,417.86

5,730.23

5,116.28

4,568.11

TOS DE LA SITUACIN OPTIMIZADA (SIN PROYECTO)


PRECIOS PRIVADOS (en nuevos soles)

RGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
Ao

Ao

Ao

Ao

Ao

10

Monto
Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

511.48

511.48

511.48

511.48

511.48

5,114.80

350.00

350.00

350.00

350.00

350.00

3,500.00

161.48

161.48

161.48

161.48

161.48

1,614.80

511.48

511.48

511.48

511.48

511.48

5,114.80

0.00

ALTERNATIVA 01
COSTOS DE LA SITUACIN CON PROYECTO
PRECIOS PRIVADOS (en nuevos soles)

RGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
Ao

Ao

Ao

Ao

Ao

10

Monto
Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

40,000.00
40,000.00
#REF!
0.00
1,250,214.32
0.00

0.00

0.00

0.00

0.00

0.00

29,092.87

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

131,792.00

10,040.00

10,040.00

10,040.00

10,040.00

10,040.00

100,400.00

3,139.20

3,139.20

3,139.20

3,139.20

3,139.20

31,392.00

13,179.20

13,179.20

13,179.20

13,179.20

13,179.20

#REF!

29,092.87

VA 01

MENTALES

n nuevos soles)

E USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO


Ao

Monto

10

Total
0.00

1,501,129.97
40,000.00
1,418,308.92
42,821.05

13,179.20

131,792.00

10,040.00

100,400.00

3,139.20

31,392.00

13,179.20

1,632,921.97

511.48

5,626.28

350.00

3,850.00

161.48

1,776.28

511.48

5,626.28

12,667.72

1,627,295.69

0.322
4,078.67

1,572,193.93

Factor
Correccin
1.00

1.00

1.00

Factor
Correccin

COSTOS DE LA SITUACIN OPTIMIZADA (SIN PROYECTO)


PRECIOS SOCIALES (en nuevos soles)

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
Concepto

Unidad

Meta

Costo
P.U.

Total

Estudio definitivo

0.00

Estudio de Prefactibilidad

Unidad

0.00

0.00

Infraestructura de riego
COSTOS DE INFRAESTRUCTURA

Ao

Ao

Ao

Ao

Ao

Ao

Ao

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

Global

Ao

0.00

0.00

Global

1.00

0.00

0.00

0 Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

1.00

0.00

0.00

Global

6.28

0.00

0.00

1.00

0.00

0.00

Global

1.00

0.00

0.00

0 Global

1.00

0.00

0.00

0 Global

1.00

0.00

0.00

GASTOS GENERALES (10% CD)

Global

1.00

0.00

0.00

SUPERVISIN (3% CD)

Global

1.00

0.00

0.00

#REF! Global

1.00

0.00

0.00

Global

0.00

0.00

280.76

280.76

280.76

280.76

280.76

280.76

280.76

Operacin de la infraestructura

Ao

10.00

143.50

1,435.00

143.50

143.50

143.50

143.50

143.50

143.50

143.50

Mantenimiento de la infraestructura

Ao

10.00

137.26

1,372.58

137.26

137.26

137.26

137.26

137.26

137.26

137.26

280.76

280.76

280.76

280.76

280.76

280.76

280.76

0 km
0

Capacitacin y Mitigacin ambiental


Capacitacin y Mitigacin ambiental

0.00

Operacin y mantenimiento

Presupuesto total del proyecto

0.00
2,807.58

2,807.58

0.00

ALTERNATIVA 01
COSTOS DE LA SITUACIN CON PROYECTO
PRECIOS SOCIALES (en nuevos soles)

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
Concepto

Unidad

Meta

Costo
P.U.

Total

Estudio definitivo
Estudio de Prefactibilidad

Ao

Ao

Ao

Ao

Ao

Ao

Ao

36,241.00

36,241.00

36,241.00

36,241.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Unidad

1.00

Infraestructura de riego

Global

1.00

0.00

#REF!

#REF!

Global

1.00

989,314.69

989,314.69

989,314.69

COSTOS DE INFRAESTRUCTURA

Global

1.00

#REF!

#REF!

#REF!

Global

1.00

#REF!

#REF!

#REF!

Global

1.00

#REF!

#REF!

#REF!

Global

1.00

#REF!

#REF!

#REF!

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Km

6.28

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

0.00

0.00

0.00

Global

1.00

12,930.35

12,930.35

12,930.35

Global

1.00

1,163.73

1,163.73

1,163.73

Global

1.00

10,465.00

10,465.00

10,465.00

24,572.54

24,572.54

Global

1.00

24,572.54

24,572.54

24,572.54
11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

Operacin de la infraestructura

Ao

10.00

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

Mantenimiento de la infraestructura

Ao

10.00

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

0
0

GASTOS GENERALES (10% CD)


SUPERVISIN (3% CD)
#REF!

36,241.00

Ao

Capacitacin y Mitigacin ambiental


Capacitacin y Mitigacin ambiental

Operacin y mantenimiento

Presupuesto total del proyecto

0.00

#REF!

#REF!

ALTERNATIVA 01
COSTOS INCREMENTALES
PRECIOS SOCIALES (en nuevos soles)
AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
Concepto

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Ao

Monto

10

Total

CON PROYECTO
A. INVERSIN
Estudios de prefactibilidad
Infraestructura
Capacitacin y mitigacin ambiental
B. OPERACIN Y MANTENIMIENTO

1,087,634.21

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,087,634.21

36,400.00

36,400.00

1,013,873.78

1,013,873.78

37,360.43

37,360.43
11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

111,047.20

Operacin

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

8,436.40

84,364.00

Mantenimiento

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

2,668.32

26,683.20

1,087,634.21

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

11,104.72

1,198,681.41

D. OPERACIN Y MANTENIMIENTO

0.00

280.76

280.76

280.76

280.76

280.76

280.76

280.76

280.76

280.76

280.76

2,807.58

Operacin

0.00

143.50

143.50

143.50

143.50

143.50

143.50

143.50

143.50

143.50

143.50

1,435.00

Mantenimiento

0.00

137.26

137.26

137.26

137.26

137.26

137.26

137.26

137.26

137.26

137.26

1,372.58

E. Costo total sin proyecto = (D)

0.00

280.76

280.76

280.76

280.76

280.76

280.76

280.76

280.76

280.76

280.76

2,807.58

1,087,634.21

10,823.96

10,823.96

10,823.96

10,823.96

10,823.96

10,823.96

10,823.96

10,823.96

10,823.96

10,823.96

1,195,873.83

C. Costo total con proyecto (A+B)

0.00

SIN PROYECTO

TOTAL COSTOS INCREMENTALES (C)-(E)


Factor de actualizacin (9%)
Valor actual de los costos incrementales

1.000

0.917

0.842

0.772

0.708

0.650

0.596

0.547

0.502

0.460

0.422

1,087,634.21

9,930.24

9,110.31

8,358.08

7,667.97

7,034.83

6,453.97

5,921.08

5,432.18

4,983.65

4,572.16

1,157,098.69

TOS DE LA SITUACIN OPTIMIZADA (SIN PROYECTO)


PRECIOS SOCIALES (en nuevos soles)

RGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
Ao

Ao

Ao

Monto

10

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

280.76

280.76

280.76

2,807.58

143.50

143.50

143.50

1,435.00

137.26

137.26

137.26

1,372.58

280.76

280.76

280.76

2,807.58

0.00

ALTERNATIVA 01
COSTOS DE LA SITUACIN CON PROYECTO
PRECIOS SOCIALES (en nuevos soles)

RGEN IZQUIERDA COMIT DE USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
Ao

Ao

Ao

10

0.00

0.00

0.00

0.00

0.00

0.00

Monto
Total
36,241.00
36,241.00
#REF!
989,314.69
#REF!
#REF!

0.00

0.00

0.00

24,572.54

###

###

###

111,047.20

8,436.40 8,436.40 8,436.40

84,364.00

2,668.32 2,668.32 2,668.32

26,683.20

24,572.54

###

###

###

#REF!

Presupuesto

Cliente
Lugar

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMISION DE
USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
PRIDER
AYACUCHO - HUAMANGA - RANCHA
PRESUPUESTO ALTERNATIVA N 01 (PRECIOS PRIVADOS)

Item

01
01.01
01.01.01
01.01.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.03
02.02.03.01
02.02.03.02
02.02.03.03
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.03.07
02.03.08
02.03.09
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
02.04.02.04
02.04.02.05
02.04.02.06
02.04.03
02.04.03.01
02.04.03.02
02.04.03.03
02.04.04
02.04.04.01
02.04.04.02
02.04.04.03
02.04.04.04
02.04.04.05
02.04.04.06
02.04.04.07
02.04.04.08
02.04.04.09
02.04.04.10
02.04.04.11
02.04.04.12
02.04.05
02.04.05.01
02.04.05.02
02.04.05.03
02.04.05.04
02.04.05.05
02.04.05.06
02.04.05.07
02.04.06

Descripcin

UNIDAD DE RIEGO CCELLOCCACCA


OBRAS PROVISIONALES
CONSTRUCCION DE CAMPAMENTO PROVICIONAL
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
TRABAJOS PRELIMINARES
FLETE TERRESTRE
MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA
TRAZO Y REPLANTEO
CONTROL TOPOGRAFICO
SECTOR QATUN QASA (RES. V=2000M3)
MEJORAMIENTO DE T-02
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
DEMOLICION DE MUROS DE CANAL DE CONCRETO
REJILLA METALICA PARA ESTRUCTURA DE SALIDA
CANAL ENTUBADO PVC D=6" (TOMA N2 - RESERVORIO N1)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA MATERIAL SUELTO A MANO
CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
RELLENO DE ZANJA CON MATERIAL PROPIO
TUBERIAS , ACCESORIOS Y MISCELANEOS
TUBERIA PVC NTP ISO 4422 UF C-7.5 D=160 mm.
CODO 90 PVC ISO 4422 DN=160 MM C-7.5 UF
PRUEBA HIDRAULICA, A ZANJA TAPADA
CANAL DE ALIMENTACION A RES. V=2400m3
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
JUNTA WATER STOP 6 "
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
RESERVORIO N01 (2000 m3)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO DE RESERVORIOS
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA A MAQUINA EN TERRENO SUELTO
REFINE Y NIVELACION EN LA CAJA DEL RESERVORIO
RELLENO EN ZONA A2
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
EXCAVACION DE ZANJA PARA ANCLAJE DE GEOMEMBRANA
RELLENO MANUAL EN ZONA DE ANCLAJE DE GEOMEMBRANA
INSTALACION DE GEOMEMBRANAS
SUMINISTRO Y COLOCACION DE GEOMEMBRANA e= 1.5 mm
SUMINISTRO Y COLOCACION DE MALLAS DE GEOTEXTIL TIPO I
SUM. E INST. DE ACCESORIOS EN ESTRUCTURA DE SALIDA DEL RESERVORIO D=6''
VALVULA COMPUERTA DE 6" EN SALIDA DE RESERVORIO 2000m3
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
VALVULA COMPUERTA DE FIERRO FUNDIDO P/ISO 4422 D=150MM UF
TAPA METALICA 0.80x1.00m.
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
CANAL DE LIMPIEZA EN RESERVORIO
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
SUMINISTRO Y COLOCACION DE MALLAS DE GEOTEXTIL TIPO I
INSTALACION TUBERIA DE PVC SAP C-10 10" EN CANAL DE LIMPIA
VERTEDERO DE DEMASIAS EN RESERVORIO

Und.

Metrado

Precio (S/.)

Parcial (S/.)

GLB
und

1.00
1.00

30,000.00
384.19

SERV
SERV
KM
mes

1.00
1.00
7.55
5.00

22,972.91
12,239.90
348.96
4,911.53

m2
m2
m3
und

2.25
1.44
0.04
1.00

4.74
1.81
17.99
366.50

m2
m2

215.00
172.00

4.74
1.81

m3
m3
m3

129.00
19.35
105.35

22.86
11.62
1.75

m
und
m

215.00
2.00
215.00

6.18
106.90
2.16

m2
m2
m3
m3
m2
kg
m
m2
m2

2.17
2.17
0.98
0.49
6.48
16.46
14.50
4.14
3.69

4.74
1.81
33.53
398.45
39.74
4.34
20.34
25.26
18.86

m2
m2

1,230.00
1,230.00

4.74
1.74

m3
m2
m3
m3
m3
m3

4,791.04
3,017.46
103.77
5,749.24
38.22
38.22

5.54
3.00
11.11
15.26
88.68
6.37

m2
m2
GLB

1,822.84
1,822.84
1.00

29.53
10.23
934.80

m2
m2
m3
m2
m3
m2
kg
und
und
m2
m2
m2

1.43
1.43
1.64
1.43
0.80
8.56
44.43
1.00
1.00
4.32
5.67
5.67

4.74
1.81
33.53
23.30
398.45
39.74
4.34
730.87
161.71
25.26
18.86
20.64

m2
m2
m3
m3
m2
m2
m

2.46
2.46
1.23
0.61
8.22
7.16
15.84

4.74
1.81
33.53
398.45
39.74
10.23
61.86

92,789.30
30,384.19
30,000.00
384.19
62,405.11
22,972.91
12,239.90
2,634.65
24,557.65
708,761.00
380.50
10.67
2.61
0.72
366.50
6,695.47
1,330.42
1,019.10
311.32
3,358.15
2,948.94
224.85
184.36
2,006.90
1,328.70
213.80
464.40
1,040.38
10.29
3.93
32.86
195.24
257.52
71.44
294.93
104.58
69.59
313,635.36
7,970.40
5,830.20
2,140.20
128,113.83
26,542.36
9,052.38
1,152.88
87,733.40
3,389.35
243.46
73,410.92
53,828.47
18,647.65
934.80
2,175.11
6.78
2.59
54.99
33.32
318.76
340.17
192.83
730.87
161.71
109.12
106.94
117.03
1,680.17
11.66
4.45
41.24
243.05
326.66
73.25
979.86
1,036.47

