ABSTRACT
Delay in industrial or project construction is one of the major barriers of developing countries such as India
& China & most of the south east countries. A survey was conducted in different projects such as power plant,
factory construction, multi story building construction etc. across the country.
The critical factors need to be identified which causes influencing negatively duration project construction.
Systematical and scientific approach is one of the techniques by which we can identify the root cause. In this
analysis we found some key factors causing the delay problems in construction project such as motivation,
payment, classical technique etc. also we found a technique is adopted.
Keywords: Project construction, delay in construction, delay elements, impact of delay and technique for
avoiding delay.
According to Mansfield, (1994) - They presented that the
causes of delay and cost overrun in Nigerian construction
project were attribute to (a) Poor contract management. (b)
Inaccurate estimations. (c) Over all price fluctuation. (d)
Shortages of materials and equipment. (e) Finance and
payments agreements.
According to Al-Momani (2000) - He identified causes of
delay in 130 public projects in Jordan. The main cause of
delay where related to design, user changes, weather, site
condition, late deliveries, economic condition and increase
in quantity. The study suggested special factors will help
industry practitioners in minimizing contract disputes.
Delay has strong relationship with failure in ineffective
performance of contractors.
Completion time is extremely important in construction.
Execution time is one of the performance measures of
construction projects, which are time, cost, and quality.
Project success is measured by these measures which show
the performance of the construction parties involved,
mainly the owner and the contractor. All the parties look
for project completion by a specified time, in the most
economical manner, with the required quality.
Introduction:
The main aim of this study is to find out what are the
major causes of delay? Delay in project construction
causes stress to overall team. As we know time is money
(Procrastination is the thief of time (Edward Young),
which itself defines delay in project construction means
overrun, loss of capital and revenue, increases market risk,
delay in production, increasing material cost as well as
lack of efficiency. While completing project at right time
leads profit, market growth, increasing customers trust
and increasing self as well as teams confidence.
In previous studies Safety, Equipment & Daily target was
not included in there studies, which also leads to cause
delay in project construction.
Similar survey was conducted by Ogunlana in 1996 at
Thailand, Bangkok, and His analysis that there are three
major categories of delay in project construction (a)
Problems of shortages or inadequacies in the industry
infrastructure. (b) Problems caused by clients and
consultants. (c) Problems caused by contractor
incompetence/inadequacy.
Chan and Kumaraswamy (1997) conducted a survey to
find delay causes in Hong Kong construction projects and
he found five major factors: delay (a) poor risk of
management and supervision
(b) Unfocused site
condition. (c) Slow decision making. (d) Client- initiated
variation. (e) Work variance.
Research Methodology:
A survey questionnaire was used to carry out the study.
The questionnaire was divided into two parts- part one
consist of basic questions & background of the project and
24
www.scholarshub.net
,QGLDQ-RXUQDORI&RPPHUFH 0DQDJHPHQW6WXGLHV
,661
25
www.scholarshub.net
,QGLDQ-RXUQDORI&RPPHUFH 0DQDJHPHQW6WXGLHV
,661
26
www.scholarshub.net
,QGLDQ-RXUQDORI&RPPHUFH 0DQDJHPHQW6WXGLHV
,661
27
www.scholarshub.net
,QGLDQ-RXUQDORI&RPPHUFH 0DQDJHPHQW6WXGLHV
,661
Table 1: Showing mean & rank; were 1 refers uppermost and 8 refer lowermost important cause of delay.
S.N.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Delay elements
DAILT TARGET
ENGINEERING
EQUIPMENTS
MATERIALS
TIME
MANAGEMENT
RISK
MANAGEMENT
Safety
Delay causes
Daily target & review
Conflict bt ideas in terms of dail1 target
Daily meeting for planning
Poor communication system
Strategic planning for daily work
Ineffective management
Ineffective supervision
Goal not defined
Complex design
Design Fault
Unskilled man force - Engineering team
Insufficient data while designing
Team work & co ordination
Delay in design approval
Customers requirement changes
Installation problem
Equipment size
Certification of Equipments
Calibration of Equipments
Unavailability of correct tool for working
Unavailability to test of equipment
Use of classical tools
Insufficient tools
Material lead time
Poor storage area
Transit Damage
Quality of material
Wrong supply
Short receipt
Delay in procurement
Supplied material was defective
Lunch time of labours and Management staff is on same time
Leaving work area - labours
Rework
Daily working Hours
Estimated project completion was time too short
Confusion
Use of classical technique
Change in design
Market risk
Bureaucracy
Future planning
Customer reliability
Conflict between owners or partners
Dependency - Supplier & Customer
Change in scope of work
Not following Personal protective equipment
Unavailability of work permit
28
Mean
0.977
0.986
0.989
0.992
0.977
0.989
0.992
0.997
0.992
0.986
0.992
0.997
0.977
0.989
0.983
0.986
0.992
0.986
0.983
0.986
0.989
0.986
0.989
0.983
0.98
0.992
0.98
0.989
0.989
0.989
0.986
0.989
0.992
0.986
0.995
0.989
0.995
0.989
0.989
0.992
0.989
0.989
0.983
0.989
0.98
0.989
0.992
0.989
Priority
1
4
5
6
1
5
6
8
6
4
6
8
1
5
3
4
6
4
3
4
5
4
5
3
2
6
2
5
5
5
4
5
6
4
7
5
7
5
5
6
5
5
3
5
2
5
6
5
www.scholarshub.net
,QGLDQ-RXUQDORI&RPPHUFH 0DQDJHPHQW6WXGLHV
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
EXTERNAL
CAUSES
FINANCE
Employee
,661
0.989
0.977
0.986
0.989
0.992
0.986
0.995
0.992
0.986
0.992
0.995
0.992
0.992
0.992
0.992
0.995
0.992
0.98
0.983
0.995
0.989
0.995
0.986
0.989
0.986
0.986
0.989
0.986
0.989
0.986
0.986
0.977
5
1
4
5
6
4
7
6
4
6
7
6
6
6
6
7
6
2
3
7
5
7
4
5
4
4
5
4
5
4
4
1
******
29
www.scholarshub.net