SUMMARY OF CUT & FILL QUANTITY

IPC # 30
Station

Station

Act. Qty

Totat Qty

Deduct

From

To

(Cu.m)

(Cu.m)

Qty After
Deduction

Cutting of Main Road (R/S)

145+000

211+325

-450023.58

-450023.58

95

-427522.401

Cutting of Main Road (L/S)

145+000
-193+000

190+850 225+000

-422181.58

-422181.58

95

-401072.501

Filling of Main Road (R/S)

145+000

211+325

130251.74

130251.74

94

122436.636

Filling of Main Road (L/S)

145+000
-193+000

190+850 225+000

61573.84

61573.84

94

57879.410

Description

Prepared By
Quantity Surveyor
(SAPAC)

Total Cut Qty

-828594.90

Cu.m

Total Fill Qty

180316.05

Cu.m

Submitted By
Project Manager
(SAPAC)

Remark's

Checked By
.
Eng. Tahir Abdullah
(ITAL Conslt)
.

SUMMARY OF SUB-GRADE QUANTITY


IPC # 30
Station

Station

Act. Qty

Totat Qty

From

To

(Cu.m)

(Cu.m)

SUB-GRADE - I

145+000

211+175

91330.47

91330.47

Main Road (R/S)

SUB-GRADE - II

145+000

211+175

83033.63

83033.63

Main Road (R/S)

SUB-GRADE - I

145+000

225+000

110763.06

110763.06

Main Road (L/S)

SUB-GRADE - II

145+000

225+000

104252.35

104252.35

Main Road (L/S)

Description

Total Qty

Prepared By
Quantity Surveyor
(SAPAC)

Submitted By
Project Manager
(SAPAC)

389379.51

Remark's

Cu.m

Checked By
Eng. Tahir Abdullah
(ITAL Conslt)
.

SUMMARY OF ABC QUANTITY


IPC # 30
Station

Station

Act. Qty

Totat Qty

From

To

(Cu.m)

(Cu.m)

AGG. BASE COURSE - I

145+000

211+162

54715.82

54715.82

Main Road (R/S)

AGG. BASE COURSE - II

145+000

189+363

37378.26

37378.26

Main Road (R/S)

AGG. BASE COURSE - I

145+000

225+000

49451.48

49451.48

Main Road (L/S)

AGG. BASE COURSE - II

145+000

225+000

38116.51

38116.51

Main Road (L/S)

Description

Total Qty

Prepared By
Quantity Surveyor
(SAPAC)

Submitted By
Project Manager
(SAPAC)

179662.07

Remark's

Cu.m

Checked By
Eng. Tahir Abdullah
(ITAL Conslt)
.

T
o
t
a
l

Summary
IPC # 34

General Work

Grand Total

Total Cut (Cu.m)

-828594.90

###

Total Fill (Cu.m)

180316.05

###

Total Sub Grade (Cu.m)

421184.00

9
5
%

ABC (Cu.m)

215038.96

###

MC-1 (Sq.m)

673001.00

BBC (Cu.m)

128794.37

BWC (Cu.m)

26116.97

Bridge Work
Description

At Site

Used

Grand Total

Reinforcement Steel - Grade 60 (Ton)


(128+129.579, 141+000 and All Completed Girders

1398.05

1398.05

Conc. for Bridge Superstructure, Class (350/20) (Cu.m)

1585.52

1585.52

Conc. for Girders, Class (350/20) (Cu.m) Camel Crossing 141+000

561.10

561.10

Conc. for Bridges Super Structure Class (350/20) (Cu.m)


of 128+129.579

294.51

294.51

Conc. for Bridge Substructure, Class (280/20) (Cu.m)

3197.00

3197.00

Used

Grand Total

Box Culvert's
Description

At Site

Reinforcement Steel - Grade 60 (Ton)

795.80

795.80

Conc. for Box Culvert 's (Cu.m)

6425.00

6425.00

Waterproof Membrane (Sq.m)

6528.55

6528.55

Structural Excavation-Other Structures (Cu.m)

5314.17

5314.17

Structural Excavation-Bridges (Cu.m)

3755.05

3755.05

Waterproof Membrane for Bridge (Sq.m)

1419.13

1419.13

Removal of Box Culvert 's (Sq.m)

2039.80

2039.80

T
o
t
a
l
###

9
###

5
%

###

TRAFFIC CONTROL DEVICES AND WORK ZONES


Retroreflectorized Thermoplastic White Traffic Lines (LM)

4177.00

4177.00

Retroreflectorized Thermoplastic Yellow Traffic Lines (LM)

16710.00

16710.00

Prepared By
Quantity Surveyor

Submitted By
Project Manager

Checked By

C
h
e
E
c
n
k
g
e
.
d
T
B
a
y
h
i
r
.

