Vous êtes sur la page 1sur 31

Mrunal (http://mrunal.

org/)

[Speed Time Work] Three men can nish a work in x days, share in
wages & other special cases

Aptitude (http://mrunal.org/category/aptitude) / 3 years Ago /


18 Comments (http://mrunal.org/2012/11/speed-time-work-three-men-can-finish-work-x-days-share
English: SP Bakshi
(http://www.flipkart.com/objective-generalenglish-2012/p/itmdyuqqgafhtehp?
pid=9788183480000&affid=mrunalrugm)

1.

Prologue

2.

Case: three men start the work simultaneously.

3.

Case: Three Men Start Working One After Another

4.

Case: Share in Daily Wage

5.

Case: Share in money after work finished?

6.

Case: Time equations: set of two people working

7.

Case: Time Ratios are given

Prologue
Speed Time workquestions routinely appears in almost every aptitude exam
A can complete a piece of work in 10 days, B can do it in 12 days, C can to it in 15 days. Now A
starts the work and continues for 2 days, then B joins and then C joins .etc.etc. how much
time will it take?
Sometimes, Instead of character names, theyll give your three pipes. Pipe A can fill the tank
in X minutes, Pipe B can do in .But the approach remains the same. (if pipe is emptying
then use minus sign in the speed.)
Such questions take very little time. Just LCM, fill in the table, and use STD formula and done.

Case: three men start the work simultaneously.


Aiyyar can paint Gokuldham society in 10 days, Bhide Master can do it in 12 days and
Champaklal can do it in 15 days. If all three of them start working simultaneously from day 1,
how many days will it take for them to finish the painting work?

It is similar to the pipes and cisterns problem.so make a table


Aiyyar

Bhide

Champak

10

12

15

Together

Speed
Time
Distance
The time for each individual character, is already given in the problem.
Now take the LCM of Time, means that factorize number into its prime numbers
(2,3,5,7,11,13,17,19 etc)
10=25
12=223
15=35
Now take each prime number in its highest power and multiply them together.
LCM=223151=60
So LCM (10,12,15)=60. This is the total distance covered, and in this case it means total work
done. i.e. entire surface area of walls of Gokuldham is 60 square meters.
Whether these characters paint the society individually or together, the area of the walls will
remain one and same 60.
Aiyyar

Bhide

Champak

Time

10

12

15

Distance

60

60

60

Together

Speed

60

Not only empty box is of speed.


Simply write the number required to get 60 by multiplication.
Example Aiyyers time is 10 days. So to get 60 from ten, youve to multiply 10 with 6.

(Alternatively) for Aiyyers case


Speed x time = distance
Speed x 10 days = 60 ; because it is already given in the problem that Aiyyar takes 10 days.
Speed = 60/10 = 6.
Write 6, in Aiyyars speed box.
Similarly for Bhide and Champak youll get 5 and 4 respectively.

Aiyyar

Bhide

Champak

Together

Speed

6+5+4=15

Time

10

12

15

Distance

60

60

60

60

When these three characters work together, their speed will increase: 6+5+4=15.
Now we have to find out the time required,
Again STD formula
Speed x time = distance
15 x time = 60
Time = 60/15= 4 days.

Final answer: if these three characters work together, they can paint the society in only four
days.

Case: Three Men Start Working One After Another


Same problem, but with little modification
Aiyyar can paint Gokuldham society in 10 days, Bhide Master can do it in 12 days and
Champaklal can do it in 15 days. Aiyyar starts painting the society and Bhide joins him after 2
days. Then Both of paint the society together for one day and then Champaklal joins the gang.
In this manner, how many total days will be required to finish the paint work?

Part I: Aiyaar starts the work


The table remains seem up to this part
Characters

Work

Aiyyar

Bhide

Champak

Aiyyar starts

Speed

Time

10

12

15

x2

Distance

60

60

60

=12

It is given that For the first two days, Aiyyar works alone.
So in the last column, fill up Aiyyars speed and time accordingly.
Speed x time = distance
6 x 2 =12 ; because Aiyyars speed is 6 and he works for 2 days.
Meaning, in the first two days Aiyyar has painted 12 square meters of walls.
How much work remains?

Total 60 minus 12 = 48.

