Vous êtes sur la page 1sur 12

APPROVAL

INSPECTION
TESTING
CERTIFICATION

Linear Composites Limited


Vale Mills
Oakworth
Keighley
West Yorkshire BD22 0EB
Tel: 01535 643363 Fax: 01535 643605

TECHNICAL APPROVALS FOR CONSTRUCTION

Agrment Certificate

03/4065

e-mail: mail@linearcomposites.com
website: www.linearcomposites.com

Product Sheet 1

LINEAR COMPOSITES SOIL REINFORCEMENT PRODUCTS


PARALINK GEOCOMPOSITES
PRODUCT SCOPE AND SUMMARY OF CERTIFICATE
This Certificate relates to Paralink Geocomposites, for
use as basal reinforcement in embankment foundations.
AGRMENT CERTIFICATION INCLUDES:
factors relating to compliance with Building
Regulations where applicable
factors relating to additional non-regulatory
information where applicable
independently verified technical specification
assessment criteria and technical investigations
design considerations
installation guidance
regular surveillance of production
formal three-yearly review.
KEY FACTORS ASSESSED
Mechanical properties short-term and long-term tensile strength and strain properties of the geocomposites have
been assessed (see section 6).
Partial material factors partial material factors for manufacture (fm11), extrapolation of test data (fm12), installation
damage (fm21) and environmental effects (fm22) have been established (see section 7).
Soil/geocomposite interaction interaction coefficients relating to direct sliding and pull-out resistance have been
evaluated (see section 8).
Durability the geocomposites have good resistance to chemical degradation, biological degradation, temperature
and weathering used in fills normally encountered in civil engineering practice (see section 10).
The BBA has awarded this Agrment Certificate to the company named above for the products described herein.
These products have been assessed by the BBA as being fit for their intended use provided they are installed,
used and maintained as set out in this Certificate.
On behalf of the British Board of Agrment

Date of First issue: 21 July 2010

Brian Chamberlain

Greg Cooper

Originally certificated on 3 December 2003

Head of Approvals Engineering

Chief Executive Executive

Certificate amended 18 November 2011 to replace Figures 2 and 4.


The BBA is a UKAS accredited certification body Number 113. The schedule of the current scope of accreditation for product certification is
available in pdf format via the UKAS link on the BBA website at www.bbacerts.co.uk

Readers are advised to check the validity and latest issue number of this Agrment Certificate by either referring to the BBA website or contacting the BBA direct.

British Board of Agrment


Bucknalls Lane
Garston, Watford
Herts WD25 9BA

2010
Page 1 of 12

tel: 01923 665300


fax: 01923 665301
e-mail: mail@bba.star.co.uk
website: www.bbacerts.co.uk

Regulations
The Building Regulations 2000 (as amended) (England and Wales)

In the opinion of the BBA, Paralink Geocomposites for use as basal reinforcements are not subject to these
Regulations.
The Building (Scotland) Regulations 2004 (as amended)

In the opinion of the BBA, Paralink Geocomposites for use as basal reinforcements are not controlled under these
Regulations.
The Building Regulations (Northern Ireland) 2000 (as amended)

In the opinion of the BBA, Paralink Geocomposites for use as basal reinforcements are not controlled under these
Regulations.
Construction (Design and Management) Regulations 2007
Construction (Design and Management) Regulations (Northern Ireland) 2007
Information in this Certificate may assist the client, CDM co-ordinator, designer and contractors to address their
obligations under these Regulations.
See sections:

2 Delivery and site handling (2.1 and 2.4) and 11 General of this Certificate.

Non-regulatory Information
NHBC Standards 2010
In the opinion of the BBA, the use of Paralink Geocomposites, in relation to this Certificate, is not subject to the
requirements of these Standards.

General
This Certificate relates to Paralink Geocomposites, for use as basal reinforcement under embankments where the
following foundation conditions exist:
soft foundation soils
piled foundations
areas prone to subsidence.
Paralink Geocomposites are planar structures consisting of a regular array of composite geosynthetic straps, nominally
interconnected laterally to form soil reinforcement materials with high unidirectional strength.
The design and construction of embankments must be in accordance with the conditions set out in the Design
Considerations and Installation parts of this Certificate.

