TCE CONSULTING ENGINEERS LIMITED

30421007-3CL-00020-

SHEET OF
i i
OF 4

UPS SIZING

SAUDI ELECTRICITY COMPANY


EASTERN OPERATING AREA
Dammam, Saudi Arabia
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
DESIGN BASIS REPORT FOR
UPS SIZING

DOCUMENT NO. : 30421007-3CL-00020-P0A


SEPTEMBER, 2004

ENGINEERING CONSULTANT
TCE CONSULTING ENGINEERS LIMITED
73/1, ST. MARKS ROAD
BANGALORE 560 001
INDIA

CONTRACTOR:
AL-TOUKHI COMPANY FOR INDUSTRY & TRADING
P.O. BOX 497, RIYADH 11411, KINGDOM OF SAUDI ARABIA
TEL. 00966-1-4633660 : FAX. 00966-1-4631150

P0A
11.10.2004

MP

SR

REV NO . DATE

PREPARED BY

CHECKED BY

CLEARED BY

APPROVED BY
TCE FORM 032 R1

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00020-

UPS SIZING

CONTENTS
SHEET 1 of 5
OF 4

CONTENTS

CLAUSE No.

DESCRIPTION

PAGE No.

1.0

Introduction

2.0

Reference Documents

3.0

Design Basis

4.0

UPS Sizing

5.0

Conclusion

ANNEXURES
6.0

Annexure-1-UPS SIZING CALCULATION

ISSUE
P0A

TCE FORM 032 R1

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00020-

1.0

UPS SIZING

SHEET 2 of 5
OF 4

INTRODUCTION:

1.1

Al-Toukhi company for Industry & Trading has been awarded


turnkey contract for Open Cycle Gas Turbine based CPS expansion
project at Arar of Saudi Electric Company-Eastern Operation Area
(SEC-EOA), Saudi Arabia.

1.2

The project consists of design, engineering, procurement,


installation, testing and commissioning of two (2) Nos. 60.16MW @
50C, PG7121 (EA) model Gas Turbine Generator unit of GE make
along with associated Generator Transformer and other balance of
plant electro-mechanical equipment.

ISSUE
P0A

TCE FORM 032 R1

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00020-

SHEET 3 of 5
OF 4

UPS SIZING

2.0

REFERENCE DOCUMENTS

2.1

Scope of Work and Technical Specifications & Data Schedule


of PTS-1022.

2.2

SCECO Engineering Standards SES-P-103.05.

2.3

SCECO
MATERIAL
46-SMSS-3, REV.2

STATNDARD

SPECIFICATION

ISSUE
P0A

TCE FORM 032 R1

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00020-

3.0
3.1

SHEET 4 of 5
OF 4

UPS SIZING

DESIGN BASIS
The UPS system configuration shall be capable of being operated in
Redundant Mode as specified in CLNo:4.2 of Data schedule for
Power Supply Uninterruptible , page 31 of 40 of PTS-1022.
In Redundant Mode, where each UPS modules (charger, inverter and
static switch assembly) shall be sized to independently carry the full AC
critical load. Under normal operating conditions, only one of the UPS
unit shall be operating and carrying 100% load whereas the other unit
shall be in standby mode. The failure of the operating UPS unit shall
cause the standby UPS unit to carry 100% of the critical load and
disconnect the inoperative module/unit from the critical load, which upon
repair shall resume standby operation.
In the event of failure of the second operating system, carrying 100%
load, when one system is already off-the line, the load shall be
transferred automatically, uninterrupted to the alternate source (bypass)
The Redundant UPS system configuration would be as per FIG-2, page
40 of 40 of 46-SMSS-3, Rev-2

3.2

The rated Input and Output characteristic of the UPS will be as follow,
as per CLNo:4.3 of Data schedule for Power Supply Uninterruptible ,
page 31 & 32 of 40 of PTS-1022.
UPS Input characteristic:
a)
b)
c)
d)

Rated input Voltage(Vac)


No of Phases
No of wires
Frequency

:
:
:
:

480V
3
4
60 Hz

:
:
:
:

127V
1
2
60 Hz

UPS Output characteristic:


a)
b)
c)
d)

Rated output Voltage(Vac)


No of Phases
No of wires
Frequency

ISSUE
P0A

TCE FORM 032 R1

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00020-

3.3

SHEET 5 of 5
OF 4

UPS SIZING

The Battery charger/rectifier rated input /output voltages are as follows,


as per CLNo:4.3 of Data schedule for Power Supply Uninterruptible ,
page 35 of 40 of PTS-1022.
a)
b)

Input Voltage(Vac)
Output Voltage

:
:

480V
125V DC

3.4

As specified in CLNo:4.3 of Data schedule for Power Supply


Uninterruptible , page 35 of 40 of PTS-1022, 125V DC Vented Lead
Acid Type battery is proposed for UPS.

3.5

The Battery back-up time shall be 2-hours in case of normal AC supply


failures as per ClNo-2.4A.4, page 9 of 21 of APPENDIX-VII
(Instrumentation & Control) of PTS-1022.

4.0

UPS SIZING :

4.1

The individual input VA requirement for each load is calculated


considering power factor 0.8 as per the following equation.
Load in VA

Load in Watt
------------------------Power Factor

4.2

The sizing calculation worksheets is attached as Annexure-1

4.3

The critical loads, which are listed in Annexure-1, has been considered
for the UPS sizing calculation.

4.4

The Unit Loads(in watt) considered in Annexure-1 are on the basis of


assumption.

4.5

Growth Factor of 1.25 has been considered to allow future expansion of


loads as per Cl No-8.3, page 9 of 15 of SES-P-103.05.

5.0

CONCLUSION:

5.1

The UPS rating of 7 kVA is considered to be adequate as per


calculations in Annexure-1 attached.