Lets focus on the well-reservoir interface. There are 2 kinds of connection design:
1. open-hole completion
2. or cased-hole completion.
If an open-hole completion is chosen, there is no casing installed at the end of the last
drilling phase. The well remains directly
in contact with the reservoir.
Such a solution is well adapted in the
case of well consolidated reservoirs,
when the well produces from one
reservoir layer only. It is particularly well
adapted for gas wells.
On the contrary, a cased-hole
completion is based on the installation
of a liner at the level of the reservoir to
be produced. In this case, the reservoir
is isolated from the well at the end of
the drilling phase.
W3V14 - Completion p. 2
IFPEN - IFP School 2015 / TOTAL SA 2015 / IFP Training 2015
In order to open the connection for the production, a perforation job is necessary. This
consists in perforating the casing, the cement and the rock using a gun suspended on cable
at the reservoir level. This is the most frequently chosen connection. It enables efficient
management of the well's stability, and is well adapted in the case of a well connected to
more than one production zone.
W3V14 - Completion p. 3
IFPEN - IFP School 2015 / TOTAL SA 2015 / IFP Training 2015
At the surface, at the well head, a Christmas tree is installed. It includes a choke, regulating
the production rate of the well, and valves, useful for well interventions.
A safety valve is added to this completion, in order to close the well in case of emergency.
W3V14 - Completion p. 4
IFPEN - IFP School 2015 / TOTAL SA 2015 / IFP Training 2015
The slope of the pressure profile in the well depends on the characteristics of the fluid, that
means viscosity, density, and the proportion of gas and liquid in the mixture, and on the
geometry of the tubing, including its profile and its internal diameter.
A well is eruptive if it can produce naturally : it is the case if the reservoir pressure is
sufficiently high for the fluid to be able to reach the top of the well without any extra help.
When the well is not eruptive, an artificial lift system is installed with the completion, in
order to introduce energy from the surface into the well to supplement the natural energy
of the reservoir. 2 main kinds of artificial lift systems exist: pumps and gas lift.
W3V14 - Completion p. 5
IFPEN - IFP School 2015 / TOTAL SA 2015 / IFP Training 2015
The principle of a pump is to increase the fluid pressure between the pump intake and
discharge. The fluid composition remains the same.
On the contrary, implementing a gas lift system consists in injecting gas at the bottom of the
tubing: the gas is mixed with the reservoir fluid and decreases in density. The column of fluid
in the well is lighter, and, therefore, easier to be lifted up to the well head.