x Installation on Windows 7
November 2014
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
www.managementyogi.blogspot.in
Page 1 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
Table of Contents
1. Downloading Primavera Professional R 8.3.x
2. Installing .NET framework, Java and DHTML
3. Installing Primavera P6 Professional R8.3.x
4. Installing Oracle XE
5. Execution of Database Script for Permission
6. Configuring Primavera P6 Database and its Users
7. Configuring Primavera P6 PMDB Database
8. Launching Primavera P6
9. Setting Up Primavera P6
www.managementyogi.blogspot.in
Page 2 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
T
O
P
3. Select the Product Pack and your OS and then select Go.
www.managementyogi.blogspot.in
Page 3 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
4. Select the following file, which will be listed when you said Go.
5. When you download the Primavera Application, you will have this file for
Version 8.3 V43395-01.zip
6. Copy this file to C: drive and unzip it. A folder P6_R83_Client_Applications
will be created
Note: Your file numbering may be different. But go ahead with your number.
7. Select the setup.exe for installation under this folder: C:\
P6_R83_Client_Applications
www.managementyogi.blogspot.in
Page 4 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
T
O
P
Note: If they are already installed in your computer, the below message wont be
popped up.
8. New message will be popped up. Accept it. If you have already installed
Microsoft .NET Framework 4 (x86 and x64), then it wont be shown to you.
9. It will ask to a Java Runtime Environment for 7.0 and the package comes bundled
with Java. Accept and install. If you have already version of Java 7 installed, then
it will not be needed.
www.managementyogi.blogspot.in
Page 5 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
11. Next it will ask for installation of Java. Go ahead and do it.
Next it will install the .NET framework (if it is not already installed)
www.managementyogi.blogspot.in
Page 6 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
T
O
P
14. Create a Password and supply it in the below dialog box. Remember this
password as this will be used in other places.
Satya Narayan Dash
www.managementyogi.blogspot.in
Page 7 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
Sample data is helpful. A number of Sample Projects will be available for your use,
which you can reference and use it for your understanding of Primavera P6. Now Click
Next.
www.managementyogi.blogspot.in
Page 8 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
www.managementyogi.blogspot.in
Page 9 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
www.managementyogi.blogspot.in
Page 10 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
T
O
P
18. Now it will install the Oracle database (Oracle XE) in the backend. This comes
bundled with package for Primavera.
THIS WILL TAKE A LONG TIME. SO HAVE PATIENCE.
www.managementyogi.blogspot.in
Page 11 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
22. After installation, few software would have been installed along with Oracle
Primavera Professional R8.3.x. These can be checked from Control Panel
Programs Programs and Features.
www.managementyogi.blogspot.in
Page 12 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
T
O
P
25. Select the dbsetup.bat to run. Use the default options in the popped up screen and
select Next.
26. Use the password created for Primavera System in Sub-step 14 and provide the
database name as XE.
www.managementyogi.blogspot.in
Page 13 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
27. In a default setting of a Windows 7 system, you will get this error.
www.managementyogi.blogspot.in
Page 14 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
If you have sqlplus.exe installed in any other directory, select that one in you path
for the command.
31. Now, we have to execute manual_script_before_install.sql script from the
SQL> prompt, execution of which was failing earlier.
@C:\database\scripts\install\PPM_08_03_00\manual_script_before_install.sql
It should say message that grant succeeded as shown below.
www.managementyogi.blogspot.in
Page 15 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
33. Select the default options and select Create for creation of Oracle Tablespaces and
click Create.
www.managementyogi.blogspot.in
Page 16 of 26
T
O
P
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
35. Create the various Oracle users with the user names and passwords. A simple
tactics can be to give same username and pass. Click Next.
www.managementyogi.blogspot.in
Page 17 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
36. In the next screen given admin as password, which is the default one. This is for
the Application User. Click on Install.
37. It will create the Oracle users, Grant the needed privileges, Create the needed
tables, Load the sample data, Create remaining database objects and Initialize
background jobs:
www.managementyogi.blogspot.in
Page 18 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
38. In the upcoming Finish, click on Finish. The needed database configuration for
Primavera is now complete!
www.managementyogi.blogspot.in
Page 19 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
41. Configuration option is available in the drop Database area, highlighted in the
screen in sub-step 40, in red square.
www.managementyogi.blogspot.in
Page 20 of 26
T
O
P
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
42. Now give the user name and password both as privuser. This has been already
established configuration for PMDB database. You can use other names.
Click Next.
www.managementyogi.blogspot.in
Page 21 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
www.managementyogi.blogspot.in
Page 22 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
www.managementyogi.blogspot.in
Page 23 of 26
T
O
P
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
T
O
P
46. Select Admin Admin Preferences and select Industry. Set your industry. It
will remove the error message displayed in Sub Step 44.
You can select the Industry you are in, which can be Engineering & Construction
or Government, Aerospace etc.
47. Go to Edit User Preferences and select Applications under it.
Ensure that the checkbox Show the Welcome dialog at startup is selected.
When Primavera opens up next, you will have many options to choose from.
48. Set currency
From Edit User Preferences, set your currency.
www.managementyogi.blogspot.in
Page 24 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
49. To set the Time Units, use Edit User Preferences Time Units, as shown below.
You can have your default units a day or week or month level. By default, it is for
Days, which is widely used.
50. You can set different formats for Dates, use Edit User Preferences Dates. I
prefer the followings which is highlighted in Red.
www.managementyogi.blogspot.in
Page 25 of 26
Primavera P6 on Windows 7
www.managementyogi.blogspot.in
*******
For more on Oracle Primavera P6 R8.x articles,