Académique Documents
Professionnel Documents
Culture Documents
CONTACT US
SHOW ROOM
553 Highway 13
Hiep Binh Phuoc
Ward
Thu Duc District
Ho Chi Minh City
Tel
08 5422 6238
(Korean)
08 5422 6267
08 5403 7192
(Vietnamese)
Fax
08 5422 6237
Email
formaply@naver.com
FORMAPLY TRUSS BEAM
INDEX
PURPOSE OF DEVELOPMENT
PRODUCT CONFIGURATION
FEATURES OF PRODUCT
CONCLUSION
A PANORAMA OF PRODUCT INSTALLATION
SECTION DRAWING OF INSTALLATION
TRUSS BEAM
TRUSS BEAM
필라용 SUPPORT
Fillar Support
EXAMPLE DRAWING OF INSTALLATION
TRUSSBEAM
SUPPORT
PURPOSE OF DEVELOPMENT
• To solve these problems, several methods of AL-FORM SYSTEM & N.S FORM
and others were tried, but to create another problems of schedule delay and hi
aditional work method generate quality and safety problems due to leveling of
That’s why our company started to develop “TRUSS BEAM FOR SLAB ”
•ENHANCING QUALITY
•WORKABILITY
Control bar
4.5M 4.37~4.63M 5.5M Within 0.7M 25Kg 5-6mm
(o)
Control bar
4.0M 3.87~4.13M 5.0M Within 0.8M 22Kg 4-6mm
(o)
Control bar
3.5M 3.37~3.63M 4.5M Within 0.9M 18Kg 3-5mm
(o)
Control bar
3.0M 2.87~3.13M 4.0M Within 0.9M 15Kg 2-4mm
(o)
Control bar
2.5M 2.5M 3.1M Within 1.0M 12Kg 1-3mm
(o)
Control bar
2.0M 2.0M 2.6M Within 1.0M 10Kg 1-2mm
(x)
FIXED BOLT FOR SUPPORT THE MAIN BODY
Easy curing
INSTALLATION OF INSIDE BREAST WALL FORM INSTALLATION OF SUPPORT & TRUSS BEAM
DRAFT OF EXECUTION STANDARD
Design Framework
(Determined Dimensions Of Truss And Spaces)
REVIEW ECONOMICS
• Reduce Used Quantity Of Support • Reduce Manpower For Wood Work Remarkably
• Secure Safety During Slab Work • Prevent Falling Risk Of Worker In Both Ends Parts
GENERAL REMARKS AND FURTHER SUBJECTS
Various advantages of quality, cost and process by applying truss beams can be c
onfirmed to using existent method. Based on this, not only short term but also co CONTACT US
ntinuous application of this can make possible to standardize framed structure an
SHOW ROOM
d to accumulate and increase reducing effect of cost down. 553 Highway 13
Hiep Binh Phuoc
Ward
Currently, total work schedule is shortened by framed structure schedule (6 days
Thu Duc District
Cycle) and application of finish TACT. Ho Chi Minh City
Herein, major point to shorten work schedule is how much early finish work can b
e input. Major impact on input of finish work in building APT is quick lift of heavy Tel
material. 08 5422 6238
(Korean)
Considering conveying of bricks start after installing hoist and stacking work of 8 08 5422 6267
~10 floors is completed, work schedule can be shortened by using truss beam, b 08 5403 7192
(Vietnamese)
ecause that TACT method of narrowed space can be applied by securing lower sp Fax
ace of truss beam to store material earlier. 08 5422 6237
Email
formaply@naver.com
FORMAPLY TRUSS BEAM Thank You