Presupuesto

Cliente
Lugar
02.04.06.01
02.04.06.02
02.04.06.03
02.04.06.04
02.04.06.05
02.04.06.06
02.04.06.07
02.04.06.08
02.04.06.09
02.04.07
02.04.07.01
02.04.07.02
02.04.07.03
02.04.07.04
02.04.07.05
02.04.07.06
02.04.07.07
02.04.07.08
02.04.07.09
02.04.07.10
02.04.08
02.04.08.01
02.04.08.02
02.04.08.03
02.04.08.04
02.04.08.05
02.04.08.06
02.04.08.07
02.04.08.08
02.04.08.09
02.04.08.10
02.04.08.11
02.04.08.12
02.04.09
02.04.09.01
02.04.09.02
02.04.09.03
02.04.09.04
02.04.09.05
02.04.09.06
02.04.09.07
02.04.09.08
02.04.10
02.04.10.01
02.04.10.02
02.04.10.03
02.04.10.04
02.04.10.05
02.04.10.06
02.04.10.07
02.04.11
02.04.11.01
02.04.11.02
02.04.11.03
02.04.11.04
02.04.11.05
02.04.11.06
02.05
02.05.01
02.05.01.01
02.05.01.02
02.05.02
02.05.02.01
02.05.02.02
02.05.02.03
02.05.02.04
02.05.02.05
02.05.03
02.05.03.01
02.05.03.02
02.05.03.03
02.05.03.04
02.05.03.05
02.06
02.06.01
02.06.01.01
02.06.01.02

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMISION DE
USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
PRIDER
AYACUCHO - HUAMANGA - RANCHA
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
TUBERIA PVC NTP ISO 4422 UF C-7.5 D=200 mm.
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
CAMARA DE REUNION TIPO I
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
EMBOQUILLADO DE CANAL F'C=140 KG/CM2 +30%PM
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
VALVULA COMPUERTA DE 8" EN CANAL DE LIMPIA R=2400m3
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
VALVULA COMPUERTA DE FIERRO FUNDIDO P/ISO 4422 D=200MM UF
TAPA METALICA 0.80x1.00m.
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
CERCO PERIMETRICO
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA ESTRUCTURAS RENDIMIENTO=25 M3/DIA
CONCRETO 1:10 +30% P.G.
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT
TUBERIA ESTRUCTURAL D=3", E=1.8 mm
HABILITACION E INSTALACION DE MALLA OLIMPICA GALVANIZADA
PUERTA METALICA LAC 1/16" C/MARCO 2"x2"x1/4" Y REFUERZOS
CANAL BY-PASS
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
POZAS DISIPADORAS
LIMPIEZA DE TERRENO MANUAL
EXCAVACION PARA ESTRUCTURAS RENDIMIENTO=25 M3/DIA
SOLADO EN OBRAS DE ARTE 2" FC=100 KG/CM2
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA MATERIAL SUELTO A MAQUINA
EXCAVACION DE ZANJA EN ROCA SUELTA A MAQUINA (INC. LIMPIEZA)
EXCAVACION DE ZANJA EN ROCA FIJA A MAQUINA (INC. LIMPIEZA)
CAMA DE APOYO C/ MATERIAL ZARANDEADO h=0.15 m (TUB 140 A 200 MM)
RELLENO DE ZANJAS CON MATERIAL PROPIO
TUBERIAS , ACCESORIOS Y MISCELANEOS
TUBERIA PVC SAP C-7.5, D=6'' NTP-ISO 4422
TUBERIA PVC SAP C-7.5, D=4".
TEE CON REDUCCION PVC NTP ISO 4422 C-5 D= 160X110 MM
TEE PVC-SAP NTP ISO4422 4"
PRUEBA HIDRAULICA, A ZANJA TAPA
OBRAS DE ARTE LINEA DE CONDUCCION
CAMARA ROMPE PRESION (04 UND)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO

m2
m2
m3
m3
m2
m
m2
m2
m2

0.72
0.72
0.40
0.20
2.15
13.20
0.92
0.34
0.34

4.74
1.81
33.53
398.45
39.74
61.86
25.26
18.86
20.64

m2
m2
m3
m3
m2
kg
m3
m2
m2
m2

5.32
5.32
5.97
1.88
20.74
114.32
0.15
15.33
11.70
11.70

4.74
1.81
33.53
398.45
39.74
4.34
185.79
25.26
18.86
20.64

m2
m2
m3
m2
m3
m2
kg
und
und
m2
m2
m2

1.43
1.43
1.64
1.43
0.81
9.76
44.44
1.00
1.00
4.32
4.60
9.84

4.74
1.81
33.53
23.30
398.45
39.74
4.34
2,135.14
161.71
25.26
18.86
20.64

m2
m3
m3
m3
m2
m
m
m2

3,679.00
65.52
46.80
10.40
83.20
244.95
208.00
8.00

1.01
21.29
237.47
249.28
33.74
46.87
191.27
83.14

m2
m2
m3
m3
m2
m2
m2

57.38
57.38
25.82
14.75
123.14
81.97
73.95

4.74
1.01
33.53
420.31
39.74
25.26
18.86

m2
m3
m2
m3
m2
kg

3.80
5.70
0.14
2.75
16.60
268.10

4.74
21.29
23.30
398.45
39.74
4.34

m2
KM

3,523.00
5.87

4.74
348.96

m3
m3
m3
m
m3

1,593.94
398.49
664.14
528.57
2,009.97

6.16
36.20
22.15
5.03
11.06

m
m
und
und
m

3,262.00
2,366.00
3.00
1.00
5,628.00

36.82
12.42
92.03
69.79
0.96

m2
m2

15.12
15.12

4.74
1.81

3.41
1.30
13.41
79.69
85.44
816.55
23.24
6.41
7.02
3,181.73
25.22
9.63
200.17
749.09
824.21
496.15
27.87
387.24
220.66
241.49
3,696.98
6.78
2.59
54.99
33.32
322.74
387.86
192.87
2,135.14
161.71
109.12
86.76
203.10
73,554.08
3,715.79
1,394.92
11,113.60
2,592.51
2,807.17
11,480.81
39,784.16
665.12
15,754.08
271.98
57.95
865.74
6,199.57
4,893.58
2,070.56
1,394.70
3,061.59
18.01
121.35
3.26
1,095.74
659.68
1,163.55
237,832.43
18,747.42
16,699.02
2,048.40
63,843.69
9,818.67
14,425.34
14,710.70
2,658.71
22,230.27
155,241.32
120,106.84
29,385.72
276.09
69.79
5,402.88
149,176.86
17,733.74
71.67
27.37

Presupuesto

Cliente
Lugar
02.06.01.03
02.06.01.04
02.06.01.05
02.06.01.06
02.06.01.07
02.06.01.08
02.06.01.09
02.06.01.10
02.06.01.11
02.06.02
02.06.02.01
02.06.02.02
02.06.02.03
02.06.02.04
02.06.02.05
02.06.02.06
02.06.03
02.06.03.01
02.06.03.02
02.06.03.03
02.06.03.04
02.06.03.05
02.06.03.06
02.06.04
02.06.04.01
02.06.04.02
02.06.04.03
02.06.04.04
02.06.04.05
02.06.04.06
02.06.04.07
02.06.04.08
02.06.04.09
02.06.04.10
02.06.04.11
02.06.04.12
02.06.05
02.06.05.01
02.06.05.02
02.06.05.03
02.06.05.04
02.06.05.05
02.06.05.06
02.06.05.07
02.06.05.08
02.06.05.09
02.06.05.10
02.06.05.11
02.06.05.12
02.06.06
02.06.06.01
02.06.06.02
02.06.06.03
02.06.06.04
02.06.06.05
02.06.06.06
02.06.06.07
02.06.06.08
02.06.06.09
02.06.06.10
02.06.06.11
02.06.06.12
02.06.06.13
02.06.06.14
02.06.06.15
02.06.06.16
02.06.07
02.06.07.01
02.06.07.02
02.06.07.03
02.06.07.04
02.06.07.05
02.06.07.06
02.06.07.07
02.06.07.08
02.06.07.09
02.06.07.10

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMISION DE
USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
PRIDER
AYACUCHO - HUAMANGA - RANCHA
EXCAVACION PARA OBRAS DE ARTE
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
REJILLA METALICA PARA ESTRUCTURA DE SALIDA
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
DADOS DE ANCLAJE VERTICAL (05 Und)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
CODO 45 PVC ISO 4422 DN=200 MM C-10
DADOS DE ANCLAJE HORIZONTAL (08 Und)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
CODO 45 PVC ISO 4422 D=200 MM C-10
VALVULA COMPUERTA DE 6" (07 UND, EN C-1)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
VALVULA COMPUERTA DE FIERRO FUNDIDO P/ISO 4422 D=150MM UF
TAPA METALICA 0.80x1.00m.
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
VALVULA COMPUERTA DE 4" (04 UND)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
VALVULA COMPUERTA DE FIERRO FUNDIDO P/ISO 4422 D=110MM UF
TAPA METALICA 0.80x1.00m.
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
VALVULA DE PURGA TIPO I (01 Und)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
RELLENO DE ZANJAS CON MATERIAL PROPIO
RELLENO COMPACTADO CON MATERIAL PROPIO ZARANDEADO
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
CAMA DE APOYO C/ MATERIAL ZARANDEADO h=0.15 m (TUB 140 A 200 MM)
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
CONCRETO F'C=210 KG/CM2
ACERO DE REFUERZO Fy =4200 Kg/ m2
EMBOQUILLADO DE CANAL F'C=140 KG/CM2 +30%PM
TAPA METALICA 1.10x1.50m.
VALVULA DE PURGA DE FF ISO 4422 D=8''
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
HIDRANTES (21 UND)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
CONCRETO F'C=210 KG/CM2
TAPA METALICA 1.05x1.35m.
HIDRANTE EN TUBERIA D=4''
HIDRANTE EN TUBERIA D=6''
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)

m3
m2
m3
m2
kg
und
m2
m2
m2

26.46
15.12
2.75
121.01
1,000.34
4.00
81.28
66.58
66.58

33.53
23.30
398.45
39.74
4.34
366.50
25.26
18.86
20.64

m2
m2
m3
m3
m2
und

3.20
3.20
2.55
2.55
12.80
5.00

4.74
1.81
33.53
398.45
39.74
135.98

m2
m2
m3
m3
m2
und

8.00
8.00
1.92
2.00
13.28
8.00

4.74
1.81
33.53
398.45
39.74
135.98

m2
m2
m3
m2
m3
m2
kg
und
und
m2
m2
m2

10.01
10.01
11.48
10.01
5.60
59.92
44.43
7.00
7.00
30.24
39.69
39.69

4.74
1.81
33.53
23.30
398.45
39.74
4.34
730.87
161.71
25.26
18.86
20.64

m2
m2
m3
m2
m3
m2
kg
und
und
m2
m2
m2

5.72
5.72
6.56
5.72
3.20
34.24
177.72
4.00
4.00
17.28
22.68
22.68

4.74
1.81
33.53
23.30
424.85
39.74
4.34
667.57
161.71
25.26
18.86
20.64

m2
m2
m3
m3
m3
m2
m
m2
m3
kg
m3
und
und
m2
m2
m2

4.19
4.19
6.36
0.72
0.27
2.21
0.14
22.42
1.55
136.47
0.57
1.00
1.00
11.17
13.98
10.71

4.74
1.81
33.53
11.06
6.45
23.30
5.03
39.74
398.45
4.34
185.79
235.25
868.57
25.26
18.86
20.64

m2
m2
m3
m2
m3
und
und
und
m2
m2

37.80
37.80
43.47
221.97
21.13
21.00
16.00
5.00
110.88
145.53

4.74
1.81
33.53
39.74
398.45
321.71
344.63
377.35
25.26
18.86

887.20
352.30
1,095.74
4,808.94
4,341.48
1,466.00
2,053.13
1,255.70
1,374.21
2,311.08
15.17
5.79
85.50
1,016.05
508.67
679.90
2,529.27
37.92
14.48
64.38
796.90
527.75
1,087.84
14,068.76
47.45
18.12
384.92
233.23
2,231.32
2,381.22
192.83
5,116.09
1,131.97
763.86
748.55
819.20
8,531.69
27.11
10.35
219.96
133.28
1,359.52
1,360.70
771.30
2,670.28
646.84
436.49
427.74
468.12
4,380.01
19.86
7.58
213.25
7.96
1.74
51.49
0.70
890.97
617.60
592.28
105.90
235.25
868.57
282.15
263.66
221.05
41,651.49
179.17
68.42
1,457.55
8,821.09
8,419.25
6,755.91
5,514.08
1,886.75
2,800.83
2,744.70

Presupuesto

Cliente
Lugar

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMISION DE
USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
PRIDER
AYACUCHO - HUAMANGA - RANCHA