Part II: Bhide joins


it is given that, after two days Bhide master joins and together Aiyyar and Bhide work for one
day. (and then Champak joins)
So make a new column in a table, Aiyyar +Bhide
since theyre working together, this bill will increase and we will do addition : 6 + 5 =11
Characters

Work

Aiyyar

Bhide

Champak

Aiyyar starts

Bhide Joins

Speed

6+5=11

x Time

10

12

15

x2

x1

=Distance

60

60

60

12

=11

Again
Speed x time = distance
11 x 1 =11
Meaning, in one-day Aiyyar and Bhide painted another 11 square meters.
How much work is left??
48 minus 11 =37

Part III : Champaklal joins


Now Champaklal also joins, so combine speed is 6+5+4=15
and remaining work is 37 We have to find out the time

Characters

Work Progress report

Aiyyar

Bhide

Champak

Aiyyarstarts

BhideJoins

ChampakJoins

Speed

6+5=11

6+5+4=15

xTime

10

12

15

??

Distance

60

60

60

60

11

37 remains

Again STD
Speed x Time =distance
15 x Time = 37
Time = 37/15= approx. 2.5 days
Caution : This 2.5 is not the final answer. Because theyve asked you to find total number of
days required to finish the paint work. So total time is right from the day one when Aiyyar
started.
2+1+2.5=5.5
Final Answer: The work will be finished in 5.5 days.

Case: Share in Daily Wage


Abdul can do a piece of work in 10 days; Bhide in 15 days. They work for 5 days. The rest of the
work was finished by Champak in 2 days. If they get Rs.1500 for the whole work. Find the daily
wages of Bhide and Champak.
They got Rs.1500 for the whole work, meaning the work is worth Rs.1500 so take it as our
distance
Repharse: Abdul can do road-construction of 1500 kms in 10 days!.. and so on
Abdul

Bhide

Speed
Time

10

15

distance

1500

1500

Apply STD formula and find out speed value of each column
A

Speed

150

100

xTime

10

15

=distance

1500

1500

Given: they (A and B) worked for five days


A

A+B

Speed

150

100

150+100=250

Time

10

15

distance

1500

1500

250 x 5=1250

Combined speed of A+B=250 so in two days they constructed road of 1250 kms.
Remaining work = 1500 minus 1250 = 250kms
This was done by C alone, in two days.
A

A+B

Speed

150

100

250

Time

10

15

distance

1500

1500

1250

250

Run STD formula on Cs column and find his speed


A

A+B

Speed

150

100

250

125

Time

10

15

distance

1500

1500

1250

250

Their daily wage depends on how much work can they do per day?
Which is actually their speed. E.g. B can construct 100 km roads per day.
So daily wage of B=Rs.100
And daily wage of C=Rs.125
Total daily wage of B and C=100+125=225

Case: Share in money after work nished?


Q. Abdul alone can do a piece of work in 6 days and Bhide alone in 8 days. They undertook to do
it for Rs.3200. With the help of Champak, they completed the work in 3 days. How much is to be
paid to Champak?
Total road construction is 3200 kms this time.
A

Time

distance

3200

3200

Speed

Run STD formula to find speeds

Speed

3200/6

400

Time

distance

3200

3200

Given: With the help of C, they completed the work in 3 days.


We dont know the speed of C, assume it is c but construct his column and fill remaining data.
A

A+B+C

Speed

3200/6

400

(3200/6)+400+c

Time

??

distance

3200

3200

Run STD formula on third column


[ (3200/6)+400+c ] x 3 = 3200
Solve this equation you get c=400/3
Meaning speed of c=400/3
He works for 3 days.
Speed x time = distance
(400/3) x 3 =distance
400= distance
Meaning C covered 400kms

3200

Which means he was paid Rs.400

Case: Time equations: set of two people working


Q. A & B can do a piece of work in 12 days , B and C in 15 , C & A in 20 days. How long
would each take separately to do the same work?
In the STD table, when people come and go, we can do addition and subtraction in the SPEED
boxes only and now in the Time boxes.
Now fill up the table.
A+B

B+C

C+A

12

15

20

SPEED
TIME
DISTANCE
TAKE THE LCM (12, 15, 20) =60. Based on that we can find individual speeds using STD formula.
A+B

B+C

C+A

SPEED

TIME

12

15

20

DISTANCE

60

60

60

Assume that these three entities work together


A+B

B+C

C+A

(A+B)+(B+C)+(C+A)

SPEED

5+4+3=12

TIME

12

15

20

??

