This is merely a subtype of Time n Work problems. and can be solved using our good ol STD
table Method.
1.
2.
3.
Speed
Time
1 Man
1 Woman
4m+6w
3m+7w
10
distance
Distance covered in each column is same.
So compare last two columns
Distance = distance
Speed x time = speed x time
(4m+6w)*8=(3m+7w)*10
Solve this equation and you get m=11w
Replace this value of w in last column
Speed
1 Man
1 Woman
4m+6w
3(11w)+7w
10
Time
distance
3(11w)+7w
=33w+7w
=40w
Speed
1 Man
1 Woman
4m+6w
40w
10
Time
distance
Speed
1 Man
1 Woman
10 women
4m+6w
40w
10w
10
??
400w
Time
distance
10w x time =400w
Time =400w/ 10w=40days.
Answer: If 10 women work together, itll take 40 days to finish the job.
12 Man
15 Woman
Speed
12m
15w
Time
distance
Distance covered in both column is same so compare them
15 Woman
6men
Speed
12m
15w
6x (5/4)w
Time
60w
6x (5/4)w x2=15w
distance
As you can see, Ive applied STD formula in last two columns to find distance simultaneously.
Remaining work=60w minus 15w=45w
Required: we want to finish this work in 3 days.
Asked: How many women should be put on the job to complete the remaining work, if it is to
be completed in 3 days?
Make a new column. Suppose we need F number of women so speed = f x w = Fw.
12 Man
15 Woman
6men
Find women
Speed
12m
15w
6x (5/4)w
Fw
Time
60w
15w
45w
Distance
Time limit is given to us: complete remaining work in three days. So t=3 for last column.
Run STD on last column
Fw x 3 =45w
F=45w /3w
F=15
Answer : 15 women required.
Important: Remaining work is to be completed in 3 days. So t=3
If they had asked total work is to be completed in 3 days, well need to take t=1, because those
men already worked for 2 days to only 1 day left to complete the job (2+1=3 days)
12 kids
8 men
Speed
12k
8m
Time
16
12
Distance
Since work done in both columns is same
Speed x time = speed x time
12k x 16= 8m x 12
K=(1/2)m
Concentrate on middle column (8 men) run STD table on it. You get distance = 8m x 12 =96m
So total distance to be covered is 48m
Given: Sixteen adults started working and after three days .
Means 16 men worked for 3 days.
12 kids
8 men
16 men
Speed
12k
8m
16m
Time
16
12
8m x 12=96m
16m x 3=48m
Distance
Weve run STD on last column and got that 16 men covered 48m kms.
So remaining work is 96m minus 48m=48m
Given: after three days ten adults left and four children joined them
So now men left =16 minus 10 =6 men and 4 kids joins them so speed is 6m+4k
Make a new column
12 kids
8 men
16 men
Speed
12k
8m
16m
6m+4k
Time
16
12
??
96m
48m
48m
Distance
Run STD on last column
(6m+4k) x time =48m
Mrunal recommends
(http://mrunal.org/2014/06/studyplan-csat-aptitude-paper-2-comprehensionreasoning-analysis-previous-papers-free-studymaterial-cutoffs-part-1-2.html)
[Reasoning] Calendar Questions: Finding day or date, concepts, shortcuts
explained (http://mrunal.org/2013/08/reasoning-calendar-questions-findingday-or-date-concepts-shortcuts-explained.html)
[Trigonometry] Finding Minimum Maximum Values for SSC CGL Made Easy
without differentiation (http://mrunal.org/2013/07/trigonometry-findingminimum-maximum-values-for-ssc-cgl-made-easy-withoutdifferentiation.html)
Print | PDF (need Chrome) (http://mrunal.org/2012/05/aptitude-time-n-work-4men-and-6-women.html/print/)
Get notified whenever I post new article!
(http://feedburner.google.com/fb/a/mailverify?uri=CivilServiceExam)
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=217867#RESPOND)
sunny kumar
kindly help with below questionmy answer- 48.
actual answer-24
twenty four men can complete a work in 16 days.
thirty two women can complete the same work in 24 days.
sixteen men & sixteen women started working and worked for twelve
days
how many more men are to be added to complete the remaining work in
2 days?
thanks.
