TCE CONSULTING ENGINEERS LIMITED


DESIGN BASIS REPORT FOR
LIGHTNING AND SHIELDING SYSTEM

30421007-3CL-00021-

SHEET OF
i i
OF 4

SAUDI ELECTRICITY COMPANY

EASTERN OPERATING AREA


Dammam, Saudi Arabia

3
4
5
6
7
8
9
10
11
12

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
DESIGN BASIS REPORT FOR
LIGHTNING AND SHIELDING SYSTEM

13

DOCUMENT NO. : 30421007-3CL-00021-P0B

14

JANUARY, 2005

15
16

18
19
20
21
22
23

ENGINEERING CONSULTANT
TCE CONSULTING ENGINEERS LIMITED
73/1, ST. MARKS ROAD
BANGALORE 560 001
INDIA

24
25
26
27
28
29
30

CONTRACTOR:
AL-TOUKHI COMPANY FOR INDUSTRY & TRADING
P.O. BOX 497, RIYADH 11411, KINGDOM OF SAUDI ARABIA
TEL. 00966-1-4633660 : FAX. 00966-1-4631150

31
32

P0B
13.01.2005

MP

SR

P0A
20.11.2004

MP

SR

REV NO . DATE

PREPARED BY

CHECKED BY

CLEARED BY

APPROVED BY
TCE FORM 032 R1

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00021-

CONTENTS

DESIGN BASIS REPORT FOR


LIGHTNING AND SHIELDING SYSTEM

SHEET 1 OF 8
OF 4

CONTENTS

CLAUSE No.

DESCRIPTION

PAGE No.

1.0

Introduction

2.0

Reference drawings / Documents

3.0

Design Basis

4.0

Considered buildings and Structures

5.0

Lightning Protection Conductor Details

6.0

Conclusion

ANNEXURES
7.0

Annexure-1-Lightning Protection System


Calculations.

ISSUE
P0B

TCE FORM 032 R1

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00021-

331.0
34
35
361.1
37
38
39
40
411.2
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

DESIGN BASIS REPORT FOR


LIGHTNING AND SHIELDING SYSTEM

CONTENTS
SHEET 2 OF 8
OF 4

INTRODUCTION:
Al-Toukhi company for Industry & Trading has been awarded turnkey
contract for Open Cycle Gas Turbine based CPS expansion project at
Arar of Saudi Electric Company-Eastern Operation Area (SEC-EOA),
Saudi Arabia.
The project consists of design, engineering, procurement,
installation, testing and commissioning of two (2) Nos. 60.16MW @
50C, PG7121 (EA) model Gas Turbine Generator unit of GE make
along with associated Generator Transformer and other balance of plant
electro-mechanical equipment.

ISSUE
P0B

TCE FORM 032 R1

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00021-

DESIGN BASIS REPORT FOR


LIGHTNING AND SHIELDING SYSTEM

762.0
77
78

REFERENCE DRAWINGS/DOCUMENTS

792.1

BS 6651-Protection of structures against lightning

CONTENTS
SHEET 3 OF 8
OF 4

80
812.2

Scope of Work and Technical Specifications. PTS-1022.

82
832.3

General site Layout. Dwg No:KA 667182

84
852.4

NFPA 780- Standard for installation of lightning protection systems.

86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116

ISSUE
P0B

TCE FORM 032 R1

TCE CONSULTING ENGINEERS LIMITED


DESIGN BASIS REPORT FOR
LIGHTNING AND SHIELDING SYSTEM

30421007-3CL-00021-

1173.0
118
1193.1
120
121
122
1233.2
124
125
1263.3
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
1443.4
145
146
147
1483.5
149
150
151
152
153
154
155

10

CONTENTS
SHEET 4 OF 8
OF 4

DESIGN BASIS
The design of Lightning protection systems (LPS) for different structures
present in the plant are based on overall risk factor as per the procedure
indicated in the BS-6651 standard.
The number of thunderstorm days per year is 15 as per PTS-1022 of
page 70 of 336.
Estimation of Overall Risk index.
The probability of Structure or building being struck by lightning in any
one year is the product of Lightning Flash Density and Effective
collection Area of the Structure to be protected
P = Ng x Ac x 10-6 -------- Equation as per Cl.No:10.2 of BS-6651.
Where,
P

Probable number of strikes/year (Risk)

Ng

Lightning Flash Density, i.e. the number of flashes to


Ground per Km2 per year.

Ac

Effective Collection Area of the Structure or building.

The established value of the probable number of strikes to the structure


per year P, multiplied by weighing factors of A to E gives the Overall Risk
factor.
BS-6651 recommends that the following weighing factors A to E vide
Tables 8 to 12, page 15 & 16.
a)
b)
c)
d

Weighing Factor A Weighing Factor B Weighing Factor C d)

Use of Structures (Table-8 )


Type of construction (Table-9)
Contents or Consequential
Effects (Table-10)
Weighing Factor D Degree of Isolation (Table-11)

ISSUE
P0B

TCE FORM 032 R1

11

TCE CONSULTING ENGINEERS LIMITED


DESIGN BASIS REPORT FOR
LIGHTNING AND SHIELDING SYSTEM

30421007-3CL-00021-

156
157
1583.6
159
160
161
162
163
164
165
166
167
1683.7
169
170
1713.8
172
173
1743.9
175
176
1773.10
178
179
1803.11
181
182
1833.12
184
185
186
187
188
189
190
191
192
193
194
195

12

e)

Weighing Factor E -

CONTENTS
SHEET 5 OF 8
OF 4

Type of country (Table-12).