DISTANCE

60

60

60

60

Speed of A+B+C together can be derived using


(A+B)+(B+C)+(C+A)
= 2(A+B+C)=5+4+3=12
Hence speed of A+B+C together =12/2=6
Now STD formula
Speed x time = distance
6 x time = 60
Time = 10
Meaning if A+B+C work together, they can finish work in 10 days. [Although Time of A+B+C, is
not asked in the question, but Ive given it only for explanation]
Now back to the question, weve to find individual time. So far our table looks like thisA+B

B+C

C+A

A+B+C

SPEED

TIME

12

15

20

10

DISTANCE

60

60

60

60

Now you can solve it three unknown equation.


Because this is speed, we can do addition, subtraction and solve it as three unknown equations
Speed of A+B+C=6
Speed of A+B=5

Hence speed of C= 6 (A+B)= 6-5=1


A+B

B+C

C+A

A+B+C

(A+B+C)-(A+B)=C

SPEED

6-5=1

TIME

12

15

20

10

??

DISTANCE

60

60

60

60

60

Speed of C is 1 and he has to cover 60 kilometers alone,


STD formula,
1 x Time = 60
Hence itll take him 60 days.
A+B

B+C

C+A

A+B+C

(A+B+C)-(A+B)=C

SPEED

6-5=1

TIME

12

15

20

10

60

DISTANCE

60

60

60

60

60

Do similar procedure for B and A.


A+B

B+C

C+A

A+B+C

SPEED

6-5=1

6-3=3

6-4=2

TIME

12

15

20

10

60

20

30

DISTANCE

60

60

60

60

60

60

60

Final answer, time taken by A,B,C if they work individually= 30,20,60


Run a cross verification to see the answer is correct. Plug the answer values.

A+B

B+C

C+A

Speed

Time

30

20

60

12

15

20

Dist

60

60

60

60

60

60

Yes it satisfies the statements given in the Question.

Case: Time Ratios are given


Q. A takes twice as much time as B and thrice as much as C to finish a piece of work. They
together finish the work in one day. Find the time taken by each of them to finish the
work.
A takes twice as much time as B,
meaning if B takes 1 day, A takes 2 days
So the ratio of time is A:B=2:1
Similarly A:C=3:1
We can write the same thing as
B:A=1:2
A:C=3:1
If we want the three terms ratio, we want mid term (A) to be same in both equation.
In the first eq. A is 2 and in second eq. A is 3. LCM (2,3)=6
Multiply something in both equations so that we get 6 in both equation.
Meaning, Multiply first eq with (2) and second equation with (3)

B:A=3:6
A:C=6:2
Now we can make a three terms ratio
B:A:C=3:6:2
Keep in mind, this is ratio and not absolute number
So we fill Time boxes as
As time = 6x
Bs time = 3x
Cs Time = 2x
Run the STD table, fill the data
A

A+B+C

Speed

Time

6x

3x

2x

1 day

Distance

6x

6x

6x

6x

LCM of (6x,3x,2x)= 6x
From the STD fomula, we can get the individual speeds of A,B,C,= 1,2,3
Together their speed A+B+C=1+2+3=6
For the last column
Speed x time = distance

6 multiplied with 1 =6x


Hence x= 1
Put the value of x=1 in the table and you get individual time
A will take 6 days individually, B will take 3 days and C will take 2 days.
Cross verification (plug the answers we got)
A

A+B+C

Speed

Time

1 day

Distance

From the table,


A takes twice as much time as B and thrice as much as C to finish a piece of work
Yes it satisfies the statement given in the question itself.
Visit Mrunal.org/Aptitude (http://Mrunal.org/Aptitude) to see entire list of all articles published
so far!