Technical Specification
1 Description
1.1 Paralink Geocomposites are planar structures consisting of a regular array of composite geosynthetic straps,
nominally interconnected laterally to form soil reinforcement materials with high unidirectional strength.
1.2 The straps comprise polyester tendons encased in a polyethylene sheath. The composite is passed through rollers
to give a knurled finish on the sheath. They are cooled and cut to length. The products are formed by heat-bonding
widely spaced composites of nominal strength across an array of the straps to produce a nominal 4.5 metre wide
planar structure.
1.3 The products are identified on site by clear marking of the product type and grade, along the length of the roll.
The range of specification of the geocomposites assessed by the BBA is given in Tables 1 and 2. A typical Paralink
Geocomposite is shown in Figure 1.

Page 2 of 12

Table 1 General specification


Grade(1)

Mass(2)
(5.0%)
(gm2)

Grid size(3)
warp/weft
AxB
(mm)

Aperture size(2)
warp/weft
CxD
(mm)

Standard
roll length
(m)
(+1/0%)

Roll weight
(kg)
(5%)

100

425

180 x 1000

98 x 940

200

440

150

515

180 x 1000

95 x 940

200

520

200

590

180 x 1000

95 x 940

200

590

250

697

180 x 1000

95 x 940

200

690

300

789

180 x 1000

92 x 940

200

770

350

890

180 x 1000

91 x 940

150

660

400

1014

180 x 1000

90 x 940

150

750

450

1124

180 x 1000

90 x 940

130

720

500

1219

180 x 1000

90 x 940

130

780

550

1410

180 x 1000

90 x 940

100

700

600

1507

180 x 1000

90 x 940

100

750

650

1681

180 x 1000

89 x 940

100

830

700

1835

180 x 1000

89 x 940

50

480

750

1970

150 x 1000

59 x 940

50

510

800

2135

150 x 1000

59 x 940

50

550

850

2221

125 x 1000

34 x 940

50

570

900

2351

125 x 1000

34 x 940

50

600

950

2543

125 x 1000

34 x 940

50

640

1000

2616

125 x 1000

34 x 940

50

660

1050

2695

100 x 1000

9 x 940

50

680

1100

2829

100 x 1000

9 x 940

50

710

1150

3018

100 x 1000

9 x 940

50

750

1200

3171

100 x 1000

9 x 940

50

790

1250

3254

100 x 1000

9 x 940

50

800

1300

3475

100 x 1000

9 x 940

50

860

1350

3674

100 x 1000

9 x 940

50

900

(1) Intermediate grades are available on request and are covered by this Certificate.
(2) Mass/unit area measured in accordance with BS EN ISO 9864 : 2005.
(3) Mean measured dimensions (see Figure 1 for reference).

Page 3 of 12

Table 2 Performance characteristics


Grade

Short-term tensile strength(1)


in warp direction
Tult (Tchar)
(kNm1 width)

s(2)

Ratio of bearing(3)
surface to plan
area
b x B/2S

Strain at
maximum tensile
strength(4)
(%)
10.5 1

100

103 (2.4)

0.49

0.00022

150

154 (3.2)

0.50

0.00021

10.5 1

200

206 (4.9)

0.50

0.00021

10.5 1

250

257 (5.6)

0.50

0.00021

10.5 1

300

309 (7.4)

0.52

0.00020

10.5 1

350

360 (8.1)

0.52

0.00020

10.5 1

400

412 (9.8)

0.53

0.00020

10.5 1

450

463 (10.5)

0.53

0.00020

10.5 1

500

515 (12.3)

0.53

0.00020

10.5 1

550

566 (13)

0.53

0.00020

10.5 1

600

612 (8.8)

0.53

0.00020

10.5 1

650

669 (15.5)

0.54

0.00020

10.5 1

700

721 (17.2)

0.54

0.00020

10.5 1

750

772 (18)

0.63

0.00016

10.5 1

800

826 (21.7)

0.63

0.00016

10.5 1

850

875 (20.5)

0.74

0.00011

10.5 1

900

927 (22.1)

0.74

0.00011

10.5 1

950

980 (23.4)

0.74

0.00011

10.5 1

1000

1038 (24.8)

0.74

0.00011

10.5 1

1050

1081 (25.4)

