Activity ID
Activity Name
Original Start
Duration
SEWER EXTENS
EXTENSION & HOUSE CONNECTIONS-AL JAZEERA/QATAR TELEVIS
PRELIMINARIES
Finish
Total Pocess
Delays
-184
-184
P1000
Project start
0 25-May-14 A
P1020
Project documentation
15 25-May-14 A 10-Jun-14 A
P1030
15 25-May-14 A 10-Jun-14 A
P1090
Mobilisation
30 25-May-14 A 28-Jun-14 A
-15
P1021
30 25-May-14 A 28-Jun-14 A
P1022
30 25-May-14 A 28-Jun-14 A
P1100
Surveying work
P1110
Dewatering
203 29-Jun-14 A
01-Mar-15 A
-62
P1120
215 29-Jun-14 A
15-Mar-15 A
-74
P1130
Revised Programme 02
P1080
Safety measures
-114
P1040
271 11-Jun-14 A
02-May-15 A
-115
P1050
271 11-Jun-14 A
02-May-15 A
-115
P1060
Testing of work
271 11-Jun-14 A
02-May-15 A
-115
P1070
Testing of materials
271 11-Jun-14 A
02-May-15 A
-115
P1010
Project finish
22-Jun-15 A
-183
0 12-Jul-14 A
12-Jul-14 A
SI-2
2015
Feb
Jun
Jul
0 12-Jul-14 A
SI-1
RC.1010
Changing VC pipe dia for 62% of scope (453 lm) from 200 mm to 300 mm
0 12-Jul-14 A
SI-1
00 mm
RC.1020
0 12-Jul-14 A
SI-1
RC.1030
Changing VC pipe dia for for all scope (105 lm) from 150 mm to 200 mm
0 12-Jul-14 A
SI-1
167 15-Jul-14 A
29-Dec-14 A
167 15-Jul-14 A
29-Dec-14 A
0 mm
RC.1040
0 15-Jul-14 A
Ps
RC.1050
0 15-Jul-14 A
Ps
RC.1060
0 16-Nov-14 A
Ps
RC.1070
0 26-Nov-14 A
Ps
RC.1080
0 16-Dec-14 A
Ps
RC.1090
0 29-Dec-14 A
Ps
135 16-Aug-14 A
SEWER IN TRENCH
TRENC PHASE-2
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
Aug
Project finish
Changing RC pipe dia for all scope (618 lm) from 200 mm to 300 mm
SEWER IN TRENCH
TRENC PHASE-1
May
Revised Programme 02
RC.1000
ISSUANCE OF PER
PERMITS
Apr
0 31-Mar-15 A
CHANGE ORDER IN
INSTRUCTION NO.01
Mar
29-Dec-14 A
Approved
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
SI-2
2015
Feb
Mar
Apr
May
Jun
Jul
RC.1110
0 16-Aug-14 A
Ps
8/14)
RC.1100
0 16-Sep-14 A
Ps
6 to 15/1/28/15)
RC.1120
0 20-Dec-14 A
Ps
RC.1130
0 29-Dec-14 A
Ps
Ps
0 29-Dec-14 A
SEWER IN TRENCH
TRENC PHASE-3
RC.1140
0 29-Dec-14 A
SI2.1010
Site Instruction No 2
29-Dec-14 A
46 12-Apr-15 A
28-May-15 A
39 12-Apr-15 A
21-May-15 A
Ps
0 28-May-15 A
SI-2
99 25-May-14 A 31-Aug-14 A
ENGINEERING
SUBCONTRACTORS' PRE-QUALIFICATION
SUBCONTRACTOR
SUBMITTAL OF S
SUBCONTRACTORS' PRE-QUALIFICATION
-18
43 25-May-14 A 06-Jul-14 A
14 25-May-14 A 07-Jun-14 A
EN.S/A.SB1020
14 25-May-14 A 07-Jun-14 A
EN.S/A.SB1000
14 25-May-14 A 07-Jun-14 A
21 08-Jun-14 A
06-Jul-14 A
APPROVAL OF S
SUBCONTRACTORS' PRE-QUALIFICATI ON
EN.S/A.SB1030
21 08-Jun-14 A
06-Jul-14 A
EN.S/A.SB1010
21 08-Jun-14 A
06-Jul-14 A
METHOD STATEMENT/GENERAL
STATEM
PLANS
43 25-May-14 A 06-Jul-14 A
SUBMITTAL OF METHOD
M
STATEMENT
14 25-May-14 A 07-Jun-14 A
14 25-May-14 A 07-Jun-14 A
21 08-Jun-14 A
06-Jul-14 A
21 08-Jun-14 A
06-Jul-14 A
43 25-May-14 A 06-Jul-14 A
14 25-May-14 A 07-Jun-14 A
EN.S.M1000
APPROVAL OF M
METHOD STATEMENT
EN.A.M1000
GENERAL PLANS
SUBMITTAL OF GENERAL
G
PLANS
EN.S.GP1000
14 25-May-14 A 07-Jun-14 A
EN.S.GP1010
14 25-May-14 A 07-Jun-14 A
EN.S.GP1020
14 25-May-14 A 07-Jun-14 A
21 08-Jun-14 A
06-Jul-14 A
APPROVAL OF G
GENERAL PLANS
E.A.GP1000
21 08-Jun-14 A
06-Jul-14 A
E.A.GP1010
21 08-Jun-14 A
06-Jul-14 A
E.A.GP1020
21 08-Jun-14 A
06-Jul-14 A
64 29-Jun-14 A
31-Aug-14 A
SHOP DRAWING S
SUBMITTAL AND APPROVAL
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
Site Instruction No 2
-18
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
ENSDSA1000
30 29-Jun-14 A
31-Jul-14 A
-18
ENSDSA1010
21 03-Aug-14 A
31-Aug-14 A
-12
-81
55 25-May-14 A 18-Jul-14 A
-41
PROCUREMENT
MATERIAL SUBMITTAL
SUBMI
Readymix concrete
7 25-May-14 A 31-May-14 A
EMS1010
Steel reinforcement
7 25-May-14 A 31-May-14 A
EMS10100
Pipe bedding
7 25-May-14 A 31-May-14 A
EMS1070
Epoxy Products
7 01-Jun-14 A
07-Jun-14 A
EMS1080
Tanking
7 01-Jun-14 A
07-Jun-14 A
EMS1090
Bitumen Primer
7 01-Jun-14 A
07-Jun-14 A
EMS1120
7 01-Jun-14 A
07-Jun-14 A
EMS1130
Surface Box
7 01-Jun-14 A
07-Jun-14 A
EMS10600
Marker/warning tape
7 01-Jun-14 A
07-Jun-14 A
EMS1100
6mm Plywood
7 01-Jun-14 A
07-Jun-14 A
EMS1040
7 12-Jul-14 A
18-Jul-14 A
-48
SI-1
EMS1050
7 12-Jul-14 A
18-Jul-14 A
-48
SI-1
EMS1060
GRP Products
7 12-Jul-14 A
18-Jul-14 A
-48
SI-1
56 01-Jun-14 A
20-Aug-14 A
-30
EMA1000
Readymix concrete
21 01-Jun-14 A
29-Jun-14 A
EMA1010
Steel reinforcement
21 01-Jun-14 A
29-Jun-14 A
EMA10100
Pipe bedding
21 01-Jun-14 A
29-Jun-14 A
EMA1070
Epoxy Products
21 08-Jun-14 A
06-Jul-14 A
EMA1080
Tanking
21 08-Jun-14 A
06-Jul-14 A
EMA1090
Bitumen Primer
21 08-Jun-14 A
06-Jul-14 A
EMA1100
6mm Plywood
21 08-Jun-14 A
06-Jul-14 A
EMA1120
21 08-Jun-14 A
06-Jul-14 A
EMA1130
Surface Box
21 08-Jun-14 A
06-Jul-14 A
EMA10600
Marker/warning tape
21 08-Jun-14 A
06-Jul-14 A
EMA1050
21 20-Jul-14 A
20-Aug-14 A
-35
SI-1
EMA1060
GRP Products
21 20-Jul-14 A
20-Aug-14 A
-35
SI-1
EMA1040
21 20-Jul-14 A
20-Aug-14 A
-35
SI-1
63 30-Jun-14 A
03-Sep-14 A
-42
PROCURE MATER
MATERIAL
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
2015
Feb
EMS1000
MATERIAL APPROVAL
APPRO
SI-2
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
Readymix concrete
14 30-Jun-14 A
13-Jul-14 A
PMP1010
14 30-Jun-14 A
13-Jul-14 A
PMP10100
Pipe bedding
14 30-Jun-14 A
13-Jul-14 A
PMP1070
Epoxy Products
14 07-Jul-14 A
20-Jul-14 A
PMP1080
Tanking
14 07-Jul-14 A
20-Jul-14 A
PMP1090
Bitumen Primer
14 07-Jul-14 A
20-Jul-14 A
PMP1100
6mm Plywood
14 07-Jul-14 A
20-Jul-14 A
PMP1120
14 07-Jul-14 A
20-Jul-14 A
PMP1130
Surface Box
14 07-Jul-14 A
20-Jul-14 A
PMP10600
Marker/warning tape
14 07-Jul-14 A
20-Jul-14 A
PMP1040
14 21-Aug-14 A
03-Sep-14 A
-49
SI-1
PMP1060
GRP Products
14 21-Aug-14 A
03-Sep-14 A
-49
SI-1
PMP1050
14 21-Aug-14 A
03-Sep-14 A
-49
236 30-Jun-14 A
28-Feb-15 A
-79
PMD1000
Readymix concrete
157 30-Jun-14 A
09-Dec-14 A
PMD1050
141 21-Aug-14 A
12-Jan-15 A
-50
PMD1010
Steel reinforcement
236 30-Jun-14 A
28-Feb-15 A
-86
PMD1040
187 21-Aug-14 A
28-Feb-15 A
-91
SI-1
PMD1060
GRP Products
187 21-Aug-14 A
28-Feb-15 A
-124
SI-1
PMD1070
Epoxy Products
229 07-Jul-14 A
28-Feb-15 A
-204
PMD1080
Tanking
229 07-Jul-14 A
28-Feb-15 A
-128
PMD1090
Bitumen Primer
229 07-Jul-14 A
28-Feb-15 A
-175
PMD1100
6mm Plywood
229 07-Jul-14 A
28-Feb-15 A
-182
PMD10100
Pipe bedding
236 30-Jun-14 A
28-Feb-15 A
-222
PMD1120
229 07-Jul-14 A
28-Feb-15 A
-215
PMD1130
Surface Box
229 07-Jul-14 A
28-Feb-15 A
-215
PMD10600
Marker/warning tape
229 07-Jul-14 A
28-Feb-15 A
-124
359 29-Jun-14 A
22-Jun-15 A
-184
359 29-Jun-14 A
22-Jun-15 A
-196
287 29-Jun-14 A
11-Apr-15 A
-216
283 29-Jun-14 A
07-Apr-15 A
-238
219 29-Jun-14 A
19-Mar-15 A
-198
CONSTRUCTION
SEWER IN TRENCH
TRENC
PHASE 1: FROM MH 15/1/28/12/6 TO MH 15/1/28/12
VC PIPE WORKS
WORKS: FROM MH 15/1/28/12/6 TO MH 15/1/28/12
200mm NOMINAL
NOMINA BORE 33.88m: From MH 15/1/28/12/6 to MH 15/1/28/12/5
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
2015
Feb
PMP1000
MATERIAL DELIVERY
DELIVE
TO SITE
SI-2
Mar
Apr
May
Jun
Jul
SI-1
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CST1010
5 29-Jun-14 A
03-Jul-14 A
CST1020
2 05-Jul-14 A