02.06.07.11
PINTURA EN OBRAS DE ARTE
02.06.08
TOMA LATERAL COLLARIN (07 UNIDADES)
02.06.08.01
LIMPIEZA DE TERRENO MANUAL
02.06.08.02
TRAZO, NIVELACION Y REPLANTEO
02.06.08.03
EXCAVACION PARA OBRAS DE ARTE
02.06.08.04
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
02.06.08.05
CONCRETO F'C=175 KG/CM2
02.06.08.06
ACCESORIOS PARA LA TOMA DE DERIVACION
02.06.08.06.01
COLLARIN EN TUBERIA DE 160MM
02.06.08.06.02
COLLARIN EN TUBERIA DE 110MM
02.06.09
CRUCE AEREO (02 Und. L=15.00m.)
02.06.09.01
TRABAJOS PRELIMINARES
02.06.09.01.01
LIMPIEZA Y DESFORESTACION MANUAL
02.06.09.01.02
TRAZO, NIVELACION Y REPLANTEO
02.06.09.02
MOVIMIENTO DE TIERRAS
02.06.09.02.01
EXCAVACION DE ESTRUCTURAS
02.06.09.02.02
NIVELACION INTERIOR APISONADO MANUAL
02.06.09.02.03
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
02.06.09.03
OBRAS DE CONCRETO SIMPLE
02.06.09.03.01
SOLADO EN OBRAS DE ARTE 2" FC=100 KG/CM2
02.06.09.03.02
CONCRETO CICLOPEO FC=175KG/CM2 + 30 % PM.
02.06.09.04
OBRAS DE CONCRETO ARMADO
02.06.09.04.01
CONCRETO F'C=210 KG/CM2
02.06.09.04.02
ENCOFRADO Y DESENCOFRADO NORMAL
02.06.09.04.03
ACERO DE REFUERZO Fy =4200 Kg/ m2
02.06.09.05
TUBERIAS , ACCESORIOS Y MISCELANEOS
02.06.09.05.01
TUBERIA DE FIERRO GALVANIZADO DE D=160MM
02.06.09.06
CABLE Y FIERROS
02.06.09.06.01
CABLE DE ACERO TIPO BOA D=1/2"
02.06.09.07
PENDOLAS
02.06.09.07.01
FIERRO LISO D=1/4"
02.06.09.08
SUMINISTRO E INSTALACION DE ACCESORIOS VARIOS
02.06.09.08.01
ACCESORIOS DE TUBERIA DE FG D=6"
02.06.09.08.02
ABRAZADERADE ACERO D=6"
02.06.09.08.03
ABRAZADERA DE ACERO D=3/8"
02.06.09.08.04
TEMPLADOR DE ACERO D=3/4"
02.06.09.08.05
APOYO MOVIL DE FIERRO EN COLUMNAS
03
SECTOR SACSAMARCA (RES. V=1600M3)
03.01
RESERVORIO N02 (1600 m3)
03.01.01
TRABAJOS PRELIMINARES
03.01.01.01
LIMPIEZA DE TERRENO MANUAL
03.01.01.02
TRAZO, NIVELACION Y REPLANTEO EN RESERVORIOS
03.01.02
MOVIMIENTO DE TIERRAS
03.01.02.01
EXCAVACION MASIVA A MAQUINA EN TERRENO SUELTO
03.01.02.02
REFINE Y NIVELACION EN LA CAJA DEL RESERVORIO
03.01.02.03
RELLENO EN ZONA A2
03.01.02.04
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
03.01.02.05
EXCAVACION DE ZANJA PARA ANCLAJE DE GEOMEMBRANA
03.01.02.06
RELLENO MANUAL EN ZONA DE ANCLAJE DE GEOMEMBRANA
03.01.03
INSTALACION DE GEOMEMBRANAS-GEOMALLAS
03.01.03.01
SUMINISTRO Y COLOCACION DE GEOMEMBRANA e= 1.5 mm
03.01.03.02
SUMINISTRO Y COLOCACION DE MALLAS DE GEOTEXTIL TIPO I
03.01.03.03
CAPTACION, TUBERIA DE SALIDA DEL RESERVORIO D=6''
03.01.04
CONCRETO SIMPLE DE PROTECCION EN RESERVORIO
03.01.04.01
CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PG.
03.01.04.02
ENCOFRADO Y DESENC. PARA ESTRUCT. CONCRETO ARMADO
03.01.05
VALVULA COMPUERTA DE 6" (SALIDA DE R=1600m3)
03.01.05.01
LIMPIEZA DE TERRENO MANUAL
03.01.05.02
TRAZO, NIVELACION Y REPLANTEO
03.01.05.03
EXCAVACION PARA OBRAS DE ARTE
03.01.05.04
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
03.01.05.05
CONCRETO F'C=210 KG/CM2
03.01.05.06
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
03.01.05.07
ACERO DE REFUERZO Fy =4200 Kg/ m2
03.01.05.08
VALVULA COMPUERTA DE FIERRO FUNDIDO P/ISO 4422 D=160MM UF
03.01.05.09
TAPA METALICA 0.80x1.00m.
03.01.05.10
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
03.01.05.11
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
03.01.05.12
PINTURA EN OBRAS DE ARTE
03.01.06
CANAL DE LIMPIEZA EN RESERVORIO
03.01.06.01
LIMPIEZA DE TERRENO MANUAL
03.01.06.02
TRAZO, NIVELACION Y REPLANTEO
03.01.06.03
EXCAVACION PARA OBRAS DE ARTE
03.01.06.04
CONCRETO F'C=210 KG/CM2
03.01.06.05
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
03.01.06.06
SUMINISTRO Y COLOCACION DE MALLAS DE GEOTEXTIL TIPO I
03.01.06.07
TUBERIA PVC NTP ISO 4422 UF C-10 D=200 mm. EN CANAL DE LIMPIA

m2

145.53

20.64

m2
m2
m3
m2
m3

8.40
8.40
4.14
15.68
1.06

4.74
1.81
33.53
39.74
353.23

und
und

5.00
2.00

273.52
274.60

m2
m2

13.00
38.00

2.42
1.01

m3
m2
m3

8.00
10.00
20.00

70.56
1.26
15.26

m2
m3

0.40
4.00

23.30
210.10

m3
m2
kg

4.63
35.60
179.93

398.45
33.04
4.34

34.00

173.22

49.54

461.05

28.68

452.72

GLB
und
und
und
und

2.00
28.00
28.00
4.00
4.00

318.24
102.64
53.49
175.08
459.13

m2
m2

2,805.16
2,805.16

4.74
3.75

m3
m2
m3
m3
m3
m3

2,804.22
2,184.07
161.79
3,365.06
32.60
32.60

5.54
3.00
11.11
15.26
88.68
6.37

m2
m2
GLB

1,633.63
1,633.63
1.00

29.53
10.23
666.59

m3
m2

192.48
107.34

324.54
43.34

m2
m2
m3
m2
m3
m2
kg
und
und
m2
m2
m2

1.43
1.43
1.64
1.43
0.80
8.56
44.43
1.00
1.00
4.32
5.67
5.67

4.74
1.81
33.53
23.30
424.85
39.74
4.34
730.87
161.71
25.26
18.86
20.64

m2
m2
m3
m3
m2
m2
m

2.46
2.46
1.23
0.61
8.22
7.16
1.00

4.74
1.81
33.53
424.85
39.74
10.23
61.86

3,003.74
3,108.17
39.82
15.20
138.81
623.12
374.42
1,916.80
1,367.60
549.20
54,862.65
69.84
31.46
38.38
882.28
564.48
12.60
305.20
849.72
9.32
840.40
3,801.94
1,844.82
1,176.22
780.90
5,889.48
5,889.48
22,840.42
22,840.42
12,984.01
12,984.01
7,544.96
636.48
2,873.92
1,497.72
700.32
1,836.52
448,664.02
330,467.19
23,815.81
13,296.46
10,519.35
78,334.53
15,535.38
6,552.21
1,797.49
51,350.82
2,890.97
207.66
65,619.71
48,241.09
16,712.03
666.59
67,119.58
62,467.46
4,652.12
2,196.23
6.78
2.59
54.99
33.32
339.88
340.17
192.83
730.87
161.71
109.12
106.94
117.03
778.28
11.66
4.45
41.24
259.16
326.66
73.25
61.86

Presupuesto

Cliente
Lugar
03.01.07
03.01.07.01
03.01.07.02
03.01.07.03
03.01.07.04
03.01.07.05
03.01.07.06
03.01.07.07
03.01.07.08
03.01.07.09
03.01.08
03.01.08.01
03.01.08.02
03.01.08.03
03.01.08.04
03.01.08.05
03.01.08.06
03.01.08.07
03.01.08.08
03.01.08.09
03.01.08.10
03.01.09
03.01.09.01
03.01.09.02
03.01.09.03
03.01.09.04
03.01.09.05
03.01.09.06
03.01.09.07
03.01.09.08
03.01.09.09
03.01.09.10
03.01.09.11
03.01.09.12
03.01.10
03.01.10.01
03.01.10.02
03.01.10.03
03.01.10.04
03.01.10.05
03.01.10.06
03.01.10.07
03.01.10.08
03.01.11
03.01.11.01
03.01.11.02
03.01.11.03
03.01.11.04
03.01.11.05
03.01.11.06
03.01.11.07
03.01.12
03.01.12.01
03.01.12.02
03.01.12.03
03.01.12.04
03.01.12.05
03.01.12.06
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.02.04
03.02.02.05
03.02.03
03.02.03.01
03.02.03.02
03.02.03.03
03.03
03.03.01
03.03.01.01
03.03.01.02
03.03.01.03

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMISION DE
USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
PRIDER
AYACUCHO - HUAMANGA - RANCHA
VERTEDERO DE DEMASIAS EN RESERVORIO
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
TUBERIA PVC NTP ISO 4422 UF C-10 D=200 mm.
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
CAMARA DE REUNION TIPO I
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
EMBOQUILLADO DE CANAL F'C=140 KG/CM2 +30%PM
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
VALVULA COMPUERTA DE 8" EN CANAL DE LIMPIA R=1600m3
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
VALVULA COMPUERTA DE FIERRO FUNDIDO P/ISO 4422 D=200MM UF
TAPA METALICA 0.80x1.00m.
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
CERCO PERIMETRICO
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA ESTRUCTURAS RENDIMIENTO=25 M3/DIA
CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT
TUBERIA ESTRUCTURAL D=3", E=1.8 mm
HABILITACION E INSTALACION DE MALLA OLIMPICA GALVANIZADA
PUERTA METALICA LAC 1/16" C/MARCO 2"x2"x1/4" Y REFUERZOS
CANAL BY-PASS
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=175 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
POZAS DISIPADORAS
LIMPIEZA DE TERRENO MANUAL
EXCAVACION PARA ESTRUCTURAS RENDIMIENTO=25 M3/DIA
SOLADO EN OBRAS DE ARTE 2" FC=100 KG/CM2
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA MATERIAL SUELTO A MAQUINA
EXCAVACION DE ZANJA EN ROCA SUELTA A MAQUINA (INC. LIMPIEZA)
EXCAVACION DE ZANJA EN ROCA FIJA A MAQUINA (INC. LIMPIEZA)
CAMA DE APOYO C/ MATERIAL ZARANDEADO h=0.15 m (TUB 140 A 200 MM)
RELLENO DE ZANJAS CON MATERIAL PROPIO
TUBERIAS , ACCESORIOS Y MISCELANEOS
TUBERIA PVC SAP C-7.5, D=4".
TEE CON REDUCCION PVC NTP ISO 4422 C-5 D= 160X110 MM
PRUEBA HIDRAULICA, A ZANJA TAPA
OBRAS DE ARTE LINEA DE CONDUCCION
DADOS DE ANCLAJE VERTICAL (08 Und)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE

m2
m2
m3
m3
m2
m
m2
m2
m2

1.17
1.17
1.23
0.47
4.53
22.90
7.04
0.55
0.55

4.74
1.81
33.53
424.85
39.74
61.86
25.26
18.86
20.64

m2
m2
m3
m3
m2
kg
m3
m2
m2
m2

5.32
5.32
5.97
1.88
20.74
114.32
0.15
15.33
11.70
11.70

4.74
1.81
33.53
424.85
39.74
4.34
185.79
25.26
18.86
20.64

m2
m2
m3
m2
m3
m2
kg
und
und
m2
m2
m2

1.43
1.43
1.64
1.43
0.81
9.76
44.44
1.00
1.00
4.32
4.60
9.84

4.74
1.81
33.53
23.30
398.45
39.74
4.34
2,135.14
161.71
25.26
18.86
20.64

m2
m3
m3
m3
m2
m
m
m2

2,805.16
62.63
44.74
9.94
79.53
234.30
198.83
8.00

1.01
21.29
237.47
249.28
33.74
46.87
191.27
83.14

m2
m2
m3
m3
m2
m2
m2

41.52
41.52
18.69
9.79
83.05
65.25
53.57

4.74
1.01
33.53
420.31
39.74
25.26
18.86

m2
m3
m2
m3
m2
kg

3.80
5.70
0.14
2.75
16.60
268.10

4.74
21.29
23.30
398.45
39.74
4.34

m2
KM

1,006.20
1.68

4.74
348.96

m3
m3
m3
m
m3

407.25
116.36
58.18
150.93
454.17

6.16
36.20
22.15
5.03
11.06

m
und
m

1,677.00
3.00
1,677.00

12.42
92.03
0.58

m2
m2
m3

5.12
5.12
4.08

4.74
1.81
33.53

2,044.75
5.55
2.12
41.24
199.68
180.02
1,416.59
177.83
10.37
11.35
3,231.36
25.22
9.63
200.17
798.72
824.21
496.15
27.87
387.24
220.66
241.49
3,696.98
6.78
2.59
54.99
33.32
322.74
387.86
192.87
2,135.14
161.71
109.12
86.76
203.10
69,629.16
2,833.21
1,333.39
10,624.41
2,477.84
2,683.34
10,981.64
38,030.21
665.12
10,939.21
196.80
41.94
626.68
4,114.83
3,300.41
1,648.22
1,010.33
3,061.59
18.01
121.35
3.26
1,095.74
659.68
1,163.55
41,224.61
5,355.64
4,769.39
586.25
13,791.88
2,508.66
4,212.23
1,288.69
759.18
5,023.12
22,077.09
20,828.34
276.09
972.66
76,972.22
2,717.61
24.27
9.27
136.80

Presupuesto

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMISION DE
USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO

Cliente
Lugar

PRIDER
AYACUCHO - HUAMANGA - RANCHA

03.03.01.04
03.03.01.05
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.02.04
03.03.02.05
03.03.03
03.03.03.01
03.03.03.02
03.03.03.03
03.03.03.04
03.03.03.05
03.03.03.06
03.03.03.07
03.03.03.08
03.03.03.09
03.03.03.10
03.03.03.11
03.03.03.12
03.03.04
03.03.04.01
03.03.04.02
03.03.04.03
03.03.04.04
03.03.04.05
03.03.04.06
03.03.04.07
03.03.04.08
03.03.04.09
03.03.04.10
03.03.04.11
03.03.04.12
03.03.04.13
03.03.04.14
03.03.04.15
03.03.04.16
03.03.05
03.03.05.01
03.03.05.02
03.03.05.03
03.03.05.04
03.03.05.05
03.03.05.06
03.03.05.07
03.03.05.08
03.03.05.09
03.03.05.10
03.03.05.11
03.03.06
03.03.06.01
03.03.06.02
03.03.06.03
03.03.06.04
03.03.06.05
03.03.06.06
03.03.06.06.01
03.03.07
03.03.07.01
03.03.07.02
03.03.07.03
03.03.07.04
03.03.07.05
03.03.07.06
03.03.07.07
03.03.07.08
03.03.07.09
03.03.07.10
03.03.07.11
03.03.07.12