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=217882#RESPOND)
diptanshu gaur
hey sunny 24 is the correct answer actually i use a different
method for time & work questions acc. to my method 24 men
finish the job in 16 days and 32 women did it in 24 days first take
lcm of 16 and 24 as their respective speed to do the work ie: 48 (let
48 as total work that needs to be done) if we divide 48 by 16 then it
is 3 thats the speed of 24 men in a day n same for women 2 is the
speed now what will be the speed of 16 men that will be 2 because
24 and 16 divisible by 8 so speed of 8 men will be 1 16=2 & 24=3
same for women speed will be 16=1. the work has to be finished
within 14 days if 16 men work for 14 days the total work done by
them will be 28 becoz speed is 2 & women will do 14 work becoz
speed is 1 now total work done=42 remaining 6 that is to be done
so if 24 men can do 3 work in one day they will do 6 in two days so
the remaining 6 they will contribute after 6 days. question is asking
how main additional men required as well as other will also work
for 2 days thankyou.
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=324443#RESPOND)
SANDHYA
hii Sunny,
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=217883#RESPOND)
Aanya
Correct ans 24.
1 mans 1 day work =1/16*24, for woman its 1/32*24
16 men 12 day work=16*12/16*24=1/2
16 women 12days work=16*12/32*24=1/4
Total completed work in 12 days=3/4
Rest work=1/4
16 men+ 16 women 1 day work= 16/16*24 + 16/32*24= 1/24+1/48=1/16
Their 2 days work=1/8
Extra men needed to complete the work=1/4-1/8= 1/8 in 2 days means
1/16 in one day
24 men can complete a work in 16 days means their 1 day work 1/16, so
we need 24 men.
In writing it seems long but very quick when we actually solve!
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=217885#RESPOND)
24*16=32*24
i.e.
1M=2F
so,
16M+16F=24M
find remaining work
i.e 1- (12/16)=1/4th work remains
now
work- 1/4
men- 24
days- 2
use relation WMT
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=217886#RESPOND)
Ans is 24 men
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=217988#RESPOND)
sunny kumar
Thanks Sankalp!
But could you plz help me with my solution given belowafter M=2F OR F=M/2
So, 8M + 16M
24M *12 = 288M- Work done by 16M + 16F
Work left to be done= (16*24M)- 288M
= 96M
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=218022#RESPOND)
Ashitha
48 is required for remaining work is right. So men
added is 48-24 = 24. Bcoz 24 are already working
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=245094#RESPOND)
jose
good job
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=218028#RESPOND)
sunny kumar
am also getting 48 as answer but the book m reffering, says 24.
one more problem-
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=218083#RESPOND)
Virender Batra
36 days
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=218091#RESPOND)
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=339246#RESPOND)
ABCD
36 Days
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=220507#RESPOND)
Garima
Kindly help How to solve this type of Ques.
8 Men complete the work in 12 days. 4 Women can complete the same
work in 48 days while 10 children can complete same work in 24 days. In
how many days 10 Men,4 Women & 10 Children complete the work?
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=227462#RESPOND)
ANZ
6 days
Am i correct.??
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=339247#RESPOND)
ABCD
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=221659#RESPOND)
ashitha
its 48 required for the remaining work but 24 men already working so 24
more required
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=235932#RESPOND)
Kanwaljeet Singh
24 is the correct answer.16 men are already working so 40-16= 24
ans
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=242324#RESPOND)
shakti
1. 12 men take 18 days to complete a job where as 12 women in 18 days
can com. 3/4th of the same job. how many days will 10m and 8 w
together take to complete the same job?
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=339245#RESPOND)
ABCD
13 1/2 or 27/2 Days
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=251367#RESPOND)
shivagi
hi sankalp
i want to ask how do u find work in the question asked by sunny kumar?
i mean, i was doing it by very long multiplication 24men*16 days= 384
m
n u did sumthing like 1- 12/16 = 1/4
so where does this 12/16 came from.
how did u find the remaining work in jus 2 simple steps?
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=252631#RESPOND)
SRaman
can anyone solve this problem in STD method..
6Men can complete apiece of work in 12 days. 8women can complete the
same piece of work in 18 days, whereas 18 children can complete the
piece of work in 10 days. 4men, 12 women and 20 children work
together for 2 days. if only men were to complete the remaining work in
1 day. how many men would be required totally ?