Tags: STDW (http://mrunal.org/tag/stdw)

Mrunal recommends

SBI/IBPS Bank Exams

UPSC Civil Service

SSC CGL: Staff selection

CDS: Defense Services

CAT/IIM MBA Entrance

ACIO Intel Officer

More from this category


[Studyplan] CSAT Aptitude Paper 2: Maths & Data Interpretation-High priority
topics, Sample Questions, free studymaterial (part 2 of 3)
(http://mrunal.org/2014/06/studyplan-csat-aptitude-paper-2-maths-datainterpretation-high-priority-topics-sample-questions-free-studymaterial-part2-3.html)
[Studyplan] CSAT Aptitude Paper 2: Decision Making + Maths Medium & Low
priority topics, Sample Questions, free studymaterial (part 3 of 3)
(http://mrunal.org/2014/06/studyplan-csat-aptitude-paper-2-decision-makingmaths-medium-low-priority-topics-sample-questions-free-studymaterial-part3-3.html)
[Studyplan] CSAT Aptitude Paper 2: Comprehension & Reasoning, analysis,
previous papers, free studymaterial, cutoffs (part 1 of 3)
(http://mrunal.org/2014/06/studyplan-csat-aptitude-paper-2-comprehensionreasoning-analysis-previous-papers-free-studymaterial-cutoffs-part-1-2.html)
[Reasoning] Calendar Questions: Finding day or date, concepts, shortcuts
explained (http://mrunal.org/2013/08/reasoning-calendar-questions-finding-

day-or-date-concepts-shortcuts-explained.html)
[Trigonometry] Finding Minimum Maximum Values for SSC CGL Made Easy
without differentiation (http://mrunal.org/2013/07/trigonometry-findingminimum-maximum-values-for-ssc-cgl-made-easy-withoutdifferentiation.html)
Print | PDF (need Chrome) (http://mrunal.org/2012/11/speed-time-work-threemen-can-finish-work-x-days-share-wages-special-cases.html/print/)
Get notified whenever I post new article!
(http://feedburner.google.com/fb/a/mailverify?uri=CivilServiceExam)

So far 18 Comments posted

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=205070#RESPOND)

aditya swaroop
Thanx fr the practice questions mrunal sir !!!!!!! Please give sum guidance
on preparation of science and tech. for GS (prelims) !!!!!

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=205072#RESPOND)

aditya swaroop
Please guide as to on which portions of technology one must focus ?????
Questions frm biology and physics came in 2013 pre. but they were less
than the technology questions !! Pls guide

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=217865#RESPOND)

sunny kumar
kindly help with below questionmy answer- 48.
actual answer-24
twenty four men can complete a work in 16 days.
thirty two women can complete the same work in 24 days.
sixteen men & sixteen women started working and worked for twelve
days
how many more men are to be added to complete the remaining work in
2 days?
thanks.

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHAREWAGES-SPECIAL-CASES.HTML?REPLYTOCOM=233713#RESPOND)

Ghufran Alam
You didnt take into account the work done by existing group of
people(16 men and women) for those two last days. Subtract their
share of work done in those two days and calculate men required
for completing the work.

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=225728#RESPOND)

Avinash
Mrunal bhai..kindly tell us..what if 2 persons work alternatively or evry
3rd day and that type eof questions
Thank u

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=230025#RESPOND)

Amit
Case 3: (short way out)
assume total time taken = x ;
then accordingly,
total work(distance)= 60;
as work = 6*x;
bs work = 5*(x-2);
cs work = 4*(x-3);
all 3 guys working,
should add up to 60; thus, x = 82/15;
It removes the redundancy of solving remainin work when other guys
join the party.

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=245183#RESPOND)

Neha
Mrunal Sir, plz tell me how to solve this ques with your method or
anybody whove mastered this method:
A can do piece of work in 6 days while B can do it in 5 days. If the total
amount to be given for this work is Rs.660, whatll be the share of B if
both do the work together?
Ans: Rs. 360

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHAREWAGES-SPECIAL-CASES.HTML?REPLYTOCOM=245487#RESPOND)

Neha

No need to post this comment. Ive solved it


Thank you Mrunal Sir, Your STD method is awesome

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYSSHARE-WAGES-SPECIAL-CASES.HTML?REPLYTOCOM=264168#RESPOND)

devendra
how u have solved with STD method ??

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=249129#RESPOND)

swathi
goodto give such a great explanation

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=251552#RESPOND)

shivangi
awesome ,just loved the way u make it easier and understandable.

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=252765#RESPOND)

shubham tomar
thnx #mrunal sir..it is really helpful

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=263725#RESPOND)

priya

4men and 6 women get 1600 Rs by doing a piece of work in 5 days . 3


men and 7 women get 1740 Rs by doing same piece of work in 6 days. In
how many days, 7 men and 6 women can complete the same work
getting 3740 rs?
Can You explain this problem using STDs?