CONCRETO F'C=210 KG/CM2


ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
DADOS DE ANCLAJE HORIZONTAL (04 Und)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
VALVULA COMPUERTA DE 4" (03 UND)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
ACERO DE REFUERZO Fy =4200 Kg/ m2
VALVULA COMPUERTA DE FIERRO FUNDIDO P/ISO 4422 D=110MM UF
TAPA METALICA 0.80x1.00m.
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
VALVULA DE PURGA TIPO II (08 Und)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
RELLENO DE ZANJAS CON MATERIAL PROPIO
RELLENO COMPACTADO CON MATERIAL PROPIO ZARANDEADO
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
CAMA DE APOYO C/ MATERIAL ZARANDEADO h=0.15 m (TUB 140 A 200 MM)
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
CONCRETO F'C=210 KG/CM2
ACERO DE REFUERZO Fy =4200 Kg/ m2
EMBOQUILLADO DE CANAL F'C=140 KG/CM2 +30%PM
TAPA METALICA 1.10x1.50m.
VALVULA DE PURGA DE FF ISO 4422 D=6''
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
HIDRANTES (11 UND)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
CONCRETO F'C=210 KG/CM2
TAPA METALICA 1.05x1.35m.
HIDRANTE EN TUBERIA D=4''
HIDRANTE EN TUBERIA D=6''
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
TOMA LATERAL CON COLLARIN (02 UNIDADES)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
CONCRETO F'C=175 KG/CM2
ACCESORIOS PARA LA TOMA DE DERIVACION
COLLARIN EN TUBERIA DE 160MM
VALVULAS DE AIRE (03 Und)
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA OBRAS DE ARTE
SOLADO EN OBRAS DE ARTE 4" FC=100 KG/CM2
ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO (OBRAS DE ARTE)
CONCRETO F'C=210 KG/CM2
ACERO DE REFUERZO Fy =4200 Kg/ m2
TAPA METALICA 1.30x1.30m.
VALVULA DE AIRE D=2"
TARRAJEO INTERIOR OBRAS DE ARTE, MEZCLA 1:2 (E=1.5 CM.)
TARRAJEO EXTERIOR OBRAS DE ARTE, MEZCLA 1:5 (E=1.5CM.)
PINTURA EN OBRAS DE ARTE
COSTOS DE INFRAESTRUCTURA

m3
m2

4.08
20.48

424.85
39.74

m2
m2
m3
m3
m2

4.00
4.00
1.52
1.00
6.64

4.74
1.81
33.53
424.85
39.74

m2
m2
m3
m2
m3
m2
kg
und
und
m2
m2
m2

4.29
4.29
4.92
4.29
2.40
25.68
133.29
3.00
3.00
12.96
17.01
17.01

4.74
1.81
33.53
23.30
424.85
39.74
4.34
667.57
161.71
25.26
18.86
20.64

m2
m2
m3
m3
m3
m2
m
m2
m3
kg
m3
und
und
m2
m2
m2

33.52
33.52
50.86
5.76
2.16
17.68
1.08
179.36
12.37
1,091.78
4.58
8.00
8.00
59.36
111.84
85.68

4.74
1.81
33.53
11.06
6.45
23.30
5.03
39.74
424.85
4.34
185.79
235.25
868.57
25.26
18.86
20.64

m2
m2
m3
m2
m3
und
und
und
m2
m2
m2

19.80
19.80
22.77
116.27
11.07
11.00
5.00
6.00
58.08
76.23
76.23

4.74
1.81
33.53
39.74
424.85
321.71
344.63
377.35
25.26
18.86
20.64

m2
m2
m3
m2
m3

2.40
2.40
0.43
4.48
0.30

4.74
1.81
33.53
39.74
353.23

und

2.00

273.52

m2
m2
m3
m2
m2
m3
kg
und
und
m2
m2
m2

6.75
6.75
11.81
6.75
51.30
4.66
76.10
3.00
3.00
33.51
41.94
32.13

4.74
1.81
33.53
23.30
39.74
424.85
4.34
271.71
448.56
25.26
18.86
20.64

COSTOS DE CAPACITACION

GLB

COSTOS DE FORTALECIMIENTO DE LA COMISION DE REGANTES

GLB

11,385.85

COSTO DE MITIGACION AMBIENTAL

GLB

15,392.87

1,733.39
813.88
765.89
18.96
7.24
50.97
424.85
263.87
6,398.77
20.33
7.76
164.97
99.96
1,019.64
1,020.52
578.48
2,002.71
485.13
327.37
320.81
351.09
34,600.04
158.88
60.67
1,705.34
63.71
13.93
411.94
5.43
7,127.77
5,255.39
4,738.33
850.92
1,882.00
6,948.56
1,499.43
2,109.30
1,768.44
22,221.08
93.85
35.84
763.48
4,620.57
4,703.09
3,538.81
1,723.15
2,264.10
1,467.10
1,437.70
1,573.39
861.19
11.38
4.34
14.42
178.04
105.97
547.04
547.04
9,407.64
32.00
12.22
395.99
157.28
2,038.66
1,979.80
330.27
815.13
1,345.68
846.46
790.99
663.16
1,250,214.32
16,042.33

Presupuesto

Cliente
Lugar

AMPLIACIN DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO CCELLOCCACCA-HUACHUALLA, MARGEN IZQUIERDA COMISION DE
USUARIOS LOS LIBERTADORES DE HUAYLLAPATA Y SACSAMARCA, DISTRITO DE AYACUCHO, HUAMANGA-AYACUCHO
PRIDER
AYACUCHO - HUAMANGA - RANCHA
COSTO DIRECTOS

1,293,035.37

GASTOS GENERALES (10% CD)

129,303.54

SUPERVISIN (3% CD)

38,791.06

LIQUIDACION DE OBRA
EXPEDIENTE TECNICO
COSTO TOTAL DEL PROYECTO

11,500.00
GLB

40,000.00
1,512,629.97

ALTERNATIVA N 01 - PRECIOS DE MERCADO

ITEM

DESCRIPCION

I.

INVERSION

PRESUPUESTO

1.1 ESTUDIOS
- EXPEDIENTE TECNICO

1.2 INFRAESTRUCTURA

40,000
1,250,214

1.2.1 MITIGACION AMBIENTAL

15,393

1.3 CAPACITACION Y ASISTENCIA TECNICA

16,092

1.4 FORTALECIMIENTO DE LA COMISIN DE REGANTES

81,402

COSTO DIRECTO
GASTOS GENERALES (5%)
SUPERVISIN (3%)
COSTO TOTAL DEL PROYECTO

II. POST INVERSION


2.1 OPERACIN
2.2 MANTENIMIENTO

1,403,101
129,304
38,791
1,512,630

13,179.20
10,040.00
3,139.20

ALTERNATIVA N 01 - PRECIOS SOCIALES

ITEM

DESCRIPCION

I.

INVERSION

PRESUPUESTO

1.1 ESTUDIOS
- EXPEDIENTE TECNICO

1.2 INFRAESTRUCTURA
1.2.1 MITIGACION AMBIENTAL

36,400.00
989,314.69
9,677.97

1.3 CAPACITACION Y ASISTENCIA TECNICA

13,553.80

1.4 FORTALECIMIENTO DE LA COMISIN DE REGANTES

68,427.26

COSTO DIRECTO

1,117,373.72

GASTOS GENERALES (5%)

55,868.69

SUPERVISIN (3%)

33,521.21

COSTO TOTAL DEL PROYECTO

1,206,763.62

II. POST INVERSION

11,104.72

2.1 OPERACIN

8,436.40

2.2 MANTENIMIENTO

2,668.32

FLUJO DE CAJA A PRECIOS PRIVADOS ALTERNATIVA 1


RUBRO
1. INGRESOS INCREMENTALES DEL PROYECTO
Venta de agua para riego con proyecto
(-) Venta de agua para riego sin proyecto
Venta de tierras incorporadas

VANAC

AO 0

AO 1

AO 2

AO 3

AO 4

AO 5

AO 6

AO 7

AO 8

AO 9

AO 10

0.00

13,179.20
13,179.20
0.00
0.00

13,179.20
13,179.20
0.00
0.00

13,179.20
13,179.20
0.00
0.00

13,179.20
13,179.20
0.00
0.00

13,179.20
13,179.20
0.00
0.00

13,179.20
13,179.20
0.00
0.00

13,179.20
13,179.20
0.00
0.00

13,179.20
13,179.20
0.00
0.00

13,179.20
13,179.20
0.00
0.00

13,179.20
13,179.20
0.00
0.00

131,792.00
131,792.00
0.00
0.00

137,948.68

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

2,321,064.19

3. COSTOS INCREMENTALES DEL PROYECTO


Costos de Inversin
Estudios (Expediente Tecnico)
Infraestructuras
Mitigacin ambiental
Capacitacin
Fortalecimiento
Costos de Operacin y mantenimiento
Operacin
Mantenimiento

1,512,629.97
1,512,629.97
40,000.00
1,429,808.92
15,392.87
16,042.33
11,385.85
0.00

13,179.20
0.00

13,179.20
0.00

13,179.20
0.00

13,179.20
0.00

13,179.20
0.00

13,179.20
0.00

13,179.20
0.00

13,179.20
0.00

13,179.20
0.00

13,179.20
0.00

1,644,421.97
1,512,629.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,429,808.92

13,179.20
10,040.00
3,139.20

13,179.20
10,040.00
3,139.20

13,179.20
10,040.00
3,139.20

13,179.20
10,040.00
3,139.20

13,179.20
10,040.00
3,139.20

13,179.20
10,040.00
3,139.20

13,179.20
10,040.00
3,139.20

13,179.20
10,040.00
3,139.20

13,179.20
10,040.00
3,139.20

13,179.20
10,040.00
3,139.20

131,792.00

4. FLUJO NETO (1+2-3)

-1,512,629.97

137,948.68

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

242,568.39

808,434.23

1.00

0.89

0.80

0.71

0.64

0.57

0.51

0.45

0.40

0.36

0.32

-1,512,629.97

123,168.46

193,374.04

172,655.39

154,156.60

137,639.82

122,892.70

109,725.62

97,969.30

87,472.59

78,100.53

2. INCREMENTO EN EL VALOR NETO DE LA PRO

5. FACTOR DE ACTUALIZACION (12%)


6. VALOR ACTUAL DEL FLUJO NETO (VAN) (4x5)

-235,474.92

7. TASA INTERNA DE RETORNO (TIR)

8.3%

8. RATIO BENEFICIO COSTO

1.41

VALOR ACTUAL NETO DEL VNP INCREMENTAL (PRECIOS PRIVADOS)


CONCEPTO

PROGRAMACION ANUAL
AO 5
AO 6

AO 1

AO 2

AO 3

AO 4

AO 7

AO 8

AO 9

AO 10

Valor Bruto de la Produccin Incremental


Situacin con Proyecto
(-) Situacin Optimizada

875,467.37
83,680.11

1,094,334.22
92,048.12

1,094,334.22
92,048.12

1,094,334.22
92,048.12

1,094,334.22
92,048.12

1,094,334.22
92,048.12

1,094,334.22
92,048.12

1,094,334.22
92,048.12

1,094,334.22
92,048.12

1,094,334.22
92,048.12

Total
Factor de Actualizacin (9%)
Valor Actual del VBP Incremental

791,787.26
0.92
726,410.33

1,002,286.10
0.84
843,604.15

1,002,286.10
0.77
773,948.76

1,002,286.10
0.71
710,044.74

1,002,286.10
0.65
651,417.19

1,002,286.10
0.60
597,630.45

1,002,286.10
0.55
548,284.82

1,002,286.10
0.50
503,013.59

1,002,286.10
0.46
461,480.36

1,002,286.10
0.42
423,376.48

Costo Total Incremental


Situacin con Proyecto
(-) Situacin Optimizada

809,905.22
156,066.63

931,391.00
171,673.29

931,391.00
171,673.29

931,391.00
171,673.29

931,391.00
171,673.29

931,391.00
171,673.29

931,391.00
171,673.29

931,391.00
171,673.29

931,391.00
171,673.29

931,391.00
171,673.29

Valor Actual de Costo Total Incremental


Factor de Actualizacin (9%)
Total

653,838.59
0.92
599,851.91

759,717.70
0.84
639,439.19

759,717.70
0.77
586,641.46

759,717.70
0.71
538,203.17

759,717.70
0.65
493,764.38

759,717.70
0.60
452,994.84

759,717.70
0.55
415,591.60

759,717.70
0.50
381,276.70

759,717.70
0.46
349,795.14

759,717.70
0.42
320,912.97

Valor Neto de la Produccin Incremental


Situacin con Proyecto
(-) Situacin Optimizada

65,562.16
-72,386.52

162,943.22
-79,625.17

162,943.22
-79,625.17

162,943.22
-79,625.17

162,943.22
-79,625.17

162,943.22
-79,625.17

162,943.22
-79,625.17

162,943.22
-79,625.17

162,943.22
-79,625.17

162,943.22
-79,625.17

Total
Factor de Actualizacin (9%)

137,948.68
0.92

242,568.39
0.84

242,568.39
0.77

242,568.39
0.71

242,568.39
0.65

242,568.39
0.60

242,568.39
0.55

242,568.39
0.50

242,568.39
0.46

242,568.39
0.42

Valor Actual Neto del VNP

126,558.42

204,164.96

187,307.30

171,841.56

157,652.81

144,635.61

132,693.22

121,736.90

111,685.23

102,463.51

VALOR
ACTUAL

6,239,210.88

4,778,471.37

1,460,739.51

VALOR NETO DE LA PRODUCCION AGRICOLA SIN PROYECTO (PRECIOS SOCIALES)