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=267907#RESPOND)
Sanju
Ans 24 men a???
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=339243#RESPOND)
ABCD
36 Days
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=252882#RESPOND)
RAJBALA
a completes a piece of work in 30 days . b and c can complets the same
work in 40 days simultaneously and a and b can do the same work in 48
days. in how many days can c do the whole work alone?
plzz solve this
m confused?
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=263403#RESPOND)
ashish kumar
15 man and 15 women divided in 15 groups.how many rules to divided
when each groups have 1 man and 1 women?
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=275623#RESPOND)
jeetendra kumar
plz
provide solution of this question
if 5 man and 9 woman do work in 19 days .than 6 man and 3 woman
how much complete the work?
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=276881#RESPOND)
Raaz
A piece of work can be done by 3 men and 4 woman in6 days and 3 men
and 1 woman in 8 days and by 4 boys and 8 woman in 5 days. how long
does one boy take to complete the work single handed??
plzz give full solution!!
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=294123#RESPOND)
preethi
three men can complete a piece of work in 18 days.6 boys also complete
the same work in 18 days..how many days if 4 men and 4 boys together
to finish the same work?please help for this question to answer in easy
way
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=339241#RESPOND)
ABCD
9 Days
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=311545#RESPOND)
Parth
7 men can complete a piece of work in 12 days. How many additional
men will be required to complete double the work in 8 days?
pls give me answer with proper steps..
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=325130#RESPOND)
Anas M
You are the best teacher..
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=325404#RESPOND)
varsha
A and B work together in 5 days..A use double efficiency and B use half
efficiency and finish the work in 4 days togetherly.in how many days A
alone can finish. the work..sir pls.give me answer
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=325411#RESPOND)
var
12 days-1work-7men
8days-2work-let x more man
X/7=12/8*2/1
21men
We hv already 7 men so required 21-7= 14 men more
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=325521#RESPOND)
anand prasad
A,B,C can complete a work in 24, 52,64 day respectively if they start the
work togather and after 6 day a leave the work and b leave the work
before 6 day to complete the work.in how many day work will complete
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=335807#RESPOND)
Kundan
Find the amount of rupees 2500 invested at 12% during the period from
4th feb 2014 to april 2015 ? Anyone ??
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=335982#RESPOND)
saurabh
6 men and 11 women can complete a work in 30 days. 4 men and 6
women can complete the same work in 50 days.find in how many days
10 men, 5 woman and 10 children can do the same work of each women
I twice as efficient as a child?
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=338124#RESPOND)
siddharth
If 6 men and 8 boys can do a piece of work in 10 days while 26 men and
48 boys can do the same in 2 days, the time taken by 15 men and 20
boys in doing the same type of work will be
A. 4 days B. 5 days
C. 6 days D. 7 days
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=338126#RESPOND)
siddharth
If 6 men and 8 boys can do a piece of work in 10 days while 26 men and
48 boys can do the same in 2 days, the time taken by 15 men and 20
boys in doing the same type of work will be
A. 4 days B. 5 days
C. 6 days D. 7 days by std method please explain me i have made the
table but the problem is i did not getting the concept to get the total
distance covered in the end column case
m=2b by putting all in the equations we get 50b in 15m+20b case
, 18b in 6m+8b case and 52b in 26m+48b case what to to
next always struck in getting the total distance for last column
REPLY (/2012/05/APTITUDE-TIME-N-WORK-4-MEN-AND-6-WOMEN.HTML?
REPLYTOCOM=340057#RESPOND)
Vaibhav
12 men nd 8 women can do a price of work in 16 days, while 13 men nd
1 woman can do it in 18 days.
How long will 13 men nd 12 women take to finish the work?
Previous (http://mrunal.org/2012/05/aptitude-time-n-work-4-men-and-6women.html/comment-page-1#comments)
1 (http://mrunal.org/2012/05/aptitude-timen-work-4-men-and-6-women.html/comment-page-1#comments)
2
Name?
Email ID?
What is your Message? Search before asking questions & confine discussions to exams
related matter only.