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHAREWAGES-SPECIAL-CASES.HTML?REPLYTOCOM=283909#RESPOND)

Sadiq
Dear Sir,
Please explain Priyas question if you can. I am also having this
doubt.

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=282088#RESPOND)

vaibhav shukla
Thanx mrunal sir..

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=308358#RESPOND)

san
can someone please explain me this stepi dont know how 6 has come
here2(12)=24 right?
Speed of A+B+C together can be derived using
(A+B)+(B+C)+(C+A)

= 2(A+B+C)=5+4+3=12
Hence speed of A+B+C together =12/2=6

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=318498#RESPOND)

Luvish
Sir, Please help me with this problem. (SSC CGL Tier-I 2014)
Three men A,B & C working together can do a job in 6 hours less time
than A alone, in 1 hour less time than B alone and in half the time
needed by C when working alone. Then A and C together can do the job
in??
a) 2/3 hrs
b) 3/4 hrs
c) 3/2 hrs
d) 4/3 hrs

REPLY (/2012/11/SPEED-TIME-WORK-THREE-MEN-CAN-FINISH-WORK-X-DAYS-SHARE-WAGESSPECIAL-CASES.HTML?REPLYTOCOM=331319#RESPOND)

Raj
1.A can do a work in 15 days and B in 20 days. If they work on it together
for 4 days, then the fraction of the work that is left is :
Please show how to use ur trick in this problem?
2.A can lay railway track between two given stations in 16 days and B can
do the same job in 12 days. With help of C, they did the job in 4 days
only. Then, C alone can do
this too

Thanks

Write your message!

Name?

Email ID?

What is your Message? Search before asking questions & confine discussions to exams
related matter only.

Post Message

Notify me of follow-up comments by email.


Notify me of new posts by email.

Search B4 Asking
Type n Press Enter

4 Days : CMS-15
18 Days : CAPF-15
46 Days : SSC CGL15

60 Days : CSAT-15
101 Days : IBPS-PO-15
164 : IBPS-Clerk-15
177 Days : Mains-15

Recent Comments
DEVENDER { Mrunal, what about may, June current affairs series?? } [Economy Lecture]
GS2: UNFCCC Lima Summit, Paris Summit Post-2020... (http://mrunal.org/2015/06/economylecture-paris-summit-post-2020-climate-finance-framework.html/comment-page1#comment-340678)

ABHISHEK { now how many lecture still remain to complete the economic lecture. sir please
discuss } [Economy Lecture] GS2: UNFCCC Lima Summit, Paris Summit Post-2020...

(http://mrunal.org/2015/06/economy-lecture-paris-summit-post-2020-climate-financeframework.html/comment-page-1#comment-340641)

ISHU { THANKUUUUUU..SO MUCH SIR.. my economics was not so good and i have fear for that
but after listening to ur lectures all doubts are clear.... } [Economy Lecture] GS2: UNFCCC Lima

Summit, Paris Summit Post-2020... (http://mrunal.org/2015/06/economy-lecture-parissummit-post-2020-climate-finance-framework.html/comment-page-1#comment-340627)

DWARIKA { in composition of the interior of the earth need updation in part of crust property
you are mentioned potassium is lowest in earth's crust ,... } [Geography Lecture1] Longitude,

Latitude, Timezones, Earth Interior, Rock types,... (http://mrunal.org/2015/02/youtubegeography-l1-longitude-latitude.html/comment-page-2#comment-340620)

ANN { Thanks for the MCQs on IYB :) } [Mock Test #3] India Yearbook Chapter 1 to 12:...
(http://mrunal.org/2015/06/upsc-mock-test-paper-1-india-yearbook.html/comment-page1#comment-340565)

RAVIRAJDODIYA { Sir, I want to appear UPSC in Gujarati.Because I think I am comfortable


in that language and I can write 10 time better that any... } [Analysis] Essay topic trends in last

19 years (1993-2011)... (http://mrunal.org/2011/12/analysis-essay-topic-trends-in-last19.html/comment-page-1#comment-340560)

VIMAL { product of two number is 600.Lcm of thease number 10.What is the HCF of those two
number? } [Aptitude] LCM, HCF, GCD: Basic concept, calculation, applications explained