CONCEPTO

PROGRAMACION ANUAL
AO 5
AO 6

AO 1

AO 2

AO 3

AO 4

Nmero de Hectreas
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

Costos por Hectrea


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

1,023.90
3,778.65
979.86
878.74
1,044.85
642.60
584.45
385.35
543.21
631.06

1,126.29
4,156.52
1,077.85
966.61
1,149.34
706.86
642.90
423.89
597.53
694.17

1,126.29
4,156.52
1,077.85
966.61
1,149.34
706.86
642.90
423.89
597.53
694.17

1,126.29
4,156.52
1,077.85
966.61
1,149.34
706.86
642.90
423.89
597.53
694.17

Rendimiento por Hectrea


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

920.00
15,980.00
7,020.00
920.00
930.00
850.00
920.00
12,920.00
920.00
20,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%
70,291.29
863.76
17,361.92
22,056.65
5,220.03

Precio de venta
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Porcentaje destinado al mercado
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Valor Bruto de la Produccin
Cebada
Papa
Hortalizas
Arveja

AO 7

AO 8

AO 9

AO 10

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

1,126.29
4,156.52
1,077.85
966.61
1,149.34
706.86
642.90
423.89
597.53
694.17

1,126.29
4,156.52
1,077.85
966.61
1,149.34
706.86
642.90
423.89
597.53
694.17

1,126.29
4,156.52
1,077.85
966.61
1,149.34
706.86
642.90
423.89
597.53
694.17

1,126.29
4,156.52
1,077.85
966.61
1,149.34
706.86
642.90
423.89
597.53
694.17

1,126.29
4,156.52
1,077.85
966.61
1,149.34
706.86
642.90
423.89
597.53
694.17

1,126.29
4,156.52
1,077.85
966.61
1,149.34
706.86
642.90
423.89
597.53
694.17

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

1,012.00
17,578.00
7,722.00
1,012.00
1,023.00
935.00
1,012.00
14,212.00
1,012.00
22,000.00

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

77,320.42
950.13
19,098.11
24,262.32
5,742.03

77,320.42
950.13
19,098.11
24,262.32
5,742.03

77,320.42
950.13
19,098.11
24,262.32
5,742.03

77,320.42
950.13
19,098.11
24,262.32
5,742.03

77,320.42
950.13
19,098.11
24,262.32
5,742.03

77,320.42
950.13
19,098.11
24,262.32
5,742.03

77,320.42
950.13
19,098.11
24,262.32
5,742.03

77,320.42
950.13
19,098.11
24,262.32
5,742.03

77,320.42
950.13
19,098.11
24,262.32
5,742.03

VALOR
ACTUAL
0.00

766,175.09

Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

4,086.94
4,876.20
1,241.39
6,377.28
3,175.54
5,031.60

4,495.63
5,363.82
1,365.52
7,015.01
3,493.09
5,534.76

4,495.63
5,363.82
1,365.52
7,015.01
3,493.09
5,534.76

4,495.63
5,363.82
1,365.52
7,015.01
3,493.09
5,534.76

4,495.63
5,363.82
1,365.52
7,015.01
3,493.09
5,534.76

4,495.63
5,363.82
1,365.52
7,015.01
3,493.09
5,534.76

4,495.63
5,363.82
1,365.52
7,015.01
3,493.09
5,534.76

4,495.63
5,363.82
1,365.52
7,015.01
3,493.09
5,534.76

4,495.63
5,363.82
1,365.52
7,015.01
3,493.09
5,534.76

4,495.63
5,363.82
1,365.52
7,015.01
3,493.09
5,534.76

Costo Total
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

71,857.53
11,262.90
18,893.25
5,879.16
10,544.88
8,358.80
7,711.20
2,337.80
1,541.40
2,172.84
3,155.30

79,043.28
12,389.19
20,782.58
6,467.08
11,599.37
9,194.68
8,482.32
2,571.58
1,695.54
2,390.12
3,470.83

79,043.28
12,389.19
20,782.58
6,467.08
11,599.37
9,194.68
8,482.32
2,571.58
1,695.54
2,390.12
3,470.83

79,043.28
12,389.19
20,782.58
6,467.08
11,599.37
9,194.68
8,482.32
2,571.58
1,695.54
2,390.12
3,470.83

79,043.28
12,389.19
20,782.58
6,467.08
11,599.37
9,194.68
8,482.32
2,571.58
1,695.54
2,390.12
3,470.83

79,043.28
12,389.19
20,782.58
6,467.08
11,599.37
9,194.68
8,482.32
2,571.58
1,695.54
2,390.12
3,470.83

79,043.28
12,389.19
20,782.58
6,467.08
11,599.37
9,194.68
8,482.32
2,571.58
1,695.54
2,390.12
3,470.83

79,043.28
12,389.19
20,782.58
6,467.08
11,599.37
9,194.68
8,482.32
2,571.58
1,695.54
2,390.12
3,470.83

79,043.28
12,389.19
20,782.58
6,467.08
11,599.37
9,194.68
8,482.32
2,571.58
1,695.54
2,390.12
3,470.83

79,043.28
12,389.19
20,782.58
6,467.08
11,599.37
9,194.68
8,482.32
2,571.58
1,695.54
2,390.12
3,470.83

783,247.08

Valor Neto de la Produccin


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

-1,566.24
-10,399.14
-1,531.33
16,177.49
-5,324.85
-4,271.86
-2,835.00
-1,096.41
4,835.88
1,002.70
1,876.30

-1,722.86
-11,439.06
-1,684.47
17,795.24
-5,857.34
-4,699.05
-3,118.50
-1,206.06
5,319.47
1,102.97
2,063.93

-1,722.86
-11,439.06
-1,684.47
17,795.24
-5,857.34
-4,699.05
-3,118.50
-1,206.06
5,319.47
1,102.97
2,063.93

-1,722.86
-11,439.06
-1,684.47
17,795.24
-5,857.34
-4,699.05
-3,118.50
-1,206.06
5,319.47
1,102.97
2,063.93

-1,722.86
-11,439.06
-1,684.47
17,795.24
-5,857.34
-4,699.05
-3,118.50
-1,206.06
5,319.47
1,102.97
2,063.93

-1,722.86
-11,439.06
-1,684.47
17,795.24
-5,857.34
-4,699.05
-3,118.50
-1,206.06
5,319.47
1,102.97
2,063.93

-1,722.86
-11,439.06
-1,684.47
17,795.24
-5,857.34
-4,699.05
-3,118.50
-1,206.06
5,319.47
1,102.97
2,063.93

-1,722.86
-11,439.06
-1,684.47
17,795.24
-5,857.34
-4,699.05
-3,118.50
-1,206.06
5,319.47
1,102.97
2,063.93

-1,722.86
-11,439.06
-1,684.47
17,795.24
-5,857.34
-4,699.05
-3,118.50
-1,206.06
5,319.47
1,102.97
2,063.93

-1,722.86
-11,439.06
-1,684.47
17,795.24
-5,857.34
-4,699.05
-3,118.50
-1,206.06
5,319.47
1,102.97
2,063.93

-17,071.99

0.92

0.84

0.77

0.71

0.65

0.60

0.55

0.50

0.46

0.42

-1,436.92

-1,450.10

-1,330.37

-1,220.52

-1,119.74

-1,027.29

-942.46

-864.65

-793.25

-727.76

Factor de Actualizacin (09%)


Valor Actual Neto del VNP

-10,913.04

VALOR NETO DE LA PRODUCCION AGRICOLA OPTIMIZADA (PRECIOS SOCIALES)


CONCEPTO

PROGRAMACION ANUAL
AO 5
AO 6

AO 1

AO 2

AO 3

AO 4

Nmero de Hectreas
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

Costos por Hectrea


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

1,076.04
3,929.76
1,026.38
924.77
1,103.61
2,753.07
614.28
405.21
572.39
660.65

1,183.65
4,322.73
1,129.02
1,017.24
1,213.97
3,028.37
675.70
445.73
629.63
726.72

1,183.65
4,322.73
1,129.02
1,017.24
1,213.97
3,028.37
675.70
445.73
629.63
726.72

1,183.65
4,322.73
1,129.02
1,017.24
1,213.97
3,028.37
675.70
445.73
629.63
726.72

Rendimiento por Hectrea


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

920.00
15,980.00
7,020.00
920.00
930.00
850.00
920.00
12,920.00
920.00
20,000.00

1,104.00
19,176.00
8,424.00
1,104.00
1,116.00
1,020.00
1,104.00
15,504.00
1,104.00
24,000.00

1,104.00
19,176.00
8,424.00
1,104.00
1,116.00
1,020.00
1,104.00
15,504.00
1,104.00
24,000.00

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%
70,291.29
863.76
17,361.92
22,056.65
5,220.03

Precio de venta
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Porcentaje destinado al mercado
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Valor Bruto de la Produccin
Cebada
Papa
Hortalizas
Arveja

AO 7

AO 8

AO 9

AO 10

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

71.00
11.00
5.00
6.00
12.00
8.00
12.00
4.00
4.00
4.00
5.00

1,183.65
4,322.73
1,129.02
1,017.24
1,213.97
3,028.37
675.70
445.73
629.63
726.72

1,183.65
4,322.73
1,129.02
1,017.24
1,213.97
3,028.37
675.70
445.73
629.63
726.72

1,183.65
4,322.73
1,129.02
1,017.24
1,213.97
3,028.37
675.70
445.73
629.63
726.72

1,183.65
4,322.73
1,129.02
1,017.24
1,213.97
3,028.37
675.70
445.73
629.63
726.72

1,183.65
4,322.73
1,129.02
1,017.24
1,213.97
3,028.37
675.70
445.73
629.63
726.72

1,183.65
4,322.73
1,129.02
1,017.24
1,213.97
3,028.37
675.70
445.73
629.63
726.72

1,104.00
19,176.00
8,424.00
1,104.00
1,116.00
1,020.00
1,104.00
15,504.00
1,104.00
24,000.00

1,104.00
19,176.00
8,424.00
1,104.00
1,116.00
1,020.00
1,104.00
15,504.00
1,104.00
24,000.00

1,104.00
19,176.00
8,424.00
1,104.00
1,116.00
1,020.00
1,104.00
15,504.00
1,104.00
24,000.00

1,104.00
19,176.00
8,424.00
1,104.00
1,116.00
1,020.00
1,104.00
15,504.00
1,104.00
24,000.00

1,104.00
19,176.00
8,424.00
1,104.00
1,116.00
1,020.00
1,104.00
15,504.00
1,104.00
24,000.00

1,104.00
19,176.00
8,424.00
1,104.00
1,116.00
1,020.00
1,104.00
15,504.00
1,104.00
24,000.00

1,104.00
19,176.00
8,424.00
1,104.00
1,116.00
1,020.00
1,104.00
15,504.00
1,104.00
24,000.00

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

20.65%
62.48%
74.93%
68.48%
68.55%
63.24%
53.26%
73.45%
70.65%
74.88%

84,349.55
1,036.51
20,834.30
26,467.98
6,264.03

84,349.55
1,036.51
20,834.30
26,467.98
6,264.03

84,349.55
1,036.51
20,834.30
26,467.98
6,264.03

84,349.55
1,036.51
20,834.30
26,467.98
6,264.03

84,349.55
1,036.51
20,834.30
26,467.98
6,264.03

84,349.55
1,036.51
20,834.30
26,467.98
6,264.03

84,349.55
1,036.51
20,834.30
26,467.98
6,264.03

84,349.55
1,036.51
20,834.30
26,467.98
6,264.03

84,349.55
1,036.51
20,834.30
26,467.98
6,264.03

VALOR
ACTUAL
0.00

829,437.25

Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

4,086.94
4,876.20
1,241.39
6,377.28
3,175.54
5,031.60

4,904.32
5,851.44
1,489.66
7,652.74
3,810.64
6,037.92

4,904.32
5,851.44
1,489.66
7,652.74
3,810.64
6,037.92

4,904.32
5,851.44
1,489.66
7,652.74
3,810.64
6,037.92

4,904.32
5,851.44
1,489.66
7,652.74
3,810.64
6,037.92

4,904.32
5,851.44
1,489.66
7,652.74
3,810.64
6,037.92

4,904.32
5,851.44
1,489.66
7,652.74
3,810.64
6,037.92

4,904.32
5,851.44
1,489.66
7,652.74
3,810.64
6,037.92

4,904.32
5,851.44
1,489.66
7,652.74
3,810.64
6,037.92

4,904.32
5,851.44
1,489.66
7,652.74
3,810.64
6,037.92

Costo Total
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

100,277.23
11,836.47
19,648.78
6,158.28
11,097.21
8,828.91
33,036.80
2,457.10
1,620.84
2,289.57
3,303.27

110,304.95
13,020.12
21,613.66
6,774.10
12,206.93
9,711.80
36,340.48
2,702.81
1,782.93
2,518.53
3,633.59

110,304.95
13,020.12
21,613.66
6,774.10
12,206.93
9,711.80
36,340.48
2,702.81
1,782.93
2,518.53
3,633.59

110,304.95
13,020.12
21,613.66
6,774.10
12,206.93
9,711.80
36,340.48
2,702.81
1,782.93
2,518.53
3,633.59

110,304.95
13,020.12
21,613.66
6,774.10
12,206.93
9,711.80
36,340.48
2,702.81
1,782.93
2,518.53
3,633.59

110,304.95
13,020.12
21,613.66
6,774.10
12,206.93
9,711.80
36,340.48
2,702.81
1,782.93
2,518.53
3,633.59

110,304.95
13,020.12
21,613.66
6,774.10
12,206.93
9,711.80
36,340.48
2,702.81
1,782.93
2,518.53
3,633.59

110,304.95
13,020.12
21,613.66
6,774.10
12,206.93
9,711.80
36,340.48
2,702.81
1,782.93
2,518.53
3,633.59

110,304.95
13,020.12
21,613.66
6,774.10
12,206.93
9,711.80
36,340.48
2,702.81
1,782.93
2,518.53
3,633.59

110,304.95
13,020.12
21,613.66
6,774.10
12,206.93
9,711.80
36,340.48
2,702.81
1,782.93
2,518.53
3,633.59

1,093,021.77

Valor Neto de la Produccin


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

-29,985.93
-10,972.72
-2,286.86
15,898.38
-5,877.18
-4,741.97
-28,160.60
-1,215.72
4,756.44
885.96
1,728.33