Post Message
Search B4 Asking
Type n Press Enter
4 Days : CMS-15
18 Days : CAPF-15
46 Days : SSC CGL15
60 Days : CSAT-15
101 Days : IBPS-PO-15
164 : IBPS-Clerk-15
177 Days : Mains-15
Recent Comments
DEVENDER { Mrunal, what about may, June current affairs series?? } [Economy Lecture]
GS2: UNFCCC Lima Summit, Paris Summit Post-2020... (http://mrunal.org/2015/06/economylecture-paris-summit-post-2020-climate-finance-framework.html/comment-page1#comment-340678)
ABHISHEK { now how many lecture still remain to complete the economic lecture. sir please
discuss } [Economy Lecture] GS2: UNFCCC Lima Summit, Paris Summit Post-2020...
(http://mrunal.org/2015/06/economy-lecture-paris-summit-post-2020-climate-financeframework.html/comment-page-1#comment-340641)
ISHU { THANKUUUUUU..SO MUCH SIR.. my economics was not so good and i have fear for that
but after listening to ur lectures all doubts are clear.... } [Economy Lecture] GS2: UNFCCC Lima
DWARIKA { in composition of the interior of the earth need updation in part of crust property
you are mentioned potassium is lowest in earth's crust ,... } [Geography Lecture1] Longitude,
ANN { Thanks for the MCQs on IYB :) } [Mock Test #3] India Yearbook Chapter 1 to 12:...
(http://mrunal.org/2015/06/upsc-mock-test-paper-1-india-yearbook.html/comment-page1#comment-340565)
VIMAL { product of two number is 600.Lcm of thease number 10.What is the HCF of those two
number? } [Aptitude] LCM, HCF, GCD: Basic concept, calculation, applications explained
(http://mrunal.org/2013/03/aptitude-lcm-hcf-gcd-basic-concept-calculation-applicationsexplained.html/comment-page-2#comment-340559)
HARSHADNARKAR { What is your Message? Search before asking questions & confine
discussions to exams related matter only. sir,history lectures kab honge. } [Economy Lecture]
JOHNSSWARGIARY { ist true that double the money plz ans me } [Financial Inclusion]
Kisan Vikas Patra (KVP): Features, Money Laundering,... (http://mrunal.org/2014/12/kisanvikas-patra-kvp-features-money-laundering-black-money-tax-benefit.html/comment-page1#comment-340548)
NAVEEN { Prateek even i got.....291 marks.....what about the reserved list??? Whts the
procedure?? } [CAPF-2014] Final result out, 105 selected, marksheets in 15...
(http://mrunal.org/2015/02/upsc-capf-2014-final-result-marksheet.html/comment-page2#comment-340545)
Vacancies
Entire List shifted to bottom. Scroll down
(http://www.alexa.com/siteinfo/mrunal.org)
Mega Jobs
23-Jul: IBPS Rural PO & Asst. (http://ibps.in/html/cwe_rrb.htm)
17-Aug: IGNOU PG Admission (https://onlineadmission.ignou.ac.in/Login.aspx)
17-Jul: NDA Officers (http://upsconline.nic.in/mainmenu2.php)
13-Jul: SSC 10+2 (http://www.ssconline.nic.in/)
09-Jul: APFC Provident Fund Comm.
(http://www.upsc.gov.in/recruitment/advt/2015/Spl.Advt.52-15%20Web%20Cell.pdf)
09-Jul: Punjab Corp Engineer (http://202.164.52.147/serv1/docs/dysecyrect121017527.pdf)
09-Jul: Punjab Corp Clerks (http://202.164.52.147/serv1/docs/dysecyrect121017527.pdf)
07-Jul: RBI Assistants (504) (https://opportunities.rbi.org.in/Scripts/bs_viewcontent.aspx?