(http://mrunal.org/2013/03/aptitude-lcm-hcf-gcd-basic-concept-calculation-applications-

explained.html/comment-page-2#comment-340559)

HARSHADNARKAR { What is your Message? Search before asking questions & confine
discussions to exams related matter only. sir,history lectures kab honge. } [Economy Lecture]

GS2: UNFCCC Lima Summit, Paris Summit Post-2020... (http://mrunal.org/2015/06/economylecture-paris-summit-post-2020-climate-finance-framework.html/comment-page1#comment-340552)

JOHNSSWARGIARY { ist true that double the money plz ans me } [Financial Inclusion]
Kisan Vikas Patra (KVP): Features, Money Laundering,... (http://mrunal.org/2014/12/kisanvikas-patra-kvp-features-money-laundering-black-money-tax-benefit.html/comment-page1#comment-340548)

NAVEEN { Prateek even i got.....291 marks.....what about the reserved list??? Whts the
procedure?? } [CAPF-2014] Final result out, 105 selected, marksheets in 15...

(http://mrunal.org/2015/02/upsc-capf-2014-final-result-marksheet.html/comment-page2#comment-340545)

Vacancies
Entire List shifted to bottom. Scroll down

(http://www.alexa.com/siteinfo/mrunal.org)

Mega Jobs
23-Jul: IBPS Rural PO & Asst. (http://ibps.in/html/cwe_rrb.htm)
17-Aug: IGNOU PG Admission (https://onlineadmission.ignou.ac.in/Login.aspx)
17-Jul: NDA Officers (http://upsconline.nic.in/mainmenu2.php)
13-Jul: SSC 10+2 (http://www.ssconline.nic.in/)
09-Jul: APFC Provident Fund Comm.
(http://www.upsc.gov.in/recruitment/advt/2015/Spl.Advt.52-15%20Web%20Cell.pdf)

09-Jul: Punjab Corp Engineer (http://202.164.52.147/serv1/docs/dysecyrect121017527.pdf)


09-Jul: Punjab Corp Clerks (http://202.164.52.147/serv1/docs/dysecyrect121017527.pdf)
07-Jul: RBI Assistants (504) (https://opportunities.rbi.org.in/Scripts/bs_viewcontent.aspx?
Id=3024#AN)
02-Jul: FCI MT (1Lakh Bond,3yr) (https://fcijobsportal.com/fcimt2015/pages/index.aspx)
01-Jul: Haryana Health Services (http://haryanahealth.nic.in/)
30-Jun: LIC ADO (25k Bond,4yr) (http://www.licindia.in/careers_pop0022.htm)
24-Jun: Haryana Gramin Bank Assiatant (http://www.shgb.co.in/RecruitmentsandPromotions)
24-Jun: IDBI Manipal Banking Admission (http://www.idbi.com/idbi-bank-careers-currentopenings.asp)

Rural Banks
23-Jul: IBPS Rural PO & Asst. (http://ibps.in/html/cwe_rrb.htm)
25-Jun: Odisha Gramya (http://www.odishabank.in/Recruitment.aspx)
25-Jun: Assam Gramin (http://www.agvbank.co.in/recruitment.php)
24-Jun: Haryana Gramin Bank PO (http://www.shgb.co.in/RecruitmentsandPromotions)

IT Jobs
20-Jul: CDAC Noida (http://www.cdac.in/index.aspx?id=ca_noida_may_2015)

Engineers
02-Jul: BEL Ghaziabad (http://bel-india.com/recruitment)
02-Jul: ISRO Scientists (http://isro.gov.in/careers)
02-Jul: FCI Engg.Trainee (http://www.fcijobsportal.com)
30-Jun: Hindustan Latex Biomed. Engg (300) (http://www.hlfppt.org/)
26-Jun: RBI JE (https://rbi.org.in/scripts/Bs_viewcontent.aspx?Id=3020)
26-Jun: Bharat Dynamics (http://bdl.ap.nic.in/bdlrecruit.htm)
25-Jun: Raipur Civil Engg (http://www.aiimsraipur.edu.in/Career.aspx)

25-Jun: MP Electricity
(https://www.mponline.gov.in/Portal/Services/Recruit_MPKVV/Indore/notification.aspx)
24-Jun: KRIBHCO Noida (http://kribhco.indiainformative.com/Post4.aspx)