-25,955.40
-11,983.61
-779.35
19,693.88
-5,942.90
-4,807.47
-30,489.04
-1,213.15
5,869.81
1,292.11
2,404.33

-25,955.40
-11,983.61
-779.35
19,693.88
-5,942.90
-4,807.47
-30,489.04
-1,213.15
5,869.81
1,292.11
2,404.33

-25,955.40
-11,983.61
-779.35
19,693.88
-5,942.90
-4,807.47
-30,489.04
-1,213.15
5,869.81
1,292.11
2,404.33

-25,955.40
-11,983.61
-779.35
19,693.88
-5,942.90
-4,807.47
-30,489.04
-1,213.15
5,869.81
1,292.11
2,404.33

-25,955.40
-11,983.61
-779.35
19,693.88
-5,942.90
-4,807.47
-30,489.04
-1,213.15
5,869.81
1,292.11
2,404.33

-25,955.40
-11,983.61
-779.35
19,693.88
-5,942.90
-4,807.47
-30,489.04
-1,213.15
5,869.81
1,292.11
2,404.33

-25,955.40
-11,983.61
-779.35
19,693.88
-5,942.90
-4,807.47
-30,489.04
-1,213.15
5,869.81
1,292.11
2,404.33

-25,955.40
-11,983.61
-779.35
19,693.88
-5,942.90
-4,807.47
-30,489.04
-1,213.15
5,869.81
1,292.11
2,404.33

-25,955.40
-11,983.61
-779.35
19,693.88
-5,942.90
-4,807.47
-30,489.04
-1,213.15
5,869.81
1,292.11
2,404.33

-263,584.52

0.92

0.84

0.77

0.71

0.65

0.60

0.55

0.50

0.46

0.42

-27,510.03

-21,846.14

-20,042.33

-18,387.46

-16,869.23

-15,476.36

-14,198.49

-13,026.14

-11,950.59

-10,963.84

Factor de Actualizacin (09%)


Valor Actual Neto del VNP

-170,270.60

VALOR NETO DE LA PRODUCCION AGRICOLA CON PROYECTO (PRECIOS SOCIALES)


CONCEPTO

PROGRAMACION ANUAL
AO 5
AO 6

VALOR
ACTUAL

AO 1

AO 2

AO 3

AO 4

AO 7

AO 8

AO 9

AO 10

Nmero de Hectreas
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

286.00
28.00
38.00
30.00
29.00
30.00
31.00
18.00
36.00
24.00
22.00

Costos por Hectrea


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

1,626.61
4,699.93
1,995.10
1,229.41
1,430.12
2,806.52
922.27
948.19
939.62
1,314.58

1,789.27
5,169.92
2,194.61
1,352.35
1,573.13
3,087.18
1,014.49
1,043.01
1,033.58
1,446.03

1,789.27
5,169.92
2,194.61
1,352.35
1,573.13
3,087.18
1,014.49
1,043.01
1,033.58
1,446.03

1,789.27
5,169.92
2,194.61
1,352.35
1,573.13
3,087.18
1,014.49
1,043.01
1,033.58
1,446.03

1,789.27
5,169.92
2,194.61
1,352.35
1,573.13
3,087.18
1,014.49
1,043.01
1,033.58
1,446.03

1,789.27
5,169.92
2,194.61
1,352.35
1,573.13
3,087.18
1,014.49
1,043.01
1,033.58
1,446.03

1,789.27
5,169.92
2,194.61
1,352.35
1,573.13
3,087.18
1,014.49
1,043.01
1,033.58
1,446.03

1,789.27
5,169.92
2,194.61
1,352.35
1,573.13
3,087.18
1,014.49
1,043.01
1,033.58
1,446.03

1,789.27
5,169.92
2,194.61
1,352.35
1,573.13
3,087.18
1,014.49
1,043.01
1,033.58
1,446.03

1,789.27
5,169.92
2,194.61
1,352.35
1,573.13
3,087.18
1,014.49
1,043.01
1,033.58
1,446.03

Rendimiento por Hectrea


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

1,564.00
19,176.00
9,126.00
1,196.00
1,209.00
1,105.00
1,380.00
23,256.00
1,380.00
30,000.00

1,955.00
23,970.00
11,407.50
1,495.00
1,511.25
1,381.25
1,725.00
29,070.00
1,725.00
37,500.00

1,955.00
23,970.00
11,407.50
1,495.00
1,511.25
1,381.25
1,725.00
29,070.00
1,725.00
37,500.00

1,955.00
23,970.00
11,407.50
1,495.00
1,511.25
1,381.25
1,725.00
29,070.00
1,725.00
37,500.00

1,955.00
23,970.00
11,407.50
1,495.00
1,511.25
1,381.25
1,725.00
29,070.00
1,725.00
37,500.00

1,955.00
23,970.00
11,407.50
1,495.00
1,511.25
1,381.25
1,725.00
29,070.00
1,725.00
37,500.00

1,955.00
23,970.00
11,407.50
1,495.00
1,511.25
1,381.25
1,725.00
29,070.00
1,725.00
37,500.00

1,955.00
23,970.00
11,407.50
1,495.00
1,511.25
1,381.25
1,725.00
29,070.00
1,725.00
37,500.00

1,955.00
23,970.00
11,407.50
1,495.00
1,511.25
1,381.25
1,725.00
29,070.00
1,725.00
37,500.00

1,955.00
23,970.00
11,407.50
1,495.00
1,511.25
1,381.25
1,725.00
29,070.00
1,725.00
37,500.00

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

0.41
0.35
0.70
0.69
0.80
0.76
0.63
0.17
1.22
0.07

82.44%
93.63%
94.99%
92.92%
93.68%
91.50%
91.78%
94.90%
94.52%
94.98%

82.44%
93.63%
94.99%
92.92%
93.68%
91.50%
91.78%
94.90%
94.52%
94.98%

82.44%
93.63%
94.99%
92.92%
93.68%
91.50%
91.78%
94.90%
94.52%
94.98%

82.44%
93.63%
94.99%
92.92%
93.68%
91.50%
91.78%
94.90%
94.52%
94.98%

82.44%
93.63%
94.99%
92.92%
93.68%
91.50%
91.78%
94.90%
94.52%
94.98%

82.44%
93.63%
94.99%
92.92%
93.68%
91.50%
91.78%
94.90%
94.52%
94.98%

82.44%
93.63%
94.99%
92.92%
93.68%
91.50%
91.78%
94.90%
94.52%
94.98%

82.44%
93.63%
94.99%
92.92%
93.68%
91.50%
91.78%
94.90%
94.52%
94.98%

82.44%
93.63%
94.99%
92.92%
93.68%
91.50%
91.78%
94.90%
94.52%
94.98%

82.44%
93.63%
94.99%
92.92%
93.68%
91.50%
91.78%
94.90%
94.52%
94.98%

Valor Bruto de la Produccin


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

735,392.59
14,920.40
237,260.51
181,751.43
22,254.03
27,227.41
23,694.74
14,439.34
133,485.27
38,233.45
42,126.00

919,240.74
18,650.50
296,575.64
227,189.29
27,817.54
34,034.26
29,618.43
18,049.18
166,856.59
47,791.82
52,657.50

919,240.74
18,650.50
296,575.64
227,189.29
27,817.54
34,034.26
29,618.43
18,049.18
166,856.59
47,791.82
52,657.50

919,240.74
18,650.50
296,575.64
227,189.29
27,817.54
34,034.26
29,618.43
18,049.18
166,856.59
47,791.82
52,657.50

919,240.74
18,650.50
296,575.64
227,189.29
27,817.54
34,034.26
29,618.43
18,049.18
166,856.59
47,791.82
52,657.50

919,240.74
18,650.50
296,575.64
227,189.29
27,817.54
34,034.26
29,618.43
18,049.18
166,856.59
47,791.82
52,657.50

919,240.74
18,650.50
296,575.64
227,189.29
27,817.54
34,034.26
29,618.43
18,049.18
166,856.59
47,791.82
52,657.50

919,240.74
18,650.50
296,575.64
227,189.29
27,817.54
34,034.26
29,618.43
18,049.18
166,856.59
47,791.82
52,657.50

919,240.74
18,650.50
296,575.64
227,189.29
27,817.54
34,034.26
29,618.43
18,049.18
166,856.59
47,791.82
52,657.50

919,240.74
18,650.50
296,575.64
227,189.29
27,817.54
34,034.26
29,618.43
18,049.18
166,856.59
47,791.82
52,657.50

9,008,559.27

Costo Total
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

551,761.32
45,545.07
178,597.36
59,853.00
35,652.87
42,903.50
87,002.24
16,600.77
34,134.93
22,550.89
28,920.68

606,937.45
50,099.57
196,457.09
65,838.30
39,218.16
47,193.85
95,702.47
18,260.85
37,548.42
24,805.98
31,812.75

606,937.45
50,099.57
196,457.09
65,838.30
39,218.16
47,193.85
95,702.47
18,260.85
37,548.42
24,805.98
31,812.75

606,937.45
50,099.57
196,457.09
65,838.30
39,218.16
47,193.85
95,702.47
18,260.85
37,548.42
24,805.98
31,812.75

606,937.45
50,099.57
196,457.09
65,838.30
39,218.16
47,193.85
95,702.47
18,260.85
37,548.42
24,805.98
31,812.75

606,937.45
50,099.57
196,457.09
65,838.30
39,218.16
47,193.85
95,702.47
18,260.85
37,548.42
24,805.98
31,812.75

606,937.45
50,099.57
196,457.09
65,838.30
39,218.16
47,193.85
95,702.47
18,260.85
37,548.42
24,805.98
31,812.75

606,937.45
50,099.57
196,457.09
65,838.30
39,218.16
47,193.85
95,702.47
18,260.85
37,548.42
24,805.98
31,812.75

606,937.45
50,099.57
196,457.09
65,838.30
39,218.16
47,193.85
95,702.47
18,260.85
37,548.42
24,805.98
31,812.75

606,937.45
50,099.57
196,457.09
65,838.30
39,218.16
47,193.85
95,702.47
18,260.85
37,548.42
24,805.98
31,812.75

6,014,198.36

Valor Neto de la Produccin


Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

183,631.28
-30,624.67
58,663.15
121,898.43
-13,398.84
-15,676.09
-63,307.50
-2,161.43
99,350.34
15,682.56
13,205.32

312,303.29
-31,449.07
100,118.55
161,350.99
-11,400.62
-13,159.59
-66,084.04
-211.67
129,308.17
22,985.84
20,844.75

312,303.29
-31,449.07
100,118.55
161,350.99
-11,400.62
-13,159.59
-66,084.04
-211.67
129,308.17
22,985.84
20,844.75

312,303.29
-31,449.07
100,118.55
161,350.99
-11,400.62
-13,159.59
-66,084.04
-211.67
129,308.17
22,985.84
20,844.75

312,303.29
-31,449.07
100,118.55
161,350.99
-11,400.62
-13,159.59
-66,084.04
-211.67
129,308.17
22,985.84
20,844.75

312,303.29
-31,449.07
100,118.55
161,350.99
-11,400.62
-13,159.59
-66,084.04
-211.67
129,308.17
22,985.84
20,844.75

312,303.29
-31,449.07
100,118.55
161,350.99
-11,400.62
-13,159.59
-66,084.04
-211.67
129,308.17
22,985.84
20,844.75

312,303.29
-31,449.07
100,118.55
161,350.99
-11,400.62
-13,159.59
-66,084.04
-211.67
129,308.17
22,985.84
20,844.75

312,303.29
-31,449.07
100,118.55
161,350.99
-11,400.62
-13,159.59
-66,084.04
-211.67
129,308.17
22,985.84
20,844.75

312,303.29
-31,449.07
100,118.55
161,350.99
-11,400.62
-13,159.59
-66,084.04
-211.67
129,308.17
22,985.84
20,844.75

2,994,360.90

Precio de venta
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa
Porcentaje destinado al mercado
Cebada
Papa
Hortalizas
Arveja
Haba
Maiz
Trigo
Avena forrajera
Quinua
Alfalfa

Factor de Actualizacin (09%)


Valor Actual Neto del VNP

0.92

0.84

0.77

0.71

0.65

0.60

0.55

0.50

0.46

0.42

168,469.06

262,859.43

241,155.44

221,243.53

202,975.71

186,216.25

170,840.60

156,734.49

143,793.11

131,920.29

0.00

1,886,207.91

VALOR ACTUAL NETO DEL VNP INCREMENTAL (PRECIOS SOCIALES)


CONCEPTO

PROGRAMACION ANUAL
AO 5
AO 6

AO 1

AO 2

AO 3

AO 4

AO 7

AO 8

AO 9

AO 10

Valor Bruto de la Produccin Incremental


Situacin con Proyecto
(-) Situacin Optimizada

735,392.59
70,291.29

919,240.74
84,349.55

919,240.74
84,349.55

919,240.74
84,349.55

919,240.74
84,349.55

919,240.74
84,349.55

919,240.74
84,349.55

919,240.74
84,349.55

919,240.74
84,349.55

919,240.74
84,349.55

Total
Factor de Actualizacin (09%)
Valor Actual del VBP Incremental

665,101.30
0.92
610,184.68

834,891.19
0.84
702,711.21

834,891.19
0.77
644,689.18

834,891.19
0.71
591,457.97

834,891.19
0.65
542,621.99

834,891.19
0.60
497,818.34

834,891.19
0.55
456,714.07

834,891.19
0.50
419,003.74

834,891.19
0.46
384,407.10

834,891.19
0.42
352,667.06

Costo Total Incremental


Situacin con Proyecto
(-) Situacin Optimizada

551,761.32
100,277.23

606,937.45
110,304.95

606,937.45
110,304.95

606,937.45
110,304.95

606,937.45
110,304.95

606,937.45
110,304.95

606,937.45
110,304.95

606,937.45
110,304.95

606,937.45
110,304.95

606,937.45
110,304.95

Valor Actual de Costo Total Incremental


Factor de Actualizacin (09%)
Total

451,484.09
0.92
414,205.59

496,632.50
0.84
418,005.64

496,632.50
0.77
383,491.41

496,632.50
0.71
351,826.98

496,632.50
0.65
322,777.05

496,632.50
0.60
296,125.73

496,632.50
0.55
271,674.98

496,632.50
0.50
249,243.11

496,632.50
0.46
228,663.40

496,632.50
0.42
209,782.93

Valor Neto de la Produccin Incremental


Situacin con Proyecto
(-) Situacin Optimizada

183,631.28
-29,985.93

312,303.29
-25,955.40

312,303.29
-25,955.40

312,303.29
-25,955.40

312,303.29
-25,955.40

312,303.29
-25,955.40

312,303.29
-25,955.40

312,303.29
-25,955.40

312,303.29
-25,955.40

312,303.29
-25,955.40

Total
Factor de Actualizacin (09%)

