Académique Documents
Professionnel Documents
Culture Documents
Project:-
Date:
Employer:
Rev. No. 0
Sl.No
Tests to be conducted
Physical
Setting time
Intial
Final
Fineness
Compressive strength at 28 days
Remarks
IS 8112
/ IS 12269
Soundness
Consistency of standard cement paste
Chemical Compostion
2 R/F steel
RE
3 Soil for backfilling
4 Fine aggregate
5 Coarse aggregate
Physical
% Elongation
Proof strength
Ultimate strength
Unit weight
Rolling margin
Chemical compostion
Each lot
IS 1786
IS 2720
IS 383
IS 2386
Min 14.5%
415 N/mm2
485N/mm2
as per Is 1786 table 3
As per IS 2720
Sieve analysis
minimum 90 to 95 % of MDD
should conform to zone 2 or 3
IS 2720
Max 8% by volume
2.6 to 2.8 (once for each source )
QA QC TESTING MATRIX
Project:-
Date:
Employer:
Rev. No. 0
Sl.No
Tests to be conducted
specific gravity
Percentage of soft or deleterious
material
Surface moisture
Determination of 10% fine value
Aggregate crushing strength
Aggregate impact value
Particle size
Estimation of Organic impurities
Remarks
IS 2386
QA QC TESTING MATRIX
Project:-
Date:
Employer:
Rev. No. 0
Sl.No
Tests to be conducted
pH value
Chloride and sulphate contents
Inorganic contents
Oganic contents
Limits of Alkality
Limits of Acidity
Cloride contents
Air content
pH value
Remarks
Each source
IS 456
Each batch
IS 9103
Density
Compressive strength
water absorption
IS 2185
Hydro test
Three edge bearing test
compressive strength
lot
IS 458
10 GI pipes
% Elongation
Proof strength
Ultimate strength
Unit weight
lot
IS 1239
Water absorption
Bend test
compressive strength
Lot
Verified by:
Note: No. of tests and the testing creteria is specified based on the general
scope of works. The same would be fine tuned as and when new item of
works are added and new packages are finalized.
7 Admixture
8 Concrete Blocks
Solid
Prepared by:
QA QC TESTING MATRIX
Project:-
Date:
Employer:
Rev. No. 0
Sl.No
Tests to be conducted
Remarks
0.57
17
29.82456
0.596491