06-Jul-14 A
CST1030
2 12-Jul-14 A
13-Jul-14 A
CST1040
2 14-Jul-14 A
15-Jul-14 A
CST1050
Backfilling
3 16-Jul-14 A
19-Jul-14 A
CST1060
2 20-Jul-14 A
21-Jul-14 A
CST1070
2 18-Mar-15 A
19-Mar-15 A
205 15-Jul-14 A
200mm NOMINAL
NOMINA BORE 90.09m: From MH 15/1/28/12/5 to MH 15/1/28/12/4
9 15-Jul-14 A
24-Jul-14 A
CST1940
2 26-Jul-14 A
27-Jul-14 A
CST1950
2 31-Jul-14 A
02-Aug-14 A
CST1960
2 03-Aug-14 A
04-Aug-14 A
CST1970
Backfilling
3 05-Aug-14 A
07-Aug-14 A
CST1980
2 09-Aug-14 A
10-Aug-14 A
CST1990
2 18-Mar-15 A
19-Mar-15 A
185 11-Aug-14 A
19-Mar-15 A
-198
CST1080
9 11-Aug-14 A
20-Aug-14 A
-34
CST1090
2 21-Aug-14 A
23-Aug-14 A
-34
CST1100
2 24-Aug-14 A
25-Aug-14 A
-34
CST1110
2 26-Aug-14 A
27-Aug-14 A
-34
CST1120
Backfilling
3 28-Aug-14 A
31-Aug-14 A
-34
CST1130
2 01-Sep-14 A
02-Sep-14 A
-34
CST1210
2 18-Mar-15 A
19-Mar-15 A
-198
185 11-Aug-14 A
19-Mar-15 A
-193
CST1150
5 11-Aug-14 A
16-Aug-14 A
-25
CST1160
2 24-Aug-14 A
25-Aug-14 A
-31
CST1170
2 26-Aug-14 A
27-Aug-14 A
-31
CST1180
2 28-Aug-14 A
30-Aug-14 A
-31
CST1190
Backfilling
3 01-Sep-14 A
03-Sep-14 A
-32
CST1200
2 04-Sep-14 A
06-Sep-14 A
-32
CST1280
2 18-Mar-15 A
19-Mar-15 A
-193
100 22-Nov-14 A
19-Mar-15 A
-183
300mm NOMINAL
NOMINA BORE 34.48m: From MH 15/1/28/12/2 to MH 15/1/28/12/1
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
2015
Feb
Mar
Apr
May
Jun
Jul
19-Mar-15 A
300mm NOMINAL
NOMINA BORE 42.20m: From MH 15/1/28/12/3 to MH 15/1/28/12/2
SI-2
-198
CST1930
300mm NOMINAL
NOMINA BORE 50.37m: From MH 15/1/28/12/4 to MH 15/1/28/12/3
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CST1220
4 22-Nov-14 A
25-Nov-14 A
-99
CST1230
3 27-Nov-14 A
30-Nov-14 A
-101
CST1240
2 04-Dec-14 A
06-Dec-14 A
-104
CST1250
2 09-Dec-14 A
10-Dec-14 A
-106
CST1260
Backfilling
4 10-Dec-14 A
14-Dec-14 A
-106
CST1270
2 17-Dec-14 A
20-Dec-14 A
-108
CST1350
2 18-Mar-15 A
19-Mar-15 A
-183
88 10-Jan-15 A
07-Apr-15 A
-238
300mm NOMINAL
NOMINA BORE 59.46m: From MH 15/1/28/12/1 to MH 15/1/28/12
Recovery
0 10-Jan-15 A
CST1290
2 01-Mar-15 A
02-Mar-15 A
CST129.10
75 10-Jan-15 A
25-Mar-15 A
CST1300
4 28-Mar-15 A
31-Mar-15 A
-203
CST1310
5 28-Mar-15 A
01-Apr-15 A
-202
CST1320
6 28-Mar-15 A
02-Apr-15 A
-201
CST1330
Backfilling
7 28-Mar-15 A
04-Apr-15 A
-199
CST1340
8 29-Mar-15 A
06-Apr-15 A
-199
CST1420
1 07-Apr-15 A
07-Apr-15 A
-199
46 16-Feb-15 A
09-Apr-15 A
46 16-Feb-15 A
09-Apr-15 A
1 16-Mar-15 A
16-Mar-15 A
FC-01
CST2330
CST2280
42 16-Feb-15 A
05-Apr-15 A
CST2290
40 18-Feb-15 A
05-Apr-15 A
CST2300
39 19-Feb-15 A
05-Apr-15 A
CST2310
38 21-Feb-15 A
05-Apr-15 A
CST2320
Backfilling
38 22-Feb-15 A
06-Apr-15 A
CST2340
2 08-Apr-15 A
09-Apr-15 A
MANHOLE CONSTRUCTION
CONS
MANHOLE: 15/1/28/12/6
15/1
204 26-Jul-14 A
29-Mar-15 A
-178
25 26-Jul-14 A
26-Aug-14 A
-14
4 26-Jul-14 A
02-Aug-14 A
-14
CSTM1020
Blinding
1 03-Aug-14 A
03-Aug-14 A
-14
CSTM1030
4 04-Aug-14 A
07-Aug-14 A
-14
CSTM1040
2 09-Aug-14 A
10-Aug-14 A
-14
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
2015
Feb
Mar
Apr
May
Jun
Jul
-180
CSTM1010
SI-2
very
CST129
FUTURE CONNE
CONNECTION
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSTM10400
Benching work
2 11-Aug-14 A
12-Aug-14 A
-14
CSTM1050
Bitumen primer
1 13-Aug-14 A
13-Aug-14 A
-14
CSTM1060
Tanking membrane
1 14-Aug-14 A
14-Aug-14 A
-14
CSTM1070
2 16-Aug-14 A
17-Aug-14 A
-14
CSTM1080
GRP accessories
2 18-Aug-14 A
19-Aug-14 A
-14
CSTM1090
2 20-Aug-14 A
21-Aug-14 A
-14
CSTM1100
Backfilling
3 23-Aug-14 A
25-Aug-14 A
-14
CSTM1330
1 26-Aug-14 A
26-Aug-14 A
-14
25 03-Aug-14 A
31-Aug-14 A
MANHOLE: 15/1/28/12/5
15/1
CSTM28210
4 03-Aug-14 A
06-Aug-14 A
CSTM28220
Blinding
1 07-Aug-14 A
07-Aug-14 A
CSTM28230
4 09-Aug-14 A
12-Aug-14 A
CSTM28240
2 13-Aug-14 A
14-Aug-14 A
CSTM28250
Benching work
2 16-Aug-14 A
17-Aug-14 A
CSTM28260
Bitumen primer
1 18-Aug-14 A
18-Aug-14 A
CSTM28270
Tanking membrane
1 19-Aug-14 A
19-Aug-14 A
CSTM28280
2 20-Aug-14 A
21-Aug-14 A
CSTM28290
GRP accessories
2 23-Aug-14 A
24-Aug-14 A
CSTM28300
2 25-Aug-14 A
26-Aug-14 A
CSTM28310
Backfilling
3 27-Aug-14 A
30-Aug-14 A
CSTM28320
1 31-Aug-14 A
31-Aug-14 A
24 21-Aug-14 A
17-Sep-14 A
-32
MANHOLE: 15/1/28/12/4
15/1
CSTM1350
4 21-Aug-14 A
25-Aug-14 A
-34
CSTM1360
Blinding
1 26-Aug-14 A
26-Aug-14 A
-34
CSTM1370
4 27-Aug-14 A
31-Aug-14 A
-34
CSTM1380
2 01-Sep-14 A
02-Sep-14 A
-32
CSTM13800
Benching work
2 03-Sep-14 A
04-Sep-14 A
-32
CSTM1390
Bitumen primer
1 06-Sep-14 A
06-Sep-14 A
-32
CSTM1400
Tanking membrane
1 07-Sep-14 A
07-Sep-14 A
-32
CSTM1410
1 08-Sep-14 A
08-Sep-14 A
-32
CSTM1420
GRP accessories
2 09-Sep-14 A
10-Sep-14 A
-32
CSTM1430
2 11-Sep-14 A
13-Sep-14 A
-32
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSTM1440
Backfilling
3 14-Sep-14 A
16-Sep-14 A
-32
CSTM1450
1 17-Sep-14 A
17-Sep-14 A
-32
32 17-Aug-14 A
22-Sep-14 A
-32
MANHOLE: 15/1/28/12/3
15/1
CSTM1470
4 17-Aug-14 A
20-Aug-14 A
-25
CSTM1480
Blinding
1 28-Aug-14 A
28-Aug-14 A
-31
CSTM1490
4 01-Sep-14 A
04-Sep-14 A
-33
CSTM1500
2 06-Sep-14 A
07-Sep-14 A
-32
CSTM15000
Benching work
2 08-Sep-14 A
09-Sep-14 A
-32
CSTM1510
Bitumen primer
1 10-Sep-14 A
10-Sep-14 A
-32
CSTM1520
Tanking membrane
1 11-Sep-14 A
11-Sep-14 A
-32
CSTM1530
1 13-Sep-14 A
13-Sep-14 A
-32
CSTM1540
GRP accessories
2 14-Sep-14 A
15-Sep-14 A
-32
CSTM1550
2 16-Sep-14 A
17-Sep-14 A
-32
CSTM1560
Backfilling
3 18-Sep-14 A
21-Sep-14 A
-32
CSTM1570
1 22-Sep-14 A
22-Sep-14 A
-32
27 21-Dec-14 A
20-Jan-15 A
-122
MANHOLE: 15/1/28/12/2
15/1
CSTM1690
1 21-Dec-14 A
21-Dec-14 A
-96
CSTM1590
4 25-Dec-14 A
29-Dec-14 A
-123
CSTM1600
Blinding
1 30-Dec-14 A
30-Dec-14 A
-123
CSTM1610
4 31-Dec-14 A
04-Jan-15 A
-123
CSTM1620
2 05-Jan-15 A
06-Jan-15 A
-123
CSTM16200
Benching work
2 07-Jan-15 A
08-Jan-15 A
-123
CSTM1630
Bitumen primer
1 10-Jan-15 A
10-Jan-15 A
-123
CSTM1640
Tanking membrane
1 11-Jan-15 A
11-Jan-15 A
-123
CSTM1650
1 12-Jan-15 A
12-Jan-15 A
-123
CSTM1660
GRP accessories
2 13-Jan-15 A
14-Jan-15 A
-123
CSTM1670
2 15-Jan-15 A
17-Jan-15 A
-123
CSTM1680
Backfilling
3 18-Jan-15 A
20-Jan-15 A
-123
81 24-Dec-14 A
29-Mar-15 A
-178
MANHOLE: 15/1/28/12/1
15/1
CSTM1710
4 24-Dec-14 A
28-Dec-14 A
-122
CSTM1720
Blinding
2 28-Dec-14 A
29-Dec-14 A
-122
CSTM1730
4 31-Dec-14 A
04-Jan-15 A
-123
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSTM1740
3 05-Jan-15 A
07-Jan-15 A
-124
CSTM17400
Benching work
2 08-Jan-15 A
10-Jan-15 A
-124
CSTM1750
Bitumen primer
1 13-Jan-15 A
13-Jan-15 A
-126
CSTM1760
Tanking membrane
1 29-Jan-15 A
29-Jan-15 A
-139
CSTM1770
1 25-Feb-15 A
25-Feb-15 A
-160
CSTM1780
GRP accessories
2 26-Feb-15 A
28-Feb-15 A
-160
CSTM1800
Backfilling
4 24-Feb-15 A
28-Feb-15 A
-155
CSTM1790
3 21-Mar-15 A
23-Mar-15 A
-178
CSTM1810
3 26-Mar-15 A
29-Mar-15 A
-178
79 25-Dec-14 A
28-Mar-15 A
MANHOLE: 15/1/28/12
15/1
CSTM28330
5 25-Dec-14 A
30-Dec-14 A
CSTM28340
Blinding
1 01-Jan-15 A
01-Jan-15 A
CSTM28350
4 03-Jan-15 A
06-Jan-15 A
CSTM28360
2 07-Jan-15 A
08-Jan-15 A
CSTM28370
Benching work
2 10-Jan-15 A
11-Jan-15 A
CSTM28380
Bitumen primer