213,617.21
0.92

338,258.69
0.84

338,258.69
0.77

338,258.69
0.71

338,258.69
0.65

338,258.69
0.60

338,258.69
0.55

338,258.69
0.50

338,258.69
0.46

338,258.69
0.42

Valor Actual Neto del VNP

195,979.09

284,705.57

261,197.77

239,630.98

219,844.94

201,692.61

185,039.09

169,760.63

155,743.70

142,884.13

VALOR
ACTUAL

5,202,275.34

3,145,796.83

2,056,478.51

FLUJO DE CAJA A PRECIOS SOCIALES ALTERNATIVA 1


RUBRO
1. INGRESOS INCREMENTALES DEL PROYECTO
Venta de agua para riego con proyecto
(-) Venta de agua para riego sin proyecto
Venta de tierras incorporadas

AO 0

AO 1

AO 2

AO 3

AO 4

AO 5

AO 6

AO 7

AO 8

AO 9

0.00

13,058.13
13,058.13
0.00
0.00

13,058.13
13,058.13
0.00
0.00

13,058.13
13,058.13
0.00
0.00

13,058.13
13,058.13
0.00
0.00

13,058.13
13,058.13
0.00
0.00

13,058.13
13,058.13
0.00
0.00

13,058.13
13,058.13
0.00
0.00

13,058.13
13,058.13
0.00
0.00

13,058.13
13,058.13
0.00
0.00

213,617.21

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

338,258.69

1,087,634.21
1,087,634.21
36,400.00
1,013,873.78
13,083.94
14,598.52
9,677.97

11,104.72
0.00

11,104.72
0.00

11,104.72
0.00

11,104.72
0.00

11,104.72
0.00

11,104.72
0.00

11,104.72
0.00

11,104.72
0.00

11,104.72
0.00

0.00

11,104.72
8,436.40
2,668.32

11,104.72
8,436.40
2,668.32

11,104.72
8,436.40
2,668.32

11,104.72
8,436.40
2,668.32

11,104.72
8,436.40
2,668.32

11,104.72
8,436.40
2,668.32

11,104.72
8,436.40
2,668.32

11,104.72
8,436.40
2,668.32

11,104.72
8,436.40
2,668.32

-1,087,634.21

215,570.62

340,212.10

340,212.10

340,212.10

340,212.10

340,212.10

340,212.10

340,212.10

340,212.10

1.00

0.92

0.84

0.77

0.71

0.65

0.60

0.55

0.50

0.46

-1,087,634.21

197,771.21

286,349.72

262,706.16

241,014.83

221,114.52

202,857.36

186,107.67

170,740.98

156,643.10

2. INCREMENTO EN EL VALOR NETO DE LA PRO

3. COSTOS INCREMENTALES DEL PROYECTO


Costos de Inversin
Estudios (Expediente Tecnico)
Infraestructuras
Mitigacin ambiental
Capacitacin
Fortaleciemiento de Comision de Regantes
Costos de Operacin y mantenimiento
Operacin
Mantenimiento

4. FLUJO NETO (1+2-3)


5. FACTOR DE ACTUALIZACION (9%)
6. VALOR ACTUAL DEL FLUJO NETO (VAN) (4x5)
7. TASA INTERNA DE RETORNO (TIR)
8. RATIO BENEFICIO COSTO

OCIALES ALTERNATIVA 1
AO 10

VANAC

13,058.13
13,058.13
0.00
0.00
338,258.69

3,257,945.43

11,104.72
0.00

1,198,681.41

11,104.72
8,436.40
2,668.32

340,212.10

2,189,845.33

0.42
143,709.27

981,380.63

25.77%
2.72

S/. 2,069,014.83

EVALUACION ECONOMICA DE LA ALTERNATIVA I


A PRECIOS DE MERCADO
AOS
0
1
2
3
4
5
6
7
8
9
10

COSTOS DE
INVERSION
1,512,629.97

BENEFICIOS BENEFICIOS NETOS


0.00
137948.68
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
VAN
TIR

-1512629.97
137948.68
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
-235,474.92
8.25%

A PRECIOS SOCIALES
AOS
0
1
2
3
4
5
6
7
8
9
10

COSTOS DE
INVERSION
1,087,634.21

BENEFICIOS BENEFICIOS NETOS


0.00
215,570.62
340,212.10
340,212.10
340,212.10
340,212.10
340,212.10
340,212.10
340,212.10
340,212.10
340,212.10
VAN
TIR

-1,087,634.21
215,570.62
340,212.10
340,212.10
340,212.10
340,212.10
340,212.10
340,212.10
340,212.10
340,212.10
340,212.10
981,380.63
25.77%

3. ANALISIS DE SENSIBILIDAD
CRITERIOS SUPUESTOS

% DE
VARIACION

COSTOS E INVERSION

+ 10%
+ 20%
+ 60%

-329,603.42
-427,924.37
-511,119.02

6%
5%
4%

1.85
1.65
1.54

694,900.75
477,373.91
-207,835.64

23%
18%
9%

BENEFICIOS

- 10%
- 20%
- 35%

-311,769.38
-365,140.96
-418,512.54

6%
5%
4%

2.03
1.75
1.35

614,534.33
340,296.07
-104,159.05

23%
18%
9%

+ 10% - 10% -391,859.39


+ 20% - 20% -463,032.38

5%
4%

1.38
2.19

654,717.54
-119,804.93

23%
9%

COSTOS + BENEFICIOS

A PRECIOS PRIVADOS
VAN
TIR
B/C

A PRECIOS SOCIALES
VAN
TIR

A PRECIOS SOCIALES
VARIACION %
VAN (10 %)
694900.75
COSTO DE INVERSIOIN +10%
477373.91
COSTO DE INVERSIOIN +30%
-207835.64
COSTO DE INVERSIOIN +93%
614534.33
BENEFICIOS - 10 %
340296.07
BENEFICIOS - 25 %
-104159.05
BENEFICIOS - 48 %
654717.54
COSTOS + 5 % Y Benef. - 5%
-119804.93
COSTOS + 31 % Y Benef. - 31%

TIR
6%
5%
4%
6%
5%
4%
5%
4%

INCREME
800000.00
600000.00
400000.00

TIR
23%
18%
9%
23%
18%
9%
23%
9%

200000.00
0.00
6%

8%

10%

-200000.00
-400000.00

VA LO R A C TUA L N E TO

A PRECIOS DE MERCADO
VARIACION %
VAN (10 %)
-329,603.42
COSTO DE INVERSIOIN +10%
-427,924.37
COSTO DE INVERSIOIN +17%
-511,119.02
COSTO DE INVERSIOIN +22%
-311,769.38
BENEFICIOS - 10 %
-365,140.96
BENEFICIOS - 14 %
-418,512.54
BENEFICIOS - 14 %
-391,859.39
COSTOS + 7.5 % Y Benef. - 7.5%
-463,032.38
COSTOS + 10 % Y Benef. - 10%

VA LO R A C TUA L N E TO

Del cuadro se desprende que a pesar de las variaciones de las variables analizadas, la rentabilidad
de la propuesta se mantiene positivo.

B
700000.00
600000.00
500000.00
400000.00
300000.00
200000.00
100000.00

0.00
8% 10% 12% 1
-100000.00
TASA D
-200000.00

VA L

700000.00
600000.00
500000.00
400000.00
300000.00
200000.00
100000.00

0.00
8% 10% 12% 1
-100000.00
TASA D
-200000.00

CIOS SOCIALES
B/C
2.52
1.96
1.77
2.57
2.02
1.71

VA LO R A C TUA L N E TO

1.73
2.81

INCREMENTO DE COSTO INVERSION


800000.00
600000.00
400000.00
200000.00
0.00
6%

8%

10%

12% 14%

16% 18% 20%

22% 24%

-200000.00

VA LO R A C TUA L N E TO

-400000.00

TASA DESCUENTO SOCIAL (%)

BENEFICIOS
700000.00
600000.00
500000.00
400000.00
300000.00
200000.00
100000.00
0.00
8% 10% 12% 14% 16% 18% 20% 22% 24%
-100000.00
TASA DESCUENTO SOCIAL (%)
-200000.00

VA L

700000.00
600000.00
500000.00
400000.00
300000.00
200000.00
100000.00
0.00
8% 10% 12% 14% 16% 18% 20% 22% 24%
-100000.00
TASA DESCUENTO SOCIAL (%)
-200000.00

ANALISIS DE SENCIBILIDAD DE LA ALTERNATIVA I


A PRECIOS DE MERCADO
VARIACION %
VAN (14 %)
COSTO DE INVERSIOIN +10%
-329603.42
COSTO DE INVERSIOIN +17%
-427924.37
COSTO DE INVERSIOIN +22%
-511119.02
BENEFICIOS - 10 %
-311769.38
BENEFICIOS - 14 %
-365140.96
BENEFICIOS - 14 %
-418512.54
COSTOS + 7.5 % Y Benef. - 7.5%
-391859.39
COSTOS + 10 % Y Benef. - 10%
-463032.38

TIR
6%
5%
4%
6%
5%
4%
5%
4%

ANEXO N 28
FORMATO 7 B I
EVALUACION ECONOMICA
ALTERNATIVA I
A PRECIOS DE MERCADO
AOS COSTOS DE
INVERSION
0
1512629.97
1
2
3
4
5
6
7
8
9
10

BENEFICIOS BENEFICIOS
NETOS
0.00
-1512629.97
137948.68
137948.68
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
VAN
-178340.43
TIR
8.25%

A PRECIOS SOCIALES
VARIACION %
VAN (11 %)
COSTO DE INVERSIOIN +10%
694900.75
COSTO DE INVERSIOIN +30%
477373.91
COSTO DE INVERSIOIN +93%
-207835.64
BENEFICIOS - 10 %
614534.33
BENEFICIOS - 25 %
340296.07
BENEFICIOS - 48 %
-104159.05
COSTOS + 5 % Y Benef. - 5%
654717.54
COSTOS + 31 % Y Benef. - 31%
-119804.93
ANEXO N 29
FORMATO 7 B II
EVALUACION ECONOMICA
ALTERNATIVA I
A PRECIOS SOCIALES
AOS COSTOS DE
INVERSION
0
1087634.21

COSTO DE INVERSIOIN +10%

BENEFICIOS BENEFICIOS
NETOS
0.00
-1087634.21

AOS COSTOS DE BENEFICIOS


INVERSION
0
1663892.96
0.00
1
137948.68
2
242568.39
3
242568.39
4
242568.39
5
242568.39
6
242568.39
7
242568.39
8
242568.39
9
242568.39
10
242568.39
VAN
TIR

TIR
23%
18%
9%
23%
18%
9%
23%
9%

COSTO DE INVERSIOIN +10%


AOS COSTOS DE BENEFICIOS
INVERSION
0
1196397.63
0.00

1
2
3
4
5
6
7
8
9
10

215570.62
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
VAN
TIR

215570.62
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
803664.17
25.77%

1
2
3
4
5
6
7
8
9
10

215570.62
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
VAN
TIR

VERSIOIN +10%
BENEFICIOS
NETOS
-1663892.96
137948.68
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
-329603.42
6.27%

VERSIOIN +10%
BENEFICIOS
NETOS
-1196397.63

COSTO DE INVERSIOIN +17%


AOS COSTOS DE BENEFICIOS BENEFICIOS
INVERSION
NETOS
0
1762213.91
0.00
-1762213.91
1
137948.68
137948.68
2
242568.39
242568.39
3
242568.39
242568.39
4
242568.39
242568.39
5
242568.39
242568.39
6
242568.39
242568.39
7
242568.39
242568.39
8
242568.39
242568.39
9
242568.39
242568.39
10
242568.39
242568.39
VAN
-427924.37
TIR
5.12%

COSTO DE INVERSIOIN +30%


AOS COSTOS DE BENEFICIOS BENEFICIOS
INVERSION
NETOS
0
1413924.47
0.00
-1413924.47

COSTO DE INVERSIOIN +2
AOS COSTOS DE
INVERSION
0
1845408.56
1
2
3
4
5
6
7
8
9
10

COSTO DE INVERSIOIN +9
AOS COSTOS DE
INVERSION
0
2099134.02

215570.62
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
694900.75
22.87%

1
2
3
4
5
6
7
8
9
10

215570.62
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
VAN
TIR

215570.62
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
477373.91
18.18%

1
2
3
4
5
6
7
8
9
10

COSTO DE INVERSIOIN +22%


BENEFICIOS BENEFICIOS
NETOS
0.00
-1845408.56
137948.68
137948.68
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
242568.39
VAN
-511119.02
TIR
4.22%

BENEFICIOS - 10 %
AOS
0
1
2
3
4
5
6
7
8
9
10

COSTO DE INVERSIOIN +93%


BENEFICIOS BENEFICIOS
NETOS
0.00
-2099134.02

AOS
0

COSTOS DE
INVERSION
1512629.97

BENEFICIOS BENEFICIOS
NETOS
0.00
-1512629.97
124153.81
124153.81
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
VAN
-311769.38
TIR
6.07%

BENEFICIOS - 10 %
COSTOS DE
BENEFICIOS
BENEFICIOS
INVERSION
NETOS
1087634.21
0.00
-1087634.21

BEN
AOS
0
1
2
3
4
5
6
7
8
9
10

BEN
AOS
0

215570.62
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
VAN
TIR

215570.62
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
340212.10
-207835.64
8.69%

1
2
3
4
5
6
7
8
9
10

194013.56
306190.89
306190.89
306190.89
306190.89
306190.89
306190.89
306190.89
306190.89
306190.89
VAN
TIR

194013.56
306190.89
306190.89
306190.89
306190.89
306190.89
306190.89
306190.89
306190.89
306190.89
614534.33
22.58%