0.92

0.00004

10.5 1

1100

1133 (27.1)

0.92

0.00004

10.5 1

1150

1184 (27.8)

0.92

0.00004

10.5 1

1200

1236 (29.5)

0.92

0.00004

10.5 1

1250

1287 (30.0)

0.92

0.00004

10.5 1

1300

1339 (32.0)

0.92

0.00004

10.5 1

1350

1390 (32.8)

0.92

0.00004

10.5 1

1) Short-term tests in accordance with BS EN ISO 10319 : 2008; the values given are mean values of ultimate strength (Tult) and
tolerance () values correspond to the 95% confidence level to establish the characteristic short-term tensile strength (Tchar) in
accordance with BS EN 13251 : 2001
(2) s is the proportion of the plane sliding area that is solid and is required for the calculation of the bond coefficient fb and the direct
sliding coefficient fds (see sections 8.1 and 8.3)
(3) The ratio is required to calculate the bond coefficient fb in accordance with CIRIA SP123 : 1996 Soil Reinforcement with Geotextiles,
Jewell R.A (see section 8.4) where:
b is the proportion of the width available for bearing
B is the thickness of a transverse member taking bearing
S is the spacing between transverse members taking bearing (equivalent to B in Figure 1)
(4) Tests in accordance with BS EN ISO 10319 : 2008; the values given are the mean and tolerance values () of strain in accordance
with BS EN 13251 : 2001.

Figure 1 Paralink

Page 4 of 12

1.4 Product quality is maintained by statistical process control at the point of manufacture.

2 Delivery and site handling


2.1 Paralink Geocomposites are delivered to site in rolls nominally 4.5 m wide, edge to edge of roll, and
approximately 4.6 m wide end to end of the central lifting tube. The roll length is normally 50 m, 100 m, 130 m,
150 m or 200 m depending upon the grade, although non-standard lengths can be produced on request. Roll
diameters and weights vary, as indicated in Tables 1 and 2. Each roll is wrapped in black polyethylene for transit
and site protection. Each package is labelled in accordance with BS EN ISO 10320 : 1999. Packaging should
not be removed until immediately prior to installation. Each roll has the product grade marked at regular intervals for
identification.
2.2 Rolls should be stored in clean, dry conditions. The rolls should be protected from mechanical or chemical
damage and extreme temperatures. Toxic fumes are given off if the geogrids catch fire and, therefore, the necessary
precautions should be taken following the instructions of the material safety data sheet for the product.
2.3 To prevent damage, care should be taken in the handling and lifting of the rolls. The weight of the rolls is such
that mechanical lifting arrangements are necessary.
2.4 Rolls should be stacked not more than three rolls high. Other loads should not be stored on top of the stack.

Assessment and Technical Investigations


The following is a summary of the assessment and technical investigations carried out on Paralink Geocomposites.

Design Considerations
3 General
3.1 Design of basal reinforcements should be in accordance with the recommendations of BS 8006 : 1995.
3.2 Prior to, during and after installation, particular care should be taken to ensure:
site preparation and foundation construction is as detailed in sections 11 to 13
fill properties satisfy the design specification
drainage is adequate at all stages of construction, as required by the contract documents
the geocomposites are protected against damage from site traffic and installation equipment
the stability of existing structures is not affected.

4 Practicability of installation
The products are easily installed by trained ground engineering contractors in accordance with the specifications and
construction drawings (see the Installation part of this Certificate).

5 Design considerations
5.1 The design should be carried out by a suitably qualified engineer, taking into account all requisite partial material
factors (fm) described in section 7 and applying all other appropriate load factors, soil material factors and soil/
reinforcement interaction factors in accordance with BS 8006 : 1995.
5.2 The ultimate limit state design strength of the reinforcement (TD ), should be taken as TCR/fm, where:
TCR = the characteristic tensile creep strength of the reinforcement, at the appropriate times and design temperature
(see section 6.4)
fm = the partial material factor for the reinforcement (see section 7).
5.3 The serviceability limit state design strength of the reinforcement (TD ), should be taken as TCS/fm, where:
TCS = the maximum tensile load in the reinforcement which does not cause the prescribed serviceability limit state
strain (max) to be exceeded during the design life (see section 6.6)
fm = the partial material factor for the reinforcement (see section 7).
5.4 Guidance on soil/geocomposite interaction coefficients applied to calculate direct sliding and pull-out resistance
can be found in section 8.
5.5 Working drawings should show the correct orientation of the geocomposites.
5.6 The designer should specify the relevant properties of the fill material for the foundation deemed acceptable for
the purposes of the design. Acceptable materials should meet the requirements of the Manual of Contract Documents
for Highway Works (MCHW), Volume 1.