1 12-Jan-15 A
12-Jan-15 A
CSTM28390
Tanking membrane
1 13-Jan-15 A
13-Jan-15 A
CSTM28400
2 19-Mar-15 A
21-Mar-15 A
CSTM28410
GRP accessories
3 21-Mar-15 A
23-Mar-15 A
CSTM28420
3 23-Mar-15 A
25-Mar-15 A
CSTM28430
Backfilling
4 24-Mar-15 A
28-Mar-15 A
CSTM28440
2 26-Mar-15 A
28-Mar-15 A
41 23-Feb-15 A
11-Apr-15 A
-180
39 23-Feb-15 A
08-Apr-15 A
-182
REINSTATEMENT
ASPHALT
CSTR1110
38 23-Feb-15 A
07-Apr-15 A
-186
CSTR1120
27 09-Mar-15 A
08-Apr-15 A
-182
18 22-Mar-15 A
11-Apr-15 A
-186
KERBSTONE
CSTR1130
16 22-Mar-15 A
08-Apr-15 A
-186
CSTR1140
Kerbs installation
17 22-Mar-15 A
09-Apr-15 A
-186
CSTR1150
Backing concrete
18 22-Mar-15 A
11-Apr-15 A
-186
2 18-Mar-15 A
19-Mar-15 A
-163
2 18-Mar-15 A
19-Mar-15 A
-165
PAVING/CONCRETE PAVING
PAVING/CONCR
CSTR1160
Formation preparation
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
CSTR1170
Original Start
Duration
Paving interlock
Finish
Total Pocess
Delays
2 18-Mar-15 A
19-Mar-15 A
-163
2 18-Mar-15 A
19-Mar-15 A
-161
CSTR1180
2 18-Mar-15 A
19-Mar-15 A
-163
CSTR1190
Planting/grass
2 18-Mar-15 A
19-Mar-15 A
-161
225 16-Aug-14 A
10-May-15 A
-162
VC PIPE WORKS:
WORKS 15/1/18/12 TO 15/1/28/16
180 16-Aug-14 A
18-Mar-15 A
-145
29 25-Jan-15 A
28-Feb-15 A
300mm NOMINAL
NOMINA BORE 56.99m: From MH 15/1/28/12 to MH 15/1/28/13
CST2030
2 29-Jan-15 A
31-Jan-15 A
CST2040
Backfilling
3 28-Jan-15 A
31-Jan-15 A
CST2050
2 29-Jan-15 A
31-Jan-15 A
CST2000
9 25-Jan-15 A
03-Feb-15 A
CST2010
9 03-Feb-15 A
14-Feb-15 A
CST2020
9 05-Feb-15 A
16-Feb-15 A
CST2060
25 29-Jan-15 A
28-Feb-15 A
52 01-Dec-14 A
31-Jan-15 A
300mm NOMINAL
NOMINA BORE 55.00m: From MH 15/1/28/13 to MH 15/1/28/14
CST2070
8 01-Dec-14 A
09-Dec-14 A
CST2080
2 10-Dec-14 A
11-Dec-14 A
CST2090
3 13-Dec-14 A
15-Dec-14 A
CST2100
2 17-Dec-14 A
20-Dec-14 A
CST2110
Backfilling
4 22-Dec-14 A
25-Dec-14 A
CST2120
2 27-Dec-14 A
28-Dec-14 A
CST2130
2 29-Jan-15 A
31-Jan-15 A
29 25-Jan-15 A
28-Feb-15 A
9 25-Jan-15 A
03-Feb-15 A
200mm NOMINAL
NOMINA BORE 36.30m: From MH 15/1/28/14 to MH 15/1/28/14/1
CST2140
CST2190
10 14-Feb-15 A
24-Feb-15 A
CST2150
11 11-Feb-15 A
24-Feb-15 A
CST2160
11 11-Feb-15 A
24-Feb-15 A
CST2170
11 11-Feb-15 A
24-Feb-15 A
CST2180
Backfilling
10 14-Feb-15 A
24-Feb-15 A
CST2200
2 26-Feb-15 A
28-Feb-15 A
45 25-Jan-15 A
18-Mar-15 A
9 25-Jan-15 A
03-Feb-15 A
200mm NOMINAL
NOMINA BORE 41.20m: From MH 15/1/28/14/1 to MH 15/1/28/14/2
CST2210
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CST2220
11 11-Feb-15 A
24-Feb-15 A
CST2230
11 11-Feb-15 A
24-Feb-15 A
CST2240
11 11-Feb-15 A
24-Feb-15 A
CST2250
Backfilling
11 11-Feb-15 A
24-Feb-15 A
CST2260
10 14-Feb-15 A
24-Feb-15 A
CST2270
2 17-Mar-15 A
18-Mar-15 A
180 16-Aug-14 A
18-Mar-15 A
-148
300mm NOMINAL
NOMINA BORE 71.5m: From MH 15/1/28/14 to MH 15/1/28/15
CST1360
5 16-Aug-14 A
20-Aug-14 A
15
CST1370
5 26-Aug-14 A
31-Aug-14 A
CST1380
3 28-Aug-14 A
31-Aug-14 A
10
CST1390
2 31-Aug-14 A
01-Sep-14 A
11
CST1400
Backfilling
3 02-Sep-14 A
04-Sep-14 A
11
CST1410
3 06-Sep-14 A
08-Sep-14 A
10
CST1490
2 17-Mar-15 A
18-Mar-15 A
-148
153 16-Sep-14 A
18-Mar-15 A
-145
300mm NOMINAL
NOMINA BORE 60m: From MH 15/1/28/15 to MH 15/1/28/16
CST1430
134 16-Sep-14 A
24-Feb-15 A
-141
CST1440
130 21-Sep-14 A
24-Feb-15 A
-139
CST1450
131 23-Sep-14 A
28-Feb-15 A
-140
CST1460
129 25-Sep-14 A
28-Feb-15 A
-136
CST1470
Backfilling
127 28-Sep-14 A
28-Feb-15 A
-132
CST1480
124 01-Oct-14 A
28-Feb-15 A
-130
CST1560
2 17-Mar-15 A
18-Mar-15 A
-145
70 18-Feb-15 A
10-May-15 A
46 18-Feb-15 A
12-Apr-15 A
FUTURE CONNE
CONNECTION
FC-02
CST2350
14 18-Feb-15 A
05-Mar-15 A
CST2360
12 21-Feb-15 A
06-Mar-15 A
CST2370
11 22-Feb-15 A
06-Mar-15 A
CST2380
11 23-Feb-15 A
07-Mar-15 A
CST2390
Backfilling
10 24-Feb-15 A
07-Mar-15 A
CST2400
1 09-Apr-15 A
09-Apr-15 A
CST2410
2 11-Apr-15 A
12-Apr-15 A
45 21-Feb-15 A
13-Apr-15 A
FC-03
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
CST2420
12 21-Feb-15 A
06-Mar-15 A
CST2430
11 23-Feb-15 A
07-Mar-15 A
CST2440
10 24-Feb-15 A
07-Mar-15 A
CST2450
10 25-Feb-15 A
08-Mar-15 A
CST2460
Backfilling
9 26-Feb-15 A
08-Mar-15 A
CST2470
1 11-Apr-15 A
11-Apr-15 A
CST2480
1 12-Apr-15 A
13-Apr-15 A
66 23-Feb-15 A
10-May-15 A
FC-04
CST2490
36 23-Feb-15 A
05-Apr-15 A
CST2500
34 25-Feb-15 A
05-Apr-15 A
CST2510
34 26-Feb-15 A
06-Apr-15 A
CST2520
33 28-Feb-15 A
06-Apr-15 A
CST2530
Backfilling
33 28-Feb-15 A
06-Apr-15 A
CST2540
24 12-Apr-15 A
09-May-15 A
CST2550
24 13-Apr-15 A
10-May-15 A
29 08-Mar-15 A
09-Apr-15 A
FC-05
CST2560
26 08-Mar-15 A
06-Apr-15 A
CST2570
23 11-Mar-15 A
06-Apr-15 A
CST2580
22 12-Mar-15 A
06-Apr-15 A
CST2590
21 14-Mar-15 A
06-Apr-15 A
CST2600
Backfilling
21 14-Mar-15 A
06-Apr-15 A
CST2610
21 16-Mar-15 A
08-Apr-15 A
CST2620
20 18-Mar-15 A
09-Apr-15 A
98 01-Dec-14 A
26-Mar-15 A
73 03-Dec-14 A
28-Feb-15 A
MANHOLE CONSTRUCTION
CONS
MANHOLE: 15/1/28/13
15/1
CSTM28450
4 03-Dec-14 A
07-Dec-14 A
CSTM28460
Blinding
2 08-Dec-14 A
09-Dec-14 A
CSTM28470
5 08-Dec-14 A
13-Dec-14 A
CSTM28480
3 15-Dec-14 A
17-Dec-14 A
CSTM28490
Benching work
3 20-Dec-14 A
22-Dec-14 A
CSTM28500
Bitumen primer
2 23-Dec-14 A
24-Dec-14 A
CSTM28510
Tanking membrane
1 02-Feb-15 A
02-Feb-15 A
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
Total Pocess
Delays
SI-2
2015
Feb
Mar
Apr
May
Jun
Jul
-140
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
CSTM28520
1 03-Feb-15 A
03-Feb-15 A
CSTM28530
GRP accessories
2 04-Feb-15 A
05-Feb-15 A
CSTM28550
Backfilling
3 09-Feb-15 A
11-Feb-15 A
CSTM28560
2 18-Feb-15 A
19-Feb-15 A
CSTM28540
2 26-Feb-15 A
28-Feb-15 A
71 04-Dec-14 A
26-Feb-15 A
MANHOLE: 15/1/28/14
15/1
CSTM28570
4 04-Dec-14 A
08-Dec-14 A
CSTM28580
Blinding
2 11-Dec-14 A
13-Dec-14 A
CSTM28590
4 14-Dec-14 A
17-Dec-14 A
CSTM28600
2 17-Dec-14 A
20-Dec-14 A
CSTM28610
Benching work
3 21-Dec-14 A
23-Dec-14 A
CSTM28620
Bitumen primer
2 08-Jan-15 A
10-Jan-15 A
CSTM28630
Tanking membrane
2 12-Jan-15 A
13-Jan-15 A
CSTM28640
1 14-Jan-15 A
14-Jan-15 A
CSTM28650
GRP accessories
2 15-Jan-15 A
17-Jan-15 A
CSTM28670
Backfilling
3 04-Feb-15 A
07-Feb-15 A
CSTM28680
2 19-Feb-15 A
21-Feb-15 A
CSTM28660
2 25-Feb-15 A
26-Feb-15 A
31 22-Jan-15 A
28-Feb-15 A
MANHOLE: 15/1/28/14/1
15/1
CSTM28690
4 22-Jan-15 A
26-Jan-15 A
CSTM28700
Blinding
1 02-Feb-15 A
02-Feb-15 A
CSTM28710
4 03-Feb-15 A
07-Feb-15 A
CSTM28720
2 08-Feb-15 A
09-Feb-15 A
CSTM28730
Benching work
2 10-Feb-15 A
11-Feb-15 A
CSTM28740
Bitumen primer
1 14-Feb-15 A
14-Feb-15 A
CSTM28750
Tanking membrane
1 15-Feb-15 A
15-Feb-15 A
CSTM28760
1 16-Feb-15 A
16-Feb-15 A
CSTM28770
GRP accessories
2 17-Feb-15 A
18-Feb-15 A
CSTM28790
Backfilling
3 22-Feb-15 A
24-Feb-15 A
CSTM28800
1 25-Feb-15 A
25-Feb-15 A
CSTM28780
1 27-Feb-15 A
28-Feb-15 A
32 21-Jan-15 A
28-Feb-15 A
MANHOLE: 15/1/28/14/2
15/1
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
Total Pocess
Delays
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSTM28810
4 21-Jan-15 A
25-Jan-15 A
CSTM28820
Blinding
1 02-Feb-15 A
02-Feb-15 A
CSTM28830
4 03-Feb-15 A
07-Feb-15 A
CSTM28840
