This report tells us about the existing problems in the industry that have serious impact on the
production, quality, turnover, safety to the workers. We had done a full analysis of industry in
the last 15 days and highlighted the problem which have serious effect. It is necessary to
identify the elements of problem in the industry, by eliminating them we can make the best
use of human resource, increase the turnover, increases the production rate increases the
quality of products, lower the costs and make them long lasting or durable.
By eliminating these problems we can make the industry reach to new heights. In this report
we had identified the problems by taking in the mental picture of the industry in the ideal
case where production rate, turnover, quality are fully optimized. After taking into account
the ideal case we have identified what are the problems that are to be eliminated to make the
industry reach those ideal heights.
Lets move further in our problem exploration and see what are the problems existing in the
industry economic system.
machines to be placed in industry. Below is a picture showing the storage conditions in the
industry.
4. Problem in fitting - a major problem is fitting of parts with screws. The screws doesnt fit
into the thread hole of box or the part.
5. Fitting of parts takes more time The fitting takes more time as it is done manually.I f it
is done by automatic screwdrivers there will be more time saved.
6. High cost of production This is part of problem of low turnover, low turnover may be
caused due to high cost of production such as costly material, unifunctional dies, more
electricity consumed, high inventory maintenance etc.
7. Difference in the quality of parts A low turnover of the industry may also be due to low
or different quality of different parts, like some operations are done with help of labor so
there is discrepancy in the parts which results in the quality failure.
8. Inventory maintenance due to negligence some extra parts are produced and thus it
results in inventory maintenance. For e.g. 210 inner parts are produces in a day, 200 outer is
produced on other day and 203 boxes are produces. After assembling we are left with10 inner
part and 3 boxes. This will make an increase in the inventory which will increase the
maintenance cost.
9. Problem to new workers in making the parts new workers cannot identify the
measurements of parts quickly and hence cannot make parts easily.
CONCLUSIONS
In this session we had identified the myriad problems which the industry is facing today and
will obtain or design the ways to remove them and make the economy of the industry to
revive again. In the next report we will deal with the problems and methods of how to remove
them to make the industry more fruitful to the economy.