Académique Documents
Professionnel Documents
Culture Documents
ppt
R\200060\Commercial\Typing\_GeneralPresentation\doris_pres\PresentationDORISDiapo\PresentationComplte
Slide 1
June 2007
General_Presentation.ppt
CONCLUSION
Slide 2
INTRODUCTION
CONTENTS
June 2007
General_Presentation.ppt
E-F
G
2,000 m
W LOBE
D
3752
3463
3120 (DHI)
Reservoir system
(nb of complexes,
stacked sand channel,
lobes)
Slide 3
CL (*)
ODT
Top
E
B+C
A
2000 m
OUT
RESERVOIR CHARACTERISTICS
E
June 2007
General_Presentation.ppt
Slide 4
PVT modelling :
Composition set up,
Heavy cut characteristic definition
Thermodynamic package
June 2007
General_Presentation.ppt
Reservoir
Burial depth
(Metres)
- 4000
- 250
0
300 - 500
600
900 - 1000
1200
1500 - 1500
1800
2100 - 2000
2400
- 2500
2700
3000
- 3000
3300
3600
- 3500
3900
4200
TLP
FPSO
SPAR
Slide 5
June 2007
- 4000
- 3500
- 3000
- 2500
- 2000
- 1500
- 1000
- 500
- 250
SEMI SUB
Jacket Platform
TYPICAL
SHALLOW WATER
FIELD
RESERVOIR LOCATION
General_Presentation.ppt
5,000
10,000
15,000
11
10
Slide 6
17
16
15
14
13
12
20,000
A45_P1
A45_P1
A45_P1
A45_P1
18
A45_P1
Oil
W ater
Liquid
Gas
19
25,000
08
07
06
05
04
03
02
01
00
RESERVOIR MODEL
PRODUCTION PROFILES PER WELL
June 2007
10
20
30
40
50
60
70
80
90
100
09
General_Presentation.ppt
Slide 7
June 2007
General_Presentation.ppt
HY
D
VISC
?
O ST Y
Slide 8
CO3--
ASPHALTENES
SO4--
RESERVOIR
CP
WAX
R
A
TE
June 2007
General_Presentation.ppt
Slide 9
PROD
PROD
WATER
June 2007
Field Architecture :
Well drilling centers
Well target
Subsea Pipeline Network
Topsides facilities location
General_Presentation.ppt
Topsides
Process Deck
WAX
Slide 10
FLOW
ACTIVATION
EMULSION
EROSION
CORROSION
SCALES
ASPHALTENES
FLOW
ASSURANCE
STRATEGIES
OPERABILITY
TOPSIDES
PROCESS
SLUGS
NAPHTENATE
HYDRATE
June 2007
105 m
General_Presentation.ppt
GAS LIFT
HYDRATE
INHIBITORS
Separation
Slide 11
Multiphase Pump
June 2007
GAS LIFT
Topsides
General_Presentation.ppt
- Topsides Requirements
- Production boosting
- Chemical Requirements
Slide 12
(m/s)
VLiquid
1.7e7
1.75e7
1.5e7
1.55e7
1.6e7
1.65e7
Trend data
5000
20 000 blpd
25 000 blpd
15 000 blpd
10 000 blpd
10000
Time [s]
June 2007
15000
Time (s)
P40_riserbase_10Mblpd_lat e_1wA_M42_M41_WC50:
P40_riserbase_15Mblpd_lat e_1wA_M42_M41_WC50:
P40_riserbase_20Mblpd_lat e_1wA_M42_M41_WC50:
P40_riserbase_25Mblpd_lat e_1wA_M42_M41_WC50:
(m/s)
VGas
UPWARD SLOPE
DOWNWARD SLOPE
STRATIFIED
SLUGS
BUBBLE
Pa
- Pipe Diameters
Pressure (Pa)
20000
General_Presentation.ppt
WELLS
&
DRILLING
RESERVOIR
SEABED
TREE
SPS
UFR
FLOWLINE
Slide 13
CHOKE
RISER
TOPSIDES
June 2007
General_Presentation.ppt
Slide 14
June 2007
General_Presentation.ppt
THERMAL
SPECIFICATIONS
(FA)
PIPE
SIZES
(FA)
CONSTRUCTION
METHODS
Slide 15
GAS LIFT
INJECTION
(FA)
DEEPWATER
RISER
DESIGN
ENVIRONMENTAL DATA
June 2007
RISER
COMPONENENTS
SPEC.
INSTALLATION
METHODS
FLOATER
EXCURSION
General_Presentation.ppt
Spools (jumper)
Core pipe
(tether)
Slide 16
June 2007
Flexjoint
(taper joint)
Riser bundle
(integral/non integral)
Buoyancy tank
(air cans)
Flexibles jumpers
(dynamic bundles)
General_Presentation.ppt
WHFT (C)
30
35
40
45
50
55
60
65
70
75
80
10
15
20
20
26
25
32
15
20
16
25
32
20
39
26
Bundle
Insulation
30
35
Tie Back distance (km)
25
23
12
15
29
19
36
PIP
Insulation
40
45
20
Electrical
26
Heating
31
50
Slide 17
55
June 2007
23
25
30
33
36
40
Wet
Insulation
60
General_Presentation.ppt
PRODUCTION LINE
TO LOOP THE
REQUIRES
GAS
Slide 18
METHANOL
DRY OIL
June 2007
General_Presentation.ppt
Slide 19
June 2007
RISER BASE
SENSORS AT
TEMPERATURE
DEDICATED
General_Presentation.ppt
Time (hours)
0.00
10.00
20.00
30.00
40.00
50.00
60.00
P30 test
10
Temperature (C)
P50 test
12
P10 test
16
14
18
T initial
T initial
0.0
0.5
1.0
1.5
2.0
2.5
Slide 20
INSULATION PERFORMANCES
t (h)
3.0
3.5
4.0
4.5
5.0
19
21
23
25
27
29
31
33
35
37
39
41
43
45
47
49
51
53
55
5.5
6.0
l302
l301
r302
r301
June 2007
T (C)
General_Presentation.ppt
Slide 21
TEMPERATURE PROBE
June 2007
General_Presentation.ppt
Slide 22
TEMPERATURE PROBE
TO UPDATE PROCEDURES
FIELD PRODUCTION
June 2007
General_Presentation.ppt
Slide 23
June 2007
General_Presentation.ppt
Slide 24
OFFSHORE IS
STILL
INNOVATIVE
DONT BE
WRONG
June 2007
General_Presentation.ppt
Slide 25
June 2007