General Work

Grand Total

Total Cut (Cu.m)


(SAPAC)

t(
Ia
T
lA
L
###

-828594.90
(SAPAC)

(ITAL Conslt)

9
C
o
5
n
%
s
l
t
)
.

Conversion Of Jeddah-Jizan Road To ExpressWay Sec-3

Revised BOQ-1
General Work

Contract Quantites

Consultant Staff Complex

Actual
Quantities

1.00

1.00

Revised BOQ - 1 Qty

Ratio

Difference in Qty

Unit Price

Actual Amount

Contract Amount

Revised BOQ-1 Amount

1.00

1.00

200,000.00

200,000.00

200,000.00

200,000.00

1.00

1.00

1.00

1.00

200,000.00

200,000.00

200,000.00

200,000.00

Removal of Existing Building

1,800.00

100.00

100.00

1.00

12.00

21,600.00

1,200.00

1,200.00

Removal of Boundary Wall, including Gate

1,200.00

1,200.00

1,200.00

1.00

19.00

22,800.00

22,800.00

22,800.00

Removal of Box Culvert & Pipe Culvert End


Section

1,300.00

15,862.00

15,862.00

1.00

62.00

80,600.00

983,444.00

983,444.00

Project Laboratory

Roadway Excavation

2,750,000.00

1,116,789.12

1,132,905.26

1.01

16,116.14

5.00

13,750,000.00

5,583,945.60

5,664,526.30

Embankment

2,540,000.00

2,022,265.34

1,527,300.86

0.76

(494,964.48)

7.00

17,780,000.00

14,155,857.38

10,691,106.02

Sub-grade

1,307,000.00

801,208.52

855,336

1.07

54,127.48

12.00

15,684,000.00

9,614,502.24

10,264,032.00

30,000.00

31,756.46

35,000.00

1.10

3,243.54

12.00

360,000.00

381,077.52

420,000.00

Structural Excavation - Bridges

45,000.00

46,068.00

46,068.00

1.00

12.00

540,000.00

552,816.00

552,816.00

ABC (Cu.m)

678,250.00

427,149.44

458,420.89

1.07

31,271.45

43.00

29,164,750.00

18,367,425.92

19,712,098.27

MC-1 (Sq.m)

1,779,000.00

1,381,546.22

1,457,204.87

1.05

75,658.65

1.00

1,779,000.00

1,381,546.22

1,457,204.87

BBC (Cu.m)

423,720.00

273,447.56

288,584.06

1.06

15,136.50

214.00

90,676,080.00

58,517,777.84

61,756,988.84

BWC (Cu.m)

109,965.00

69,889.93

55,818.04

0.80

(14,071.89)

249.00

27,381,285.00

17,402,592.57

13,898,691.96

Structural Excavation - Other Structures

Bridge Work

###

Reinforcement Steel - Grade 60 (Ton)


and All Completed

5,975.00

9,631.25

9,631.25

1.00

5,616.00

33,555,600.00

54,089,100.00

54,089,100.00

Conc. for Bridges Super Structure Class (350/20)


(Cu.m)

9,290.00

11,144.00

11,144.00

1.00

986.00

9,159,940.00

10,987,984.00

10,987,984.00

12,410.00

48,967.00

48,967.00

1.00

649.00

8,054,090.00

31,779,583.00

31,779,583.00

Conc. for Bridges Substructure, Class (280/20) (Cu.m)

Description

8,255.00

11,003.00

11,003.00

1.00

524.00

4,325,620.00

5,765,572.00

5,765,572.00

Bearing Device Elastometric 120 Ton

640.00

648.00

648.00

1.00

487.00

311,680.00

315,576.00

315,576.00

Expansion Joints, 50 mm to 100 mm

680.00

670.00

670.00

1.00

1,167.00

793,560.00

781,890.00

781,890.00

Prestressed Steel (Ton)

90.00

293.00

293.00

1.00

14,976.00

1,347,840.00

4,387,968.00

4,387,968.00

Structural Steel Finished, Fabricated and


Erected

60.00

1.00

1.00

1.00

4,368.00

262,080.00

4,368.00

4,368.00

2,735.00

1,660.00

1,660.00

1.00

1,248.00

3,413,280.00

2,071,680.00

2,071,680.00

22,591.00

22,591.00

1.00

2,500.00

56,477,500.00

56,477,500.00

Conc. for Box Culvert 's (Cu.m)

