Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
1
2
1.
Designation No.
: ______________
Circuit
: ________________
Manufacturer
: ______________
Panel
: ________________
: ______________
Scheme Option
: ________________
Serial No.
: ______________
Model No.
: ________________
: SL____________
Module No: 16
Program No.
Def. Scheme
S/W No.
: D ____________
Module No. 19
Program No.
: ________________
________________
________________
: ________________
________________
AC Rating
: ______________
DC Rating
: ________________
CT Shorting
: ______________
Main Scheme
S/W No.
(a)
CT Ratio
VT Ratio
(b)
(c)
(d)
Ph =
(e)
Z1 (Primary) = R2 + X2
(f)
Tested by:
_______________ ................................
_______________ ................................
Line 1
..................... Km
..................... ohms
..................... ohms
N=
..................... ohms/Km
Witnessed by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer ref.:
Cont:
2
3
1.21.MMHO
Page 1 of 15
Site :
Drawing ref.:
2.
Item
3.
Project no.:
Description
Checked
1.
2.
3.
4.
5.
6.
Setting on Relay
(a)
Z1 ohmic reach
(b)
Select K1 + K2 = 4.8 ohms (0.96 ohms) unless the required reach
is less than 4.8 ohms (0.96 ohms) when a value equal to slightly less than the reach
should be choosen.
K1 + K2 = ................................................ ohms
(c)
Devide the required reach by K1 + K2 to obtain the Z1 multiplying
factor (K11 + K12 + K13) K14.
K11 = ..............................
K12 = ..............................
K13 = ..............................
K14 = ..............................
Tested by:
Witnessed by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
3
4
(d)
1.21.MMHO
(f)
(g)
Tested by:
Witnessed by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
4
5
(h)
1.21.MMHO
Page 3 of 15
K3 = ..............................
K4 = ..............................
K5 = ..............................
(j)
(k)
Z5
2(1-K54)
x Zph
K51 = ..............................
K52 = ..............................
K53 = ..............................
Tested by:
Witnessed by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
5
6
(l)
1.21.MMHO
Timer settings
t2ph
.............................. ms
(Zone 2)
t2n
.............................. ms
(Zone 2)
t3ph
.............................. s
(Zone 3)
t3n
.............................. s
(Zone 3)
Page 4 of 15
2.
tz6
.............................. ms
tp
...........................
td
.............................. ms
(Blocking and ermessive
Overreach Schemes)
ms
(Blocking and Permissive
Overreach Schemes)
Test Results
(I) Power Supply
Monitor power supply fail alarm contacts (ZB3, ZB4), with an
ohmeter, with no DC supply, the contacts will be closed.
Connect DC supply to the relay and check the alarm contacts open.
- DC supply off contacts closed
- DC supply off contacts open
...............................
...............................
Note: The alarm contact also closes when a non-scheme option is selected.
Tested by:
Witnessed by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
6
7
(ii)
PSB timer
Setting
Actual result =
(iii)
(iv)
PSB inhibition
1.21.MMHO
............................. ms
Zone-2 blocked
Zone-1 blocked
(v)
Zone-1 Timing
FAULT
50 %
0%
A- N
_____ ms
_____ ms
B-N
_____ ms
_____ ms
C-N
_____ ms
_____ ms
A- B
_____ ms
_____ ms
B-C
_____ ms
_____ ms
C -A
_____ ms
_____ ms
Witnessed by:
Tested by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
7
8
(vi)
FAULT
Zone- 2
Zone- 3
A- N
_____ ms
_____ ms
B-N
_____ ms
_____ ms
C-N
_____ ms
_____ ms
A- B
_____ ms
_____ ms
B-C
_____ ms
_____ ms
C -A
_____ ms
_____ ms
Page 6 of 15
CORRECT DIRECTION
REVERSE DIRECTION
A- N
_____
_____
B-N
_____
_____
C-N
_____
_____
A- B
_____
_____
B-C
_____
_____
C -A
_____
_____
Tested by:
Witnessed by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
8
9
Voltage inhibit
Zone comparators
(x)
1.21.MMHO
RESET VALUE
__________ V }
__________ V }
C-N
(xi)
__________ V }
CURRENT
OPERATE
VALUE
CORRECT
VALUE
_____ A
_____ A
_____ A
_____ A
_____ A
_____ A
Tested by:
Witnessed by:
Date:
Designation no.:
Record no.:
Description :
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
9
10
(xii) High set current level detectors (only applicable to blocking schemes).