2 08-Feb-15 A
09-Feb-15 A
CSTM28850
Benching work
2 10-Feb-15 A
11-Feb-15 A
CSTM28860
Bitumen primer
1 14-Feb-15 A
14-Feb-15 A
CSTM28870
Tanking membrane
1 15-Feb-15 A
15-Feb-15 A
CSTM28880
1 16-Feb-15 A
16-Feb-15 A
CSTM28890
GRP accessories
2 17-Feb-15 A
18-Feb-15 A
CSTM28910
Backfilling
3 22-Feb-15 A
24-Feb-15 A
CSTM28920
1 26-Feb-15 A
26-Feb-15 A
CSTM28900
2 26-Feb-15 A
28-Feb-15 A
75 01-Dec-14 A
28-Feb-15 A
-121
MANHOLE: 15/1/28/15
15/1
CSTM1950
4 01-Dec-14 A
04-Dec-14 A
-70
CSTM1960
Blinding
2 06-Dec-14 A
07-Dec-14 A
-71
CSTM1970
5 09-Dec-14 A
14-Dec-14 A
-73
CSTM1980
3 15-Dec-14 A
17-Dec-14 A
-74
CSTM19800
Benching work
3 17-Dec-14 A
21-Dec-14 A
-74
CSTM1990
Bitumen primer
2 24-Dec-14 A
25-Dec-14 A
-77
CSTM2000
Tanking membrane
2 27-Dec-14 A
28-Dec-14 A
-78
CSTM2010
1 08-Feb-15 A
08-Feb-15 A
-113
CSTM2020
GRP accessories
2 09-Feb-15 A
10-Feb-15 A
-113
CSTM2040
Backfilling
3 15-Feb-15 A
17-Feb-15 A
-113
CSTM2030
2 26-Feb-15 A
28-Feb-15 A
-125
CSTM2050
1 28-Feb-15 A
28-Feb-15 A
-121
45 02-Feb-15 A
26-Mar-15 A
-140
MANHOLE: 15/1/28/16
15/1
CSTM2070
3 02-Feb-15 A
04-Feb-15 A
-122
CSTM2080
Blinding
1 05-Feb-15 A
05-Feb-15 A
-122
CSTM2090
4 07-Feb-15 A
10-Feb-15 A
-122
CSTM2100
2 11-Feb-15 A
14-Feb-15 A
-118
CSTM21000
Benching work
2 15-Feb-15 A
16-Feb-15 A
-118
CSTM2110
Bitumen primer
1 17-Feb-15 A
17-Feb-15 A
-118
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSTM2120
Tanking membrane
1 18-Feb-15 A
18-Feb-15 A
-118
CSTM2130
1 19-Feb-15 A
19-Feb-15 A
-118
CSTM2140
GRP accessories
2 21-Feb-15 A
22-Feb-15 A
-118
CSTM2160
Backfilling
3 25-Feb-15 A
28-Feb-15 A
-118
CSTM2170
3 25-Feb-15 A
28-Feb-15 A
-117
CSTM2150
2 25-Mar-15 A
26-Mar-15 A
-144
54 11-Feb-15 A
15-Apr-15 A
-141
54 11-Feb-15 A
15-Apr-15 A
-147
49 11-Feb-15 A
09-Apr-15 A
-147
6 09-Apr-15 A
15-Apr-15 A
-147
2 09-Apr-15 A
11-Apr-15 A
-145
REINSTATEMENT
ASPHALT
CSTR1010
CSTR1020
KERBSTONE
CSTR1030
2 09-Apr-15 A
11-Apr-15 A
-147
CSTR1040
Kerbs installation
2 09-Apr-15 A
11-Apr-15 A
-146
CSTR1050
Backing concrete
2 09-Apr-15 A
11-Apr-15 A
-145
3 09-Apr-15 A
12-Apr-15 A
-142
PAVING/CONCRETE PAVING
PAVING/CONCR
CSTR1060
Formation preparation
3 09-Apr-15 A
12-Apr-15 A
-144
CSTR1070
Paving interlock
3 09-Apr-15 A
12-Apr-15 A
-142
5 09-Apr-15 A
14-Apr-15 A
-140
3 09-Apr-15 A
12-Apr-15 A
-140
CSTR1090
Planting/grass
3 12-Apr-15 A
14-Apr-15 A
-140
155 19-Jan-15 A
22-Jun-15 A
-196
VC PIPE WORKS:
WORKS 15/1/28/17 TO 15/1/28/21
127 16-Feb-15 A
22-Jun-15 A
-217
55 19-Feb-15 A
14-Apr-15 A
-195
10 19-Feb-15 A
02-Mar-15 A
-137
300mm NOMINAL
NOMINA BORE 70m: From MH 15/1/28/16 to MH 15/1/28/17
CST1500
CST1510
1 28-Mar-15 A
28-Mar-15 A
-157
CST1520
1 28-Mar-15 A
28-Mar-15 A
-155
CST1530
1 28-Mar-15 A
28-Mar-15 A
-153
CST1540
Backfilling
1 12-Apr-15 A
12-Apr-15 A
-191
CST1550
1 13-Apr-15 A
13-Apr-15 A
-190
CST1630
1 14-Apr-15 A
14-Apr-15 A
-190
39 12-Apr-15 A
30-May-15 A
-198
200mm NOMINAL
NOMINA BORE 45.93m: From MH 15/1/28/17 to MH 15/1/28/18
0000.30
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Revision
Checked
2015
Feb
Mar
Apr
May
Jun
Jul
Aug
0 12-Apr-15 A
Date
SI-2
Approved
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CST1570
39 12-Apr-15 A
21-May-15 A
-203 Ps
CST1580
34 17-Apr-15 A
22-May-15 A
-202 Ps
CST1590
33 18-Apr-15 A
23-May-15 A
-200 Ps
CST1600
Pipe Connection to MH
32 19-Apr-15 A
25-May-15 A
-200 Ps
CST1610
30 21-Apr-15 A
26-May-15 A
-197 Ps
CST1620
28 23-Apr-15 A
29-May-15 A
-198 Ps
CST1700
24 27-Apr-15 A
30-May-15 A
-198 Ps
29 12-Apr-15 A
10-May-15 A
200mm NOMINAL
NOMINA BORE 20.00m: From MH 15/1/28/18 to MH 15/1/28/19
SI-2
0 12-Apr-15 A
CST2840
6 12-Apr-15 A
17-Apr-15 A
CST2850
1 18-Apr-15 A
18-Apr-15 A
CST2860
1 19-Apr-15 A
19-Apr-15 A
CST2880
2 22-Apr-15 A
23-Apr-15 A
CST2870
Pipe Connection to MH
15 20-Apr-15 A
04-May-15 A
CST2890
4 06-May-15 A 09-May-15 A
CST2900
1 10-May-15 A 10-May-15 A
CST2910
7 28-May-15 A 03-Jun-15 A
SI-2
CST2920
2 04-Jun-15 A
05-Jun-15 A
SI-2
CST2930
2 06-Jun-15 A
07-Jun-15 A
SI-2
CST2940
Pipe Connection to MH
2 08-Jun-15 A
09-Jun-15 A
SI-2
CST2950
2 10-Jun-15 A
11-Jun-15 A
SI-2
CST2960
5 12-Jun-15 A
16-Jun-15 A
SI-2
CST2970
1 17-Jun-15 A
17-Jun-15 A
SI-2
CST3050
Reinstatement
5 18-Jun-15 A
22-Jun-15 A
43 16-Feb-15 A
30-Mar-15 A
-135
200mm NOMINAL
NOMINA BORE 29.58m: From MH 15/1/28/19 to MH 15/1/28/20
CST1710
11 16-Feb-15 A
28-Feb-15 A
-98
CST1720
11 19-Feb-15 A
03-Mar-15 A
-100
CST1730
1 17-Mar-15 A
17-Mar-15 A
-110
CST1740
2 17-Mar-15 A
18-Mar-15 A
-110
CST1750
Backfilling
2 17-Mar-15 A
18-Mar-15 A
-107
CST1760
2 17-Mar-15 A
18-Mar-15 A
-106
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Apr
May
Jun
Jul
26 28-May-15 A 22-Jun-15 A
200mm NOMINAL
NOMINA BORE 20.00m: From MH 15/1/28/19 to MH 15/1/28/19/1
Second Baseline
Mar
Revision
Checked
Aug
0000.40
2015
Feb
Approved
Activity ID
Activity Name
CST1840
Original Start
Duration
200mm NOMINAL
NOMINA BORE 14.68m: From MH 15/1/28/20 to MH 15/1/28/21
Finish
Total Pocess
Delays
2 29-Mar-15 A
30-Mar-15 A
-133
27 22-Feb-15 A
24-Mar-15 A
-107
CST1780
11 22-Feb-15 A
05-Mar-15 A
-100
CST1790
11 24-Feb-15 A
08-Mar-15 A
-101
CST1800
1 14-Mar-15 A
14-Mar-15 A
-104
CST1810
1 15-Mar-15 A
15-Mar-15 A
-104
CST1820
Backfilling
1 24-Mar-15 A
24-Mar-15 A
-109
CST1910
1 24-Mar-15 A
24-Mar-15 A
-107
CST1830
1 24-Mar-15 A
24-Mar-15 A
-108
11 04-Apr-15 A
14-Apr-15 A
11 04-Apr-15 A
14-Apr-15 A
FUTURE CONNE
CONNECTION
FC-06
CST2980
2 04-Apr-15 A
05-Apr-15 A
CST2990
1 06-Apr-15 A
06-Apr-15 A
CST3000
1 07-Apr-15 A
07-Apr-15 A
CST3010
1 09-Apr-15 A
09-Apr-15 A
CST3020
Backfilling
1 11-Apr-15 A
11-Apr-15 A
CST3030
1 12-Apr-15 A
12-Apr-15 A
CST3040
2 13-Apr-15 A
14-Apr-15 A
152 19-Jan-15 A
19-Jun-15 A
-197
38 09-Mar-15 A
15-Apr-15 A
-179
MANHOLE CONSTRUCTION
CONS
MANHOLE: 15/1/28/17
15/1
CSTM2190
1 09-Mar-15 A
09-Mar-15 A
-140
CSTM2200
Blinding
1 10-Mar-15 A
10-Mar-15 A
-140
CSTM2210
1 11-Mar-15 A
11-Mar-15 A
-137
CSTM2220
1 12-Mar-15 A
12-Mar-15 A
-136
CSTM22200
Benching work
1 12-Mar-15 A
12-Mar-15 A
-134
CSTM2230
Bitumen primer
1 14-Mar-15 A
14-Mar-15 A
-134
CSTM2240
Tanking membrane
1 14-Mar-15 A
14-Mar-15 A
-133
CSTM2250
1 14-Mar-15 A
14-Mar-15 A
-132
CSTM2260
GRP accessories
1 12-Apr-15 A
12-Apr-15 A
-181
CSTM2270
1 13-Apr-15 A
13-Apr-15 A
-180
CSTM2280
Backfilling
1 14-Apr-15 A
14-Apr-15 A
-178
CSTM2290
1 15-Apr-15 A
15-Apr-15 A
-177
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
MANHOLE: 15/1/28/18
15/1
Finish
120 19-Jan-15 A
18-May-15 A
Total Pocess
Delays
35 19-Jan-15 A
22-Feb-15 A
0000.20
37 23-Feb-15 A
31-Mar-15 A
CSTM2310
2 12-Apr-15 A
13-Apr-15 A
-161
CSTM2320
3 14-Apr-15 A
16-Apr-15 A
-163
CSTM2330
4 01-May-15 A 04-May-15 A
-177
CSTM2340
4 05-May-15 A 08-May-15 A
-178
CSTM23400
Bitumen primer
1 09-May-15 A 09-May-15 A
-177
CSTM2350
Tanking membrane
1 10-May-15 A 10-May-15 A
-177
CSTM2360
Backfilling
4 11-May-15 A
14-May-15 A
-180
CSTM2370
1 15-May-15 A 15-May-15 A
-179
CSTM2380
1 16-May-15 A 16-May-15 A
-178
