Académique Documents
Professionnel Documents
Culture Documents
ST
YEAR
ACHIEVEMENTS AND
INITIATIVES OF
Ministry of Power, Coal and New & Renewable Energy
GOVERNMENT OF INDIA
Record breaking
progress towards
fulfilling
Honble Prime Minister
Shri Narendra Modis
vision of...
24X7
ACHIEVEMENTS
Highest coal
production growth
in 23 years
Power deficit
reduced to
8.3%
3.6%
the lowest
ever
Highest ever
generation capacity addition
22,566 MW
22,100 ckm
Over
8.4%
65,554 MVA
Highest ever increase in
Sub-station capacity
exceeded
renewable
capacity
addition
TARGETS
Doubling
Coal Indias
production to
100 Cr.
tonnes/year by 2020
Power Generation
to increase by
50%
by 2020
>5 Times
1,75,000 MW
by 2022
Energy saving to
increase to
10%
of current
consumption
MISSION
24X7
BY 2019
POWER
IS DELIVERED THROUGH A CHAIN
OF ACTIVITIES
TO
LIGHT
FROM
DARKNESS
>24,000 MW of
power capacity idle
due to lack of fuel
28 Cr. people
without access to
power
Less than 1% of
solar potential
realized
Largest power
outage in history
with 62 Cr. people in
darkness in 2012
FUEL
GENERATION
TRANSMISSION
Highest coal
production growth
in 23 years
Power generation
exceeds 1 lakh Cr.
units for the first
time
Plans to increase
solar capacity by
> 30 times
Highest ever
increase in
Transmission lines
& sub station
capacity (22,100
ckm and 65,559
MVA respectively)
Discoms losing
` 70,000 Cr. annually
and accumulated
losses of
> ` 2,50,000 Cr.
DISTRIBUTION
Approved new
schemes for
investment of
` 1.09 lakh Cr. in
Discoms
Spiralling
consumer tariffs
Lack of focused
energy
conservation
efforts
CONSUMPTION
Overall energy
deficit down to
3.6%, the lowest
ever
11
CLEANING
COAL
REMOVING THE
TAINT
12
13
CLEANING
COAL
REMOVING THE
TAINT
ENERGY
Shutdown of
plants dependant
on cancelled coal
mines
EMPLOYMENT
Livelihood of thousands of
workers endangered
ECONOMY
15
REGIONAL
DEVELOPMENT
Coal bearing states like Jharkhand, Chhattisgarh,
Odisha, West Bengal, Madhya Pradesh, Maharashtra
and Telangana to get potential revenue (including
auction proceeds and royalties) of
REJUVENATED ECONOMY
Reduced import potential and
generated momentum for
Make in India
Legislation Enabled
Coal Mines (Special Provision) Act
& Mines and Minerals
(Development and Regulation)
Amendment Act enacted to
16
INCREASING
PRODUCTION
THROUGH EFFICIENCY
IMPROVEMENT
Reduction in coal theft using
RFID/GPS tagging
Reduced
Transportation Cost
Coal linkage rationalization to reduce
transportation costs and
save environment
18
Coal Project
Monitoring Portal
for quicker decision making,
faster dispute resolution and
accelerated removal of bottlenecks
Improved coal
quality
19
Double coal
production to
100
Cr. Tonnes
by 2020
DOUBLING
COAL INDIA
PRODUCTION
IN 5 YEARS
Trebling exploration activities
for enhancing coal production
Over 60 new mines to be opened
Better evacuation of
coal planned by investing
massively in new railway rakes,
expediting railway lines,
modern equipment and
mechanization
Partnership between Railways,
coal-bearing states and Coal India
to strengthen infrastructure creation.
