Vous êtes sur la page 1sur 1

FIGURES

"b"

"m"

"D "
L

"D "
R

Ahead End (On Stationing)

Negative Value Indicates


Point Beyond Girder End

"F "
L

"E "
L

"E "
R

"F "
R

Negative Value Indicates

EST. MIDSPAN
DEFLECTION

Point Beyond Girder End

"F "
L

"E "
L

"E "
R

Upward at
Release

"F "
R

Upward 3
Months after
Release

Estimated
Shortening 2 Weeks
after Release

"a"

Negative Value
Indicates Back
from Midspan

End Block

Spaces

Back End (On Stationing)

Diaphragm

Leg)

Stirrup

End Block

Reinforcing Bars
(Stirrup

Strand Pattern

per Girder "N"

Figure Number for

per Strand, Kips

Number of Strands

@ Release, Ksi

Initial Tension

@ 28 Days, Ksi

Concrete Strength

Concrete Strength

Girder Mass, Kips

(Horiz. Length

after Shortening)

"A", o-o Girder

Girder {

Bents along

Span ctr. - ctr.

Span Number

RT. = Rt. Exterior

LT. = Lt. Exterior

Number Required

Girder Number

Girder Type

GIRDER SCHEDULE
FIGURE 1

FIGURE 2

FIGURE 3

FIGURE 4

FIGURE 5

FIGURE 6

FIGURE 7

FIGURE 8

"N"

"yc"

"N"

"yc"

When the girder build-up exceeds 3" and/or


the girder stirrups extend less than 2" into

3 @ 9"

the deck, add #4 stirrup extensions.


(9 1/2 " average spacing)

Place stirrup extensions at each girder

3-3 3/8
"

stirrups and tie to the girder stirrup.

"a" @ 6"

18" max.

"b" @ 12"

extentions @ 12" max.

Skew end plan


Bar "U4" stirrups spacing

5-0" end block

4-0" transition

7 @ 1-3"
1 @ 1-0 3/4 "
1 @ 10 1/2 "
1 @ 8"

#3 "U3" bars, see


Midspan Section for
bar spacing.

compensate for the difference between deck


elevation and girder camber.

BUILD - UP DECK DETAIL


(Alternate A)
One cable restraint at location

2-1 1/2 " w/7 1/2 " web

#4 "U9" bars at 8" max.

2-2" w/8" web

#4 longit. btwn. ducts each


face of web when clear distance
btwn. ducts is 4" or greater.

END BLOCK SIDE ELEVATION

END BLOCK END VIEW


No Scale

fabrication and erection will meet

Cable restraints top

flush with surface of girder

and bottom at each

(exterior girders only).

Beam D.

GIRDER RESTRAINT DIAGRAM

the required deck elevations. In

Note:

beam details, see dwg. BR350

DET3396

Note:
Transport members in accordance with Section 00550.51 of the
Standard Specifications for Highway Construction. Place members
no less than _____ days after casting.

case of variations, lower girder

Snug fit prestressed girders against forms prior to diaphragm

to meet corrected elevation.

pour. Keep restraints in place a min. of two days after

SECTION A-A

completion of diaphragm pour.

OREGON DEPARTMENT OF TRANSPORTATION


NOTE TO DESIGNER
NOTE TO DESIGNER

Remove note if 7 day transport and placement


is okay without placement restrictions.

(Alternate B)

After restraint is removed,

fill hole with concrete and finish

dimension assumes girder

For temporary diaphragm

NOTE TO DESIGNER

shown.

1"cl.

Minimum deck thickness. This


2-#13 x cont. each side,
stagger splice.

to prestressing. Use build-up over girder to

w/7 1/2 " web


w/8" web

as required

Ensure girder soffits are on level grade prior

Possible strand locations.

extension
Build-up

(Normal dimension,
adjust first bar
for skew)

#4 "U11" BAR

6"

2"

7-0" BI84
8-0" BI96
9-0" BI108

1-7 1/2 " w/7 1/2 " web


3"

#4 stirrup

Midspan section

w/8" web

1-8" w/8" web

Midspan B

#4 "U9" BAR

w/7 1/2 " web

2-#5 x 2-6" epoxy


coated dowels each side
projecting 12" out
of beam end.

Deck

Girder Depth-2 3/8 "

2"cl.

W12 "U2" bars


(galv.) at 6" alternate
"U5" stirrups (1st.,
3rd, 5th, and 7th).

8"

#4 "U9" bar

spcg.

Bar "U5"
stirrups

9 @ 4"

"X"

w/ 8" web

6 @ 3"

w/ 7 1/2 " web

1 3/4 "

6"

varies

6" or less, place stirrup

STEM SECTION AT END BLOCK


1 3/4 "cl.

6"

Where girder stirrup spacing is

2-#6 x cont.
each side,
stagger splices.

#4 "U9" bars @ 8" max.

2"cl.

@ 10" max.

#4 "U11" bar

#5 x 2-6" epoxy
coated dowels btwn.
post-tensioning ducts
each side projecting
12" out of beam end.

1 3/4 "cl.

6 spcs.

1-4"

2"

1 1/2 "|

2-2"

#4 "U1" bars at
18" max. ctrs.
2-#5 x 2-6" epoxy
coated dowels each
side projecting 12"
out of beam end.

3-3"

4-9"
W12 "U2" bars @ 6" ctrs. on 1st, 3rd,
5th and 7th stirrups (from girder ends).

12"

2-1 1/2 "

w/8" web

6"

2"cl.

2-#5 x cont. bars,


stagger splices.

w/7 1/2 " web

1"cl.

1 3/4 "cl.

End Blocks are typically not


necessary at continous bents.

Design girders using 3/4 " min.


build-up over girders.

TECHNICAL SERVICES
DETAILS

BULB-I GIRDER SCHEDULE,


POST-TENSIONED END BLOCK
AND
MISCELLANEOUS DETAILS

DETAIL NO.

DET3396

1:16 - det3396

Vous aimerez peut-être aussi