CSTM2390
Benching work
1 17-May-15 A 17-May-15 A
-177
CSTM2410
GRP accessories
1 18-May-15 A 18-May-15 A
-173
19 12-Apr-15 A
30-Apr-15 A
CSTM29290
2 12-Apr-15 A
13-Apr-15 A
CSTM29300
3 14-Apr-15 A
16-Apr-15 A
CSTM29310
4 17-Apr-15 A
20-Apr-15 A
CSTM29320
4 21-Apr-15 A
24-Apr-15 A
CSTM29330
Bitumen primer
1 25-Apr-15 A
25-Apr-15 A
CSTM29340
Tanking membrane
1 26-Apr-15 A
26-Apr-15 A
CSTM29350
Backfilling
4 27-Apr-15 A
30-Apr-15 A
CSTM29360
1 30-Apr-15 A
30-Apr-15 A
CSTM29370
1 30-Apr-15 A
30-Apr-15 A
CSTM29380
Benching work
1 30-Apr-15 A
30-Apr-15 A
CSTM29390
GRP accessories
1 30-Apr-15 A
30-Apr-15 A
SI-2
2015
Feb
Mar
Apr
May
Jun
Jul
-175
0000.10
MANHOLE: 15/1/28/19
15/1
23 28-May-15 A 19-Jun-15 A
MANHOLE: 15/1/28/19/1
15/1
CSTM29410
2 28-May-15 A 29-May-15 A
SI-2
CSTM29420
3 30-May-15 A 01-Jun-15 A
SI-2
CSTM29430
4 02-Jun-15 A
05-Jun-15 A
SI-2
CSTM29440
4 06-Jun-15 A
09-Jun-15 A
SI-2
CSTM29450
Bitumen primer
1 10-Jun-15 A
10-Jun-15 A
SI-2
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
SI-2
CSTM29460
Tanking membrane
1 11-Jun-15 A
11-Jun-15 A
SI-2
CSTM29470
Backfilling
4 12-Jun-15 A
15-Jun-15 A
SI-2
CSTM29480
1 16-Jun-15 A
16-Jun-15 A
SI-2
CSTM29490
1 17-Jun-15 A
17-Jun-15 A
SI-2
CSTM29500
Benching work
1 18-Jun-15 A
18-Jun-15 A
SI-2
CSTM29510
GRP accessories
1 19-Jun-15 A
19-Jun-15 A
SI-2
63 16-Feb-15 A
19-Apr-15 A
-139
MANHOLE: 15/1/28/20
15/1
CSTM2550
2 16-Feb-15 A
17-Feb-15 A
-85
CSTM2560
Blinding
2 24-Mar-15 A
25-Mar-15 A
-115
CSTM2570
1 25-Mar-15 A
25-Mar-15 A
-111
CSTM2580
2 28-Mar-15 A
29-Mar-15 A
-112
CSTM25800
Benching work
1 12-Apr-15 A
12-Apr-15 A
-143
CSTM2590
Bitumen primer
1 13-Apr-15 A
13-Apr-15 A
-143
CSTM2600
Tanking membrane
1 14-Apr-15 A
14-Apr-15 A
-143
CSTM2610
1 15-Apr-15 A
15-Apr-15 A
-142
CSTM2620
GRP accessories
1 16-Apr-15 A
16-Apr-15 A
-141
CSTM2630
1 17-Apr-15 A
17-Apr-15 A
-140
CSTM2640
Backfilling
1 18-Apr-15 A
18-Apr-15 A
-137
CSTM2650
1 19-Apr-15 A
19-Apr-15 A
-137
66 14-Feb-15 A
20-Apr-15 A
-137
13 14-Feb-15 A
28-Feb-15 A
-91
MANHOLE: 15/1/28/21
15/1
CSTM2670
CSTM2680
Blinding
1 12-Mar-15 A
12-Mar-15 A
-101
CSTM2690
2 15-Mar-15 A
16-Mar-15 A
-100
CSTM2700
1 26-Mar-15 A
26-Mar-15 A
-107
CSTM27000
Benching work
1 13-Apr-15 A
13-Apr-15 A
-140
CSTM2710
Bitumen primer
1 14-Apr-15 A
14-Apr-15 A
-140
CSTM2720
Tanking membrane
1 15-Apr-15 A
15-Apr-15 A
-140
CSTM2730
1 16-Apr-15 A
16-Apr-15 A
-140
CSTM2740
GRP accessories
1 17-Apr-15 A
17-Apr-15 A
-139
CSTM2750
1 18-Apr-15 A
18-Apr-15 A
-137
CSTM2760
Backfilling
1 19-Apr-15 A
19-Apr-15 A
-135
CSTM2770
1 20-Apr-15 A
20-Apr-15 A
-135
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
REINSTATEMENT
ASPHALT
Finish
Total Pocess
Delays
45 19-Apr-15 A
02-Jun-15 A
-174
32 19-Apr-15 A
01-Jun-15 A
-178
CSTA1010
32 19-Apr-15 A
01-Jun-15 A
-179 Ps
CSTA1020
32 19-Apr-15 A
01-Jun-15 A
-178 Ps
1 01-Jun-15 A
01-Jun-15 A
-180
KERBSTONE
CSTC1000
1 01-Jun-15 A
01-Jun-15 A
-182 Ps
CSTC1010
Kerbs installation
1 01-Jun-15 A
01-Jun-15 A
-181 Ps
CSTC1020
Backing concrete
1 01-Jun-15 A
01-Jun-15 A
-180 Ps
2 01-Jun-15 A
02-Jun-15 A
-176
PAVING/CONCRETE PAVING
PAVING/CONCR
CSTP1010
Paving interlock
2 01-Jun-15 A
02-Jun-15 A
-176 Ps
CSTP1000
Formation preparation
2 01-Jun-15 A
02-Jun-15 A
-179 Ps
2 01-Jun-15 A
02-Jun-15 A
-174
2 01-Jun-15 A
02-Jun-15 A
-176 Ps
CSTPG1010
Planting/grass
2 01-Jun-15 A
02-Jun-15 A
-174 Ps
262 12-Jul-14 A
30-Mar-15 A
-104
262 12-Jul-14 A
30-Mar-15 A
-160
82 12-Jul-14 A
21-Oct-14 A
-44
43 12-Jul-14 A
02-Sep-14 A
-36
SEWER IN MICTROTUNNEL
MICTR
PHASE 1: FROM MH 15/1/28 TO 15/1/28/4
JACKING PIPES
PIPES: FROM MH 15/1/28 TO 15/1/28/4
L-300mm NOMINAL
NOMI
BORE IN M.TUNNEL 59.26m: From MH 15/1/28/1 to MH Ex.15/1/28
CSMJ1010
7 12-Jul-14 A
19-Jul-14 A
-13
CSMJ1020
3 20-Jul-14 A
22-Jul-14 A
-13
CSMJ1030
9 21-Aug-14 A
31-Aug-14 A
-36
CSMJ10300
1 01-Sep-14 A
01-Sep-14 A
-36
CSMJ1040
Annulus grouting
1 02-Sep-14 A
02-Sep-14 A
-36
19 24-Aug-14 A
14-Sep-14 A
-37
300mm NOMINAL
NOMINA BORE IN M.TUNNEL 60m: From MH 15/1/28/1 to MH 15/1/28/2
CSMJ1070
7 24-Aug-14 A
31-Aug-14 A
-36
CSMJ1080
1 01-Sep-14 A
01-Sep-14 A
-36
CSMJ1090
9 02-Sep-14 A
11-Sep-14 A
-37
CSMJ10900
1 13-Sep-14 A
13-Sep-14 A
-37
CSMJ1100
Annulus grouting
1 14-Sep-14 A
14-Sep-14 A
-37
21 01-Sep-14 A
24-Sep-14 A
-38
L-300mm NOMINAL
NOMI
BORE IN M.TUNNEL 60m: From MH 15/1/28/3 to MH 15/1/28/2
CSMJ1130
7 01-Sep-14 A
08-Sep-14 A
-38
CSMJ1140
3 09-Sep-14 A
11-Sep-14 A
-37
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSMJ1150
9 13-Sep-14 A
22-Sep-14 A
-38
CSMJ11500
1 23-Sep-14 A
23-Sep-14 A
-38
CSMJ1160
Annulus grouting
1 24-Sep-14 A
24-Sep-14 A
-38
22 23-Sep-14 A
21-Oct-14 A
-44
300mm NOMINAL
NOMINA BORE IN M.TUNNEL70m: From MH 15/1/28/3 to MH 15/1/28/4
CSMJ1190
9 23-Sep-14 A
02-Oct-14 A
-44
CSMJ1200
1 07-Oct-14 A
07-Oct-14 A
-44
CSMJ1210
10 08-Oct-14 A
19-Oct-14 A
-44
CSMJ12100
1 20-Oct-14 A
20-Oct-14 A
-44
CSMJ1220
Annulus grouting
1 21-Oct-14 A
21-Oct-14 A
-44
187 25-Sep-14 A
30-Mar-15 A
-182
123 27-Nov-14 A
29-Mar-15 A
-222
MANHOLE CONSTRUCTION
CONS
MANHOLE: 15/1/28/1
15/1
CSMM1840
2 27-Nov-14 A
29-Nov-14 A
-107
CSMM1850
Blinding
1 30-Nov-14 A
30-Nov-14 A
-107
CSMM184
Recovery
0 10-Jan-15 A
CSMM1860
CSMM1870
21-Jan-15 A
-147
3 21-Jan-15 A
24-Jan-15 A
-146
CSMM18700
Benching work
2 31-Jan-15 A
01-Feb-15 A
-151
CSMM1880
Bitumen primer
1 02-Feb-15 A
02-Feb-15 A
-151
CSMM1890
Tanking membrane
1 03-Feb-15 A
03-Feb-15 A
-151
CSMM1900
1 04-Feb-15 A
04-Feb-15 A
-151
CSMM1930
Backfilling
3 23-Feb-15 A
25-Feb-15 A
-159
CSMM1910
GRP accessories
2 25-Feb-15 A
26-Feb-15 A
-167
CSMM1920
3 23-Mar-15 A
25-Mar-15 A
-188
CSMM1940
3 26-Mar-15 A
29-Mar-15 A
-185
122 25-Sep-14 A
19-Feb-15 A
-137
CSMM1950
1 25-Sep-14 A
25-Sep-14 A
-38
CSMM1960
Blinding
1 27-Sep-14 A
27-Sep-14 A
-38
CSMM1970
96 28-Sep-14 A
21-Jan-15 A
-130
CSMM1980
3 26-Jan-15 A
28-Jan-15 A
-134
CSMM19800
Benching work
2 02-Feb-15 A
03-Feb-15 A
-137
CSMM1990
Bitumen primer
1 04-Feb-15 A
04-Feb-15 A
-137
CSMM2000
Tanking membrane
1 05-Feb-15 A
05-Feb-15 A
-137
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Mar
Apr
May
Jun
Jul
very
44 01-Dec-14 A
MANHOLE: 15/1/28/2
15/1
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSMM2010
1 07-Feb-15 A
07-Feb-15 A
-137
CSMM2020
GRP accessories
2 08-Feb-15 A
09-Feb-15 A
-137
CSMM2030
2 10-Feb-15 A
11-Feb-15 A
-137
CSMM2040
Backfilling
5 14-Feb-15 A
18-Feb-15 A
-137
CSMM2050
1 19-Feb-15 A
19-Feb-15 A
-137
103 22-Oct-14 A
21-Feb-15 A
-125
MANHOLE: 15/1/28/3
15/1
CSMJ1840
1 22-Oct-14 A
22-Oct-14 A
-44
CSMJ1850
Blinding
1 23-Oct-14 A
23-Oct-14 A
-44
CSMJ1860
76 25-Oct-14 A
21-Jan-15 A
-116
CSMJ1870
3 31-Jan-15 A
02-Feb-15 A
-124
CSMJ18700
Benching work
2 04-Feb-15 A
05-Feb-15 A
-125
CSMJ1880
Bitumen primer
1 07-Feb-15 A
07-Feb-15 A
-125
CSMJ1890
Tanking membrane
1 08-Feb-15 A
08-Feb-15 A
-125
CSMJ1900
1 09-Feb-15 A
09-Feb-15 A
-125
CSMJ1910
GRP accessories
1 10-Feb-15 A
10-Feb-15 A
-125
CSMJ1920
2 11-Feb-15 A
14-Feb-15 A
-125
CSMJ1930
Backfilling