Cast-in-Place Concrete Piles, 1.0 m dia, InPlace


Cast-in-Place Concrete Piles, 1.2m dia, InPlace

Bridge Parapet

2,765.00

1,816.00

1,816.00

1.00

463.00

1,280,195.00

840,808.00

840,808.00

Granular Backfill

1,500.00

4,253.00

4,000.00

0.94

(253.00)

37.00

55,500.00

157,361.00

148,000.00

Waterproof Membrane for Bridge (Sq.m)

4,970.00

25,071.00

25,000.00

1.00

(71.00)

40.00

198,800.00

1,002,840.00

1,000,000.00

10,000.00

34,193.31

34,000.00

0.99

(193.31)

239,353.17

238,000.00

200.00

1.00

1.00

1.00

2,040.00

15,973.00

12,832.00

0.80

500.00

1.00

1.00

1.00

14,400.00

5,545.00

5,545.00

100.00

1.00

Bituminous paint
Miscellenious Structure Steel
New Jersey Concrete Barrier, Single Face
New Jersey Concrete Barrier, Double Face
Precast Curb
Combined curb and gutter , type ( ED6-1)

7.00

70,000.00

312.00

62,400.00

312.00

312.00

448.00

913,920.00

7,155,904.00

5,748,736.00

437.00

218,500.00

437.00

437.00

1.00

35.00

504,000.00

194,075.00

194,075.00

1.00

1.00

112.00

11,200.00

112.00

112.00

(3,141.00)

Catch Basin

10.00

1.00

1.00

1.00

3,120.00

31,200.00

3,120.00

3,120.00

Manhole

14.00

14.00

14.00

1.00

9,360.00

131,040.00

131,040.00

131,040.00

14.00

14.00

14.00

1.00

2,496.00

34,944.00

34,944.00

34,944.00

Plastic Irrigation Pipe 300mm Dia

100.00

1.00

1.00

1.00

374.00

37,400.00

374.00

374.00

Plastic Irrigation Pipe 600mm Dia

100.00

1.00

1.00

1.00

749.00

74,900.00

749.00

749.00

Reinforcement Conc. Storm Sewer pipe


150mm dia

3,240.00

1,000.00

1,000.00

1.00

94.00

304,560.00

94,000.00

94,000.00

Loose Stone Riprap

1,000.00

1.00

1.00

1.00

87.00

87,000.00

87.00

87.00

Grouted Stone Riprap

1,000.00

1.00

1.00

1.00

125.00

125,000.00

125.00

125.00

Inlet

Gabions
R.C. Slope Protection

2,000.00

1.00

1.00

1.00

125.00

250,000.00

125.00

125.00

56,215.00

9,285.42

9,285.42

1.00

106.00

5,958,790.00

984,254.52

984,254.52
81.00
284,400.00
649.00
17,000.00

1,000.00

1.00

1.00

1.00

81.00

81,000.00

800.00
600.00

300.00
1.00

300.00
1.00

1.00
1.00

948.00
649.00

758,400.00
389,400.00

160,000.00

1,000.00

1,000.00

1.00

17.00

2,720,000.00

81.00
284,400.00
649.00
17,000.00

80,000.00

1,000.00

1,000.00

1.00

15.00

1,200,000.00

15,000.00

15,000.00

100.00

1.00

1.00

1.00

624.00

62,400.00

624.00

624.00

Retroreflectorized Thermoplastic White Traffic Lines

12,350.00

57,282.21

57,401.92

1.00

119.71

20.00

247,000.00

1,145,644.20

1,148,038.40

Retroreflectorized Thermoplastic Yellow Traffic Lines

60,500.00

61,368.45

61,038.45

0.99

(330.00)

20.00

1,210,000.00

1,227,369.00

1,220,769.00

Retroreflective Raised Pavement Markers-Type A


15X15

55,800.00

25,500.00

25,877.00

1.01

377.00

22.00

1,227,600.00

561,000.00

569,294.00

Concrete Ditch Lining


Reinforcement Conc. Pipe Culvert (Precast)
1000mm
dia
Reinforcement
Conc. Pipe Culvert (Precast)
800mm dia
Industrial Fence 1.80Mtr Hight
High Tension wire fence Type 1
animal guard
TRAFFIC CONTROL DEVICES

