Académique Documents
Professionnel Documents
Culture Documents
P
Conceptos requeridos:
-
Demostracin:
12
2
( 2)
bbl
2 ( 1 ft )
Capacidad
= D
ft
4
1 ft
( )
( ft 3 )1 bbl
bbl
=5,4541539 x 103ID 2
ft
5,615 ft 3
Capacidad
( )
Capacidad
( bblft )=9,7135421 x 10
Capacidad
22
<
(D)2
bbl
D2
=
; D( 2)
ft
1029,4
( )
P
Conceptos requeridos:
-
Demostracin:
V ( bbl )=capacidad
Conceptos requeridos:
( bblft )L(ft)
Dmayor h D 2menor h
4
4
Dcsg
Dhole
1 ft
Demostracin:
Capacidad
D
12
D
12
( 2 1 ft )
( csg ( ))2( 1 ft )2
4
( 2 1 ft )
( hole ( ) )2( 1 ft )2
4
bbl
Capacidad
=
ft
( )
3
bbl
1
2
2 ( ft )1 bbl
Capacidad
=
( Dhole Dcsg )
ft
4 12
5,615 ft 3
( ) ( )
Capacidad
( bblft )=9,706 x 10
( Dhole2Dcsg2 )
2
2
bbl ( Dhole Dcsg ) bbl
Capacidad
=
ft
1029,4
ft
( )
( )
Conceptos requeridos:
( bblft )
Demostracin:
( bblft )L(ft )
Conceptos requeridos:
-
( )
Cpacity
Bbls Diameter 2 ( 2 )
=
Ft
1029,4
( )
Demostracin:
Length ( Ft )=
V olume( Bbls)
=
Bbls
SectionCapacity
Ft
( )
Length( Ft )
( Bbls
FT )
Bbls
Capacity (
Ft )
Capacity
Diameter ( )
Length (Ft )
1029,4
(
)
Length Ft =
=Length ( Ft )
2 2
Diameter ( )
1029,4
Conceptos requeridos:
-
Fluid Gradient=
Presin
=
Profundidad
Lbm
( 1Gal
)gL ( 1 Ft )
Ft
Psi
=
Ft
Fluid Gradient
( )
Fluid Gradient
Lbs
( PsiFt )=0,052 ( Gal
)
)(
1 Lbs
7.48 Gal
1 ft
( 1 Ft )
3
2
Gal
1 ft
144
Ft
Conceptos requeridos:
-
Lbs
( Gal
)TVD ( Ft )
( psift )TVD ( Ft )
Conceptos requeridos:
-
Demostracin:
SIDPP ( psi)=Pformacion (psi)P hidrostaticaDP( psi)
Pformacion ( psi )=SIDPP ( ps i )+ P hidrostaticaDP (psi)
Conceptos requeridos:
-
Pformacion ( psi )=SICP ( psi ) + ( MudLength ( ft )MudDensity ( ppg )0.052 )+ ( KickLength ( ft )KickDensity
Conceptos requeridos:
-
Demostracin:
SIDPP ( psi)=Pf ( psi) Phdp( psi)
KMW ( ppg)=
10.
SIDPP( p si)
+ MW ( ppg)
0.052TVD ft
Conceptos requeridos:
-
Demostracin:
11.
Conceptos requeridos:
Demostracin:
12.
ESTIMATED
PRESSURE
SHUT-
IN
DRILLPIPE
(OR
TUBING)
MUD
DENSITY
Conceptos requeridos:
Demostracin:
13.
Conceptos requeridos:
Demostracin:
14.
ESTIMATED
(PPG)
INTEGRITY/
FRACTURE
Conceptos requeridos:
Demostracin:
15.
TRIP MARGIN(PPG)
Conceptos requeridos:
Demostracin:
16.
Conceptos requeridos:
Demostracin:
17.
Conceptos requeridos:
Demostracin:
18.
MAX LENGHT (FT) PULLED PRIOR TO FILL-UP
DRY PIPE
Conceptos requeridos:
Demostracin:
19.
MAX LENGHT (FT) PULLED PRIOR TO FILL-UP
WET PIPE
Conceptos requeridos:
Demostracin: