SEDE QUITO
DIRECTOR:
ING. SANTIAGO ESPINOSA
QUITO, 2014
DECLARATORIA DE AUTORA:
Adems declaro que los conceptos y anlisis desarrollados y las conclusiones del
presente trabajo son de exclusiva responsabilidad del autor.
_________________________________
Patricio Javier Romero Ramos
CC: 1804349775
AUTOR
CERTIFICA:
Yo, Ing. Santiago Espinosa tutor, director de la tesis que titula ANLISIS
ELCTRICO EN EL SISTEMA NACIONAL DE TRANSMISIN POR LA
INCORPORACIN DE COCINAS DE INDUCCIN, certifico, haber dirigido y
revisado prolijamente cada uno de los captulos tcnicos y financieros, realizado por el
Sr. Patricio Javier Romero Ramos, previa a la obtencin del ttulo de Ingeniero Elctrico
en la Carrera de Ingeniera Elctrica.
Por cumplir los requisitos autoriza su presentacin.
______________________________
Ing. Santiago Espinosa
DIRECTOR
ii
DEDICATORIA.
iii
AGRADECIMIENTO.
iv
INDICE
DECLARATORIA DE AUTORA:.................................................................................. i
CERTIFICA: .................................................................................................................... ii
DEDICATORIA. ............................................................................................................. iii
AGRADECIMIENTO. .................................................................................................... iv
INDICE ............................................................................................................................. v
INDICE DE GRFICOS ................................................................................................ ix
INDICES DE TABLAS .................................................................................................. ix
NOMENCLATURA ....................................................................................................... xii
ABREVIATURAS ........................................................................................................ xiii
RESUMEN .................................................................................................................... xiv
ABSTRACT ................................................................................................................... xv
INTRODUCCIN ......................................................................................................... xvi
CAPTULO I .................................................................................................................... 1
1.
1.1.2.
1.1.1.1.
1.2.3.2.
1.2.3.3.
2.2.2.
2.2.3.
2.2.4.
CLCULO DEL VALOR ESPERADO DE VARIACIN DE POTENCIA
POR PERIODO DE ANLISIS. ................................................................................ 35
2.2.5.
2.2.6.
INTERVALO DE CONFIANZA................................................................. 37
2.2.7.
2.2.8.
2.4.2.
2.4.2.1.
2.4.2.2.
2.4.2.3.
2.4.2.4.
3.
3.1.5.
3.1.6.
3.3.1.
3.3.2.
3.3.
3.3.1.
FLUJOS DE CARGA............................................................................... 70
3.3.2.
ANLISIS DE RESULTADOS............................................................... 70
ANLISIS DE RESULTADOS............................................................................. 76
4.1
ANLISIS DE LA CARGABILIDAD EN LNEAS DE TRANSMISIN Y
TRANSFORMADORES DE POTENCIA. ................................................................ 76
4.1.1. ANLISIS DE CARGABILIDAD EN TRANSFORMADORES DE
POTENCIA. ........................................................................................................... 76
4.1.1.1. CARGABILIDAD EN TRANSFORMADORES DE POTENCIA
POCA DE LLUVIA. ............................................................................................ 77
4.1.1.2. CARGABILIDAD EN TRANSFORMADORES DE POTENCIA
HIDROLOGA BAJA. ........................................................................................... 79
4.1.2.
vii
4.2.2.
4.2.2.1.
FACTOR DE POTENCIA EN TRANSFORMADORES DE POTENCIA
EN HIDROLOGA ALTA .......................................................................................... 91
4.2.2.2.
FACTOR DE POTENCIA EN TRANSFORMADORES DE POTENCIA
EN HIDROLOGA BAJA .......................................................................................... 94
4.3. ANLISIS DE LOS NIVELES DE RESERVA RESPECTO A LA
DEMANDA A SER ABASTECIDA. ......................................................................... 97
4.3.1.
4.3.2.
viii
INDICE DE GRFICOS
Grfico 1.1, Zonas operativas del Sistema Nacional de Transmisin .............................. 3
Grfico 1.2, Perfiles de voltaje en el anillo Transmisin de 230 kV ................................ 4
Grfico 1.3, Perfiles de voltaje a nivel de 138 kV. ........................................................... 5
Grfico 1.4, Cargabilidad en lneas de transmisin 230 kV. ............................................ 5
Grfico 1.5, Cargabilidad en lneas de transmisin 138 kV. ............................................ 6
Grfico 1.6, Cargabilidad en lneas de transmisin 138 kV. ............................................ 6
Grfico 1.7, Cargabilidad de transformadores 230/138 kV.............................................. 7
Grfico 1.8, Cargabilidad de transformadores 138/69 kV................................................ 7
Grfico 1.9, Energa por tipo de tecnologa, hidrologa media ........................................ 8
Grfico 1.10, Reserva de energa, hidrologa media. ....................................................... 9
Grfico 1.11, Energa por tipo de tecnologa, hidrologa semi-seca .............................. 10
Grfico 1.12, Demanda mxima de potencia y energa mensual 2012 .......................... 11
Grfico 1.13, Curva de demanda diaria nacional. .......................................................... 12
Grfico 1.14, Tipos de regmenes de carga de un transformador ................................... 19
Grfico 1.15 Tipos de regmenes de carga de un transformador .................................... 20
Grfico 1.16 Tipos de regmenes de carga de un transformador .................................... 21
Grfico 1.17 Tipos de regmenes de carga de un transformador .................................... 21
Grfico 2.2. Curva del Factor de Simultaneidad para un da tpico. .............................. 40
Grfico 2.3. Curva del Factor de Utilizacin para un da tpico. .................................... 41
Grfico 3.1. Curvas de cargabilidad: (a) St. Clair [3] y (b) Revisin 1967................. 63
Grfico 3.2 Curva de cargabilidad de lneas de transmisin .......................................... 64
Grfico 3.3. Equivalente simplificado de dos sistemas enlazados por una lnea de
transmisin ..................................................................................................................... 65
INDICES DE TABLAS
Tabla 1.1. Potencia Nominal total a diciembre de 2012. .................................................. 2
Tabla 1.2. Demanda de energa y potencia en bornes de generacin ao 2012 ............. 10
Tabla 1.3. Datos tcnicos de las Lneas de Transmisin asociadas al S.N.I.[]................ 13
Tabla 1.4. Datos tcnicos de las Subestaciones asociadas al S.N.I. ............................... 15
Tabla 1.5 Bandas de variacin de voltaje y factores de potencia ................................... 15
Tabla 1.6. Limitaciones de corriente y temperatura segn las guas .............................. 22
Tabla 1.7. Consumo de GLP a nivel nacional por sectores, ao 2011. .......................... 24
Tabla 1.8, Fuentes de energa para cocinar .................................................................... 24
Tabla 1.9. Eficiencia del Equipo para cocinas de gas segn NTC 2832y eficiencia de
cocinas elctricas segn norma elctrica ........................................................................ 26
Tabla 2.1. Factor de potencia de artefactos residenciales............................................... 31
Tabla 2.2. Perodos diarios de variacin de potencia para un da ................................. 33
Tabla 2.3. Variacin de la potencia entre demanda anterior y posterior a la instalacin
de cocinas de induccin...................................................... ....... 35
ix
xi
NOMENCLATURA
Fu
Factor de Demanda
CI
DM
:
Factor de Simultaneidad
Valor Esperado
Desviacin Estandar
. .
Grados de Libertad
Nivel de significancia
xii
ABREVIATURAS
S.N.I
CENACE
MEER
CELEC EP
CONELEC
S.N.T
MW
Megavatio.
kV
Kilovoltios.
Hz
Hertz.
kA
kilo Amperio
AC
Corriente Alterna
MVA
Mega-voltio amperio.
GWh
Gigavatios-hora.
PEG
S/E
Subestacin
IEEE
IEC
GLP
ARCH
EMELNORTE
NTE
INEN
EHV
AEP
xiii
RESUMEN
xiv
ABSTRACT
xv
INTRODUCCIN
En el Plan Maestro de Electrificacin 2013 - 2022, se considera el Plan Nacional de
Coccin eficiente para lo se planea distribuir 300000 cocinas de induccin a lo largo de
todo el pas, por lo cual nace la necesidad de analizar el S.N.I para detectar niveles
cargabilidad en Transformadores de Potencia y Lneas de Transmisin as como
violaciones a las bandas de voltaje de las barras de las S/E.
Para determina la Potencia Activa de las cocinas de Induccin a incorporarse para el
ao 2015, la cual se simulara en DigSilent Power Factory, es necesario determinar los
factores de simultaneidad, utilizacin y Factor de Potencia para conocer la verdadera
potencia a incrementarse por la inclusin de cocinas de induccin.
Para el Anlisis se ha considerado 12 casos de estudio, que se reparten de la siguiente
manera: E1 a E6: Demanda Mxima, Media y Mnima sin cocinas de Indiccin para
Hidrologa alta y baja; E6 a E12: Demanda Mxima, Media y Mnima con cocinas de
Indiccin para Hidrologa alta y baja.
De la simulacin de flujos de potencia se conocer cules son los Transformadores de
Potencia y Lneas de Transmisin sobrecargadas o que presenten alertas de
sobrecarga, las cuales debern ser consideras en el Plan de Expansin Elaborado por
el CONELEC para su mejoramiento o repotenciacin.
xvi
xvii
CAPTULO I
El sector elctrico ecuatoriano est compuesto por tres etapas: Generacin, Transmisin
y Distribucin, estas etapas son de suma importancias, ya que siempre debe cumplirse el
balance entre la generacin y carga, por lo tanto el sistema elctrico debe mantenerse en
balance con la menor prdida de potencia en la transmisin y distribucin de la energa,
con el fin de abastecer con confiabilidad y seguridad al consumidor final. A continuacin
se muestra el estado actual del sector elctrico, de forma general, en estas tres etapas.
1.1.1. SISTEMAS DE GENERACIN
El parque hidrotrmico disponible para produccin de energa elctrica en el Ecuador est
comprendido por: 16 centrales hidroelctricas estatales de pequea, mediana y gran
capacidad las cuales van de 1MW y 1.100 MW, y 39 centrales pequeas pertenecientes a
las empresas de distribucin de energa elctrica, a municipios y a empresas privadas;
ms de un centenar de centrales trmicas con diferentes combustibles y pertenecientes a
diferentes empresas, entre generadoras, distribuidoras, industria privada y petroleras en
general, en la Tabla 1.1, se observa el porcentaje de participacin de la actividad de
generacin en el Sistema Nacional Interconectado (S.N.I) con corte a diciembre de 2012.
En el pas existen cuatro centrales de embalse consideradas como centrales de regulacin,
el embalse de Mazar, con una regulacin mensual de caudales, que permite la operacin
de la central del mismo nombre y la regulacin del caudal de ingreso hacia el embalse
Amaluza de la Central Molino; la central de Mazar y principalmente su embalse, es
importante por su papel de regulacin de caudal turbinado y vertido para la central
Molino, la ms grande del pas, hasta la construccin del proyecto hidroelctrico
emblemtico Coca Codo Sinclair de 1.500 MW.
En lo que se refiere al parque termoelctrico, la infraestructura y tecnologa data de ms
de 30 aos, con generadores de combustin interna, unidades de vapor y a gas. Existen
unidades que utilizan gas natural como combustible y que actualmente son operadas por
CELEC EP Termogas Machala1.
Tabla 1.1. Potencia Nominal total a diciembre de 2012.
Sistema Tipo de Central Potencia Efectiva (MW) Porcentaje de Potencia Efectiva (%)
S.N.I
Hidrulica
2256,00
48,46%
MCI
864,28
18,56%
Turbo gas
976,74
20,98%
Turbo vapor
446,24
9,59%
Renovable
109,90
2,36%
4653,16
100,00%
Total
Fuente: CONELEC, Situacin actual y capacidad disponible del S.N.I. Plan Maestro de
Electrificacin 2013 2022, Captulo 2 EXPANSIN DE GENERACIN.
CONELEC, Infraestructura Existente - Situacin actual y capacidad disponible del S.N.I. Plan Maestro
de Electrificacin 2013 2022, Captulo 2 EXPANSIN DE GENERACIN
1
Fuente: CONELEC, Situacin Actual, PLAN MAESTRO DE ELECTRIFICACIN 20132022, Quito, 2013,
PERFILES DE VOLTAJE
Para mejorar las condiciones de calidad y seguridad del S.N.I. es indispensable mantener
un adecuado perfil de voltaje (dentro de la banda +7% / -5%) en todo el anillo troncal de
transmisin de 230 kV.
En las Grfico 1.2 y Grfico 1.3, se muestran los valores promedio de voltajes en barras
de 230 kV y 138 kV, respectivamente, del S.N.I. registrados en demanda mxima, para
condiciones normales de operacin y de hidrologa alta en la cadena Mazar - Paute. Como
se observa, en 230 kV todas las barras mantienen su voltaje dentro de los lmites
admisibles, pero hay problemas de bajo voltaje en barras de 138 kV de las subestaciones
Orellana y Loja.
En la zona Suroccidental las subestaciones Pascuales y Nueva Prosperina presentan bajos
perfiles de voltaje debido al disminuido aporte de la generacin trmica local en
condiciones de alta hidrologa, mientras que en la zona Sur el perfil de voltaje es bajo en
la subestacin Machala en caso de indisponibilidad de la generacin de la central
Termogas Machala.
Del Grfico 1.4 al Grfico 1.6, se puede concluir que las lneas a nivel de 230 kV,
presentan un bajo nivel de cargabilidad, mientras que a nivel 138 kV, las lneas Mulal
Pucar, Pascuales - Santa Elena, Salitral Pascuales y Santa Rosa Conocoto, sobrepasan
el 80% de su capacidad.
6
Del Grfico 1.7 se puede concluir que el 15,78% de los transformadores 230/138 kV se
encuentran sobrecargados, as mismo del Grfico 1.8, el 25,72% de los transformadores
de 138/69 kV se encuentran sobrecargados.
1.1.3. RESERVAS DE ENERGA3
El objetivo primordial del plan de expansin de la generacin de acuerdo Plan Maestro
de Electrificacin 2013-222, es de garantizar, en lo posible, una reserva mnima de
energa del 10% ante la ocurrencia de un escenario hidrolgico seco (90 % de
probabilidad de excedencia), y una reserva mnima de potencia del 20%, sin
interconexiones internacionales.
A continuacin se presentan los resultados de las reservas de energa considerando, para
los siguientes escenarios:
ESCENARIO HIDROLGICO PROMEDIO
En el caso de presentarse un escenario hidrolgico promedio, el Grfico 1.9 muestra la
oferta y demanda para el Plan de Expansin de la Generacin (PEG) 2013 - 2022, en el
que se identifica la composicin de generacin segn el tipo de tecnologa, siendo
predominante la generacin hidroelctrica especialmente desde la entrada en operacin
del proyecto hidroelctrico Coca Codo Sinclair.
CONELEC,
Expansin
de
la
Generacin,
PLAN
MAESTRO
DE
CONELEC,
Expansin
de
la
Generacin,
PLAN
MAESTRO
DE
De la Grfico 1.10, se puede concluir que el margen de reserva de energa se ubica entre
el 20% y el 52%.
ESCENARIO HIDROLGICO SEMI SECO (75% DE PROBABILIDAD DE
EXCEDENCIA)
Para el caso de un escenario hidrolgico intermedio, entre promedio y seco, se presenta
el Grfico 1.11 de oferta y demanda de energa elctrica.
CONELEC,
Expansin
de
la
Generacin,
PLAN
MAESTRO
DE
VARIABLE
DEMANDA
3207
5,94
Energa (GWh)
19534
4,91
(%)
Mientras que para el perodo entre el ao 2010 y 2012, los crecimientos medios anuales
fueron: 5,09% en potencia y 5,43% en energa. El crecimiento medio anual durante enero
CONELEC, Situacin Actual de la Demanda Elctrica Plan Maestro de Electrificacin 2013 2022,
ESTUDIO Y GESTIN DE LA DEMANDA ELCTRICA
10
2008 a diciembre 2012 presentaron los siguientes crecimientos medios anuales: 3,73% en
potencia y 4,23% en energa. La demanda mxima de potencia registrada en el 2012 a
nivel de bornes de generacin, se produjo en diciembre con 3.207 MW, mientras que la
potencia mnima se registr en enero con 2.937 MW. En lo referente a energa, la
demanda mxima de energa se produjo en mayo de 2012 con 1.715 GWh, mientras que
la demanda mnima de energa se registr en febrero con 1.502 GWh.
11
De la Grfico 1.13, se puede observar que la demanda de los das laborable y festivo
mantiene similar comportamiento, mientras que la curva del da semi laborable se
encuentra en medio de las dos curvas. Adems, la demanda en el da semi laborable y del
da festivo coincide con la demanda mxima a las 20 horas, mientras que la demanda del
da laborable se encuentra un 10% por arriba de las demandas antes mencionadas a esa
misma hora.
1.2. IDENTIFICACIN
DE
LMITES
OPERATIVOS
DE
LNEAS
DE
TRANSMISIN Y TRANSFORMADORES
Las lneas de transmisin son la parte ms importante en el sistema de transmisin de
energa elctrica, debido a que, son utilizadas para transportar la energa desde los
sistemas de produccin hasta los grandes centros de consumo.
Actualmente, el consumo elctrico se lo utiliza como un indicador de la evolucin
econmica de un pas, por tal razn, la evaluacin del sistema de transmisin elctrico es
muy importante para planificar las futuras expansiones que se realizan en el sistema y
poder mejorar la calidad y continuidad del servicio suministrado.
Uno de los principales problemas al transmitir potencia a travs de una lnea de
transmisin es la cada de voltaje, parmetro que es medido entre las barras de generacin
y la de carga, esta cada de voltaje bajo condiciones normales de operacin hace que el
12
voltaje de la carga se encuentre en los lmites de operacin permitidos, para evitar posibles
problemas en las futuras lneas es necesario que los proyectos elctricos de expansin
sean planificados en forma adecuada, para ello es necesario evaluar la topologa actual
del sistema, estimar la carga futura, optimizar rutas y espacios, entre otros aspectos ms.
1.2.1. LNEAS DE TRANSMISIN DEL S.N.T ASOCIADOS A LAS
SUBESTACIONES DE ANLISIS.
1.1.
Tabla 1.3, se presenta un listado de los datos tcnicos de las lneas asociadas a las
subestaciones de transferencia de energa, entre los datos ms relevantes tenemos:
Nombre y Voltaje de las lneas de transmisin en kV.
Tipo y calibre de conductor.
Capacidad de Transmisin en MVA, continua y emergente.
Nmero de Circuitos y longitud del conductor en Km.
Tabla 1.3, Datos tcnicos de las Lneas de Transmisin asociadas al S.N.I.[5]
DATOS TCNICOS DE LAS LNEAS DE TRANSMISIN
CONDUTOR POR
NOMBRE DE LA LNEA
VOLTA
JE (kV)
TIPO
ACSR
NMER
CAPACIDAD
FASE
O DE
LONGIT
CIRCUIT
UD (Km)
CALIB
CONTIN
(MVA
EMERGEN
RE
UA (A)
CIA (A)
477,0
483
115
669
160
74,5
397,5
474
113
590
141
154,8
397,5
416
100
590
141
134,2
397,5
475
113
590
141
112,8
(MVA)
OS
Ibarra Tulcn
138
138
Cuenca Loja
138
138
138
ACSR
397,5
475
113
590
141
21,0
Loja Cumbaratza
138
ACSR
266,8
377
90
460
110
54,1
Fliker
ACSR
Brant
ACSR
Brant
ACSR
Brant
13
Zona Norte: S/E Esmeraldas, S/E Milagro, S/E Nueva Loja, S/E Tulcn.
Tipo de Transformador.
LTC, (load tapchanger) o cambiador de tomas en carga, se define como un
equipo con interruptor selector, el cual puede incluir conmutadores para
14
SUBESTACIN
RELACIN DE
NMERO DE
TRANSFORMACIN TRANSFORMADORES
CAPACIDAD
(MVA)
TIPO
LTC
75
auto - 3f
si
OA FA FOA
Esmeraldas
138/69/13,8
45
60
Machala
230/69/13,8
3+1
auto - 1f
no
Machala
138/68/13,8
auto - 1f
si
Milagro
230/69/13,8
3+1
auto - 1f
no
Milagro
230/138/13,8
auto - 3f
no
Cuenca
138/69/13,8
3+1
60
80
100
auto - 1f
no
Loja
138/69/13,8
40
53
66
auto - 3f
si
Tulcn
138/69/13,8
20
27
33
auto - 3f
si
Nueva Loja
138/69/13,8
20
27
33
auto - 3f
si
IEEE standard requirements for load tap changers. IEEE Std C57.131-1995.
CENACE, POA, Plan de Operacin del Sistema Nacional Interconectado abril 2013, Quito,
marzo 2013.
7
15
Barra de
Barras de
230 kV
138 kV
Puntos de entrega:
Barras de: 69 kV, 46 kV y 34,5 kV
+3% / -3% del voltaje nominal
nominal
FACTORES DE POTENCIA EN PUNTOS DE ENTREGA
Distribuidores y Grandes
Consumidores
Demanda Mxima
Demanda Media
Demanda Mnima
16
permisible no se excede; lo mismo puede decirse del lmite por estabilidad o separacin
angular, siendo la separacin angular relativamente pequea. Este margen trmico se
establece en funcin del tipo de conductor normalmente la temperatura de operacin
mxima no deben superar los 80C.
Los fabricantes de conductores en dependencia del naturaleza y calidad de los materiales
que utilizan para desarrollar sus productos, determinan un mximo valor de corriente que
deber fluir a travs de su conductor, esto debido a que la circulacin de corriente excesiva
provoca mayores prdidas en el conductor, estas prdidas de energa se reflejan en calor
que provoca un incremento en el gradiente de temperatura en la superficie del conductor
y que a su vez se incrementa la resistencia del mismo, lo que puede generar altas
temperaturas en los conductores y provocar deformaciones en los materiales o prdidas
de las caractersticas de conductividad de los conductores.
17
10
IEC 60076-7. Power transformers- Part 7: Loading guide for oil-immersed power transformers.
Ginebra, IEC, 2005.
18
11
19
11
13
15
17
19
21
23
hora del Da
Temperatura del Punto ms Caliente
11
13
15
hora del Da
Temperatura del Punto ms Caliente
20
17
19
21
23
11
13
15
17
19
21
23
hora del Da
Temperatura del Punto ms Caliente
11
13
15
17
19
21
23
hora del Da
Temperatura del Punto ms Caliente
21
Transformadores de
Transformadores de
Transformadores de
distribucin
media potencia
gran potencia
IEC
IEEE
IEC
IEEE
IEC
IEEE
1,5
1,5
1,3
120
120
120
120
140
140
140
140
105
105
105
105
22
Datos de Operacin
Parmetro
Transformadores de
Transformadores de
Transformadores de
distribucin
media potencia
gran potencia
IEC
IEEE
IEC
IEEE
IEC
IEEE
Sobrecarga programada
Corriente (p.u.)
130
150
110
1,8
1,5
1,3
140
140
140
140
160
160
160
160
115
115
115
110
2,0
3,0
1,8
1,5
2,0
200
160
160
180
180
180
200
120
115
115
110
23
mensual promedio de Gas Licuado de Petrleo (GLP) por hogar y la relacin entre las
eficiencias de la coccin con (GLP y electricidad).
As mismo se establece que el consumo promedio de GLP por hogar (CPGLP/H), se
determina por la relacin entre el consumo de GLP del sector domstico (CPGLP) y el
nmero de hogares que usan GLP para coccin (NHGLP), Como se muestra la siguiente
ecuacin:
/ = /
(1.1)
Capacidades (Ton)
Cil. 15 kg
Cil. 45 kg
Al granel
Total
Porcentaje
otras
Benef.
(Ton)
(%)
12.838
12.847
1,25
110
110
0,01
Comercial
3.575
7.762
2.981
14.319
1,39
Domstico
923.363
20
6.121
929.505
90,3
Industrial
3.095
1.683
54.991
3.040
62.810
6,1
Vehicular
9.795
9.795
0,95
930.042
9.466
86.727
3.040
110
Industria
Beneficencia
Total
1.029.38
5
100
24
3.466.737
90,98
259.216
6,8
Electricidad
16.223
0,43
Otros
68.372
1,79
3.810.548
100
Total de hogares
25
Tipo de
equipo
Eficiencia
Elctrico
R (nE/nG)
70,14
Marca 1
1,56
Gas
44,91
Elctrico
75,26
Marca 2
1,66
Gas
45,32
Con esta consideracin la eficiencia de la coccin de alimentos para una cocina de gas
se encuentra entre (44,91% y 45,32 %), y la de una cocina de induccin de uso domstico
12
26
tipo D es de 84%14. La relacin entre las eficiencias de las cocinas a GLP y a electricidad
es: GLP / Elec = (0,4532/0,84) = 0,53.
La demanda de energa mensual promedio por cocina resulta del producto del consumo
mensual promedio por hogar en kWh por la relacin GLP / Elec:
233,28 %& 0,53 = 123,64 %&
1.3.2. PLAN FRONTERAS PARA LA SUSTITUCIN DE COCINAS DE
INDUCCIN
El Plan Fronteras para la Sustitucin de Cocinas de Induccin desarrollado por
EMELNORTE, es un plan piloto que permiti evaluar el incremento de potencia por el
ingreso de cocinas de induccin en la zona del Carchi, para este estudio la empresa de
Distribucin EMELNORTE escogi el transformador G1T331, de 25KVA y
(13800/120/240V), el cual se encuentra ubicado en la parroquia de Julio Andrade,
alimentado por el circuito 1 de la subestacin San Gabriel, este transformador fue
instalado en el ao de 1984, sirve a 73 usuarios, de los cuales EMELNORTE entrego
para el estudio a 26 familias 2 cocinas de induccin 1200 W15.
1.4.
FACTOR DE
SIMULTANEIDAD
1.4.1. FACTOR DE UTILIZACIN
Al factor de utilizacin se le puede considerar como: La relacin, expresada como un
valor numrico o como un porcentaje, del consumo durante un perodo determinado
(ao, mes, da, etc.), y el consumo que podra generarse debido al uso permanente de la
potencia mxima o de cualquier valor particular especfico de potencia observada
durante este perodo 16.
Notas:
14
Norma tcnica de eficiencia energtica en cocinas de induccin de uso domstico, NTE INEN
2 567,2010.
27
DM
CI
(1.2)
Donde,
Fu: Factor de Demanda
CI: Carga total instalada (kW)
DM:Demanda Mxima Registrada en la carga (kW)
28
(1.3)
Donde,
: Factor de Simultaneidad
18
Empresa Elctrica Quito, Determinacin de la demanda de una vivienda, NORMAS PARA SISTEMAS
DE DISTRIBUCIN PARTE A GUA PARA DISEO, Quito, 2014, 5 revisin, pp.7
29
CAPTULO II
2. FACTOR DE UTILIZACIN, SIMULTANEIDAD Y FACTOR DE
POTENCIA
Para determinar la demanda mxima coincidente por la incorporacin de cocinas de
induccin es necesario conocer los factores de potencia, simultaneidad y utilizacin, los
cuales se presentan a continuacin:
2.1. FACTOR DE POTENCIA COCINAS DE INDUCCIN.
El factor de potencia se define como la relacin entre la potencia activa (W, kW o MW)
y la potencia aparente (VA, kVA, MVA), determinada en el sistema o en uno de sus
componentes19.
(2.1)
En la
19Ramrez
30
Artefactos
(W)
Factor de Potencia
65,40
0,92
5,70
0,61
LCD 32''
107,00
0,98
LCD 40''
96,00
0,91
TV 14''
53,00
0,71
TV 21''
76,40
0,63
TV 14'' STB
7,00
0,83
16,50
0,71
29,00
0,65
10,90
0,62
Router WIFI
9,40
0,79
Heladera / Freezer
160,00
0,42
Heladera / Freezer
152,60
0,64
Freezer
90,00
0,45
Lavadora de Ropa
300,00
0,91
Horno a Microondas
980,00
0,92
PC Monitor 17''
127,00
0,65
10,00
0,60
19,70
0,80
Foco de 60 W incandescente
60,00
1,00
20,00
0,98
Foco Ahorrador 23 W
23,00
0,99
20
Por lo tanto el factor de potencia a utilizarse en los clculos ser el indicado por la
Subsecretaria de la Calidad del Ministerio de Industrias y Productividad.
2.2. METODOLOGA PARA LA DETERMINACIN DEL FACTOR DE
UTILIZACIN Y FACTOR DE SIMULTANEIDAD.
Para determinar el factor de simultaneidad y utilizacin, de un conjunto de datos de
potencia tomada antes y despus de la incorporacin de cocinas de induccin, la
metodologa plantea las siguientes acciones:
2.2.1. PROCEDENCIA DE DATOS.
Los datos fueron solicitados por la Universidad Politcnica Salesiana al Ministerio de
Electricidad mediante Oficio CET-Q No. 00005-14 de 19 de marzo de 2014.
Los datos entregados por Ministerio de Electricidad corresponden a mediciones
realizadas por la Empresa Elctrica Distribuidora del Norte (EMELNORTE) antes de
incorporacin de cocinas de induccin en la zona del Carchi que corresponden desde el
mircoles 29 de septiembre de 2010 hasta el mircoles 13 de octubre y posterior a la
implementacin de cocinas de induccin en la misma zona desde jueves 24 de noviembre
de 2011 hasta jueves 01 de diciembre de 2011.
Los datos entregados tienen una periodicidad de 10 minutos, es decir en el periodo
comprendido para las mediciones realizadas antes y despus de la implementacin de las
cocinas de induccin los cuales se encuentran en tablas separadas, se obtiene un total de
2016 datos.
En los cuales se tienen valores de voltaje, corriente, THD, factor de potencia, potencia
activa, potencia reactiva y energa.
2.2.2. PERODOS DE ANLISIS.
Para el anlisis, se consider, como muestra, las mediciones de potencia activa en Wattios
realizadas para una semana antes y despus de la incorporacin de cocinas de induccin
en la zona del Carchi, tomando esto en cuenta existen 1008 mediciones para cada semana,
por lo tanto el tamao de la muestra total asciende a un valor de 2016 mediciones en
intervalos de 10 minutos.
Se asign a cada intervalo de medicin un perodo y un estado, esto se realiza para todas
las mediciones de la semana antes y la semana despus de la incorporacin de cocinas,
para este anlisis se considerar 24 periodos para cada da durante para la semana antes
de la incorporacin de cocinas y 7 das para despus de la incorporacin de cocinas, esto
quiere decir por ejemplo que el periodo 1 estar comprendo por las mediciones que se
encuentren entre 1:00 y las 1:50 y as sucesivamente para todos los periodos de cada da
durante las semanas de anlisis, como se muestra en la siguiente tabla:
Tabla 2.2. Perodos diarios de variacin de potencia para un da
Perodo diario
[ inicio ; fin [
[ 01:00 ; 02:00 [
[ 02:00 ; 03:00 [
[ 03:00 ; 04:00 [
[ 04:00 ; 05:00 [
[ 05:00 ; 06:00 [
[ 06:00 ; 07:00 [
[ 07:00 ; 08:00 [
[ 08:00 ; 09:00 [
[ 09:00 ; 10:00 [
10
[ 10:00 ; 11:00 [
11
[ 11:00 ; 12:00 [
12
[ 12:00 ; 13:00 [
13
[ 13:00 ; 14:00 [
14
[ 14:00 ; 15:00 [
15
[ 15:00 ; 16:00 [
16
[ 16:00 ; 17:00 [
17
[ 17:00 ; 18:00 [
18
[ 18:00 ; 19:00 [
19
[ 19:00 ; 20:00 [
20
[ 20:00 ; 21:00 [
33
Perodo diario
[ inicio ; fin [
21
[ 21:00 ; 22:00 [
22
[ 22:00 ; 23:00 [
23
[ 23:00 ; 00:00 [
24
[ 00:00 ; 01:00 [
(2. 2)
Quedando como resultado una nueva tabla con las variaciones de potencia da-da y horahora.
Para lograr lo indicado, se realiz dos tablas, una de datos anteriores y otra de datos
posteriores a la implementacin de las cocinas, con el mismo nmero de mediciones es
decir para la semana anterior se tendra 1008 mediciones obtenidos de las mediciones
cada 10 minutos y para una posterior la misma cantidad, las dos tablas tendrn el mismo
nmero de mediciones por da y a las mismas horas. En tal sentido, se procedi con el
ordenado personalizado por orden ascendente en funcin del da y en segundo nivel por
hora de menor, dando como resultado la tabla resultado de la variacin de potencia.
34
PERIODO
HORA
DIA
478.069
24
0:00:00
dom
304.578
24
0:10:00
dom
208.956
24
0:20:00
dom
248.925
24
0:30:00
dom
679.702
24
0:40:00
dom
-190.706
24
0:50:00
dom
1008
184.73
23
23:50:00
vie
(2.4)
Donde:
= #$
= ,,$ -- $ #
Como se puede observar en la frmula del clculo del valor esperado, es necesario
conocer la probabilidad de ocurrencia del evento i, para lo cual se debe aplicar una
distribucin de probabilidades t student a los datos para obtener la probabilidad de
ocurrencia del evento i.
35
[
# de
mediciones
dentro del
intervalo
Valor esperado
!
Donde:
!
"
$ 1 & 3.33 *+
"
,- ,.
/
.
Como se va a calcular un valor esperado de variacin de potencia para cada da durante
7 das y 24 perodos por da, se obtendrn un total de 168 valores esperados.
De la Tabla 2.4 se obtiene el valor esperado, el cual se utilizar para calcular el intervalo
de confianza.
36
2.2.6.
INTERVALO DE CONFIANZA21.
En estadstica, se llama a un par o varios pares de nmeros entre los cuales se estima que
estar cierto valor desconocido con una determinada probabilidad de acierto
= .
Donde:
, +
= #$ -12
= #$
=
Walpole, Roland; Myers, Raymond y Ye, Keying (2002). Probability and Statistics for Engineers
and Scientists. Pearson Education.
37
Para este clculo se realiz una Macro en Excel la cual se presenta en el ANEXO 1, Determinacin del Factor de utilizacin y Simultaneidad, aplicando las frmulas de
obtencin del factor de simultaneidad y Utilizacin que se presentan a continuacin se
obtiene los mximos valores esperados incluido el error calculado con intervalos de
confianza.
2.2.8. FACTOR DE SIMULTANEIDAD Y UTILIZACIN.
El factor de simultaneidad se le puede definir como: La relacin, expresada como un
valor numrico o como un porcentaje, de la potencia simultnea mxima de un grupo de
artefactos elctricos o clientes durante un perodo determinado; y la suma de sus
potencias individuales mximas, durante el mismo perodo y se define por la ecuacin.
=
(2.3)
Donde,
: Factor de Simultaneidad
Por los tanto el factor de simultaneidad Fs, resulta de DMt = Promedio o Valor esperado
sobre el = 62400 & Potencia activa de 26 usuarios.
Para la determinacin del factor de Utilizacin se pude partir de La frmula de la
Demandan Mxima la cual se define como:
= 9
Donde,
: Factor de simultaneidad
: Factor de utilizacin
: Factor de potencia
(2.5)
=
9
(2.6)
Donde,
9 = 62400 W (potencia de 26 usuarios beneficiario del plan de cocinas de induccin en
la Zona del Carchi, cada uno con una potencia Instalada de 2400 W valor necesario para
la determinacin del factor de utilizacin)
Fp = 1,00 (factor de potencia de las cocinas de Induccin)
DM = Potencia esperada.
A continuacin se presenta los resultados obtenidos de los perodos de anlisis mximos
toda la semana.
POT MAX
MAX FS ESP
MAX FU
ESPERADO (W)
(%)
ESP (%)
2372,56
0,04
81%
1179,50
0,02
83%
1001,39
0,02
92%
1209,51
0,02
87%
3828,70
0,06
76%
12825,75
0,21
84%
8084,73
0,13
80%
6402,16
0,10
83%
8874,24
0,14
84%
10
12863,54
0,21
91%
11
11964,13
0,19
89%
12
10069,17
0,16
84%
13
5222,61
0,08
92%
14
4193,54
0,07
80%
39
PERIODO
POT MAX
MAX FS ESP
MAX FU
ESPERADO (W)
(%)
ESP (%)
15
4061,69
0,07
85%
16
5299,22
0,08
82%
17
5619,03
0,09
90%
18
8610,96
0,14
93%
19
8833,49
0,14
89%
20
5778,35
0,09
89%
21
5488,59
0,09
86%
22
5184,47
0,08
80%
23
2108,51
0,03
93%
24
2958,76
0,05
80%
MAXIMO VE
12863,53548
20,61%
92,98%
Se pude concluir que el maximo valor esperado del simultaneidad con un nivel de
confianza de 85% es igual 20,61% y el maximo valor del factor de utilizacin esperado
es de de 92,98%.
40
DISEO, establecida por la Empresa Elctrica Quito S.A., establece los valores del
factor de utilizacin y simultaneidad de cocinas induccin, los cuales se muestran a
continuacin:
Tabla 2.6. EEQ - Factores de Utilizacin y Simultaneidad
EEQ NOMAS DISTRIB. PARTE A
Factor de Simultaneidad
0,24
Factor de Utilizacin
0,80
41
Nota: Factor de Simultaneidad para 1,000 usuarios y la potencia prevista por cocinas de
3,0 kW.
0,20
Factor de Utilizacin
0,60
GUA
TCNICA
DE
42
0,50
Factor de Utilizacin
0,75
0,21
Factor de Utilizacin
0,93
FACTORES
Factor de Simultaneidad
(Fs)
Factor de Utilizacin
(Fu)
EEQ NOMAS
PME -
DISTRIB.
2012
PARTE A
2021
0,24
0,20
0,50
0,21
0,80
0,60
0,75
0,93
43
GUIA
BT-25
DE ACUERDO A
LA
METODOLOGA
45
Grupo Vectorial en lado de Alto, medio y Bajo Voltaje: [YN, YN, D], Desplazamiento
angular.
Impedancias de Secuencias: Necesario para el anlisis de cortocircuitos si se lo va a
realizar.
Para Lneas de Transmisin tenemos:
Longitud del Conductor: Distancia de la lnea en km.
Tensin Nominal: [230, 138, 69, 13,8 kV] Tensin Nominal a la cual ser sometido el
conductor.
Corriente Nominal: [kA] Corriente mxima que circulara en el conductor
Tensin Nominal: [kV] Voltaje al cual ser sometido el conductor.
Frecuencia Nominal: Para todos los caso [60 hz].
Nmero de fases: Para todos los casos se considera un sistema trifsico.
Tipo de Sistema: Para todos los casos se considera sistemas en Corriente Alterna (AC).
Impedancias de Secuencias: Necesario para el anlisis de cortocircuitos si se lo va a
realizar.
Tipo de tendido: para todos los casos se considera lneas Areas.
Para Cargas tenemos:
Potencia Activa: Cantidad de Potencia Activa a ser abastecida (Carga puntual de cada
Empresa Distribuidora)
Factor de Potencia: Para todas las cargas considero un factor de potencia de 0,96
Voltaje: Nivel de voltaje en [p.u.]
Tipo de Carga: Todas las cargas puntuales se consideraran como carga Balanceada.
46
CASO
ESCENARIO
CONFIGURACIN DEMANDA
E1
DMAX
#1
#1 (SIN COCINAS)
(MXIMA)
E2
DMED
#1 (SIN
DMIN
COCINAS)
#3 (MNIMA)
#1 (SIN
#1
DMAX
COCINAS)
(MXIMA)
E3
E4
E5
DMED
#1 (SIN
COCINAS)
#2 (MEDIA)
E6
DMIN
47
Cambios en cascada en el sistema de potencia, como por ejemplo, una serie de salidas
o cortes de lneas con el consiguiente alcance del lmite de generacin de reactivos22.
Las bandas de variacin de voltaje para barras de 230 kV, 138 kV y 69 kV que se
encuentran en la Tabla 2.12, sern utilizadas para conocer que barras se encuentran por
debajo de los lmites establecidos as como para las que se encuentran sobre los lmites.
22
EPN. Ing. Antonio Ortiz, PIL S.A., Ing. Jess Jtiva, Ph.D. Anlisis de Estabilidad de Voltaje en Estado
Estable del Sistema de Subtransmisin de la Empresa Elctrica Quito ESTABILIDAD DE SISTEMAS DE
POTENCIA pp 3
48
Barras de
230 kV
138 kV
69 kV, 46 kV y 34,5 kV
nominal
Distribuidores y Grandes
Demanda Media
Consumidores
Demanda Mnima
A continuacin se prestan los niveles de voltaje en p.u. para los distintos escenarios de
Simulacin, se ha establecido dos alertas establecidas para bajo nivel de voltaje la ceda
ser de color azul y para alto nivel de voltaje la celda ser roja.
Tabla 2.13. Voltajes en Barras de 69, 138, 230 kV
#1 (E. H.
#2 (E. H.
#3 (E. H.
#4 (E. H.
#5 (E. H.
#6 (E. H.
ALTA 2015)
ALTA 2015)
ALTA 2015)
BAJA 2015)
BAJA 2015)
BAJA 2015)
DMAX
DMED
DMIN
DMAX
DMED
DMIN
Nom.L-L
u, Magnitud
u, Magnitud
u, Magnitud
u, Magnitud
u, Magnitud
u, Magnitud
Volt. Kv
p.u.
p.u.
p.u
p.u.
p.u.
p.u.
CUMBARATZA 69
69.00
1.05
1.03
1.05
1.04
1.04
1.05
MULALO 69
69.00
1.00
0.98
1.05
0.97
0.97
1.05
LOJA 69
69.00
1.02
1.04
1.05
1.05
1.05
1.04
IBARRA 69 2
69.00
0.97
0.96
1.02
0.96
0.97
1.02
TENA 69
69.00
0.95
0.99
1.00
0.95
0.97
1.02
COCA 69
69.00
0.95
0.96
0.97
0.96
0.96
0.98
CHAVEZPAMBA 69
69.00
0.98
0.97
1.05
0.98
0.99
1.05
TULCAL 69
69.00
0.97
1.04
1.05
1.05
1.05
1.05
CASOS DE ESTUDIO
Nombre de la Barra
CUENCA 69
69.00
1.01
1.01
1.02
1.01
1.01
1.04
AMBATO 69
69.00
0.97
1.00
1.03
0.97
0.98
1.03
NUEVA LOJA 69
69.00
0.97
0.96
0.99
0.99
0.97
1.00
SALITRAL 69
69.00
0.98
0.99
1.00
0.98
1.00
1.01
SALITRAL 138
138.00
0.97
0.96
1.01
0.95
0.96
1.02
POLICENTRO 138
138.00
0.97
0.97
1.02
0.96
0.96
1.03
CENACE, POA, Plan de Operacin del Sistema Nacional Interconectado abril 2013, Quito, marzo
2013.
23
49
#1 (E. H.
#2 (E. H.
#3 (E. H.
#4 (E. H.
#5 (E. H.
#6 (E. H.
ALTA 2015)
ALTA 2015)
ALTA 2015)
BAJA 2015)
BAJA 2015)
BAJA 2015)
DMAX
DMED
DMIN
DMAX
DMED
DMIN
Nom.L-L
u, Magnitud
u, Magnitud
u, Magnitud
u, Magnitud
u, Magnitud
u, Magnitud
Volt. Kv
p.u.
p.u.
p.u
p.u.
p.u.
p.u.
TRINITARIA 138
138.00
0.98
0.96
1.01
0.97
0.96
1.02
138.00
1.01
1.01
1.05
1.00
1.00
1.05
138.00
1.02
1.00
1.05
1.02
1.02
1.06
ESCLUSAS 138
138.00
1.01
1.01
1.04
1.01
1.01
1.04
CASOS DE ESTUDIO
Nombre de la Barra
138.00
0.98
0.98
1.00
0.97
0.99
1.02
230.00
0.98
0.97
1.03
0.97
0.97
1.04
230.00
1.01
0.97
1.05
1.01
1.00
1.05
EL INGA 230
230.00
1.01
0.97
1.05
1.01
1.00
1.05
230.00
0.98
0.98
1.05
0.97
0.98
1.02
DCR 230
230.00
0.98
0.98
1.03
0.97
0.98
1.04
PASCUALES 230
230.00
0.98
0.98
1.03
0.97
0.98
1.04
TRINITARIA 230
230.00
0.98
0.98
1.05
0.99
0.99
1.05
QUEVEDO 230
230.00
1.01
1.00
1.05
1.00
1.00
1.05
ESCLUSAS 230
230.00
0.98
0.99
1.03
0.98
0.98
1.04
TOTORAS 230
230.00
1.01
0.97
1.02
0.96
0.97
1.02
MILAGRO 230
230.00
1.00
1.00
1.05
0.99
1.00
1.05
230.00
1.03
1.01
1.06
1.02
1.02
1.06
De los resultados obtenidos se pude apreciar que el sistema se encuentra estable y que
existen pocas violaciones a las bandas voltaje, como es el caso de las barras de 69 kV
Coca, Tena e Ibarra, estas violaciones se deben a la falta de generacin o compensacin
reactiva, la cual regule los niveles de voltaje a los normados en la Regulacin No.
CONELEC 004/02.
Los resultados de los flujos de potencia para Demanda Mxima, Media y Mnima para
Hidrologa Alta y Baja se presentan a continuacin en la siguiente Tabla:
Tabla 2.14. Consolidado de Flujo de Carga para Demanda Mxima media y mnima sin cocinas
de induccin.
FLUJO DE CARGA PARA EL AO 2015
HIDROLOGA ALTA
SISTEMAS
HIDROLOGA BAJA
DEMAND
DEMAND
DEMAND
DEMAND
DEMAND
DEMAND
A MEDIA
A MEDIA
MXIMA
(MW)
MNIMA
MXIMA
(MW)
MNIMA
(MW)
(MW)
(MW)
50
(MW)
GENERACIN
4201.31
3777.71
2656.11
4213.59
3824.04
2644.92
CARGA
4239.73
3671.55
2589.19
4239.73
3671.55
2589.19
COLOMBIA
172.56
5.84
0.06
173.42
5.53
0.09
PERDIDAS EN LA MALLA
134.14
112
66.98
147.27
158.02
55.82
PERDIDAS EN LA MALLA
3.07%
2.96%
2.52%
3.36%
4.13%
2.11%
INTERCONEXIN
(%)
CAPITULO III
el CONELEC.
52
Tabla 3.2. Zonas de Coccin y niveles de potencia para una cocina de 7200 W.
Zonas de coccin
53
(mm)
210 -280
Nivel
145 -180
200 230
145
Potencia (W)
1
2
100
75
100
75
200
150
200
150
300
300
300
300
500
400
500
400
700
500
700
500
900
600
900
600
1.100
800
1.100
800
1.300
1.000
1.300
1.000
1.500
1.200
1.500
1.200
2.000
1.600
2.000
1.600
Fuente: FOSTER SPA, Manual de Instrucciones, PLACAS POR INDUCCIN, Italia, 2012.
Las caractersticas tcnicas que una cocina de induccin que se debe considerar al
momento de compra son las siguientes Tabla 3.3.
Tabla 3.3. Caractersticas Tcnicas de las Cocinas de Induccin.
(mm)
230-240 V~ o 400-415 V 2N~, 50/60
Conexin elctrica Hz
Tensin nominal
Tipo interrupcin
Sensores electrnicos
Zonas de coccin
Zona 1
210 280
1800 - 3500
Zona 2
145 180
1200 - 2600
Zona3
200 - 230
1800 - 3000
Zona 4
145
1200 - 1800
La potencia de las cocinas puede variar dependiendo del nmero de zonas de coccin as
como del modelo y marca de cocina, en la Error! No se encuentra el origen de la
referencia. se muestra los modelos y marcas de cocina de induccin de algunas marcas
representativas como son Siemens, Bosch, , SVAN, INDESIT, entre otras, las potencia
potencias de la cocinas oscilan entre los 5,0 kW y 10,8 kW, en el mercado ecuatoriano se
presentan marcas como home vega, Teka, Whirlpool entre otras que oscila entre 3,3 kW
a 7,2 kW, a continuacin se presenta un Benchmarking de varios modelos de cocinas
tanto en el mercado ecuatoriano como en el mercado internacional, que servir para
conocer las caractersticas tcnicas de las marcas que se ofertan en el mercado
actualmente.
Tabla 3.4. Benchmarker de Modelos y potencias de cocinas de induccin
Zonas de coccin
potencia
Niveles de
Rango de (mm)
210 -280
145 -180
200 - 230
145
Total
Potencia
FOSTER SPA
Potencia (W)
2000
1600
2000
1600
7200
MIDEA MC-IF701
Potencia (W)
2000
1600
2000
1600
7200
HOMEVEGA TEKA
Potencia (W)
2300
2600
1800
6700
SVAN SVI637
Potencia (W)
3500
1800
2500
7800
SIMENS EH975ML21E
Potencia (W)
2400
1200
2200
1400
7200
Potencia (W)
3400
3000
1200
7600
13
BOSCH PIL631B18E
Potencia (W)
2400
2200
1400
6000
INDESIT VIB644C
Potencia (W)
2000
1600
2000
1600
7200
Potencia (W)
3400
2200
2200
7800
13
BALAY 3EB820LR.
Potencia (W)
1800
1400
1800
1400
6400
INDURAMA
Potencia (W)
1800
1200
2000
1400
6400
ELECTROLUX
Potencia (W)
2500
1200
3700
MARCAS
Fuente: FOSTER SPA, Manual de Instrucciones, PLACAS POR INDUCCIN, Italia, 2012
http://www.bosch-home.es/productos/placas/placas-induccion/PIV975N17E.html?source=browse
http://www.clickelectrodomesticos.com/placa-induccion-svan-svi637.html
http://www.clickelectrodomesticos.com/encimera-induccion-aeg-hk894400fg.html
http://www.clickelectrodomesticos.com/placa-induccion-siemens-eh975mv17e.html
http://www.carrefouronline.carrefour.es/noalimentacion/TemplateProduct.aspx;jsessionid=EC5BAB36CD11B7B086
E7E701DD127B44.fronttecno1?pila=catalog360020%40cat5980002%40cat5980052%40cat5940142&itemMarcado
=catalog360020&nivel_desplegado=cat5940142&itemId=292700606
http://www.carrefouronline.carrefour.es/noalimentacion/TemplateProduct.aspx;jsessionid=EC5BAB36CD11B7B086
E7E701DD127B44.fronttecno1?pila=catalog360020%40cat5980002%40cat5980052%40cat5940142&itemMarcado
=catalog360020&nivel_desplegado=cat5940142&itemId=226301146
55
(3.1)
Donde,
= Demanda Mxima Coincidente de Cocinas.
Subsecretara de la Calidad del Ministerio de Industrias y productividad, Articulo No. 14153 CAPITULO 5. REQUISITOS DEL PRODUCTO, Numeral 5.6.12, pp 15.
25
Empresa Elctrica Quito, Determinacin de la demanda de una vivienda, NORMAS PARA SISTEMAS
DE DISTRIBUCIN PARTE A GUA PARA DISEO, Quito, 2014, 5 revisin, pp.7
24
56
4%
81%
2:00
2%
83%
3:00
2%
92%
4:00
2%
87%
5:00
6%
76%
6:00
21%
84%
7:00
13%
80%
8:00
10%
83%
9:00
14%
84%
10:00
21%
91%
11:00
19%
89%
12:00
16%
84%
13:00
8%
92%
14:00
7%
80%
15:00
7%
85%
16:00
8%
82%
17:00
9%
90%
18:00
14%
93%
19:00
14%
89%
20:00
9%
89%
57
Mnima
6%
93%
Media
21%
92%
Mxima
14%
93%
HORARIO MAX FS ESP (%) MAX FU ESP (%) DEMANDA MAX FS ESP (%) MAX FU ESP (%)
21:00
9%
86%
22:00
8%
80%
23:00
3%
93%
0:00
5%
80%
Media
21%
92%
F(s) F(u)
Factor de
Cocinas
Potencia
Induccin (kW)
Asignadas
DMD CI (MW)
CNEL Bolvar
0.06 0.93
0.98
7.20
700.00
0.28
CNEL El Oro
0.06 0.93
0.98
7.20
800.00
0.31
CNEL Esmeraldas
0.06 0.93
0.98
7.20
600.00
0.24
0.06 0.93
0.98
7.20
600.00
0.24
0.06 0.93
0.98
7.20
0.00
0.00
CNEL Manab
0.06 0.93
0.98
7.20
0.00
0.00
CNEL Milagro
0.06 0.93
0.98
7.20
0.00
0.00
0.06 0.93
0.98
7.20
600.00
0.24
0.06 0.93
0.98
7.20
0.00
0.00
CNEL Sucumbos
0.06 0.93
0.98
7.20
0.00
0.00
E.E. Ambato
0.06 0.93
0.98
7.20
41,900.00
16.50
E.E. Azogues
0.06 0.93
0.98
7.20
4,400.00
1.73
0.06 0.93
0.98
7.20
60,000.00
23.62
E.E. Cotopaxi
0.06 0.93
0.98
7.20
24,500.00
9.65
E.E. Norte
0.06 0.93
0.98
7.20
8,400.00
3.31
E.E. Quito
0.06 0.93
0.98
7.20
62,100.00
24.45
E.E. Riobamba
0.06 0.93
0.98
7.20
13,000.00
5.12
E.E. Sur
0.06 0.93
0.98
7.20
15,800.00
6.22
0.06 0.93
0.98
7.20
66,600.00
26.22
0.06 0.93
0.98
7.20
300,000.00
118.12
CNEL Sto.
Domingo
Elctrica de
Guayaquil
TOTAL
58
F(s) F(u)
Factor de
Potencia
Induccin (kW)
Cocinas Asignadas
DMD CI (MW)
CNEL Bolvar
0.21 0.92
0.98
7.20
400.00
0.55
CNEL El Oro
0.21 0.92
0.98
7.20
800.00
1.09
0.98
7.20
600.00
0.82
0.21 0.92
0.98
7.20
600.00
0.82
0.21 0.92
0.98
7.20
0.00
0.00
CNEL Manab
0.21 0.92
0.98
7.20
0.00
0.00
CNEL Milagro
0.21 0.92
0.98
7.20
0.00
0.00
0.98
7.20
600.00
0.82
0.21 0.92
0.98
7.20
0.00
0.00
0.98
7.20
0.00
0.00
CNEL Sto.
Domingo
E.E. Ambato
0.21 0.92
0.98
7.20
41,900.00
57.12
E.E. Azogues
0.21 0.92
0.98
7.20
4,400.00
6.00
0.21 0.92
0.98
7.20
60,000.00
81.79
E.E. Cotopaxi
0.21 0.92
0.98
7.20
24,500.00
33.40
E.E. Norte
0.21 0.92
0.98
7.20
8,400.00
11.45
E.E. Quito
0.21 0.92
0.98
7.20
62,100.00
84.66
E.E. Riobamba
0.21 0.92
0.98
7.20
13,000.00
17.72
E.E. Sur
0.21 0.92
0.98
7.20
15,800.00
21.54
0.21 0.92
0.98
7.20
66,600.00
90.79
0.21 0.92
0.98
7.20
299,700.00
408.56
Elctrica de
Guayaquil
TOTAL
F(s) F(u)
Factor de
Potencia
Induccin (kW)
Cocinas Asignadas
DMD CI (MW)
CNEL Bolvar
0.14 0.93
0.98
7.20
700.00
0.64
CNEL El Oro
0.14 0.93
0.98
7.20
800.00
0.73
0.98
7.20
600.00
0.55
0.14 0.93
0.98
7.20
600.00
0.55
0.14 0.93
0.98
7.20
0.00
0.00
CNEL Manab
0.14 0.93
0.98
7.20
0.00
0.00
59
Empresas
Factor de
Potencia
Induccin (kW)
0.14 0.93
0.98
Cocinas Asignadas
DMD CI (MW)
7.20
0.00
0.00
0.98
7.20
600.00
0.55
0.14 0.93
0.98
7.20
0.00
0.00
0.98
7.20
0.00
0.00
Distribuidoras
CNEL Milagro
CNEL Sto.
Domingo
F(s) F(u)
E.E. Ambato
0.14 0.93
0.98
7.20
41,900.00
38.49
E.E. Azogues
0.14 0.93
0.98
7.20
4,400.00
4.04
0.14 0.93
0.98
7.20
60,000.00
55.12
E.E. Cotopaxi
0.14 0.93
0.98
7.20
24,500.00
22.51
E.E. Norte
0.14 0.93
0.98
7.20
8,400.00
7.72
E.E. Quito
0.14 0.93
0.98
7.20
62,100.00
57.05
E.E. Riobamba
0.14 0.93
0.98
7.20
13,000.00
11.94
E.E. Sur
0.14 0.93
0.98
7.20
15,800.00
14.52
0.14 0.93
0.98
7.20
66,600.00
61.18
0.14 0.93
0.98
7.20
300,000.00
275.61
Elctrica de
Guayaquil
TOTAL
E.E.D.
POR CARGA
(MW)
ESMERALDAS
ESMERALDAS
CNEL ESMERALDAS
ESMERALDAS
QUININDE
CNEL ESMERALDAS
DOS CERRITOS
RIOS
PASCUALES
RIOS
QUEVEDO
RIOS
DMD POR
E.E.D. (MW)
88.6
PORCENTAJE DE
POTENCIA DE
POTENCIA DE
INGRESO DE
COCINAS POR
COCINAS POR
COCINAS (%)
E.E.D. (MW)
CARGA (MW)
82.2%
107.8
0.452
0.55
19.2
17.8%
0.098
58.1
22.5%
0.124
97
37.5%
0.206
103.5
40.0%
0.220
60
DEL
MODELO
PARA
DETERMINAR
LA
Por lo tanto, para realizar una simulacin del comportamiento del SNI en operacin
normal por la implementacin de las cocinas de induccin, se considerar que la
cargabilidad de los transformadores no deber sobrepasar su capacidad nominal.
Es decir que se considera una operacin normal de un transformador siempre y cuando el
mismo no supere el 100% de su carga nominal, sin embargo, por variaciones de carga y
posibles expansiones, el CONELEC en el PME 2012 - 2021, para anlisis del sistema en
cuanto a cargabilidad, da una seal de alarma cuando el transformador supera el 80%26
de su carga.
CONELEC, Situacin Actual., PLAN MAESTRO DE ELECTRIFICACIN 2012- 2021, Quito, 2012,
pp. 29.
27
KUNDUR, Prabha, Power System Stability and Control, Mc Graw-Hill,cap 6, pg. 228
26
62
kV y longitudes de lnea desde 50 hasta 400 millas (80 640 km). En 1967, ingenieros
de la American Electric Power (AEP) publicaron una revisin de la curva de Clair que
bsicamente la ratific para niveles superiores a 345 kV, en el rango de EHV (extra high
voltage o voltaje extra alto) y hasta 600 millas (965 km).
Tambin esta revisin justific la curva con base en consideraciones prcticas y en la
experiencia sobre lneas existentes.28
Grfico 3.1. Curvas de cargabilidad: (a) St. Clair [3] y (b) Revisin 1967
Fuente: KUNDUR, Prabha, Power System Stability and Control, Mc Graw-Hill,cap 6, pg. 228
Las curvas de cargabilidad antes descritas proporcionan una forma sencilla de visualizar
la capacidad de transferencia de energa de lneas de transmisin. Las cuales se utilizan
para el desarrollo de guas conceptuales de cargabilidad de lneas y para la planificacin
preliminar de sistemas de transmisin. Como se indica en el Error! No se encuentra el
origen de la referencia. los lmites para la cargabilidad de las lneas son se clasifican
por:
28
KUNDUR, Prabha, Power System Stability and Control, Mc Graw-Hill,cap 6, pg. 229
63
Donde:
1. Regin de limitacin trmica
2. Regin de lmite de cada de
voltaje
3. Regin de lmite de
estabilidad
Temperatura ambiente
64
: =
Donde:
: :
100
:
(3.2)
Grfico 3.3, Equivalente simplificado de dos sistemas enlazados por una lnea de transmisin
65
Barras de
230 kV
138 kV
69 kV, 46 kV y 34,5 kV
nominal
nominal
Demanda Mnima
=
100
(3.3)
Donde:
= Margen de Estabilidad de Estado Estable
= Potencia mxima
66
DATOS DE ENTRADA
67
Potencia Nominal en lado de Alto, medio y Bajo Voltaje: [en MW] potencia definida
para cada tipo de transformador.
Grupo Vectorial en lado de Alto, medio y Bajo Voltaje: [YN, YN, D], Desplazamiento
angular.
Para Lneas de Transmisin tenemos:
Longitud del Conductor: Distancia de la lnea en km.
Tensin Nominal: [230, 138, 69, 13,8 kV] Voltaje nominal a la cual ser sometido el
conductor.
Corriente Nominal: [kA] Corriente mxima que circulara en el conductor
Tensin Nominal: [kV] Voltaje al cual ser sometido el conductor.
Frecuencia Nominal: Para todos los caso [60 hz].
Nmero de fases: Para todos los casos se considera un sistema trifsico.
Tipo de Sistema: Para todos los casos se considera sistemas en corriente alterna (AC).
Tipo de tendido: para todos los casos se considera lneas areas.
Para Cargas tenemos:
Potencia Activa: Cantidad de potencia activa a ser abastecida (Carga puntual de cada
empresa distribuidora) + Potencia Coincidente de Cocinas de Induccin
Factor de Potencia: Para todas las cargas considero un factor de potencia de 0,96 y
para Cocinas de Induccin un factor de potencia 0,98.
Voltaje: Nivel de voltaje en [p.u.]
Tipo de Carga: Todas las cargas puntuales se consideraran como carga balanceada.
68
CASO
E7
ESCENARIO
CONFIGURACIN
DEMANDA
#2 (CON COCINAS)
#7 (MXIMA)
E8
#2 (CON COCINAS)
#8 (MEDIA)
E9
E10
E11
E12
#2 (CON COCINAS)
#2 (CON COCINAS)
#2 (CON COCINAS)
#2 (CON COCINAS)
#9 (MNIMA)
#10 (MXIMA)
#11 (MEDIA)
#12 (MNIMA)
70
Tabla 3.12. Anlisis de Voltajes en Barras de 69, 138, 230 kV en Hidrologa Alta.
ESCENARIOS DE ESTUDIOS
DATOS DE BARRAS
#1 (E. H.
#7 (E. H.
#2 (E. H.
#8 (E. H.
#3 (E. H.
#9 (E. H.
ALTA
ALTA
ALTA
ALTA
ALTA
ALTA
2015)
2015)
2015)
2015)
2015)
2015)
DMAX
DMAX
DMED
DMED
DMIN
DMIN
DEMANDA MAXIMA
u,
Nombre
u,
DEMANDA MEDIA
u,
u,
DEMANDA MINIMA
u,
u,
p.u.
p.u.
p.u.
p.u.
p.u.
CUMBARATZA 69
69.00
1.05
1.02
1.03
0.92
1.05
1.05
MULALO 69
69.00
1.00
1.00
0.98
0.93
1.05
1.03
LOJA 69
69.00
1.02
1.00
1.04
0.93
1.05
1.05
IBARRA 69 2
69.00
0.97
0.95
0.96
0.94
1.02
1.01
TENA 69
69.00
0.95
0.93
0.99
0.95
1.00
0.99
COCA 69
69.00
0.95
0.95
0.96
0.95
0.97
0.96
CHAVEZPAMBA 69
69.00
0.98
0.96
0.97
0.95
1.05
1.05
TULCAL 69
69.00
0.97
0.95
1.04
0.95
1.05
1.04
CUENCA 69
69.00
1.01
1.01
1.01
0.95
1.02
1.02
AMBATO 69
69.00
0.97
0.96
1.00
0.95
1.03
1.02
NUEVA LOJA 69
69.00
0.97
0.97
0.96
0.96
0.99
0.99
SALITRAL 69
69.00
0.98
0.97
0.99
0.98
1.00
0.99
SALITRAL 138
138.00
0.97
0.97
0.96
0.95
1.01
1.00
POLICENTRO 138
138.00
0.97
0.96
0.97
0.95
1.02
1.01
TRINITARIA 138
138.00
0.98
0.97
0.96
0.96
1.01
1.01
138.00
1.01
1.00
1.01
0.99
1.05
1.05
138.00
1.02
1.01
1.00
1.00
1.05
1.05
ESCLUSAS 138
138.00
1.01
1.01
1.01
1.00
1.04
1.03
138.00
0.98
0.98
0.98
0.97
1.00
1.00
230.00
0.98
0.97
0.97
0.96
1.03
1.02
230.00
1.01
1.00
0.97
0.96
1.05
1.05
EL INGA 230
230.00
1.01
1.00
0.97
0.96
1.05
1.05
230.00
0.98
0.97
0.98
0.97
1.05
1.04
DCR 230
230.00
0.98
0.97
0.98
0.97
1.03
1.02
PASCUALES 230
230.00
0.98
0.98
0.98
0.97
1.03
1.02
TRINITARIA 230
230.00
0.98
0.98
0.98
0.97
1.05
1.02
71
ESCENARIOS DE ESTUDIOS
DATOS DE BARRAS
#1 (E. H.
#7 (E. H.
#2 (E. H.
#8 (E. H.
#3 (E. H.
#9 (E. H.
ALTA
ALTA
ALTA
ALTA
ALTA
ALTA
2015)
2015)
2015)
2015)
2015)
2015)
DMAX
DMAX
DMED
DMED
DMIN
DMIN
DEMANDA MAXIMA
u,
Nombre
u,
DEMANDA MEDIA
u,
u,
DEMANDA MINIMA
u,
u,
p.u.
p.u.
p.u.
p.u.
p.u.
QUEVEDO 230
230.00
1.01
1.00
1.00
0.99
1.05
1.05
ESCLUSAS 230
230.00
0.98
0.98
0.99
0.97
1.03
1.03
TOTORAS 230
230.00
1.01
1.00
0.97
0.98
1.02
1.04
MILAGRO 230
230.00
1.00
0.99
1.00
0.99
1.05
1.04
230.00
1.03
1.02
1.01
1.00
1.06
1.05
PAUTE 230
230.00
1.04
1.04
1.04
1.04
1.06
1.05
De los resultados obtenidos de los flujos de potencia para Hidrologa Alta, se puede
apreciar que el sistema despus de la incorporacin de cocinas de induccin en demanda
mxima sufre una disminucin leve de voltaje que est en el rango de 0,01 a 0,02 en p.u.,
las barras que han violado el rango permisible de estabilidad de acuerdo a la Regulacin
No. CONELEC 004/02. Son: Ibarra, Tena, Coca, Tulcn y Ambato; mientras que en
demanda media este rango se incrementa de 0,02 a 0,06 p.u., las barras que han violado
el rango permisible son: Cumbaratza, Mulal, Loja, Tena, Ibarra, Coca, Tulcn, Cuenca,
Nueva Loja, Salitral; en demanda mnima presenta un decremento de 0,01 p.u. en todas
las barras y no se presenta violaciones a las bandas normadas, este decremento de voltaje
se debe a que el sistema la incorporacin de cocinas de induccin sufre limitaciones en la
transmisin de potencia reactiva que involucra grandes prdidas de reactivos en lneas de
transmisin, as mismo la potencia reactiva entrega al sistema no es suficiente para
abastecer la demanda actual de cocinas de induccin, sera aconsejable que se realice una
regulacin en Taps de transformadores de potencia, compensaciones reactivas en las
zonas ms afectadas,
aspectos.
72
Tabla 3.13. Anlisis de Voltajes en Barras de 69, 138, 230 kV en Hidrologa Baja.
ESCENARIOS DE ESTUDIOS
DATOS DE BARRAS
#4 (E. H.
#10 (E. H.
#5 (E. H.
#11 (E.
#6 (E. H.
#12 (E. H.
BAJA
BAJA
BAJA
H.BAJA
BAJA
BAJA
2015)
2015)
2015)
2015)
2015)
2015)
DMAX
DMAX
DMED
DMED
DMIN
DMIN
DEMANDA MAXIMA
u,
Nombre
Nom.L-L Volt. Kv
Magnitud
u, Magnitud
p.u.
p.u.
DEMANDA MEDIA
DEMANDA MINIMA
u,
u,
u,
u,
Magnitud
Magnitud
Magnitud
Magnitud
p.u.
p.u.
p.u.
p.u.
CUMBARATZA 69
69.00
1.04
1.02
1.04
1.00
1.05
1.05
MULALO 69
69.00
0.97
0.93
0.97
0.91
1.05
1.03
LOJA 69
69.00
1.05
1.05
1.05
1.02
1.04
1.03
IBARRA 69 2
69.00
0.96
0.95
0.97
0.95
1.02
1.02
TENA 69
69.00
0.95
0.92
0.97
0.92
1.02
1.00
COCA 69
69.00
0.96
0.95
0.96
0.95
0.98
0.98
CHAVEZPAMBA 69
69.00
0.98
0.96
0.99
0.97
1.05
1.05
TULCAL 69
69.00
1.05
0.97
1.05
0.97
1.05
1.05
CUENCA 69
69.00
1.01
1.01
1.01
1.00
1.04
1.03
AMBATO 69
69.00
0.97
0.94
0.98
0.93
1.03
1.02
NUEVA LOJA 69
69.00
0.99
0.98
0.97
0.97
1.00
1.00
SALITRAL 69
69.00
0.98
0.97
1.00
0.99
1.01
1.00
SALITRAL 138
138.00
0.95
0.94
0.96
0.94
1.02
1.01
POLICENTRO 138
138.00
0.96
0.94
0.96
0.94
1.03
1.02
TRINITARIA 138
138.00
0.97
0.95
0.96
0.95
1.02
1.02
138.00
1.00
0.99
1.00
0.99
1.05
1.05
138.00
1.02
1.01
1.02
1.01
1.06
1.05
ESCLUSAS 138
138.00
1.01
1.00
1.01
1.00
1.04
1.04
138.00
0.97
0.97
0.99
0.97
1.02
1.02
230.00
0.97
0.96
0.97
0.95
1.04
1.03
230.00
1.01
0.99
1.00
0.99
1.05
1.05
EL INGA 230
230.00
1.01
0.99
1.00
0.99
1.05
1.05
230.00
0.97
0.97
0.98
0.96
1.02
1.02
DCR 230
230.00
0.97
0.96
0.98
0.95
1.04
1.04
PASCUALES 230
230.00
0.97
0.96
0.98
0.95
1.04
1.04
TRINITARIA 230
230.00
0.99
0.96
0.99
0.96
1.05
1.03
QUEVEDO 230
230.00
1.00
0.99
1.00
0.98
1.05
1.04
ESCLUSAS 230
230.00
0.98
0.97
0.98
0.96
1.04
1.04
TOTORAS 230
230.00
0.96
0.99
0.97
0.98
1.02
1.04
MILAGRO 230
230.00
0.99
0.98
1.00
0.98
1.05
1.05
230.00
1.02
1.02
1.02
1.01
1.06
1.05
PAUTE 230
230.00
1.04
1.04
1.04
1.03
1.06
1.06
73
De los resultados obtenidos de los flujos de potencia para Hidrologa Baja, se puede
apreciar que el sistema despus de la incorporacin de cocinas de induccin en demanda
mxima sufre una disminucin leve de voltaje que est en el rango de 0,01 a 0,03 en p.u.,
las barras que han violado el rango permisible de estabilidad de acuerdo a la Regulacin
No. CONELEC 004/02. son: Mulal, Ibarra, Tena, Coca, Cumbaratza y Ambato mientras
que en demanda Media este rango se incrementa de 0,02 a 0,06 p.u., las barras que han
violado el rango permisible son: Mulal, Tena, Ibarra, Coca, y Ambato, en Demanda
Mnima presenta un decremento de 0,01 p.u. en todas las barras y no se presenta
violaciones a las bandas normadas, este decremento de voltaje se debe a que el sistema la
incorporacin de cocinas de induccin sufre limitaciones en la transmisin de potencia
reactiva que involucra grandes prdidas de reactivos en lneas de transmisin, as mismo
la potencia reactiva entrega al sistema no es suficiente para abastecer la demanda actual
de cocinas de induccin, sera aconsejable que se realice una regulacin en taps de
transformadores de potencia, compensaciones reactivas en las zonas ms afectadas,
incremento de potencia reactiva de generadores, entre otros aspectos.
3.3.3. FLUJO DE CARGA DE ANTES Y DESPUS DE LA INCORPORACCIN
DE COCINAS DE INDUCCIN
En la siguiente tabla se presenta la variacin de potencia de generacin y de prdidas en
el S.N.I. por la incorporacin de cocinas de induccin, se puede observar que en demanda
media se presenta la mayor cantidad de perdidas, esto se debe a que las lneas de
transmisin sufre limitaciones en la transmisin de potencia reactiva que involucra
grandes prdidas de potencia reactivos y por ende perdidas en el sistema de Potencia.
Tabla 2.15. Flujo de Carga antes y despus de la incorporacin de cocinas de Induccin.
LUJO DE CARGA PARA EL AO 2015
HIDROLOGA ALTA
SISTEMAS
HIDROLOGA BAJA
DEMANDA
DEMANDA
DEMANDA
DEMANDA
DEMANDA
DEMANDA
MXIMA
MEDIA
MNIMA
MXIMA
MEDIA
MNIMA
(MW)
(MW)
(MW)
(MW)
(MW)
(MW)
4501.31
4220.46
2781.62
4517.58
4286.3
2769.62
4201.31
3777.71
2656.11
4213.59
3824.04
2644.92
INCREMENTO GEN.
300
442.75
125.51
303.99
462.26
124.7
% DE INCREMENTO
6.7%
10.5%
4.5%
6.7%
10.8%
4.5%
4515.3
4080.11
2707.28
4515.3
4080.11
2707.28
4239.73
3671.55
2589.19
4239.73
3671.55
2589.19
INCREMENTO DEM.
275.57
408.56
118.09
275.57
408.56
118.09
ESTADO
GENERACIN
CARGA
74
HIDROLOGA BAJA
DEMANDA
DEMANDA
DEMANDA
DEMANDA
DEMANDA
DEMANDA
MXIMA
MEDIA
MNIMA
MXIMA
MEDIA
MNIMA
(MW)
(MW)
(MW)
(MW)
(MW)
(MW)
% DE INCREMENTO
6.1%
10.0%
4.4%
6.1%
10.0%
4.4%
ESTADO
COLOMBIA
174.72
6.49
0.27
175.06
6.62
0.31
INTERCONEXIN
172.56
5.84
0.06
173.42
5.53
0.09
PERDIDAS EN LA
156.13
146.84
74.61
177.35
212.81
62.65
MALLA
134.14
112
66.98
147.27
158.02
55.82
3.34%
3.47%
2.68%
3.78%
4.96%
2.26%
3.28%
2.65%
2.49%
3.60%
2.96%
2.07%
INCREMENTO PER.
0.06%
0.82%
0.19%
0.18%
1.99%
0.19%
PERDIDAS EN LA
MALLA (%)
75
CAPITULO IV
4. ANLISIS DE RESULTADOS
4.1 ANLISIS DE LA CARGABILIDAD EN LNEAS DE TRANSMISIN Y
TRANSFORMADORES DE POTENCIA.
Una vez realizadas las simulaciones de los escenarios plateados para demanda mxima,
media y mnima, en hidrologa baja y de hidrologa alta para el ao 2015, a continuacin
se presentan los resultados obtenidos de cargabilidad antes y despus de la incorporacin
de cocinas de induccin, los cuales fueron obtenidos por el procesamiento de los datos
entregados por Digsilent Power Factory.
4.1.1. ANLISIS DE CARGABILIDAD EN TRANSFORMADORES
DE
POTENCIA.
Para determinar el incremento de cargabilidad en transformadores de potencia por la
incorporacin de las cocinas de induccin en el S.N.I, se realiz una comparacin entre
los resultados de los escenarios plateados para antes de la incorporacin de cocinas y
despus de la incorporacin de cocinas de induccin, considerando la misma topologa
de la red para ambos casos, a continuacin se presentan las tablas consolidas con los
porcentajes ms representativos de cargabilidad.
El porcentaje de incremento nos permitir conocer en cuanto se ha incrementado la
cargabilidad despus de la incorporacin de cocinas de induccin y se representa por la
siguiente formula:
% =
% %
%
76
(4.1)
DEMANDA MEDIA
MINIMA
SIN
CON
INCREMENT
SIN
CON
INCREMENT
SIN
CON
INCREMENT
COCINAS
COCINAS
COCINAS
COCINAS
COCINAS
COCINAS
(%) De
(%) De
(%) De
(%) De
(%) De
(%) De
Cargabilida
Cargabilida
Cargabilida
Cargabilida
Cargabilida
Cargabilida
T POLICENTRO
85.74%
91.93%
7.23%
85.01%
94.28%
10.90%
46.81%
49.23%
5.16%
T S/E 18
83.87%
91.07%
8.58%
80.19%
91.03%
13.53%
20.46%
21.76%
6.32%
T SALITRAL
70.10%
76.21%
8.72%
79.77%
88.25%
10.63%
53.84%
56.65%
5.23%
T S/E S ROSA 1
95.15%
105.07%
10.43%
73.67%
87.92%
19.34%
60.13%
63.94%
6.34%
T S/E S ROSA 2
95.15%
105.07%
10.43%
73.67%
87.92%
19.34%
60.13%
63.94%
6.34%
T TRINITARIA 69
94.46%
100.82%
6.73%
70.64%
79.86%
13.05%
53.51%
56.32%
5.24%
T MULALO
61.79%
77.18%
24.91%
47.61%
76.67%
61.03%
33.20%
39.95%
20.31%
T S/E 19
88.46%
96.48%
9.07%
63.88%
75.06%
17.50%
39.03%
41.51%
6.37%
59.93%
67.20%
12.13%
62.86%
73.77%
17.35%
30.53%
33.23%
8.86%
59.93%
67.20%
12.13%
62.86%
73.77%
17.35%
30.53%
33.23%
8.86%
T S/E CUMBAYA
75.69%
79.79%
5.41%
63.87%
69.85%
9.35%
53.15%
52.15%
-1.88%
T TOTORAS 69
58.16%
78.16%
34.39%
39.49%
67.90%
71.93%
24.27%
31.67%
30.52%
T RIOBAMBA
86.03%
100.30%
16.59%
40.57%
62.68%
54.49%
44.74%
48.59%
8.62%
T PASCUALES 1
70.14%
68.39%
-2.49%
61.21%
62.15%
1.52%
53.61%
55.54%
3.60%
T PASCUALES 2
70.14%
68.39%
-2.49%
61.21%
62.15%
1.52%
53.61%
55.54%
3.60%
T BAOS
58.36%
78.28%
34.15%
33.90%
62.03%
82.97%
26.52%
36.35%
37.04%
T S/E CHILIBULO(1)
78.80%
85.56%
8.57%
50.03%
59.48%
18.89%
20.18%
21.46%
6.34%
T NPR
48.88%
52.41%
7.21%
53.83%
59.23%
10.03%
25.14%
26.44%
5.16%
T ESC 96
56.84%
60.67%
6.74%
52.26%
57.93%
10.84%
31.01%
32.55%
4.95%
TRANSFORMADORE
S
INCREMENTO PROMED.
(%) De
Incremento
11.50%
24.29%
(%) De
Incremento
(%) De
Incremento
9.31%
Los resultados se los analizar para demanda Mxima, Media y Mnima, se han
considerado las siguientes alertas que permitirn observar las posibles sobrecargas del
sistema:
Para transformadores que se encuentran entre el 80% a 99% de su capacidad de carga
77
78
DE POTENCIA
HIDROLOGA BAJA.
Tabla 4.2. Porcentaje de Cargabilidad ms representativos en Transformadores de Potencia
Hidrologa Baja
DEMANDA MAXIMA
NOMBRE
TRANSFORMADOR
ES
DEMANDA MEDIA
MINIMA
SIN
CON
INCREMENT
SIN
CON
INCREMENT
SIN
CON
INCREMENT
COCINAS
COCINAS
COCINAS
COCINAS
COCINAS
COCINAS
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
Cargabilid
Cargabilid
INCREMEN
Cargabilid
Cargabilid
INCREMEN
Cargabilid
Cargabilid
INCREMEN
ad
ad
TO
ad
ad
TO
ad
ad
TO
T POLICENTRO
88.83%
95.49%
7.50%
85.35%
95.46%
11.84%
46.21%
48.48%
4.90%
T S/E 18
84.19%
91.77%
9.01%
78.99%
89.88%
13.79%
20.46%
21.64%
5.76%
T S/E S ROSA 1
95.53%
105.84%
10.79%
73.81%
88.32%
19.67%
60.11%
63.81%
6.14%
79
DEMANDA MAXIMA
NOMBRE
DEMANDA MEDIA
MINIMA
SIN
CON
INCREMENT
SIN
CON
INCREMENT
SIN
CON
COCINAS
COCINAS
COCINAS
COCINAS
COCINAS
COCINAS
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
Cargabilid
Cargabilid
INCREMEN
Cargabilid
Cargabilid
INCREMEN
Cargabilid
Cargabilid
INCREMEN
ad
ad
TO
ad
ad
TO
ad
ad
TO
T S/E S ROSA 2
95.53%
105.84%
10.79%
73.81%
88.32%
19.67%
60.11%
63.81%
6.14%
T TRINITARIA 69
96.33%
103.19%
7.12%
70.37%
80.14%
13.89%
53.15%
55.71%
4.81%
T MULALO
63.33%
83.96%
32.58%
47.99%
77.56%
61.62%
23.14%
29.72%
28.43%
T S/E 19
88.83%
97.26%
9.50%
63.11%
74.33%
17.78%
39.02%
41.36%
5.98%
T SALITRAL
96.85%
103.62%
6.98%
64.93%
73.66%
13.45%
53.31%
55.90%
4.86%
T S/E CUMBAYA
75.80%
80.06%
5.63%
64.87%
71.02%
9.48%
53.27%
52.93%
-0.64%
T TOTORAS 69
58.27%
78.77%
35.18%
40.51%
69.88%
72.51%
24.17%
31.64%
30.92%
60.52%
68.34%
12.92%
55.61%
67.10%
20.66%
30.62%
33.32%
8.79%
60.52%
68.34%
12.92%
55.61%
67.10%
20.66%
30.62%
33.32%
8.79%
T TOTORAS
65.95%
89.58%
35.83%
34.09%
66.09%
93.84%
52.36%
61.55%
17.55%
T TOTORAS 2
65.95%
89.58%
35.83%
34.09%
66.09%
93.84%
46.54%
55.44%
19.13%
T BAOS
58.83%
79.40%
34.96%
34.87%
64.02%
83.62%
27.97%
36.58%
30.78%
T RIOBAMBA
84.34%
103.81%
23.08%
57.07%
63.54%
11.33%
42.10%
47.24%
12.22%
T NPR
49.38%
53.14%
7.60%
54.03%
60.09%
11.21%
24.88%
26.11%
4.95%
T S/E CHILIBULO(1)
79.11%
86.20%
8.96%
49.77%
59.33%
19.19%
20.18%
21.39%
6.01%
T ESC 96
57.44%
61.53%
7.13%
52.33%
58.55%
11.90%
30.75%
32.21%
4.76%
TRANSFORMADOR
ES
INCREMENT
INCREMENTO
PROMED.
16.54%
32.63%
11.07%
Los resultados se los analizar para demanda Mxima, Media y Mnima, se han
considerado las siguientes alertas que permitirn observar las posibles sobrecargas del
sistema:
Para transformadores que se encuentran entre el 80% a 99% de su capacidad de carga
una se ha considerado una alerta anaranjada preventiva,
Para los transformadores que sobrepasen el 100% de su capacidad de carga una alerta
roja.
Para Demanda Mxima:
Existe un incremento en la cargabilidad de los transformadores de potencia que est
en un promedio de 16,54% con respecto al 11,50% en hidrologa alta.
80
% =
% %
%
(4.1)
Nivel
Lnea de Transmisin
de
Tensin
(KV)
DEMANDA MEDIA
MNIMA
SIN
CON
INCREMEN
SIN
CON
INCREMEN
SIN
CON
INCREMEN
COCINAS
COCINAS
TO
COCINAS
COCINAS
TO
COCINAS
COCINAS
TO
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
Cargabili
Cargabili
INCREMEN
Cargabili
Cargabili
INCREMEN
Cargabili
Cargabili
INCREMEN
dad
dad
TO
dad
dad
TO
dad
dad
TO
SININCAY - CUENCA
69
25.59%
38.06%
48.71%
41.33%
100.24%
142.55%
39.19%
34.67%
-11.52%
PUYO - TOPO
138
95.86%
105.62%
10.18%
82.21%
96.86%
17.83%
91.95%
95.95%
4.34%
MONTC- SGREGORIO
138
67.37%
67.99%
0.92%
91.55%
91.09%
-0.51%
27.32%
29.67%
8.62%
138
59.80%
65.47%
9.47%
68.26%
76.69%
12.36%
30.36%
32.44%
6.86%
BAOS - TOPO
138
74.66%
83.97%
12.47%
60.41%
74.40%
23.17%
70.37%
74.17%
5.40%
SE S ROSA - CONOCOTO
138
66.73%
77.67%
16.39%
55.97%
72.44%
29.43%
26.72%
29.70%
11.18%
DCR - MJILAGRO
230
74.33%
77.76%
4.62%
64.24%
70.97%
10.48%
40.94%
43.84%
7.10%
SE CHILIBULO - S/E
SANTA ROSA
82
DEMANDA MXIMA
NOMBRE
Nivel
Lnea de Transmisin
de
Tensin
(KV)
DEMANDA MEDIA
MNIMA
SIN
CON
INCREMEN
SIN
CON
INCREMEN
SIN
CON
INCREMEN
COCINAS
COCINAS
TO
COCINAS
COCINAS
TO
COCINAS
COCINAS
TO
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
Cargabili
Cargabili
INCREMEN
Cargabili
Cargabili
INCREMEN
Cargabili
Cargabili
INCREMEN
dad
dad
TO
dad
dad
TO
dad
dad
TO
PUCARA - MULALO
138
52.06%
59.06%
13.45%
60.02%
69.83%
16.35%
39.73%
42.54%
7.06%
TOTORAS - AMBATO
138
46.22%
58.65%
26.89%
47.25%
65.06%
37.69%
24.46%
29.41%
20.24%
ELECAUSTRO - CUENCA
138
57.80%
58.31%
0.89%
61.12%
64.61%
5.70%
60.72%
60.88%
0.26%
PASCUALES - MJILAGRO
230
65.70%
68.72%
4.60%
56.54%
62.65%
10.81%
35.30%
38.00%
7.64%
TOTORAS - SOPLADORA
230
44.38%
57.95%
30.59%
45.22%
60.40%
33.57%
23.39%
28.75%
22.91%
POMASQUI - ZAMBIZA
138
65.92%
72.88%
10.57%
47.15%
59.25%
25.66%
26.18%
28.27%
7.98%
SHORAY - TRONCAL
230
52.66%
58.34%
10.80%
52.89%
57.45%
8.63%
47.26%
50.29%
6.40%
S ROSA - TOACHI P 1
230
23.28%
29.79%
27.95%
42.07%
56.98%
35.43%
14.38%
16.91%
17.62%
S ROSA - TOACHI P 2
230
23.28%
29.79%
27.95%
42.07%
56.98%
35.43%
14.38%
16.91%
17.62%
TRINITARIA - SALTRAL 1
138
24.96%
42.51%
70.33%
39.32%
56.05%
42.55%
17.40%
18.23%
4.77%
TRINITARIA - SALTRAL 2
138
24.96%
42.51%
70.33%
39.32%
56.05%
42.55%
17.40%
18.23%
4.77%
138
35.85%
39.45%
10.03%
50.42%
55.82%
10.71%
21.00%
22.47%
7.00%
138
50.15%
53.75%
7.19%
49.99%
55.56%
11.14%
27.84%
29.27%
5.16%
138
50.15%
53.75%
7.19%
49.99%
55.56%
11.14%
27.84%
29.27%
5.16%
138
43.45%
52.70%
21.29%
42.58%
55.32%
29.93%
20.41%
22.24%
8.94%
230
47.83%
53.45%
11.75%
49.05%
53.53%
9.15%
44.53%
47.51%
6.68%
230
28.64%
34.37%
20.01%
46.77%
51.79%
10.73%
29.15%
31.54%
8.19%
230
28.64%
34.37%
20.01%
46.77%
51.79%
10.73%
29.15%
31.54%
8.19%
19.78%
24.93%
7.94%
Los resultados se los analizar para demanda Mxima, Media y Mnima, se han
considerado las siguientes alertas que permitirn observar las posibles sobrecargas del
sistema:
Para Lneas de Transmisin que se encuentran entre el 80% a 99% de su capacidad
de carga una se ha considerado una alerta anaranjada preventiva,
Para Lneas de Transmisin que sobrepasen el 100% de su capacidad de carga una
83
alerta roja.
Nivel
Lnea de Transmisin
de
Tensi
n (KV)
SIN
CON
COCINA
COCINA
DEMANDA MEDIA
INCREMEN
TO
SIN
CON
COCINA
COCINA
MNIMA
INCREMEN
TO
SIN
CON
COCINA
COCINA
INCREMEN
TO
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
Cargabili
Cargabili
INCREMEN
Cargabili
Cargabili
INCREMEN
Cargabili
Cargabili
INCREMEN
dad
dad
TO
dad
dad
TO
dad
dad
TO
PUYO TOPO
138
20.36%
23.98%
17.80%
85.35%
101.24%
18.60%
9.47%
12.23%
29.20%
T G MACHALA - SID 1
230
11.21%
8.58%
-23.50%
34.52%
95.80%
177.50%
5.49%
5.04%
-8.10%
85
DEMANDA MXIMA
Nivel
Lnea de Transmisin
de
Tensi
n (KV)
SIN
CON
COCINA
COCINA
DEMANDA MEDIA
INCREMEN
TO
SIN
CON
COCINA
COCINA
MNIMA
INCREMEN
TO
SIN
CON
COCINA
COCINA
INCREMEN
TO
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
(%) De
(%) De
(%) DE
Cargabili
Cargabili
INCREMEN
Cargabili
Cargabili
INCREMEN
Cargabili
Cargabili
INCREMEN
dad
dad
TO
dad
dad
TO
dad
dad
TO
T G MACHALA - SID 2
230
53.13%
54.63%
2.80%
34.52%
95.80%
177.50%
26.33%
28.37%
7.70%
DCR MJILAGRO
230
5.85%
7.25%
23.90%
73.04%
91.66%
25.50%
5.65%
6.28%
11.00%
PASCUALES - MJILAGRO
230
8.16%
11.14%
36.40%
65.31%
83.26%
27.50%
10.62%
12.24%
15.30%
TOTORAS - SOPLADORA
230
51.88%
50.72%
-2.20%
71.23%
82.44%
15.70%
21.29%
23.26%
9.30%
BAOS TOPO
138
30.83%
36.85%
19.50%
63.04%
78.10%
23.90%
0.10%
0.10%
-0.90%
138
52.82%
56.78%
7.50%
63.64%
72.48%
13.90%
27.48%
28.83%
4.90%
PUCARA MULALO
138
75.73%
76.53%
1.10%
60.68%
69.95%
15.30%
26.36%
26.38%
0.10%
PAUTE - SOPLADORA 1
230
31.30%
34.54%
10.30%
53.09%
67.93%
28.00%
16.69%
17.22%
3.20%
PAUTE - SOPLADORA 2
230
62.58%
68.68%
9.70%
53.09%
67.93%
28.00%
30.07%
31.44%
4.60%
SE S ROSA - CONOCOTO
138
42.74%
46.45%
8.70%
48.11%
67.62%
40.50%
19.40%
20.58%
6.10%
TOTORAS AMBATO
138
33.77%
40.07%
18.70%
47.79%
65.07%
36.10%
9.49%
11.91%
25.50%
POMASQUI - ZAMBIZA
138
47.48%
51.08%
7.60%
53.30%
64.88%
21.70%
25.86%
27.08%
4.70%
RIOBAMBA - SOPLADORA
230
28.95%
32.02%
10.60%
53.85%
62.33%
15.70%
24.20%
28.02%
15.80%
ELECAUSTRO - CUENCA
138
37.22%
42.79%
15.00%
60.93%
61.46%
0.90%
19.17%
20.76%
8.30%
TOTORAS - SANTAROSA 1
230
16.19%
18.09%
11.70%
55.63%
59.84%
7.60%
12.85%
13.16%
2.40%
230
64.76%
78.10%
20.60%
55.63%
59.84%
7.60%
24.66%
26.52%
7.60%
LVC - QUEVEDO 1
230
50.61%
63.48%
25.40%
45.33%
57.65%
27.20%
16.55%
21.39%
29.20%
LVC - QUEVEDO 2
230
5.63%
4.68%
-16.90%
45.33%
57.65%
27.20%
7.95%
7.15%
-10.00%
138
30.19%
39.55%
31.00%
50.20%
56.28%
12.10%
21.68%
25.69%
18.50%
138
30.19%
39.55%
31.00%
50.20%
56.28%
12.10%
21.68%
25.69%
18.50%
230
23.71%
31.82%
34.20%
46.34%
55.44%
19.60%
31.60%
45.07%
42.70%
TRINITARIA - SALTRAL 1
138
57.93%
65.14%
12.50%
52.51%
55.11%
5.00%
31.92%
34.49%
8.00%
TRINITARIA - SALTRAL 2
138
34.08%
39.23%
15.10%
52.51%
55.11%
5.00%
16.93%
18.10%
6.90%
TOTORAS - SANTAROSA
1(1)
POLICENTRO - PASCUALES
1
POLICENTRO - PASCUALES
2
TRINITARIA - NUEVA
PROSPERINA
13.14%
31.59%
10.42%
Los resultados se los analizar para demanda Mxima, Media y Mnima, se han
considerado las siguientes alertas que permitirn observar las posibles sobrecargas del
sistema:
86
31,59% promedio, para disminuir el porcentaje de carga de esta lnea se debera aumentar
la generacin de la de la zona Sur.
En lo que respecta a la Lnea de Transmisin Puyo - Topo, en para hidrologa Alta se
expuso que esta lnea se encuentra con problemas de sobrecarga, para lo cual se debera
considerar las recomendaciones expuestas para reducir la cargabilidad de esta lnea.
Para Demanda Mnima:
Existe un incremento en la cargabilidad promedio en las Lneas de Transmisin que
est en un promedio de 10,42%.
No existen Las Lneas de Transmisin que se encuentran entre el 80% a 99% de su
capacidad de carga despus de la incorporacin de Cocinas de Induccin.
No existen Las Lneas de Transmisin que sobrepasen el 100% de su capacidad de
carga despus de la incorporacin de Cocinas de Induccin.
En el ANEXO 9 Cargabilidad en lneas y Transformadores, se presenta todos los
resultados obtenidos de las simulaciones planteadas
4.2. ANLISIS DE FACTOR DE POTENCIA EN LNEAS TRANSMISIN Y
TRANSFORMADORES DE POTENCIA.
4.2.1. FACTOR DE POTENCIA EN LNEAS DE TRANSMISIN
Para determinar la variacin del factor de potencia en lneas de transmisin por la
incorporacin de las cocinas de induccin en el S.N.I, se realiz una comparacin entre
los resultados obtenidos antes y despus de la incorporacin de las cocinas de induccin,
considerando la misma topologa del sistema para ambos casos, a continuacin se
presenta las tablas consolidas los porcentajes ms representativos de variacin.
El porcentaje de variacin nos permitir conocer en cuanto la variacin del factor de
potencia despus de la incorporacin de cocinas de induccin y se representa por la
siguiente formula:
% =
% %
%
88
(4.2)
CON
COCINAS
COCINAS
Tensin
Factor de
(KV)
Potencia
YAHUACHI - PAUTE 1
230
YAHUACHI - PAUTE 2
230
DEMANDA MEDIA
SIN
CON
VARIACIN
COCINAS
COCINAS
Factor de
Factor de
Potencia
Variacin
Potencia
1.00
1.00
0.0%
1.00
1.00
0.0%
138
1.00
1.00
138
1.00
LOJA VILONACO
138
RIOBAMBA - SOPLADORA
MNIMA
SIN
CON
VARIACIN
COCINAS
COCINAS
Factor de
Factor de
Factor de
Potencia
Variacin
Potencia
Potencia
Variacin
1.00
1.00
0.0%
1.00
1.00
0.0%
1.00
1.00
0.0%
1.00
1.00
0.0%
-0.4%
1.00
1.00
0.2%
0.89
0.89
0.2%
1.00
-0.4%
1.00
1.00
0.2%
0.89
0.89
0.2%
1.00
1.00
0.0%
1.00
1.00
0.0%
1.00
1.00
0.0%
230
1.00
1.00
0.1%
1.00
1.00
0.1%
0.99
1.00
0.4%
POMASQUI - CHAVEZPAMBA
138
0.99
0.99
0.1%
1.00
1.00
0.0%
0.97
0.98
0.3%
PUYO TOPO
138
1.00
1.00
-0.1%
1.00
1.00
0.0%
1.00
1.00
0.0%
PASCUALES - MJILAGRO
230
1.00
1.00
0.0%
1.00
1.00
0.0%
0.99
0.99
0.1%
ELECAUSTRO - CUENCA
138
1.00
1.00
0.0%
1.00
1.00
0.0%
1.00
1.00
0.0%
SOPLADORA - MILAGRO 1
230
0.99
1.00
0.4%
1.00
1.00
0.1%
1.00
1.00
0.0%
SOPLADORA - MILAGRO 2
230
0.99
1.00
0.4%
1.00
1.00
0.1%
1.00
1.00
0.0%
LVC TRINITARIA
230
0.98
1.00
1.5%
0.98
1.00
1.9%
0.93
0.96
3.7%
MILAGRO TRONCAL
230
1.00
1.00
0.0%
1.00
1.00
0.0%
0.99
0.99
0.3%
230
1.00
1.00
0.0%
1.00
1.00
0.3%
0.99
0.99
0.0%
230
1.00
1.00
0.0%
1.00
1.00
0.3%
0.99
0.99
0.0%
BAOS TOPO
138
1.00
1.00
-0.2%
1.00
1.00
-0.1%
1.00
1.00
0.0%
CHONE DPERIPA
138
1.00
1.00
0.0%
1.00
1.00
0.2%
0.99
0.98
-1.4%
PUCARA - MULALO
138
1.00
0.99
-0.8%
1.00
1.00
-0.1%
1.00
1.00
0.0%
230
1.00
1.00
0.0%
1.00
1.00
0.1%
0.98
0.99
0.2%
230
1.00
1.00
0.0%
1.00
1.00
0.1%
0.98
0.99
0.2%
VARIACIN
Nivel de
Lneas de Transmisin
CON
COCINAS
COCINAS
Tensin
Factor de
(KV)
Potencia
YAHUACHI - PAUTE 1
230
YAHUACHI - PAUTE 2
230
DEMANDA MEDIA
SIN
CON
VARIACIN
COCINAS
COCINAS
Factor de
Factor de
Potencia
Variacin
Potencia
1.00
1.00
0.0%
1.00
1.00
0.0%
138
1.00
1.00
138
1.00
LOJA VILONACO
138
RIOBAMBA - SOPLADORA
MNIMA
SIN
CON
VARIACIN
COCINAS
COCINAS
Factor de
Factor de
Factor de
Potencia
Variacin
Potencia
Potencia
Variacin
1.00
1.00
0.0%
1.00
1.00
0.0%
1.00
1.00
0.0%
1.00
1.00
0.0%
-0.4%
1.00
1.00
0.2%
0.89
0.89
0.2%
1.00
-0.4%
1.00
1.00
0.2%
0.89
0.89
0.2%
1.00
1.00
0.0%
1.00
1.00
0.0%
1.00
1.00
0.0%
230
1.00
1.00
0.1%
1.00
1.00
0.1%
0.99
1.00
0.4%
POMASQUI - CHAVEZPAMBA
138
0.99
0.99
0.1%
1.00
1.00
0.0%
0.97
0.98
0.3%
PUYO TOPO
138
1.00
1.00
-0.1%
1.00
1.00
0.0%
1.00
1.00
0.0%
PASCUALES - MJILAGRO
230
1.00
1.00
0.0%
1.00
1.00
0.0%
0.99
0.99
0.1%
ELECAUSTRO - CUENCA
138
1.00
1.00
0.0%
1.00
1.00
0.0%
1.00
1.00
0.0%
SOPLADORA - MILAGRO 1
230
0.99
1.00
0.4%
1.00
1.00
0.1%
1.00
1.00
0.0%
VARIACIN
Nivel de
Lneas de Transmisin
89
DEMANDA MXIMA
SIN
CON
COCINAS
COCINAS
DEMANDA MEDIA
SIN
CON
VARIACIN
COCINAS
COCINAS
MNIMA
SIN
CON
VARIACIN
COCINAS
COCINAS
VARIACIN
Nivel de
Tensin
Factor de
Factor de
Factor de
Factor de
Factor de
Factor de
Lneas de Transmisin
(KV)
Potencia
Potencia
Variacin
Potencia
Potencia
Variacin
Potencia
Potencia
Variacin
SOPLADORA - MILAGRO 2
230
0.99
1.00
0.4%
1.00
1.00
0.1%
1.00
1.00
0.0%
LVC TRINITARIA
230
0.98
1.00
1.5%
0.98
1.00
1.9%
0.93
0.96
3.7%
MILAGRO TRONCAL
230
1.00
1.00
0.0%
1.00
1.00
0.0%
0.99
0.99
0.3%
230
1.00
1.00
0.0%
1.00
1.00
0.3%
0.99
0.99
0.0%
230
1.00
1.00
0.0%
1.00
1.00
0.3%
0.99
0.99
0.0%
BAOS TOPO
138
1.00
1.00
-0.2%
1.00
1.00
-0.1%
1.00
1.00
0.0%
CHONE DPERIPA
138
1.00
1.00
0.0%
1.00
1.00
0.2%
0.99
0.98
-1.4%
PUCARA MULALO
138
1.00
0.99
-0.8%
1.00
1.00
-0.1%
1.00
1.00
0.0%
230
1.00
1.00
0.0%
1.00
1.00
0.1%
0.98
0.99
0.2%
230
1.00
1.00
0.0%
1.00
1.00
0.1%
0.98
0.99
0.2%
CUENCA - PAUTE 1
138
0.56
0.98
74.5%
0.98
1.00
1.4%
0.43
0.57
33.1%
CUENCA - PAUTE 2
138
0.56
0.98
74.5%
0.98
1.00
1.4%
0.43
0.57
33.1%
230
1.00
1.00
0.0%
0.99
1.00
0.3%
0.90
1.00
10.8%
% %
%
90
(4.2)
Pot
Activa
Aparente
TRANSFORMADORES
(MW)
(MVA)
T ESME - ST
35.22
35.71
T TOTORAS
36.68
T TOTORAS 2
CON COCINAS
Pot
Pot
Activa
Aparente
(MW)
(MVA)
0.99
34.63
37.12
0.99
36.68
37.12
T CUMBARATZA
5.62
T MACHALA 1
Factor de
INCREMENTO
Factor de
(%)
Potencia
Incremento
34.71
1.00
1.15%
62.50
62.63
1.00
0.99%
0.99
62.50
62.63
1.00
0.99%
5.97
0.94
11.28
11.93
0.95
0.49%
26.24
27.10
0.97
27.54
28.31
0.97
0.48%
T MACHALA 2
26.24
27.10
0.97
27.54
28.31
0.97
0.48%
T STO. DOM 1
46.78
49.14
0.95
46.76
48.91
0.96
0.43%
T STO. DOM 2
46.78
49.14
0.95
46.76
48.91
0.96
0.43%
T VICENTINA 2
31.61
31.93
0.99
35.50
35.73
0.99
0.37%
T VICENTINA 1
22.44
22.67
0.99
25.20
25.36
0.99
0.37%
T PASCULAS 69 1
158.85
160.90
0.99
162.58
164.23
0.99
0.27%
5.02
5.37
0.93
5.37
5.73
0.94
0.23%
5.02
5.37
0.93
5.37
5.73
0.94
0.23%
T CHONE
47.31
47.43
1.00
47.31
47.37
1.00
0.13%
T TRINITARIA
168.67
169.69
0.99
145.58
146.30
1.00
0.12%
T DCR 1
58.17
58.28
1.00
58.28
58.37
1.00
0.06%
T IBARRA 2
4.94
5.23
0.95
5.22
5.52
0.95
0.04%
226.01
226.26
1.00
250.48
250.69
1.00
0.02%
226.01
226.26
1.00
250.48
250.69
1.00
0.02%
T S/E S ROSA 1
68.38
68.39
1.00
74.63
74.63
1.00
0.01%
T S/E S ROSA 2
68.38
68.39
1.00
74.63
74.63
1.00
0.01%
T AMBATO
27.58
29.24
0.94
36.79
39.00
0.94
0.01%
T MONTECRISTI
50.51
50.52
1.00
50.51
50.52
1.00
0.00%
Potencia
91
Pot
Activa
Aparente
TRANSFORMADORES
(MW)
(MVA)
T ESME - ST
60.27
60.44
T TOTORAS
16.69
T TOTORAS 2
CON COCINAS
Pot
Pot
Activa
Aparente
(MW)
(MVA)
1.00
59.57
27.71
0.60
16.69
27.71
T CUMBARATZA
1.92
T MACHALA 1
Factor de
INCREMENTO
Factor de
(%)
Potencia
Incremento
59.96
0.99
-0.36%
52.62
57.75
0.91
51.28%
0.60
52.62
57.75
0.91
51.28%
2.11
0.91
10.33
10.93
0.95
3.84%
30.53
30.81
0.99
30.72
31.00
0.99
-0.03%
T MACHALA 2
30.53
30.81
0.99
30.72
31.00
0.99
-0.03%
T STO. DOM 1
25.48
26.79
0.95
25.54
26.72
0.96
0.55%
T STO. DOM 2
25.48
26.79
0.95
25.54
26.72
0.96
0.55%
T VICENTINA 2
27.31
29.18
0.94
33.36
34.43
0.97
3.52%
T VICENTINA 1
17.21
18.38
0.94
21.02
21.69
0.97
3.52%
T PASCULAS 69 1
138.35
140.89
0.98
143.88
145.75
0.99
0.54%
41.45
44.04
0.94
41.97
44.63
0.94
-0.09%
41.45
44.04
0.94
41.97
44.63
0.94
-0.09%
T CHONE
31.36
32.20
0.97
31.36
31.99
0.98
0.64%
T TRINITARIA
124.83
129.04
0.97
111.85
115.47
0.97
0.14%
T DCR 1
43.36
44.34
0.98
43.54
44.35
0.98
0.39%
209.42
229.32
0.91
247.01
264.92
0.93
2.10%
209.42
229.32
0.91
247.01
264.92
0.93
2.10%
T S/E S ROSA 1
52.75
52.95
1.00
62.02
62.15
1.00
0.15%
T S/E S ROSA 2
52.75
52.95
1.00
62.02
62.15
1.00
0.15%
T AMBATO
18.36
19.54
0.94
32.01
33.92
0.94
0.39%
T MONTECRISTI
33.40
34.18
0.98
33.40
34.18
0.98
0.00%
Potencia
92
Pot
Activa
Aparente
TRANSFORMADORES
(MW)
(MVA)
T ESME - ST
60.49
60.99
T TOTORAS
11.77
T TOTORAS 2
CON COCINAS
Pot
Pot
Activa
Aparente
(MW)
(MVA)
0.99
60.26
15.69
0.75
11.77
15.69
T CUMBARATZA
4.22
T MACHALA 1
Factor de
INCREMENTO
Factor de
(%)
Potencia
Incremento
60.72
0.99
0.07%
22.52
25.29
0.89
18.76%
0.75
22.52
25.29
0.89
18.76%
4.49
0.94
5.10
5.50
0.93
-1.31%
12.53
12.89
0.97
12.62
13.01
0.97
-0.17%
T MACHALA 2
12.53
12.89
0.97
12.62
13.01
0.97
-0.17%
T STO. DOM 1
14.73
17.54
0.84
14.73
17.33
0.85
1.16%
T STO. DOM 2
14.73
17.54
0.84
14.73
17.33
0.85
1.16%
T VICENTINA 2
9.87
11.36
0.87
11.32
12.58
0.90
3.54%
T VICENTINA 1
7.01
8.06
0.87
8.04
8.93
0.90
3.54%
T PASCULAS 69 1
116.65
117.95
0.99
118.73
120.11
0.99
-0.05%
16.49
23.90
0.69
17.43
24.71
0.71
2.26%
16.46
17.47
0.94
17.42
18.25
0.95
1.33%
T CHONE
36.57
36.58
1.00
36.58
38.39
0.95
-4.71%
T TRINITARIA
120.51
125.97
0.96
125.17
131.32
0.95
-0.37%
T DCR 1
43.86
45.40
0.97
43.92
45.33
0.97
0.28%
T IBARRA 2
0.04
0.21
0.22
0.04
0.21
0.22
0.00%
120.10
120.22
1.00
130.23
130.37
1.00
-0.01%
120.10
120.22
1.00
130.23
130.37
1.00
-0.01%
T S/E S ROSA 1
44.89
45.12
0.99
47.52
47.79
0.99
-0.07%
T S/E S ROSA 2
44.89
45.12
0.99
47.52
47.79
0.99
-0.07%
T AMBATO
12.66
13.58
0.93
16.83
17.94
0.94
0.63%
T MONTECRISTI
46.45
48.20
0.96
46.45
48.20
0.96
0.00%
Potencia
93
Pot
Activa
Aparente
TRANSFORMADORES
(MW)
(MVA)
T MILAGRO 2
24.74
26.88
T SID
42.22
T MACHALA 3
CON COCINAS
Pot
Pot
Activa
Aparente
(MW)
(MVA)
0.92
39.16
43.70
0.97
70.70
74.66
T ESME - ST
21.59
T VICENTINA 1
Factor de
INCREMENTO
Factor de
(%)
Potencia
Incremento
41.57
0.94
2.36%
53.96
54.83
0.98
1.86%
0.95
75.25
78.84
0.95
0.79%
21.74
0.99
41.13
41.13
1.00
0.67%
22.44
22.62
0.99
25.20
25.27
1.00
0.50%
T VICENTINA 2
31.61
31.86
0.99
35.50
35.61
1.00
0.50%
T CUMBARATZA
5.62
5.97
0.94
11.28
11.93
0.95
0.49%
T PASCULAS 69 1
158.85
160.64
0.99
162.58
163.97
0.99
0.27%
5.02
5.37
0.93
5.37
5.73
0.94
0.24%
5.02
5.37
0.93
5.37
5.73
0.94
0.24%
T TRINITARIA
158.72
162.65
0.98
149.08
152.51
0.98
0.17%
T DCR 1
58.16
58.25
1.00
58.28
58.33
1.00
0.06%
T PASCUALES 1
254.60
254.86
1.00
251.93
252.08
1.00
0.04%
T PASCUALES 2
254.60
254.86
1.00
251.93
252.08
1.00
0.04%
T IBARRA 2
4.94
5.23
0.95
5.22
5.52
0.95
0.04%
T CHONE
47.31
47.35
1.00
47.31
47.34
1.00
0.02%
T S/E S ROSA 1
68.38
68.40
1.00
74.64
74.65
1.00
0.01%
T S/E S ROSA 2
68.38
68.40
1.00
74.64
74.65
1.00
0.01%
T QUEVEDO 69
83.57
90.51
0.92
83.79
90.74
0.92
0.00%
T MONTECRISTI
50.51
50.52
1.00
50.51
50.52
1.00
0.00%
Potencia
94
Pot
Activa
Aparente
TRANSFORMADORES
(MW)
(MVA)
T MILAGRO 2
14.74
15.51
T SID
16.28
T MACHALA 3
CON COCINAS
Pot
Pot
Activa
Aparente
(MW)
(MVA)
0.95
67.24
18.99
0.86
47.13
50.40
T ESME - ST
54.02
T VICENTINA 1
Factor de
INCREMENTO
Factor de
(%)
Potencia
Incremento
68.51
0.98
3.33%
58.28
58.37
1.00
16.45%
0.94
62.71
64.44
0.97
4.07%
54.03
1.00
66.67
66.72
1.00
-0.03%
18.49
18.61
0.99
22.59
22.61
1.00
0.53%
T VICENTINA 2
26.05
26.21
0.99
31.82
31.85
1.00
0.53%
T CUMBARATZA
1.92
2.11
0.91
10.33
10.92
0.95
3.96%
T PASCULAS 69 1
138.35
140.82
0.98
143.88
145.57
0.99
0.61%
41.45
44.03
0.94
41.97
44.62
0.94
-0.09%
41.45
44.03
0.94
41.97
44.62
0.94
-0.09%
T TRINITARIA
94.26
96.79
0.97
124.13
125.16
0.99
1.83%
T DCR 1
43.36
44.30
0.98
43.53
44.23
0.98
0.57%
T PASCUALES 1
189.05
189.26
1.00
207.61
207.61
1.00
0.11%
T PASCUALES 2
189.05
189.26
1.00
207.61
207.61
1.00
0.11%
T CHONE
31.36
32.28
0.97
31.36
31.81
0.99
1.49%
T S/E S ROSA 1
52.75
52.96
1.00
62.02
62.18
1.00
0.14%
T S/E S ROSA 2
52.75
52.96
1.00
62.02
62.18
1.00
0.14%
T QUEVEDO 69
50.64
55.41
0.91
50.97
55.78
0.91
-0.01%
T MONTECRISTI
33.40
34.09
0.98
33.40
33.93
0.98
0.48%
Potencia
95
Pot
Activa
Aparente
TRANSFORMADORES
(MW)
(MVA)
T MILAGRO 2
47.56
47.77
T SID
15.03
T MACHALA 3
CON COCINAS
Pot
Pot
Activa
Aparente
(MW)
(MVA)
1.00
47.66
25.27
0.60
32.08
35.08
T ESME - ST
2.35
T VICENTINA 1
T VICENTINA 2
Factor de
INCREMENTO
Factor de
(%)
Potencia
Incremento
47.76
1.00
0.22%
15.27
23.54
0.65
9.05%
0.91
32.23
34.92
0.92
0.94%
6.34
0.37
2.61
6.01
0.43
17.42%
7.01
8.09
0.87
8.04
9.04
0.89
2.62%
9.87
11.40
0.87
11.32
12.74
0.89
2.62%
T PASCULAS 69 1
116.65
121.76
0.96
118.73
123.36
0.96
0.46%
16.47
17.38
0.95
17.42
18.38
0.95
0.01%
16.47
17.38
0.95
17.42
18.38
0.95
0.01%
T TRINITARIA
69.29
79.97
0.87
67.61
77.99
0.87
0.06%
T DCR 1
43.86
45.54
0.96
43.92
45.49
0.97
0.25%
T PASCUALES 1
144.09
146.57
0.98
144.93
147.36
0.98
0.04%
T PASCUALES 2
144.09
146.57
0.98
144.93
147.36
0.98
0.04%
T IBARRA 2
0.04
0.21
0.22
0.04
0.21
0.22
0.00%
T CHONE
25.56
30.20
0.85
25.56
29.85
0.86
1.16%
T S/E S ROSA 1
44.89
45.12
0.99
47.52
47.79
0.99
-0.06%
T S/E S ROSA 2
44.89
45.12
0.99
47.52
47.79
0.99
-0.06%
T QUEVEDO 69
49.43
51.87
0.95
49.50
51.95
0.95
0.00%
T MONTECRISTI
26.40
28.68
0.92
26.40
28.59
0.92
0.33%
Potencia
Como se pude observar, tanto para hidrologa alta como baja, en los escenarios de
demanda mxima, media y mnima, existe un incremento en el factor de potencia despus
de la incorporacin de cocinas de induccin, esto se debe que las cocinas de induccin al
tener un factor de potencia alto igual 0.98, est obligando al Sistema de Transformacin
a disminuir la cantidad de potencia reactiva que va a transmitir, sin embargo como
aumento la potencia activa es considerable, se requiere mayor cantidad de potencia
reactiva para compensar los bajos niveles de volteje en las barras de estos Sistema.
96
( ) ( )
( )
(4,3)
Fuente: CONELEC, INTRODUCCIN., PLAN MAESTRO DE ELECTRIFICACIN 20122021, QUITO, 2012, PP. 6.
Fuel Ol
PARAMETROS
Hidroelctrica
Renovables
TOTAL
% de
(MW-H)
(MW-H)
(MW-H)
Reserva
Natural
(MW-H)
(MW-H)
(MW-H)
ENERGA
718.75
3970.4
2460
15287.4
70
4501.31
2488.7
7658.1
3711
17948.4
85.95
6378.44
1769.95
3687.7
1251
2661
15.95
1877.13
2012.5
10038.98
10080
37680.72
196
4286.3
SUMINISTRADA
18:00 A
ENERGA
22:00
DISPONIBLE
MXIMA
29.43%
MARGEN DE
RESERVA
06:00 A
ENERGA
17:00
SUMINISTRADA
MEDIA
31
26.76%
CONELEC, Introduccin., PLAN MAESTRO DE ELECTRIFICACIN 2012- 2021, Quito, 2012, pp.
6.
97
Gas
Disel
DEMANDA HORARIO
Fuel Ol
PARAMETROS
Hidroelctrica
Renovables
TOTAL
% de
(MW-H)
(MW-H)
(MW-H)
Reserva
Natural
(MW-H)
(MW-H)
(MW-H)
23:00 A
ENERGA
24:00
DISPONIBLE
6254.36
18288.76
10390.8
46754.4
240.66
5852.07
4241.86
8249.78
310.8
9073.68
44.66
1565.77
518.75
1724.9
11594.45
85.95
2784.81
1095.5
4378.65
17179.05
85.95
4547.83
576.75
2653.75
5584.6
1763.02
MARGEN DE
RESERVA
ENERGA
SUMINISTRADA
01:00 A
ENERGA
05:00
DISPONIBLE
MNIMA
38.77%
MARGEN DE
RESERVA
Los niveles de reserva de Energa para Hidrologa alta se encuentran sobre el lmite
establecido en el PME 2012 - 2021 que considera como mnimo un 10% de energa
rodante para cubrir contingencias del el sistema.
4.3.2. NIVEL DE RESERVA EN HIDROLOGA BAJA
Tabla 4.144. Reserva de Energa en Hidrologa Baja.
Gas
Disel
DEMANDA
Fuel Ol
PARAMETROS
Hidroelctrica
Renovables
TOTAL
% de
(MW)
(MW)
(MW)
Reserva
Natural
(MW)
(MW)
(MW)
POTENCIA
103.75
880.77
672.00
2847.06
14.00
4517.58
168.10
1653.09
742.20
3450.15
17.19
6030.73
64.35
772.31
70.20
603.09
3.19
1513.14
143.75
717.07
720.00
2691.48
14.00
4286.30
446.74
1306.34
742.20
3339.60
17.19
5852.07
302.99
589.27
22.20
648.12
3.19
1565.77
103.75
344.98
0.00
2318.89
14.00
2781.62
219.10
875.73
0.00
3435.81
17.19
4547.83
115.35
530.75
0.00
1116.92
3.19
1766.21
ACTIVA
POTENCIA
MXIMA
25.1%
NOMINAL
MARGEN DE
RESERVA
POTENCIA
ACTIVA
POTENCIA
MEDIA
26.8%
NOMINAL
MARGEN DE
RESERVA
POTENCIA
ACTIVA
POTENCIA
MNIMA
NOMINAL
MARGEN DE
RESERVA
98
38.8%
Los niveles de reserva de energa para hidrologa baja se encuentran sobre el lmite
establecido en el PME 2012 - 2021 que considera como mnimo un 10% de energa
rodante para cubrir contingencias del el sistema.
4.4. COSTO - BENEFICIO PARA EL PAS POR LA INCLUSIN DE COCINA
INDUCCIN AL ESTADO
Para determinar el Costo Beneficio de la inclusin de las cocinas de induccin al S.N.T.,
es importante determinar el consumo de energa que de un hogar con GLP (Gas Licuado
de Petrleo) y el consumo de la nueva demanda con cocinas de induccin, para de esta
forma determinar el costo beneficio que llevara al pas al cambio de GLP a cocinas de
induccin, a continuacin se presenta el anlisis de la determinacin de la energa que
utiliza un hogar.
4.4.1. DEMANDA DE ENERGA MENSUAL PROMEDIO (kWh) DEL GLP Y
COCINAS DE INDUCCIN32
En el Captulo 1, numeral 1.3,1, DEMANDA DE ENERGA MENSUAL PROMEDIO
POR HOGAR, se determin la relacin que existira en cocinar a base de GLP y con
cocinas de induccin de lo cual resulta que la demanda de energa mensual promedio por
cocina a base de electricidad es igual a: 123,64 %&.
Conociendo que el consumo por hogar es de 1,12 Cil15kg por mes se obtiene que:
. 1,12$15' = 208,28 %& 1,12 = 233,28 %&
4.4.2. DEMANDA DE ENERGA MENSUAL PROMEDIO (kWh) COCINA DE
INDUCCCIN
Con los con los valores de factor de potencia, factor de simultaneidad y factor de
utilizacin a continuacin se determina el consumo mensual de una cocina de induccin:
99
FP
FS
FU
Potencia (KW)
6:00
21%
84%
0.98
7.2
1.2
7:00
13%
80%
0.98
7.2
0.7
8:00
10%
83%
0.98
7.2
0.6
10:00
21%
91%
0.98
7.2
1.3
11:00
19%
89%
0.98
7.2
1.2
12:00
16%
84%
0.98
7.2
1.0
14:00
8%
92%
0.98
7.2
0.5
18:00
14%
93%
0.98
7.2
0.9
19:00
14%
89%
0.98
7.2
0.9
20:00
9%
89%
0.98
7.2
0.6
8.96
268.67
Como se podr observar el consumo de energa mensual promedio para una cocina de
induccin de 7.2 kW es de 268.67 kWh,
4.4.3. COSTO BENEFICIO
Para un hogar que utiliza una cocina de induccin de 7.2. kW, que equivale una
energa de mensual de 268.67 kWh.
Para un hogar que utiliza una cocina convencional de GLP 1,12 Cil15kg., que
equivale a una energa mensual de 233.28 kWh.
CONELEC, Costo del servicio de distribucin participacin en % del costo del servicio de la generacin,
Transmisin y Distribucin.
33
100
Energa
Eficiencia
(KWh)
Energa til
(KWh)
Cocina de Induccin
268.67
0.84
225.68
Cocina de GLP
233.38
0.45
105.77
Debido a que la eficiencia de una cocina de Induccin es mayor a la de una cocina a base
de GLP, para obtener la Energa neta que utilizara una cocina de GLP para la coccin de
alimentos sera igual a
=
-
233.28 kWh
=
= 518.40 kWh
1--
0.45
Ya que se requiere conocer la cantidad de energa neta que utiliza una cocina
convencional a base de GLP se divide la Energa de 1,12$15' para la eficiencia de
esta forma obtenemos la energa Neta que se va a utilizar, sin embargo para una cocina
de induccin es diferente ya que se requiere conocer la energa neta que se va a requerir
ser suministrada desde la red hacia la cocina mas no la energa til.
101
Tabla 4.17. Costo beneficio para el Pas por la Incorporacin de cocinas de Induccin.
Energa
Cantidad de
Costo Energa
(kWh)
Cil15kg
Subsidio (Usd)
(ctvs/KWh)
Cocina de Induccin
268.67
7.98
Cocina de GLP
518.40
2.49
1.60
16
3.98
39.82
21.45
Ahorro mensual por la sustitucin de GLP por cocina de Induccin para el Estado (USD)
18.37
tem
TOTAL (USD)
102
Tabla 4.18. Costo beneficio para el Pas por la Incorporacin de 300.000 cocinas de Induccin
en (MUSD) para el ao 2015.
tem
Energa (kWh)
Cantidad de
Cil15kg
Costo
Energa
(ctvs/KWh)
Cocina de Induccin
268.67
7.98
Cocina de GLP
518.4
2.49
1.6
16
3.98
39.82
21.45
Ahorro mensual por la sustitucin de GLP por cocina de Induccin para el Estado (USD)
18.37
Ahorro Anual por la sustitucin de GLP por cocina de Induccin para el Estado (USD)
220.44
Ahorro Anual por la sustitucin de GLP por cocina de Induccin de 300.000 Usuarios (MUSD)
66.132
TOTAL (USD)
Elico
Termoelctrico
Total
(MUSD)
(MUSD)
(MUSD)
(MUSD)
2013
529
37
566
2014
305
610
444
1359
2015
1587
167
1754
2016
3093
3093
2017
60
60
Total
5574
647
611
6832
Ao
Fuente: CONELEC, Anlisis Econmico., PLAN MAESTRO DE ELECTRIFICACIN 20132022, Perspectiva y Expansin del Sistema Elctrico Quito, 20132, pp. 207.
Nota: MUSD Miles de Millones
De acuerdo al PME 2013 2022, se est considerando que se realizar para el ao 2015
una inversin en sistema de Generacin de 1754 Millones de Dlares.
103
2013
2014
2015
2016
2017
Lneas de Transmisin
81.75
171.21
73.20
34.63
8.06
4.64
0.18
0.18
0.18
0.84
48.93
35.26
18.37
5.51
7.22
28.18
135.77
54.65
28.94
Subestaciones
92.40
251.82 153.69
85.24
32.54
Reduccin
12.34
9.74
4.55
2.91
Elevacin
43.19
66.61
85.19
54.71
29.63
Seccionamiento
36.87
175.47
63.95
30.53
Total
Fuente: CONELEC, Anlisis Econmico., PLAN MAESTRO DE ELECTRIFICACIN 20132022, Perspectiva y Expansin del Sistema Elctrico Quito, 20132, pp. 209.
De acuerdo al PME 2013 2022, se est considerando que se realizar una inversin para
el ao 2015 en Lneas de Transmisin de 73.20 Millones de Dlares y para Subestaciones
153.69 Millones de Dlares.
Tabla 4.21. Costo Beneficio Para el S.N.I por la incorporacin de Cocinas de Induccin para el
ao 2015.
Ahorro por incorporacin de
Cocinas de Induccin
66.13
Generacin Hidroelctrico
1587.00
Generacin Termoelctrica
167.00
Lneas de Transmisin
73.20
Subestaciones
153.69
Total
66.13
1980.89
tem
para realizar las mejoras que requiere el S.N.I por el incremento de Demanda de Cocinas
de Induccin, lo cual significara que el estado tendra que hacer una inversin ya no de
1980.89 MUSD contemplada Originalmente, sino 1914.76 MUSD.
105
CONCLUSIONES Y RECOMENDACIONES.
CONCLUSIONES
Con la informacin entregada por el Ministerio de Electricidad y Energas
Renovables, referente al plan Fronteras que realiz EMELNORTE en la zona del
Carchi para la sustitucin de cocinas a base de GLP por cocinas de induccin, se
obtuvo los datos de las mediciones realizadas en un alimentador que sirve a 73
usuarios, de los cuales 26 usuarios fueron beneficiados con cocinas de induccin de
2400 W, lo que permiti determinar el factor de utilizacin y simultaneidad para los
diferentes perodos de demanda, en la siguiente tabla comparativa se presenta los
valores de simultaneidad y utilizacin obtenidos en la investigacin.
Tabla 1, Comparacin de los Factores de Simultaneidad y utilizacin.
FACTORES
PME - 2012
GUIA
DE ACUERDO A LA
PARTE A
2021
BT-25
METODOLOGA
0,24
0,20
0,50
0,21
0,80
0,60
0,75
0,93
ESCENARIOS DE ESTUDIOS
DATOS DE BARRAS
Nombre
Nom.L-L Volt. Kv
#1 (E. H.
#7 (E. H.
#2 (E. H.
#8 (E. H.
#3 (E. H.
#9 (E. H.
ALTA
ALTA
ALTA
ALTA
ALTA
ALTA
2015)
2015)
2015)
2015)
2015)
2015)
DMAX
DMAX
DMED
DMED
DMIN
DMIN
DEMANDA MAXIMA
DEMANDA MEDIA
DEMANDA MINIMA
p.u.
p.u.
p.u.
p.u.
p.u.
CUMBARATZA 69
69
1.05
1.02
1.03
0.92
1.05
1.05
MULALO 69
69
0.98
0.93
1.05
1.03
LOJA 69
69
1.02
1.04
0.93
1.05
1.05
IBARRA 69 2
69
0.97
0.95
0.96
0.94
1.02
1.01
TENA 69
69
0.95
0.93
0.99
0.95
0.99
COCA 69
69
0.95
0.95
0.96
0.95
0.97
0.96
CHAVEZPAMBA 69
69
0.98
0.96
0.97
0.95
1.05
1.05
TULCAL 69
69
0.97
0.95
1.04
0.95
1.05
1.04
CUENCA 69
69
1.01
1.01
1.01
0.95
1.02
1.02
AMBATO 69
69
0.97
0.96
0.95
1.03
1.02
NUEVA LOJA 69
69
0.97
0.97
0.96
0.96
0.99
0.99
ESCENARIOS DE ESTUDIOS
DATOS DE BARRAS
Nombre
Nom.L-L Volt. Kv
#4 (E. H.
#10 (E. H.
#5 (E. H.
#11 (E.
#6 (E. H.
#12 (E. H.
BAJA
BAJA
BAJA
H.BAJA
BAJA
BAJA
2015)
2015)
2015)
2015)
2015)
2015)
DMAX
DMAX
DMED
DMED
DMIN
DMIN
DEMANDA MAXIMA
DEMANDA MEDIA
DEMANDA MINIMA
p.u.
p.u.
p.u.
p.u.
p.u.
MULALO 69
69
0.97
0.93
0.97
0.91
1.05
1.03
IBARRA 69 2
69
0.96
0.95
0.97
0.95
1.02
1.02
TENA 69
69
0.95
0.92
0.97
0.92
1.02
COCA 69
69
0.96
0.95
0.96
0.95
0.98
0.98
CHAVEZPAMBA 69
69
0.98
0.96
0.99
0.97
1.05
1.05
DEMANDA MEDIA
MINIMA
NOMBRE
SIN COCINAS
CON COCINAS
SIN COCINAS
CON COCINAS
SIN COCINAS
(%) De
(%) De
(%) De
(%) De
(%) De
(%) De
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
T POLICENTRO
88.83%
95.49%
85.35%
95.46%
46.21%
48.48%
T S/E 18
84.19%
91.77%
78.99%
89.88%
20.46%
21.64%
T S/E S ROSA 1
95.53%
105.84%
73.81%
88.32%
60.11%
63.81%
T S/E S ROSA 2
95.53%
105.84%
73.81%
88.32%
60.11%
63.81%
T TRINITARIA 69
96.33%
103.19%
70.37%
80.14%
53.15%
55.71%
T MULALO
63.33%
83.96%
47.99%
77.56%
23.14%
29.72%
T S/E 19
88.83%
97.26%
63.11%
74.33%
39.02%
41.36%
T SALITRAL
96.85%
103.62%
64.93%
73.66%
53.31%
55.90%
T S/E CUMBAYA
75.80%
80.06%
64.87%
71.02%
53.27%
52.93%
T TOTORAS
65.95%
89.58%
34.09%
66.09%
52.36%
61.55%
T TOTORAS 2
65.95%
89.58%
34.09%
66.09%
46.54%
55.44%
T RIOBAMBA
84.34%
103.81%
57.07%
63.54%
42.10%
47.24%
T S/E CHILIBULO(1)
79.11%
86.20%
49.77%
59.33%
20.18%
21.39%
TRANSFORMADORES
CON COCINAS
109
DEMANDA MEDIA
MINIMA
NOMBRE
SIN COCINAS
CON COCINAS
SIN COCINAS
CON COCINAS
SIN COCINAS
CON COCINAS
(%) De
(%) De
(%) De
(%) De
(%) De
(%) De
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
T POLICENTRO
85.74%
91.93%
85.01%
94.28%
46.81%
49.23%
T S/E 18
83.87%
91.07%
80.19%
91.03%
20.46%
21.76%
T S/E S ROSA 1
95.15%
105.07%
73.67%
87.92%
60.13%
63.94%
T S/E S ROSA 2
95.15%
105.07%
73.67%
87.92%
60.13%
63.94%
T TRINITARIA 69
94.46%
100.82%
70.64%
79.86%
53.51%
56.32%
T S/E 19
88.46%
96.48%
63.88%
75.06%
39.03%
41.51%
T RIOBAMBA
86.03%
100.30%
40.57%
62.68%
44.74%
48.59%
T S/E CHILIBULO(1)
78.80%
85.56%
50.03%
59.48%
20.18%
21.46%
TRANSFORMADORES
DEMANDA MEDIA
MNIMA
NOMBRE
SIN COCINAS
CON COCINAS
SIN COCINAS
CON COCINAS
SIN COCINAS
CON COCINAS
Nivel de
(%) De
(%) De
(%) De
(%) De
(%) De
(%) De
Tensin (KV)
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
SININCAY CUENCA
69
25.59%
38.06%
41.33%
100.24%
39.19%
34.67%
PUYO TOPO
138
95.86%
105.62%
82.21%
96.86%
91.95%
95.95%
MONTC- SGREGORIO
138
67.37%
67.99%
91.55%
91.09%
27.32%
29.67%
BAOS TOPO
138
74.66%
83.97%
60.41%
74.40%
70.37%
74.17%
Lnea de Transmisin
HIDROLOGA BAJA
DEMANDA MXIMA
SIN COCINAS
CON COCINAS
DEMANDA MEDIA
SIN COCINAS
CON COCINAS
MNIMA
SIN COCINAS
CON COCINAS
Nivel de
(%) De
(%) De
(%) De
(%) De
(%) De
(%) De
Tensin (KV)
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
Cargabilidad
PUYO TOPO
138
20.36%
23.98%
85.35%
101.24%
9.47%
12.23%
T G MACHALA - SID 1
230
11.21%
8.58%
34.52%
95.80%
5.49%
5.04%
T G MACHALA - SID 2
230
53.13%
54.63%
34.52%
95.80%
26.33%
28.37%
DCR MJILAGRO
230
5.85%
7.25%
73.04%
91.66%
5.65%
6.28%
Lnea de Transmisin
110
PASCUALES - MJILAGRO
230
8.16%
11.14%
65.31%
83.26%
10.62%
12.24%
TOTORAS - SOPLADORA
230
51.88%
50.72%
71.23%
82.44%
21.29%
23.26%
Los niveles de reserva de energa para hidrologa baja se encuentran sobre el lmite
establecido en el PME 2013 - 2022 que considera como mnimo un 10%37 de energa
rodante para cubrir contingencias del el sistema.
El costo beneficio para el pas por la incorporacin de cocinas de induccin para el
ao 2015, se ve reflejado en un ahorro anual para el estado de 66.13 Millones de
Dlares por el cambio de cocinas a base de GLP por cocinas de induccin a base de
electricidad, sin embargo el Sistema Nacional Interconectado por la incorporacin de
cocinas de Induccin sufrira:
37
111
RECOMENDACIONES
Para tener una mayor certeza de los factores de simultaneidad por estrato de demanda
se recomienda realizar planes piloto para distintos tipos de estratos de usuarios
diferentes zonas del pas, para ello es necesario considerar antes de realizar la
determinacin de los factores de simultaneidad y utilizacin una base de datos con el
mismo nmero de mediciones, por un lapso de por lo menos un mes antes y despus
de la incorporacin, para de esa forma obtener la curva de carga de la utilizacin de
cocinas de induccin por zona y realizar estudios ms detallados.
Para aumentar los niveles de voltaje en las barras del sistema sera aconsejable que se
realice una regulacin en taps de transformadores de potencia, utilizacin de
compensadores reactivos en las zonas ms afectadas, incremento de potencia reactiva
de generadores, entre otros aspectos, sin dejar de lado los anlisis dinmicos que
conllevan las variaciones antes dichas.
Para las futuras expansiones del S.N.I se debera considerar en el plan de expansin
desarrollado por el CONELEC los elementos que se encuentren en alertas preventivas
o sobrecargados, es decir los trasformadores de potencia y lneas de transmisin, para
cubrir econmicamente esta expansin, se debe considerar la alternativa que exista un
reconocimiento econmico por el ahorro generado por el uso de las cocinas de
induccin.
Es recomendable considerar para las lneas de transmisin que se encuentren en alerta
preventiva es decir entren 80% y 99 % de su capacidad de carga se realice un
repotenciacin para de esta forma evitar prdidas de potencia.
112
REFERENCIAS
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
[10]
[11]
[12]
[13]
[14]
[15]
[16]
[17]
[18]
[19]
[20]
[21]
[22]
113
[23] CENACE, POA, Plan de Operacin del Sistema Nacional Interconectado abril 2013, Quito,
marzo 2013.
[24] Subsecretara de la Calidad del Ministerio de Industrias y productividad, Articulo No.
14153 - CAPITULO 5. REQUISITOS DEL PRODUCTO, Numeral 5.6.12, pp 15.
[25] Empresa Elctrica Quito, Determinacin de la demanda de una vivienda, NORMAS
PARA SISTEMAS DE DISTRIBUCIN PARTE A GUA PARA DISEO, Quito,
2014, 5 revisin, pp.7
[26] CONELEC, Situacin Actual., PLAN MAESTRO DE ELECTRIFICACIN 2012- 2021, Quito,
2012, pp. 29.
[27] KUNDUR, Prabha, Power System Stability and Control, Mc Graw-Hill,cap 6, pg. 228
[28] KUNDUR, Prabha, Power System Stability and Control, Mc Graw-Hill,cap 6, pg.
[29] G. Arroyo, OPERACIN DE LNEAS DE TRANSMISIN, MEMORIA IEEE, 1992,
PG. 3.5/8
[30] Andrade Pazmio Francisco Xavier ANLISIS DE COMPENSACIN REACTIVA
SERIE EN LA RED DE 230 KV DEL SISTEMA NACIONAL INTERCONECTADO
ECUATORIANO
[31] CONELEC, Introduccin., PLAN MAESTRO DE ELECTRIFICACIN 2012- 2021,
Quito, 2012, pp. 6.
[32] Estudio de la Demanda de Energa y Potencia de cocinas elctricas y su impacto en la curva
de carga diaria del S.N.I. perodo 2015-2022.
[33] CONELEC, Costo del servicio de distribucin participacin en % del costo del servicio de
la generacin, Transmisin y Distribucin.
[34] Precios de venta en los terminales de EP PETROECUADOR a las comercializadoras,
vigencia: del 08 al 14 de mayo de 2014.
[35]
http://www.arch.gob.ec/index.php/noticias/79-nacional-noticias-externas/368-jose-luiscortazar-fue-entrevistado-por-radio-majestad.html
[36] Universidad de Antioquia, Anlisis comparativo en eficiencia de coccin Con Gas Natural
y electricidad, 2001, pp 102.
[37] CONELEC, ndices de seguridad de abastecimiento de la demanda., PLAN MAESTRO
DE ELECTRIFICACIN 2013- 2022, Quito, 2012, pp. 14
114
ANEXOS
115
ANEXO 1
Determinacin del Factor de utilizacin y Simultaneidad
116
Da
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
Valore
Perodo
esperado
1
1
1
1
1
1
1
2
2
2
2
2
2
2
3
3
3
3
3
3
3
4
4
4
4
4
4
4
5
5
5
5
5
5
5
6
6
6
6
6
6
6
1123.72
-326.87
609.24
395.67
852.19
1514.21
-167.02
836.52
-349.03
577.88
848.84
505.85
725.80
-187.44
738.04
-319.86
554.42
107.41
918.07
417.74
-357.49
677.98
775.43
473.94
648.13
742.81
487.90
-353.57
1503.85
1431.00
1466.87
2828.89
1299.00
-859.21
-807.49
209.81
8505.24
4985.29
8972.93
3691.63
-2306.46
698.43
Ancho
de
Clase
288
140
222
278
195
864
328
161
278
138
318
187
307
217
212
792
150
168
92
267
176
117
420
303
160
355
270
308
508
1166
518
1014
619
492
387
704
3784
2019
1502
2086
2051
2582
Mediana
1103.22
-315.43
608.87
403.30
827.68
1593.07
-178.04
839.18
-336.50
574.47
824.95
519.78
700.65
-185.85
705.01
-210.76
553.04
88.43
919.44
425.65
-355.31
665.13
726.89
445.55
660.23
766.40
503.87
-399.44
1420.74
1521.61
1420.25
2717.56
1296.21
-787.43
-793.69
144.68
9255.50
5384.40
8992.51
3801.56
-2470.18
318.68
117
Error
MAX
PROM
290.94 1394.16
140.86
-174.57
246.79
855.66
289.64
692.95
218.47 1046.15
858.34 2451.41
379.20
201.16
167.93 1007.11
300.43
-36.07
140.10
714.57
330.66 1155.61
175.13
694.91
286.81
987.45
222.96
37.11
194.31
899.32
795.28
584.51
188.40
741.45
214.69
303.11
83.31
1002.75
261.96
687.61
181.69
-173.62
111.05
776.19
434.08 1160.97
289.52
735.07
146.61
806.84
408.75 1175.16
278.47
782.35
324.83
-74.62
555.95 1976.69
1098.70 2620.31
581.60 2001.85
999.81 3717.37
623.27 1919.48
472.23
-315.21
410.57
-383.12
719.31
863.99
4320.51 13576.01
2009.86 7394.26
1659.06 10651.57
1965.55 5767.11
2081.58 -388.59
2849.31 3167.99
MAX
Fs
ESPERADO MED
1414.66
-186.01
856.03
685.31
1070.66
2372.56
212.18
1004.45
-48.60
717.98
1179.50
680.99
1012.61
35.52
932.34
475.42
742.83
322.10
1001.39
679.70
-175.80
789.03
1209.51
763.46
794.74
1151.56
766.37
-28.74
2059.80
2529.70
2048.48
3828.70
1922.27
-386.98
-396.91
929.12
12825.75
6995.15
10632.00
5657.18
-224.87
3547.74
2.23%
-0.28%
1.37%
1.11%
1.68%
3.93%
0.32%
1.61%
-0.06%
1.15%
1.85%
1.11%
1.58%
0.06%
1.44%
0.94%
1.19%
0.49%
1.61%
1.10%
-0.28%
1.24%
1.86%
1.18%
1.29%
1.88%
1.25%
-0.12%
3.17%
4.20%
3.21%
5.96%
3.08%
-0.51%
-0.61%
1.38%
21.76%
11.85%
17.07%
9.24%
-0.62%
5.08%
Fs ESP
2.27%
-0.30%
1.37%
1.10%
1.72%
3.80%
0.34%
1.61%
-0.08%
1.15%
1.89%
1.09%
1.62%
0.06%
1.49%
0.76%
1.19%
0.52%
1.60%
1.09%
-0.28%
1.26%
1.94%
1.22%
1.27%
1.85%
1.23%
-0.05%
3.30%
4.05%
3.28%
6.14%
3.08%
-0.62%
-0.64%
1.49%
20.55%
11.21%
17.04%
9.07%
-0.36%
5.69%
Fu
MED
80.6%
0.0%
71.2%
57.1%
81.5%
61.8%
0.0%
83.1%
0.0%
80.9%
73.5%
72.8%
73.5%
0.0%
82.1%
0.0%
74.8%
35.4%
91.6%
60.8%
0.0%
87.3%
66.8%
64.5%
80.3%
63.2%
62.4%
0.0%
76.1%
54.6%
73.3%
76.1%
67.7%
0.0%
0.0%
24.3%
62.6%
67.4%
84.2%
64.0%
0.0%
22.0%
Da
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
Valore
Perodo
esperado
7
7
7
7
7
7
7
8
8
8
8
8
8
8
9
9
9
9
9
9
9
10
10
10
10
10
10
10
11
11
11
11
11
11
11
12
12
12
12
12
12
12
3235.38
5413.16
3547.11
3157.67
1027.71
396.54
4982.55
4613.98
3982.63
3772.27
2938.95
1762.49
4780.11
4507.62
2820.20
3299.86
4481.81
-546.00
3311.15
1902.70
6602.57
4008.19
5782.48
6152.75
492.59
4332.22
4291.50
10847.40
5331.50
5598.70
10184.23
4247.88
6665.48
7264.14
5846.12
8349.34
5540.28
8278.55
2619.47
5275.11
5822.51
3473.76
Ancho
de
Clase
1821
1237
1359
1139
3796
2908
2819
1045
2406
1101
1825
1523
1077
1581
475
1810
1094
1470
944
1405
2251
1290
1182
1899
1210
414
1926
1929
971
694
1467
1008
1413
1774
2111
1109
1136
1508
1376
1055
1203
1965
Mediana
3515.56
5511.55
3629.23
2988.81
1155.57
402.63
4698.20
4464.43
3812.29
3684.20
3044.08
1818.44
4655.03
4428.39
2810.59
3277.63
4508.64
-516.33
3307.18
1955.54
6647.84
4219.23
5799.77
6458.61
441.08
4326.72
4143.85
10636.87
5431.62
5609.00
10013.30
4042.77
6552.55
7182.67
5561.71
8487.55
5432.16
8198.41
2470.71
5455.04
5815.21
3507.44
118
Error
MAX
PROM
1739.31 5254.87
1273.84 6785.38
1304.31 4933.54
1283.92 4272.73
4523.17 5678.74
2795.46 3198.09
3102.18 7800.38
1151.10 5615.53
2419.52 6231.81
1068.12 4752.32
1717.08 4761.16
1569.25 3387.69
1076.58 5731.61
1683.20 6111.60
560.51 3371.10
2007.82 5285.45
1267.64 5776.27
1419.67
903.34
945.97 4253.15
1501.17 3456.71
2271.67 8919.51
1332.16 5551.39
1083.37 6883.14
1884.15 8342.76
1216.88 1657.95
422.20 4748.93
1858.28 6002.12
2016.14 12653.01
930.98 6362.60
707.34 6316.34
1779.90 11793.20
1140.33 5183.11
1486.68 8039.23
1898.88 9081.55
2219.61 7781.32
1464.60 9952.15
1211.29 6643.44
1790.62 9989.03
1445.59 3916.30
1330.34 6785.38
1493.47 7308.68
2486.42 5993.86
MAX
Fs
ESPERADO MED
4974.69
6686.99
4851.42
4441.59
5550.89
3192.00
8084.73
5765.09
6402.16
4840.39
4656.03
3331.74
5856.69
6190.82
3380.71
5307.68
5749.45
873.66
4257.11
3403.87
8874.24
5340.35
6865.84
8036.90
1709.47
4754.42
6149.77
12863.54
6262.48
6306.04
11964.13
5388.22
8152.16
9163.02
8065.73
9813.94
6751.57
10069.17
4065.06
6605.45
7315.98
5960.18
8.42%
10.87%
7.91%
6.85%
9.10%
5.13%
12.50%
9.00%
9.99%
7.62%
7.63%
5.43%
9.19%
9.79%
5.40%
8.47%
9.26%
1.45%
6.82%
5.54%
14.29%
8.90%
11.03%
13.37%
2.66%
7.61%
9.62%
20.28%
10.20%
10.12%
18.90%
8.31%
12.88%
14.55%
12.47%
15.95%
10.65%
16.01%
6.28%
10.87%
11.71%
9.61%
Fs ESP
7.97%
10.72%
7.77%
7.12%
8.90%
5.12%
12.96%
9.24%
10.26%
7.76%
7.46%
5.34%
9.39%
9.92%
5.42%
8.51%
9.21%
1.40%
6.82%
5.45%
14.22%
8.56%
11.00%
12.88%
2.74%
7.62%
9.86%
20.61%
10.04%
10.11%
19.17%
8.63%
13.06%
14.68%
12.93%
15.73%
10.82%
16.14%
6.51%
10.59%
11.72%
9.55%
Fu
MED
61.6%
79.8%
71.9%
73.9%
18.1%
12.4%
63.9%
82.2%
63.9%
79.4%
61.7%
52.0%
83.4%
73.8%
83.7%
62.4%
77.6%
0.0%
77.9%
55.0%
74.0%
72.2%
84.0%
73.7%
29.7%
91.2%
71.5%
85.7%
83.8%
88.6%
86.4%
82.0%
82.9%
80.0%
75.1%
83.9%
83.4%
82.9%
66.9%
77.7%
79.7%
58.0%
Da
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
Valore
Perodo
esperado
13
13
13
13
13
13
13
14
14
14
14
14
14
14
15
15
15
15
15
15
15
16
16
16
16
16
16
16
17
17
17
17
17
17
17
18
18
18
18
18
18
18
4566.05
2712.77
3792.20
2113.03
2870.26
3898.36
4267.08
3261.13
106.22
468.98
-1746.42
-127.29
555.21
2718.06
3168.19
-344.49
-352.93
-415.09
-747.07
586.37
3437.64
1679.85
4308.93
3369.63
-1907.47
2562.12
1895.39
1621.36
3952.44
5043.50
1642.07
1020.47
1587.06
129.62
3889.06
1264.33
8036.26
2814.36
1644.44
1560.19
5153.53
3471.88
Ancho
de
Clase
668
1408
1125
1671
1263
861
432
675
867
834
396
351
371
1272
636
1316
1452
869
671
412
636
1300
801
965
317
1536
1061
645
1256
515
804
845
1595
772
1539
836
472
1194
900
1020
1429
1104
Mediana
4547.68
2806.69
3632.24
1842.75
3106.25
4006.15
4191.49
3319.81
201.42
480.97
-1749.88
-135.80
517.77
2517.96
3145.18
-430.56
-269.10
-402.23
-705.36
552.70
3477.67
1644.82
4269.80
3303.43
-1886.67
2310.23
1992.10
1646.27
3998.41
5042.99
1597.63
1016.63
1613.22
263.30
3864.09
1263.49
8068.25
2830.92
1648.47
1671.06
5112.21
3488.80
119
Error
MAX
PROM
656.56 5204.24
1580.83 4387.52
1137.65 4769.90
1725.71 3568.46
1302.00 4408.25
1023.88 5030.03
435.80 4627.29
740.27 4060.08
993.47 1194.90
1005.18 1486.15
458.88 -1291.00
327.97
192.17
391.04
908.81
1475.48 3993.44
587.16 3732.34
1613.29 1182.73
1523.29 1254.19
1027.17
624.94
697.75
-7.61
402.55
955.25
624.05 4101.71
1407.94 3052.76
990.29 5260.09
948.83 4252.26
319.23 -1567.44
1742.11 4052.34
971.54 2963.63
600.22 2246.49
1297.28 5295.69
541.27 5584.26
836.85 2434.49
876.75 1893.38
1812.33 3425.55
803.62 1066.91
1729.97 5594.06
949.20 2212.69
574.70 8642.95
1414.08 4244.99
1082.35 2730.81
1236.22 2907.28
1381.22 6493.43
1112.94 4601.74
MAX
Fs
ESPERADO MED
5222.61
4293.61
4929.85
3838.75
4172.26
4922.24
4702.88
4001.40
1099.69
1474.16
-1287.54
200.68
946.25
4193.54
3755.35
1268.80
1170.36
612.08
-49.31
988.92
4061.69
3087.79
5299.22
4318.45
-1588.25
4304.23
2866.92
2221.58
5249.71
5584.77
2478.92
1897.22
3399.39
933.24
5619.03
2213.53
8610.96
4228.43
2726.79
2796.41
6534.75
4584.82
8.34%
7.03%
7.64%
5.72%
7.06%
8.06%
7.42%
6.51%
1.91%
2.38%
-2.07%
0.31%
1.46%
6.40%
5.98%
1.90%
2.01%
1.00%
-0.01%
1.53%
6.57%
4.89%
8.43%
6.81%
-2.51%
6.49%
4.75%
3.60%
8.49%
8.95%
3.90%
3.03%
5.49%
1.71%
8.96%
3.55%
13.85%
6.80%
4.38%
4.66%
10.41%
7.37%
Fs ESP
8.37%
6.88%
7.90%
6.15%
6.69%
7.89%
7.54%
6.41%
1.76%
2.36%
-2.06%
0.32%
1.52%
6.72%
6.02%
2.03%
1.88%
0.98%
-0.08%
1.58%
6.51%
4.95%
8.49%
6.92%
-2.55%
6.90%
4.59%
3.56%
8.41%
8.95%
3.97%
3.04%
5.45%
1.50%
9.00%
3.55%
13.80%
6.78%
4.37%
4.48%
10.47%
7.35%
Fu
MED
87.7%
61.8%
79.5%
59.2%
65.1%
77.5%
92.2%
80.3%
8.9%
31.6%
0.0%
0.0%
61.1%
68.1%
84.9%
0.0%
0.0%
0.0%
0.0%
61.4%
83.8%
55.0%
81.9%
79.2%
0.0%
63.2%
64.0%
72.2%
74.6%
90.3%
67.5%
53.9%
46.3%
12.1%
69.5%
57.1%
93.0%
66.3%
60.2%
53.7%
79.4%
75.4%
Da
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
lun
mar
mi
jue
vie
sb
dom
Valore
Perodo
esperado
19
19
19
19
19
19
19
20
20
20
20
20
20
20
21
21
21
21
21
21
21
22
22
22
22
22
22
22
23
23
23
23
23
23
23
24
24
24
24
24
24
24
4122.07
7887.13
3595.00
4767.17
2423.39
3519.33
796.14
4957.59
4846.08
1851.68
3622.82
-2550.90
-39.97
3416.62
4735.09
2113.54
1489.50
1091.70
-2259.67
-1613.86
2749.57
4083.57
470.92
1482.61
571.94
-1496.11
-2433.18
107.91
1956.95
246.72
1465.08
1258.28
528.23
-267.59
2.25
1409.66
-372.71
489.95
168.91
617.27
2027.23
317.96
Ancho
de
Clase
575
896
1425
946
2600
1241
736
752
766
611
755
1903
995
402
727
802
395
1190
808
312
507
1038
643
683
461
461
717
465
150
229
444
321
229
682
338
371
356
214
240
362
823
218
Mediana
4138.45
7947.23
3701.33
4862.16
1936.03
3373.38
864.27
5009.83
4771.13
1908.89
3681.58
-2679.34
11.88
3388.59
4736.79
2076.42
1520.35
1310.69
-2345.89
-1634.71
2687.67
4034.14
525.74
1484.95
540.59
-1454.59
-2456.88
51.06
1953.72
256.22
1459.59
1220.64
516.40
-295.73
19.76
1371.23
-404.02
487.12
118.75
593.25
1959.15
288.25
120
Error
MAX
PROM
512.85 4651.30
946.36 8893.59
1419.87 5121.20
895.66 5757.82
2909.63 4845.66
1213.91 4587.30
810.10 1674.36
820.76 5830.58
750.05 5521.18
707.83 2616.73
794.16 4475.73
1956.09 -723.25
990.04 1001.92
434.89 3823.48
753.50 5490.29
841.08 2917.50
388.65 1909.00
1171.69 2482.39
888.26 -1457.63
320.09 -1314.62
504.13 3191.80
1100.90 5135.04
598.60 1124.34
713.37 2198.32
465.94 1006.53
533.53
-921.06
730.21 -1726.67
532.89
583.95
151.56 2105.29
205.27
461.49
434.24 1893.83
284.65 1505.30
228.60
744.99
682.90
387.17
352.81
372.56
386.73 1757.96
405.29
1.27
211.09
698.21
222.48
341.23
434.19 1027.44
931.53 2890.68
202.68
490.94
MAX
Fs
ESPERADO MED
4634.92
8833.49
5014.87
5662.83
5333.02
4733.25
1606.24
5778.35
5596.13
2559.51
4416.98
-594.82
950.07
3851.51
5488.59
2954.62
1878.15
2263.39
-1371.41
-1293.76
3253.70
5184.47
1069.52
2195.98
1037.88
-962.58
-1702.97
640.80
2108.51
451.99
1899.32
1542.93
756.83
415.30
355.06
1796.39
32.58
701.04
391.39
1051.46
2958.76
520.64
7.45%
14.25%
8.21%
9.23%
7.77%
7.35%
2.68%
9.34%
8.85%
4.19%
7.17%
-1.16%
1.61%
6.13%
8.80%
4.68%
3.06%
3.98%
-2.34%
-2.11%
5.12%
8.23%
1.80%
3.52%
1.61%
-1.48%
-2.77%
0.94%
3.37%
0.74%
3.03%
2.41%
1.19%
0.62%
0.60%
2.82%
0.00%
1.12%
0.55%
1.65%
4.63%
0.79%
Fs ESP
7.43%
14.16%
8.04%
9.08%
8.55%
7.59%
2.57%
9.26%
8.97%
4.10%
7.08%
-0.95%
1.52%
6.17%
8.80%
4.73%
3.01%
3.63%
-2.20%
-2.07%
5.21%
8.31%
1.71%
3.52%
1.66%
-1.54%
-2.73%
1.03%
3.38%
0.72%
3.04%
2.47%
1.21%
0.67%
0.57%
2.88%
0.05%
1.12%
0.63%
1.69%
4.74%
0.83%
Fu
MED
88.6%
88.7%
70.2%
82.8%
50.0%
76.7%
47.5%
85.0%
87.8%
70.8%
80.9%
0.0%
0.0%
89.4%
86.2%
72.4%
78.0%
44.0%
0.0%
0.0%
86.1%
79.5%
41.9%
67.4%
56.8%
0.0%
0.0%
18.5%
93.0%
53.5%
77.4%
83.6%
70.9%
0.0%
0.6%
80.2%
0.0%
70.2%
49.5%
60.1%
70.1%
64.8%
Da
Ancho
de Mediana Error
Clase
MAXIMOS VALORES ESPERADOS
Valore
Perodo
esperado
121
MAX
PROM
MAX
Fs
ESPERADO MED
Fs ESP
Fu
MED
ANEXO 2
Despacho 2015 CENACE Sin Cocinas de Induccin
122
HIDROLOGA ALTA
AGOYH
ETAPA
ALAZANH
MWh
BABAH
MWh
CALOH
MWh
CHORRILLO
MWh
MWh
SDELSITANIS ADUDASH
MWh
HABAH
MWh
MANDURIAC MAZAH
MWh
MWh
MINASH
MWh
MLANH
MWh
OCAH
MWh
PAUTH
MWh
PILATNH
MWh
MWh
PUCAH
QUIJOSH
MWh
MWh
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
737.5
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
661.3
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
655.4
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
638.5
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
657.5
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
817.4
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
798.5
64.5
20.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
861.4
64.5
20.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1033.5
64.5
20.0
40.0
10
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1056.6
64.5
20.0
40.0
11
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1064.4
64.5
20.0
40.0
12
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1063.6
64.5
20.0
40.0
13
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1064.5
64.5
20.0
40.0
14
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1063.4
64.5
20.0
40.0
15
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1061.7
64.5
20.0
40.0
16
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1062.9
64.5
20.0
40.0
17
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1064.9
64.5
20.0
40.0
18
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1064.7
64.5
20.0
40.0
19
154.0
6.2
19.2
12.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1024.1
64.5
73.0
40.0
20
154.0
6.2
19.2
12.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1025.5
64.5
73.0
40.0
21
154.0
6.2
19.2
12.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1032.0
64.5
73.0
40.0
22
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1064.8
64.5
20.0
40.0
23
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
900.2
64.5
20.0
40.0
24
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
736.7
64.5
0.0
40.0
TOTAL 3696.0
148.6
460.8
204.0
96.0 2784.0
360.0
924.0
499.0
960.0
821.4 3485.0
123
60.0 1224.0
HIDROLOGA ALTA
SAN
ANTONI
ETAPA
MWh
SFRAH
SIBIH
MWh
SJ
SOPLADORAH TOACHIH
TAMBOH
MWh
MWh
MWh
MWh
TOPOH
MWh
MWh
MWh
7.2
212.0
30.0
8.0
290.1
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
249.0
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
245.8
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
236.7
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
246.9
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
333.2
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
323.0
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
357.0
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
449.9
128.5
22.0
10.0
10.0
3.0
10
7.2
212.0
30.0
8.0
462.3
128.5
22.0
10.0
10.0
3.0
11
7.2
212.0
30.0
8.0
466.5
128.5
22.0
10.0
10.0
3.0
12
7.2
212.0
30.0
8.0
466.1
128.5
22.0
10.0
10.0
3.0
13
7.2
212.0
30.0
8.0
466.6
128.5
22.0
10.0
10.0
5.0
14
7.2
212.0
30.0
8.0
466.0
128.5
22.0
10.0
10.0
5.0
15
7.2
212.0
30.0
8.0
465.1
128.5
22.0
10.0
10.0
5.0
16
7.2
212.0
30.0
8.0
465.7
128.5
22.0
10.0
10.0
5.0
17
7.2
212.0
30.0
8.0
466.8
128.5
22.0
10.0
10.0
8.0
18
7.2
212.0
30.0
8.0
466.7
128.5
22.0
10.0
10.0
8.0
19
7.2
212.0
30.0
8.0
444.8
128.5
22.0
10.0
10.0
8.0
20
7.2
212.0
30.0
8.0
445.6
128.5
22.0
10.0
10.0
8.0
21
7.2
212.0
30.0
8.0
449.1
128.5
22.0
10.0
10.0
8.0
MWh
MWh
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
124
MWh
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
MWh
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
MWh
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
MWh
MWh
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
22
7.2
212.0
30.0
8.0
466.7
128.5
22.0
10.0
10.0
3.0
23
7.2
212.0
30.0
8.0
377.9
128.5
22.0
10.0
10.0
3.0
24
7.2
212.0
30.0
8.0
289.7
128.5
22.0
10.0
10.0
3.0
7.2
7.2
7.2
172.8
TOTAL 173.8 5088.0 720.0 192.0 9397.3 3084.0 528.0 240.0 240.0 105.0
HIDROLOGA ALTA
125
1.8
1.8
1.8
43.2
2.4
2.4
2.4
57.6
30.0
30.0
30.0
720.0
10.5
10.5
10.5
252.0
4.0
4.0
4.0
96.0
4.0
4.0
4.0
96.0
LOREH0A
ETAPA
MWh
LPLAH0A
MWh
NAYOH0A PAPAH0A
MWh
MWh
PASOH0A
MWh
PENIH0A
MWh
RBLAH0A
MWh
RCHIH0A
MWh
RECUH0A SAUCH0A
MWh
MWh
SAYMH0A SMIGH0A
MWh
MWh
MWh
MWh
MWh
MWh
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
12.0
11.0
9.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
12.0
10.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
14.0
13.0
9.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
12.0
9.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
12.0
8.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
12.0
10.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
14.0
12.0
11.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
12.0
13.0
8.0
14.0
0.0
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
13.0
8.0
14.0
0.0
10
11
2.0
2.0
0.8
0.8
15.0
15.0
6.2
6.2
3.2
3.2
1.5
1.5
2.4
2.4
0.4
0.4
13.8
13.8
17.5
17.5
0.0
13.5
2.8
2.8
15.0
15.0
13.0
12.0
5.0
10.0
14.0
14.0
0.0
0.0
12
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
13.5
2.8
15.0
11.0
6.0
14.0
0.0
13
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
13.5
2.8
18.0
12.0
8.0
14.0
0.0
14
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
13.5
2.8
15.0
11.0
6.0
14.0
0.0
15
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
18.0
14.4
2.8
15.0
12.0
4.0
14.0
0.0
16
2.0
0.8
18.3
6.2
3.2
1.5
2.4
0.4
13.8
18.0
14.4
2.8
16.0
12.0
5.0
14.0
0.0
17
2.0
0.8
18.3
6.2
3.2
1.5
2.4
0.4
13.8
18.0
14.4
2.8
14.0
11.0
3.0
14.0
0.0
18
2.0
0.8
18.3
6.2
3.2
1.5
2.4
0.4
13.8
18.0
14.4
2.8
16.0
14.0
2.0
14.0
0.0
19
2.0
0.8
29.6
6.2
3.2
1.5
2.4
0.4
13.8
20.5
14.4
2.8
15.0
12.0
2.0
14.0
0.0
20
2.0
0.8
29.6
6.2
3.2
1.5
2.4
0.4
13.8
24.0
14.4
2.8
15.0
12.0
2.0
14.0
0.0
21
2.0
0.8
29.6
6.2
3.2
1.5
2.4
0.4
13.8
23.0
14.4
2.8
16.0
12.0
3.0
14.0
0.0
22
23
2.0
2.0
0.8
0.8
26.0
21.5
6.2
6.2
3.2
3.2
1.5
1.5
2.4
2.4
0.4
0.4
13.8
13.8
17.5
17.5
14.0
0.0
2.8
2.8
15.0
16.0
12.0
12.0
3.0
6.0
14.0
14.0
0.0
0.0
24
TOTAL
2.0
0.8
21.5
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
16.0
11.0
5.0
14.0
0.0
48.0
19.2
424.9
148.8
76.8
36.0
57.6
9.6
331.2
437.0
168.8
67.2
359.0
289.0
152.0
336.0
0.0
126
HIDROLOGA ALTA
GZEVTVA03
GZEVTVA02
ETAPA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
MWh
MWh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
59.0
169.2
201.0
161.5
206.2
215.1
155.0
85.1
85.5
295.0
285.0
160.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
78.0
78.0
78.0
78.0
108.0
78.0
0.0
MWh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
78.0
78.0
78.0
78.0
108.0
78.0
0.0
MWh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
78.0
78.0
78.0
78.0
108.0
78.0
0.0
MWh
MWh
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
78.0
78.0
78.0
78.0
108.0
78.0
127
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
78.0
78.0
78.0
78.0
108.0
78.0
0.0
MWh
MWh
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
65.0
72.8
65.0
65.0
MWh
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
26.0
22
23
24
TOTAL
141.2
59.0
59.0
2336.9
0.0
0.0
0.0
498.0
0.0
0.0
0.0
498.0
0.0
0.0
0.0
498.0
0.0
0.0
0.0
498.0
0.0
0.0
0.0
498.0
65.0
65.0
65.0
1567.8
26.0
26.0
26.0
624.0
26.0
26.0
26.0
624.0
HIDROLOGA ALTA
4500.0
4000.0
3500.0
MWh
MWh
MWh
MWh
MWh
MWh
2246.4
2129.0
2120.0
2094.0
2123.2
2369.4
2360.3
2542.2
2808.7
2844.3
2869.7
2868.6
2871.9
2870.3
2869.0
2874.1
46.0
51.0
50.0
50.0
49.0
51.0
51.0
47.0
50.0
47.0
51.0
46.0
52.0
46.0
45.0
47.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
59.0
169.2
201.0
161.5
206.2
527.1
545.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2469.4
2357.0
2347.0
2321.0
2349.2
2597.4
2588.3
2766.2
3035.7
3127.3
3266.9
3292.6
3262.4
3299.5
3618.1
3643.1
3000.0
Diesel
2500.0
Fuel Oil
Gas Natural
2000.0
Renovables
1500.0
1000.0
500.0
0.0
1
128
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
2880.2
2880.0
2888.2
2894.0
2902.9
2881.8
2610.0
2338.3
63136.5
42.0
46.0
43.0
43.0
45.0
44.0
48.0
46.0
1136.0
475.1
475.5
805.0
705.0
238.2
141.2
59.0
59.0
4826.9
177.0
177.0
184.8
177.0
177.0
177.0
177.0
177.0
4255.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3574.3
3578.5
3921.1
3819.0
3363.1
3244.1
2894.0
2620.3
73355.2
HIDROLOGA BAJA
AGOYH
ETAPA
ALAZANH
MWh
BABAH
MWh
CALOH
MWh
CHORRILLO
MWh
MWh
SDELSITANIS
MWh
ADUDASH
HABAH
MWh
MANDURIAC UMAZAH
MWh
MWh
MLANH
MWh
OCAH
MWh
PAUTH
MWh
PILATNH
MWh
MWh
PUCAH
QUIJOSH
MWh
SAN ANTONI
MWh
MWh
SFRAH
MWh
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
51.0
26.0
737.5
64.5
0.0
40.0
7.1
160.0
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
51.0
26.0
661.3
64.5
0.0
40.0
7.1
160.0
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
51.0
26.0
655.4
64.5
0.0
40.0
7.1
160.0
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
638.5
64.5
0.0
40.0
7.1
160.0
77.0
4.6
19.2
2.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
657.5
64.5
0.0
40.0
7.1
160.0
77.0
4.6
19.2
2.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
817.4
64.5
0.0
40.0
7.1
160.0
77.0
4.6
19.2
2.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
798.5
64.5
73.0
40.0
7.1
160.0
77.0
4.6
19.2
2.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
861.4
64.5
73.0
40.0
7.1
160.0
129
77.0
4.6
19.2
2.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1033.5
64.5
73.0
40.0
7.1
160.0
10
77.0
4.6
19.2
3.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1056.6
64.5
73.0
40.0
7.1
160.0
11
77.0
4.6
19.2
3.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1064.4
64.5
73.0
40.0
7.1
160.0
12
77.0
4.6
19.2
4.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1063.6
64.5
73.0
40.0
7.1
160.0
13
77.0
4.6
19.2
4.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1064.5
64.5
73.0
40.0
7.1
160.0
14
77.0
4.6
19.2
4.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1063.4
64.5
73.0
40.0
7.1
160.0
15
77.0
4.6
19.2
4.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1061.7
64.5
73.0
40.0
7.1
160.0
16
77.0
4.6
19.2
5.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1062.9
64.5
73.0
40.0
7.1
160.0
17
77.0
4.6
19.2
5.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1064.9
64.5
73.0
40.0
7.1
160.0
18
77.0
4.6
19.2
5.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1064.7
64.5
73.0
40.0
7.1
160.0
19
77.0
4.6
19.2
5.0
1.8
115.3
5.3
38.5
39.3
160.0
176.0
26.0
1024.1
64.5
73.0
40.0
7.1
160.0
20
77.0
4.6
19.2
5.0
1.8
115.3
5.3
38.5
39.3
160.0
176.0
26.0
1025.5
64.5
73.0
40.0
7.1
160.0
21
77.0
4.6
19.2
3.0
1.8
115.3
5.3
38.5
39.3
160.0
176.0
26.0
1032.0
64.5
73.0
40.0
7.1
160.0
22
77.0
4.6
19.2
3.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1064.8
64.5
73.0
40.0
7.1
160.0
23
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
51.0
26.0
900.2
64.5
73.0
40.0
7.1
160.0
24
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
51.0
26.0
736.7
64.5
0.0
40.0
7.1
160.0
1848.0
111.5
461.2
63.0
42.2
2767.2
128.3
924.0
942.8
2265.0
3599.0
624.0
22211.0
1548.0
1240.9
960.0
169.9
3840.0
SOPLADORAH
TOACHIH
ALAOH0A
AMBIH0A
CMORH0A
CUMBH0A
GUANH0A
ILL1H0A
ILL2H0A
LOREH0A
LPLAH0A
TOTAL
HIDROLOGA BAJA
SIBIH
ETAPA
SJ TAMBOH
MWh
MWh
MWh
MWh
TOPOH
VICTORIAH
MWh
MWh
MWh
CARMH0A
MWh
CHILH0A
MWh
MWh
MWh
MWh
MWh
MWh
MWh
MWh
MWh
5.0
8.0
127.0
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
5.0
8.0
109.3
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
5.0
8.0
99.7
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
5.0
8.0
59.4
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
5.0
8.0
74.6
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
5.0
8.0
152.8
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
5.0
8.0
133.8
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
130
5.0
8.0
209.2
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
5.0
8.0
293.7
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
10
5.0
8.0
330.8
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
16.0
6.0
2.0
2.2
1.7
0.8
11
5.0
8.0
367.7
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
16.0
6.0
2.0
2.2
1.7
0.8
12
5.0
8.0
404.6
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
20.0
6.0
2.0
2.2
1.7
0.8
13
5.0
8.0
395.9
110.0
22.0
7.3
9.0
5.0
2.5
1.8
1.2
20.0
6.0
2.0
2.2
1.7
0.8
14
5.0
8.0
428.3
110.0
22.0
7.3
9.0
5.0
2.5
1.8
1.2
17.0
6.0
2.0
2.2
1.7
0.8
15
5.0
8.0
440.2
110.0
22.0
7.3
9.0
5.0
2.5
1.8
1.2
18.0
6.0
2.0
2.2
1.7
0.8
16
5.0
8.0
448.6
110.0
22.0
7.3
9.0
5.0
2.5
1.8
1.2
15.0
6.0
2.0
2.2
1.7
0.8
17
5.0
8.0
429.3
110.0
22.0
7.3
9.0
8.0
2.5
1.8
1.2
12.0
6.0
2.0
2.2
1.7
0.8
18
5.0
8.0
461.8
110.0
22.0
7.3
9.0
8.0
2.5
1.8
1.2
12.0
6.0
2.0
2.2
1.7
0.8
19
5.0
8.0
440.8
110.0
22.0
7.3
9.0
8.0
2.5
1.8
1.2
24.0
6.0
2.0
2.2
1.7
0.8
20
5.0
8.0
442.4
110.0
22.0
7.3
9.0
8.0
2.5
1.8
1.2
24.0
6.0
2.0
2.2
1.7
0.8
21
5.0
8.0
381.0
110.0
22.0
7.3
9.0
8.0
2.5
1.8
1.2
30.0
6.0
2.0
2.2
1.7
0.8
22
5.0
8.0
381.0
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
30.0
6.0
2.0
2.2
1.7
0.8
23
5.0
8.0
305.4
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
20.0
6.0
2.0
2.2
1.7
0.8
24
5.0
8.0
207.3
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
10.0
6.0
2.0
2.2
1.7
0.8
120.0
192.0
7124.5
2640.0
528.0
175.2
216.0
105.0
60.0
43.2
28.8
365.0
144.0
48.0
52.8
40.8
19.2
ECOETNC01
EDOSTNC01
SASCTNC01
TOTAL
HIDROLOGA BAJA
NAYOH0A
ETAPA
PAPAH0A
MWh
PASOH0A
MWh
PENIH0A
MWh
RBLAH0A
MWh
MWh
RECUH0A
SAUCH0A
SAYMH0A
SMIGH0A
MWh
MWh
MWh
MWh
MWh
MWh
MWh
VILLONACO
MWh
CCTGMACHALA
MWh
TGM2TTG01
MWh
9.0
2.0
3.2
0.6
1.6
13.0
11.0
10.0
2.8
18.0
15.0
9.0
7.0
295.0
18.0
9.0
2.0
3.2
0.6
1.6
13.0
11.0
10.0
2.8
19.0
15.0
8.0
7.0
295.0
18.0
9.0
2.0
3.2
0.6
1.6
13.0
11.0
10.0
2.8
18.0
16.0
7.0
7.0
295.0
18.0
131
9.0
2.0
3.2
0.6
1.6
13.0
11.0
10.0
2.8
17.0
15.0
7.0
7.0
284.1
13.0
9.0
2.0
3.2
0.6
1.6
13.0
11.0
10.0
2.8
19.0
15.0
7.0
7.0
295.0
18.0
9.0
2.0
3.2
0.6
1.6
13.0
11.0
10.0
2.8
16.0
15.0
10.0
7.0
295.0
18.0
9.0
2.0
3.2
0.6
1.6
13.0
11.0
10.0
2.8
18.0
13.0
10.0
7.0
295.0
18.0
9.0
2.0
3.2
0.6
1.6
13.0
11.0
10.0
2.8
18.0
13.0
10.0
7.0
295.0
18.0
30.0
2.0
3.2
0.6
1.6
13.0
11.0
10.0
2.8
18.0
10.0
8.0
7.0
295.0
18.0
10
30.0
2.0
3.2
0.6
1.6
13.0
11.0
10.0
2.8
12.0
10.0
7.0
7.0
295.0
18.0
11
30.0
2.0
3.2
0.6
1.6
13.0
12.0
10.0
2.8
19.0
11.0
7.0
7.0
295.0
18.0
12
30.0
2.0
3.2
0.6
1.6
13.0
12.0
10.0
2.8
17.0
2.0
7.0
7.0
295.0
18.0
13
30.0
2.0
3.2
0.6
1.6
13.0
13.0
10.0
2.8
18.0
2.0
8.0
7.0
295.0
18.0
14
15.0
2.0
3.2
0.6
1.6
13.0
13.0
10.0
2.8
18.0
12.0
8.0
7.0
295.0
18.0
15
30.0
2.0
3.2
0.6
1.6
13.0
13.0
10.0
2.8
18.0
12.0
8.0
7.0
295.0
18.0
16
12.0
2.0
3.2
0.6
1.6
13.0
13.0
10.0
2.8
11.0
17.0
8.0
7.0
295.0
18.0
17
10.0
2.0
3.2
0.6
1.6
13.0
13.0
10.0
2.8
18.0
5.0
4.0
7.0
295.0
18.0
18
10.0
2.0
3.2
0.6
1.6
13.0
13.0
10.0
2.8
16.0
14.0
6.0
7.0
295.0
18.0
19
22.0
2.0
3.2
0.6
1.6
13.0
24.0
10.0
2.8
17.0
13.0
5.0
7.0
295.0
18.0
20
22.0
2.0
3.2
0.6
1.6
13.0
24.0
10.0
2.8
14.0
14.0
5.0
7.0
295.0
18.0
21
30.0
2.0
3.2
0.6
1.6
13.0
21.0
10.0
2.8
15.0
16.0
7.0
7.0
295.0
18.0
22
30.0
2.0
3.2
0.6
1.6
13.0
21.0
10.0
2.8
19.0
16.0
7.0
7.0
295.0
18.0
23
30.0
2.0
3.2
0.6
1.6
13.0
13.0
10.0
2.8
17.0
16.0
3.0
7.0
295.0
18.0
24
30.0
2.0
3.2
0.6
1.6
13.0
12.0
10.0
2.8
16.0
16.0
6.0
7.0
295.0
18.0
463.0
48.0
76.8
14.4
38.4
312.0
327.0
240.0
67.2
406.0
303.0
172.0
168.0
7069.1
427.0
TOTAL
HIDROLOGA BAJA
GZEVTVA03
132
ETAPA
MWh
MWh
MWh
MWh
MWh
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
26
26
26
26
26
40.0
65.0
26.0
26.0
0.0
10.0
50.0
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
10
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
11
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
12
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
13
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
14
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
15
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
16
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
17
36
36
36
36
36
40.0
65.0
26.0
26.0
0.0
10.0
50.0
18
36
36
36
36
36
40.0
65.0
26.0
26.0
41.9
10.0
50.0
19
36
36
36
36
36
40.0
130.0
26.0
26.0
41.9
14.4
50.0
20
36
36
36
36
36
40.0
65.0
26.0
26.0
41.9
10.0
50.0
21
36
36
36
36
36
40.0
65.0
26.0
26.0
18.2
10.0
50.0
22
36
36
36
36
36
40.0
65.0
26.0
26.0
19.3
10.0
50.0
23
36
36
36
36
36
40.0
65.0
26.0
26.0
19.3
10.0
50.0
24
36
36
36
36
36
40.0
65.0
26.0
26.0
19.3
10.0
50.0
960.0
1625.0
624.0
624.0
201.6
244.4
1200.0
TOTAL
854.0
854.0
854.0
854.0
854.0
MWh
MWh
MWh
MWh
133
MWh
MWh
MWh
HIDROLOGA BAJA
Hidroelctrica
Renovables
Gas Natural
Fuel Oil
Diesel
MWh
MWh
MWh
MWh
MWh
VICTTTG01
MWh
1843.8
49.0
533.0
177.0
0.0
2602.8
1749.9
49.0
533.0
177.0
0.0
2508.9
1734.4
48.0
533.0
177.0
0.0
2492.4
1802.2
46.0
467.1
177.0
0.0
2492.4
1838.5
48.0
533.0
177.0
0.0
2596.5
2076.6
48.0
533.0
177.0
0.0
2834.6
2111.6
48.0
533.0
177.0
0.0
2869.6
2249.9
48.0
533.0
177.0
0.0
3007.9
2527.5
43.0
533.0
177.0
0.0
3280.5
Fuel Oil
2595.7
36.0
533.0
177.0
0.0
3341.7
Gas Natural
2641.3
44.0
533.0
177.0
0.0
3395.3
Renovables
2682.5
33.0
533.0
177.0
0.0
3425.5
2677.7
35.0
533.0
177.0
0.0
3422.7
2691.0
45.0
533.0
177.0
0.0
3446.0
2717.2
45.0
533.0
177.0
0.0
3472.2
2706.8
43.0
533.0
177.0
0.0
3459.8
2687.5
34.0
533.0
177.0
0.0
3431.5
2719.9
43.0
533.0
218.9
0.0
3514.8
2768.2
42.0
533.0
333.9
0.0
3677.1
2771.3
40.0
533.0
254.9
0.0
3599.2
2725.3
45.0
533.0
204.3
0.0
3507.6
2678.1
49.0
533.0
205.4
0.0
3465.4
2291.9
43.0
533.0
205.4
0.0
3073.3
1946.3
45.0
533.0
205.4
0.0
2729.7
57235.3
1049.0
12726.1
4637.0
0.0
75647.4
Hidroelctrica
134
ANEXO 3
Diagrama y Configuracin del SNI
135
Como primer paso es necesario realzar el diagramas del S.N.I, para lo cual se realiza el ingresar
generadores, barras, compensadores reactivos, lneas de transmisin y cargas, en el presente
diagrama fue tomado como referencia para la construccin del S.N.I, en el Anexo 2 se muestra
el diagrama del S.N.I, desarrollado en DigSilent Power Factory, el mismo que permite
desarrollar escenarios de simulacin, para los casos planteados.
136
137
Es importante ingresar para cada sistema las caractersticas placa de cada uno de los elementos
que conforman el S.N.I, para ello se dividir en los siguientes sistemas:
GENERADORES.
4.1.2. Para ingresar un generador en Digsilent se debe tomar las siguientes consideraciones:
1. En la ventana Datos Basicos, seleccionar el tipo de Generador/Motor para este caso se
seleccionar generador.
2. Maquinas en paralelo, para este caso sera 1
3. En el menu type, seleccionar Nuevo proyecto tipo.
138
3
2
1
Una vez seleccionado nuevo proyecto tipo se despliega Datos Bsicos en la cual se ingresa:
1. Potencia Aparente Nominal 116,67 MVA, que es la potencia de placa de uno de los
generadores de paute.
2. Voltaje nominal 13,8kV, que es el voltaje de placa del generador.
3. Factor de potencia, para este caso 0,9, que es la cantidad de potencia activa y reactiva
que puede entregar este generador.
4. Conexin, la configuracin del generador, para este caso es una conexin Y
NEUTRO.
139
1
2
3
4
Una vez ingresados los parmetros en Datos Bsicos, se ingresa a la pestaa de Flujo de Carga,
en la cual se ingresa los siguientes parmetros:
1. Reactancia sincrnica, Xd y Xq, 1,09 y 074 respectivamente, valores definidos en los
parmetros tcnicos del generador.
2. Lmites de potencia reactiva: mnimo -0,36 mximo 0,54 en pu, este valor indica la
capacidad mxima y mnima del generador para entregar potencia reactiva.
3. Datos de Secuencia Zero, x0 y r0 0,11 y 0, valores definidos en los parmetros del
generador, as permite conocer los clculos asociados con la tierra para que tenga un
estado existente desequilibrado.
4. Datos de Secuencia Negativa, x0 y r0, 0.195 y 0,00045 valores definidos en los
parmetros tcnicos del generador, permiten medir la cantidad de desequilibrio que
soporta un sistema de energa.
140
Grfico 7, Pestaa de Flujo de carga - Datos del generador para la determinacin del flujo de potencia.
Fuente: DigSilent Power Factory
Una vez ingresados los parmetros de Flujo de Carga, se ingresa a la pestaa de Flujo de Carga,
en la cual se ingresa los siguientes parmetros:
1. Reactancia subtransitoria, xd0,1992, dato que permite realizar el anlisis de
cortocircuitos. definidos en los parmetros tcnicos del generador.
2. Resistencia del estator, rstr 0,00284, valores definidos en los parmetros del generador.
141
Grfico 8, Pestaa de Datos Bsicos - Valores de reactancia de secuencias cero y negativa para
determinacin de Cortocircuitos.
Fuente: DigSilent Power Factory
Una vez ingresado todos los parmetros del generador, se presiona OK se despliega la pantalla
al men principal, de aqu hay que dirigirse a la pestaa de flujos de potencia en la cual se
definir la operacin del generador (Despacho de potencia) como se muestra a continuacin.
1. El Generador por defecto se encuentra en modo PV (potencia y voltaje), si se selecciona
mquina de referencia cambia de modo PV modo a SL ( slack)
2. Modo de control de voltaje local: este modo permite la seleccin de dos posiciones:
primero factor de potencia este permite que el generador en la barra entregue la potencia
activa y reactiva que se le ingrese para el despacho, dos voltaje este permite que el
generador en la barra entregue el voltaje en p.u, que se ingresa para el despacho.
3. Modo de entrada, se despliega una serie de combinaciones para el ingreso de potencia
activa, reactiva, ejemplo: P,Q, P,cos(pi), S,cos(pi), Q,cos(pi), S,P, S,Q.
4. La Curva de Capabilidad o Capacidad, permite observar cuales son los lmites de
potencia activa y reactiva a la que pude trabajar el generador.
142
5. Lmites de operacin. Min 0 MW, Mximo 9999 MW, el valor mximo por defecto se
sita en 9999 MW, este valor puede ser mayor que la Pn del Generador.
6. Potencia Activa. Max 105,00 MW, Factor de clasificacin 1, permite ingresar la
capacidad mxima de potencia activa que va a entregar el generador durante el despacho.
Grfico 9, Pestaa de Flujo de Carga Limites de operacin del generador (Curva de Capacidad)
Fuente: DigSilent Power Factory
143
TRANSFORMADORES
Una vez seleccionado nuevo proyecto tipo se despliega Datos Bsicos en la cual se ingresa:
1. Potencia Nominal lado de HV 375 MW, lado de MV 375 MW, lado de LV 100 MW,
que es la potencia de placa de uno de los Transformadores de la Subestacin de Molino.
2. Potencia Nominal lado de HV 230 kV, lado de MV 138 kV, lado de LV 13.8 kV que es
el voltaje de placa del Transformador.
3. Vector Grupo, lado de HV YN, lado de MV YN, lado de LV D, configuracin del
transformador, estrella o delta, datos de placa del transformador.
144
LNEAS DE TRASMISIN
Para ingresar una Lnea de Transmisin en DigSilent se debe tomar las siguientes
consideraciones:
1. Lineas en paralelo, para este caso sera 1.
2. Longuitud de linea:15 km y Factor de reduccin: por defecto 1
145
Una vez seleccionado nuevo proyecto tipo se despliega Datos Bsicos en la cual se ingresa:
1. Voltaje Nominal: 230 kV, voltaje nominal del conductor
2. Corriente Nominal: 0,85849 kV, Corriente nominal del conductor
3. Frecuencia: 60 hz, frecuencia del sistema.
4. Cable / OHL: nos presenta 3 opciones de cable, cable no armado y lnea rea, para este
caso ser lnea area.
5. Tipo de sistema: presenta dos tipos de sistemas AC y DC, las redes de transmisin del
S.N.I son de corriente alterna (AC).
6. Numero de fases: 3, nmero de neutros: 0
7. Parmetros por longitud Secuencia 1, 2: Resistencia R: 0,0592325 Ohm/km, Reactancia
X: 0,4816 Ohm/km, impedancia de Secuencia 1, 2.
146
8. Parmetros por longitud Secuencia Zero: Resistencia R0: 0,33023 Ohm/km, Reactancia
X0: 1,5723 Ohm/km, impedancia de Secuencia Zero.
1
2
3
6
4
Una vez ingresados los parmetros en Datos Bsicos, se ingresa a la pestaa de Flujo de Carga,
en la cual se ingresa los siguientes parmetros:
1. Mxima temperatura de operacin: 80C, temperatura mxima de diseo del conductor.
2. Resistencia R(20C): 0,0592325 Ohm/km, resistencia del conductor
3. Material del Conductor: aluminio, dependiendo del conductor se pude seleccionar
aluminio cobre o aleacin.
4. Susceptancia B sec 1,2: 3,46874 uS/km, parte imaginaria de la resistencia medida en
siemens
5. Susceptancia B0 sec Zero: 2,24771 uS/km.
147
1
2
3
CARGA
Para ingresar una Carga en DigSilent se debe tomar las siguientes consideraciones, en la pestaa
de flujo de carga:
1. Modo de entrada, se despliega una serie de combinaciones para el ingreso de potencia activa,
reactiva, ejemplo: P,Q, P,cos(pi), S,cos(pi), Q,cos(pi), S,P, S,Q.
2. Carga Balanceada/ Desbalabceada: para este cago Balanceada.
3. Potencia Activa: 75 MW, Factor de potencia: 0,96, para cargas residenciales.
4. Voltaje: 1 pu, escalamiento: 1.
148
ANEXO 4
Flujos de Carga para los perodos de anlisis sin cocinas de Induccin
149
Tabla 16, Resultado del flujo de Carga para Demanda Mxima en Hidrologa Alta para el perodo
2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MAXIMA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 98
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
25
No. of SVS
0
|
|
|
| Generation
=
4201.31 MW
1025.26
Mvar
4324.60 MVA
|
| External Infeed
=
172.56 MW
-7.31
Mvar
172.72 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
4239.73 MW
1144.06
Mvar
4391.38 MVA
|
| Load P(Un)
=
4239.73 MW
1144.06
Mvar
4391.38 MVA
|
| Load P(Un-U)
=
-0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
134.14 MW
218.06
Mvar
|
| Line Charging
=
-1172.54
Mvar
|
| Compensation ind.
=
145.79
Mvar
|
| Compensation cap.
=
-489.96
Mvar
|
|
|
| Installed Capacity
=
6055.74 MW
|
| Spinning Reserve
=
1854.43 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
0.97 [-]
|
|
Load/Motor
= 0.97 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------|
150
Tabla 17, Resultado del flujo de Carga para Demanda Media en Hidrologa Alta para el perodo 2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MAXIMA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 94
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
24
No. of SVS
0
|
|
|
| Generation
=
3777.71 MW
651.91
Mvar
3833.55 MVA
|
| External Infeed
=
5.84 MW
59.68
Mvar
59.97 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
3671.55 MW
999.76
Mvar
3805.23 MVA
|
| Load P(Un)
=
3671.55 MW
999.76
Mvar
3805.23 MVA
|
| Load P(Un-U)
=
-0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
112.00 MW
-48.64
Mvar
|
| Line Charging
=
-1170.58
Mvar
|
| Compensation ind.
=
140.43
Mvar
|
| Compensation cap.
=
-379.95
Mvar
|
|
|
| Installed Capacity
=
5787.34 MW
|
| Spinning Reserve
=
2009.63 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
0.99 [-]
|
|
Load/Motor
= 0.96 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------|
151
Tabla 18, Resultado del flujo de Carga para Demanda Mnima en Hidrologa Alta para el perodo
2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MAXIMA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 77
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
24
No. of SVS
0
|
|
|
| Generation
=
2656.11 MW
-130.95
Mvar
2659.34 MVA
|
| External Infeed
=
0.06 MW
-85.36
Mvar
85.36 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
2589.19 MW
692.23
Mvar
2680.13 MVA
|
| Load P(Un)
=
2589.19 MW
692.23
Mvar
2680.13 MVA
|
| Load P(Un-U)
=
-0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
66.98 MW
-600.74
Mvar
|
| Line Charging
=
-1264.06
Mvar
|
| Compensation ind.
=
158.12
Mvar
|
| Compensation cap.
=
-465.92
Mvar
|
|
|
| Installed Capacity
=
4289.28 MW
|
| Spinning Reserve
=
1633.17 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
1.00 [-]
|
|
Load/Motor
= 0.97 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------|
152
Tabla 19, Resultado del flujo de Carga para Demanda Mxima en Hidrologa baja para el perodo
2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MAXIMA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 99
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
25
No. of SVS
0
|
|
|
| Generation
=
4213.59 MW
1176.35
Mvar
4374.71 MVA
|
| External Infeed
=
173.42 MW
0.67
Mvar
173.42 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
4239.73 MW
1144.06
Mvar
4391.38 MVA
|
| Load P(Un)
=
4239.73 MW
1144.06
Mvar
4391.38 MVA
|
| Load P(Un-U)
=
-0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
147.27 MW
362.19
Mvar
|
| Line Charging
=
-1159.30
Mvar
|
| Compensation ind.
=
144.86
Mvar
|
| Compensation cap.
=
-474.08
Mvar
|
|
|
| Installed Capacity
=
6242.87 MW
|
| Spinning Reserve
=
2029.29 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
0.96 [-]
|
|
Load/Motor
= 0.97 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------|
153
Tabla 20, Resultado del flujo de Carga para Demanda Media en Hidrologa baja para el perodo 2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MEDIA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 94
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
25
No. of SVS
0
|
|
|
| Generation
=
3824.04 MW
831.92
Mvar
3913.49 MVA
|
| External Infeed
=
5.53 MW
9.44
Mvar
10.94 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
3671.55 MW
999.76
Mvar
3805.23 MVA
|
| Load P(Un)
=
3671.55 MW
999.76
Mvar
3805.23 MVA
|
| Load P(Un-U)
=
-0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
158.02 MW
187.53
Mvar
|
| Line Charging
=
-1174.25
Mvar
|
| Compensation ind.
=
145.50
Mvar
|
| Compensation cap.
=
-491.42
Mvar
|
|
|
| Installed Capacity
=
5893.08 MW
|
| Spinning Reserve
=
2069.04 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
0.98 [-]
|
|
Load/Motor
= 0.96 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------|
154
Tabla 21, Resultado del flujo de Carga para Demanda Mnima en Hidrologa baja para el perodo
2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MINIMA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 71
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
23
No. of SVS
0
|
|
|
| Generation
=
2644.92 MW
-259.09
Mvar
2657.58 MVA
|
| External Infeed
=
0.09 MW
-84.88
Mvar
84.88 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
2589.19 MW
705.53
Mvar
2683.59 MVA
|
| Load P(Un)
=
2589.19 MW
705.53
Mvar
2683.59 MVA
|
| Load P(Un-U)
=
0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
55.82 MW
-699.70
Mvar
|
| Line Charging
=
-1269.57
Mvar
|
| Compensation ind.
=
158.19
Mvar
|
| Compensation cap.
=
-507.98
Mvar
|
|
|
| Installed Capacity
=
3958.57 MW
|
| Spinning Reserve
=
1313.66 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
1.00 [-]
|
|
Load/Motor
= 0.96 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------|
155
ANEXO 5
Distribucin de Cocinas de Induccin en S.N.I
156
DEMANDA MXIMA
NOMBRE
BOLIVAR
C GUANGOPOLO
EL ORO - MACHALA
EL ORO - MACHALA PERU
ESMERALDAS - ESMERALDAS
ESMERALDAS - QUININDE
GUAYAS LOS RIOS - DOS CERRITOS
GUAYAS LOS RIOS - PASCUALES
GUAYAS LOS RIOS - QUEVEDO
LOS RIOS - BABAHOYO
CHONE - SEVERINO(1)
MANABI
MANABI - CHONE
MANABI - MONTECRISTI
MANABI - PORTOVIEJO
MANABI S GREGORIO
MANABI SAN JUAN
MILAGRO - LA TROCAL
MILAGRO - MILAGRO
STA ELENA - STA ELENA
STA. ELENA - POSORJA
STO. DOMINGO
SUCUMBIOS - COCA
SUCUMBIOS - LAGO AGRIO JIVINO
CARGA COLOMBIA
AMBATO - AMBATO
AMBATO - BAOS
AMBATO - PUYO
AMBATO - TENA
AMBATO - TOTORAS
AZOGUES
CENTRO SUR - CUENCA
CENTRO SUR - GUALACEO
CENTRO SUR - MACAS
COTOPAXI - NOVACERO
EE COTOPAXI - AMBATO
EE COTOPAXI - MULALO
NORTE - CHAVEZPAMBA
NORTE - IBARRA 34.5 KV
NORTE - IBARRA 69 KV
NORTE - IBARRA NUEVA 1
NORTE - TULCAN
EEQ - ALANGASI
EEQ - BAEZA
EEQ - CHILIBULO
EEQ - CONOCOTO
EEQ - COTOCOLLAO
EEQ - CUMBAYA
EEQ - ESPEJO
EEQ - MACHACHI
EEQ - POMASQUI
EEQ - S. ALEGRE
EEQ - S. ANTONIO
Act.Pow.
MW
17.1
7.13
65.2
97.8
88.6
19.2
58.1
97
103.5
84.9
0
60.46
58.2
70.5
99.2
59.3
128
57.9
92.1
80.6
29.7
111.8
16.7
39.9
0
29
18.3
11.18
8.4
54.8
23.1
150
12
10.9
9.8
17.6
66.8
32.6
4.9
48.5
31.2
17
26.46
6
23.9
37.5
22.5
53.1
50
21.3
66.8
10
17.2
AGENTE
PORCENTAJE
DE INGRESO
(%)
CNEL Bolvar
CNEL Bolvar
CNEL El Oro
CNEL El Oro
CNEL Esmeraldas
CNEL Esmeraldas
CNEL Guayas los Ros
CNEL Guayas los Ros
CNEL Guayas los Ros
CNEL Los Ros
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Milagro
CNEL Milagro
CNEL Santa Elena
CNEL Santa Elena
CNEL Sto. Domingo
CNEL Sucumbos
CNEL Sucumbos
COLOMBIA
E.E. Ambato
E.E. Ambato
E.E. Ambato
E.E. Ambato
E.E. Ambato
E.E. Azogues
E.E. Centro Sur
E.E. Centro Sur
E.E. Centro Sur
E.E. Cotopaxi
E.E. Cotopaxi
E.E. Cotopaxi
E.E. Norte
E.E. Norte
E.E. Norte
E.E. Norte
E.E. Norte
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
70.57%
29.43%
40.00%
60.00%
82.19%
17.81%
22.47%
37.51%
40.02%
100.00%
0.00%
12.71%
12.24%
14.82%
20.86%
12.47%
26.91%
38.60%
61.40%
73.07%
26.93%
100.00%
29.51%
70.49%
0.00%
23.83%
15.04%
9.19%
6.90%
45.04%
100.00%
86.76%
6.94%
6.30%
10.40%
18.68%
70.91%
24.29%
3.65%
36.14%
23.25%
12.67%
3.24%
0.74%
2.93%
4.60%
2.76%
6.51%
6.13%
2.61%
8.19%
1.23%
2.11%
157
P. ACTIVA
INGRESO
COCINAS
(MW)
0.45
0.19
0.29
0.44
0.45
0.10
0.12
0.21
0.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.40
0.15
0.00
0.00
0.00
0.00
9.17
5.79
3.54
2.66
17.34
4.04
47.82
3.83
3.47
2.34
4.21
15.96
1.87
0.28
2.79
1.79
0.98
1.85
0.42
1.67
2.62
1.57
3.71
3.50
1.49
4.67
0.70
1.20
P ACTIVA
POR
AGENTES
(MW)
17.55
7.32
65.49
98.24
89.05
19.30
58.22
97.21
103.72
84.90
0.00
60.46
58.20
70.50
99.20
59.30
128.00
57.90
92.10
81.00
29.85
111.80
16.70
39.90
0.00
38.17
24.09
14.72
11.06
72.14
27.14
197.82
15.83
14.37
12.14
21.81
82.76
34.47
5.18
51.29
32.99
17.98
28.31
6.42
25.57
40.12
24.07
56.81
53.50
22.79
71.47
10.70
18.40
NOMBRE
Act.Pow.