5,000.00

1.00

1.00

1.00

9.00

45,000.00

9.00

9.00

Highway signs, (Ground Mounted) Sheet Aluminum

500.00

500.00

500.00

1.00

636.00

318,000.00

318,000.00

318,000.00

Highway signs, (Overheah Mounted) Sheet Aluminum

500.00

500.00

500.00

1.00

699.00

349,500.00

349,500.00

349,500.00

Highway signs, Overheah

100.00

100.00

100.00

1.00

699.00

69,900.00

69,900.00

69,900.00

Sign support, (Breakaway) Single post I.P.E

8,000.00

8,000.00

8,000.00

1.00

16.00

128,000.00

128,000.00

128,000.00

Sign support, (breakaway) Double post I.P.E

6,000.00

6,000.00

6,000.00

1.00

15.00

90,000.00

90,000.00

90,000.00

100.00

100.00

100.00

1.00

829.00

82,900.00

82,900.00

82,900.00

60.00

60.00

60.00

1.00

13,728.00

823,680.00

823,680.00

823,680.00

Ceramic raised Pavement Markers

Sign support, (breakaway) Tublerd


Sign Support-Cantilever
Sign Support-Gantry
End Mark's
Single Face KM Mark's

60.00

60.00

60.00

1.00

13,728.00

823,680.00

823,680.00

823,680.00

225.00

225.00

225.00

1.00

766.00

172,350.00

172,350.00

172,350.00

82.00

82.00

82.00

1.00

749.00

61,418.00

61,418.00

61,418.00

280,073,382.00

311,037,431.18

308,080,720.18

Total
Difference : Actual Amount & Contract Amount
10% From Contract Amount
Difference : Contract Amount & Revised BOQ-1 Amount
Contract Amount + 10%

30,964,049.18
28,007,338.20
28,007,338.18
308,080,720.18

Miscellaneous Summary Sec-3


Revised BOQ-1

General Work
Consultant Staff Complex
Project Laboratory
Removal of Existing Building
Removal of Boundary Wall, including Gate
Removal of Box Culvert & Pipe Culvert End Section

Present Total Qty


1.00
1.00

Prev. Qty

Difference

Unit Price

Amount

1.00

0.00

200000.00

200000.000
200000.000

1.00

0.00

200000.00

100.00

100.00

0.00

12.00

1200.000

1200.00

1200.00

0.00

9.00

10800.000

15862.00

0.00

62.00

983444.000

Structural Excavation-Other Structures (Cu.m)

1116789.12

1132905.26

-16116.14

12.00

13401469.440

Structural Excavation-Bridges (Cu.m)

2022265.34

1527300.86

494964.48

12.00

24267184.080

801208.52

855336.00

-54127.48

-4006042.600

Embankment

31756.46

35000.00

-3243.54

7.00

222295.220

Subgrade thic 30cm

46068.00

46068.00

0.00

12.00

552816.000

ABC (Cu.m)

427149.44

458420.89

-31271.45

43.00

18367425.920

MC-1 (Sq.m)

1381546.22

1457204.87

-75658.65

1.00

1381546.220

BBC (Cu.m)

273447.56

288584.06

-15136.50

214.00

58517777.840

BWC (Cu.m)

69889.93

55818.04

14071.89

249.00

17402592.570

Roadway Excavation

15862.00

Bridge Work
Reinforcement Steel - Grade 60 (Ton)
and All Completed
Conc. for Bridges Super Structure Class (350/20) (Cu.m)
Conc. for Bridges Substructure, Class (280/20) (Cu.m)

9631.25

9631.25

0.00

5616.00

54089100.000

11144.00

11144.00

0.00

986.00

10987984.000

48967.00

48967.00

0.00

649.00

31779583.000

11003.00

Description
Conc. for Box Culvert 's (Cu.m)

11003.00

0.00

524.00

5765572.000

Bearing Device Elastometric 120 Ton

648.00

648.00

0.00

487.00

315576.000

Expansion Joints, 50 mm to 100 mm

670.00

670.00

0.00

1167.00

781890.000

Prestressed Steel (Ton)

293.00

293.00

0.00

14976.00

4387968.000

Structural Steel Finished, Fabricated and Erected

1.00

1.00

0.00

4368.00

4368.000

Cast-in-Place Concrete Piles, 1.0 m dia, In-Place

1660.00

1660.00

0.00

1248.00

2071680.000

Bridge Parapet

1816.00

1816.00

0.00

463.00

840808.000

Granular Backfill

4253.00

4000.00

253.00

37.00

157361.000

Waterproof Membrane for Bridge (Sq.m)