5 15-Feb-15 A
19-Feb-15 A
-125
CSMJ1940
1 21-Feb-15 A
21-Feb-15 A
-125
72 05-Jan-15 A
30-Mar-15 A
-151
MANHOLE: 15/1/28/4
15/1
CSMJ1950
2 05-Jan-15 A
06-Jan-15 A
-102
CSMJ1960
Blinding
2 18-Jan-15 A
19-Jan-15 A
-112
CSMJ1970
4 04-Feb-15 A
08-Feb-15 A
-125
CSMJ1980
2 09-Feb-15 A
10-Feb-15 A
-125
CSMJ19800
Benching work
2 11-Feb-15 A
14-Feb-15 A
-125
CSMJ1990
Bitumen primer
1 15-Feb-15 A
15-Feb-15 A
-125
CSMJ2000
Tanking membrane
1 16-Feb-15 A
16-Feb-15 A
-125
CSMJ2010
1 17-Feb-15 A
17-Feb-15 A
-125
CSMJ2020
GRP accessories
1 25-Feb-15 A
25-Feb-15 A
-131
CSMJ2040
Backfilling
4 24-Feb-15 A
28-Feb-15 A
-126
CSMJ2030
3 26-Mar-15 A
29-Mar-15 A
-156
CSMJ2050
3 28-Mar-15 A
30-Mar-15 A
-151
12 16-Mar-15 A
29-Mar-15 A
-134
REINSTATEMENT
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
ASPHALT
Finish
Total Pocess
Delays
5 24-Mar-15 A
29-Mar-15 A
-146
CSMTR1510
3 24-Mar-15 A
26-Mar-15 A
-146
CSMTR1520
3 26-Mar-15 A
29-Mar-15 A
-146
2 16-Mar-15 A
17-Mar-15 A
-130
KERBSTONE
CSMTR1530
2 16-Mar-15 A
17-Mar-15 A
-134
CSMTR1540
Kerbs installation
2 16-Mar-15 A
17-Mar-15 A
-132
CSMTR1550
Backing concrete
2 16-Mar-15 A
17-Mar-15 A
-130
2 16-Mar-15 A
17-Mar-15 A
-126
PAVING/CONCRETE PAVING
PAVING/CONCR
CSMTR1560
Formation preparation
2 16-Mar-15 A
17-Mar-15 A
-128
CSMTR1570
Paving interlock
2 16-Mar-15 A
17-Mar-15 A
-126
1 16-Mar-15 A
16-Mar-15 A
-123
1 16-Mar-15 A
16-Mar-15 A
-124
CSMTR1590
Planting/grass
1 16-Mar-15 A
16-Mar-15 A
-123
221 21-Aug-14 A
29-Mar-15 A
-103
183 21-Aug-14 A
19-Feb-15 A
-110
26 15-Dec-14 A
10-Jan-15 A
-128
6 15-Dec-14 A
22-Dec-14 A
-104
CSMJ1260
4 23-Dec-14 A
27-Dec-14 A
-100
CSMJ1270
4 29-Dec-14 A
01-Jan-15 A
-101
CSMJ12700
1 03-Jan-15 A
03-Jan-15 A
-101
CSMJ1280
Annulus grouting
2 06-Jan-15 A
07-Jan-15 A
-104
CSMJ125
Recovery
0 10-Jan-15 A
300mm NOMINAL
NOMINA BORE IN M.TUNNEL 30.43m: From MH 15/1/28/5 to MH 15/1/28/6
22 04-Jan-15 A
28-Jan-15 A
-116
4 04-Jan-15 A
07-Jan-15 A
-106
CSMJ1320
2 10-Jan-15 A
11-Jan-15 A
-108
CSMJ1330
8 18-Jan-15 A
26-Jan-15 A
-116
CSMJ1340
Annulus grouting
2 27-Jan-15 A
28-Jan-15 A
-116
CSMJ13300
2 27-Jan-15 A
28-Jan-15 A
-117
19 06-Jan-15 A
27-Jan-15 A
-108
CSMJ1370
8 06-Jan-15 A
14-Jan-15 A
-107
CSMJ1380
4 11-Jan-15 A
14-Jan-15 A
-104
CSMJ1390
10 14-Jan-15 A
25-Jan-15 A
-108
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Mar
Apr
May
Jun
Jul
very
CSMJ1310
L-300mm NOMINAL
NOMI
BORE IN M.TUNNEL 61.78m: From MH 15/1/28/7 to MH 15/1/28/6
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSMJ13900
2 25-Jan-15 A
26-Jan-15 A
-108
CSMJ1400
Annulus grouting
2 26-Jan-15 A
27-Jan-15 A
-108
106 21-Aug-14 A
27-Dec-14 A
-75
300mm NOMINAL
NOMINA BORE IN M.TUNNEL 55.74m: From MH 15/1/28/7 to MH 15/1/28/8
CSMJ1430
6 21-Aug-14 A
27-Aug-14 A
17
CSMJ1440
1 28-Aug-14 A
28-Aug-14 A
17
CSMJ1450
8 30-Aug-14 A
07-Sep-14 A
14
CSMJ14500
1 08-Sep-14 A
08-Sep-14 A
14
CSMJ1460
Annulus grouting
2 25-Dec-14 A
27-Dec-14 A
-75
102 28-Aug-14 A
29-Dec-14 A
-71
L-300mm NOMINAL
NOMI
BORE IN M.TUNNEL 35.13m: From MH 15/1/28/9 to MH 15/1/28/8
CSMJ1490
3 28-Aug-14 A
31-Aug-14 A
19
CSMJ1500
3 04-Sep-14 A
07-Sep-14 A
16
CSMJ1510
4 08-Sep-14 A
11-Sep-14 A
16
CSMJ15100
1 13-Sep-14 A
13-Sep-14 A
16
CSMJ1520
Annulus grouting
2 28-Dec-14 A
29-Dec-14 A
-71
95 09-Sep-14 A
01-Jan-15 A
-68
300mm NOMINAL
NOMINA BORE IN M.TUNNEL 32.74m: From MH 15/1/28/9 to MH 15/1/28/10
CSMJ1550
3 09-Sep-14 A
11-Sep-14 A
16
CSMJ1560
1 13-Sep-14 A
13-Sep-14 A
16
CSMJ1570
5 14-Sep-14 A
18-Sep-14 A
16
CSMJ15700
1 20-Sep-14 A
20-Sep-14 A
16
CSMJ1580
Annulus grouting
2 31-Dec-14 A
01-Jan-15 A
-68
93 13-Sep-14 A
03-Jan-15 A
-62
L-300mm NOMINAL
NOMI
BORE IN M.TUNNEL 50.23m: From MH 15/1/28/11 to MH 15/1/28/10
CSMJ1610
7 13-Sep-14 A
20-Sep-14 A
14
CSMJ1620
3 21-Sep-14 A
23-Sep-14 A
14
CSMJ1630
7 24-Sep-14 A
01-Oct-14 A
12
CSMJ16300
1 02-Oct-14 A
02-Oct-14 A
12
CSMJ1640
Annulus grouting
2 01-Jan-15 A
03-Jan-15 A
-62
123 24-Sep-14 A
19-Feb-15 A
-93
300mm NOMINAL
NOMINA BORE IN M.TUNNEL 54.53m: From MH 15/1/28/11 to MH 15/1/28/12
CSMJ1670
7 24-Sep-14 A
01-Oct-14 A
12
CSMJ1680
1 02-Oct-14 A
02-Oct-14 A
12
CSMJ1690
8 07-Oct-14 A
15-Oct-14 A
12
CSMJ16900
1 16-Oct-14 A
16-Oct-14 A
12
CSMJ1700
Annulus grouting
1 19-Feb-15 A
19-Feb-15 A
-93
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
MANHOLE CONSTRUCTION
CONS
MANHOLE: 15/1/28/5
15/1
Finish
Total Pocess
Delays
86 17-Dec-14 A
29-Mar-15 A
-103
79 27-Dec-14 A
29-Mar-15 A
-144
CSMJ2060
2 27-Dec-14 A
28-Dec-14 A
-88
CSMJ2070
Blinding
1 20-Jan-15 A
20-Jan-15 A
-107
CSMJ2080
4 31-Jan-15 A
03-Feb-15 A
-115
CSMJ2090
2 15-Feb-15 A
16-Feb-15 A
-123
CSMJ20900
Benching work
2 17-Feb-15 A
18-Feb-15 A
-123
CSMJ2100
Bitumen primer
1 19-Feb-15 A
19-Feb-15 A
-123
CSMJ2110
Tanking membrane
1 21-Feb-15 A
21-Feb-15 A
-123
CSMJ2120
1 22-Feb-15 A
22-Feb-15 A
-123
CSMJ2130
GRP accessories
1 25-Feb-15 A
25-Feb-15 A
-125
CSMJ2150
Backfilling
6 22-Feb-15 A
28-Feb-15 A
-120
CSMJ2160
3 25-Mar-15 A
28-Mar-15 A
-143
CSMJ2140
3 26-Mar-15 A
29-Mar-15 A
-150
72 04-Jan-15 A
29-Mar-15 A
-137
MANHOLE: 15/1/28/6
15/1
CSMJ2170
2 04-Jan-15 A
05-Jan-15 A
-88
CSMJ2180
Blinding
2 27-Jan-15 A
28-Jan-15 A
-107
CSMJ2190
4 31-Jan-15 A
03-Feb-15 A
-108
CSMJ2200
2 04-Feb-15 A
05-Feb-15 A
-108
CSMJ22000
Benching work
2 07-Feb-15 A
08-Feb-15 A
-108
CSMJ2210
Bitumen primer
1 09-Feb-15 A
09-Feb-15 A
-108
CSMJ2220
Tanking membrane
1 10-Feb-15 A
10-Feb-15 A
-108
CSMJ2230
1 11-Feb-15 A
11-Feb-15 A
-108
CSMJ2240
GRP accessories
1 25-Feb-15 A
25-Feb-15 A
-118
CSMJ2260
Backfilling
6 22-Feb-15 A
28-Feb-15 A
-113
CSMJ2250
3 25-Mar-15 A
28-Mar-15 A
-142
CSMJ2270
3 26-Mar-15 A
29-Mar-15 A
-137
75 31-Dec-14 A
29-Mar-15 A
-131
MANHOLE: 15/1/28/7
15/1
CSMJ2300
4 31-Dec-14 A
04-Jan-15 A
-76
CSMJ2310
3 05-Jan-15 A
07-Jan-15 A
-77
CSMJ23100
Benching work
2 08-Jan-15 A
10-Jan-15 A
-77
CSMJ2280
2 12-Jan-15 A
13-Jan-15 A
-89
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSMJ2320
Bitumen primer
2 13-Jan-15 A
14-Jan-15 A
-80
CSMJ2290
Blinding
2 27-Jan-15 A
28-Jan-15 A
-101
CSMJ2330
Tanking membrane
1 31-Jan-15 A
31-Jan-15 A
-93
CSMJ2340
1 01-Feb-15 A
01-Feb-15 A
-93
CSMJ2350
GRP accessories
1 25-Feb-15 A
25-Feb-15 A
-112
CSMJ2370
Backfilling
5 23-Feb-15 A
28-Feb-15 A
-107
CSMJ2360
3 26-Mar-15 A
29-Mar-15 A
-137
CSMJ2380
3 26-Mar-15 A
29-Mar-15 A
-131
74 01-Jan-15 A
29-Mar-15 A
-125
MANHOLE: 15/1/28/8
15/1
CSMJ2400
Blinding
2 01-Jan-15 A
03-Jan-15 A
-73
CSMJ2410
4 04-Jan-15 A
07-Jan-15 A
-73
CSMJ2390
2 08-Jan-15 A
10-Jan-15 A
-80
CSMJ2420
3 07-Jan-15 A
10-Jan-15 A
-73
CSMJ24200
Benching work
2 10-Jan-15 A
11-Jan-15 A
-72
CSMJ2430
Bitumen primer
2 11-Jan-15 A
12-Jan-15 A
-72
CSMJ2440
Tanking membrane
1 31-Jan-15 A
31-Jan-15 A
-87
CSMJ2450
1 01-Feb-15 A
01-Feb-15 A
-87
CSMJ2460
GRP accessories
1 25-Feb-15 A
25-Feb-15 A
-106
CSMJ2480
Backfilling
6 22-Feb-15 A
28-Feb-15 A
-101
CSMJ2470
3 26-Mar-15 A
29-Mar-15 A
-131
CSMJ2490
3 26-Mar-15 A
29-Mar-15 A
-125
86 17-Dec-14 A
29-Mar-15 A
-119
MANHOLE: 15/1/28/9