Page 5 of 12

6 Mechanical properties
Tensile strength and strain short-term
6.1 The short-term values of tensile strength and strain for the geocomposites are given in Table 2. A typical short-term
stress/strain curve is shown in Figure 2.
Figure 2 Typical short-term stress/strain curve

Tensile strength long-term


6.2 Long-term creep strain and rupture testing, generally in accordance with the principles of BS EN ISO 13431 :
1999, has been carried out for periods in excess of 10 years and at varying test temperatures, to cover the range of
Paralink detailed in this Certificate.
6.3 Real time data has been extrapolated by <1.0 log cycles to allow the characteristic long-term strength (TCR) for
design lives of up to 120 years to be determined.
6.4 For ultimate limit state, the value of TCR is a percentage of the characteristic short term tensile strength (Tchar) (see
Figure 3) at various design temperatures and design life as shown in Table 3. The characteristic short-term tensile
strength values (Tchar) are given in Table 2.

Page 6 of 12

Table 3 Percentages of Tchar to determine TCR at various temperatures and design life
Design temperature (C)

Percentage of Tchar
2-year design life

60-year design life

120-year design life

20

77

73

72

25

76

72

71

30

74

70

69

6.5 An alternative approach to determine the long-term strength is one of residual strength (see Figure 3), particularly
in respect of the strength available during seismic events. Such an approach is outside the scope of this Certificate and
would require separate evaluation and justification of the partial safety factor components.
Figure 3 Regression line for life expectancy at constant stress defined by percentage of characteristic short-term
strength at 20C
100
95
residual strength approach
90

tensile strength (%)

85
80
75
stress rupture approach
70
65
60
55
50
0.01

0.1
extrapolated

10

100

1000

time (years)

Creep
6.6 The isochronous curves for Paralink are given in Figure 4 and can be used to predict strain under load over
the design life of the structure. If strain is limiting, the critical load can be established for a given design life. As a
general guide, the maximum strain max in the basal reinforcement used for soft foundation soil should not exceed 5%
for short-term applications and 5% to 10% for long-term conditions. For piled foundations the practical upper limit of
short-term tensile strain is 6% and the allowed long-term strain due to creep should not exceed 2% over the initial strain.
For areas prone to subsidence, the maximum allowable reinforcement strain should be calculated in accordance with
BS 8006 : 1995, section 8.4.4.4.

Page 7 of 12

Figure 4 Stress/strain isochronous curves

7 Partial material factors


7.1 In establishing the design tensile strength of Paralink Geocomposites and ensuring that during the life of the
reinforced soil structure the geocomposite will not fail in tension, the BBA recommends that in line with BS 8006 :
1995, a set of partial material safety factors for both the ultimate (ULS) and serviceability (SLS) limit states should be
applied to TCR and TCS. Conditions of use outside the scope for which partial safety factors are defined (see also
sections 7.3 to 7.10) are not covered by this Certificate and advice should be sought from the manufacturer.
7.2 The total material factor (fm), is given by fm = fm11 x fm12 x fm21 x fm22, where:

fm11 is
fm12 is
fm21 is
fm22 is

a
a
a
a

material
material
material
material

factor
factor
factor
factor

relating
relating
relating
relating

to
to
to
to

manufacture
extrapolation of test data
susceptibility of installation damage
environmental effects.

Manufacture partial material factor (fm11)


7.3 For Paralink Geocomposites a characteristic base strength is specified and the partial material factor (fm11) can be
taken as 1.0 for both ULS and SLS.
Extrapolation of test data partial material factor (fm12)
7.4 To account for extrapolation of data the values for the partial material factor (fm12) can be taken as 1.0 for both
ULS and SLS for a 2-year, 60-year or 120-year design life.
Installation damage partial material factor (fm21)
7.5 To allow for loss of strength due to mechanical damage that may be sustained during installation, the appropriate
value for fm21 for ultimate limit state (ULS) may be selected from Table 4. These partial material factors were established
from full-scale installation damage tests using a range of materials whose gradings can be seen in Figure 5. For soils
not covered by Table 4, appropriate values of fm21 may be determined from site-specific trials.