Legal
10-Jun: AAI Law (http://www.aai.aero/employment_news/Employee_Recruitment_new.jsp)

Specialists
31-Jul: IIIT Allahabad Gr. A & B (http://www.iiita.ac.in/announcements.php)
20-Jul: State Trading corp. (http://www.stc.gov.in/careers/current-openings.aspx)
20-Jul: NISER APO (http://www.niser.ac.in/drupal_new/)
15-Jul: Jammu Univ. (http://www.cujammu.ac.in//Default.aspx?
option=article&type=single&id=32&mnuid=734&prvtyp=site)
15-Jul: MoEF Scientists (http://envfor.nic.in/advertisements)
09-Jul: Allahabad Bank (https://www.allahabadbank.in/english/Recruitment.aspx)
12-Jul: Mumbai Metro (https://mmrda.maharashtra.gov.in/tenders-notices)
12-Jul: GBPUAT (http://www.gbpuat.ac.in/)
09-Jul: Punjab Corp Law (http://202.164.52.147/serv1/docs/dysecyrect121017527.pdf)
07-Jul: NBCC Building (http://www.nbccindia.com/nbccindia/nroot/njsp/Career.jsp)
01-Jul: NIELIT Spec. (http://www.nielit.gov.in/recruitments.aspx)
30-Jun: Rajendra Agro. (http://www.mangaldhwani.com/pusa/wpcontent/uploads/2014/09/Advt_-01_2015.pdf )
30-Jun: IIT Kanpur (http://www.iitk.ac.in/new/vacancies-in-administrative-and-technicalcadre )
28-Jun: ONGC Rajbhasha (NET)

(http://ongcindia.ongc.co.in/wps/wcm/connect/ongcindia/home/career/recruitment+notices/recru
of-olo-2015)
25-Jun: Raj. Industrial Development (http://www.riicorecruitment.org/)
25-Jun: HSCC Noida (http://www.hsccltd.com/)
24-Jun: Haryana Gramin Agro (http://www.shgb.co.in/RecruitmentsandPromotions)
24-Jun: Haryana Gramin Law Officer (http://www.shgb.co.in/RecruitmentsandPromotions)

Medics
14-Jul: MP medical officer (http://www.mppsc.nic.in/)
30-Jun: HAL Medical officer (http://www.halindia.com/Common/Uploads/Resumes/144_CareerPDF1_Med-advt-AC.pdf)

ParaMedics
Not At the moment

Deskjobs
05-Aug: NBE Assistants (http://natboard.edu.in)
31-Jul: IIIT Allahabad Gr.C (http://www.iiita.ac.in/announcements.php)
20-Jul: NISER Clerks (http://www.niser.ac.in/drupal_new/)
15-Jul: Jammu Univ. (http://www.cujammu.ac.in//Default.aspx?
option=article&type=single&id=32&mnuid=734&prvtyp=site)
07-Jul: NBCC Building (http://www.nbccindia.com/nbccindia/nroot/njsp/Career.jsp)
01-Jul: NIELIT Deskjobs (http://www.nielit.gov.in/recruitments.aspx)
13-Jun: Bank Note Press (http://www.jobapply.in/bnpdewas/)
30-Jun: Lucknow Law univ. (http://rmlnlu.ac.in/recruitment-notification-process.html)
30-Jun: Rashtriya Sanskrit Sansthan (http://sanskrit.nic.in/advt_22_05_2015.pdf)
25-Jun: Pawan Hans Limited (http://pawanhans.co.in/site/Careern.aspx)
24-Jun: SJVN (PH) (http://sjvn.nic.in/careerdetail.htm?10/jobdetail)

Faculty
31-Jul: IIIT Allahabad (http://www.iiita.ac.in/announcements.php)
20-Jul: Raipur Univ. (http://www.prsu.ac.in:8010/Univ_Req.aspx)
15-Jul: NIT Puducherry (http://www.nitpy.ac.in/assets/teaching.pdf)
16-Jul: RPSC Home Science (http://rpsconline.rajasthan.gov.in/)
15-Jul: Jammu Univ. (http://www.cujammu.ac.in//Default.aspx?
option=article&type=single&id=32&mnuid=734&prvtyp=site)

12-Jul: GBPUAT (http://www.gbpuat.ac.in/)