1
2
3
4
5
6
7
8
9
10

BENEFICIOS - 14 %
COSTOS DE BENEFICIOS BENEFICIOS
INVERSION
NETOS
1512629.97
0.00
-1512629.97
118635.86
118635.86
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
208608.82
VAN
-365140.96
TIR
5.16%

BENEFICIOS - 25 %
COSTOS DE BENEFICIOS BENEFICIOS
INVERSION
NETOS
1087634.21
0.00
-1087634.21

BENEFICIOS - 18 %
AOS COSTOS DE BENEFICIOS BENEFICIOS
INVERSION
NETOS
0
1512629.97
0.00
-1512629.97
1
113117.92
113117.92
2
198906.08
198906.08
3
198906.08
198906.08
4
198906.08
198906.08
5
198906.08
198906.08
6
198906.08
198906.08
7
198906.08
198906.08
8
198906.08
198906.08
9
198906.08
198906.08
10
198906.08
198906.08
VAN
-418512.54
TIR
4.23%

BENEFICIOS - 48 %
AOS COSTOS DE BENEFICIOS BENEFICIOS
INVERSION
NETOS
0
1087634.21
0.00
-1087634.21

162755.82
256860.14
256860.14
256860.14
256860.14
256860.14
256860.14
256860.14
256860.14
256860.14
VAN
TIR

162755.82
256860.14
256860.14
256860.14
256860.14
256860.14
256860.14
256860.14
256860.14
256860.14
340296.07
17.68%

1
2
3
4
5
6
7
8
9
10

112096.72
176910.29
176910.29
176910.29
176910.29
176910.29
176910.29
176910.29
176910.29
176910.29
VAN
TIR

112096.72
176910.29
176910.29
176910.29
176910.29
176910.29
176910.29
176910.29
176910.29
176910.29
-104159.05
8.76%

0.075

COSTOS + 7.5 % Y Benef. - 7.5%


AOS COSTOS DE
INVERSION
0
1626077.21
1
2
3
4
5
6
7
8
9
10

BENEFICIOS BENEFICIOS
NETOS
0.00
-1626077.21
127602.53
127602.53
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
224375.76
VAN
-391859.39
TIR
5.17%

COSTOS + 10 % Y Benef. - 10%


AOS COSTOS DE BENEFICIOS
INVERSION
0
1663892.96
0.00
1
124153.81
2
218311.55
3
218311.55
4
218311.55
5
218311.55
6
218311.55
7
218311.55
8
218311.55
9
218311.55
10
218311.55
VAN
TIR

0.785

COSTOS + 5 % Y Benef. - 5%
AOS COSTOS DE
INVERSION
0
1142015.92

BENEFICIOS BENEFICIOS
NETOS
0.00
-1142015.92

COSTOS + 31 % Y Benef. - 31%


AOS COSTOS DE BENEFICIOS
INVERSION
0
1424800.81
0.00

1
2
3
4
5
6
7
8
9
10

204792.09
323201.50
323201.50
323201.50
323201.50
323201.50
323201.50
323201.50
323201.50
323201.50
VAN
TIR

204792.09
323201.50
323201.50
323201.50
323201.50
323201.50
323201.50
323201.50
323201.50
323201.50
654717.54
22.73%

1
2
3
4
5
6
7
8
9
10

148743.73
234746.35
234746.35
234746.35
234746.35
234746.35
234746.35
234746.35
234746.35
234746.35
VAN
TIR

% Y Benef. - 10%
BENEFICIOS
NETOS
-1663892.96
124153.81
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
218311.55
-463032.38
4.19%

% Y Benef. - 31%
BENEFICIOS
NETOS
-1424800.81

148743.73
234746.35
234746.35
234746.35
234746.35
234746.35
234746.35
234746.35
234746.35
234746.35
-119804.93
9.04%

COSTOS DE OPERACIN, MANTENIMIENTO


COSTOS DE OPERACIN
INSUMOS Y MATERIALES DE ORIGEN NACIONAL
DESCRIPCION

UNIDAD

CANTIDAD

UNITARIO

PARCIALCON IGV

FACTOR DE CORR.

PARCIALSIN IGV

LIMPIEZA DE CANAL

GLB

0.50

400.00

200.00

0.41

82.00

LIMPIEZA DE DERRUMBES

GLB

0.50

300.00

150.00

0.41

61.50

TOTAL

350.00

143.50

COSTOS DE MANTENIMIENTO

INSUMOS Y MATERIALES DE ORIGEN NACIONAL


DESCRIPCION

UNIDAD

CANTIDAD

UNITARIO

PARCIALCON IGV

FACTOR DE CORR.

PRECIO SOCIAL

ARENA FINA

M3

0.50

80.00

40.00

0.85

34.00

CEMENTO PORTLAND TIPO I

BL

0.30

21.60

6.48

0.85

5.51

HORMIGON

M3

0.50

80.00

40.00

0.85

34.00

HERRAMIENTAS

GLB

0.50

150.00

75.00

0.85

63.75

TOTAL

161.48

137.26

COSTOS DE OPERACIN, MANTENIMIENTO


COSTOS DE OPERACIN
INSUMOS Y MATERIALES DE ORIGEN NACIONAL
DESCRIPCION

UNIDAD

CANTIDAD

UNITARIO

PARCIALCON IGV

FACTOR DE CORR.

PARCIALSIN IGV

LIMPIEZA DE LAS TALUDES DE MALEZAS

GLB

1.00

800.00

800.00

0.41

328.00

LIMPIEZA DE DERRUMBES

GLB

1.00

600.00

600.00

0.41

246.00
574.00

TOTAL

1,400.00

REMUNERACIONES
DESCRIPCION
OPERADOR DEL RESERVORIO

UNIDAD
MES

CANTIDAD
12.00

UNITARIO
720.00

TOTAL

PARCIAL CON IMP.


8,640.00

FACTOR DE CORR.
0.91

8,640.00

PRECIO SOCIAL
7,862.40
7,862.40

COSTOS DE MANTENIMIENTO

INSUMOS Y MATERIALES DE ORIGEN NACIONAL


DESCRIPCION

UNIDAD

CANTIDAD

UNITARIO

PARCIALCON IGV

FACTOR DE CORR.

PRECIO SOCIAL

ARENA FINA

M3

12.00

95.00

1,140.00

0.85

969.00

CEMENTO PORTLAND TIPO I

BL

12.00

21.60

259.20

0.85

220.32

HORMIGON

M3

12.00

95.00

1,140.00

0.85

969.00

HERRAMIENTAS

GLB

4.00

150.00

600.00

0.85

510.00

TOTAL

3,139.20

2,668.32

13,700.00

12,467.00

COMPONENTE SOCIAL
COSTO TOTAL DE CAPACITACION

PRESUPUESTO DE MITIGACION AMBIENTAL


PARTIDA

DESCRIPCION

UNIDAD

METRADO

UNITARIO

PARCIAL

TOTAL

FACTOR
CORR.

01.00

REFORESTACION AMBOS LADOS DE EJE DE CANAL

01.01

DEMARCACION DE HOYOS

UND

200.00

0.80

160.00

0.41

01.02

APERTURA DE HOYOS

UND

200.00

2.50

500.00

0.41

01.03

ADQUISICION Y TRANSPORTE DE PLANTONES

UND

200.00

4.00

800.00

0.85

01.04

SIEMBRE DE PLANTONES

UND

200.00

1.50

300.00

0.41

01.05

MANTENIMIENTO DE PLANTONES

UND

200.00

2.00

400.00

02.00

CONFORMACION DE COMITES

02.01

CONFORMACION DE COMITES DE MANTENIMIENTO

03.00

EVENTOS DE CAPACITACION

03.01

CURSO SOBRE MITIGACION AMBIENTAL

CURSO

1.00

1800.00

1800.00

0.91

03.02

CHARLA AMBIENTAL ATRABAJADORES

CURSO

1.00

1800.00

1800.00

0.91

03.03

CHARLA A TRABAJADORES

CHARLA

1.00

1800.00

1800.00

04.00

RESTAURACIONES

04.01

LIMPIEZA DEL AREA DE TRABAJO

GLB

1.00

800.00

800.00

04.04

LIMPIEZA DE LOS CURSOS DE AGUA

GLB

1.00

800.00

800.00

05.00

RIESGOS DE LA SALUD

05.01

BOTIQUIN

UND

1.00

600.00

600.00

0.85

05.02

CONTENEDOR

UND

4.00

150.00

600.00

0.85

05.03

BIDON

UND

4.00

150.00

600.00

0.85

05.04

MICRORELLENO SANITARIO

UND

4.00

350.00

1400.00

0.85

06.00

INSTALACION DE CARTELES AMBIENTALES

06.01

CONSTRUCCION

UND

1.00

1052.87

1052.87

0.85

06.02

INSTALACION

UND

1.00

1180.00

1180.00

0.85

2,160.00

0.41
800.00

COMIT

1.00

800.00

800.00

0.85
5,400.00

0.91
1,600.00
0.41
0.41
3,200.00

COSTO TOTAL

2,232.87

15,392.87

ESTO DE MITIGACION AMBIENTAL


PRECIO SOC. TOTAL
1,237.60
65.60
205.00
680.00
123.00
164.00
680.00
680.00
4,914.00
1638.00
1638.00
1638.00
656.00
328.00
328.00
2,720.00
510.00
510.00
510.00
1190.00
1,897.94
894.94
1003.00

12,105.54

ESTUDIO DEFINITIVO

PARTIDA

UNIDAD
GBL
GBL

A. TARIFAS DE PERSONAL

B. GASTOS REEMBOLSABLES

CANTIDAD
1
1

COSTO
P.U
37,350.00
2,650.00

PARCIAL
37,350.00
2,650.00

TOTAL

40,000.00

A. TARIFA DE PERSONAL
UNIDAD
CANTIDAD
PARTIDA
PERSONAL PROFESIONAL
Ing. Agricola - Responsable del estudio
Ingeniero en diseos hidraulicos
Ingeniero costos y presupuestos
Ingeniero en Agrologico
Ingeniero Geotecnista
PERSONAL TECNICO
Topografo
Dibujante en Autocad Land
Ayudante de Topografia
Estudio de canteras
Estudio edafolgico
Anlisis de muestra de suelos
Anlisis de calidad de agua: riego y uso poblacional
TOTAL

COSTO
P.U

PARCIAL

mes
mes
mes
mes
mes

2
1.5
1
1.5
1

6,000.00
3,500.00
3,500.00
3,000.00
4,000.00

12,000.00
5,250.00
3,500.00
4,500.00
4,000.00

mes
mes
mes
GBL
GBL
GBL
GBL

1
1

1,500.00
1,200.00
1,500.00
500.00
2,500.00
500.00
400.00

1,500.00
1,200.00
1,500.00
500.00
2,500.00
500.00
400.00

TOTAL
PRIVADOS
29,250.00

8,100.00

1
1
1
1
1

37,350.00

B. GASTOS REEMBOLSALES
UMDAD
CANTIDAD
PARTIDA
1. Materiales de oficina
1.1 Utiles de Oficina y dibujo
1 .2 Fotocopia y anillados
2. Pasajes
2.1 Pasajes Terrestres Ayacucho- Lugar del proyecto
2.2 Viaticos
3. Alquiler
3.1 Alquiler de Movilidad
3.2 Alquiler de Equipo de Topografia (Estacion Total)
3.3 Alquiler de GPS
3.4 Alquiler de Nivel de Ingeniero
TOTAL

TOTAL
PRIVADOS
37,350.00
2,650.00

COSTO
P.U

PARCIAL

GBL
GBL

1
1

300
500

300.00
500.00

GBL
GBL

5
1
1
1
5
5
5

10
330

50.00
330.00

420
120
60
30

420.00
600.00
300.00
150.00

TOTAL
PRIVADOS
800.00

380.00

dias
dias
dias
dias

1,470.00

2,650.00

LIQUIDACION DE OBRA

PARTIDA

UNIDAD
GBL
GBL

A. TARIFAS DE PERSONAL

B. GASTOS REEMBOLSABLES

CANTIDAD
1
1

COSTO
P.U
10,300.00
1,200.00

PARCIAL
10,300.00
1,200.00

TOTAL

11,500.00

UNIDAD
PARTIDA
PERSONAL PROFESIONAL
Ing. Agricola - Responsable del estudio
Contador
PERSONAL TECNICO
Asistente Administrativo
TOTAL

A. TARIFA DE PERSONAL
CANTIDAD
COSTO
P.U

PARCIAL

mes
mes

1
1

5,000.00
3,500.00

5,000.00
3,500.00

mes

1,800.00

1,800.00

TOTAL
PRIVADOS
8,500.00

1,800.00

UMDAD
PARTIDA
1. Materiales de oficina
1.1 Utiles de Oficina y dibujo
1 .2 Fotocopia y anillados
2. Pasajes
2.1 Pasajes Terrestres AyacuchoLugar del proyecto
2.2 Viaticos
TOTAL

TOTAL
PRIVADOS
10,300.00
1,200.00

GBL
GBL

10,300.00

B. GASTOS REEMBOLSALES
CANTIDAD
COSTO
P.U
PARCIAL
1
1

500
500

TOTAL
PRIVADOS
1,000.00

500.00
500.00
200.00

GBL
GBL

5
1

20
100

100.00
100.00
1,200.00

PREC
FACTOR
PARCIAL.SOCI
TOTAL
CORRECCION
AL
PREC.SOCIAL
9,373.00
9,373.00
1,020.00
1,020.00
10,393.00

PREC
FACTOR
PARCIAL.SOCI
TOTAL
CORRECCION
AL
PREC.SOCIAL
7,735.00
0.91
0.91

4,550.00
3,185.00

0.91

1,638.00

1,638.00
9,373.00

PREC
FACTOR
PARCIAL.SOCI
TOTAL
CORRECCION
AL
PREC.SOCIAL
850.00
0.85
425
0.85
425
170.00
0.85
0.85

85
85
1,020.00

1,020.00

Vous aimerez peut-être aussi