Set option 46. Correct value = 4.8 x 0.087 A
Zph
CURRENT
OPERATE
VALUE
CORRECT
VALUE
INDICATION
_____ A
_____ A
_____ A
_____ A
_____ A
_____ A
OPERATE
VALUE
CORRECT
VALUE
INDICATION
_____ Amp
_____ Amp
CORRECT
VALUE
INDICATION
(xiii)
CURRENT
1.21.MMHO
Voltage supervision
Set any option (41-60)
OPERATE
VALUE
Page 8 of 15
A- N
_____ V
_____ V
V~
B-N
_____ V
_____ V
fail
C-N
_____ V
_____ V
Witnessed by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
10
11
CURRENT
ACTUAL
CURRENT
ACTUAL NEG
SEQ CURRENT
_____ A
_____ A
_____ A
_____ A
_____ A
_____ A
ACTUAL
CURRENT
ACTUAL NEG
SEQ CURRENT
_____ A
_____ A
_____ A
_____ A
_____ A
_____ A
1.21.MMHO
Tested by:
Witnessed by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
11
12
Connect timer start to the double pole switch & the stop to terminals
ZD7 and ZD8
Open the switch. The timer will indicate the delay of td timer plus the
Microprocessor time of approximately 4 ms
1.21.MMHO
tp
.............................. ms
Page 10 of 15
td
.............................. ms
Tested by:
Witnessed by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
12
13
On-load checks
Phase rotation
Voltages
A- N
_____ V
A- B
_____ V
B-N
_____ V
B-C
_____ V
C-N
_____ V
C-A
_____ V
Currents
A - Phase
_____ A
C - Phase
_____ V
B - Phase
_____ A
Neutral
_____ V
Performed on ______________
Tested by:
Test equipment used:
1.21.MMHO
Witnessed by:
Date:
Designation no.:
Page 11 of 15
Record no.:
Description :
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
13
14
= __________ IN
LK3G
Timer Settings
t1G
t2G
t3G
t4G
t5G
Test Results
1. Check Low Level Current Detector (ILS)
Set DEF LK2G
= 1 (Back-up timer enabled)
Set DEF t4G
= 0 secs
Set MICROMHO to required scheme option 06 or 07
(ILS) = 0.1 (1 + K41 + K42) IN
K41
SETTING
=0
=1
=1
K42
SETTING
=0
=0
=1
NOMINAL
CURRENT
0.1 IN
0.2 IN
0.3 IN
TOL
10%
10%
10%
OPERATE
CURRENT
____ amps
____ amps
____ amps
Tested by:
Witnessed by:
Date:
1.21.MMHO
Designation no.:
Record no.:
1.21.MMHO
Sheet:
Page 12 of 15
14
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
15
Start
Timer
ZFB
N/O
Stop
Timer
VF1-VF2
N/O
Method of
Test
Set t4G = 0 apply fault
record time
Set t4G to required value
apply fault record time
Results
_____ ms
_____ s
7.12 to
7.14
LED Indications:
DIR
t4G
VG-5-VG6
7.15 to
7.20
N/C
LED Indications:
t5G
7.21 to
7.22
VG-5-VG6
N/C
Tested by:
Witnessed by:
Date:
Designation no.:
Description :
Record no.:
1.21.MMHO
Contract no.:
Sheet:
Customer :
Customer ref.:
Cont:
Site :
Drawing ref.:
Project no.:
15
-
1.21.MMHO
Page 13 of 15
LED Indications:
4.
5.
6.
On the completion of tests ensure all Links and Settings are
correct to reruirements and system wiring to relay is fully
reinstated.
Tested by:
Test equipment used:
1.21.MMHO
Witnessed by:
Witnessed by:
Date:
Designation no.:
Page 14 of 15