Id=3024#AN)
02-Jul: FCI MT (1Lakh Bond,3yr) (https://fcijobsportal.com/fcimt2015/pages/index.aspx)
01-Jul: Haryana Health Services (http://haryanahealth.nic.in/)
Rural Banks
23-Jul: IBPS Rural PO & Asst. (http://ibps.in/html/cwe_rrb.htm)
25-Jun: Odisha Gramya (http://www.odishabank.in/Recruitment.aspx)
25-Jun: Assam Gramin (http://www.agvbank.co.in/recruitment.php)
24-Jun: Haryana Gramin Bank PO (http://www.shgb.co.in/RecruitmentsandPromotions)
IT Jobs
20-Jul: CDAC Noida (http://www.cdac.in/index.aspx?id=ca_noida_may_2015)
Engineers
02-Jul: BEL Ghaziabad (http://bel-india.com/recruitment)
02-Jul: ISRO Scientists (http://isro.gov.in/careers)
02-Jul: FCI Engg.Trainee (http://www.fcijobsportal.com)
30-Jun: Hindustan Latex Biomed. Engg (300) (http://www.hlfppt.org/)
26-Jun: RBI JE (https://rbi.org.in/scripts/Bs_viewcontent.aspx?Id=3020)
26-Jun: Bharat Dynamics (http://bdl.ap.nic.in/bdlrecruit.htm)
25-Jun: Raipur Civil Engg (http://www.aiimsraipur.edu.in/Career.aspx)
25-Jun: MP Electricity
(https://www.mponline.gov.in/Portal/Services/Recruit_MPKVV/Indore/notification.aspx)
24-Jun: KRIBHCO Noida (http://kribhco.indiainformative.com/Post4.aspx)
Legal
Specialists
31-Jul: IIIT Allahabad Gr. A & B (http://www.iiita.ac.in/announcements.php)
20-Jul: State Trading corp. (http://www.stc.gov.in/careers/current-openings.aspx)
20-Jul: NISER APO (http://www.niser.ac.in/drupal_new/)
15-Jul: Jammu Univ. (http://www.cujammu.ac.in//Default.aspx?
option=article&type=single&id=32&mnuid=734&prvtyp=site)
15-Jul: MoEF Scientists (http://envfor.nic.in/advertisements)
09-Jul: Allahabad Bank (https://www.allahabadbank.in/english/Recruitment.aspx)
12-Jul: Mumbai Metro (https://mmrda.maharashtra.gov.in/tenders-notices)
12-Jul: GBPUAT (http://www.gbpuat.ac.in/)
09-Jul: Punjab Corp Law (http://202.164.52.147/serv1/docs/dysecyrect121017527.pdf)
07-Jul: NBCC Building (http://www.nbccindia.com/nbccindia/nroot/njsp/Career.jsp)
01-Jul: NIELIT Spec. (http://www.nielit.gov.in/recruitments.aspx)
30-Jun: Rajendra Agro. (http://www.mangaldhwani.com/pusa/wpcontent/uploads/2014/09/Advt_-01_2015.pdf )
30-Jun: IIT Kanpur (http://www.iitk.ac.in/new/vacancies-in-administrative-and-technicalcadre )
28-Jun: ONGC Rajbhasha (NET)
(http://ongcindia.ongc.co.in/wps/wcm/connect/ongcindia/home/career/recruitment+notices/recru
of-olo-2015)
25-Jun: Raj. Industrial Development (http://www.riicorecruitment.org/)
25-Jun: HSCC Noida (http://www.hsccltd.com/)
24-Jun: Haryana Gramin Agro (http://www.shgb.co.in/RecruitmentsandPromotions)
24-Jun: Haryana Gramin Law Officer (http://www.shgb.co.in/RecruitmentsandPromotions)
Medics
14-Jul: MP medical officer (http://www.mppsc.nic.in/)
30-Jun: HAL Medical officer (http://www.halindia.com/Common/Uploads/Resumes/144_CareerPDF1_Med-advt-AC.pdf)
ParaMedics
Not At the moment
Deskjobs
05-Aug: NBE Assistants (http://natboard.edu.in)
31-Jul: IIIT Allahabad Gr.C (http://www.iiita.ac.in/announcements.php)
20-Jul: NISER Clerks (http://www.niser.ac.in/drupal_new/)
15-Jul: Jammu Univ. (http://www.cujammu.ac.in//Default.aspx?
option=article&type=single&id=32&mnuid=734&prvtyp=site)
07-Jul: NBCC Building (http://www.nbccindia.com/nbccindia/nroot/njsp/Career.jsp)
01-Jul: NIELIT Deskjobs (http://www.nielit.gov.in/recruitments.aspx)
13-Jun: Bank Note Press (http://www.jobapply.in/bnpdewas/)
30-Jun: Lucknow Law univ. (http://rmlnlu.ac.in/recruitment-notification-process.html)
30-Jun: Rashtriya Sanskrit Sansthan (http://sanskrit.nic.in/advt_22_05_2015.pdf)
25-Jun: Pawan Hans Limited (http://pawanhans.co.in/site/Careern.aspx)
24-Jun: SJVN (PH) (http://sjvn.nic.in/careerdetail.htm?10/jobdetail)
Faculty
31-Jul: IIIT Allahabad (http://www.iiita.ac.in/announcements.php)
20-Jul: Raipur Univ. (http://www.prsu.ac.in:8010/Univ_Req.aspx)
15-Jul: NIT Puducherry (http://www.nitpy.ac.in/assets/teaching.pdf)
16-Jul: RPSC Home Science (http://rpsconline.rajasthan.gov.in/)
15-Jul: Jammu Univ. (http://www.cujammu.ac.in//Default.aspx?