MW
EEQ - S. ROSA
EEQ - S/E 18 (CRISTIANA)
EEQ - S/E 19
EEQ - SAN RAFAEL
EEQ - TABABELA
EEQ - VICENTINA
EEQ - ZAMBIZA
RIOBAMBA
SUR - CUMBARATZA
SUR - LOJA
CATEG - CARAGUAY
CATEG - LAS ESCLUSAS
CATEG - LAS ORQUIDEAS
CATEG - NUEVA PROSPERINA
CATEG - PASCUALES
CATEG - POLICENTRO
CATEG - SALITRAL
CATEG - TRINITARIA
CEDEGE PASCUALES
ACERIA POSORJA
ADELCA SA
AEROPUERTO
ANDEC S.A. - LAS ESCLUSAS
CATEG- FCA. CEMENTOS HOLCIM
MINERIA ZAMORA CHINCHIPE
154
51.6
80
23
49.7
94.9
27.5
71.1
9.6
15
92
87.6
97.8
206.7
50.8
118.6
275.6
135
11
100
17.5
21
45
35
46
AGENTE
PORCENTAJE
DE INGRESO
(%)
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Riobamba
E.E. Sur
E.E. Sur
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
18.89%
6.33%
9.81%
2.82%
6.09%
11.64%
3.37%
100.00%
39.02%
60.98%
8.56%
8.15%
9.10%
19.23%
4.73%
11.03%
25.63%
12.56%
1.02%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
P. ACTIVA
INGRESO
COCINAS
(MW)
10.77
3.61
5.60
1.61
3.48
6.64
1.92
11.94
5.66
8.85
5.24
4.99
5.57
11.76
2.89
6.75
15.68
7.68
0.63
0.00
0.00
0.00
0.00
0.00
0.00
P ACTIVA
POR
AGENTES
(MW)
164.77
55.21
85.60
24.61
53.18
101.54
29.42
83.04
15.26
23.85
97.24
92.59
103.37
218.46
53.69
125.35
291.28
142.68
11.63
100.00
17.50
21.00
45.00
35.00
46.00
DEMANDA MEDIA
NOMBRE
Act.Pow.
MW
BOLIVAR
C GUANGOPOLO
EL ORO - MACHALA
EL ORO - MACHALA PERU
ESMERALDAS - ESMERALDAS
ESMERALDAS - QUININDE
GUAYAS LOS RIOS - DOS
CERRITOS
GUAYAS LOS RIOS - PASCUALES
8.3
7.13
52.6
78.9
66.4
14.4
43.3
70.6
76.5
60.8
0
60.46
42.3
53.4
75.2
44.9
AGENTE
CNEL Blivar
CNEL Blivar
CNEL El Oro
CNEL El Oro
CNEL Esmeraldas
CNEL Esmeraldas
CNEL Guayas los
Ros
CNEL Guayas los
Ros
CNEL Guayas los
Ros
CNEL Los Ros
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
158
INGRESO COCINAS
%
70.57%
29.43%
40.00%
60.00%
82.19%
17.81%
22.47%
P. ACTIVA
INGRESO
COCINAS
MW
0.38
0.16
0.44
0.65
0.67
0.15
0.18
P
ACTIVA
AGENTE
S (MW)
8.68
7.29
53.04
79.55
67.07
14.55
43.48
37.51%
0.31
76.81
40.02%
0.33
70.93
100.00%
0.00%
12.71%
12.24%
14.82%
20.86%
12.47%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.80
0.00
60.46
42.30
53.40
75.20
44.90
NOMBRE
Act.Pow.
MW
97.2
45.9
73.1
61.3
24.9
80.8
11
25.7
0
19.8
11
7.7
4.9
38.5
18
127.4
6.3
6.4
9.8
14.1
51.7
22.2
0
33
36.2
9.3
26.46
6
15.1
23.6
20.2
46.6
40
17.4
70.2
82.8
13.4
124.1
48.5
57.6
21.8
40.2
85.4
23.1
44
5.9
35.9
81.4
81.1
94.9
227.3
AGENTE
INGRESO COCINAS
%
P. ACTIVA
INGRESO
COCINAS
MW
0.00
0.00
0.00
0.60
0.22
0.00
0.00
0.00
P
ACTIVA
AGENTE
S (MW)
97.20
45.90
73.10
61.90
25.12
80.80
11.00
25.70
CNEL Manab
CNEL Milagro
CNEL Milagro
CNEL Santa Elena
CNEL Santa Elena
CNEL Sto. Domingo
CNEL Sucumbos
CNEL Sucumbos
26.91%
38.60%
61.40%
73.07%
26.93%
100.00%
29.51%
70.49%
COLOMBIA
E.E. Ambato
E.E. Ambato
E.E. Ambato
E.E. Ambato
E.E. Ambato
E.E. Azogues
E.E. Centro Sur
E.E. Centro Sur
E.E. Centro Sur
E.E. Cotopaxi
E.E. Cotopaxi
E.E. Cotopaxi
E.E. Norte
E.E. Norte
E.E. Norte
E.E. Norte
E.E. Norte
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Riobamba
E.E. Sur
E.E. Sur
Elctrica de
Guayaquil
Elctrica de
Guayaquil
Elctrica de
Guayaquil
Elctrica de
Guayaquil
0.00%
23.83%
15.04%
9.19%
6.90%
45.04%
100.00%
86.76%
6.94%
6.30%
10.40%
18.68%
70.91%
24.29%
3.65%
36.14%
23.25%
12.67%
3.24%
0.74%
2.93%
4.60%
2.76%
6.51%
6.13%
2.61%
8.19%
1.23%
2.11%
18.89%
6.33%
9.81%
2.82%
6.09%
11.64%
3.37%
100.00%
39.02%
60.98%
8.56%
0.00
13.61
8.59
5.25
3.94
25.72
6.00
70.96
5.68
5.16
3.47
6.24
23.68
2.78
0.42
4.14
2.66
1.45
2.75
0.62
2.48
3.89
2.34
5.51
5.19
2.21
6.93
1.04
1.79
15.99
5.36
8.31
2.39
5.16
9.85
2.85
17.72
8.41
13.13
7.77
0.00
33.41
19.59
12.95
8.84
64.22
24.00
198.36
11.98
11.56
13.27
20.34
75.38
24.98
0.42
37.14
38.86
10.75
29.21
6.62
17.58
27.49
22.54
52.11
45.19
19.61
77.13
83.84
15.19
140.09
53.86
65.91
24.19
45.36
95.25
25.95
61.72
14.31
49.03
89.17
8.15%
7.40
88.50
9.10%
8.26
103.16
19.23%
17.46
244.76
159
NOMBRE
Act.Pow.
MW
AGENTE
CATEG - PASCUALES
50.8
CATEG - POLICENTRO
117.4
CATEG - SALITRAL
303.2
CATEG - TRINITARIA
101.3
CEDEGE PASCUALES
11
ACERIA POSORJA
ADELCA SA
AEROPUERTO
ANDEC S.A. - LAS ESCLUSAS
CATEG- FCA. CEMENTOS HOLCIM
MINERIA ZAMORA CHINCHIPE
184
30
17
40
30.5
46
Elctrica de
Guayaquil
Elctrica de
Guayaquil
Elctrica de
Guayaquil
Elctrica de
Guayaquil
Elctrica de
Guayaquil
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
INGRESO COCINAS
%
4.73%
P. ACTIVA
INGRESO
COCINAS
MW
4.29
P
ACTIVA
AGENTE
S (MW)
55.09
11.03%
10.02
127.42
25.63%
23.27
326.47
12.56%
11.40
112.70
1.02%
0.93
11.93
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
184.00
30.00
17.00
40.00
30.50
46.00
DEMANDA MNIMA
NOMBRE
Act.Pow.
MW
AGENTE
PORCENTAJE
DE INGRESO
(%)
BOLIVAR
C GUANGOPOLO
EL ORO - MACHALA
EL ORO - MACHALA PERU
ESMERALDAS - ESMERALDAS
ESMERALDAS - QUININDE
GUAYAS LOS RIOS - DOS CERRITOS
GUAYAS LOS RIOS - PASCUALES
GUAYAS LOS RIOS - QUEVEDO
LOS RIOS - BABAHOYO
CHONE - SEVERINO(1)
MANABI
MANABI - CHONE
MANABI - MONTECRISTI
MANABI - PORTOVIEJO
MANABI S GREGORIO
MANABI SAN JUAN
MILAGRO - LA TROCAL
MILAGRO - MILAGRO
STA ELENA - STA ELENA
STA. ELENA - POSORJA
STO. DOMINGO
SUCUMBIOS - COCA
SUCUMBIOS - LAGO AGRIO JIVINO
CARGA COLOMBIA
AMBATO - AMBATO
7.6
7.13
39.1
58.7
58.4
12.7
43.8
67.5
49.4
39.2
0
39.2
36.5
46.4
65.4
84.4
84.4
35.6
56.6
49.2
20.3
59
8.3
19.3
0
14.1
CNEL Bolvar
CNEL Bolvar
CNEL El Oro
CNEL El Oro
CNEL Esmeraldas
CNEL Esmeraldas
CNEL Guayas los Ros
CNEL Guayas los Ros
CNEL Guayas los Ros
CNEL Los Ros
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Manab
CNEL Milagro
CNEL Milagro
CNEL Santa Elena
CNEL Santa Elena
CNEL Sto. Domingo
CNEL Sucumbos
CNEL Sucumbos
COLOMBIA
E.E. Ambato
70.57%
29.43%
40.00%
60.00%
82.19%
17.81%
22.47%
37.51%
40.02%
100.00%
0.00%
12.71%
12.24%
14.82%
20.86%
12.47%
26.91%
38.60%
61.40%
73.07%
26.93%
100.00%
29.51%
70.49%
0.00%
23.83%
160
P. ACTIVA
INGRESO
COCINAS
MW
0.14
0.13
0.13
0.19
0.19
0.04
0.06
0.10
0.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.17
0.07
0.00
0.00
0.00
0.00
4.17
POT.
ACTIVA POR
AGENTES
(MW)
7.74
7.26
39.23
58.89
58.59
12.74
43.86
67.60
49.47
39.20
0.00
39.20
36.50
46.40
65.40
84.40
84.40
35.60
56.60
49.37
20.37
59.00
8.30
19.30
0.00
18.27
NOMBRE
Act.Pow.
MW
AGENTE
PORCENTAJE
DE INGRESO
(%)
AMBATO - BAOS
AMBATO - PUYO
AMBATO - TENA
AMBATO - TOTORAS
AZOGUES
CENTRO SUR - CUENCA
CENTRO SUR - GUALACEO
CENTRO SUR - MACAS
COTOPAXI - NOVACERO
EE COTOPAXI - AMBATO
EE COTOPAXI - MULALO
NORTE - CHAVEZPAMBA
NORTE - IBARRA 34.5 KV
NORTE - IBARRA 69 KV
NORTE - IBARRA NUEVA 1
NORTE - TULCAN
EEQ - ALANGASI
EEQ - BAEZA
EEQ - CHILIBULO
EEQ - CONOCOTO
EEQ - COTOCOLLAO
EEQ - CUMBAYA
EEQ - ESPEJO
EEQ - MACHACHI
EEQ - POMASQUI
EEQ - S. ALEGRE
EEQ - S. ANTONIO
EEQ - S. ROSA
EEQ - S/E 18 (CRISTIANA)
EEQ - S/E 19
EEQ - SAN RAFAEL
EEQ - TABABELA
EEQ - VICENTINA
EEQ - ZAMBIZA
RIOBAMBA
SUR - CUMBARATZA
SUR - LOJA
CATEG - CARAGUAY
CATEG - LAS ESCLUSAS
CATEG - LAS ORQUIDEAS
CATEG - NUEVA PROSPERINA
CATEG - PASCUALES
CATEG - POLICENTRO
CATEG - SALITRAL
CATEG - TRINITARIA
CEDEGE PASCUALES
ACERIA POSORJA
ADELCA SA
AEROPUERTO
ANDEC S.A. - LAS ESCLUSAS
CATEG- FCA. CEMENTOS HOLCIM
MINERIA ZAMORA CHINCHIPE
9.1
4.9
3.7
24
15.5
89.8
5.7
5.1
9.8
11.8
40
14.7
0
21.8
36.2
7.1
26.46
6
6.5
14.2
5.8
21.6
23.1
8.7
50.1
32.9
9.1
81.8
13.4
38.1
8.7
22.9
42.8
10.4
34.9
4.2
25.4
65.1
50.8
64.6
115.7
38.1
67.6
154.4
81.1
11
30
14.5
21.3
40
30.5
46
E.E. Ambato
E.E. Ambato
E.E. Ambato
E.E. Ambato
E.E. Azogues
E.E. Centro Sur
E.E. Centro Sur
E.E. Centro Sur
E.E. Cotopaxi
E.E. Cotopaxi
E.E. Cotopaxi
E.E. Norte
E.E. Norte
E.E. Norte
E.E. Norte
E.E. Norte
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Quito
E.E. Riobamba
E.E. Sur
E.E. Sur
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
Elctrica de Guayaquil
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
G CONSUMIDORES
15.04%
9.19%
6.90%
45.04%
100.00%
86.76%
6.94%
6.30%
10.40%
18.68%
70.91%
24.29%
3.65%
36.14%
23.25%
12.67%
3.24%
0.74%
2.93%
4.60%
2.76%
6.51%
6.13%
2.61%
8.19%
1.23%
2.11%
18.89%
6.33%
9.81%
2.82%
6.09%
11.64%
3.37%
100.00%
39.02%
60.98%
8.56%
8.15%
9.10%
19.23%
4.73%
11.03%
25.63%
12.56%
1.02%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
161
P. ACTIVA
INGRESO
COCINAS
MW
2.69
1.45
1.09
7.10
1.73
21.09
1.34
1.20
1.53
1.85
6.26
0.61
0.00
0.90
1.50
0.29
1.53
0.35
0.38
0.82
0.34
1.25
1.34
0.50
2.90
1.90
0.53
4.73
0.78
2.20
0.50
1.33
2.48
0.60
5.12
0.88
5.34
2.63
2.05
2.61
4.68
1.54
2.73
6.24
3.28
0.44
0.00
0.00
0.00
0.00
0.00
0.00
POT.
ACTIVA POR
AGENTES
(MW)
11.79
6.35
4.79
31.10
17.23
110.89
7.04
6.30
11.33
13.65
46.26
15.31
0.00
22.70
37.70
7.39
27.99
6.35
6.88
15.02
6.14
22.85
24.44
9.20
53.00
34.80
9.63
86.53
14.18
40.30
9.20
24.23
45.28
11.00
40.02
5.08
30.74
67.73
52.85
67.21
120.38
39.64
70.33
160.64
84.38
11.44
30.00
14.50
21.30
40.00
30.50
46.00
ANEXO 6
Parmetros de Cargabilidad en Lneas y Transformadores
162
163
164
165
ANEXO 7
Despacho 2015 CENACE con Cocinas de Induccin
166
HIDROLOGA ALTA
AGOYH
ETAPA
ALAZANH
MWh
BABAH
MWh
CALOH
MWh
CHORRILLO
MWh
MWh
SDELSITANIS ADUDASH
MWh
HABAH
MWh
MANDURIAC MAZAH
MWh
MWh
MINASH
MWh
MLANH
MWh
OCAH
MWh
PAUTH
MWh
PILATNH
MWh
MWh
PUCAH
QUIJOSH
MWh
MWh
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
737.5
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
661.3
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
655.4
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
638.5
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
657.5
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
817.4
64.5
0.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
85.0
2.5
51.0
26.0
798.5
64.5
20.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
861.4
64.5
20.0
40.0
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1033.5
64.5
20.0
40.0
10
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1056.6
64.5
20.0
40.0
11
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1064.4
64.5
20.0
40.0
12
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1063.6
64.5
20.0
40.0
13
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1064.5
64.5
20.0
40.0
14
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1063.4
64.5
20.0
40.0
15
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1061.7
64.5
20.0
40.0
16
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1062.9
64.5
20.0
40.0
17
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1064.9
64.5
20.0
40.0
18
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1064.7
64.5
20.0
40.0
19
154.0
6.2
19.2
12.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1024.1
64.5
73.0
40.0
20
154.0
6.2
19.2
12.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1025.5
64.5
73.0
40.0
21
154.0
6.2
19.2
12.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1032.0
64.5
73.0
40.0
22
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
1064.8
64.5
20.0
40.0
23
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
900.2
64.5
20.0
40.0
24
154.0
6.2
19.2
8.0
4.0
116.0
15.0
38.5
34.2
170.0
2.5
51.0
26.0
736.7
64.5
0.0
40.0
3696.0
148.6
460.8
204.0
96.0
2784.0
360.0
924.0
821.4
3485.0
60.0
1224.0
624.0
22211.0
1548.0
499.0
960.0
TOTAL
167
HIDROLOGA ALTA
SAN ANTONI SFRAH
ETAPA
MWh
SIBIH
MWh
SJ TAMBOH
MWh
MWh
SOPLADORAH
MWh
TOACHIH
MWh
TOPOH
VICTORIAH
MWh
ALAOH0A
AMBIH0A
MWh
MWh
MWh
CARMH0A
MWh
7.2
212.0
30.0
8.0
290.1
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
249.0
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
245.8
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
236.7
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
246.9
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
333.2
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
323.0
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
357.0
128.5
22.0
10.0
10.0
3.0
7.2
212.0
30.0
8.0
449.9
128.5
22.0
10.0
10.0
3.0
10
7.2
212.0
30.0
8.0
462.3
128.5
22.0
10.0
10.0
3.0
11
7.2
212.0
30.0
8.0
466.5
128.5
22.0
10.0
10.0
3.0
12
7.2
212.0
30.0
8.0
466.1
128.5
22.0
10.0
10.0
3.0
13
7.2
212.0
30.0
8.0
466.6
128.5
22.0
10.0
10.0
5.0
14
7.2
212.0
30.0
8.0
466.0
128.5
22.0
10.0
10.0
5.0
15
7.2
212.0
30.0
8.0
465.1
128.5
22.0
10.0
10.0
5.0
16
7.2
212.0
30.0
8.0
465.7
128.5
22.0
10.0
10.0
5.0
17
7.2
212.0
30.0
8.0
466.8
128.5
22.0
10.0
10.0
8.0
18
7.2
212.0
30.0
8.0
466.7
128.5
22.0
10.0
10.0
8.0
19
7.2
212.0
30.0
8.0
444.8
128.5
22.0
10.0
10.0
8.0
20
7.2
212.0
30.0
8.0
445.6
128.5
22.0
10.0
10.0
8.0
21
7.2
212.0
30.0
8.0
449.1
128.5
22.0
10.0
10.0
8.0
22
7.2
212.0
30.0
8.0
466.7
128.5
22.0
10.0
10.0
3.0
23
7.2
212.0
30.0
8.0
377.9
128.5
22.0
10.0
10.0
3.0
24
7.2
212.0
30.0
8.0
289.7
128.5
22.0
10.0
10.0
173.8
5088.0
720.0
192.0
9397.3
3084.0
528.0
240.0
240.0
TOTAL
168
CHILH0A
CMORH0A
MWh
MWh
CUMBH0A
MWh
GUANH0A
MWh
ILL1H0A
ILL2H0A
MWh
MWh
7.2
7.2
1.8
1.8
2.4
2.4
30.0
30.0
10.5
10.5
4.0
4.0
4.0
4.0
7.2
7.2
7.2
1.8
1.8
1.8
2.4
2.4
2.4
30.0
30.0
30.0
10.5
10.5
10.5
4.0
4.0
4.0
4.0
4.0
4.0
7.2
7.2
7.2
1.8
1.8
1.8
2.4
2.4
2.4
30.0
30.0
30.0
10.5
10.5
10.5
4.0
4.0
4.0
4.0
4.0
4.0
7.2
7.2
7.2
7.2
7.2
1.8
1.8
1.8
1.8
1.8
2.4
2.4
2.4
2.4
2.4
30.0
30.0
30.0
30.0
30.0
10.5
10.5
10.5
10.5
10.5
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
7.2
7.2
7.2
1.8
1.8
1.8
2.4
2.4
2.4
30.0
30.0
30.0
10.5
10.5
10.5
4.0
4.0
4.0
4.0
4.0
4.0
3.0
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
2.4
2.4
2.4
2.4
2.4
2.4
2.4
2.4
30.0
30.0
30.0
30.0
30.0
30.0
30.0
30.0
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
105.0
172.8
43.2
57.6
720.0
252.0
96.0
96.0
HIDROLOGA ALTA
LOREH0A
ETAPA
LPLAH0A
MWh
NAYOH0A
MWh
MWh
PAPAH0A
PASOH0A
MWh
PENIH0A
MWh
RBLAH0A
MWh
RCHIH0A
MWh
MWh
RECUH0A
SAUCH0A
MWh
MWh
SAYMH0A
MWh
SMIGH0A
MWh
MWh
MWh
MWh
MWh
MWh
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
12.0
11.0
9.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
12.0
10.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
14.0
13.0
9.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
12.0
9.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
12.0
8.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
12.0
10.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
14.0
12.0
11.0
14.0
0.0
2.0
0.8
13.4
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
12.0
13.0
8.0
14.0
0.0
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
13.0
8.0
14.0
0.0
10
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
15.0
13.0
5.0
14.0
59.0
11
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
13.5
2.8
15.0
12.0
10.0
14.0
169.2
12
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
13.5
2.8
15.0
11.0
6.0
14.0
201.0
13
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
13.5
2.8
18.0
12.0
8.0
14.0
161.5
14
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
13.5
2.8
15.0
11.0
6.0
14.0
206.2
15
2.0
0.8
15.0
6.2
3.2
1.5
2.4
0.4
13.8
18.0
14.4
2.8
15.0
12.0
4.0
14.0
215.1
16
2.0
0.8
18.3
6.2
3.2
1.5
2.4
0.4
13.8
18.0
14.4
2.8
16.0
12.0
5.0
14.0
155.0
17
2.0
0.8
18.3
6.2
3.2
1.5
2.4
0.4
13.8
18.0
14.4
2.8
14.0
11.0
3.0
14.0
85.1
18
2.0
0.8
18.3
6.2
3.2
1.5
2.4
0.4
13.8
18.0
14.4
2.8
16.0
14.0
2.0
14.0
85.5
19
2.0
0.8
29.6
6.2
3.2
1.5
2.4
0.4
13.8
20.5
14.4
2.8
15.0
12.0
2.0
14.0
295.0
20
2.0
0.8
29.6
6.2
3.2
1.5
2.4
0.4
13.8
24.0
14.4
2.8
15.0
12.0
2.0
14.0
285.0
21
2.0
0.8
29.6
6.2
3.2
1.5
2.4
0.4
13.8
23.0
14.4
2.8
16.0
12.0
3.0
14.0
160.2
22
2.0
0.8
26.0
6.2
3.2
1.5
2.4
0.4
13.8
17.5
14.0
2.8
15.0
12.0
3.0
14.0
141.2
23
2.0
0.8
21.5
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
16.0
12.0
6.0
14.0
59.0
24
2.0
0.8
21.5
6.2
3.2
1.5
2.4
0.4
13.8
17.5
0.0
2.8
16.0
11.0
5.0
14.0
59.0
48.0
19.2
424.9
148.8
76.8
36.0
57.6
9.6
331.2
437.0
168.8
67.2
359.0
289.0
152.0
336.0
2336.9
TOTAL
169
HIDROLOGA ALTA
TGM2TTG01 TGM2TTG02 TGM2TTG03 TGM2TTG04 TGM2TTG05 ESMETVA01
ETAPA
MWh
MWh
MWh
MWh
MWh
MWh
0.0
0.0
0.0
0.0
0.0
65.0
0.0
0.0
0.0
0.0
0.0
65.0
0.0
0.0
0.0
0.0
0.0
65.0
0.0
0.0
0.0
0.0
0.0
65.0
0.0
0.0
0.0
0.0
0.0
65.0
0.0
0.0
0.0
0.0
0.0
65.0
0.0
0.0
0.0
0.0
0.0
65.0
0.0
0.0
0.0
0.0
0.0
65.0
0.0
0.0
0.0
0.0
0.0
65.0
10
0.0
0.0
0.0
0.0
0.0
65.0
11
0.0
0.0
0.0
0.0
0.0
65.0
12
0.0
0.0
0.0
0.0
0.0
65.0
13
0.0
0.0
0.0
0.0
0.0
65.0
14
0.0
0.0
0.0
0.0
0.0
65.0
15
78.0
78.0
78.0
0.0
78.0
65.0
16
78.0
78.0
78.0
78.0
78.0
65.0
17
78.0
78.0
78.0
78.0
78.0
65.0
18
78.0
78.0
78.0
78.0
78.0
65.0
19
108.0
108.0
108.0
78.0
108.0
72.8
20
78.0
78.0
78.0
108.0
78.0
65.0
21
0.0
0.0
0.0
78.0
0.0
65.0
22
0.0
0.0
0.0
0.0
0.0
65.0
23
0.0
0.0
0.0
0.0
0.0
65.0
24
0.0
0.0
0.0
0.0
0.0
65.0
498.0
498.0
498.0
498.0
498.0
1567.8
TOTAL
170
HIDROLOGA ALTA
Fuel Oil
Diesel
MWh
MWh
MWh
MWh
MWh
VICTTTG01
MWh
2246.4
46.0
0.0
177.0
0.0
2469.4
2129.0
2120.0
2094.0
2123.2
2369.4
2360.3
51.0
50.0
50.0
49.0
51.0
51.0
0.0
0.0
0.0
0.0
0.0
0.0
177.0
177.0
177.0
177.0
177.0
177.0
0.0
0.0
0.0
0.0
0.0
0.0
2357.0
2347.0
2321.0
2349.2
2597.4
2588.3
2542.2
2808.7
2844.3
2869.7
2868.6
2871.9
2870.3
2869.0
2874.1
47.0
50.0
47.0
51.0
46.0
52.0
46.0
45.0
47.0
0.0
0.0
59.0
169.2
201.0
161.5
206.2
527.1
545.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2766.2
3035.7
3127.3
3266.9
3292.6
3262.4
3299.5
3618.1
3643.1
2880.2
2880.0
2888.2
42.0
46.0
43.0
475.1
475.5
805.0
177.0
177.0
184.8
0.0
0.0
0.0
3574.3
3578.5
3921.1
2894.0
2902.9
2881.8
2610.0
2338.3
43.0
45.0
44.0
48.0
46.0
705.0
238.2
141.2
59.0
59.0
177.0
177.0
177.0
177.0
177.0
0.0
0.0
0.0
0.0
0.0
3819.0
3363.1
3244.1
2894.0
2620.3
63136.5
1136.0
4826.9
4255.8
0.0
73355.2
171
HIDROLOGA BAJA
AGOYH
ETAPA
ALAZANH
MWh
BABAH
MWh
CALOH
MWh
CHORRILLO
MWh
MWh
SDELSITANIS ADUDASH
MWh
HABAH
MWh
MANDURIAC MAZAH
MWh
MWh
MLANH
MWh
OCAH
MWh
PAUTH
MWh
PILATNH
MWh
MWh
PUCAH
QUIJOSH
MWh
MWh
MWh
SIBIH
MWh
MWh
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
51.0
26.0
737.5
64.5
0.0
40.0
7.1
160.0
5.0
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
51.0
26.0
661.3
64.5
0.0
40.0
7.1
160.0
5.0
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
51.0
26.0
655.4
64.5
0.0
40.0
7.1
160.0
5.0
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
638.5
64.5
0.0
40.0
7.1
160.0
5.0
77.0
4.6
19.2
2.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
657.5
64.5
0.0
40.0
7.1
160.0
5.0
77.0
4.6
19.2
2.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
817.4
64.5
0.0
40.0
7.1
160.0
5.0
77.0
4.6
19.2
2.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
798.5
64.5
73.0
40.0
7.1
160.0
5.0
77.0
4.6
19.2
2.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
861.4
64.5
73.0
40.0
7.1
160.0
5.0
77.0
4.6
19.2
2.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1033.5
64.5
73.0
40.0
7.1
160.0
5.0
10
77.0
4.6
19.2
3.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1056.6
64.5
73.0
40.0
7.1
160.0
5.0
11
77.0
4.6
19.2
3.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1064.4
64.5
73.0
40.0
7.1
160.0
5.0
12
77.0
4.6
19.2
4.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1063.6
64.5
73.0
40.0
7.1
160.0
5.0
13
77.0
4.6
19.2
4.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1064.5
64.5
73.0
40.0
7.1
160.0
5.0
14
77.0
4.6
19.2
4.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1063.4
64.5
73.0
40.0
7.1
160.0
5.0
15
77.0
4.6
19.2
4.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1061.7
64.5
73.0
40.0
7.1
160.0
5.0
16
77.0
4.6
19.2
5.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1062.9
64.5
73.0
40.0
7.1
160.0
5.0
17
77.0
4.6
19.2
5.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1064.9
64.5
73.0
40.0
7.1
160.0
5.0
18
77.0
4.6
19.2
5.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1064.7
64.5
73.0
40.0
7.1
160.0
5.0
19
77.0
4.6
19.2
5.0
1.8
115.3
5.3
38.5
39.3
160.0
176.0
26.0
1024.1
64.5
73.0
40.0
7.1
160.0
5.0
20
77.0
4.6
19.2
5.0
1.8
115.3
5.3
38.5
39.3
160.0
176.0
26.0
1025.5
64.5
73.0
40.0
7.1
160.0
5.0
21
77.0
4.6
19.2
3.0
1.8
115.3
5.3
38.5
39.3
160.0
176.0
26.0
1032.0
64.5
73.0
40.0
7.1
160.0
5.0
22
77.0
4.6
19.2
3.0
1.8
115.3
5.3
38.5
39.3
85.0
176.0
26.0
1064.8
64.5
73.0
40.0
7.1
160.0
5.0
23
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
51.0
26.0
900.2
64.5
73.0
40.0
7.1
160.0
5.0
24
77.0
4.6
19.2
0.0
1.8
115.3
5.3
38.5
39.3
85.0
51.0
26.0
736.7
64.5
0.0
40.0
7.1
160.0
5.0
1848.0
111.5
461.2
63.0
42.2
2767.2
128.3
924.0
942.8
2265.0
3599.0
624.0
22211.0
1548.0
1240.9
960.0
169.9
3840.0
120.0
TOTAL
172
HIDROLOGA BAJA
SJ TAMBOH
ETAPA
MWh
SOPLADORAH
MWh
TOACHIH
MWh
TOPOH
VICTORIAH
MWh
MWh
ALAOH0A
AMBIH0A
MWh
CARMH0A
MWh
MWh
CHILH0A
CMORH0A
MWh
MWh
CUMBH0A
MWh
GUANH0A
MWh
ILL1H0A
ILL2H0A
MWh
LOREH0A
MWh
LPLAH0A
MWh
NAYOH0A
MWh
PAPAH0A
MWh
PASOH0A
MWh
MWh
8.0
127.0
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
9.0
2.0
3.2
8.0
109.3
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
9.0
2.0
3.2
8.0
99.7
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
9.0
2.0
3.2
8.0
59.4
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
9.0
2.0
3.2
8.0
74.6
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
9.0
2.0
3.2
8.0
152.8
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
9.0
2.0
3.2
8.0
133.8
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
9.0
2.0
3.2
8.0
209.2
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
9.0
2.0
3.2
8.0
293.7
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
9.0
6.0
2.0
2.2
1.7
0.8
30.0
2.0
3.2
10
8.0
330.8
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
16.0
6.0
2.0
2.2
1.7
0.8
30.0
2.0
3.2
11
8.0
367.7
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
16.0
6.0
2.0
2.2
1.7
0.8
30.0
2.0
3.2
12
8.0
404.6
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
20.0
6.0
2.0
2.2
1.7
0.8
30.0
2.0
3.2
13
8.0
395.9
110.0
22.0
7.3
9.0
5.0
2.5
1.8
1.2
20.0
6.0
2.0
2.2
1.7
0.8
30.0
2.0
3.2
14
8.0
428.3
110.0
22.0
7.3
9.0
5.0
2.5
1.8
1.2
17.0
6.0
2.0
2.2
1.7
0.8
15.0
2.0
3.2
15
8.0
440.2
110.0
22.0
7.3
9.0
5.0
2.5
1.8
1.2
18.0
6.0
2.0
2.2
1.7
0.8
30.0
2.0
3.2
16
8.0
448.6
110.0
22.0
7.3
9.0
5.0
2.5
1.8
1.2
15.0
6.0
2.0
2.2
1.7
0.8
12.0
2.0
3.2
17
8.0
429.3
110.0
22.0
7.3
9.0
8.0
2.5
1.8
1.2
12.0
6.0
2.0
2.2
1.7
0.8
10.0
2.0
3.2
18
8.0
461.8
110.0
22.0
7.3
9.0
8.0
2.5
1.8
1.2
12.0
6.0
2.0
2.2
1.7
0.8
10.0
2.0
3.2
19
8.0
440.8
110.0
22.0
7.3
9.0
8.0
2.5
1.8
1.2
24.0
6.0
2.0
2.2
1.7
0.8
22.0
2.0
3.2
20
8.0
442.4
110.0
22.0
7.3
9.0
8.0
2.5
1.8
1.2
24.0
6.0
2.0
2.2
1.7
0.8
22.0
2.0
3.2
21
8.0
381.0
110.0
22.0
7.3
9.0
8.0
2.5
1.8
1.2
30.0
6.0
2.0
2.2
1.7
0.8
30.0
2.0
3.2
22
8.0
381.0
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
30.0
6.0
2.0
2.2
1.7
0.8
30.0
2.0
3.2
23
8.0
305.4
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
20.0
6.0
2.0
2.2
1.7
0.8
30.0
2.0
3.2
24
8.0
207.3
110.0
22.0
7.3
9.0
3.0
2.5
1.8
1.2
10.0
6.0
2.0
2.2
1.7
0.8
30.0
2.0
3.2
192.0
7124.5
2640.0
528.0
175.2
216.0
105.0
60.0
43.2
28.8
365.0
144.0
48.0
52.8
40.8
19.2
463.0
48.0
76.8
TOTAL
173
HIDROLOGA BAJA
PENIH0A
ETAPA
RBLAH0A
MWh
MWh
RECUH0A
SAUCH0A
SAYMH0A
SMIGH0A
MWh
MWh
MWh
MWh
ECOETNC01
MWh
EDOSTNC01
MWh
SASCTNC01
MWh
VILLONACO
MWh
TGMATTG01
MWh
MWh
MWh
MWh
MWh
0.6
1.6
0.0
13.0
11.0
10.0
2.8
18.0
15.0
9.0
7.0
295.0
18.0
36
36
36
36
36
40.0
0.6
1.6
0.0
13.0
11.0
10.0
2.8
19.0
15.0
8.0
7.0
295.0
18.0
36
36
36
36
36
40.0
0.6
1.6
0.0
13.0
11.0
10.0
2.8
18.0
16.0
7.0
7.0
295.0
18.0
36
36
36
36
36
40.0
0.6
1.6
0.0
13.0
11.0
10.0
2.8
17.0
15.0
7.0
7.0
284.1
13.0
26
26
26
26
26
40.0
0.6
1.6
0.0
13.0
11.0
10.0
2.8
19.0
15.0
7.0
7.0
295.0
18.0
36
36
36
36
36
40.0
0.6
1.6
0.0
13.0
11.0
10.0
2.8
16.0
15.0
10.0
7.0
295.0
18.0
36
36
36
36
36
40.0
0.6
1.6
0.0
13.0
11.0
10.0
2.8
18.0
13.0
10.0
7.0
295.0
18.0
36
36
36
36
36
40.0
0.6
1.6
0.0
13.0
11.0
10.0
2.8
18.0
13.0
10.0
7.0
295.0
18.0
36
36
36
36
36
40.0
0.6
1.6
0.0
13.0
11.0
10.0
2.8
18.0
10.0
8.0
7.0
295.0
18.0
36
36
36
36
36
40.0
10
0.6
1.6
0.0
13.0
11.0
10.0
2.8
12.0
10.0
7.0
7.0
295.0
18.0
36
36
36
36
36
40.0
11
0.6
1.6
0.0
13.0
12.0
10.0
2.8
19.0
11.0
7.0
7.0
295.0
18.0
36
36
36
36
36
40.0
12
0.6
1.6
0.0
13.0
12.0
10.0
2.8
17.0
2.0
7.0
7.0
295.0
18.0
36
36
36
36
36
40.0
13
0.6
1.6
0.0
13.0
13.0
10.0
2.8
18.0
2.0
8.0
7.0
295.0
18.0
36
36
36
36
36
40.0
14
0.6
1.6
0.0
13.0
13.0
10.0
2.8
18.0
12.0
8.0
7.0
295.0
18.0
36
36
36
36
36
40.0
15
0.6
1.6
0.0
13.0
13.0
10.0
2.8
18.0
12.0
8.0
7.0
295.0
18.0
36
36
36
36
36
40.0
16
0.6
1.6
0.0
13.0
13.0
10.0
2.8
11.0
17.0
8.0
7.0
295.0
18.0
36
36
36
36
36
40.0
17
0.6
1.6
0.0
13.0
13.0
10.0
2.8
18.0
5.0
4.0
7.0
295.0
18.0
36
36
36
36
36
40.0
18
0.6
1.6
0.0
13.0
13.0
10.0
2.8
16.0
14.0
6.0
7.0
295.0
18.0
36
36
36
36
36
40.0
19
0.6
1.6
0.0
13.0
24.0
10.0
2.8
17.0
13.0
5.0
7.0
295.0
18.0
36
36
36
36
36
40.0
20
0.6
1.6
0.0
13.0
24.0
10.0
2.8
14.0
14.0
5.0
7.0
295.0
18.0
36
36
36
36
36
40.0
21
0.6
1.6
0.0
13.0
21.0
10.0
2.8
15.0
16.0
7.0
7.0
295.0
18.0
36
36
36
36
36
40.0
22
0.6
1.6
0.0
13.0
21.0
10.0
2.8
19.0
16.0
7.0
7.0
295.0
18.0
36
36
36
36
36
40.0
23
0.6
1.6
0.0
13.0
13.0
10.0
2.8
17.0
16.0
3.0
7.0
295.0
18.0
36
36
36
36
36
40.0
24
0.6
1.6
0.0
13.0
12.0
10.0
2.8
16.0
16.0
6.0
7.0
295.0
18.0
36
36
36
36
36
14.4
38.4
0.0
312.0
327.0
240.0
67.2
406.0
303.0
172.0
168.0
7069.1
427.0
174
MWh
CCTGMACHALA
TOTAL
MWh
RCHIH0A
854.0
854.0
854.0
854.0
854.0
MWh
40.0
960.0
HIDROLOGA BAJA
TGMATTG02 GHERTMC03 GHERTMC04 GZEVTVA02
ETAPA
MWh
MWh
MWh
MWh
GZEVTVA03
MWh
MWh
MWh
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
10
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
11
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
12
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
13
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
14
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
15
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
16
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
17
100.0
50.0
50.0
26.0
26.0
0.0
10.0
50.0
18
100.0
50.0
50.0
26.0
26.0
41.9
10.0
50.0
19
100.0
50.0
50.0
26.0
26.0
41.9
14.4
50.0
20
100.0
50.0
50.0
26.0
26.0
41.9
10.0
50.0
21
100.0
50.0
50.0
26.0
26.0
18.2
10.0
50.0
22
100.0
50.0
50.0
26.0
26.0
19.3
10.0
50.0
23
100.0
50.0
50.0
26.0
26.0
19.3
10.0
50.0
24
100.0
50.0
50.0
26.0
26.0
19.3
10.0
50.0
2400.0
1200.0
1200.0
624.0
624.0
201.6
244.4
1200.0
TOTAL
175
HIDROLOGA BAJA
4500.0
Hidroelctrica
Renovables
Gas Natural
Fuel Oil
Diesel
VICTTTG01
MWh
MWh
MWh
MWh
MWh
MWh
1843.8
49.0
633.0
317.0
0.0
2842.8
1749.9
49.0
633.0
317.0
0.0
2748.9
1734.4
48.0
633.0
317.0
0.0
2732.4
1802.2
46.0
567.1
317.0
0.0
2732.4
1838.5
48.0
633.0
317.0
0.0
2836.5
2076.6
48.0
633.0
317.0
0.0
3074.6
2111.6
48.0
633.0
317.0
0.0
3109.6
2249.9
48.0
633.0
317.0
0.0
3247.9
2527.5
43.0
633.0
317.0
0.0
3520.5
2595.7
36.0
633.0
317.0
0.0
3581.7
2641.3
44.0
633.0
317.0
0.0
3635.3
2682.5
33.0
633.0
317.0
0.0
3665.5
2677.7
35.0
633.0
317.0
0.0
3662.7
2691.0
45.0
633.0
317.0
0.0
3686.0
2717.2
45.0
633.0
317.0
0.0
3712.2
2706.8
43.0
633.0
317.0
0.0
3699.8
2687.5
34.0
633.0
317.0
0.0
3671.5
2719.9
43.0
633.0
358.9
0.0
3754.8
2768.2
42.0
633.0
513.9
0.0
3957.1
2771.3
40.0
633.0
414.9
0.0
3859.2
2725.3
45.0
633.0
344.3
0.0
3747.6
2678.1
49.0
633.0
345.4
0.0
3705.4
2291.9
43.0
633.0
345.4
0.0
3313.3
1946.3
45.0
633.0
345.4
0.0
2969.7
57235.3
1049.0
15126.1
8057.0
0.0
81467.4
4000.0
3500.0
3000.0
Diesel
2500.0
Fuel Oil
Gas Natural
2000.0
Renovables
Hidroelctrica
1500.0
1000.0
500.0
0.0
1
176
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ANEXO 8
Flujos de Carga para los perodos de anlisis con Cocinas
177
Tabla 22, Resultado del flujo de Carga para Demanda Mxima en Hidrologa Alta para el perodo
2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MAXIMA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 100
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
25
No. of SVS
0
|
|
|
| Generation
=
4501.31 MW
1372.53
Mvar
4705.91 MVA
|
| External Infeed
=
174.72 MW
16.83
Mvar
175.53 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
4515.30 MW
1219.22
Mvar
4677.01 MVA
|
| Load P(Un)
=
4515.30 MW
1219.22
Mvar
4677.01 MVA
|
| Load P(Un-U)
=
-0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
160.73 MW
508.58
Mvar
|
| Line Charging
=
-1153.09
Mvar
|
| Compensation ind.
=
142.48
Mvar
|
| Compensation cap.
=
-480.93
Mvar
|
|
|
| Installed Capacity
=
6332.67 MW
|
| Spinning Reserve
=
1831.36 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
0.96 [-]
|
|
Load/Motor
= 0.97 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------
178
Tabla 23, Resultado del flujo de Carga para Demanda Media en Hidrologa Alta para el perodo 2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MAXIMA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 97
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
24
No. of SVS
0
|
|
|
| Generation
=
4220.46 MW
1121.17
Mvar
4366.84 MVA
|
| External Infeed
=
6.49 MW
91.17
Mvar
91.40 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
4080.11 MW
1111.06
Mvar
4228.68 MVA
|
| Load P(Un)
=
4080.11 MW
1111.06
Mvar
4228.68 MVA
|
| Load P(Un-U)
=
-0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
146.84 MW
334.44
Mvar
|
| Line Charging
=
-1139.93
Mvar
|
| Compensation ind.
=
136.04
Mvar
|
| Compensation cap.
=
-369.19
Mvar
|
|
|
| Installed Capacity
=
6132.67 MW
|
| Spinning Reserve
=
1912.21 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
0.97 [-]
|
|
Load/Motor
= 0.96 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------|
179
Tabla 24, Resultado del flujo de Carga para Demanda Mnima en Hidrologa Alta para el perodo 2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MAXIMA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 81
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
24
No. of SVS
0
|
|
|
| Generation
=
2781.62 MW
-8.40
Mvar
2781.63 MVA
|
| External Infeed
=
0.27 MW
-77.24
Mvar
77.24 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
2707.28 MW
737.98
Mvar
2806.06 MVA
|
| Load P(Un)
=
2707.28 MW
737.98
Mvar
2806.06 MVA
|
| Load P(Un-U)
=
-0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
74.61 MW
-518.77
Mvar
|
| Line Charging
=
-1252.16
Mvar
|
| Compensation ind.
=
156.91
Mvar
|
| Compensation cap.
=
-461.75
Mvar
|
|
|
| Installed Capacity
=
4571.79 MW
|
| Spinning Reserve
=
1790.17 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
1.00 [-]
|
|
Load/Motor
= 0.96 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------|
180
Tabla 25, Resultado del flujo de Carga para Demanda Mxima en Hidrologa Baja para el perodo
2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MAXIMA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 100
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
25
No. of SVS
0
|
|
|
| Generation
=
4517.58 MW
1562.70
Mvar
4780.23 MVA
|
| External Infeed
=
175.06 MW
30.39
Mvar
177.68 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
4515.30 MW
1212.90
Mvar
4675.37 MVA
|
| Load P(Un)
=
4515.30 MW
1212.90
Mvar
4675.37 MVA
|
| Load P(Un-U)
=
-0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
177.35 MW
702.88
Mvar
|
| Line Charging
=
-1135.17
Mvar
|
| Compensation ind.
=
140.71
Mvar
|
| Compensation cap.
=
-463.39
Mvar
|
|
|
| Installed Capacity
=
6357.80 MW
|
| Spinning Reserve
=
1840.22 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
0.95 [-]
|
|
Load/Motor
= 0.97 / 0.00 [-]
|
181
Tabla 26, Resultado del flujo de Carga para Demanda Media en Hidrologa Baja para el perodo 2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MEDIA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 96
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
25
No. of SVS
0
|
|
|
| Generation
=
4286.30 MW
1404.25
Mvar
4510.47 MVA
|
| External Infeed
=
6.62 MW
47.31
Mvar
47.77 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
4080.11 MW
1111.06
Mvar
4228.68 MVA
|
| Load P(Un)
=
4080.11 MW
1111.06
Mvar
4228.68 MVA
|
| Load P(Un-U)
=
-0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
212.81 MW
673.49
Mvar
|
| Line Charging
=
-1136.95
Mvar
|
| Compensation ind.
=
140.23
Mvar
|
| Compensation cap.
=
-473.22
Mvar
|
|
|
| Installed Capacity
=
5929.71 MW
|
| Spinning Reserve
=
1643.41 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
0.95 [-]
|
|
Load/Motor
= 0.96 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------|
182
Tabla 27, Resultado del flujo de Carga para Demanda Mnima en Hidrologa Baja para el perodo
2015.
----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
14.1.3
| Date: 8/4/2014
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Load Flow Calculation
Grid Summary |
----------------------------------------------------------------------------------------------------------------------------------|
AC Load Flow, balanced, positive sequence
|
Automatic Model Adaptation for Convergence
No
|
|
Automatic Tap Adjust of Transformers
No
|
Max. Acceptable Load Flow Error for
|
|
Consider Reactive Power Limits
No
|
Nodes
1.00 kVA |
|
|
Model Equations
0.10 %
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
System Stage: SNT2015
| Study Case: DEMANDA MINIMA
| Annex:
/ 1 |
----------------------------------------------------------------------------------------------------------------------------------| Grid: SNT2015
Summary
|
|
|
| No. of Substations
0
No. of Busbars
315
No. of Terminals
8
No. of Lines
158
|
| No. of 2-w Trfs.
87
No. of 3-w Trfs.
79
No. of syn. Machines 72
No. of asyn.Machines 0
|
| No. of Loads
77
No. of Shunts
23
No. of SVS
0
|
|
|
| Generation
=
2769.62 MW
-172.35
Mvar
2774.97 MVA
|
| External Infeed
=
0.31 MW
-80.50
Mvar
80.50 MVA
|
| Inter Grid Flow
=
0.00 MW
0.00
Mvar
|
| Load P(U)
=
2707.28 MW
711.09
Mvar
2799.11 MVA
|
| Load P(Un)
=
2707.28 MW
711.09
Mvar
2799.11 MVA
|
| Load P(Un-U)
=
0.00 MW
0.00
Mvar
|
| Motor Load
=
0.00 MW
0.00
Mvar
0.00 MVA
|
| Grid Losses
=
62.65 MW
-617.04
Mvar
|
| Line Charging
=
-1257.37
Mvar
|
| Compensation ind.
=
157.29
Mvar
|
| Compensation cap.
=
-504.19
Mvar
|
|
|
| Installed Capacity
=
4073.50 MW
|
| Spinning Reserve
=
1303.89 MW
|
|
|
| Total Power Factor:
|
|
Generation
=
1.00 [-]
|
|
Load/Motor
= 0.97 / 0.00 [-]
|
|---------------------------------------------------------------------------------------------------------------------------------|
183
ANEXO 9
Cargabilidad en lneas y Transformadores.
184
TRANSFORMADOR
ES
T POLICENTRO
T S/E 18
T SALITRAL
T S/E S ROSA 1
T S/E S ROSA 2
T TRINITARIA 69
T MULALO
T S/E 19
T S/E S ROSA 230 1
T S/E S ROSA 230 2
T S/E CUMBAYA
T TOTORAS 69
T RIOBAMBA
T PASCUALES 1
T PASCUALES 2
T BAOS
T S/E
CHILIBULO(1)
T NPR
T ESC 96
T S/E CONC
T LOJA
T TRINITARIA
T CHONE
T TOTORAS
T TOTORAS 2
T PORTOVIEJO
T PAUTE S/E 1
T PAUTE S/E 2
T IBARRA 1
T SININCAY
S/E POMASQUI 1
S/E POMASQUI 2
T VICENTINA 1
T S JUAN
T S/E SELVA
ALEGRE 1
T S/E SELVA
ALEGRE 2
T ORQUIDEAS
T PUYO
T STO. DOM. 69 1
T STO. DOM. 69 2
T CHAVEZPAMBA
T POSORJA
T S GREGORIO
T AMBATO
T CRY
T MILAGRO 1
T CUENCA
T MACHALA 3
T ESMERALDAS
T VICENTINA 2
T CUMBARATZA
T ESME - ST
T MONTECRISTI
T PASCULAS 69 1
T QUEVEDO 69
T MACHALA 1
DEMANDA MAXIMA
SIN
CON
COCINAS
COCINAS
(%) De
(%) De
Cargabilid Cargabilid
ad
ad
85.74%
91.93%
83.87%
91.07%
70.10%
76.21%
95.15%
105.07%
95.15%
105.07%
94.46%
100.82%
61.79%
77.18%
88.46%
96.48%
59.93%
67.20%
59.93%
67.20%
75.69%
79.79%
58.16%
78.16%
86.03%
100.30%
70.14%
68.39%
70.14%
68.39%
58.36%
78.28%
MINIMA
SIN
CON
COCINAS
COCINAS
(%) De
(%) De
Cargabilid Cargabilid
ad
ad
46.81%
49.23%
20.46%
21.76%
53.84%
56.65%
60.13%
63.94%
60.13%
63.94%
53.51%
56.32%
33.20%
39.95%
39.03%
41.51%
30.53%
33.23%
30.53%
33.23%
53.15%
52.15%
24.27%
31.67%
44.74%
48.59%
53.61%
55.54%
53.61%
55.54%
26.52%
36.35%
INCREMEN
TO
(%) DE
INCREMEN
TO
5.16%
6.32%
5.23%
6.34%
6.34%
5.24%
20.31%
6.37%
8.86%
8.86%
-1.88%
30.52%
8.62%
3.60%
3.60%
37.04%
78.80%
85.56%
8.57%
50.03%
59.48%
18.89%
20.18%
21.46%
6.34%
48.88%
56.84%
75.92%
13.39%
77.06%
78.72%
33.07%
33.07%
67.59%
66.16%
66.16%
49.77%
10.60%
49.21%
49.21%
47.91%
62.62%
52.41%
60.67%
82.24%
17.32%
67.02%
78.72%
57.10%
57.10%
67.93%
61.63%
61.63%
57.06%
14.21%
54.22%
54.22%
54.22%
63.17%
7.21%
6.74%
8.33%
29.34%
-13.03%
0.00%
72.66%
72.66%
0.50%
-6.85%
-6.85%
14.65%
34.06%
10.18%
10.18%
13.19%
0.89%
53.83%
52.26%
48.00%
32.06%
58.33%
53.14%
30.14%
30.14%
49.86%
57.18%
57.18%
37.42%
14.12%
39.99%
39.99%
39.18%
46.75%
59.23%
57.93%
57.13%
56.51%
52.93%
52.87%
52.81%
52.81%
50.11%
49.16%
49.16%
48.44%
48.15%
47.82%
47.82%
47.19%
47.15%
10.03%
10.84%
19.02%
76.27%
-9.27%
-0.51%
75.19%
75.19%
0.49%
-14.04%
-14.04%
29.45%
240.96%
19.60%
19.60%
20.45%
0.86%
25.14%
31.01%
27.94%
37.30%
54.22%
58.69%
30.54%
30.54%
41.82%
64.15%
64.15%
2.76%
21.78%
21.53%
21.53%
16.23%
37.92%
26.44%
32.55%
29.70%
45.19%
57.01%
62.95%
30.37%
30.37%
41.97%
63.33%
63.33%
5.00%
17.51%
23.38%
23.38%
18.07%
38.06%
5.16%
4.95%
6.29%
21.17%
5.14%
7.26%
-0.56%
-0.56%
0.37%
-1.28%
-1.28%
81.11%
-19.58%
8.61%
8.61%
11.29%
0.37%
5.44%
5.89%
8.20%
45.27%
46.79%
3.38%
23.00%
23.88%
3.83%
5.44%
5.89%
8.20%
45.27%
46.79%
3.38%
16.94%
17.75%
4.79%
42.17%
37.02%
58.08%
58.08%
53.24%
48.66%
23.43%
34.79%
41.65%
44.61%
52.59%
44.88%
50.69%
32.39%
17.15%
20.63%
50.85%
36.61%
52.96%
29.10%
45.17%
50.05%
58.55%
58.55%
57.24%
49.34%
23.94%
47.15%
44.34%
44.96%
63.85%
44.03%
51.24%
36.67%
35.07%
20.17%
50.85%
37.76%
53.40%
30.24%
7.14%
35.22%
0.81%
0.81%
7.51%
1.41%
2.18%
35.54%
6.46%
0.79%
21.40%
-1.88%
1.09%
13.19%
104.41%
-2.24%
0.00%
3.15%
0.83%
3.94%
40.64%
24.66%
42.45%
42.45%
36.39%
40.52%
41.26%
22.68%
36.56%
40.58%
23.45%
38.52%
35.72%
29.85%
6.17%
35.25%
34.43%
32.07%
32.34%
31.91%
45.08%
43.16%
42.68%
42.68%
41.90%
41.41%
41.35%
40.91%
40.51%
40.06%
39.21%
39.19%
36.29%
35.95%
35.76%
35.12%
34.43%
33.69%
32.73%
32.26%
10.93%
74.99%
0.53%
0.53%
15.14%
2.19%
0.21%
80.39%
10.80%
-1.29%
67.19%
1.74%
1.59%
20.45%
479.63%
-0.38%
0.00%
5.05%
1.20%
1.08%
25.96%
15.51%
29.42%
29.42%
22.34%
31.88%
26.09%
15.28%
28.22%
42.49%
26.02%
19.19%
29.62%
10.98%
13.11%
34.58%
47.25%
25.69%
18.66%
19.34%
27.27%
20.28%
29.49%
29.49%
23.38%
32.33%
26.54%
20.37%
29.54%
42.16%
33.24%
19.43%
29.77%
12.22%
16.06%
34.46%
47.25%
26.41%
18.79%
19.18%
5.08%
30.76%
0.24%
0.24%
4.65%
1.40%
1.73%
33.31%
4.67%
-0.78%
27.75%
1.23%
0.52%
11.29%
22.50%
-0.35%
0.00%
2.81%
0.70%
-0.79%
185
TRANSFORMADOR
ES
T MACHALA 2
T DCR 2
T TULCAN
T COCA
T TENA
T LA TRONCAL
T SE ZAAMBIZA
T S GREGORIO 69
T IBARRA 3
T DCR 1
T ESC 138
T S ELENA
T QUEVEDO
T S/E 19(1)
T BABAHOYO
T QUININDE
T STO. DOM 1
T STO. DOM 2
T EL INGA
T EL INGA 2
T SID
T MILAGRO 2
T IBARRA 2
DEMANDA MAXIMA
SIN
CON
COCINAS
COCINAS
(%) De
(%) De
Cargabilid Cargabilid
ad
ad
29.10%
30.24%
28.59%
30.64%
50.79%
55.02%
26.63%
30.63%
28.12%
37.94%
36.54%
36.82%
29.46%
31.94%
38.18%
38.51%
20.32%
22.14%
35.73%
36.16%
22.88%
25.81%
40.30%
40.80%
20.64%
18.19%
24.30%
26.39%
63.30%
63.71%
17.86%
17.86%
28.73%
28.83%
28.73%
28.83%
12.43%
12.08%
12.43%
12.08%
19.14%
16.73%
12.34%
8.06%
13.40%
14.36%
MINIMA
SIN
CON
COCINAS
COCINAS
(%) De
(%) De
Cargabilid Cargabilid
ad
ad
19.34%
19.18%
17.57%
18.47%
16.42%
17.39%
44.15%
45.29%
12.06%
15.68%
21.38%
21.53%
10.63%
11.28%
53.45%
53.64%
23.21%
24.52%
26.33%
26.52%
11.44%
12.08%
37.32%
37.88%
28.51%
28.58%
5.99%
6.36%
44.43%
44.76%
25.10%
25.09%
9.93%
9.84%
9.93%
9.84%
16.14%
15.90%
16.14%
15.90%
7.86%
7.92%
17.74%
18.25%
0.51%
0.50%
INCREMEN
TO
(%) DE
INCREMEN
TO
-0.79%
5.10%
5.95%
2.57%
30.03%
0.71%
6.16%
0.37%
5.65%
0.73%
5.64%
1.48%
0.25%
6.18%
0.75%
-0.04%
-0.92%
-0.92%
-1.47%
-1.47%
0.80%
2.89%
-0.45%
TRANSFORMADOR
ES
T POLICENTRO
T S/E 18
T S/E S ROSA 1
T S/E S ROSA 2
T TRINITARIA 69
T MULALO
T S/E 19
T SALITRAL
T S/E CUMBAYA
T TOTORAS 69
T S/E S ROSA 230 1
T S/E S ROSA 230 2
T TOTORAS
T TOTORAS 2
T BAOS
T RIOBAMBA
T NPR
T PAUTE S/E 1
T PAUTE S/E 2
T S/E
CHILIBULO(1)
T ESC 96
T PASCUALES 1
T PASCUALES 2
T TRINITARIA
DEMANDA MAXIMA
SIN
CON
COCINAS
COCINAS
(%) De
(%) De
Cargabilid Cargabilid
ad
ad
88.83%
95.49%
84.19%
91.77%
95.53%
105.84%
95.53%
105.84%
96.33%
103.19%
63.33%
83.96%
88.83%
97.26%
96.85%
103.62%
75.80%
80.06%
58.27%
78.77%
60.52%
68.34%
60.52%
68.34%
65.95%
89.58%
65.95%
89.58%
58.83%
79.40%
84.34%
103.81%
49.38%
53.14%
66.54%
62.23%
66.54%
62.23%
MINIMA
SIN
CON
COCINAS
COCINAS
(%) De
(%) De
Cargabilid Cargabilid
ad
ad
46.21%
48.48%
20.46%
21.64%
60.11%
63.81%
60.11%
63.81%
53.15%
55.71%
23.14%
29.72%
39.02%
41.36%
53.31%
55.90%
53.27%
52.93%
24.17%
31.64%
30.62%
33.32%
30.62%
33.32%
52.36%
61.55%
46.54%
55.44%
27.97%
36.58%
42.10%
47.24%
24.88%
26.11%
3.66%
5.54%
3.66%
5.54%
INCREMEN
TO
(%) DE
INCREMEN
TO
4.90%
5.76%
6.14%
6.14%
4.81%
28.43%
5.98%
4.86%
-0.64%
30.92%
8.79%
8.79%
17.55%
19.13%
30.78%
12.22%
4.95%
51.52%
51.52%
79.11%
86.20%
8.96%
49.77%
59.33%
19.19%
20.18%
21.39%
6.01%
57.44%
70.33%
70.33%
74.66%
61.53%
70.52%
70.52%
70.86%
7.13%
0.27%
0.27%
-5.09%
52.33%
51.60%
51.60%
43.81%
58.55%
58.03%
58.03%
57.99%
11.90%
12.46%
12.46%
32.36%
30.75%
37.45%
37.45%
34.12%
32.21%
37.92%
37.92%
33.49%
4.76%
1.25%
1.25%
-1.84%
186
TRANSFORMADOR
ES
T CUENCA
T S/E CONC
T CHONE
T LOJA
T PORTOVIEJO
S/E POMASQUI 1
S/E POMASQUI 2
T VICENTINA 1
T S JUAN
T S/E SELVA
ALEGRE 1
T S/E SELVA
ALEGRE 2
T ORQUIDEAS
T PUYO
T IBARRA 1
T STO. DOM. 69 1
T STO. DOM. 69 2
T POSORJA
T AMBATO
T CHAVEZPAMBA
T CRY
T MILAGRO 1
T MACHALA 3
T ESME - ST
T COCA
T ESMERALDAS
T MONTECRISTI
T PASCULAS 69 1
T QUEVEDO
T VICENTINA 2
T CUMBARATZA
T QUEVEDO 69
T MILAGRO 2
T DCR 2
T TENA
T ESC 138
T TULCAN
T LA TRONCAL
T S GREGORIO 69
T SE ZAAMBIZA
T DCR 1
T IBARRA 3
T S ELENA
T SID
T S/E 19(1)
T BABAHOYO
T QUININDE
T S GREGORIO
T SININCAY
T MACHALA 1
T MACHALA 2
T STO. DOM 1
T STO. DOM 2
T EL INGA
T EL INGA 2
T IBARRA 2
DEMANDA MAXIMA
SIN
CON
COCINAS
COCINAS
(%) De
(%) De
Cargabilid Cargabilid
ad
ad
53.09%
64.17%
76.20%
83.03%
78.73%
78.74%
3.97%
17.31%
68.11%
68.44%
49.56%
55.01%
49.56%
55.01%
47.97%
54.55%
63.03%
63.64%
MINIMA
SIN
CON
COCINAS
COCINAS
(%) De
(%) De
Cargabilid Cargabilid
ad
ad
7.91%
12.43%
28.64%
30.37%
49.27%
48.75%
19.64%
27.74%
41.11%
41.30%
21.22%
22.83%
21.22%
22.83%
16.28%
18.23%
40.83%
41.05%
INCREMEN
TO
(%) DE
INCREMEN
TO
57.12%
6.03%
-1.07%
41.22%
0.44%
7.63%
7.63%
12.02%
0.54%
5.46%
5.93%
8.56%
44.90%
46.53%
3.64%
17.00%
18.00%
5.92%
5.46%
5.93%
8.56%
44.90%
46.53%
3.64%
17.00%
18.00%
5.92%
42.73%
37.29%
50.64%
58.37%
58.37%
49.17%
34.92%
53.44%
41.88%
45.01%
45.09%
12.61%
28.53%
50.87%
50.85%
37.15%
35.17%
32.44%
17.33%
53.34%
12.13%
28.97%
28.25%
26.65%
50.95%
36.82%
38.44%
29.57%
36.15%
20.39%
41.23%
19.32%
24.40%
63.90%
17.93%
34.21%
10.09%
29.14%
29.14%
30.43%
30.43%
12.48%
12.48%
13.45%
45.94%
50.76%
58.87%
58.98%
58.98%
49.94%
48.04%
57.65%
44.67%
45.53%
47.93%
24.04%
33.79%
51.45%
50.85%
38.42%
31.99%
36.89%
35.00%
53.48%
18.98%
31.16%
38.33%
30.79%
55.37%
37.16%
38.79%
32.18%
36.71%
22.28%
41.78%
24.40%
26.59%
64.97%
17.96%
34.93%
13.74%
27.85%
27.85%
28.05%
28.05%
12.18%
12.18%
14.44%
7.53%
36.11%
16.24%
1.04%
1.04%
1.57%
37.58%
7.88%
6.67%
1.17%
6.29%
90.53%
18.44%
1.15%
0.00%
3.42%
-9.05%
13.72%
101.94%
0.26%
56.39%
7.55%
35.68%
15.54%
8.68%
0.93%
0.93%
8.85%
1.56%
9.27%
1.32%
26.31%
8.99%
1.66%
0.14%
2.11%
36.20%
-4.44%
-4.44%
-7.81%
-7.81%
-2.45%
-2.45%
7.39%
40.85%
25.36%
31.10%
41.84%
41.84%
40.75%
23.10%
35.76%
36.59%
40.43%
30.13%
31.17%
28.66%
35.44%
34.65%
32.17%
33.59%
26.58%
6.12%
31.89%
6.90%
27.70%
16.35%
22.51%
24.49%
28.77%
28.65%
24.79%
27.14%
24.38%
25.34%
8.31%
21.86%
23.77%
23.50%
22.53%
14.90%
24.06%
24.06%
16.84%
16.84%
13.89%
13.89%
0.48%
45.80%
44.62%
42.97%
42.32%
42.32%
41.90%
41.85%
41.26%
40.75%
39.54%
39.04%
38.80%
36.34%
36.11%
35.10%
34.03%
33.94%
33.04%
32.92%
32.45%
31.15%
31.06%
30.61%
30.13%
29.97%
29.24%
29.23%
28.48%
27.79%
27.21%
26.08%
25.90%
24.99%
24.65%
23.51%
23.50%
19.88%
19.13%
19.13%
15.33%
15.33%
13.26%
13.26%
1.28%
12.12%
75.91%
38.19%
1.16%
1.16%
2.82%
81.11%
15.37%
11.38%
-2.19%
29.58%
24.46%
26.78%
1.90%
1.31%
5.77%
1.05%
24.31%
438.11%
1.76%
351.34%
12.16%
87.18%
33.83%
22.37%
1.64%
2.04%
14.86%
2.43%
11.60%
2.91%
211.57%
14.29%
3.70%
0.04%
4.28%
33.43%
-20.47%
-20.47%
-8.94%
-8.94%
-4.47%
-4.47%
166.08%
25.69%
15.38%
2.76%
29.35%
29.35%
31.24%
15.23%
22.34%
28.09%
42.80%
20.13%
3.60%
6.68%
29.64%
28.07%
26.20%
48.28%
11.01%
4.88%
29.15%
20.13%
17.39%
11.85%
10.59%
16.42%
21.19%
51.79%
10.62%
26.15%
23.21%
14.98%
10.62%
5.99%
8.44%
25.08%
14.09%
8.07%
19.21%
19.21%
16.21%
16.21%
16.15%
16.15%
0.51%
26.95%
20.16%
4.23%
29.44%
29.44%
31.56%
20.33%
23.31%
29.37%
42.52%
20.15%
3.41%
7.61%
29.80%
28.11%
26.73%
47.66%
12.33%
7.06%
29.27%
20.26%
18.24%
15.43%
10.02%
17.34%
21.32%
52.07%
11.23%
26.31%
24.45%
15.23%
9.95%
6.34%
8.72%
25.08%
14.10%
15.97%
19.11%
19.11%
16.21%
16.21%
15.89%
15.89%
0.50%
4.89%
31.07%
52.99%
0.30%
0.30%
1.01%
33.52%
4.31%
4.56%
-0.64%
0.09%
-5.09%
13.99%
0.54%
0.13%
2.02%
-1.30%
12.02%
44.58%
0.44%
0.62%
4.92%
30.18%
-5.34%
5.64%
0.63%
0.54%
5.67%
0.60%
5.34%
1.67%
-6.32%
5.82%
3.37%
0.00%
0.05%
97.82%
-0.52%
-0.52%
-0.05%
-0.05%
-1.61%
-1.61%
-0.16%
187
Lineas de Transmisin
SININCAY - CUENCA
PUYO - TOPO
MONTC- SGREGORIO
SE CHILIBULO - S/E
SANTA ROSA
BAOS - TOPO
SE S ROSA - CONOCOTO
DCR - MJILAGRO
PUCARA - MULALO
CUENCA - PAUTE 1
CUENCA - PAUTE 2
TOTORAS - AMBATO
ELECAUSTRO - CUENCA
PASCUALES - MJILAGRO
TOTORAS - SOPLADORA
POMASQUI - ZAMBIZA
SHORAY - TRONCAL
S ROSA - TOACHI P 1
S ROSA - TOACHI P 2
TRINITARIA - SALTRAL 1
TRINITARIA - SALTRAL 2
SELVA ALEGRE - S/E
SANTA ROSA
POLICENTRO PASCUALES 1
POLICENTRO PASCUALES 2
VICENTINA CONOCOTO
SHORAY - MILAGRO
TOTORAS - SANTAROSA
1
TOTORAS - SANTAROSA
1(1)
YAHUACHI - PAUTE 1
YAHUACHI - PAUTE 2
PASCUALES - SALITRAL 1
PASCUALES - SALITRAL 2
SE CHILIBULO - S/E
ESPEJO
RIOBAMBA SOPLADORA
BAOS - AGOYAN 1
BAOS - AGOYAN 2
S/E S R - SANLQ
POMASQUI - IBARRA
PUCARA - AMBATO
MILAGRO - TRONCAL
SID - TGM 138
SOPLADORA - MILAGRO
1
SOPLADORA - MILAGRO
2
PAUTE - SOPLADORA 1
PAUTE - SOPLADORA 2
DEMANDA MNIMA
SIN
CON
INCREME
COCINAS COCINAS
NTO
(%) De
Cargabili
dad
25.59%
95.86%
67.37%
(%) De
Cargabili
dad
38.06%
105.62%
67.99%
(%) De
Cargabili
dad
39.19%
91.95%
27.32%
(%) De
Cargabili
dad
34.67%
95.95%
29.67%
59.80%
65.47%
30.36%
32.44%
74.66%
66.73%
74.33%
52.06%
5.89%
5.89%
46.22%
57.80%
65.70%
44.38%
65.92%
52.66%
23.28%
23.28%
24.96%
24.96%
83.97%
77.67%
77.76%
59.06%
26.33%
26.33%
58.65%
58.31%
68.72%
57.95%
72.88%
58.34%
29.79%
29.79%
42.51%
42.51%
70.37%
26.72%
40.94%
39.73%
10.22%
10.22%
24.46%
60.72%
35.30%
23.39%
26.18%
47.26%
14.38%
14.38%
17.40%
17.40%
74.17%
29.70%
43.84%
42.54%
9.21%
9.21%
29.41%
60.88%
38.00%
28.75%
28.27%
50.29%
16.91%
16.91%
18.23%
18.23%
35.85%
39.45%
21.00%
22.47%
50.15%
53.75%
27.84%
29.27%
50.15%
53.75%
27.84%
29.27%
138
230
43.45%
52.70%
20.41%
22.24%
47.83%
53.45%
44.53%
47.51%
230
28.64%
34.37%
29.15%
31.54%
230
28.64%
34.37%
29.15%
31.54%
230
230
138
138
48.46%
48.46%
61.31%
61.31%
53.08%
53.08%
50.80%
50.80%
37.96%
37.96%
47.89%
47.89%
40.93%
40.93%
50.42%
50.42%
138
28.70%
31.68%
16.97%
18.19%
230
39.31%
50.15%
21.02%
25.24%
138
138
46
138
138
230
138
45.33%
45.33%
44.56%
55.52%
29.44%
35.51%
42.16%
47.66%
47.66%
48.36%
60.38%
36.46%
41.15%
42.21%
34.77%
34.77%
14.87%
25.76%
17.58%
37.44%
0.46%
35.09%
35.09%
15.93%
27.51%
20.03%
40.43%
0.46%
230
36.44%
41.45%
34.94%
36.43%
230
36.44%
41.45%
34.94%
36.43%
230
230
49.59%
49.59%
48.94%
48.94%
34.59%
34.59%
54.09%
54.09%
Nivel
de
Tensi
n
(KV)
69
138
138
138
138
138
230
138
138
138
138
138
230
230
138
230
230
230
138
138
138
138
138
(%) DE
INCREME
NTO
48.7%
10.2%
0.9%
9.5%
12.5%
16.4%
4.6%
13.4%
347.2%
347.2%
26.9%
0.9%
4.6%
30.6%
10.6%
10.8%
27.9%
27.9%
70.3%
70.3%
10.0%
7.2%
7.2%
21.3%
11.7%
20.0%
20.0%
9.5%
9.5%
-17.1%
-17.1%
10.4%
27.6%
5.1%
5.1%
8.5%
8.8%
23.9%
15.9%
0.1%
13.7%
13.7%
-1.3%
-1.3%
(%) De
Cargabili
dad
41.33%
82.21%
91.55%
(%) De
Cargabili
dad
100.24%
96.86%
91.09%
68.26%
76.69%
60.41%
55.97%
64.24%
60.02%
34.68%
34.68%
47.25%
61.12%
56.54%
45.22%
47.15%
52.89%
42.07%
42.07%
39.32%
39.32%
74.40%
72.44%
70.97%
69.83%
67.89%
67.89%
65.06%
64.61%
62.65%
60.40%
59.25%
57.45%
56.98%
56.98%
56.05%
56.05%
50.42%
55.82%
49.99%
55.56%
49.99%
55.56%
42.58%
55.32%
49.05%
53.53%
46.77%
51.79%
46.77%
51.79%
46.96%
46.96%
56.57%
56.57%
51.79%
51.79%
50.59%
50.59%
43.65%
48.12%
35.01%
47.72%
45.43%
45.43%
41.91%
37.95%
36.35%
39.51%
43.31%
47.66%
47.66%
47.55%
45.20%
45.07%
43.94%
43.02%
37.92%
42.50%
37.92%
42.50%
46.30%
46.30%
41.83%
41.83%
188
(%) DE
INCREME
NTO
142.5%
17.8%
-0.5%
12.4%
23.2%
29.4%
10.5%
16.3%
95.8%
95.8%
37.7%
5.7%
10.8%
33.6%
25.7%
8.6%
35.4%
35.4%
42.6%
42.6%
10.7%
11.1%
11.1%
29.9%
9.1%
10.7%
10.7%
10.3%
10.3%
-10.6%
-10.6%
10.2%
36.3%
4.9%
4.9%
13.4%
19.1%
24.0%
11.2%
-0.7%
12.1%
12.1%
-9.6%
-9.6%
(%) DE
INCREME
NTO
-11.5%
4.3%
8.6%
6.9%
5.4%
11.2%
7.1%
7.1%
-9.9%
-9.9%
20.2%
0.3%
7.6%
22.9%
8.0%
6.4%
17.6%
17.6%
4.8%
4.8%
7.0%
5.2%
5.2%
8.9%
6.7%
8.2%
8.2%
7.8%
7.8%
5.3%
5.3%
7.2%
20.1%
0.9%
0.9%
7.1%
6.8%
14.0%
8.0%
-0.8%
4.2%
4.2%
56.4%
56.4%
Lineas de Transmisin
MILAGRO - LAS
ESCLUSAS 1
MILAGRO - LAS
ESCLUSAS 2
TRINITARIA - NUEVA
PROSPERINA
VICENTINA - CUMBAYA
PASCUALES - LAGO
CHONGON 1
PASCUALES - LAGO
CHONGON 2
INGA - TABABELA
DAULE PERIPA QUEVEDO 1
DAULE PERIPA QUEVEDO 2
SHORAY - PAUTE 1
SHORAY - PAUTE 2
SE CHILIBULO - SELVA
ALEGRE
POMASQUI - POMASQUI
EEQ
PUYO - TENA
POMASQUI - S/E 19
S/E 18 - ZAMBIZA
T G MACHALA - SID 1
T G MACHALA - SID 2
CUMBAYA AEROPUERTO
LVC - NUEVA
PROSPERINA 1
POMASQUI CHAVEZPAMBA
DCR - ORQIDEAS 1
DCR - ORQIDEAS 2
PORTOVIEJO - DPERIPA 1
PORTOVIEJO - DPERIPA
1(1)
TOTORAS - RIOBAMBA
TOTORAS - S. FRANCIS 1
TOTORAS - S. FRANCIS 2
ESCLUSAS - CARAGUAY 1
ESCLUSAS - CARAGUAY 2
TRINITARIA - LAS
ESCLUSAS 1
TRINITARIA - LAS
ESCLUSAS 2
DCR - MJILAGRO(1)
COCA - TENA
CHONE - DPERIPA
SID - NACHALA 138 1
SID - NACHALA 138 2
STO. DOMINGO - BABA
SHORAY - SININCAY
SELVA ALEGRE - S/E 19
STO. DOMINGO QUEVEDO
BAOS - TOTORAS 1
BAOS - TOTORAS 2
DEMANDA MNIMA
SIN
CON
INCREME
COCINAS COCINAS
NTO
Nivel
de
Tensi
n
(KV)
(%) De
Cargabili
dad
(%) De
Cargabili
dad
(%) De
Cargabili
dad
(%) De
Cargabili
dad
230
42.83%
44.03%
24.56%
26.22%
230
42.83%
44.03%
24.56%
26.22%
230
36.11%
40.23%
16.33%
17.64%
138
18.41%
16.77%
15.10%
13.30%
138
47.06%
48.93%
43.71%
44.28%
138
47.06%
48.93%
43.71%
44.28%
138
40.53%
44.67%
11.93%
13.16%
138
26.61%
27.04%
26.14%
26.25%
138
26.61%
27.04%
26.14%
26.25%
230
230
26.33%
26.33%
32.49%
32.49%
26.65%
26.65%
33.74%
33.74%
138
13.65%
15.34%
13.12%
14.10%
138
36.00%
39.36%
138
138
138
230
230
35.60%
37.01%
23.64%
65.26%
65.26%
39.81%
39.92%
25.14%
56.69%
56.69%
46
43.17%
43.37%
230
26.63%
26.76%
138
43.13%
46.64%
138
138
138
30.50%
30.50%
31.43%
32.62%
32.62%
31.77%
138
31.43%
31.77%
230
230
230
138
138
19.23%
27.25%
27.25%
30.41%
30.41%
26.13%
27.11%
27.11%
32.35%
32.35%
230
32.89%
33.10%
230
32.89%
33.10%
230
138
138
138
138
230
230
138
30.72%
27.91%
42.07%
24.38%
24.38%
9.51%
4.55%
28.49%
32.08%
30.72%
42.06%
25.44%
25.44%
14.42%
8.84%
31.32%
230
9.39%
13.51%
138
138
20.83%
20.83%
20.28%
20.28%
(%) DE
INCREME
NTO
2.8%
2.8%
11.4%
-8.9%
4.0%
4.0%
10.2%
1.6%
1.6%
23.4%
23.4%
12.4%
9.3%
11.8%
7.8%
6.3%
-13.1%
-13.1%
0.5%
0.5%
8.1%
6.9%
6.9%
1.1%
1.1%
35.9%
-0.5%
-0.5%
6.4%
6.4%
0.6%
0.6%
4.4%
10.1%
0.0%
4.3%
4.3%
51.6%
94.1%
9.9%
43.9%
-2.7%
-2.7%
(%) De
Cargabili
dad
(%) De
Cargabili
dad
38.15%
41.40%
38.15%
41.40%
35.68%
41.30%
46.07%
39.37%
34.58%
38.50%
34.58%
38.50%
31.08%
37.35%
37.11%
37.13%
37.11%
37.13%
29.61%
29.61%
37.07%
37.07%
34.22%
36.84%
30.38%
36.22%
28.67%
30.71%
34.20%
34.50%
34.50%
35.50%
35.32%
35.13%
34.92%
34.92%
34.20%
34.48%
33.16%
34.40%
29.06%
34.15%
29.58%
29.58%
31.79%
32.81%
32.81%
32.11%
31.79%
32.11%
23.98%
28.67%
28.67%
26.77%
26.77%
31.29%
29.74%
29.74%
29.66%
29.66%
27.45%
29.24%
27.45%
29.24%
24.47%
23.11%
27.75%
27.10%
27.10%
21.09%
7.04%
20.63%
28.23%
28.16%
27.66%
27.41%
27.41%
25.52%
23.95%
23.94%
17.57%
22.37%
25.72%
25.72%
22.18%
22.18%
189
(%) DE
INCREME
NTO
8.5%
8.5%
15.7%
-14.5%
11.3%
11.3%
20.2%
0.1%
0.1%
25.2%
25.2%
7.7%
19.2%
23.8%
15.0%
2.7%
1.2%
1.2%
0.8%
3.7%
17.5%
10.9%
10.9%
1.0%
1.0%
30.5%
3.8%
3.8%
10.8%
10.8%
6.5%
16.58%
17.88%
40.60%
16.48%
17.11%
0.63%
0.63%
42.32%
17.58%
17.32%
0.62%
0.62%
42.88%
42.96%
15.75%
16.09%
19.40%
20.59%
18.89%
18.89%
40.96%
19.85%
19.85%
40.94%
40.96%
40.94%
9.09%
41.90%
41.90%
20.66%
20.66%
11.70%
41.55%
41.55%
21.63%
21.63%
18.23%
19.51%
6.5%
15.4%
21.8%
-0.3%
1.1%
1.1%
21.0%
240.2%
16.0%
18.23%
19.51%
11.25%
35.65%
31.31%
10.76%
10.76%
6.36%
10.85%
9.87%
13.04%
36.56%
32.79%
10.94%
10.94%
8.23%
8.73%
10.45%
27.3%
-13.8%
-13.8%
4.56%
6.34%
13.00%
13.00%
11.58%
11.58%
(%) DE
INCREME
NTO
6.8%
6.8%
8.0%
-11.9%
1.3%
1.3%
10.4%
0.4%
0.4%
26.6%
26.6%
7.4%
7.9%
4.2%
6.7%
1.2%
-0.8%
-0.8%
0.2%
2.1%
6.1%
5.1%
5.1%
0.0%
0.0%
28.7%
-0.8%
-0.8%
4.7%
4.7%
7.0%
7.0%
15.8%
2.6%
4.7%
1.7%
1.7%
29.4%
-19.5%
5.9%
39.1%
-10.9%
-10.9%
Lineas de Transmisin
LVC - QUEVEDO 1
LVC - QUEVEDO 2
NUEVA LOJA - COCA
S ROSA INGA 230 1
S ROSA INGA 230 2
ZAMBIZA - CUMBAYA
L CHONGON - EQUIL 1
L CHONGON - EQUIL 2
GUARANDA - RIOBAMBA
VICENTINA - MULALO
JAMONDINO POMASQUI 1 220
JAMONDINO POMASQUI 2 220
JAMONDINO POMASQUI 3 220
JAMONDINO POMASQUI 4 220
S/E S ROSA - ADELCA
TOACHI PILT - STO DOM
1
TOACHI PILT - STO DOM
2
CUENCA - LOJA 1
CUENCA - LOJA 2
STO DOM - QUININDE
LOJA VILONACO
MILAGRO - SID 1 230
MILAGRO - SID 2 230
BABA - QUEVEDO
SELVA ALEGRE POMASQUI EEQ
SOLPLADORA - SAN
BARTOLO
S JUAN - S GREGORIO 1
S JUAN - S GREGORIO 2
INGA - S ROSA 1
INGA - S ROSA 2
MACAS - CUENCA
CENCA - GUALACEO
S ROSA POMASQUI 230
1
S ROSA POMASQUI 230
2
MILAGRO - SID 1
MILAGRO - SID 2
CUMBARATZA - LOJA
ALANGASI - EL CARMEN
CHAVEZPAMBA - IBARRA
POSORJA - L CHONGON
ESMERALDAS - STO DOM
2
SAN ROSA - MACHACHI
LVC - TRINITARIA
PORTOVIEJO - S
GREGORIO
YAHUACHI - PASCUALES
1
DEMANDA MNIMA
SIN
CON
INCREME
COCINAS COCINAS
NTO
Nivel
de
Tensi
n
(KV)
230
230
69
230
230
138
138
138
69
138
(%) De
Cargabili
dad
16.35%
16.35%
15.94%
5.59%
5.59%
10.12%
17.81%
17.81%
42.35%
11.62%
(%) De
Cargabili
dad
24.81%
24.81%
18.31%
3.76%
3.76%
17.98%
18.74%
18.74%
43.61%
11.82%
(%) De
Cargabili
dad
8.37%
8.37%
68.36%
8.81%
8.81%
23.18%
14.01%
14.01%
17.33%
12.10%
(%) De
Cargabili
dad
9.57%
9.57%
70.56%
9.58%
9.58%
21.07%
14.16%
14.16%
17.66%
11.38%
230
30.03%
30.62%
6.14%
6.70%
230
30.03%
30.62%
6.14%
6.70%
230
30.03%
30.62%
6.14%
6.70%
230
30.03%
30.62%
6.14%
6.70%
138
10.54%
10.65%
8.37%
8.41%
230
12.44%
6.59%
2.44%
3.98%
230
12.44%
6.59%
2.44%
3.98%
138
138
138
138
230
230
230
14.25%
14.25%
9.01%
14.04%
32.20%
32.20%
8.03%
12.23%
12.23%
9.34%
14.32%
27.41%
27.41%
10.44%
15.80%
15.80%
16.46%
15.06%
8.08%
8.08%
3.63%
18.02%
18.02%
16.39%
15.07%
8.07%
8.07%
1.70%
138
15.17%
17.14%
6.16%
6.59%
230
13.88%
13.98%
1.37%
16.43%
230
230
230
230
138
138
20.87%
20.87%
9.80%
9.80%
13.52%
13.67%
21.01%
21.01%
7.77%
7.77%
17.13%
18.06%
12.62%
12.62%
2.26%
2.26%
10.31%
6.47%
12.67%
12.67%
3.00%
3.00%
10.71%
8.00%
230
4.07%
2.90%
5.70%
6.21%
230
4.07%
2.90%
5.70%
6.21%
138
138
138
138
138
138
27.79%
27.79%
6.61%
11.43%
13.64%
14.17%
24.09%
24.09%
13.27%
12.65%
15.19%
14.35%
6.05%
6.05%
7.13%
10.73%
6.71%
9.36%
5.86%
5.86%
8.18%
11.66%
7.22%
9.49%
138
7.72%
8.20%
11.80%
11.61%
138
230
12.46%
12.73%
13.49%
14.95%
4.92%
3.67%
5.19%
4.26%
138
26.40%
26.46%
24.10%
23.84%
230
14.79%
12.81%
17.42%
17.35%
(%) DE
INCREME
NTO
51.7%
51.7%
14.8%
-32.7%
-32.7%
77.8%
5.2%
5.2%
3.0%
1.7%
2.0%
2.0%
2.0%
2.0%
1.0%
-47.0%
-47.0%
-14.2%
-14.2%
3.7%
2.0%
-14.9%
-14.9%
30.0%
13.0%
0.7%
0.7%
0.7%
-20.8%
-20.8%
26.6%
32.1%
-28.6%
-28.6%
-13.3%
-13.3%
100.7%
10.7%
11.4%
1.3%
6.3%
8.3%
17.5%
0.2%
-13.4%
(%) De
Cargabili
dad
13.39%
13.39%
19.08%
18.40%
18.40%
27.86%
17.07%
17.07%
17.04%
21.98%
(%) De
Cargabili
dad
22.04%
22.04%
21.81%
21.01%
21.01%
21.00%
18.99%
18.99%
18.90%
18.86%
16.34%
18.51%
16.34%
18.51%
16.34%
18.51%
16.34%
18.51%
18.12%
18.42%
14.88%
18.27%
14.88%
18.27%
12.46%
12.46%
16.76%
15.20%
15.92%
15.92%
11.02%
17.47%
17.47%
16.86%
16.72%
16.53%
16.53%
16.18%
14.19%
16.16%
11.89%
15.76%
15.61%
15.61%
12.25%
12.25%
10.72%
7.19%
15.75%
15.75%
15.09%
15.09%
14.65%
14.51%
12.20%
13.85%
12.20%
13.85%
13.94%
13.94%
3.53%
11.17%
10.36%
11.90%
13.40%
13.40%
13.29%
13.04%
12.77%
12.16%
11.86%
12.13%
10.14%
8.62%
11.66%
11.45%
10.40%
11.24%
12.95%
11.08%
190
(%) DE
INCREME
NTO
64.7%
64.7%
14.3%
14.2%
14.2%
-24.6%
11.2%
11.2%
10.9%
-14.2%
13.3%
13.3%
13.3%
13.3%
1.7%
22.8%
22.8%
40.1%
40.1%
0.6%
10.0%
3.8%
3.8%
46.9%
13.9%
32.5%
0.9%
0.9%
23.2%
23.2%
36.7%
101.9%
13.5%
13.5%
-3.9%
-3.9%
276.0%
16.7%
23.3%
2.2%
2.3%
15.0%
32.9%
8.1%
-14.4%
(%) DE
INCREME
NTO
14.3%
14.3%
3.2%
8.8%
8.8%
-9.1%
1.0%
1.0%
1.9%
-6.0%
9.1%
9.1%
9.1%
9.1%
0.4%
62.8%
62.8%
14.0%
14.0%
-0.4%
0.1%
-0.2%
-0.2%
-53.1%
7.0%
1095.4%
0.4%
0.4%
32.8%
32.8%
3.8%
23.6%
8.9%
8.9%
-3.2%
-3.2%
14.6%
8.7%
7.5%
1.4%
-1.6%
5.6%
16.1%
-1.1%
-0.4%
Lineas de Transmisin
YAHUACHI - PASCUALES
2
YAHUACHI - PASCUALES
3
YAHUACHI - PASCUALES
3(1)
QUEVEDO - S GREGORIO
1
QUEVEDO - S GREGORIO
2
POMASQUI - SAN
ANTONIO
MULALO - NOVACERO
IBARRA - TULCAN
ESM 230 - STO DOM 1
ESM 230 - STO DOM
1(1)
SE S ROSA - EL CARMEN
TOTORAS - QUEVEDO 1
TOTORAS - QUEVEDO 2
L CHOGON - ST ELENA 1
L CHOGON - ST ELENA 2
SID - NACHALA 230 1
SID - NACHALA 230 2
VICENTINA GUANGOPOLO
ESMERALDASQUININDE
MILAGRO - BABAHOYO 1
MILAGRO - BABAHOYO 2
SANGLOQUI PASOCHOA
CHONE - SEVERINO
SAN ANTONIO - S/E 18
REF PACIF - S JUAN 1
REF PACIF - S JUAN 2
DEMANDA MNIMA
SIN
CON
INCREME
COCINAS COCINAS
NTO
Nivel
de
Tensi
n
(KV)
(%) De
Cargabili
dad
(%) De
Cargabili
dad
(%) De
Cargabili
dad
(%) De
Cargabili
dad
230
14.79%
12.81%
17.42%
17.35%
230
14.79%
12.81%
17.42%
17.35%
230
14.79%
12.81%
17.42%
17.35%
230
24.10%
23.94%
16.92%
17.07%
230
24.10%
23.94%
16.92%
17.07%
138
10.84%
11.77%
5.35%
5.70%
138
138
230
6.96%
15.06%
7.50%
8.69%
16.28%
7.83%
6.52%
5.18%
5.83%
7.62%
5.36%
5.54%
230
7.50%
7.83%
5.83%
5.54%
138
230
230
138
138
230
230
8.04%
13.61%
13.61%
10.08%
10.08%
7.25%
7.25%
8.77%
10.86%
10.86%
10.75%
10.75%
7.11%
7.11%
9.83%
16.19%
16.19%
11.96%
11.96%
3.06%
3.06%
10.09%
15.07%
15.07%
12.12%
12.12%
3.10%
3.10%
138
4.33%
4.63%
3.02%
2.61%
138
4.17%
4.75%
5.78%
5.46%
138
138
46
138
138
230
230
11.17%
11.17%
2.76%
1.71%
9.63%
0.47%
0.47%
11.19%
11.19%
2.80%
1.71%
12.25%
0.47%
0.47%
7.57%
7.57%
2.75%
1.77%
9.77%
0.51%
0.51%
7.74%
7.74%
2.77%
1.73%
9.36%
0.51%
0.51%
(%) DE
INCREME
NTO
-13.4%
-13.4%
-13.4%
-0.7%
-0.7%
8.6%
24.8%
8.1%
4.4%
4.4%
9.1%
-20.2%
-20.2%
6.6%
6.6%
-1.8%
-1.8%
7.0%
13.9%
0.2%
0.2%
1.1%
-0.1%
27.3%
-0.6%
-0.6%
(%) De
Cargabili
dad
(%) De
Cargabili
dad
12.95%
11.08%
12.95%
11.08%
12.95%
11.08%
10.84%
10.29%
10.84%
10.29%
8.54%
9.91%
6.91%
7.32%
8.65%
9.85%
8.95%
8.91%
8.65%
8.91%
7.57%
8.83%
8.83%
5.50%
5.50%
6.14%
6.14%
8.67%
7.40%
7.40%
6.92%
6.92%
6.24%
6.24%
5.08%
5.96%
4.83%
5.28%
4.14%
4.14%
2.83%
1.72%
4.04%
0.48%
0.48%
4.15%
4.15%
2.87%
1.72%
0.66%
0.47%
0.47%
(%) DE
INCREME
NTO
-14.4%
-14.4%
-14.4%
-5.1%
-5.1%
16.1%
42.6%
22.2%
3.1%
3.1%
14.5%
-16.2%
-16.2%
25.9%
25.9%
1.7%
1.7%
17.3%
9.2%
0.3%
0.3%
1.5%
-0.1%
-83.7%
-0.8%
-0.8%
(%) DE
INCREME
NTO
-0.4%
-0.4%
-0.4%
0.9%
0.9%
6.4%
16.9%
3.5%
-5.0%
-5.0%
2.6%
-7.0%
-7.0%
1.4%
1.4%
1.2%
1.2%
-13.6%
-5.6%
2.3%
2.3%
0.4%
-2.2%
-4.2%
-0.4%
-0.4%
Lneas de Transmisin
PUYO - TOPO
T G MACHALA - SID 1
T G MACHALA - SID 2
DCR - MJILAGRO
PASCUALES - MJILAGRO
TOTORAS - SOPLADORA
BAOS - TOPO
SE CHILIBULO - S/E
SANTA ROSA
Nivel
de
Tensi
n
(KV)
138
230
230
230
230
230
138
138
MNIMA
SIN
CON
INCREME
COCINAS COCINAS
NTO
(%) De
Cargabili
dad
20.36%
11.21%
53.13%
5.85%
8.16%
51.88%
30.83%
(%) De
Cargabili
dad
23.98%
8.58%
54.63%
7.25%
11.14%
50.72%
36.85%
(%) De
Cargabili
dad
9.47%
5.49%
26.33%
5.65%
10.62%
21.29%
0.10%
(%) De
Cargabili
dad
12.23%
5.04%
28.37%
6.28%
12.24%
23.26%
0.10%
52.82%
56.78%
27.48%
28.83%
(%) DE
INCREME
NTO
17.8%
-23.5%
2.8%
23.9%
36.4%
-2.2%
19.5%
7.5%
(%) De
Cargabili
dad
85.35%
34.52%
34.52%
73.04%
65.31%
71.23%
63.04%
(%) De
Cargabili
dad
101.24%
95.80%
95.80%
91.66%
83.26%
82.44%
78.10%
63.64%
72.48%
191
(%) DE
INCREME
NTO
18.6%
177.5%
177.5%
25.5%
27.5%
15.7%
23.9%
13.9%
(%) DE
INCREME
NTO
29.2%
-8.1%
7.7%
11.0%
15.3%
9.3%
-0.9%
4.9%
Lneas de Transmisin
PUCARA - MULALO
PAUTE - SOPLADORA 1
PAUTE - SOPLADORA 2
SE S ROSA - CONOCOTO
TOTORAS - AMBATO
POMASQUI - ZAMBIZA
RIOBAMBA SOPLADORA
ELECAUSTRO - CUENCA
TOTORAS - SANTAROSA
1
TOTORAS - SANTAROSA
1(1)
LVC - QUEVEDO 1
LVC - QUEVEDO 2
POLICENTRO PASCUALES 1
POLICENTRO PASCUALES 2
TRINITARIA - NUEVA
PROSPERINA
TRINITARIA - SALTRAL 1
TRINITARIA - SALTRAL 2
S ROSA - TOACHI P 1
S ROSA - TOACHI P 2
MILAGRO - SID 1 230
MILAGRO - SID 2 230
SELVA ALEGRE - S/E
SANTA ROSA
YAHUACHI - PAUTE 1
YAHUACHI - PAUTE 2
VICENTINA CONOCOTO
DCR - MJILAGRO(1)
MILAGRO - LAS
ESCLUSAS 1
MILAGRO - LAS
ESCLUSAS 2
S/E S R - SANLQ
SHORAY - TRONCAL
TOTORAS - RIOBAMBA
SININCAY - CUENCA
PUCARA - AMBATO
POMASQUI - IBARRA
BAOS - AGOYAN 1
BAOS - AGOYAN 2
SE CHILIBULO - S/E
ESPEJO
SHORAY - MILAGRO
TRINITARIA - LAS
ESCLUSAS 1
TRINITARIA - LAS
ESCLUSAS 2
VICENTINA - CUMBAYA
PUYO - TENA
POMASQUI - S/E 19
MILAGRO - SID 1
MILAGRO - SID 2
Nivel
de
Tensi
n
(KV)
138
230
230
138
138
138
MNIMA
SIN
CON
INCREME
COCINAS COCINAS
NTO
(%) De
Cargabili
dad
75.73%
31.30%
62.58%
42.74%
33.77%
47.48%
(%) De
Cargabili
dad
26.36%
16.69%
30.07%
19.40%
9.49%
25.86%
(%) De
Cargabili
dad
76.53%
34.54%
68.68%
46.45%
40.07%
51.08%
230
28.95%
32.02%
138
37.22%
42.79%
230
16.19%
18.09%
230
64.76%
78.10%
230
230
50.61%
5.63%
63.48%
4.68%
30.19%
39.55%
30.19%
39.55%
230
23.71%
31.82%
138
138
230
230
230
230
57.93%
34.08%
8.96%
29.88%
5.63%
32.89%
65.14%
39.23%
12.53%
34.35%
4.68%
38.35%
10.88%
11.89%
25.10%
44.62%
26.14%
48.61%
93.66%
104.66%
69.71%
86.83%
230
31.93%
34.85%
230
38.52%
42.42%
46
230
230
69
138
138
138
138
36.11%
33.93%
9.97%
5.08%
39.37%
13.52%
20.53%
30.83%
39.78%
43.35%
18.59%
4.42%
37.96%
18.40%
25.52%
36.85%
138
52.22%
59.17%
230
8.73%
10.89%
230
28.95%
32.02%
138
138
138
230
230
138
230
230
5.03%
6.85%
138
138
138
138
138
19.62%
7.03%
10.70%
16.99%
16.99%
19.26%
9.06%
10.88%
18.58%
18.58%
(%) DE
INCREME
NTO
1.1%
10.3%
9.7%
8.7%
18.7%
7.6%
10.6%
15.0%
11.7%
20.6%
25.4%
-16.9%
31.0%
31.0%
34.2%
12.5%
15.1%
39.8%
15.0%
-16.9%
16.6%
9.2%
4.1%
9.0%
11.7%
24.6%
9.1%
10.1%
10.2%
27.8%
86.4%
-13.0%
-3.6%
36.0%
24.3%
19.5%
13.3%
24.7%
10.6%
36.2%
-1.8%
28.9%
1.7%
9.4%
9.4%
(%) De
Cargabili
dad
60.68%
53.09%
53.09%
48.11%
47.79%
53.30%
(%) De
Cargabili
dad
69.95%
67.93%
67.93%
67.62%
65.07%
64.88%
53.85%
62.33%
60.93%
61.46%
55.63%
59.84%
55.63%
59.84%
45.33%
45.33%
57.65%
57.65%
50.20%
56.28%
50.20%
56.28%
46.34%
55.44%
52.51%
52.51%
35.85%
35.85%
17.29%
17.29%
55.11%
55.11%
52.61%
52.61%
51.58%
51.58%
45.56%
51.39%
51.62%
51.62%
50.44%
50.44%
33.52%
50.22%
33.31%
48.98%
38.78%
48.98%
38.78%
48.98%
41.97%
57.11%
39.26%
27.82%
36.98%
37.00%
38.61%
38.61%
47.70%
47.18%
45.70%
45.39%
44.84%
44.25%
44.20%
44.20%
38.84%
43.74%
53.22%
43.42%
32.02%
40.53%
32.02%
40.53%
42.64%
32.33%
34.79%
14.69%
14.69%
40.16%
39.75%
39.52%
39.32%
39.32%
192
(%) DE
INCREME
NTO
15.3%
28.0%
28.0%
40.5%
36.1%
21.7%
15.7%
0.9%
7.6%
7.6%
27.2%
27.2%
12.1%
12.1%
19.6%
5.0%
5.0%
46.7%
46.7%
198.3%
198.3%
12.8%
-2.3%
-2.3%
49.8%
47.1%
26.3%
26.3%
13.7%
-17.4%
16.4%
63.2%
21.3%
19.6%
14.5%
14.5%
12.6%
-18.4%
26.6%
26.6%
-5.8%
23.0%
13.6%
167.6%
167.6%
(%) De
Cargabili
dad
26.38%
17.22%
31.44%
20.58%
11.91%
27.08%
24.20%
28.02%
19.17%
20.76%
12.85%
13.16%
24.66%
26.52%
16.55%
7.95%
21.39%
7.15%
21.68%
25.69%
21.68%
25.69%
31.60%
45.07%
31.92%
16.93%
5.54%
16.49%
7.95%
18.05%
34.49%
18.10%
5.78%
19.18%
7.15%
20.91%
5.35%
5.68%
17.97%
14.86%
18.48%
15.89%
64.80%
68.48%
44.30%
44.55%
9.79%
10.22%
20.72%
21.46%
19.33%
13.39%
5.13%
47.93%
14.05%
10.50%
17.33%
0.10%
19.89%
15.77%
7.36%
47.84%
16.02%
10.78%
20.01%
0.10%
7.83%
0.91%
8.71%
9.60%
24.20%
28.02%
4.02%
7.96%
21.59%
6.50%
2.28%
6.17%
6.17%
21.62%
7.59%
2.40%
6.47%
6.47%
(%) DE
INCREME
NTO
0.1%
3.2%
4.6%
6.1%
25.5%
4.7%
15.8%
8.3%
2.4%
7.6%
29.2%
-10.0%
18.5%
18.5%
42.7%
8.0%
6.9%
4.3%
16.3%
-10.0%
15.9%
6.0%
2.8%
6.9%
5.7%
0.6%
4.4%
3.6%
2.9%
17.8%
43.6%
-0.2%
14.0%
2.7%
15.5%
-0.9%
-88.3%
10.3%
15.8%
97.8%
0.1%
16.9%
5.3%
4.9%
4.9%
Lneas de Transmisin
POMASQUI - POMASQUI
EEQ
PASCUALES - LAGO
CHONGON 1
PASCUALES - LAGO
CHONGON 2
INGA - TABABELA
CUMBAYA AEROPUERTO
S/E 18 - ZAMBIZA
SID - TGM 138
PASCUALES - SALITRAL 1
PASCUALES - SALITRAL 2
POMASQUI CHAVEZPAMBA
DCR - ORQIDEAS 1
DCR - ORQIDEAS 2
MILAGRO - TRONCAL
COCA - TENA
SE CHILIBULO - SELVA
ALEGRE
MONTC- SGREGORIO
CUENCA - PAUTE 1
CUENCA - PAUTE 2
SOPLADORA - MILAGRO
1
SOPLADORA - MILAGRO
2
STO. DOMINGO - BABA
ESCLUSAS - CARAGUAY 1
ESCLUSAS - CARAGUAY 2
QUEVEDO - S GREGORIO
1
QUEVEDO - S GREGORIO
2
PORTOVIEJO - DPERIPA 1
PORTOVIEJO - DPERIPA
1(1)
TOTORAS - S. FRANCIS 1
TOTORAS - S. FRANCIS 2
NUEVA LOJA - COCA
STO. DOMINGO QUEVEDO
CHONE - DPERIPA
LVC - TRINITARIA
BAOS - TOTORAS 1
BAOS - TOTORAS 2
SHORAY - PAUTE 1
SHORAY - PAUTE 2
VICENTINA - MULALO
TOACHI PILT - STO DOM
1
TOACHI PILT - STO DOM
2
BABA - QUEVEDO
LVC - NUEVA
PROSPERINA 1
GUARANDA - RIOBAMBA
S ROSA INGA 230 1
MNIMA
SIN
CON
INCREME
COCINAS COCINAS
NTO
Nivel
de
Tensi
n
(KV)
(%) De
Cargabili
dad
(%) De
Cargabili
dad
(%) De
Cargabili
dad
(%) De
Cargabili
dad
138
10.70%
10.88%
2.28%
2.40%
138
11.56%
14.51%
13.27%
13.12%
138
11.56%
14.51%
13.27%
13.12%
138
8.45%
7.91%
6.16%
6.37%
46
6.44%
13.01%
2.09%
6.14%
138
138
138
138
36.11%
42.21%
15.02%
24.12%
39.78%
42.88%
15.08%
23.43%
19.33%
52.92%
14.94%
8.28%
19.89%
53.05%
15.11%
8.27%
138
15.05%
19.08%
14.01%
14.93%
138
138
230
138
21.49%
82.06%
10.59%
1.71%
21.06%
89.75%
10.75%
1.71%
18.14%
48.65%
8.37%
1.74%
17.54%
51.16%
8.39%
1.74%
138
52.82%
56.78%
27.48%
28.83%
138
138
138
16.99%
11.43%
3.43%
18.58%
12.46%
24.02%
6.17%
6.45%
13.78%
6.47%
7.37%
20.88%
230
12.52%
13.63%
4.91%
5.18%
230
2.84%
2.88%
2.75%
2.76%
230
138
138
28.66%
31.09%
31.09%
29.54%
33.43%
33.43%
30.96%
18.69%
18.69%
30.36%
19.61%
19.61%
230
7.18%
7.63%
3.21%
3.21%
230
44.54%
44.54%
38.95%
37.60%
138
29.93%
36.83%
20.63%
20.56%
138
35.26%
44.86%
25.19%
25.26%
230
230
69
8.73%
5.85%
8.86%
10.89%
7.25%
9.80%
8.71%
5.65%
2.58%
9.60%
6.28%
2.50%
230
39.26%
44.86%
25.11%
26.63%
138
230
138
138
230
230
138
13.33%
47.61%
70.98%
18.41%
7.45%
16.80%
0.47%
15.12%
61.83%
81.39%
25.61%
8.09%
19.16%
0.46%
6.71%
39.06%
43.18%
14.51%
11.88%
5.98%
0.50%
7.30%
42.89%
46.63%
16.30%
12.80%
4.20%
0.49%
230
26.49%
25.39%
17.44%
13.97%
230
15.51%
20.53%
12.38%
11.90%
230
47.61%
61.83%
39.06%
42.89%
230
39.66%
38.50%
69
230
30.66%
46.35%
32.71%
50.77%
(%) DE
INCREME
NTO
1.7%
25.5%
25.5%
-6.3%
101.9%
10.2%
1.6%
0.4%
-2.9%
26.8%
-2.0%
9.4%
1.5%
0.0%
7.5%
9.4%
9.0%
599.8%
8.9%
1.3%
3.1%
7.5%
7.5%
6.3%
0.0%
23.1%
27.2%
24.7%
23.9%
10.6%
14.3%
13.4%
29.9%
14.7%
39.2%
8.5%
14.0%
-0.9%
-4.2%
32.3%
29.9%
-2.9%
6.7%
9.5%
(%) De
Cargabili
dad
(%) De
Cargabili
dad
33.47%
39.11%
33.26%
38.73%
33.26%
38.73%
30.06%
36.23%
34.77%
35.10%
33.63%
34.91%
28.25%
28.25%
34.89%
34.31%
33.77%
33.77%
28.65%
33.70%
29.73%
29.73%
43.76%
27.00%
33.33%
33.33%
33.31%
32.88%
29.35%
32.44%
31.98%
4.08%
4.08%
32.34%
31.63%
31.63%
40.47%
31.43%
40.47%
31.43%
26.61%
26.79%
26.79%
31.05%
29.83%
29.83%
29.28%
29.71%
29.28%
29.71%
27.85%
29.61%
27.85%
29.61%
28.67%
28.67%
25.46%
29.60%
29.60%
29.28%
23.83%
28.94%
27.79%
20.28%
21.33%
21.33%
28.02%
28.02%
25.52%
27.59%
27.05%
25.03%
25.03%
24.52%
24.52%
24.40%
16.56%
23.76%
16.56%
23.76%
17.49%
23.62%
23.26%
22.58%
19.88%
17.11%
21.46%
20.43%
193
(%) DE
INCREME
NTO
16.9%
16.5%
16.5%
20.5%
1.0%
3.7%
-1.7%
19.5%
19.5%
17.6%
12.1%
12.1%
-23.9%
21.8%
10.5%
1.1%
674.4%
674.4%
-22.4%
-22.4%
16.7%
11.4%
11.4%
1.5%
1.5%
6.3%
6.3%
3.2%
3.2%
15.0%
21.4%
-0.7%
33.4%
17.4%
17.4%
-12.5%
-12.5%
-4.4%
43.5%
43.5%
35.1%
-2.9%
8.0%
19.4%
19.83%
21.18%
20.56%
30.55%
21.50%
33.22%
(%) DE
INCREME
NTO
5.3%
-1.2%
-1.2%
3.4%
194.2%
2.9%
0.3%
1.1%
-0.1%
6.6%
-3.3%
5.2%
0.2%
-0.1%
4.9%
4.9%
14.2%
51.5%
5.4%
0.3%
-1.9%
4.9%
4.9%
0.1%
-3.5%
-0.3%
0.3%
10.3%
11.0%
-3.1%
6.1%
8.7%
9.8%
8.0%
12.3%
7.7%
-29.8%
-0.5%
-19.9%
-3.9%
9.8%
6.8%
4.6%
8.7%
Lneas de Transmisin
S ROSA INGA 230 2
SELVA ALEGRE - S/E 19
S/E S ROSA - ADELCA
CUENCA - LOJA 1
CUENCA - LOJA 2
STO DOM - QUININDE
L CHONGON - EQUIL 1
L CHONGON - EQUIL 2
PORTOVIEJO - S
GREGORIO
S JUAN - S GREGORIO 1
S JUAN - S GREGORIO 2
SOLPLADORA - SAN
BARTOLO
LOJA VILONACO
JAMONDINO POMASQUI 1 220
JAMONDINO POMASQUI 2 220
JAMONDINO POMASQUI 3 220
JAMONDINO POMASQUI 4 220
INGA - S ROSA 1
INGA - S ROSA 2
ZAMBIZA - CUMBAYA
SID - NACHALA 138 1
SID - NACHALA 138 2
MACAS - CUENCA
CENCA - GUALACEO
S ROSA POMASQUI 230
1
S ROSA POMASQUI 230
2
ALANGASI - EL CARMEN
ESMERALDAS - STO DOM
2
POSORJA - L CHONGON
CUMBARATZA - LOJA
CHAVEZPAMBA - IBARRA
SAN ROSA - MACHACHI
SELVA ALEGRE POMASQUI EEQ
MULALO - NOVACERO
SHORAY - SININCAY
POMASQUI - SAN
ANTONIO
IBARRA - TULCAN
ESM 230 - STO DOM 1
ESM 230 - STO DOM
1(1)
SE S ROSA - EL CARMEN
DAULE PERIPA QUEVEDO 1
DAULE PERIPA QUEVEDO 2
L CHOGON - ST ELENA 1
L CHOGON - ST ELENA 2
SID - NACHALA 230 1
MNIMA
SIN
CON
INCREME
COCINAS COCINAS
NTO
Nivel
de
Tensi
n
(KV)
230
138
138
138
138
138
138
138
(%) De
Cargabili
dad
46.35%
33.92%
73.24%
26.92%
11.43%
14.44%
37.94%
15.00%
(%) De
Cargabili
dad
50.77%
37.19%
80.49%
31.00%
12.46%
14.67%
41.44%
16.30%
(%) De
Cargabili
dad
30.55%
16.50%
43.00%
12.44%
6.45%
9.15%
15.12%
5.18%
(%) De
Cargabili
dad
33.22%
17.63%
45.33%
13.43%
7.37%
9.24%
14.72%
5.35%
138
29.93%
36.83%
20.63%
20.56%
230
230
27.06%
69.71%
31.76%
86.83%
17.72%
44.30%
20.47%
44.55%
230
11.21%
8.58%
5.49%
5.04%
138
3.80%
6.07%
2.11%
2.85%
230
53.68%
63.11%
29.85%
34.08%
230
21.12%
21.33%
12.91%
12.98%
230
21.12%
21.33%
12.91%
12.98%
230
33.93%
43.35%
13.39%
15.77%
230
230
138
138
138
138
138
11.21%
11.21%
0.47%
58.98%
42.21%
3.80%
18.41%
8.58%
8.58%
0.46%
67.05%
42.88%
6.07%
25.61%
5.49%
5.49%
0.50%
25.18%
52.92%
2.11%
14.51%
5.04%
5.04%
0.49%
24.96%
53.05%
2.85%
16.30%
230
34.51%
36.99%
19.54%
20.34%
230
34.51%
36.99%
19.54%
20.34%
138
11.21%
12.50%
11.93%
12.85%
138
61.33%
61.68%
59.54%
60.24%
138
138
138
138
35.26%
3.43%
13.67%
69.56%
44.86%
24.02%
18.06%
63.45%
25.19%
13.78%
6.32%
35.02%
25.26%
20.88%
7.71%
34.38%
138
33.05%
36.89%
16.22%
15.74%
138
230
8.86%
9.97%
9.80%
18.59%
2.58%
5.13%
2.50%
7.36%
138
47.48%
51.08%
25.86%
27.08%
138
230
8.45%
28.66%
7.91%
29.54%
6.16%
30.96%
6.37%
30.36%
230
66.26%
77.23%
138
54.67%
59.85%
138
43.25%
43.57%
138
21.49%
21.06%
138
138
230
8.04%
5.69%
41.38%
10.23%
5.70%
52.74%
(%) DE
INCREME
NTO
9.5%
9.7%
9.9%
15.1%
9.0%
1.6%
9.2%
8.7%
23.1%
17.4%
24.6%
-23.5%
59.5%
17.6%
1.0%
1.0%
27.8%
-23.5%
-23.5%
-0.9%
13.7%
1.6%
59.5%
39.2%
7.2%
7.2%
11.6%
0.6%
27.2%
599.8%
32.1%
-8.8%
11.6%
10.6%
86.4%
7.6%
-6.3%
3.1%
16.6%
9.5%
0.7%
-2.0%
27.2%
0.2%
27.5%
(%) De
Cargabili
dad
17.11%
15.14%
18.15%
13.93%
13.93%
14.90%
15.25%
15.25%
(%) De
Cargabili
dad
20.43%
18.77%
18.50%
18.43%
18.43%
17.62%
17.62%
17.62%
12.99%
16.01%
15.66%
15.66%
16.00%
16.00%
15.71%
15.85%
15.06%
15.46%
12.69%
15.30%
12.69%
15.30%
12.69%
15.30%
12.69%
15.30%
11.31%
11.31%
20.92%
19.79%
19.79%
10.74%
7.16%
14.99%
14.99%
14.47%
14.32%
14.32%
14.10%
13.65%
11.14%
13.29%
11.14%
13.29%
11.19%
13.09%
10.05%
12.49%
11.97%
3.56%
9.49%
10.16%
12.30%
12.23%
12.00%
11.71%
8.18%
11.61%
6.96%
7.43%
9.96%
9.91%
8.38%
9.75%
7.21%
7.78%
8.82%
8.59%
7.78%
8.59%
7.52%
8.58%
4.78%
8.51%
4.78%
8.51%
6.13%
6.13%
4.80%
8.22%
8.22%
6.22%
194
(%) DE
INCREME
NTO
19.4%
24.0%
1.9%
32.3%
32.3%
18.2%
15.5%
15.5%
23.2%
2.1%
2.1%
0.9%
2.6%
20.6%
20.6%
20.6%
20.6%
32.5%
32.5%
-30.8%
-27.7%
-27.7%
31.3%
90.7%
19.3%
19.3%
17.0%
24.3%
2.8%
244.0%
26.4%
15.3%
41.9%
43.1%
33.4%
16.3%
22.4%
10.5%
10.5%
14.2%
77.9%
77.9%
34.1%
34.1%
29.6%
36.89%
42.38%
25.76%
27.55%
42.87%
42.90%
18.14%
17.54%
5.15%
10.09%
19.27%
5.51%
9.97%
19.68%
(%) DE
INCREME
NTO
8.7%
6.8%
5.4%
7.9%
14.2%
1.0%
-2.7%
3.4%
-0.3%
15.5%
0.6%
-8.1%
35.3%
14.2%
0.6%
0.6%
17.8%
-8.1%
-8.1%
-0.5%
-0.9%
0.3%
35.3%
12.3%
4.1%
4.1%
7.7%
1.2%
0.3%
51.5%
22.1%
-1.8%
-3.0%
-3.1%
43.6%
4.7%
3.4%
-1.9%
14.9%
6.9%
0.1%
-3.3%
7.0%
-1.2%
2.1%
Lneas de Transmisin
SID - NACHALA 230 2
TOTORAS - QUEVEDO 1
TOTORAS - QUEVEDO 2
VICENTINA GUANGOPOLO
ESMERALDASQUININDE
SAN ANTONIO - S/E 18
MILAGRO - BABAHOYO 1
MILAGRO - BABAHOYO 2
YAHUACHI - PASCUALES
1
YAHUACHI - PASCUALES
2
YAHUACHI - PASCUALES
3
YAHUACHI - PASCUALES
3(1)
SANGLOQUI PASOCHOA
CHONE - SEVERINO
REF PACIF - S JUAN 1
REF PACIF - S JUAN 2
MNIMA
SIN
CON
INCREME
COCINAS COCINAS
NTO
Nivel
de
Tensi
n
(KV)
230
230
230
(%) De
Cargabili
dad
4.92%
1.34%
39.66%
(%) De
Cargabili
dad
5.55%
1.33%
38.50%
(%) De
Cargabili
dad
5.51%
15.35%
19.83%
(%) De
Cargabili
dad
5.34%
15.42%
21.18%
138
19.62%
19.26%
21.59%
21.62%
138
30.66%
32.71%
20.56%
21.50%
138
138
138
69.56%
40.14%
16.99%
63.45%
44.56%
18.58%
35.02%
11.93%
6.17%
34.38%
13.15%
6.47%
230
56.77%
55.62%
23.93%
25.94%
230
24.03%
22.68%
10.99%
11.06%
230
24.03%
22.68%
10.99%
11.06%
230
7.18%
7.63%
46
138
230
230
52.22%
41.60%
53.13%
6.88%
59.17%
41.64%
54.63%
10.18%
(%) DE
INCREME
NTO
12.6%
-0.6%
-2.9%
-1.8%
6.7%
-8.8%
11.0%
9.4%
-2.0%
-5.6%
-5.6%
6.3%
13.3%
0.1%
2.8%
48.0%
(%) De
Cargabili
dad
4.80%
11.79%
11.79%
(%) De
Cargabili
dad
6.22%
6.09%
6.09%
4.80%
5.62%
3.32%
5.15%
3.54%
4.14%
4.14%
4.74%
4.19%
4.19%
3.98%
4.12%
3.98%
4.12%
3.98%
4.12%
3.98%
4.12%
2.83%
1.72%
0.47%
0.47%
2.88%
1.72%
0.46%
0.46%
195
(%) DE
INCREME
NTO
29.6%
-48.3%
-48.3%
17.1%
55.3%
34.1%
1.2%
1.2%
3.4%
3.4%
3.4%
3.4%
1.7%
-0.3%
-2.0%
-2.0%
3.21%
3.21%
7.83%
25.16%
26.33%
24.99%
0.91%
24.91%
28.37%
26.13%
(%) DE
INCREME
NTO
-3.1%
0.5%
6.8%
0.1%
4.6%
-1.8%
10.2%
4.9%
8.4%
0.6%
0.6%
0.1%
-88.3%
-1.0%
7.7%
4.6%
ANEXO 10
Factor de Potencia en lneas y Transformadores
196
HIDROLOGA ALTA
MXIMA
SIN COCINAS
TRANSFORMADOR
ES
T ESME - ST
T TOTORAS
T TOTORAS 2
T CUMBARATZA
T MACHALA 1
T MACHALA 2
T STO. DOM 1
T STO. DOM 2
T VICENTINA 2
T VICENTINA 1
T PASCULAS 69 1
T S/E SELVA
ALEGRE 1
T S/E SELVA
ALEGRE 2
T CHONE
T TRINITARIA
T DCR 1
T IBARRA 2
T S/E S ROSA 230 1
T S/E S ROSA 230 2
T S/E S ROSA 1
T S/E S ROSA 2
T AMBATO
T MONTECRISTI
T MILAGRO 1
T LA TRONCAL
T PASCUALES 1
T PASCUALES 2
T S GREGORIO 69
T QUEVEDO 69
T SE ZAAMBIZA
INCREMENT
O
CON COCINAS
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
35.22
36.68
36.68
5.62
26.24
26.24
46.78
46.78
31.61
22.44
158.8
5
35.71
37.12
37.12
5.97
27.10
27.10
49.14
49.14
31.93
22.67
Factor
de
Potenci
a
0.99
0.99
0.99
0.94
0.97
0.97
0.95
0.95
0.99
0.99
160.90
0.99
5.37
0.93
5.02
5.37
0.93
47.31
168.6
7
58.17
4.94
226.0
1
226.0
1
68.38
68.38
27.58
50.51
72.17
57.95
257.3
9
257.3
9
59.34
83.57
27.53
47.43
1.00
169.69
0.99
58.28
5.23
1.00
0.95
226.26
1.00
5.02
HIDROLOGA ALTA
MEDIA
226.26
1.00
68.39
68.39
29.24
50.52
72.18
60.91
1.00
1.00
0.94
1.00
1.00
0.95
257.45
1.00
257.45
1.00
62.46
90.48
28.95
0.95
0.92
0.95
SIN COCINAS
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
60.27
16.69
16.69
1.92
30.53
30.53
25.48
25.48
27.31
17.21
138.3
5
60.44
27.71
27.71
2.11
30.81
30.81
26.79
26.79
29.18
18.38
Factor
de
Potenci
a
1.00
0.60
0.60
0.91
0.99
0.99
0.95
0.95
0.94
0.94
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
59.57
52.62
52.62
10.33
30.72
30.72
25.54
25.54
33.36
21.02
143.8
8
59.96
57.75
57.75
10.93
31.00
31.00
26.72
26.72
34.43
21.69
Factor
de
Potenci
a
0.99
0.91
0.91
0.95
0.99
0.99
0.96
0.96
0.97
0.97
140.89
0.98
145.75
0.99
0.54%
44.04
0.94
41.97
44.63
0.94
-0.09%
44.04
32.20
0.94
41.97
44.63
0.94
0.97
31.36
111.8
5
43.54
0.46
247.0
1
247.0
1
62.02
62.02
32.01
33.40
53.15
45.94
225.0
3
225.0
3
44.93
50.97
25.98
31.99
0.98
115.47
0.97
0.14%
44.35
0.49
0.98
0.94
0.39%
333.77%
264.92
0.93
2.10%
264.92
0.93
2.10%
62.15
62.15
33.92
34.18
53.40
48.22
1.00
1.00
0.94
0.98
1.00
0.95
0.15%
0.15%
0.39%
0.00%
0.09%
-0.01%
225.45
1.00
0.03%
225.45
1.00
0.03%
47.18
55.79
27.34
0.95
0.91
0.95
-0.01%
0.01%
-0.02%
Pot
Aparent
e (MVA)
34.63
62.50
62.50
11.28
27.54
27.54
46.76
46.76
35.50
25.20
162.5
8
34.71
62.63
62.63
11.93
28.31
28.31
48.91
48.91
35.73
25.36
Factor
de
Potenci
a
1.00
1.00
1.00
0.95
0.97
0.97
0.96
0.96
0.99
0.99
164.23
0.99
0.27%
5.73
0.94
0.23%
41.45
5.37
5.73
0.94
0.23%
41.45
47.31
145.5
8
58.28
5.22
250.4
8
250.4
8
74.63
74.63
36.79
50.51
72.17
57.95
248.2
8
248.2
8
59.34
83.79
29.45
47.37
1.00
0.13%
146.30
1.00
0.12%
129.04
0.97
58.37
5.52
1.00
0.95
0.06%
0.04%
44.34
0.18
0.98
0.22
250.69
1.00
0.02%
229.32
0.91
250.69
1.00
0.02%
229.32
0.91
74.63
74.63
39.00
50.52
72.19
60.91
1.00
1.00
0.94
1.00
1.00
0.95
0.01%
0.01%
0.01%
0.00%
-0.01%
-0.01%
52.95
52.95
19.54
34.18
53.45
48.21
1.00
1.00
0.94
0.98
0.99
0.95
248.36
1.00
-0.01%
225.57
1.00
248.36
1.00
-0.01%
225.57
1.00
62.47
90.74
30.98
0.95
0.92
0.95
-0.02%
-0.02%
-0.02%
31.36
124.8
3
43.36
0.04
209.4
2
209.4
2
52.75
52.75
18.36
33.40
53.15
45.94
225.0
8
225.0
8
44.93
50.64
23.13
47.17
55.43
24.34
0.95
0.91
0.95
5.37
1.15%
0.99%
0.99%
0.49%
0.48%
0.48%
0.43%
0.43%
0.37%
0.37%
INCREMENT
O
CON COCINAS
Pot
Activa
(MW)
(%)
Incremento
HIDROLOGA ALTA
MINIMA
197
SIN COCINAS
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
60.49
11.77
11.77
4.22
12.53
12.53
14.73
14.73
9.87
7.01
116.6
5
60.99
15.69
15.69
4.49
12.89
12.89
17.54
17.54
11.36
8.06
Factor
de
Potenci
a
0.99
0.75
0.75
0.94
0.97
0.97
0.84
0.84
0.87
0.87
117.95
0.99
16.49
23.90
0.69
-0.09%
16.46
17.47
0.94
0.64%
36.57
120.5
1
43.86
0.04
120.1
0
120.1
0
44.89
44.89
12.66
46.45
36.65
35.64
202.7
8
202.7
8
84.47
29.42
10.43
36.58
1.00
125.97
0.96
45.40
0.21
0.97
0.22
120.22
1.00
(%)
Incremento
-0.36%
51.28%
51.28%
3.84%
-0.03%
-0.03%
0.55%
0.55%
3.52%
3.52%
INCREMENT
O
CON COCINAS
120.22
1.00
45.12
45.12
13.58
48.20
38.81
37.35
0.99
0.99
0.93
0.96
0.94
0.95
207.54
0.98
207.54
0.98
89.10
33.19
11.01
0.95
0.89
0.95
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
60.26
22.52
22.52
5.10
12.62
12.62
14.73
14.73
11.32
8.04
118.7
3
60.72
25.29
25.29
5.50
13.01
13.01
17.33
17.33
12.58
8.93
Factor
de
Potenci
a
0.99
0.89
0.89
0.93
0.97
0.97
0.85
0.85
0.90
0.90
120.11
0.99
-0.05%
24.71
0.71
2.26%
17.42
18.25
0.95
1.33%
36.58
125.1
7
43.92
0.04
130.2
3
130.2
3
47.52
47.52
16.83
46.45
36.65
35.64
207.8
0
207.8
0
84.47
29.49
11.03
38.39
0.95
-4.71%
131.32
0.95
-0.37%
45.33
0.21
0.97
0.22
0.28%
0.00%
130.37
1.00
-0.01%
130.37
1.00
-0.01%
47.79
47.79
17.94
48.20
38.71
37.35
0.99
0.99
0.94
0.96
0.95
0.95
-0.07%
-0.07%
0.63%
0.00%
0.26%
0.00%
213.11
0.98
-0.20%
213.11
0.98
-0.20%
89.11
33.26
11.64
0.95
0.89
0.95
-0.01%
0.01%
0.06%
17.43
(%)
Incremento
0.07%
18.76%
18.76%
-1.31%
-0.17%
-0.17%
1.16%
1.16%
3.54%
3.54%
HIDROLOGA ALTA
MXIMA
SIN COCINAS
TRANSFORMADOR
ES
T STO. DOM. 69 1
T STO. DOM. 69 2
T POSORJA
T PORTOVIEJO
T S JUAN
T TULCAN
T SALITRAL
S/E POMASQUI 1
S/E POMASQUI 2
T IBARRA 3
T ESMERALDAS
T S/E CONC
T S ELENA
T S/E 18
T S/E CHILIBULO(1)
T S/E 19(1)
T BABAHOYO
T ESC 96
T ORQUIDEAS
T CHAVEZPAMBA
T CRY
T TENA
T TRINITARIA 69
T DCR 2
T QUININDE
T NPR
T PUYO
T POLICENTRO
T BAOS
T S/E 19
T MACHALA 3
T TOTORAS 69
T S GREGORIO
HIDROLOGA ALTA
MEDIA
INCREMENT
O
CON COCINAS
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
55.95
55.95
29.77
96.38
128.1
0
15.04
204.0
3
144.3
6
144.3
6
24.24
76.74
37.53
51.95
51.65
23.93
22.53
39.97
87.69
59.11
59.11
31.39
98.84
Factor
de
Potenci
a
0.95
0.95
0.95
0.98
136.31
0.94
16.07
0.94
204.28
1.00
148.76
0.97
148.76
0.97
26.42
78.66
39.57
53.62
54.59
25.89
23.85
41.35
93.05
0.92
0.98
0.95
0.97
0.95
0.92
0.94
0.97
0.94
97.88
103.52
0.95
32.69
92.07
8.44
135.1
0
34.76
93.74
8.96
0.94
0.98
0.94
137.75
0.98
98.24
104.74
0.94
10.77
207.0
8
11.20
118.7
1
18.33
80.03
70.62
54.83
51.24
12.27
0.88
213.88
0.97
11.80
0.95
123.10
0.96
19.36
86.80
74.55
58.13
51.27
0.95
0.92
0.95
0.94
1.00
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
55.95
55.95
29.93
96.38
128.1
0
16.02
219.7
6
157.2
0
157.2
0
26.04
77.19
40.15
52.36
55.26
25.60
24.10
39.97
92.69
103.4
6
34.57
97.31
11.10
142.7
9
103.8
6
10.67
218.8
9
14.75
125.4
7
24.13
85.63
68.75
72.18
51.26
59.13
59.13
31.56
98.87
Factor
de
Potenci
a
0.95
0.95
0.95
0.97
136.36
17.12
SIN COCINAS
HIDROLOGA ALTA
MINIMA
INCREMENT
O
CON COCINAS
Factor
de
Potenci
a
0.95
0.95
0.95
0.99
Factor
de
Potenci
a
0.95
0.95
0.95
0.99
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
-0.01%
-0.01%
-0.03%
-0.03%
29.53
29.53
20.35
62.51
30.99
30.99
21.38
62.98
Factor
de
Potenci
a
0.95
0.95
0.95
0.99
0.94
-0.02%
84.47
89.07
0.93
0.33%
5.12
154.5
7
5.57
163.27
0.95
66.10
67.81
0.97
-0.43%
66.10
67.81
0.97
71.50
-0.12%
-0.06%
-0.04%
-0.13%
-0.11%
-0.01%
-0.11%
-0.16%
-0.20%
29.25
46.49
14.23
49.29
13.46
6.53
5.83
31.25
50.86
31.90
46.81
15.00
49.45
14.31
7.12
6.22
31.26
53.54
0.92
0.99
0.95
1.00
0.94
0.92
0.94
1.00
0.95
30.75
46.68
15.05
49.46
14.24
6.91
6.17
31.25
52.91
0.94
-0.21%
64.63
67.89
0.95
67.24
26.52
90.80
9.43
0.94
0.98
0.94
-0.24%
-0.32%
0.20%
14.74
65.17
3.73
15.49
65.60
3.99
0.95
0.99
0.94
114.48
0.99
-0.35%
81.14
81.50
1.00
110.89
0.94
-0.40%
64.79
68.10
0.95
67.42
16.10
0.96
-0.15%
17.75
0.97
255.67
0.96
-0.51%
116.62
0.99
13.69
0.95
-0.44%
17.26
115.8
7
4.92
5.16
0.95
17.22
120.5
6
6.37
132.99
0.96
-0.57%
67.65
71.42
0.95
20.74
71.14
65.26
68.33
90.66
0.95
0.93
0.94
0.94
1.00
-0.43%
-0.59%
-0.07%
-0.89%
0.71%
9.12
38.13
32.83
24.02
53.09
9.13
40.51
33.53
25.21
58.43
1.00
0.94
0.98
0.95
0.91
Pot
Aparent
e (MVA)
40.43
40.43
25.18
72.33
42.57
42.57
26.52
73.35
0.95
97.28
102.96
0.93
8.77
242.8
5
137.2
7
137.2
7
31.91
55.17
27.52
33.24
53.91
17.61
22.56
15.83
88.59
103.2
5
25.04
89.24
8.88
112.7
7
103.7
4
15.41
245.2
8
12.98
127.5
4
19.62
65.94
61.26
64.25
90.50
9.42
250.50
0.97
1.42%
138.55
0.99
-0.43%
138.55
0.99
34.86
55.95
28.98
34.02
57.03
19.03
23.90
15.90
94.05
0.92
0.99
0.95
0.98
0.95
0.93
0.94
1.00
0.94
109.35
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
-0.02%
-0.02%
-0.02%
-0.04%
40.43
40.43
24.96
72.33
42.57
42.57
26.28
73.32
0.94
-0.04%
97.28
102.93
0.94
-0.05%
7.88
220.14
1.00
-0.05%
229.67
0.96
162.07
0.97
-0.05%
117.61
1.00
162.07
0.97
-0.05%
117.61
1.00
28.38
79.17
42.36
54.08
58.45
27.71
25.53
41.40
98.49
0.92
0.98
0.95
0.97
0.95
0.92
0.94
0.97
0.94
-0.05%
-0.06%
-0.06%
-0.07%
-0.07%
-0.07%
-0.08%
-0.11%
-0.14%
7.32
219.5
3
117.0
3
117.0
3
29.25
54.50
23.63
32.63
48.55
15.13
20.23
15.83
81.18
31.92
55.23
24.88
33.34
51.30
16.35
21.40
15.87
86.01
0.92
0.99
0.95
0.98
0.95
0.93
0.95
1.00
0.94
109.58
0.94
-0.14%
94.97
100.38
0.95
36.83
99.27
11.82
0.94
0.98
0.94
-0.20%
-0.20%
-0.21%
23.51
82.63
5.25
0.95
0.99
0.94
145.93
0.98
-0.23%
22.25
81.47
4.93
101.3
6
102.53
0.99
111.04
0.94
-0.28%
95.38
101.54
0.94
12.19
0.88
-0.32%
16.23
0.96
226.86
0.96
-0.35%
15.60
0.95
-0.37%
130.62
0.96
-0.38%
25.59
93.33
73.01
77.06
51.94
0.94
0.92
0.94
0.94
0.99
-0.41%
-0.48%
-0.60%
-0.69%
-1.24%
15.56
227.7
5
7.72
117.5
1
11.02
57.63
60.54
38.52
90.43
236.18
0.96
8.11
0.95
121.82
0.96
11.60
61.81
64.44
40.60
91.23
0.95
0.93
0.94
0.95
0.99
198
INCREMENT
O
CON COCINAS
(%)
Incremento
Pot
Activa
(MW)
(%)
Incremento
SIN COCINAS
Factor
de
Potenci
a
0.95
0.95
0.95
0.99
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
29.53
29.53
20.42
62.51
30.99
30.99
21.46
62.99
0.95
84.47
89.07
0.95
-0.01%
0.92
5.41
160.8
1
5.88
0.92
0.22%
170.01
0.95
-0.08%
73.38
0.97
-0.04%
73.38
0.97
-0.04%
33.55
47.01
15.86
49.64
15.13
7.53
6.58
31.32
55.73
0.92
0.99
0.95
1.00
0.94
0.92
0.94
1.00
0.95
-0.04%
-0.02%
0.04%
-0.05%
0.11%
0.13%
0.13%
-0.19%
-0.04%
70.67
0.95
-0.05%
15.35
67.80
4.82
16.13
68.33
5.13
0.95
0.99
0.94
-0.03%
-0.12%
0.41%
84.42
84.90
0.99
-0.11%
70.95
0.95
-0.12%
17.71
0.97
-0.03%
121.54
0.99
-0.17%
6.69
0.95
-0.04%
70.38
74.35
0.95
-0.07%
11.81
40.33
32.96
31.12
52.87
12.43
42.89
33.68
32.73
59.23
0.95
0.94
0.98
0.95
0.89
-4.93%
-0.10%
-0.04%
-0.18%
-1.76%
71.50
(%)
Incremento
0.00%
0.00%
-0.01%
-0.02%
HIDROLOGA ALTA
MXIMA
SIN COCINAS
TRANSFORMADOR
ES
T PAUTE S/E 1
T PAUTE S/E 2
T SID
T IBARRA 1
T CUENCA
T EL INGA
T EL INGA 2
T S/E CUMBAYA
T COCA
Pot
Activa
(MW)
247.5
3
247.5
3
41.99
28.53
103.4
6
22.41
22.41
24.60
12.93
HIDROLOGA ALTA
MEDIA
INCREMENT
O
CON COCINAS
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
251.16
0.99
251.16
0.99
43.45
32.30
0.97
0.88
107.29
0.96
28.14
28.14
25.39
16.58
0.80
0.80
0.97
0.78
Pot
Activa
(MW)
227.0
2
227.0
2
35.88
31.32
121.9
1
20.44
20.44
28.31
12.95
SIN COCINAS
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
(%)
Incremento
233.25
0.97
-1.24%
233.25
0.97
-1.24%
37.91
36.52
0.95
0.86
-2.09%
-2.90%
214.9
5
214.9
5
15.69
13.02
130.25
0.94
-2.94%
27.04
27.04
31.57
18.88
0.76
0.76
0.90
0.69
-5.05%
-5.05%
-7.41%
-11.99%
INCREMENT
O
CON COCINAS
SIN COCINAS
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
(%)
Incremento
186.31
0.97
-1.03%
186.31
0.97
-1.03%
20.03
30.54
0.81
0.56
0.65%
3.77%
248.3
2
248.3
2
18.71
1.82
73.04
75.33
0.97
4.48%
24.27
24.27
19.51
13.16
29.50
29.50
20.30
18.70
0.82
0.82
0.96
0.70
-4.81%
-4.81%
62.23%
-17.86%
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
218.46
0.98
218.46
0.98
19.38
24.05
0.81
0.54
181.4
2
181.4
2
16.32
17.17
44.24
47.67
0.93
27.18
27.18
14.00
13.12
31.46
31.46
23.64
15.31
0.86
0.86
0.59
0.86
Pot
Activa
(MW)
HIDROLOGA ALTA
MINIMA
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
248.36
1.00
248.36
1.00
18.73
1.89
1.00
0.96
244.0
0
244.0
0
18.72
2.72
53.06
53.07
1.00
35.88
35.88
6.57
25.33
38.13
38.13
30.03
28.10
0.94
0.94
0.22
0.90
Pot
Activa
(MW)
INCREMENT
O
CON COCINAS
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
(%)
Incremento
244.32
1.00
-0.12%
244.32
1.00
-0.12%
18.74
3.39
1.00
0.80
0.05%
-16.49%
67.45
67.80
0.99
-0.48%
35.04
35.04
5.32
25.42
37.42
37.42
26.41
28.61
0.94
0.94
0.20
0.89
-0.51%
-0.51%
-7.90%
-1.41%
Pot
Activa
(MW)
HIDROLOGA BAJA
MXIMA
SIN COCINAS
TRANSFORMADOR
ES
T MILAGRO 2
T SID
T MACHALA 3
T ESME - ST
T VICENTINA 1
T VICENTINA 2
T CUMBARATZA
T PASCULAS 69 1
T S/E SELVA
ALEGRE 1
T S/E SELVA
ALEGRE 2
T TRINITARIA
T DCR 1
INCREMENT
O
CON COCINAS
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
24.74
42.22
70.70
21.59
22.44
31.61
5.62
158.8
5
26.88
43.70
74.66
21.74
22.62
31.86
5.97
Factor
de
Potenci
a
0.92
0.97
0.95
0.99
0.99
0.99
0.94
160.64
0.99
5.02
5.37
0.93
5.02
5.37
0.93
158.7
2
58.16
HIDROLOGA BAJA
MEDIA
162.65
0.98
58.25
1.00
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
39.16
53.96
75.25
41.13
25.20
35.50
11.28
162.5
8
41.57
54.83
78.84
41.13
25.27
35.61
11.93
Factor
de
Potenci
a
0.94
0.98
0.95
1.00
1.00
1.00
0.95
163.97
0.99
0.27%
5.37
5.73
0.94
0.24%
5.37
5.73
0.94
0.24%
149.0
8
58.28
(%)
Incremento
2.36%
1.86%
0.79%
0.67%
0.50%
0.50%
0.49%
SIN COCINAS
HIDROLOGA BAJA
MINIMA
INCREMENT
O
CON COCINAS
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
14.74
16.28
47.13
54.02
18.49
26.05
1.92
138.3
5
15.51
18.99
50.40
54.03
18.61
26.21
2.11
Factor
de
Potenci
a
0.95
0.86
0.94
1.00
0.99
0.99
0.91
140.82
0.98
41.45
44.03
0.94
41.45
44.03
0.94
152.51
0.98
0.17%
94.26
96.79
0.97
58.33
1.00
0.06%
43.36
44.30
0.98
199
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
67.24
58.28
62.71
66.67
22.59
31.82
10.33
143.8
8
68.51
58.37
64.44
66.72
22.61
31.85
10.92
Factor
de
Potenci
a
0.98
1.00
0.97
1.00
1.00
1.00
0.95
145.57
0.99
0.61%
41.97
44.62
0.94
-0.09%
41.97
44.62
0.94
125.16
44.23
124.1
3
43.53
SIN COCINAS
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
47.56
15.03
32.08
2.35
7.01
9.87
0.22
116.6
5
47.77
25.27
35.08
6.34
8.09
11.40
1.70
Factor
de
Potenci
a
1.00
0.60
0.91
0.37
0.87
0.87
0.13
121.76
0.96
16.47
17.38
0.95
-0.09%
16.47
17.38
0.95
0.99
1.83%
69.29
79.97
0.87
67.61
0.98
0.57%
43.86
45.54
0.96
43.92
(%)
Incremento
3.33%
16.45%
4.07%
-0.03%
0.53%
0.53%
3.96%
INCREMENT
O
CON COCINAS
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
47.66
15.27
32.23
2.61
8.04
11.32
1.10
118.7
3
47.76
23.54
34.92
6.01
9.04
12.74
2.31
Factor
de
Potenci
a
1.00
0.65
0.92
0.43
0.89
0.89
0.47
123.36
0.96
0.46%
17.42
18.38
0.95
0.01%
17.42
18.38
0.95
0.01%
77.99
0.87
0.06%
45.49
0.97
0.25%
(%)
Incremento
0.22%
9.05%
0.94%
17.42%
2.62%
2.62%
270.45%
HIDROLOGA BAJA
MXIMA
SIN COCINAS
TRANSFORMADOR
ES
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
254.86
1.00
254.86
1.00
5.23
47.35
68.40
68.40
90.51
50.52
0.95
1.00
1.00
1.00
0.92
1.00
276.03
1.00
29.24
60.91
72.19
62.47
0.94
0.95
1.00
0.95
227.54
1.00
227.54
1.00
28.95
59.12
59.12
31.41
72.46
72.46
98.89
0.95
0.95
0.95
0.95
1.00
1.00
0.97
136.31
0.94
26.42
16.06
78.68
39.57
53.81
54.59
25.89
23.85
0.92
0.94
0.98
0.95
0.97
0.95
0.92
0.94
T S JUAN
T IBARRA 3
T TULCAN
T ESMERALDAS
T S/E CONC
T S ELENA
T S/E 18
T S/E CHILIBULO(1)
T S/E 19(1)
T ORQUIDEAS
T ESC 96
T CRY
T CHAVEZPAMBA
97.88
103.57
0.95
87.69
92.07
32.69
93.10
93.77
34.76
0.94
0.98
0.94
T PASCUALES 2
T IBARRA 2
T CHONE
T S/E S ROSA 1
T S/E S ROSA 2
T QUEVEDO 69
T MONTECRISTI
T SALITRAL
T AMBATO
T LA TRONCAL
T MILAGRO 1
T S GREGORIO 69
T S/E S ROSA 230 1
T S/E S ROSA 230 2
T SE ZAAMBIZA
T STO. DOM. 69 1
T STO. DOM. 69 2
T POSORJA
T TOTORAS
T TOTORAS 2
T PORTOVIEJO
INCREMENT
O
CON COCINAS
254.6
0
254.6
0
4.94
47.31
68.38
68.38
83.57
50.51
276.0
3
27.58
57.95
72.17
59.34
227.3
8
227.3
8
27.53
55.95
55.95
29.77
72.46
72.46
96.38
128.1
0
24.24
15.04
76.74
37.53
52.00
51.65
23.93
22.53
T PASCUALES 1
HIDROLOGA BAJA
MEDIA
Pot
Activa
(MW)
251.9
3
251.9
3
5.22
47.31
74.64
74.64
83.79
50.51
291.7
7
36.79
57.95
72.17
59.34
252.9
3
252.9
3
29.45
55.95
55.95
29.93
97.18
97.18
96.38
128.1
0
26.04
16.02
77.19
40.15
52.41
55.26
25.60
24.10
103.4
6
92.69
97.31
34.57
SIN COCINAS
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
(%)
Incremento
252.08
1.00
0.04%
252.08
1.00
0.04%
5.52
47.34
74.65
74.65
90.74
50.52
0.95
1.00
1.00
1.00
0.92
1.00
0.04%
0.02%
0.01%
0.01%
0.00%
0.00%
291.80
1.00
-0.01%
39.00
60.92
72.20
62.48
0.94
0.95
1.00
0.95
-0.01%
-0.01%
-0.02%
-0.02%
253.16
1.00
-0.02%
253.16
1.00
-0.02%
30.98
59.14
59.14
31.58
97.21
97.21
98.93
0.95
0.95
0.95
0.95
1.00
1.00
0.97
-0.03%
-0.03%
-0.03%
-0.03%
-0.03%
-0.03%
-0.04%
189.0
5
189.0
5
0.04
31.36
52.75
52.75
50.64
33.40
183.6
3
18.36
45.94
53.15
44.93
209.3
0
209.3
0
23.13
40.43
40.43
24.96
35.02
35.02
72.33
136.36
0.94
-0.04%
28.38
17.12
79.19
42.36
54.27
58.45
27.72
25.53
0.92
0.94
0.97
0.95
0.97
0.95
0.92
0.94
109.65
98.56
99.32
36.84
INCREMENT
O
CON COCINAS
Factor
de
Potenci
a
(%)
Incremento
207.61
1.00
0.11%
207.61
1.00
0.11%
0.49
31.81
62.18
62.18
55.78
33.93
0.93
0.99
1.00
1.00
0.91
0.98
332.44%
1.49%
0.14%
0.14%
-0.01%
0.48%
208.70
0.99
1.43%
33.92
48.22
