Académique Documents
Professionnel Documents
Culture Documents
Walner SAINT-AUBIN
17/04/2015
EBlink at a glance
Negotiation
Landlord
agreement /third
party
New sites
Deployment
objective
Design &
Network
planning
Site design
Sites upgrade
From Start
90% of process time
PM agreement
decision
Construction
/Installation
Radio
agreement
To Finish
10% of process time
Conclusion:
EBlinks system reflects the evolution toward increasingly centralized telecom
architectures, and enables faster and easier deployment of 3G, 4G and future
5G networks
EBlinks technology has been selected for two 5GPPP initiatives Horizon 2020
program: Xhaul and Superfluidity
Wireless fronthaul provides a flexible and cost-effective interconnection
between base band and Remote Radio Heads
mm-Waves bands are needed to support C-RAN and 5G architectures
EBlink will use Xhaul and Superfluidity projects to evolve its innovative Wireless
Fronthaul solutions and to reach several tens of Gbps to cope with C-RAN/5G
fronthaul high capacity requirement
Thank you