10-Jul: NITTTR Chandigarh (http://www.nitttrchd.ac.in )
07-Jul: Palampur, Himachal asst. (http://www.ihbt.res.in/recruit/recruitNotice.php)
06-Jul: PEC Chandigarh (http://pec.ac.in/~pecac/new/jobs)
03-Jul: SKHM Government Medical College (http://www.gmcmewat.ac.in)
30-Jun: IIT Roorkee (http://www.iitr.ernet.in/administration/pages/Openings+Faculty.html)
30-Jun: Ambedkar Uni. Delhi (http://aud.ac.in/careerataud)
30-Jun: NEIGRIHMS (http://neigrihms.gov.in)
30-Jun: Lucknow Law (http://rmlnlu.ac.in/recruitment-notification-process.html)
30-Jun: AIIMS Raipur (http://www.aiimsraipur.edu.in/Career.aspx)
28-Jun: Ranchi Agro (http://www.bauranchi.org/application-for-the-post-of-teachers-2/)
22-Jun: DIATPune (http://14.139.111.180/admin.html)
22-Jun: IGIT (http://www.igitsarang.ac.in/careers.php)
22-Jun: Himachal Central Univ. (http://www.cuhimachal.ac.in/job_emp.aspx)

Uniform
19-Jul: Navy Officers (http://www.irfc-nausena.nic.in/hindi/join_indiannavy.htm)
17-Jul: NDA Officers (http://upsconline.nic.in/mainmenu2.php)
15-Jul: Army Dental (23) (http://indianarmy.nic.in)
10-Jul: Army 10+2 (http://joinindianarmy.nic.in/)
30-Jun: BSF Constable (http://bsf.nic.in/en/recruitment.html)
15-Jun: Navy Sailers (SSR) (http://nausena-bharti.nic.in/forthcomingSailor.php)
15-Jun: Daman Diu Constables (http://daman.nic.in/jobs/2015/616-12-05-2015.PDF)

B.Com,CA,HR,MBA
20-Jul: Pawan Hans Audit (http://pawanhans.co.in/site/Careern.aspx)
06-Jul: GBPUAT Accountant (http://www.gbpuat.ac.in/)
01-Jul: NIELIT Accounts (http://www.nielit.gov.in/recruitments.aspx)
25-Jun: MP Electricity Accounts
(https://www.mponline.gov.in/Portal/Services/Recruit_MPKVV/Indore/notification.aspx)
21-Jun: Lucknow Metro Accounts

(https://www.digialm.com/EForms/html/form2399/index.html)

RESULT /MARKSHEET
SSC 2014 T2
NCLAT
Hotel Management

TENTATIVE NOTIFICATIONS
IAS-IPS-IFoS: 16 May
IES: 7 Feb
SSC CGL: 2 May
SSC 10+2: 6 June
SSC Sub insp: 28 Mar
CAT: Aug 2015
RBI Officer / Assistant: ??
IBPS PO / Clerk / RRB: ??
ACIO 2015: ??

1. Online Form Part-I stops few days before deadline, so don't wait till last date. Dont forget
reg.id & roll no.Note'em in Google Drive (https://www.google.com/drive/)
2. I usually update vacancies every Monday.Purple link= newly added,Blue= existing.Last
updated Mon. Jun 22, at 9:04PM

(https://plus.google.com/10945534686828
(http://feedburner.google.c

(https://www.facebook.com/Mrunal.org)
(https://twitter.com/mrunal_patel)
rel=author)
(http://www.youtube.com/user/The
uri=CivilServiceExam)
HOME (HTTP://MRUNAL.ORG/) / ECONOMY (HTTP://MRUNAL.ORG/ECONOMY)
/ DOWNLOAD (HTTP://MRUNAL.ORG/DOWNLOAD) / CONTACT ME (HTTP://MRUNAL.ORG/CONTACT)
The work of Mrunal (http://mrunal.org/) is under the Creative Commons Attribution-Non Commercial-ShareAlike 4.0
License (http://creativecommons.org/licenses/by-nc-sa/4.0/deed.en_US).Permissions beyond the scope of this license
may be available at Mrunal.org/contact (http://mrunal.org/contact).

(http://www.alexa.com/data/details/main?url=http://mrunal.org)

Vous aimerez peut-être aussi