Federation of Piling Specialists

Model bills of quantities


Bored cast-in-place piles/CFA
Number

Item description

Unit

Transport piling plant and equipment to site,


set up, dismantle and remove upon
completion. Per visit
Move between area * and area *

sum

D
E
F

G
H
J

K
L
M

N
P
Q

The following work to be carried out from a


piling platform level of *m OD with a
Commencing Surface level of *m OD
Movement of plant and equipment to each
pile position, including setting up rig
* mm specified diameter
* mm specified diameter
Bore pile shafts to depths not exceeding * m
* mm specified diameter
* mm specified diameter
Concrete quality * in pile shafts
* mm specified diameter
* mm specified diameter
Enlarged bases including forming and
concrete quality * therein
Shaft dia.
Base dia.
* mm
* mm
* mm
* mm
Mild steel straight bars in reinforcing cage
* mm diameter
* mm diameter
Mild steel helical binding * mm diameter at
* mm pitch
Mild steel permanent casing * mm wall
thickness
* mm internal diameter (in * nr)
* mm internal diameter (in * nr)
Backfill open shafts with *, as specified in
the particular specification
Remove excavated material from the area
around the pile position during boring
operations, including loading and depositing*
Cut down concrete pile shaft to the specified
cut-off level, prepare exposed head and
reinforcement to receive capping: load and
dispose of debris
* mm specified diameter
* mm specified diameter
Make concrete cube and test
Take undisturbed sample 100 mm diameter
from bore at depths not exceeding * m
Laboratory tests: set of three undrained
triaxial compression tests on 100 mm

Federation of Piling Specialists


www.fps.org.uk

Quantity

Rate

Amount

sum

nr
nr
m
m
m
m

nr
nr
t
t
t

m
m
m3
m3

nr
nr
nr
nr
nr

June 2007

R
S
T
V
W

X
Y
Z

samples, including handling and transport


Standard penetration test, depth not
exceeding * m
Provide CCTV equipment and labour to
descend shafts for inspection purposes
Transport equipment to site for maintained
load tests not exceeding * kN and remove
upon completion of tests
Maintained load test on a * mm diameter
working pile to * kN, including reaction
Cut down * mm pile cap and tops of reaction
piles to a depth of * m, dispose of debris,
backfill, and make good disturbed site
surface
Carry out approved integrity tests (minimum
20 per visit) and provide report by approved
specialist
Attempt to bore through obstruction in bore,
utilizing standard equipment on site. Each
plant and gang excluding consumables.
Charge for plant and labour delayed by
causes beyond the piling contractors control
or when instructed. Each plant and gang

nr
sum
sum
nr
nr

nr
h
h

Driven cast-in-place piles


Number

Item description

Unit

Transport piling plant and equipment to


site, set up, dismantle and remove upon
completion. Per visit
Move between area * and area *

sum

C
D
E
F
G
H
J
K
L
M

The following work to be carried out from a


piling platform level of *m OD with a
Commencing Surface level of *m OD
Movement of plant and equipment to each
pile position, including setting up rig and
handling and pitching casing
Drive pile casing to depths not exceeding
*m
Concrete quality * in pile shafts * mm
specified diameter
Enlarged base * mm diameter to shafts of
* mm specified diameter
Mild steel straight bars in reinforcing cage;
* mm diameter
Mild steel helical binding * mm diameter at
* mm pitch
Mild steel permanent casing * mm wall
thickness and * mm internal diameter (in *
nr)
Transport preboring machine to site and
remove upon completion
Prebore for * mm specified diameter piles
and deposit excavated material adjacent to
head of shafts
Backfill open shafts with *, as specified in
the particular specification