Page 8 of 12

Table 4 Partial material factor installation damage (fm21)


Soil type

D50 particle size(1)


(mm)

D90 particle size(1)


(mm)

Paralink range

Partial material
factor
(fm21)

0.15

0.70

300 450
500 650
700 1350

1.01
1.01
1.00

Concrete sand(2)

1.0

4.0

300 450
500 650
700 1350

1.02
1.02
1.01

Coarse gravel(2)

13

23

300 450
500 650
700 1350

1.05
1.03
1.02

Silty sand(2)

(1) Detailed particle size distributions are shown in Figure 5


(2) Depth of soil layer before compacting:
200 mm
Weight of vibrating roll:
1600 kgm1
Number of passes:
8.

Figure 5 Particle size distributions of soils used in installation damage testing

7.6 For Paralink range 100 to 250, a cautionary value of at least 1.10 should be applied in the absence of test data.
7.7 For the serviceability limit state (SLS), the value of fm21 may be taken as 1.0.
Environmental effects partial material factor (fm22)
7.8 The polyethylene sheath used on Paralink acts as a chemical barrier which, if not broken or damaged, will reduce
the risk of chemical attack on the polyester fibres. It should be noted that the most aggressive fills are usually of fine
particle sizes which cause little or no damage to the polyethylene sheath. Compaction can reduce the high pH level of
a fill. Tests have shown that, 48 hours after the compaction stage, the pH level of a soillime mix reduces from 12.5 to 11.
Where appropriate, site- and soil-specific testing should be carried out to verify the reduction.
7.9 To account for environmental conditions, the appropriate value for fm22 for ultimate limit state (ULS) should be
selected from Table 5.
Table 5 Partial material factor environmental effects (fm22)
Design temperature (C)

Partial safety factor


(fm22)
2-year design life

60-year design life

120-year design life

Soil pH level
4.0 9.5

Soil pH level
9.6 11.0

Soil pH level
4.0 9.5

Soil pH level
9.6 11.0

Soil pH level
4.0 9.5

Soil pH level
9.6 11.0

20

1.00

1.01

1.05

1.09

1.10

1.17

25

1.00

1.01

1.07

1.11

1.14

1.21

30

1.01

1.02

1.12

1.16

1.23

1.31

Page 9 of 12

7.10 For the serviceability limit state (SLS), the value of fm22 may be taken as 1.0.

8 Soil/geocomposite interaction
Direct sliding
8.1 The theoretical expression for direct sliding recommended for design is:
fds x tan
where: fds is the direct sliding coefficient.
fds = s x (tan /tan ) + (1 s)
where: (tan /tan ) is the coefficient of skin friction (fsf) [synonymous with the term friction coefficient () defined in
BS 8006 : 1995], and
s is the proportion of plane sliding area that is solid (see Table 2).
8.2 When calculating fds, the coefficient of skin friction (fsf) for the product may be assumed, for routine design
purposes, to be 0.7 and 0.4 for compacted frictional fill ( = 30) and compacted cohesive fill ( = 15)
respectively. This is a conservative value. Where more precise values are required, for use in design, suitable soil and
geocomposite specific shear box testing may be carried out.
Pull-out resistance (bond strength)
8.3 The theoretical expression for bond is:
fb x tan
where: fb is the bond coefficient.
8.4 For routine design purposes, values may be estimated using the calculation method of Jewell (CIRIA SP123, 1996
Soil Reinforcement with Geotextiles, section 4.6). When calculating fb, the coefficient of skin friction [fsf = (tan /tan )
synonymous with the term friction coefficient () defined in BS 8006 : 1995] for the product may be assumed
conservatively, for routine design purposes, to be 0.7 and 0.4 for compacted frictional fill ( = 30) and compacted
cohesive fill ( = 15) respectively, and the ratio of bearing surface to plane area can be taken from Table 2.
Significantly enhanced values of fb can be justified in design by carrying out site- and soil-specific pull-out tests in
accordance with BS EN 13738 : 2004. Values of fsf > 1.0 have been reported based on site- and soil-specific testing.
Formulae notation
= angle of friction between soil and plane reinforcement surface
= effective angle of friction of soil.

