Académique Documents
Professionnel Documents
Culture Documents
30421007-3CL-00021-
SHEET OF
i i
OF 4
3
4
5
6
7
8
9
10
11
12
13
14
JANUARY, 2005
15
16
18
19
20
21
22
23
ENGINEERING CONSULTANT
TCE CONSULTING ENGINEERS LIMITED
73/1, ST. MARKS ROAD
BANGALORE 560 001
INDIA
24
25
26
27
28
29
30
CONTRACTOR:
AL-TOUKHI COMPANY FOR INDUSTRY & TRADING
P.O. BOX 497, RIYADH 11411, KINGDOM OF SAUDI ARABIA
TEL. 00966-1-4633660 : FAX. 00966-1-4631150
31
32
P0B
13.01.2005
MP
SR
P0A
20.11.2004
MP
SR
REV NO . DATE
PREPARED BY
CHECKED BY
CLEARED BY
APPROVED BY
TCE FORM 032 R1
CONTENTS
SHEET 1 OF 8
OF 4
CONTENTS
CLAUSE No.
DESCRIPTION
PAGE No.
1.0
Introduction
2.0
3.0
Design Basis
4.0
5.0
6.0
Conclusion
ANNEXURES
7.0
ISSUE
P0B
331.0
34
35
361.1
37
38
39
40
411.2
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
CONTENTS
SHEET 2 OF 8
OF 4
INTRODUCTION:
Al-Toukhi company for Industry & Trading has been awarded turnkey
contract for Open Cycle Gas Turbine based CPS expansion project at
Arar of Saudi Electric Company-Eastern Operation Area (SEC-EOA),
Saudi Arabia.
The project consists of design, engineering, procurement,
installation, testing and commissioning of two (2) Nos. 60.16MW @
50C, PG7121 (EA) model Gas Turbine Generator unit of GE make
along with associated Generator Transformer and other balance of plant
electro-mechanical equipment.
ISSUE
P0B
762.0
77
78
REFERENCE DRAWINGS/DOCUMENTS
792.1
CONTENTS
SHEET 3 OF 8
OF 4
80
812.2
82
832.3
84
852.4
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
ISSUE
P0B
30421007-3CL-00021-
1173.0
118
1193.1
120
121
122
1233.2
124
125
1263.3
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
1443.4
145
146
147
1483.5
149
150
151
152
153
154
155
10
CONTENTS
SHEET 4 OF 8
OF 4
DESIGN BASIS
The design of Lightning protection systems (LPS) for different structures
present in the plant are based on overall risk factor as per the procedure
indicated in the BS-6651 standard.
The number of thunderstorm days per year is 15 as per PTS-1022 of
page 70 of 336.
Estimation of Overall Risk index.
The probability of Structure or building being struck by lightning in any
one year is the product of Lightning Flash Density and Effective
collection Area of the Structure to be protected
P = Ng x Ac x 10-6 -------- Equation as per Cl.No:10.2 of BS-6651.
Where,
P
Ng
Ac
ISSUE
P0B
11
30421007-3CL-00021-
156
157
1583.6
159
160
161
162
163
164
165
166
167
1683.7
169
170
1713.8
172
173
1743.9
175
176
1773.10
178
179
1803.11
181
182
1833.12
184
185
186
187
188
189
190
191
192
193
194
195
12
e)
Weighing Factor E -
CONTENTS
SHEET 5 OF 8
OF 4
Where,
L
=
W
=
H
=
LW + 2LH + 2WH + H2
ISSUE
P0B
13
CONTENTS
SHEET 6 OF 8
OF 4
196
1974.0 CONSIDERED BUILDINGS AND STRUCTURES.
198
199 4.1 The following buildings or structures of Arar Power Plant have been
200
considered for the Lightning Protection System.
201
202
a) Main Switchgear Building
203
b) GTG building
204
c) Attendant Room
205
d) Fuel Forwarding pump shed,
206
e) DFO unloading pump shed.
207
f) DFO storage tank
208
g) Exhaust stack.
209
h) Fin Fan cooler
210
i) Fuel filteration skid
211
j) Cooling Water skid.
212
k) Air Compressor shed
213
214
215 4.2 The Lightning Protection System calculation along with recommendation
216
for the above said buildings or structure have been compiled in
217
ANNEXURE-1. Attached.
218
219
2205.0 LIGHTNING PROTECTION CONDUCTOR DETAILS:
221
222
The following Lightning protection material/sizes are proposed to be used
223
In accordance with Cl.No:8.0 of BS-6651 Table-4.
224
2255.1 Main Switchgear Building Horizontal mesh with bare
226
Copper tape of size 25mm x 1.5mm
227
(Furse Cat. # TC-025) or equivalent
228
arranged in such a way that no part
229
of the roof is more than 5M from the
230
nearest horizontal conductor.
231
232
Down Conductors, one for every 20m
233
of perimeter with tape of size 25mm x
234
1.5mm (Furse Cat. # TC-025) or
235
equivalent, with each down conductor
236
terminated onto a 15mm dia, 2500mm ISSUE
P0B
237
long ground rod.
14
15
238
239
240
241
242
243
244
245
246
2475.2
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
2715.3
272
273
274
275
276
277
278
279
280
281
282
16
CONTENTS
SHEET 7 OF 8
OF 4
Attendant Room
ISSUE
P0B
17
283
2846.0
285
2866.1
287
288
289
290
291
292
293
2946.2
295
296
297
298
299
CONTENTS
SHEET 8 OF 8
OF 4
CONCLUSION.
The structures that compose the Arar Power Plant are mostly self
protected since they are made of steel works except Main Switchgear
building and Attendant Room.
All the steel structures would be connected to the primary grounding
system.
As indicated in Annexure-1, Lightning protection with horizontal roof
conductor & Vertical Down conductor is recommended for Main
Switchgear Building and Attendant Room.
ISSUE
P0B
18