Federation of Piling Specialists


www.fps.org.uk

Quantity

Rate

Amount

sum

nr
m
m
nr
t
t
m
sum
m
m3

June 2007

Q
R
S
T
V
W

Remove excavated material from the area


around the pile position during boring
operations, including loading and
depositing *
Cut down * mm specified diameter concrete
pile shaft to the specified cut-off level,
prepare exposed head and reinforcement
to receive capping; load and dispose of
debris
Make concrete cube and test
Transport equipment to site for maintained
load tests not exceeding *kN and remove
upon completion of tests
Maintained load test on a * mm diameter
working pile to *kN, including reaction
Carry out approved integrity tests
(minimum 20 per visit) and provide report
by approved specialist
Attempt to drive through obstructions,
utilizing standard equipment on site. Each
plant and gang excluding consumables.
Charge for plant and labour delayed by
causes beyond the piling contractors
control or when instructed. Each plant and
gang

m3

nr

nr
sum
nr
nr
h
h

Jointed precast concrete segmental piles


Number

Item description

Unit

Transport piling plant and equipment to


site, set up, dismantle and remove upon
completion. Per visit
Move between area * and area *

sum

C
D
E
F
G
H
J
K
L
M

The following work to be carried out from a


piling platform level of *m OD with a
Commencing Surface level of *m OD
Movement of plant and equipment to each
pile position, including setting up rig and
handling and pitching pile segments
Supply * m long precast concrete
segmental pile toe units * mm x * mm in
cross-section
Supply * m long extension units * mm x *
mm in cross-section
Supply cast-in mechanical joints (pairs)
Prepare pile heads for extension using
approved methods and materials
Pitch and drive piles to depths not
exceeding * m
Credit for unused half joints
Transport preboring machine to site and
remove upon completion
Prebore for pile with * mm x * mm crosssection and deposit excavated material
adjacent to head of shaft
Remove excavated material from the area
around the pile position during preboring

Federation of Piling Specialists


www.fps.org.uk

Quantity

Rate

Amount

sum

nr
m
m
nr
nr
m
nr
sum
m
m3

June 2007

N
P
Q
R
S
T

operations, including loading and


depositing at * .
After driving pile, fill annulus of prebore with
* ..
Cut-off surplus pile * mm x * mm in crosssection, dispose of debris and prepare
head and reinforcement to receive capping
Transport equipment to site for maintained
load tests not exceeding * kN and remove
upon completion of tests
Maintained load test on a working pile to
*kN, including reaction
Attempt to drive through obstructions,
utilizing standard equipment on site. Each
plant and gang excluding consumables.
Charge for plant and labour delayed by
causes beyond the piling contractors
control or when instructed. Each plant and
gang
Mobilise testing engineer to carry out
Dynamic load testing to prove 1.5 x SWL
including CAPWAP analysis.

m
nr
sum
nr
h
h

nr

Driven Steel Section and Tube piles


Number

Item description

Unit

Transport piling plant and equipment to


site, set up, dismantle and remove upon
completion. Per visit
Move between area * and area *

sum

C
D
E
F
G
H
J
K
L
M
N

The following work to be carried out from a


piling platform level of *m OD with a
Commencing Surface level of *m OD
Movement of plant and equipment to each
pile position, including setting up rig and
handling and pitching pile.
Supply * mm x * mm steel * section piles
(* kg/m), each * m long
Supply * mm x * mm extension piles
(* kg/m), each * m long
Provide covered structure under which
coating of piles is undertaken, and remove
on completion
Blast-cleaning * mm x * mm pile
Paint * coats of primer and * coats of *
paint, the whole having a minimum total
thickness of * mm
Pitch and drive piles to depths not
exceeding * m
Provide site-welded butt joints between
piles and extensions; * mm x * mm
Cut off surplus lengths after driving * mm x
* mm piles (* kg/m) and stack for reuse
where authorised
Transport preboring machine to site and
remove upon completion
Prebore for steel pile with * mm x * mm
cross-section and deposit excavated
material adjacent to head of shaft

Federation of Piling Specialists


www.fps.org.uk

Quantity

Rate

Amount

sum

nr
m
m
sum
m2
m2
m
nr
nr
sum
m

June 2007

Remove excavated material from the area


around the pile position during preboring
operations, including loading and
depositing at * .