9 Maintenance
As the product is confined within the soil and it has suitable durability (see section 10), maintenance is not required.

10 Durability
10.1 Paralink Geocomposites may be used in fills normally encountered in civil engineering practice (see section 5.6).
10.2 Evidence from tests shows that the products have good resistance to chemical degradation, biological degradation,
temperature and weathering (see sections 10.3 to 10.8).
Chemical degradation
10.3 Within a soil environment where pH ranges from 4.0 to 9.5 and temperatures are typical of those normally
found in embankments in the United Kingdom, the strength of the geocomposites is not adversely affected by hydrolysis.
Should pH values exceed 9.5, suitable safety factors can be found in Table 5.
Biological degradation
10.4 The geocomposites are highly resistant to microbial attack.
Effects of temperature
10.5 The long-term creep performance of the geocomposites is not adversely affected by the range of soil
temperatures typical to the UK.
10.6 The long-term creep performance for a range of soil temperatures is shown in Table 3. Where the
geocomposites may be exposed to temperatures greater than 30C or lower than 20C for significant periods,
consideration should be given to temperature levels, range of temperature, period of exposure and stress levels at the
location in question.
10.7 The long-term environmental effects factor for a range of soil temperatures is shown in Table 5. Sustained
temperatures of greater than 30C increase the rate of hydrolysis and further reduction factors may be required.
Resistance to weathering
10.8 The geocomposites have a high resistance to ultraviolet light. The product may be exposed to light for up to one
month on site. Exposure of up to four months may be acceptable depending upon the season and location.

Page 10 of 12

Installation
11 General
11.1 In general, the execution of the reinforced soil structures should be carried out in accordance with BS EN 14475 : 2006.
11.2 Care should be exercised to ensure geocomposites are laid with the longitudinal direction parallel to the
direction of principal stress. Design drawings should indicate the orientation of the geocomposite.
11.3 Rolls should be placed on the formation in the position where the length of Paralink is required to start and with
the roll as closely as possible at right angles to the line of the run. Accurate alignment at the start is essential to ensure a
satisfactory positioning of the laid material.

12 Preparation
To ease the laying and proper performance of the run, the formation on which it is to be laid should be flat without ruts
and sharp undulations.

13 Procedure
13.1 The roll should be unwound a small amount by pushing the roll in the direction of the run. The loose end of the
Paralink now exposed should be secured by weighting or pinning it to the formation. The roll should be unwound
carefully, avoiding slack or undulations wherever possible laying must not continue until corrections are made.
When the roll is completely unwound, the free end of the Paralink should be hand tensioned and secured by weighting
or pinning.
13.2 The run of Paralink should be straight and all strip elements flat and untwisted. Undulations should not be evident.
13.3 Where Paralink is to be used in two layers at right angles to each other, the edge joints will normally be simple
butt joints. The drawings should be consulted to verify this as certain circumstances may dictate otherwise.
13.4 Where a number of rolls are to be laid at one time, rolls should be arranged to be in a slightly staggered
formation to avoid the lifting tubes interfering with one another.
13.5 Fill material in immediate contact with the Paralink should be placed and spread in the longitudinal direction
only. If this results in some undulations of the Paralink, the secured end should be released and the undulations removed
by pulling the free end.
13.6 Site vehicles should not be allowed to traffic over the laid, unprotected Paralink.
13.7 Paralink is a structural material and, where joints are necessary in its longitudinal direction, they should be full
structural joints capable of carrying the full design tensile force. This will normally be shown as a full anchorage bond
length on the drawings. The anchorage bond length depends on the depth of cover and type and characteristics of
the fill in which Paralink is being used. Where pile caps are spanned, this length is unlikely to be less than the distance
across three pile caps. Where the products are being used to span subsidence voids it will depend upon the size of
the void anticipated by the designer.