15/1
CSMJ2510
Blinding
2 17-Dec-14 A
20-Dec-14 A
-55
CSMJ2520
5 22-Dec-14 A
27-Dec-14 A
-57
CSMJ2530
2 29-Dec-14 A
30-Dec-14 A
-58
CSMJ25300
Benching work
2 01-Jan-15 A
03-Jan-15 A
-59
CSMJ2500
2 04-Jan-15 A
05-Jan-15 A
-70
CSMJ2540
Bitumen primer
2 05-Jan-15 A
06-Jan-15 A
-61
CSMJ2550
Tanking membrane
1 31-Jan-15 A
31-Jan-15 A
-81
CSMJ2560
1 01-Feb-15 A
01-Feb-15 A
-81
CSMJ2570
GRP accessories
1 25-Feb-15 A
25-Feb-15 A
-100
CSMJ2590
Backfilling
6 23-Feb-15 A
01-Mar-15 A
-96
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSMJ2580
3 26-Mar-15 A
29-Mar-15 A
-125
CSMJ2600
3 26-Mar-15 A
29-Mar-15 A
-119
70 06-Jan-15 A
29-Mar-15 A
-112
MANHOLE: 15/1/28/10
15/1
CSMJ2610
2 06-Jan-15 A
07-Jan-15 A
-65
CSMJ2620
Blinding
2 27-Jan-15 A
28-Jan-15 A
-82
CSMJ2630
4 31-Jan-15 A
03-Feb-15 A
-83
CSMJ2640
2 04-Feb-15 A
05-Feb-15 A
-83
CSMJ26400
Benching work
2 07-Feb-15 A
08-Feb-15 A
-83
CSMJ2650
Bitumen primer
1 09-Feb-15 A
09-Feb-15 A
-83
CSMJ2660
Tanking membrane
1 10-Feb-15 A
10-Feb-15 A
-83
CSMJ2670
1 11-Feb-15 A
11-Feb-15 A
-83
CSMJ2680
GRP accessories
1 25-Feb-15 A
25-Feb-15 A
-93
CSMJ2700
Backfilling
6 22-Feb-15 A
28-Feb-15 A
-88
CSMJ2690
3 26-Mar-15 A
29-Mar-15 A
-118
CSMJ2710
3 26-Mar-15 A
29-Mar-15 A
-112
33 13-Jan-15 A
21-Feb-15 A
-72
MANHOLE: 15/1/28/11
15/1
CSMJ2720
2 13-Jan-15 A
14-Jan-15 A
-62
CSMJ2730
Blinding
2 27-Jan-15 A
28-Jan-15 A
-73
CSMJ2750
2 31-Jan-15 A
01-Feb-15 A
-70
CSMJ2740
5 28-Jan-15 A
02-Feb-15 A
-73
CSMJ27500
Benching work
2 02-Feb-15 A
03-Feb-15 A
-70
CSMJ2760
Bitumen primer
1 04-Feb-15 A
04-Feb-15 A
-70
CSMJ2770
Tanking membrane
1 05-Feb-15 A
05-Feb-15 A
-70
CSMJ2780
1 07-Feb-15 A
07-Feb-15 A
-70
CSMJ2790
GRP accessories
1 08-Feb-15 A
08-Feb-15 A
-70
CSMJ2800
2 09-Feb-15 A
10-Feb-15 A
-70
CSMJ2810
Backfilling
5 11-Feb-15 A
17-Feb-15 A
-70
CSMJ2820
2 19-Feb-15 A
21-Feb-15 A
-72
3 16-Mar-15 A
18-Mar-15 A
-109
3 16-Mar-15 A
18-Mar-15 A
-109
11 16-Mar-15 A
28-Mar-15 A
-85
3 25-Mar-15 A
28-Mar-15 A
-89
MANHOLE: 15/1/28/12
15/1
CSMJ2830
REINSTATEMENT
ASPHALT
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSMTR1360
3 25-Mar-15 A
28-Mar-15 A
-91
CSMTR1370
3 25-Mar-15 A
28-Mar-15 A
-89
2 16-Mar-15 A
17-Mar-15 A
-76
PAVING/CONCRETE PAVING
PAVING/CONCR
CSMTR1410
Formation preparation
2 16-Mar-15 A
17-Mar-15 A
-77
CSMTR1420
Paving interlock
2 16-Mar-15 A
17-Mar-15 A
-76
1 16-Mar-15 A
16-Mar-15 A
-76
KERBSTONE
CSMTR1380
1 16-Mar-15 A
16-Mar-15 A
-78
CSMTR1400
Backing concrete
1 16-Mar-15 A
16-Mar-15 A
-76
CSMTR1390
Kerbs installation
1 16-Mar-15 A
16-Mar-15 A
-77
2 16-Mar-15 A
17-Mar-15 A
-76
2 16-Mar-15 A
17-Mar-15 A
-76
CSMTR1440
Planting/grass
2 16-Mar-15 A
17-Mar-15 A
-76
162 08-Jan-15 A
18-Jun-15 A
-184
159 11-Jan-15 A
18-Jun-15 A
-184
144 11-Jan-15 A
03-Jun-15 A
-170
54 11-Jan-15 A
15-Mar-15 A
-87
HOUSE CONNECTION
CONNECT
SEWER IN TRENCH
TRENC (AREA)
HOUSE CONNECTION
CONNEC
PHASE 1
SURVEY AND DEMOLISH
D
CHG1000
Plot survey
2 11-Jan-15 A
12-Jan-15 A
-37
CHG1010
3 12-Mar-15 A
15-Mar-15 A
-87
67 24-Feb-15 A
01-May-15 A
-242
43 24-Feb-15 A
07-Apr-15 A
-232
CSHCP1020
43 26-Feb-15 A
09-Apr-15 A
-231
CSHCP1030
42 28-Feb-15 A
10-Apr-15 A
-228
CSHCP1040
44 28-Feb-15 A
12-Apr-15 A
-227
CSHCP1050
Backfilling
46 28-Feb-15 A
14-Apr-15 A
-227
CSHCP1060
Concrete backfill
63 28-Feb-15 A
01-May-15 A
-242
70 28-Feb-15 A
08-May-15 A
30 28-Feb-15 A
29-Mar-15 A
CSHCP1080
43 28-Feb-15 A
11-Apr-15 A
CSHCP1090
50 28-Feb-15 A
18-Apr-15 A
CSHCP1100
52 28-Feb-15 A
20-Apr-15 A
CSHCP1110
Backfilling
54 28-Feb-15 A
22-Apr-15 A
CSHCP1120
Concrete backfill
70 28-Feb-15 A
08-May-15 A
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
98 24-Feb-15 A
01-Jun-15 A
Total Pocess
Delays
CSHCP1130
86 24-Feb-15 A
22-May-15 A
Ps
CSHCP1140
84 26-Feb-15 A
24-May-15 A
Ps
CSHCP1150
84 26-Feb-15 A
26-May-15 A
Ps
CSHCP1160
84 26-Feb-15 A
28-May-15 A
Ps
CSHCP1170
Backfilling
50 07-Apr-15 A
30-May-15 A
Ps
CSHCP1180
Concrete backfill
2 31-May-15 A 01-Jun-15 A
99 25-Feb-15 A
03-Jun-15 A
48 25-Feb-15 A
13-Apr-15 A
CSHCP1200
49 26-Feb-15 A
15-Apr-15 A
CSHCP1210
51 26-Feb-15 A
17-Apr-15 A
CSHCP1220
53 26-Feb-15 A
19-Apr-15 A
CSHCP1230
Backfilling
53 28-Feb-15 A
21-Apr-15 A
CSHCP1240
Concrete backfill
2 02-Jun-15 A
03-Jun-15 A
21 14-Apr-15 A
04-May-15 A
-139
1 14-Apr-15 A
14-Apr-15 A
-133
CHCC1020
Blinding
1 15-Apr-15 A
15-Apr-15 A
-133
CHCC1030
1 16-Apr-15 A
16-Apr-15 A
-132
CHCC1040
1 17-Apr-15 A
17-Apr-15 A
-132
CHCC10400
Benching work
1 18-Apr-15 A
18-Apr-15 A
-130
CHCC1050
Bitumen primer
1 19-Apr-15 A
19-Apr-15 A
-130
CHCC1060
Tanking membrane
1 20-Apr-15 A
20-Apr-15 A
-130
CHCC1070
1 21-Apr-15 A
21-Apr-15 A
-130
CHCC1080
GRP accessories
1 22-Apr-15 A
22-Apr-15 A
-130
CHCC1090
1 03-May-15 A 03-May-15 A
-139
CHCC1100
Backfilling
1 04-May-15 A 04-May-15 A
-139
44 15-Apr-15 A
28-May-15 A
-163
CHCC1120
1 15-Apr-15 A
15-Apr-15 A
-134
CHCC1130
Blinding
1 16-Apr-15 A
16-Apr-15 A
-134
CHCC1140
1 17-Apr-15 A
17-Apr-15 A
-133
CHCC1150
1 18-Apr-15 A
18-Apr-15 A
-133
CHCC11500
Benching work
1 03-May-15 A 03-May-15 A
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
2015
Feb
Mar
Apr
May
Jun
Jul
Ps
CHCC1010
INSPECTION CHAMBER
CH
2
SI-2
Ps
CSHCP1190
INSPECTION CHAMBER
CH
1
-145
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CHCC1160
Bitumen primer
1 23-May-15 A 23-May-15 A
-164 Ps
CHCC1170
Tanking membrane
1 24-May-15 A 24-May-15 A
-164 Ps
CHCC1180
1 25-May-15 A 25-May-15 A
-164 Ps
CHCC1190
GRP accessories
1 26-May-15 A 26-May-15 A
-164 Ps
CHCC1200
1 27-May-15 A 27-May-15 A
-163 Ps
CHCC1210
Backfilling
1 28-May-15 A 28-May-15 A
-163 Ps
SI-2
2015
Feb
Mar
Apr
May
Jun
Jul
11 03-May-15 A 13-May-15 A
INSPECTION CHAMBER
CH
3
CHCC11510
1 03-May-15 A 03-May-15 A
CHCC11520
Blinding
1 04-May-15 A 04-May-15 A
CHCC11530
1 05-May-15 A 05-May-15 A
CHCC11540
1 06-May-15 A 06-May-15 A
CHCC11550
Benching work
1 07-May-15 A 07-May-15 A
CHCC11560
Bitumen primer
1 08-May-15 A 08-May-15 A
CHCC11570
Tanking membrane
1 09-May-15 A 09-May-15 A
CHCC11580
1 10-May-15 A 10-May-15 A
CHCC11590
GRP accessories
1 11-May-15 A
CHCC11600
1 12-May-15 A 12-May-15 A
CHCC11610
Backfilling
1 13-May-15 A 13-May-15 A
INSPECTION CHAMBER
CH
4
11-May-15 A
28 17-Apr-15 A
14-May-15 A
CHCC11620
1 17-Apr-15 A
17-Apr-15 A
CHCC11630
Blinding
1 18-Apr-15 A
18-Apr-15 A
CHCC11640
1 04-May-15 A 04-May-15 A
CHCC11650
1 05-May-15 A 05-May-15 A
CHCC11660
Benching work
1 06-May-15 A 06-May-15 A
CHCC11670
Bitumen primer
1 07-May-15 A 07-May-15 A
CHCC11680
Tanking membrane
1 08-May-15 A 08-May-15 A
CHCC11690
1 09-May-15 A 09-May-15 A
CHCC11700
GRP accessories
1 10-May-15 A 10-May-15 A
CHCC11710
1 11-May-15 A
CHCC11720
Backfilling
1 14-May-15 A 14-May-15 A
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
11-May-15 A
1 31-May-15 A 31-May-15 A
-165
1 31-May-15 A 31-May-15 A
-165
Checked
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
HOUSE CONNECTION
CONNEC
PHASE 2
SURVEY AND DEMOLISH
D
Finish
128 21-Jan-15 A
28-May-15 A
125 21-Jan-15 A
25-May-15 A