Signed MoUs with Odisha
and Jharkhand
20
21
7,900 Cr.
units of power
over the next two years from
24,150 MW of
gas based capacity
Reviving these
Gas
Based
Power
Plants
Below
` 4.70/unit
SUPPLY RESUMED
22
RAPID
INCREASE IN
GENERATION CAPACITY
5 NEW
4,000 MW
20,000 MW
to be setup in
plug-and-play mode
attracting an investment of
GENERATION
24
25
100,000 MW of Solar
and 60,000 MW of
Wind capacity
Worlds largest renewable energy
financing meet. Commitments of
118
7
countries
exhibitors from
Increasing the overall
renewable capacity target by
MORE THAN
5 TIMES
by 2022
62,000 MW
of renewable manufacturing
commitment
70,000 MW
of renewable financing
commitment
from
32,000 MW to 1,75,000 MW
2,73,000 MW
Nearly
2500 delegates
200 global
investors &
financiers
from 32 countries
GENERATION
26
RE-Invest
2015
27
RAPID
GREEN
PROGRESS
1,112 MW
42%
increase in solar
capacity during
2014-15
17
solar parks
Accelerated depreciation
restored for wind power
from July 2014 to help
increase wind capacity
in 14 states
have already
been approved
2,170 MW
25
solar parks
of Solar Projects
with capacity of
~1000 MW
each planned
Coal cess
quadrupled from
` 50 to ` 200/tonnes
28
29
TRANSMITTING &
DISTRIBUTING
POWER
POWERLESS TO POWERFUL
SMART GRID
` 38,000 Cr.
` 1 LAKH Cr.
transmission projects to be
bid out over the next year
CREATING COMPETITION
SMART
GRID
31
Integrated Power
Development Scheme
(DDUGJY)
(IPDS)
` 63,027 Cr.
24x7 power
` 45,816 Cr.
Smart-metering
infrastructure upgradation
in urban areas
Remote Villages
Solar Installations
32
IT implementation
for better customer service
Solar installations like rooftop solar
also covered
33
ENERGY
EFFICIENCY
PROGRAMMES
TARGET
TO SAVE 10% of
ENERGY
EFFICIENCY:
ONE UNIT OF
POWER
SAVED
IS WORTH 1.33 UNITS PRODUCED
NATIONWIDE CAMPAIGN
FOR ENERGY CONSERVATION
LAUNCHED
34
35
DOMESTIC
EFFICIENT
LIGHTING
PROGRAMME
ALL
INCANDESCENT
BULBS TO BE
CHANGED TO
LED IN THREE
YEARS
36
(DELP) taken up in
about 151 cities in 18
states to replace
20.45 Cr. bulbs in
6.3 Cr. households
by 2016
LED PRICE
` 310
` 204
74%
Reduction
` 149
Feb-14
Aug-14
Nov-14
` 104
Feb-15
` 82
Mar-15
CONSUMPTION
37
SABKA
SAATH,
SABKA
VIKAS
CO-OPERATIVE FEDERALISM
Entire Coal auction revenue will go to
coal bearing states especially under
developed states of Eastern India like
Jharkhand, Chhattisgarh, Odisha,
West Bengal etc.
Massive thrust to expedite projects in North
East to overcome power shortages and
increase prosperity. Investment of
` 9,865 Cr. for upgrading power systems in
8 North Eastern States (Arunachal Pradesh,
Assam, Manipur, Meghalaya, Mizoram,
Nagaland, Sikkim and Tripura)
For the first time, National State Power
Ministers conference was held in Guwahati
where Ministers & Officials from all over India
converged in North East
24X7 power plans made for Andhra Pradesh
and Rajasthan. Action plans for other states
at advanced stage of finalization
38
39
ZERO EFFECT
ON ENVIRONMENT
Massive thrust on renewables to
increase share of clean energy
More than 1 lakh solar pumps
sanctioned in the past year
Solar pumps helped lakhs of
farmers increase output, income
and also provide drinking water
41
42
Swachh
Bharat
The PSUs under the three Ministries are
committed to active involvement in this effort.
As a first step, they are investing over
44
45
TRANSPARENCY &
EFFICIENCY
in USING TECHNOLOGY
DIGITAL
46
47
TRANSPARENCY
Fully transparent and online process for
coal auctions adopted
Support for restarting stranded gas-based
power plants on the basis of reverse
e-bidding process to discover lowest
customer tariff
Reduced red-tape and paper-work
through delegation of powers and
expansion of online interface
48
49
A GOVERNMENT
WHICH CARES
24
365
50
Rapid
Emergency
Response
GOVERNMENT OF INDIA
www.ujwalbharat.gov.in
@UjwalBharat
UjwalBharat2015