25071.00

25000.00

71.00

40.00

1002840.000

Bituminous paint

34193.31

34000.00

193.31

7.00

239353.170

0.00

0.00

312.00

0.000

12832.00

3141.00

448.00

7155904.000

Breaking and Removal of Structure Concrete


New Jersey Concrete Barrier, Single Face
New Jersey Concrete Barrier, Double Face
Precast Curb

0.00
15973.00
1.00
5545.00

1.00

0.00

437.00

437.000

5545.00

0.00

35.00

194075.000

Combined curb and gutter , type ( ED6-1)

1.00

1.00

0.00

112.00

112.000

Catch Basin

1.00

1.00

0.00

3120.00

3120.000

Manhole

14.00

14.00

0.00

9360.00

131040.000

Inlet

14.00

14.00

0.00

2496.00

34944.000

Plastic Irrigation Pipe 300mm Dia

1.00

1.00

0.00

374.00

374.000

Plastic Irrigation Pipe 600mm Dia

1.00

1.00

0.00

749.00

749.000

1000.00

0.00

94.00

94000.000

Reinforcement Conc. Storm Sewer pipe 150mm dia

1000.00

Loose Stone Riprap

1.00

1.00

0.00

87.00

87.000

Grouted Stone Riprap

1.00

1.00

0.00

125.00

125.000

Gabions
R.C. Slope Protection
Concrete Ditch Lining
Reinforcement Conc. Pipe Culvert (Precast) 1000mm dia
Reinforcement Conc. Pipe Culvert (Precast) 800mm dia

1.00
9285.42
1.00
300.00

0.00

125.00

125.000

0.00

106.00

984254.520

1.00

0.00

81.00

81.000

300.00

0.00

948.00

284400.000

1.00

0.00

649.00

649.000

Industrial Fence 1.80Mtr Hight

1000.00

1000.00

0.00

17.00

17000.000

High Tension wire fence Type 1

1000.00

1000.00

0.00

15.00

15000.000

1.00

0.00

624.00

624.000

1260208.620

animal guard

1.00

1.00
9285.42

1.00

Retroreflective Raised Pavement Markers, Type A

57282.21

57401.92

-119.71

22.00

Ceramic Raised Pavement Markers (CERAMIC)

61368.45

61038.45

330.00

9.00

552316.050

Highway Signs, Ground-Mounted - Sheet Aluminum


Highway Signs, Ground-Mounted - Aluminum Planking or Internally Double Skin
Aluminum Sheet

25500.00

25877.00

-377.00

639.00

16294500.000

1.00

0.00

699.00

699.000

Highway Signs Overhead

500.00

500.00

0.00

699.00

349500.000

Sign Support, (Breakaway) Single Post I.P.E.

500.00

500.00

0.00

16.00

8000.000

Sign Support, (Breakaway) Double Post I.P.E.

100.00

100.00

0.00

15.00

1500.000

Sign Support, (Breakaway) Tubular

8000.00

8000.00

0.00

829.00

6632000.000

Sign Support-Gantry

6000.00

6000.00

0.00

13728.00

82368000.000

100.00

100.00

0.00

13728.00

1372800.000

Delineators

60.00

60.00

0.00

766.00

45960.000

Kilometer Post, Single-face

60.00

60.00

0.00

749.00

44940.000

Retroreflectorized Thermoplastic White Traffic Lines (LM)

225.00

225.00

0.00

20.00

4500.000

Retroreflectorized Thermoplastic Yellow Traffic Lines (LM)

82.00

82.00

0.00

20.00

1640.000

Sign Support-Cantilever

1.00

361780256.140
64,577,775.72
102,856,509.74
167,434,285.46

Deduction due to 17.85%


Deduction of previous certificates
Total Deductions & Stops
NET PAYMENT DUE TO CONTRACTOR
% Work Done
Prepared By
Quantity Surveyor
(SAPAC)

361780256.14
280073382.00

194,345,970.67
129.17%
Checked By

(ITAL Conslt)

Miscellaneous Summary Sec-3


Revised BOQ-1

General Work

Present Total Qty

Prev. Qty

Difference

Total Cut (Cu.m)

801208.52

855336.00

-54127.48

Total Fill (Cu.m)

31,756.46

35,000.00

-3243.54

Total Sub Grade (Cu.m)