Technical Investigations
14 Investigations
14.1 The manufacturing process of the geocomposite materials was examined, including the methods adopted for
quality control, and details were obtained of the quality and composition of the materials used.
14.2 An examination was made of data relating to:
evaluation of long- and short-term tensile properties
chemical resistance including hydrolysis
resistance to biological attack
resistance to weathering
effects of temperature
site damage trials and resistance to mechanical damage
soil/geocomposites interaction.
14.3 Calculations were made to establish the plane sliding area that is solid and the ratio of bearing surface to plane area.
14.4 The practicability of installation and ease of handling were assessed.

Additional Information
The management systems of Linear Composites Limited have been assessed and registered as meeting the requirements
of BS EN ISO 9001 : 2008 by Lloyds Register Quality Assurance, Approval Certificate No LRQ 0902157.

Page 11 of 12

Bibliography
BS 8006 : 1995 Code of practice for strengthened/reinforced soils and other fills
BS EN 13251 : 2001 Geotextiles and geotextile-related products Characteristics required for use in earthworks,
foundations and retaining structures
BS EN 13738 : 2004 Geotextiles and geotextile-related products Determination of pullout resistance in soil
BS EN 14475 : 2006 Execution of special geotechnical works Reinforced fill
BS EN ISO 9001 : 2008 Quality management systems Requirements
BS EN ISO 9864 : 2005 Geosynthetics Test method for the determination of mass per unit area of geotextiles and
geotextile-related products
BS EN ISO 10319 : 2008 Geotextiles Widewidth tensile test
BS EN ISO 10320 : 1999 Geotextiles and geotextile-related products Identification on site
BS EN ISO 13431 : 1999 Geotextiles and geotextile-related products Determination of tensile creep and creep
rupture behaviour
Manual of Contract Documents for Highway Works, Volume 1 Specification for Highway Works, August 1998 (as
amended)

Conditions of Certification
15 Conditions
15.1 This Certificate:
relates only to the product/system that is named and described on the front page
is granted only to the company, firm or person named on the front page no other company, firm or person may
hold or claim any entitlement to this Certificate
is valid only within the UK
has to be read, considered and used as a whole document it may be misleading and will be incomplete to be
selective
is copyright of the BBA
is subject to English law.
15.2 Publications and documents referred to in this Certificate are those that the BBA deems to be relevant at the date
of issue or re-issue of this Certificate and include any: Act of Parliament; Statutory Instrument; Directive; Regulation;
British, European or International Standard; Code of Practice; manufacturers instructions; or any other publication or
document similar or related to the aforementioned.
15.3 This Certificate will remain valid for an unlimited period provided that the product/system and the manufacture
and/or fabrication including all related and relevant processes thereof:
are maintained at or above the levels which have been assessed and found to be satisfactory by the BBA
continue to be checked as and when deemed appropriate by the BBA under arrangements that it will determine
are reviewed by the BBA as and when it considers appropriate.
15.4 In granting this Certificate, the BBA is not responsible for:
the presence or absence of any patent, intellectual property or similar rights subsisting in the product/system or any
other product/system
the right of the Certificate holder to manufacture, supply, install, maintain or market the product/system
individual installations of the product/system, including the nature, design, methods and workmanship of or related
to the installation
the actual works in which the product/system is installed, used and maintained, including the nature, design,
methods and workmanship of such works.
15.5 Any information relating to the manufacture, supply, installation, use and maintenance of this product/system
which is contained or referred to in this Certificate is the minimum required to be met when the product/system is
manufactured, supplied, installed, used and maintained. It does not purport in any way to restate the requirements
of the Health & Safety at Work etc Act 1974, or of any other statutory, common law or other duty which may exist
at the date of this Certificate; nor is conformity with such information to be taken as satisfying the requirements of the
1974 Act or of any statutory, common law or other duty of care. In granting this Certificate, the BBA does not accept
responsibility to any person or body for any loss or damage, including personal injury, arising as a direct or indirect
result of the manufacture, supply, installation, use and maintenance of this product/system.
British Board of Agrment
Bucknalls Lane
Garston, Watford
Herts WD25 9BA

2010
Page 12 of 12

tel: 01923 665300


fax: 01923 665301
e-mail: mail@bba.star.co.uk
website: www.bbacerts.co.uk

Vous aimerez peut-être aussi