m3

After driving pile, fill annulus of prebore with


*
Cut-off surplus steel pile * mm x * mm in
cross-section, dispose of debris and
prepare head to receive capping
Attempt to drive through obstructions,
utilizing standard equipment on site. Each
plant and gang excluding consumables.
Charge for plant and labour delayed by
causes beyond the piling contractors
control or when instructed. Each plant and
gang
Mobilise testing engineer to carry out
Dynamic load testing to prove 1.5 x SWL
including CAPWAP analysis.
Transport equipment to site for maintained
load tests not exceeding * kN and remove
upon completion of tests
Maintained load test on a * mm square
working pile to * kN including reaction

R
S
T

U
V
W

nr
h
h

nr
sum
nr

Contiguous bored pile walls


Number

Item description

Unit

Transport piling plant and equipment to


site, set up, dismantle and remove upon
completion. Per visit
Move between area * and area *

sum

C
D
E
F
G
H

J
K

The following work to be carried out from a


piling platform level of * m OD with a
Commencing Surface level of * m OD
Movement of plant and equipment to each
pile position, including setting up rig * mm
specified diameter
Bore pile shafts to depths not exceeding
* m * mm specified diameter
Concrete quality * in pile shafts
* mm specified diameter
* mm specified diameter
High yield straight bars in reinforcing cage
* mm diameter
* mm diameter
Mild steel helical binding * mm diameter at
* mm pitch
Mild steel permanent casing * mm wall
thickness
* mm internal diameter (in * nr)
* mm internal diameter (in * nr)
Backfill open shafts with *, as specified in
the particular specification
Remove excavated material from the area
around the pile position during boring
operations, including loading and
depositing *
Cut down concrete pile shaft to the

Federation of Piling Specialists


www.fps.org.uk

Quantity

Rate

Amount

sum

nr
m
m
m
t
t
t
m
m
m3
m3

June 2007

M
N
P
Q
R
S
T

specified cut-off level, prepare exposed


head and reinforcement to receive capping:
load and dispose of debris
* mm specified diameter
* mm specified diameter
Make concrete cube and test
Take undisturbed sample 100 mm diameter
from bore at depths not exceeding * m
Laboratory tests: set of three undrained
triaxial compression tests on 100 mm
samples, including handling and transport
Standard penetration test, depth not
exceeding * m
Carry out approved integrity tests
(minimum 20 per visit) and provide report
by approved specialist
Attempt to bore through obstruction in bore,
utilizing standard equipment on site. Each
plant and gang excluding consumables.
Charge for plant and labour delayed by
causes beyond the piling contractors
control or when instructed. Each plant and
gang.

nr
nr
nr
nr

nr
nr
h
h

Secant bored pile walls


Number

Item description

Unit

Transport piling plant and equipment to


site, set up, dismantle and remove upon
completion. Per visit
Move between area * and area *

sum

C
D
E
F
G
H
J
K

L
M

The following work to be carried out from a


piling platform level of * m OD with a
Commencing Surface level of * m OD
Movement of plant and equipment to each
pile position, including setting up rig * mm
specified diameter
Bore female pile shafts to depths not
exceeding * m * mm specified diameter
Bore male pile shafts to depths not
exceeding * m * mm specified diameter
Concrete or bentonite/cement mix quality *
in female pile shafts * mm specified
diameter
Concrete quality * in male pile shafts * mm
specified diameter
High yield straight bars in reinforcing cage
* mm diameter
* mm diameter
Mild steel helical binding * mm diameter at
* mm pitch
Mild steel permanent casing * mm wall
thickness
* mm internal diameter (in * nr)
* mm internal diameter (in * nr)
Structural steel section * in pile shaft
Backfill open shafts with *, as specified in
the particular specification