46,068.00

46,068.00

ABC (Cu.m)

427,149.44

458,420.89

(31,271.45)

MC-1 (Sq.m)

1,381,546.22

1,457,204.87

-75658.65

BBC (Cu.m)

273,447.56

288,584.06

(15,136.50)

BWC (Cu.m)

69,889.93

55,818.04

14,071.89

9,631.25

9,631.25

11,144.00

11,144.00

48,967.00

48,967.00

11,003.00

11,003.00

Prestressed Steel (Ton)

293.00

293.00

0.00

Bearing Device Elastometric 120 Ton

648.00

648.00

0.00

Bridge Parapet

1,816.00

1,816.00

0.00

Cast-in-Place Concrete Piles, 1.0 m dia, In-Place

1,660.00

1,660.00

0.00

Structural Excavation-Other Structures (Cu.m)

1,116,789.12

1,132,905.26

-16116.14

Structural Excavation-Bridges (Cu.m)

2,022,265.34

1,527,300.86

494964.48

25,071.00

25,000.00

71.00

Bridge Work
Description

Grand Total

Reinforcement Steel - Grade 60 (Ton)


and All Completed
Conc. for Bridges Super Structure Class (350/20) (Cu.m)
Conc. for Bridges Substructure, Class (280/20) (Cu.m)

Description

Grand Total

Conc. for Box Culvert 's (Cu.m)

Waterproof Membrane for Bridge (Sq.m)


Removal of Box Culvert 's (Sq.m)

2,039.80 ###

0.00

TRAFFIC CONTROL DEVICES AND WORK ZONES


Retroreflectorized Thermoplastic White Traffic Lines (LM)

225.00

225.00

0.00

Retroreflectorized Thermoplastic Yellow Traffic Lines (LM)

82.00

82.00

0.00

Prepared By
Quantity Surveyor
(SAPAC)

Submitted By

Checked By

Project Manager
(SAPAC)

(ITAL Conslt)

Micilinious Summary
Up to29/11/1434

General Work

Present Total Qty

Prev. Qty

Difference

-828594.90
180316.05
421184.00
215038.96
673001
128794.37
26116.97

-828594.90
180316.05
421184.00
210664.00
673001
118747.00
22997.00

0.00
0.00
0.00
4374.96
0.00
10047.37
3119.97

1398.05

0.00

1585.52

0.00

561.09532

561.10

0.00

Conc. for Bridges Super Structure Class (350/20) (Cu.m)


of 128+129.579

294.51

294.51

0.00

Conc. for Bridges Substructure, Class (280/20) (Cu.m)


of (128+129.579 and 141+000)

3197.00

3197.00

0.00

787.96
6103.75
6528.55
5314.17
3755.05
1419.13
2039.80

0.00

Total Cut (Cu.m)


Total Fill (Cu.m)
Total Sub Grade (Cu.m)
ABC (Cu.m)
MC-1 (Sq.m)
BBC (Cu.m)
BWC (Cu.m)

Bridge Work
Description

Grand Total

Reinforcement Steel - Grade 60 (Ton)


(128+129.579, 141+000 and All Completed Girders
Conc. for Girders, Class (350/20) (Cu.m)
Conc. for Girders, Class (350/20) (Cu.m)

1398.05
1981.90

141+000

Box Culvert's
Description
Reinforcement Steel - Grade 60 (Ton)
Conc. for Box Culvert 's (Cu.m)
Waterproof Membrane (Sq.m)
Structural Excavation-Other Structures (Cu.m)
Structural Excavation-Bridges (Cu.m)
Waterproof Membrane for Bridge (Sq.m)
Removal of Box Culvert 's (Sq.m)

x 80%= 1585.52

Grand Total
795.80 * 95%=787.955
6425.00 * 95%=6103.75
6528.55
5314.17
3755.05
1419.13
2039.80

0.00

0.00
0.00
0.00
0.00
0.00

TRAFFIC CONTROL DEVICES AND WORK ZONES


Retroreflectorized Thermoplastic White Traffic Lines (LM)
Retroreflectorized Thermoplastic Yellow Traffic Lines (LM)
Prepared By
Quantity Surveyor

4177.00
16710.00
Submitted By
Project Manager

4177
16710

0.00
0.00
Checked By

General Work
Total Cut (Cu.m)
(SAPAC)

(SAPAC)

Present Total Qty

Prev. Qty

-828594.90

-828594.90

Difference
0.00
(ITAL Conslt)

566