The Effective collection area of the structure or building shall be


calculated as per Cl.No.10.2 of BS-6651.
Ac

Where,
L
=
W
=
H
=

LW + 2LH + 2WH + H2

Length of the building in meter.


Width of the building in meter.
Height of the building in meter.

Table-6 of BS 6651, page 13 gives the value of Ng lightning flashes per


km2 per year corresponding to thunderstorm days per year.
The Suggested acceptable risk has been taken as 10 -5 per year, i.e.1 in
100000 per year as per Cl.No 10.4 of BS 6651 page 13.
The value of overall Risk factor should be compared with the acceptable
risk, which is 10-5.
If the Value of Overall risk factor is less than 10 -5, then Lightning
protection for the structure is not required.
If the Value of Overall risk factor is greater than 10 -4 , then Lightning
protection is required.
Lightning protection for all the metallic steel structures have been
followed as per Cl.No 6.19 b of PTS-1022 page 245 of 336.

ISSUE
P0B

TCE FORM 032 R1

13

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00021-

DESIGN BASIS REPORT FOR


LIGHTNING AND SHIELDING SYSTEM

CONTENTS
SHEET 6 OF 8
OF 4

196
1974.0 CONSIDERED BUILDINGS AND STRUCTURES.
198
199 4.1 The following buildings or structures of Arar Power Plant have been
200
considered for the Lightning Protection System.
201
202
a) Main Switchgear Building
203
b) GTG building
204
c) Attendant Room
205
d) Fuel Forwarding pump shed,
206
e) DFO unloading pump shed.
207
f) DFO storage tank
208
g) Exhaust stack.
209
h) Fin Fan cooler
210
i) Fuel filteration skid
211
j) Cooling Water skid.
212
k) Air Compressor shed
213
214
215 4.2 The Lightning Protection System calculation along with recommendation
216
for the above said buildings or structure have been compiled in
217
ANNEXURE-1. Attached.
218
219
2205.0 LIGHTNING PROTECTION CONDUCTOR DETAILS:
221
222
The following Lightning protection material/sizes are proposed to be used
223
In accordance with Cl.No:8.0 of BS-6651 Table-4.
224
2255.1 Main Switchgear Building Horizontal mesh with bare
226
Copper tape of size 25mm x 1.5mm
227
(Furse Cat. # TC-025) or equivalent
228
arranged in such a way that no part
229
of the roof is more than 5M from the
230
nearest horizontal conductor.
231
232
Down Conductors, one for every 20m
233
of perimeter with tape of size 25mm x
234
1.5mm (Furse Cat. # TC-025) or
235
equivalent, with each down conductor
236
terminated onto a 15mm dia, 2500mm ISSUE
P0B
237
long ground rod.

14

TCE FORM 032 R1

15

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00021-

238
239
240
241
242
243
244
245
246
2475.2
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
2715.3
272
273
274
275
276
277
278
279
280
281
282

16

DESIGN BASIS REPORT FOR


LIGHTNING AND SHIELDING SYSTEM

CONTENTS
SHEET 7 OF 8
OF 4

For every down conductor, one Test


clamp ( Furse Cat # CT 305 or
equivalent) shall be installed.

Attendant Room

Also one No. of Taper Pointed Air Rod,


1 meter high, ( Furse Cat # RA 225)
shall be installed.

Horizontal mesh with bare


Copper tape of size 25mm x 1.5mm
(Furse Cat. # TC-025) or equivalent
arranged in such a way that no part
of the roof is more than 5M from the
nearest horizontal conductor.

Down Conductors, one for every 20m


of perimeter with tape of size 25mm x
1.5mm (Furse Cat. # TC-025) or
equivalent, with each down conductor
terminated onto a 15mm dia, 2500mm
long ground rod.
For every down conductor, one Test
clamp ( Furse Cat # CT 305 or
equivalent) shall be installed.

Also one No. of Taper Pointed Air Rod,


1 meter high, ( Furse Cat # RA 225)
shall be installed.

GTG Building/Exhaust stack/DFO Storage Tank/Fuel Forwarding


Pump Shed/ Fuel unloading Pump shed / Fuel Filtration Skid /
Cooling water skid/Air compressor shed/Fin Fan cooling
No separate Lightning Protection grid with horizontal/vertical conductors
are required for the above structures, since the above are provided with
metallic frame structures.
All these metallic structures like steel columns, panel roof and metallic
enclosures would be effectively grounded at the base of the structures at
minimum two points to the grounding grid.

ISSUE
P0B

TCE FORM 032 R1

17

TCE CONSULTING ENGINEERS LIMITED


30421007-3CL-00021-

283
2846.0
285
2866.1
287
288
289
290
291
292
293
2946.2
295
296
297
298
299

DESIGN BASIS REPORT FOR


LIGHTNING AND SHIELDING SYSTEM

CONTENTS
SHEET 8 OF 8
OF 4

CONCLUSION.
The structures that compose the Arar Power Plant are mostly self
protected since they are made of steel works except Main Switchgear
building and Attendant Room.
All the steel structures would be connected to the primary grounding
system.
As indicated in Annexure-1, Lightning protection with horizontal roof
conductor & Vertical Down conductor is recommended for Main
Switchgear Building and Attendant Room.

ISSUE