Federation of Piling Specialists


www.fps.org.uk

Quantity

Rate

Amount

sum

nr
m
m
m
m
t
t
t
m
m
m
m3

June 2007

Q
R
S
T
V
W
X

Remove excavated material from the area


around the pile position during boring
operations, including loading and
depositing *
Cut down concrete pile shaft to the
specified cut-off level, prepare exposed
head and reinforcement to receive capping:
load and dispose of debris
* mm specified diameter
* mm specified diameter
Make concrete cube and test
Take undisturbed sample 100 mm diameter
from bore at depths not exceeding * m
Laboratory tests: set of three undrained
triaxial compression tests on 100 mm
samples, including handling and transport
Standard penetration test, depth not
exceeding * m
Carry out approved integrity tests
(minimum 20 per visit) and provide report
by approved specialist
Attempt to bore through obstruction in bore,
utilizing standard equipment on site. Each
plant and gang excluding consumables.
Charge for plant and labour delayed by
causes beyond the piling contractors
control or when instructed. Each plant and
gang

m3

nr
nr
nr
nr
nr
nr
nr
h

Diaphragm walls
Number

Item description

Unit

Transport diaphragm walling plant and


equipment to site, set up, dismantle and
remove upon completion. Per visit
Move between area * and area *

sum

D
E
F
G
H
J

nr

Excavate diaphragm wall panel to depth


not exceeding * m * mm specified diameter

m2

Federation of Piling Specialists


www.fps.org.uk

Rate

Amount

sum

The following work to be carried out from a


piling platform level of * m OD with a
Commencing Surface level of * m OD
Movement of plant and equipment to each
panel position, including setting up rig
* mm specified thickness

Concrete quality * in diaphragm wall * mm


specified thickness
High yield straight bars in reinforcing cage *
mm thickness
Mild steel helical binding * mm diameter at
* mm centres
Backfill open excavation with *, as specified
in the particular specification
Remove excavated material from the area
around the diaphragm wall during boring
operations, including loading and
depositing *

Quantity

m2
t
t
m3

m3

June 2007

L
M
N
P

Cut down concrete panel to the specified


cut-off level, prepare exposed head and
reinforcement to receive capping: load and
dispose of debris * mm specified thickness
Make concrete cube and test
Take bentonite sample from excavation and
test
Attempt to remove obstruction in bore,
utilizing standard equipment on site. Each
plant and gang excluding consumables.
Charge for plant and labour delayed by
causes beyond the piling contractors
control or when instructed. Each plant and
gang

m2
nr
nr
h

Steel sheet piling


Number

Item description

Transport steel sheet piling plant and


equipment to site, set up, dismantle and
remove upon completion. Per visit
Supply, handle, pitch and drive piles grade
* self colour/painted PC * to * nominal
D.F.T. or similar in lengths * m to * m

D
E
F
G
H
J
K

Lengths (m) to be specified in the following


ranges:
2 to under 4
4 to under 6
6 to 18
Over 18 to 24
Over 24 to 29
(Note: This is consistent with BS method
of specification)
E.O. for fabricated piles
(a) Open corner type 2A
(b) Closed corner type 2
(c) Junction type 3
(d) Junction type 1
(e) Other
Cut-off piles
Track move plant and equipment in excess
of 100 m
Derig move including low loader for rig
Re-transport steel sheet piling plant and
equipment, set up, dismantle and remove
on completion for pile extraction. Per visit
Extract piles as driven
Credit for goods, straight, reusable or
unused piles in * minimum lengths
(a) * type
Charge for plant and labour delayed by
causes beyond the piling contractors
control or when instructed. Each plant and
gang

Federation of Piling Specialists


www.fps.org.uk

Unit

Quantity

Rate

Amount

sum
m2

m
m
m
m
m
m
no
no
sum
ton
m2
ton
h

June 2007

Although permanent works steel sheet piles would not be extracted, temporary steel
piles are sometimes specified within the contract documentation if they are a
necessary part of providing the permanent works.
Although every effort has been made to check the accuracy of the information and validity of the guidance given in
this publication, the Federation of Piling Specialists do not accept any responsibility for mis-statements contained
herein or misunderstanding arising herefrom.

Federation of Piling Specialists


www.fps.org.uk

June 2007