option=article&type=single&id=32&mnuid=734&prvtyp=site)
12-Jul: GBPUAT (http://www.gbpuat.ac.in/)
10-Jul: NITTTR Chandigarh (http://www.nitttrchd.ac.in )
07-Jul: Palampur, Himachal asst. (http://www.ihbt.res.in/recruit/recruitNotice.php)
06-Jul: PEC Chandigarh (http://pec.ac.in/~pecac/new/jobs)
03-Jul: SKHM Government Medical College (http://www.gmcmewat.ac.in)
30-Jun: IIT Roorkee (http://www.iitr.ernet.in/administration/pages/Openings+Faculty.html)
Uniform
19-Jul: Navy Officers (http://www.irfc-nausena.nic.in/hindi/join_indiannavy.htm)
17-Jul: NDA Officers (http://upsconline.nic.in/mainmenu2.php)
15-Jul: Army Dental (23) (http://indianarmy.nic.in)
10-Jul: Army 10+2 (http://joinindianarmy.nic.in/)
30-Jun: BSF Constable (http://bsf.nic.in/en/recruitment.html)
15-Jun: Navy Sailers (SSR) (http://nausena-bharti.nic.in/forthcomingSailor.php)
15-Jun: Daman Diu Constables (http://daman.nic.in/jobs/2015/616-12-05-2015.PDF)
B.Com,CA,HR,MBA
20-Jul: Pawan Hans Audit (http://pawanhans.co.in/site/Careern.aspx)
06-Jul: GBPUAT Accountant (http://www.gbpuat.ac.in/)
01-Jul: NIELIT Accounts (http://www.nielit.gov.in/recruitments.aspx)
25-Jun: MP Electricity Accounts
(https://www.mponline.gov.in/Portal/Services/Recruit_MPKVV/Indore/notification.aspx)
21-Jun: Lucknow Metro Accounts
(https://www.digialm.com/EForms/html/form2399/index.html)
RESULT /MARKSHEET
SSC 2014 T2
NCLAT
Hotel Management
TENTATIVE NOTIFICATIONS
IAS-IPS-IFoS: 16 May
IES: 7 Feb
SSC CGL: 2 May
SSC 10+2: 6 June
SSC Sub insp: 28 Mar
CAT: Aug 2015
RBI Officer / Assistant: ??
IBPS PO / Clerk / RRB: ??
ACIO 2015: ??
1. Online Form Part-I stops few days before deadline, so don't wait till last date. Dont forget
reg.id & roll no.Note'em in Google Drive (https://www.google.com/drive/)
2. I usually update vacancies every Monday.Purple link= newly added,Blue= existing.Last
updated Mon. Jun 22, at 9:04PM
(https://plus.google.com/10945534686828
(http://feedburner.google.c
(https://www.facebook.com/Mrunal.org)
(https://twitter.com/mrunal_patel)
rel=author)
(http://www.youtube.com/user/The
uri=CivilServiceExam)
HOME (HTTP://MRUNAL.ORG/) / ECONOMY (HTTP://MRUNAL.ORG/ECONOMY)
/ DOWNLOAD (HTTP://MRUNAL.ORG/DOWNLOAD) / CONTACT ME (HTTP://MRUNAL.ORG/CONTACT)
The work of Mrunal (http://mrunal.org/) is under the Creative Commons Attribution-Non Commercial-ShareAlike 4.0
License (http://creativecommons.org/licenses/by-nc-sa/4.0/deed.en_US).Permissions beyond the scope of this license
may be available at Mrunal.org/contact (http://mrunal.org/contact).
(http://www.alexa.com/data/details/main?url=http://mrunal.org)