C.HC.P221000
Plot survey
3 21-Jan-15 A
C.HC.P221010
3 23-May-15 A 25-May-15 A
94 24-Feb-15 A
28-May-15 A
75 24-Feb-15 A
09-May-15 A
CSHCP1260
76 25-Feb-15 A
11-May-15 A
CSHCP1270
79 24-Feb-15 A
13-May-15 A
CSHCP1280
81 24-Feb-15 A
15-May-15 A
CSHCP1290
Backfilling
82 25-Feb-15 A
17-May-15 A
CSHCP1300
Concrete backfill
93 25-Feb-15 A
28-May-15 A
INSPECTION CHAMBER
CH
5
2 25-May-15 A 26-May-15 A
SI-2
2015
Feb
Mar
Apr
May
Jun
Jul
24-Jan-15 A
CSHCP1250
C.HC.P221020
Total Pocess
Delays
2 25-May-15 A 26-May-15 A
HOUSE CONNECTION
CONNEC
PHASE 3
SURVEY AND DEMOLISH
D
148 22-Jan-15 A
18-Jun-15 A
-184
108 22-Jan-15 A
09-May-15 A
-157
24-Jan-15 A
-45
CSTH1070
Plot survey
2 22-Jan-15 A
CSTH1080
3 07-May-15 A 09-May-15 A
13 26-May-15 A 07-Jun-15 A
-155
-177
CSTH1010
5 26-May-15 A 30-May-15 A
-183
CSTH1020
2 31-May-15 A 01-Jun-15 A
-182
CSTH1030
4 02-Jun-15 A
05-Jun-15 A
-182
CSTH1050
Backfilling
2 06-Jun-15 A
07-Jun-15 A
-179
CSTH1060
Concrete backfill
2 06-Jun-15 A
07-Jun-15 A
-177
CSTH1040
2 06-Jun-15 A
07-Jun-15 A
-181
11 31-May-15 A 10-Jun-15 A
5 31-May-15 A 04-Jun-15 A
SI-2
CSTH12420
2 05-Jun-15 A
06-Jun-15 A
SI-2
CSTH12430
2 07-Jun-15 A
08-Jun-15 A
SI-2
CSTH12440
2 07-Jun-15 A
08-Jun-15 A
SI-2
CSTH12460
Concrete backfill
2 09-Jun-15 A
10-Jun-15 A
SI-2
CSTH12450
Backfilling
2 09-Jun-15 A
10-Jun-15 A
SI-2
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
INSPECTION CH
CHAMBER 1 (SI 2)
Finish
Total Pocess
Delays
13 05-Jun-15 A
17-Jun-15 A
-181
SI-2
CSTH1100
1 05-Jun-15 A
05-Jun-15 A
-183
SI-2
CSTH1110
Blinding
1 06-Jun-15 A
06-Jun-15 A
-183
SI-2
CSTH1120
2 07-Jun-15 A
08-Jun-15 A
-182
SI-2
CSTH1130
1 09-Jun-15 A
09-Jun-15 A
-182
SI-2
CSTH11300
Benching work
2 10-Jun-15 A
11-Jun-15 A
-182
SI-2
CSTH1140
Bitumen primer
1 12-Jun-15 A
12-Jun-15 A
-182
SI-2
CSTH1150
Tanking membrane
1 13-Jun-15 A
13-Jun-15 A
-182
SI-2
CSTH1160
1 14-Jun-15 A
14-Jun-15 A
-181
SI-2
CSTH1170
GRP accessories
1 15-Jun-15 A
15-Jun-15 A
-181
SI-2
CSTH1180
1 16-Jun-15 A
16-Jun-15 A
-181
SI-2
CSTH1190
Backfilling
1 17-Jun-15 A
17-Jun-15 A
-181
SI-2
13 06-Jun-15 A
18-Jun-15 A
-182
INSPECTION CH
CHAMBER 2 (SI 2)
CSTH1210
1 06-Jun-15 A
06-Jun-15 A
-184
SI-2
CSTH1220
Blinding
1 07-Jun-15 A
07-Jun-15 A
-184
SI-2
CSTH1230
2 08-Jun-15 A
09-Jun-15 A
-183
SI-2
CSTH1240
1 10-Jun-15 A
10-Jun-15 A
-183
SI-2
CSTH12400
Benching work
2 11-Jun-15 A
12-Jun-15 A
-183
SI-2
CSTH1250
Bitumen primer
1 13-Jun-15 A
13-Jun-15 A
-183
SI-2
CSTH1260
Tanking membrane
1 14-Jun-15 A
14-Jun-15 A
-183
SI-2
CSTH1270
1 15-Jun-15 A
15-Jun-15 A
-182
SI-2
CSTH1280
GRP accessories
1 16-Jun-15 A
16-Jun-15 A
-182
SI-2
CSTH1290
1 17-Jun-15 A
17-Jun-15 A
-182
SI-2
CSTH1300
Backfilling
1 18-Jun-15 A
18-Jun-15 A
-182
SI-2
5 14-Jun-15 A
18-Jun-15 A
-182
5 14-Jun-15 A
18-Jun-15 A
-182
141 08-Jan-15 A
28-May-15 A
-163
141 08-Jan-15 A
28-May-15 A
-163
97 08-Jan-15 A
14-Apr-15 A
-132
SEWER IN MICTROTUNNEL
MICTR
HOUSE CONNECTION
CONNEC
PHASE 2
SURVEY AND DEMOLISH
D
CSMTHC1390
Plot survey
2 08-Jan-15 A
10-Jan-15 A
-33
CSMTHC1400
3 12-Apr-15 A
14-Apr-15 A
-130
88 22-Feb-15 A
22-May-15 A
-158
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
2015
Feb
Mar
Apr
May
Jun
Jul
SI-2
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
CSMTHC1330
56 22-Feb-15 A
18-Apr-15 A
-138
CSMTHC1340
54 24-Feb-15 A
18-Apr-15 A
-136
CSMTHC1350
55 24-Feb-15 A
19-Apr-15 A
-132
CSMTHC1360
54 25-Feb-15 A
19-Apr-15 A
-130
CSMTHC1370
Backfilling
54 25-Feb-15 A
19-Apr-15 A
-128
CSMTHC1380
Concrete backfill
84 26-Feb-15 A
22-May-15 A
-158
31 20-Apr-15 A
25-May-15 A
-158
INSPECTION CHAMBER
CH
1
CSMTHC1420
2 20-Apr-15 A
21-Apr-15 A
-138
CSMTHC1430
Blinding
2 21-Apr-15 A
22-Apr-15 A
-138
CSMTHC1440
3 22-Apr-15 A
24-Apr-15 A
-137
CSMTHC1450
2 24-Apr-15 A
25-Apr-15 A
-137
3 25-Apr-15 A
27-Apr-15 A
-137
CSMTHC1460
Bitumen primer
2 27-Apr-15 A
29-Apr-15 A
-137
CSMTHC1470
Tanking membrane
2 28-Apr-15 A
29-Apr-15 A
-137
CSMTHC1480
2 29-Apr-15 A
30-Apr-15 A
-136
CSMTHC1490
GRP accessories
2 30-Apr-15 A
01-May-15 A
-136
CSMTHC1500
2 01-May-15 A 02-May-15 A
-136
CSMTHC1510
Backfilling
19 02-May-15 A 25-May-15 A
-158
INSPECTION CHAMBER
CH
2
3 26-May-15 A 28-May-15 A
-161
3 26-May-15 A 28-May-15 A
-161
CSMTHC1630
PIPE CONNECTIO
CONNECTION TO EXISTING MH
MANHOLE: Existing
Existi
15/1/28
5 16-Mar-15 A
21-Mar-15 A
-77
5 16-Mar-15 A
21-Mar-15 A
-77
2 16-Mar-15 A
17-Mar-15 A
-77
CSMM2770
2 18-Mar-15 A
19-Mar-15 A
-78
CSMM2780
Backfilling
2 19-Mar-15 A
21-Mar-15 A
-77
233 22-Jul-14 A
22-Jun-15 A
-131
233 22-Jul-14 A
22-Jun-15 A
-132
145 22-Jul-14 A
18-Feb-15 A
-131
SEWER IN TRENCH
TRENC
FINAL TESTING PHASE
P
1
TC.ST.P1.00
1 22-Jul-14 A
22-Jul-14 A
TC.ST.P1.10
1 03-Sep-14 A
03-Sep-14 A
-27
TC.ST.P1.20
1 07-Sep-14 A
07-Sep-14 A
-26
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
SI-2
2015
Feb
Mar
Apr
May
Jun
Jul
CSMM2750
Checked
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
TC.ST.P1.30
1 05-Feb-15 A
05-Feb-15 A
-124
TC.ST.P1.40
1 18-Feb-15 A
18-Feb-15 A
-131
22 19-Feb-15 A
22-Mar-15 A
-118
1 19-Feb-15 A
19-Feb-15 A
-105
TC.ST.P2.20
2 19-Mar-15 A
22-Mar-15 A
-118
TC.ST.P2.10
2 19-Mar-15 A
22-Mar-15 A
-123
47 15-Apr-15 A
18-Jun-15 A
-143
2 15-Apr-15 A
16-Apr-15 A
-106
TC.ST.P3.40
2 16-Apr-15 A
19-Apr-15 A
-99
TC.ST.P3.00
1 18-May-15 A 18-May-15 A
-132
TC.ST.P3.20
1 18-May-15 A 18-May-15 A
-130
TC.ST.P3.10
1 27-May-15 A 27-May-15 A
-138
TC.ST.P3.50
2 17-Jun-15 A
18-Jun-15 A
63 26-Mar-15 A
22-Jun-15 A
-132
COMMISIONING
Commissioning phase 2 (in trench)
13 26-Mar-15 A
13-Apr-15 A
-82
TC.ST.C.10
17 26-Mar-15 A
19-Apr-15 A
-87
TC.ST.C.30
4 17-Jun-15 A
22-Jun-15 A
38 04-Feb-15 A
30-Mar-15 A
-71
16 04-Feb-15 A
28-Feb-15 A
-102
2 04-Feb-15 A
05-Feb-15 A
-117
TC.SMT.P1.20
1 10-Feb-15 A
10-Feb-15 A
-96
TC.SMT.P1.30
1 15-Feb-15 A
15-Feb-15 A
-93
TC.SMT.P1.10
1 26-Feb-15 A
28-Feb-15 A
-118
12 11-Feb-15 A
01-Mar-15 A
-51
TC.SMT.P2.70
1 11-Feb-15 A
11-Feb-15 A
-47
TC.SMT.P2.10
1 17-Feb-15 A
17-Feb-15 A
-84
TC.SMT.P2.20
1 18-Feb-15 A
18-Feb-15 A
-80
TC.SMT.P2.00
1 19-Feb-15 A
19-Feb-15 A
-91
TC.SMT.P2.30
1 19-Feb-15 A
19-Feb-15 A
-76
TC.SMT.P2.40
1 22-Feb-15 A
22-Feb-15 A
-72
TC.SMT.P2.50
1 23-Feb-15 A
23-Feb-15 A
-67
TC.SMT.P2.60
1 24-Feb-15 A
24-Feb-15 A
-60
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
2015
Feb
Mar
Apr
May
Jun
Jul
-132 Ps
TC.SMT.P1.00
SI-2
SI-2
TC.ST.C.20
Approved
Aug
Activity ID
Activity Name
Original Start
Duration
Finish
Total Pocess
Delays
TC.SMT.P2.80
1 25-Feb-15 A
25-Feb-15 A
-53
TC.SMT.P2.90
1 01-Mar-15 A
01-Mar-15 A
-51
9 18-Mar-15 A
30-Mar-15 A
-71
COMMISIONING
TC.SNT.C.20
9 18-Mar-15 A
30-Mar-15 A
-71
TC.SNT.C.10
9 18-Mar-15 A
30-Mar-15 A
-72
85 10-Feb-15 A
22-Jun-15 A
-157
CLOSE OUT
A1030
Demobilisation
73 25-Feb-15 A
22-Jun-15 A
-157
A1010
85 10-Feb-15 A
22-Jun-15 A
-157
A1020
Snagging
55 18-Mar-15 A
22-Jun-15 A
-157
Second Baseline
Criti...
Actual Work
Mile...
Primary Baseline
Remaining Work
Date
Revision
Checked
SI-2
2015
Feb
Approved
Mar
Apr
May
Jun
Jul
Aug