53.35
47.19
0.94
0.95
1.00
0.95
0.34%
-0.02%
0.15%
-0.03%
247.91
1.00
-0.02%
247.91
1.00
-0.02%
27.32
42.57
42.57
26.52
70.86
70.86
73.36
0.95
0.95
0.95
0.95
1.00
1.00
0.99
-0.02%
-0.02%
-0.02%
-0.04%
0.87%
0.87%
-0.11%
144.0
9
144.0
9
0.04
25.56
44.89
44.89
49.43
26.40
154.5
7
12.66
35.64
36.65
84.47
120.5
4
120.5
4
10.43
29.53
29.53
20.35
50.74
52.67
62.51
97.28
103.00
0.94
-0.06%
31.91
8.77
55.17
27.52
33.26
53.91
17.61
22.57
103.2
5
88.59
89.24
25.04
34.85
9.41
55.93
28.98
34.05
57.02
19.03
23.90
0.92
0.93
0.99
0.95
0.98
0.95
0.93
0.94
109.42
94.09
90.83
26.51
Factor
de
Potenci
a
189.26
1.00
189.26
1.00
0.19
32.28
52.96
52.96
55.41
34.09
0.22
0.97
1.00
1.00
0.91
0.98
187.82
0.98
19.53
48.21
53.43
47.17
0.94
0.95
0.99
0.95
209.33
1.00
209.33
1.00
24.32
42.56
42.56
26.28
35.34
35.34
73.28
0.95
0.95
0.95
0.95
0.99
0.99
0.99
207.6
1
207.6
1
0.46
31.36
62.02
62.02
50.97
33.40
206.9
7
32.01
45.94
53.15
44.93
247.8
3
247.8
3
25.98
40.43
40.43
25.18
70.82
70.82
72.33
97.28
102.94
0.94
-0.06%
-0.06%
-0.07%
-0.07%
-0.07%
-0.08%
-0.08%
-0.09%
29.25
7.32
54.50
23.63
32.64
48.55
15.13
20.23
31.91
7.88
55.20
24.88
33.36
51.30
16.35
21.40
0.92
0.93
0.99
0.95
0.98
0.95
0.93
0.95
0.94
-0.16%
94.97
100.39
0.95
0.94
0.98
0.94
-0.16%
-0.21%
-0.21%
81.18
81.47
22.25
86.02
82.63
23.50
0.94
0.99
0.95
200
SIN COCINAS
Pot
Aparent
e (MVA)
Pot
Aparent
e (MVA)
Pot
Activa
(MW)
HIDROLOGA BAJA
MINIMA
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
146.57
0.98
146.57
0.98
0.21
30.20
45.12
45.12
51.87
28.68
0.22
0.85
0.99
0.99
0.95
0.92
163.23
0.95
13.58
37.35
38.91
89.16
0.93
0.95
0.94
0.95
120.56
1.00
120.56
1.00
11.01
30.99
30.99
21.37
61.22
52.68
62.92
0.95
0.95
0.95
0.95
0.83
1.00
0.99
144.9
3
144.9
3
0.04
25.56
47.52
47.52
49.50
26.40
160.8
1
16.83
35.64
36.65
84.47
130.8
3
130.8
3
11.03
29.53
29.53
20.42
61.01
63.36
62.51
84.47
89.12
0.95
-0.11%
0.33%
-0.09%
-0.03%
-0.17%
-0.11%
-0.01%
-0.11%
29.25
5.12
46.49
14.23
20.43
13.46
6.53
5.83
31.90
5.57
46.81
15.00
20.53
14.31
7.12
6.22
0.92
0.92
0.99
0.95
1.00
0.94
0.92
0.94
0.94
-0.25%
64.63
67.87
0.95
67.24
0.94
0.98
0.94
-0.24%
-0.35%
-0.24%
50.86
65.17
14.74
53.54
65.58
15.49
0.95
0.99
0.95
52.91
67.80
15.35
Pot
Activa
(MW)
INCREMENT
O
CON COCINAS
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
(%)
Incremento
147.36
0.98
0.04%
147.36
0.98
0.04%
0.21
29.85
47.79
47.79
51.95
28.59
0.22
0.86
0.99
0.99
0.95
0.92
0.00%
1.16%
-0.06%
-0.06%
0.00%
0.33%
169.95
0.95
-0.07%
17.95
37.35
38.82
89.18
0.94
0.95
0.94
0.95
0.65%
0.00%
0.23%
-0.01%
130.83
1.00
0.02%
130.83
1.00
0.02%
11.64
30.99
30.99
21.45
71.52
63.41
62.93
0.95
0.95
0.95
0.95
0.85
1.00
0.99
0.05%
0.00%
0.00%
-0.01%
2.92%
-0.07%
-0.02%
84.47
89.13
0.95
-0.01%
30.75
5.41
46.68
15.05
20.62
14.24
6.91
6.17
33.55
5.88
47.01
15.86
20.73
15.13
7.53
6.58
0.92
0.92
0.99
0.95
0.99
0.94
0.92
0.94
-0.04%
0.22%
-0.02%
0.03%
-0.10%
0.09%
0.12%
0.12%
70.65
0.95
-0.05%
55.72
68.31
16.13
0.95
0.99
0.95
-0.04%
-0.12%
-0.03%
Pot
Activa
(MW)
HIDROLOGA BAJA
MXIMA
SIN COCINAS
TRANSFORMADOR
ES
T POLICENTRO
T TENA
S/E POMASQUI 1
S/E POMASQUI 2
T TRINITARIA 69
T BABAHOYO
T DCR 2
T QUININDE
T NPR
T PUYO
T BAOS
T S/E 19
T S GREGORIO
T TOTORAS 69
T MULALO
T STO. DOM 1
T STO. DOM 2
T MACHALA 1
T MACHALA 2
T PAUTE S/E 1
T PAUTE S/E 2
T RIOBAMBA
T CUENCA
T IBARRA 1
T EL INGA
T EL INGA 2
T S/E CUMBAYA
T COCA
Pot
Activa
(MW)
118.7
0
8.44
144.9
8
144.9
8
135.1
0
39.97
HIDROLOGA BAJA
MEDIA
INCREMENT
O
CON COCINAS
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
126.52
0.94
8.96
0.94
149.26
0.97
149.26
0.97
137.60
0.98
41.42
0.97
98.24
104.84
0.94
10.77
207.0
7
11.20
18.33
80.03
74.41
54.83
76.54
49.90
49.90
26.20
26.20
247.3
2
247.3
2
74.84
103.9
8
28.53
22.41
22.41
24.60
13.01
12.27
0.88
213.50
0.97
11.81
19.36
86.84
74.41
58.13
79.41
51.75
51.75
27.06
27.06
0.95
0.95
0.92
1.00
0.94
0.96
0.96
0.96
0.97
0.97
251.92
0.98
251.92
0.98
82.37
0.91
108.31
0.96
32.76
28.16
28.16
26.08
17.79
0.87
0.80
0.80
0.94
0.73
Pot
Activa
(MW)
125.4
5
11.10
158.3
3
158.3
3
142.7
9
39.97
103.8
8
10.67
218.8
8
14.75
24.13
85.63
74.86
72.18
96.77
45.07
45.07
24.30
24.30
227.0
2
227.0
2
87.38
121.8
3
31.32
20.44
20.44
28.32
13.06
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
(%)
Incremento
134.01
0.94
-0.22%
11.82
0.94
-0.23%
163.40
0.97
-0.24%
163.40
0.97
-0.24%
145.78
0.98
-0.24%
SIN COCINAS
Pot
Activa
(MW)
HIDROLOGA BAJA
MINIMA
INCREMENT
O
CON COCINAS
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
121.86
0.96
5.25
0.94
125.85
0.97
125.85
0.97
102.51
0.99
41.54
0.96
-0.28%
117.5
1
4.93
121.8
9
121.8
9
101.3
6
15.83
15.88
1.00
111.19
0.93
-0.31%
95.38
101.58
0.94
12.19
0.88
-0.32%
16.23
0.96
226.55
0.97
-0.39%
15.60
25.60
93.40
75.28
77.09
101.16
47.25
47.25
25.39
25.39
0.95
0.94
0.92
0.99
0.94
0.96
0.95
0.95
0.96
0.96
-0.39%
-0.44%
-0.52%
-0.56%
-0.72%
-0.75%
-1.07%
-1.07%
-1.17%
-1.17%
234.76
0.97
-1.50%
234.76
0.97
-1.50%
98.03
0.89
-1.90%
15.56
227.7
5
7.72
11.02
57.63
47.09
38.52
57.90
27.26
27.26
22.23
22.23
248.9
6
248.9
6
52.55
56.44
0.93
130.91
0.93
-3.06%
84.71
86.97
0.97
37.45
27.07
27.07
34.32
20.82
0.84
0.76
0.76
0.83
0.63
-3.96%
-5.10%
-5.10%
-12.53%
-14.22%
13.02
27.18
27.18
24.01
13.23
20.29
31.36
31.36
25.15
17.94
0.64
0.87
0.87
0.95
0.74
236.26
0.96
8.11
11.60
61.77
49.69
40.62
60.75
28.70
28.70
22.56
22.56
0.95
0.95
0.93
0.95
0.95
0.95
0.95
0.95
0.99
0.99
251.67
0.99
251.67
0.99
Pot
Activa
(MW)
127.5
4
8.88
141.8
6
141.8
6
112.7
7
15.83
103.7
5
15.41
245.2
9
12.98
19.62
65.94
46.47
64.25
87.90
24.15
24.15
14.99
14.99
219.7
6
219.7
6
57.68
108.5
3
17.16
24.27
24.27
29.53
13.31
INCREMENT
O
CON COCINAS
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
(%)
Incremento
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
Factor
de
Potenci
a
Pot
Activa
(MW)
Pot
Aparent
e (MVA)
133.15
0.96
-0.66%
67.65
71.48
0.95
70.38
9.43
0.94
0.13%
3.73
3.99
0.93
4.82
146.74
0.97
-0.18%
65.20
66.82
0.98
146.74
0.97
-0.18%
65.20
66.82
114.51
0.98
-0.39%
81.14
81.48
Factor
de
Potenci
a
(%)
Incremento
74.42
0.95
-0.07%
5.14
0.94
0.44%
70.93
71.77
0.99
1.27%
0.98
70.93
71.77
0.99
1.27%
1.00
84.42
84.86
0.99
-0.10%
15.97
0.99
-0.56%
5.77
5.85
0.99
5.77
6.00
0.96
-2.34%
111.03
0.93
-0.48%
64.79
68.07
0.95
67.41
70.91
0.95
-0.11%
16.09
0.96
-0.15%
17.75
0.97
0.97
-0.03%
0.96
-0.61%
116.55
0.99
121.45
0.99
-0.15%
13.70
20.75
71.10
50.79
68.41
92.89
25.85
25.85
16.16
16.16
0.95
0.95
0.93
0.91
0.94
0.95
0.93
0.93
0.93
0.93
-0.49%
-0.49%
-0.59%
-3.47%
-0.96%
-0.73%
-1.59%
-1.59%
-5.89%
-5.89%
5.16
9.59
40.51
32.47
25.21
31.38
28.64
28.64
12.91
12.91
0.95
0.95
0.94
0.97
0.95
0.91
0.98
0.98
1.00
1.00
17.22
120.5
6
6.37
11.81
40.33
31.61
31.12
36.71
28.05
28.05
12.99
12.99
17.71
256.01
17.26
115.8
7
4.92
9.12
38.13
31.42
24.02
28.59
28.07
28.07
12.90
12.90
6.69
12.43
42.89
32.31
32.73
39.87
28.54
28.54
12.99
12.99
0.95
0.95
0.94
0.98
0.95
0.92
0.98
0.98
1.00
1.00
-0.04%
-0.07%
-0.09%
1.09%
-0.19%
1.04%
0.31%
0.31%
0.08%
0.08%
227.17
0.97
-2.21%
10.62
14.06
0.76
19.71
21.36
0.92
22.10%
227.17
0.97
-2.21%
10.62
14.06
0.76
19.71
21.36
0.92
22.10%
61.04
0.95
1.51%
41.63
44.28
0.94
46.89
49.27
0.95
1.22%
118.22
0.92
-5.75%
12.38
16.53
0.75
21.45
25.70
0.83
11.46%
27.46
29.40
29.40
36.55
22.35
0.63
0.83
0.83
0.81
0.60
-2.61%
-4.78%
-4.78%
-15.35%
-19.22%
1.82
35.88
35.88
6.57
3.91
1.90
38.13
38.13
30.38
4.27
0.96
0.94
0.94
0.22
0.91
2.72
35.04
35.04
5.32
3.92
2.89
37.42
37.42
29.06
4.79
0.94
0.94
0.94
0.18
0.82
-2.08%
-0.50%
-0.50%
-15.30%
-10.50%
SIN COCINAS
HIDROLOGA ALTA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
SIN
CON
SIN
COCINAS COCINAS VARIACIN COCINAS COCINAS VARIACIN COCINAS
Lneas de Transmisin
YAHUACHI - PAUTE 1
YAHUACHI - PAUTE 2
DAULE PERIPA - QUEVEDO 1
DAULE PERIPA - QUEVEDO 2
LOJA VILONACO
RIOBAMBA - SOPLADORA
POMASQUI - CHAVEZPAMBA
PUYO - TOPO
PASCUALES - MJILAGRO
ELECAUSTRO - CUENCA
SOPLADORA - MILAGRO 1
SOPLADORA - MILAGRO 2
LVC - TRINITARIA
MILAGRO - TRONCAL
MILAGRO - SID 1 230
MILAGRO - SID 2 230
BAOS - TOPO
CHONE - DPERIPA
PUCARA - MULALO
MILAGRO - LAS ESCLUSAS 1
MILAGRO - LAS ESCLUSAS 2
CUENCA - PAUTE 1
CUENCA - PAUTE 2
SOLPLADORA - SAN BARTOLO
MONTC- SGREGORIO
Nivel de
Tensin Factor de Factor de
(KV)
Potencia Potencia
230
1.00
1.00
230
1.00
1.00
138
1.00
1.00
138
1.00
1.00
138
1.00
1.00
230
1.00
1.00
138
0.99
0.99
138
1.00
1.00
230
1.00
1.00
138
1.00
1.00
230
0.99
1.00
230
0.99
1.00
230
0.98
1.00
230
1.00
1.00
230
1.00
1.00
230
1.00
1.00
138
1.00
1.00
138
1.00
1.00
138
1.00
0.99
230
1.00
1.00
230
1.00
1.00
138
0.56
0.98
138
0.56
0.98
230
1.00
1.00
138
1.00
1.00
%
Variacin
0.0%
0.0%
-0.4%
-0.4%
0.0%
0.1%
0.1%
-0.1%
0.0%
0.0%
0.4%
0.4%
1.5%
0.0%
0.0%
0.0%
-0.2%
0.0%
-0.8%
0.0%
0.0%
74.5%
74.5%
0.0%
-0.3%
202
Factor de Factor de
Potencia Potencia
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.98
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.98
1.00
0.98
1.00
0.99
1.00
0.99
1.00
%
Variacin
0.0%
0.0%
0.2%
0.2%
0.0%
0.1%
0.0%
0.0%
0.0%
0.0%
0.1%
0.1%
1.9%
0.0%
0.3%
0.3%
-0.1%
0.2%
-0.1%
0.1%
0.1%
1.4%
1.4%
0.3%
0.6%
MNIMA
CON
COCINAS VARIACIN
Factor de Factor de
Potencia Potencia
1.00
1.00
1.00
1.00
0.89
0.89
0.89
0.89
1.00
1.00
0.99
1.00
0.97
0.98
1.00
1.00
0.99
0.99
1.00
1.00
1.00
1.00
1.00
1.00
0.93
0.96
0.99
0.99
0.99
0.99
0.99
0.99
1.00
1.00
0.99
0.98
1.00
1.00
0.98
0.99
0.98
0.99
0.43
0.57
0.43
0.57
0.90
1.00
0.81
0.74
%
Variacin
0.0%
0.0%
0.2%
0.2%
0.0%
0.4%
0.3%
0.0%
0.1%
0.0%
0.0%
0.0%
3.7%
0.3%
0.0%
0.0%
0.0%
-1.4%
0.0%
0.2%
0.2%
33.1%
33.1%
10.8%
-7.9%
HIDROLOGA ALTA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
SIN
CON
SIN
COCINAS COCINAS VARIACIN COCINAS COCINAS VARIACIN COCINAS
Lneas de Transmisin
SHORAY - MILAGRO
TOTORAS - SANTAROSA 1
TOTORAS - SANTAROSA 1(1)
PAUTE - SOPLADORA 1
PAUTE - SOPLADORA 2
IBARRA - TULCAN
TOTORAS - SOPLADORA
SHORAY - TRONCAL
DCR - MJILAGRO
TOTORAS - S. FRANCIS 1
T G MACHALA - SID 2
T G MACHALA - SID 1
TOACHI PILT - STO DOM 1
TOACHI PILT - STO DOM 2
POMASQUI - IBARRA
SID - NACHALA 138 1
SID - NACHALA 138 2
SAN ROSA - MACHACHI
TRINITARIA - SALTRAL 1
TRINITARIA - SALTRAL 2
PUCARA - AMBATO
CUENCA - LOJA 1
CUENCA - LOJA 2
INGA - TABABELA
SID - TGM 138
Nivel de
Tensin Factor de Factor de
(KV)
Potencia Potencia
230
0.99
0.99
230
0.99
0.98
230
0.99
0.98
230
1.00
0.99
230
1.00
0.99
138
1.00
0.99
230
1.00
0.99
230
0.99
0.99
230
1.00
1.00
230
0.99
1.00
230
1.00
1.00
230
1.00
1.00
230
0.09
0.80
230
0.09
0.80
138
1.00
1.00
138
0.97
0.97
138
0.97
0.97
138
0.99
0.99
138
0.98
0.99
138
0.98
0.99
138
1.00
0.99
138
0.55
0.78
138
0.55
0.78
138
0.99
0.98
138
0.99
0.99
%
Variacin
-0.2%
-0.6%
-0.6%
-0.6%
-0.6%
-0.4%
-0.6%
-0.2%
-0.2%
0.9%
-0.3%
-0.3%
787.1%
787.1%
0.0%
0.5%
0.5%
-0.2%
0.8%
0.8%
-0.8%
42.3%
42.3%
-0.2%
0.3%
203
Factor de Factor de
Potencia Potencia
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.98
1.00
1.00
1.00
0.99
0.99
0.99
0.99
1.00
0.99
1.00
0.99
1.00
0.99
0.95
0.99
0.95
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.97
0.99
0.97
0.99
1.00
0.99
0.85
0.99
0.85
0.99
0.99
0.99
0.97
0.98
%
Variacin
-0.1%
-0.3%
-0.3%
-0.3%
-0.3%
1.9%
-0.4%
-0.1%
-0.1%
-0.5%
-0.7%
-0.8%
4.3%
4.3%
-0.2%
0.0%
0.0%
-0.3%
1.8%
1.8%
-0.8%
15.7%
15.7%
-0.4%
1.1%
MNIMA
CON
COCINAS VARIACIN
Factor de Factor de
Potencia Potencia
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.86
0.88
0.97
0.98
1.00
1.00
0.99
0.99
0.92
0.93
1.00
1.00
0.00
0.00
0.80
0.99
0.80
0.99
0.98
0.98
0.97
0.97
0.97
0.97
1.00
1.00
0.88
0.88
0.88
0.88
0.98
0.99
0.82
0.87
0.82
0.87
0.99
0.99
0.00
0.00
%
Variacin
0.2%
-0.2%
-0.2%
0.1%
0.1%
2.6%
1.2%
0.1%
-0.1%
1.2%
-0.4%
0.0%
24.1%
24.1%
0.5%
-0.2%
-0.2%
0.2%
-0.2%
-0.2%
0.8%
5.8%
5.8%
0.6%
0.0%
HIDROLOGA ALTA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
SIN
CON
SIN
COCINAS COCINAS VARIACIN COCINAS COCINAS VARIACIN COCINAS
Nivel de
Tensin Factor de Factor de
Lneas de Transmisin
(KV)
Potencia Potencia
TOTORAS - RIOBAMBA
230
0.93
0.94
ESCLUSAS - CARAGUAY 1
138
0.98
0.98
ESCLUSAS - CARAGUAY 2
138
0.98
0.98
DCR - MJILAGRO(1)
230
0.96
0.96
TRINITARIA - LAS ESCLUSAS 1
230
1.00
1.00
TRINITARIA - LAS ESCLUSAS 2
230
1.00
1.00
TOTORAS - S. FRANCIS 2
230
1.00
1.00
SHORAY - PAUTE 1
230
0.98
0.98
SHORAY - PAUTE 2
230
0.98
0.98
STO. DOMINGO - BABA
230
0.88
0.92
POMASQUI - S/E 19
138
0.91
0.90
TRINITARIA - NUEVA PROSPERINA
230
0.99
0.99
BAOS - AGOYAN 1
138
0.96
0.92
BAOS - AGOYAN 2
138
0.96
0.92
YAHUACHI - PASCUALES 1
230
0.98
0.97
YAHUACHI - PASCUALES 2
230
0.98
0.97
YAHUACHI - PASCUALES 3
230
0.98
0.97
YAHUACHI - PASCUALES 3(1)
230
0.98
0.97
TOTORAS - AMBATO
138
0.99
1.00
PORTOVIEJO - DPERIPA 1
138
0.95
0.95
PORTOVIEJO - DPERIPA 1(1)
138
0.95
0.95
POMASQUI - ZAMBIZA
138
0.94
0.96
MILAGRO - BABAHOYO 1
138
0.99
0.99
MILAGRO - BABAHOYO 2
138
0.99
0.99
S/E S ROSA - ADELCA
138
0.97
0.97
%
Variacin
1.1%
-0.2%
-0.2%
0.4%
-0.2%
-0.2%
-0.3%
0.1%
0.3%
4.6%
-0.4%
-0.6%
-3.8%
-3.8%
-0.3%
-0.3%
-0.3%
-0.3%
0.3%
-0.6%
-0.6%
1.9%
-0.1%
-0.1%
0.0%
204
Factor de Factor de
Potencia Potencia
0.99
0.98
0.99
0.98
0.99
0.98
0.99
0.98
0.99
0.98
0.99
0.98
1.00
0.98
0.99
0.98
0.99
0.98
0.98
0.98
0.99
0.98
0.98
0.98
1.00
0.97
1.00
0.97
0.98
0.97
0.98
0.97
0.98
0.97
0.98
0.97
0.99
0.97
0.97
0.97
0.97
0.97
0.95
0.97
0.96
0.96
0.96
0.96
0.96
0.96
%
Variacin
-1.1%
-0.3%
-0.3%
-0.5%
-0.4%
-0.4%
-1.9%
-1.1%
-1.0%
-0.7%
-1.0%
-0.8%
-2.6%
-2.6%
-1.4%
-1.4%
-1.4%
-1.4%
-2.0%
-0.5%
-0.5%
1.7%
0.8%
0.8%
0.0%
MNIMA
CON
COCINAS VARIACIN
Factor de Factor de
Potencia Potencia
0.92
0.95
0.99
0.99
0.99
0.99
0.98
0.99
0.99
0.99
0.99
0.99
0.94
0.95
1.00
1.00
1.00
1.00
0.51
0.68
0.91
0.90
1.00
1.00
1.00
1.00
1.00
1.00
0.97
0.96
0.97
0.96
0.97
0.96
0.97
0.96
1.00
1.00
0.99
0.99
0.99
0.99
0.69
0.74
0.98
0.97
0.98
0.97
0.97
0.97
%
Variacin
3.0%
-0.1%
-0.1%
1.0%
-0.3%
-0.3%
1.1%
0.1%
0.1%
32.1%
-0.2%
-0.1%
-0.3%
-0.3%
-0.9%
-0.9%
-0.9%
-0.9%
0.2%
0.1%
0.1%
6.4%
-1.6%
-1.6%
0.0%
HIDROLOGA ALTA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
SIN
CON
SIN
COCINAS COCINAS VARIACIN COCINAS COCINAS VARIACIN COCINAS
Lneas de Transmisin
GUARANDA - RIOBAMBA
S/E S R - SANLQ
STO DOM - QUININDE
S ROSA - TOACHI P 1
S ROSA - TOACHI P 2
CENCA - GUALACEO
MULALO - NOVACERO
POLICENTRO - PASCUALES 1
POLICENTRO - PASCUALES 2
S JUAN - S GREGORIO 1
S JUAN - S GREGORIO 2
MACAS - CUENCA
POSORJA - L CHONGON
POMASQUI - POMASQUI EEQ
CUMBARATZA - LOJA
CUMBAYA - AEROPUERTO
DCR - ORQIDEAS 1
DCR - ORQIDEAS 2
MILAGRO - SID 1
MILAGRO - SID 2
S/E 18 - ZAMBIZA
SID - NACHALA 230 1
SID - NACHALA 230 2
LVC - NUEVA PROSPERINA 1
BAOS - TOTORAS 1
Nivel de
Tensin Factor de Factor de
(KV)
Potencia Potencia
69
0.95
0.95
46
0.96
0.96
138
0.94
0.92
230
0.98
0.98
230
0.98
0.98
138
0.96
0.96
138
0.96
0.96
138
0.96
0.96
138
0.96
0.96
230
0.95
0.95
230
0.95
0.95
138
0.90
0.97
138
0.95
0.95
138
0.92
0.93
138
0.94
0.95
46
0.94
0.94
138
0.95
0.94
138
0.95
0.94
138
0.98
0.98
138
0.98
0.98
138
0.91
0.86
230
0.95
0.94
230
0.95
0.94
230
0.88
0.89
138
0.89
0.76
%
Variacin
-0.1%
-0.1%
-2.2%
-0.3%
-0.3%
0.0%
0.0%
-0.4%
-0.4%
-0.1%
-0.1%
8.0%
0.0%
1.0%
0.5%
0.0%
-0.1%
-0.1%
0.6%
0.6%
-5.2%
-0.6%
-0.6%
0.2%
-15.1%
205
Factor de Factor de
Potencia Potencia
0.97
0.96
0.97
0.96
0.97
0.96
0.97
0.96
0.97
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.67
0.95
0.95
0.95
0.95
0.95
0.91
0.95
0.95
0.94
0.95
0.94
0.95
0.94
0.89
0.94
0.89
0.94
0.97
0.94
0.94
0.94
0.94
0.94
0.94
0.93
1.00
0.93
%
Variacin
-0.4%
-0.2%
-0.7%
-0.8%
-0.8%
0.0%
0.0%
-0.6%
-0.6%
0.0%
0.0%
42.9%
0.0%
0.1%
3.8%
0.0%
-0.2%
-0.2%
5.5%
5.5%
-2.8%
-0.1%
-0.1%
-0.5%
-6.6%
MNIMA
CON
COCINAS VARIACIN
Factor de Factor de
Potencia Potencia
0.98
0.98
0.98
0.98
1.00
1.00
1.00
1.00
1.00
1.00
0.96
0.96
0.96
0.96
0.95
0.95
0.95
0.95
0.97
0.97
0.97
0.97
0.55
0.65
0.95
0.95
0.82
0.83
0.94
0.93
0.94
0.94
0.95
0.95
0.95
0.95
0.90
0.88
0.90
0.88
1.00
1.00
0.98
0.98
0.98
0.98
0.99
0.99
1.00
0.99
%
Variacin
0.0%
-0.1%
0.0%
-0.1%
-0.1%
0.0%
0.0%
-0.1%
-0.1%
0.0%
0.0%
19.0%
0.0%
1.6%
-1.3%
0.0%
-0.1%
-0.1%
-2.4%
-2.4%
-0.3%
0.0%
0.0%
-0.2%
-0.8%
HIDROLOGA ALTA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
SIN
CON
SIN
COCINAS COCINAS VARIACIN COCINAS COCINAS VARIACIN COCINAS
Lneas de Transmisin
PASCUALES - SALITRAL 1
PASCUALES - SALITRAL 2
POMASQUI - SAN ANTONIO
STO. DOMINGO - QUEVEDO
ALANGASI - EL CARMEN
VICENTINA - CUMBAYA
BAOS - TOTORAS 2
SE CHILIBULO - S/E SANTA ROSA
SE S ROSA - EL CARMEN
SELVA ALEGRE - S/E SANTA ROSA
SE CHILIBULO - S/E ESPEJO
SE CHILIBULO - SELVA ALEGRE
SE S ROSA - CONOCOTO
LVC - QUEVEDO 1
LVC - QUEVEDO 2
ZAMBIZA - CUMBAYA
SININCAY - CUENCA
SHORAY - SININCAY
S ROSA INGA 230 1
S ROSA INGA 230 2
VICENTINA - CONOCOTO
ESMERALDAS - STO DOM 2
SELVA ALEGRE - S/E 19
INGA - S ROSA 1
INGA - S ROSA 2
Nivel de
Tensin Factor de Factor de
(KV)
Potencia Potencia
138
1.00
1.00
138
1.00
1.00
138
0.93
0.93
230
0.78
0.86
138
0.92
0.92
138
1.00
1.00
138
0.87
0.73
138
0.94
0.94
138
0.80
0.87
138
0.94
0.94
138
0.95
0.95
138
0.96
0.97
138
0.95
0.98
230
0.92
0.96
230
0.92
0.96
138
0.78
0.01
69
0.34
0.75
230
0.69
0.87
230
0.98
0.97
230
0.98
0.97
138
0.95
0.99
138
0.69
0.66
138
0.94
0.94
230
0.99
1.00
230
0.99
1.00
%
Variacin
0.0%
0.0%
-0.4%
9.9%
0.4%
-0.2%
-16.1%
-0.1%
9.4%
0.1%
0.3%
0.5%
2.9%
4.7%
4.7%
-99.2%
119.4%
27.3%
-1.4%
-1.4%
4.0%
-5.1%
-0.3%
0.9%
0.9%
206
Factor de Factor de
Potencia Potencia
0.94
0.93
0.94
0.93
0.94
0.93
0.94
0.93
0.92
0.93
0.87
0.92
1.00
0.91
0.90
0.90
0.80
0.90
0.88
0.89
0.88
0.89
0.86
0.88
0.77
0.87
0.72
0.87
0.72
0.87
0.98
0.86
0.80
0.85
0.80
0.85
0.83
0.84
0.83
0.84
0.68
0.84
0.85
0.84
0.80
0.83
0.76
0.83
0.76
0.83
%
Variacin
-1.2%
-1.2%
-0.5%
-0.8%
0.6%
5.3%
-8.5%
0.5%
12.3%
0.9%
1.3%
1.8%
13.2%
20.7%
20.7%
-12.2%
7.1%
6.5%
2.2%
2.2%
23.0%
-2.0%
3.4%
8.2%
8.2%
MNIMA
CON
COCINAS VARIACIN
Factor de Factor de
Potencia Potencia
0.97
0.97
0.97
0.97
0.95
0.95
0.24
0.55
0.92
0.92
0.76
0.80
0.99
0.97
0.95
0.95
0.64
0.66
0.95
0.95
0.95
0.95
0.95
0.95
0.60
0.69
0.26
0.15
0.26
0.15
0.74
0.73
0.50
0.35
0.79
0.71
1.00
1.00
1.00
1.00
0.39
0.54
0.99
0.98
0.98
0.98
0.93
0.98
0.93
0.98
%
Variacin
-0.1%
-0.1%
-0.1%
126.6%
0.4%
5.2%
-2.0%
0.1%
4.0%
0.2%
0.3%
0.5%
15.4%
-42.6%
-42.6%
-2.2%
-30.1%
-10.5%
-0.1%
-0.1%
37.9%
-0.6%
0.1%
5.7%
5.7%
HIDROLOGA ALTA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
SIN
CON
SIN
COCINAS COCINAS VARIACIN COCINAS COCINAS VARIACIN COCINAS
Lneas de Transmisin
BABA - QUEVEDO
CHAVEZPAMBA - IBARRA
PUYO - TENA
VICENTINA - GUANGOPOLO
S ROSA POMASQUI 230 1
S ROSA POMASQUI 230 2
QUEVEDO - S GREGORIO 1
QUEVEDO - S GREGORIO 2
PASCUALES - LAGO CHONGON 1
PASCUALES - LAGO CHONGON 2
NUEVA LOJA - COCA
L CHONGON - EQUIL 1
L CHONGON - EQUIL 2
SELVA ALEGRE - POMASQUI EEQ
COCA - TENA
SANGLOQUI PASOCHOA
ESMERALDAS- QUININDE
PORTOVIEJO - S GREGORIO
VICENTINA - MULALO
SAN ANTONIO - S/E 18
L CHOGON - ST ELENA 1
L CHOGON - ST ELENA 2
ESM 230 - STO DOM 1
ESM 230 - STO DOM 1(1)
TOTORAS - QUEVEDO 1
Nivel de
Tensin Factor de Factor de
(KV)
Potencia Potencia
230
0.61
0.76
138
0.93
0.92
138
0.84
0.84
138
0.98
0.92
230
0.90
0.90
230
0.90
0.90
230
0.93
0.94
230
0.93
0.94
138
0.87
0.85
138
0.87
0.85
69
0.03
0.02
138
0.88
0.83
138
0.88
0.83
138
0.96
0.97
138
0.78
0.69
46
0.67
0.68
138
0.20
0.18
138
0.98
0.97
138
0.48
0.00
138
1.00
0.98
138
0.62
0.59
138
0.62
0.59
230
0.27
0.27
230
0.27
0.27
230
0.91
0.78
%
Variacin
22.9%
-0.8%
0.5%
-6.1%
-0.3%
-0.3%
1.5%
1.5%
-3.3%
-3.3%
-22.0%
-5.0%
-5.0%
1.6%
-12.0%
0.1%
-7.0%
-0.8%
-99.9%
-2.4%
-5.5%
-5.5%
-0.8%
-0.8%
-14.7%
207
Factor de Factor de
Potencia Potencia
0.83
0.83
0.82
0.82
0.81
0.81
0.94
0.81
0.77
0.80
0.77
0.80
0.73
0.78
0.73
0.78
0.81
0.75
0.81
0.75
0.85
0.75
0.82
0.75
0.82
0.75
0.61
0.75
0.86
0.70
0.67
0.68
0.57
0.53
0.43
0.40
0.88
0.30
0.95
0.24
0.25
0.22
0.25
0.22
0.20
0.18
0.20
0.18
0.72
0.18
%
Variacin
-0.8%
0.6%
0.5%
-14.1%
4.0%
4.0%
6.1%
6.1%
-7.7%
-7.7%
-11.8%
-9.0%
-9.0%
21.9%
-17.9%
0.2%
-6.8%
-6.5%
-65.7%
-74.8%
-10.1%
-10.1%
-8.4%
-8.4%
-75.1%
MNIMA
CON
COCINAS VARIACIN
Factor de Factor de
Potencia Potencia
0.97
0.25
1.00
1.00
0.88
0.89
0.02
0.06
0.95
0.95
0.95
0.95
0.99
0.99
0.99
0.99
1.00
1.00
1.00
1.00
0.75
0.73
0.95
0.95
0.95
0.95
0.71
0.77
0.90
0.89
0.67
0.67
0.75
0.85
0.98
0.99
0.76
0.54
0.98
0.99
1.00
1.00
1.00
1.00
0.62
0.58
0.62
0.58
0.92
0.91
%
Variacin
-73.9%
0.1%
0.5%
128.8%
-0.2%
-0.2%
0.3%
0.3%
0.0%
0.0%
-3.0%
0.0%
0.0%
8.9%
-1.4%
0.1%
12.5%
0.9%
-28.8%
1.0%
0.1%
0.1%
-5.3%
-5.3%
-1.2%
HIDROLOGA ALTA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
SIN
CON
SIN
COCINAS COCINAS VARIACIN COCINAS COCINAS VARIACIN COCINAS
Lneas de Transmisin
TOTORAS - QUEVEDO 2
JAMONDINO - POMASQUI 1 220
JAMONDINO - POMASQUI 2 220
JAMONDINO - POMASQUI 3 220
JAMONDINO - POMASQUI 4 220
CHONE - SEVERINO
REF PACIF - S JUAN 1
REF PACIF - S JUAN 2
Nivel de
Tensin Factor de Factor de
(KV)
Potencia Potencia
230
0.91
0.78
230
0.77
0.73
230
0.77
0.73
230
0.77
0.73
230
0.77
0.73
138
0.00
0.00
230
0.00
0.00
230
0.00
0.00
%
Variacin
-14.7%
-5.2%
-5.2%
-5.2%
-5.2%
-0.1%
-1.4%
-1.4%
Factor de Factor de
Potencia Potencia
0.72
0.18
0.12
0.14
0.12
0.14
0.12
0.14
0.12
0.14
0.00
0.00
0.00
0.00
0.00
0.00
%
Variacin
-75.1%
15.5%
15.5%
15.5%
15.5%
0.0%
0.3%
0.3%
MNIMA
CON
COCINAS VARIACIN
Factor de Factor de
Potencia Potencia
0.92
0.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
%
Variacin
-1.2%
298.2%
298.2%
298.2%
298.2%
0.0%
0.0%
0.0%
Lneas de Transmisin
PUYO - TOPO
LVC - TRINITARIA
BAOS - TOPO
CHONE - DPERIPA
MILAGRO - LAS ESCLUSAS 1
MILAGRO - LAS ESCLUSAS 2
MILAGRO - SID 1 230
Nivel
de
(%) De
Tensi Cargabilid
n (KV)
ad
138
1.00
230
1.00
138
1.00
138
1.00
230
1.00
230
1.00
230
1.00
(%) De
Cargabilid
ad
1.00
1.00
1.00
1.00
1.00
1.00
1.00
(%) DE
INCREMEN
TO
0.0%
0.2%
-0.1%
0.0%
0.0%
0.0%
-0.1%
(%) De
Cargabilid
ad
1.00
1.00
1.00
1.00
1.00
1.00
1.00
208
(%) De
Cargabilid
ad
1.00
1.00
1.00
1.00
1.00
1.00
1.00
(%) DE
INCREMEN
TO
0.0%
0.0%
0.0%
0.4%
0.0%
0.0%
0.0%
SIN
COCINAS
MNIMA
CON
COCINAS
INCREMEN
TO
(%) De
Cargabilid
ad
0.94
0.92
0.28
0.28
1.00
1.00
1.00
(%) De
Cargabilid
ad
0.94
0.92
0.28
0.28
1.00
1.00
1.00
(%) DE
INCREMEN
TO
0.2%
0.4%
0.0%
0.0%
0.0%
-0.2%
0.0%
HIDROLOGA BAJA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
INCREMEN
SIN
CON
INCREMEN
COCINAS COCINAS
TO
COCINAS COCINAS
TO
Nivel
de
(%) De
Tensi Cargabilid
Lneas de Transmisin
n (KV)
ad
MILAGRO - SID 2 230
230
1.00
LOJA VILONACO
138
1.00
T G MACHALA - SID 1
230
1.00
PUCARA - MULALO
138
1.00
ELECAUSTRO - CUENCA
138
1.00
PUCARA - AMBATO
138
1.00
PASCUALES - MJILAGRO
230
1.00
YAHUACHI - PAUTE 1
230
1.00
YAHUACHI - PAUTE 2
230
1.00
T G MACHALA - SID 2
230
1.00
RIOBAMBA - SOPLADORA
230
1.00
POMASQUI - CHAVEZPAMBA
138
0.99
SOLPLADORA - SAN BARTOLO 230
0.00
TRINITARIA - SALTRAL 1
138
0.99
TRINITARIA - SALTRAL 2
138
0.99
SELVA ALEGRE - POMASQUI
138
0.96
EEQ
POMASQUI - IBARRA
138
1.00
QUEVEDO - S GREGORIO 1
230
0.90
QUEVEDO - S GREGORIO 2
230
0.90
DCR - MJILAGRO
230
1.00
TOTORAS - S. FRANCIS 1
230
1.00
CUENCA - LOJA 1
138
0.84
CUENCA - LOJA 2
138
0.84
IBARRA - TULCAN
138
1.00
(%) De
Cargabilid
ad
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.99
1.00
0.99
0.00
0.99
0.99
0.98
1.00
0.92
0.92
0.99
1.00
0.73
0.73
0.99
(%) DE
INCREMEN
TO
-0.1%
0.0%
-0.1%
0.0%
0.0%
-0.3%
0.0%
0.0%
0.0%
-0.2%
0.0%
0.2%
-1.1%
0.2%
0.2%
(%) De
Cargabilid
ad
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
(%) De
Cargabilid
ad
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.99
1.00
1.00
0.99
0.99
1.00
0.99
0.73
0.73
0.97
1.00
1.00
1.00
1.00
0.99
0.99
0.99
0.99
1.2%
0.0%
2.4%
2.4%
-0.1%
-0.2%
-14.0%
-14.0%
-0.4%
209
(%) DE
INCREMEN
TO
0.0%
0.0%
0.1%
0.1%
0.0%
0.1%
-0.1%
-0.1%
-0.1%
-0.1%
0.0%
0.1%
0.0%
-0.2%
-0.2%
1.1%
-0.2%
0.2%
0.2%
0.0%
0.0%
36.2%
36.2%
2.2%
SIN
COCINAS
MNIMA
CON
COCINAS
INCREMEN
TO
(%) De
Cargabilid
ad
0.96
1.00
0.92
0.92
0.91
0.41
0.41
0.90
0.90
0.43
0.94
0.83
0.83
1.00
1.00
(%) De
Cargabilid
ad
1.00
1.00
0.93
0.90
0.82
0.77
0.77
0.97
0.97
0.47
0.94
0.86
0.86
1.00
1.00
(%) DE
INCREMEN
TO
4.2%
0.0%
0.9%
-2.6%
-10.5%
87.7%
87.7%
8.4%
8.4%
10.4%
0.0%
3.0%
3.0%
0.0%
-0.1%
0.95
0.95
0.95
1.00
0.99
0.99
0.70
0.70
0.41
0.99
0.95
1.00
0.99
0.99
0.67
0.67
0.38
0.98
0.0%
0.0%
0.0%
-0.1%
-0.1%
-3.8%
-3.8%
-7.4%
-0.8%
HIDROLOGA BAJA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
INCREMEN
SIN
CON
INCREMEN
COCINAS COCINAS
TO
COCINAS COCINAS
TO
Nivel
de
(%) De
Tensi Cargabilid
Lneas de Transmisin
n (KV)
ad
SID - TGM 138
138
0.99
MILAGRO - TRONCAL
230
1.00
TRINITARIA - LAS ESCLUSAS 1
230
0.99
TRINITARIA - LAS ESCLUSAS 2
230
0.99
SAN ROSA - MACHACHI
138
0.99
TOTORAS - SOPLADORA
230
1.00
INGA - TABABELA
138
0.99
PAUTE - SOPLADORA 1
230
0.99
PAUTE - SOPLADORA 2
230
0.99
S ROSA - TOACHI P 1
230
0.98
S ROSA - TOACHI P 2
230
0.98
SELVA ALEGRE - S/E 19
138
0.94
LVC - QUEVEDO 1
230
0.92
LVC - QUEVEDO 2
230
0.92
MONTC- SGREGORIO
138
0.99
SHORAY - MILAGRO
230
0.99
TOTORAS - S. FRANCIS 2
230
1.00
ESCLUSAS - CARAGUAY 1
138
0.98
ESCLUSAS - CARAGUAY 2
138
0.98
MILAGRO - SID 1
138
0.99
MILAGRO - SID 2
138
0.99
SHORAY - PAUTE 1
230
0.99
TRINITARIA - NUEVA
230
0.99
PROSPERINA
TOTORAS - AMBATO
138
0.99
(%) De
Cargabilid
ad
1.00
1.00
0.99
0.99
0.99
0.99
0.98
0.98
0.98
0.98
0.98
0.94
0.96
0.96
0.99
0.98
0.98
0.98
0.98
0.99
0.99
0.98
0.98
0.97
(%) DE
INCREMEN
TO
0.5%
-0.3%
-0.1%
-0.1%
-0.2%
-0.8%
-0.2%
-1.0%
-1.0%
-0.3%
-0.3%
-0.2%
3.7%
3.7%
-0.9%
-0.7%
-1.5%
-0.2%
-0.2%
0.7%
0.7%
-0.1%
(%) De
Cargabilid
ad
0.97
1.00
0.99
0.99
0.99
1.00
0.99
1.00
1.00
0.99
0.99
0.99
0.97
0.97
0.98
1.00
1.00
0.99
0.99
0.92
0.92
0.99
(%) De
Cargabilid
ad
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.99
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
1.00
0.98
-0.4%
-1.5%
210
(%) DE
INCREMEN
TO
2.6%
-0.6%
0.2%
0.2%
-0.3%
-0.7%
-0.4%
-1.0%
-1.0%
-0.5%
-0.5%
-0.5%
1.3%
1.3%
0.5%
-1.3%
-1.6%
-0.3%
-0.3%
6.2%
6.2%
-1.1%
-0.2%
-1.6%
SIN
COCINAS
MNIMA
CON
COCINAS
INCREMEN
TO
(%) De
Cargabilid
ad
0.97
0.86
0.94
0.94
0.99
0.00
0.00
0.00
0.00
0.61
0.61
0.98
0.98
1.00
0.79
0.95
0.95
0.95
0.53
0.60
0.60
0.99
(%) De
Cargabilid
ad
1.00
0.88
1.00
1.00
0.99
0.00
0.00
0.00
0.00
0.62
0.62
1.00
1.00
1.00
0.79
0.96
0.96
0.96
0.64
0.58
0.58
0.99
(%) DE
INCREMEN
TO
2.7%
2.3%
6.6%
6.6%
0.6%
224.5%
224.5%
224.5%
224.5%
1.0%
1.0%
1.7%
1.7%
0.0%
-1.0%
1.2%
1.2%
1.3%
21.6%
-4.5%
-4.5%
0.2%
0.99
0.99
0.87
0.88
0.2%
1.0%
HIDROLOGA BAJA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
INCREMEN
SIN
CON
INCREMEN
COCINAS COCINAS
TO
COCINAS COCINAS
TO
Lneas de Transmisin
STO DOM - QUININDE
SHORAY - TRONCAL
SHORAY - PAUTE 2
MILAGRO - BABAHOYO 1
MILAGRO - BABAHOYO 2
DCR - MJILAGRO(1)
TOTORAS - RIOBAMBA
INGA - S ROSA 1
INGA - S ROSA 2
SOPLADORA - MILAGRO 1
SOPLADORA - MILAGRO 2
PASCUALES - SALITRAL 1
PASCUALES - SALITRAL 2
SID - NACHALA 230 1
SID - NACHALA 230 2
VICENTINA - CONOCOTO
SE CHILIBULO - SELVA
ALEGRE
TOTORAS - SANTAROSA 1
TOTORAS - SANTAROSA 1(1)
GUARANDA - RIOBAMBA
SE S ROSA - CONOCOTO
TOACHI PILT - STO DOM 1
TOACHI PILT - STO DOM 2
S/E S ROSA - ADELCA
Nivel
de
(%) De
Tensi Cargabilid
n (KV)
ad
138
0.83
230
0.98
230
0.98
138
0.99
138
0.99
230
0.97
230
0.95
230
1.00
230
1.00
230
0.99
230
0.99
138
0.99
138
0.99
230
0.95
230
0.95
138
0.96
(%) De
Cargabilid
ad
0.93
0.98
0.98
0.99
0.99
0.97
0.94
0.99
0.99
0.99
0.99
0.99
0.99
0.95
0.95
0.98
138
0.97
0.97
230
230
69
138
230
230
138
0.99
0.99
0.96
0.95
0.85
0.85
0.97
0.98
0.98
0.95
0.97
0.94
0.94
0.97
(%) DE
INCREMEN
TO
12.6%
-0.7%
0.0%
-0.2%
-0.2%
-0.2%
-1.1%
-1.1%
-1.1%
-0.6%
-0.6%
-0.1%
-0.1%
0.8%
0.8%
2.2%
(%) De
Cargabilid
ad
0.97
1.00
0.99
0.96
0.96
0.99
0.97
0.98
0.98
1.00
1.00
0.85
0.85
0.94
0.94
0.92
(%) De
Cargabilid
ad
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.97
0.97
0.97
0.97
0.97
0.98
0.98
0.97
0.93
0.98
0.98
0.96
0.97
0.97
0.97
0.97
0.97
0.97
0.96
0.4%
-0.6%
-0.6%
-0.4%
1.6%
10.4%
10.4%
0.0%
211
(%) DE
INCREMEN
TO
1.1%
-1.5%
-1.3%
1.9%
1.9%
-0.8%
0.3%
-0.6%
-0.6%
-2.4%
-2.4%
14.4%
14.4%
4.1%
4.1%
6.0%
0.4%
-0.8%
-0.8%
-0.3%
4.2%
-1.6%
-1.6%
0.0%
SIN
COCINAS
MNIMA
CON
COCINAS
INCREMEN
TO
(%) De
Cargabilid
ad
0.99
0.87
0.99
0.99
0.92
0.96
0.23
0.99
0.99
1.00
0.65
0.65
0.99
0.99
0.95
0.95
(%) De
Cargabilid
ad
0.99
0.88
0.99
0.99
0.92
0.96
0.17
0.98
0.98
1.00
0.63
0.63
0.97
0.97
0.95
0.95
(%) DE
INCREMEN
TO
0.1%
1.0%
0.1%
0.1%
0.3%
0.0%
-25.9%
-1.3%
-1.3%
0.0%
-3.4%
-3.4%
-2.1%
-2.1%
-0.1%
-0.1%
0.97
0.98
0.98
0.82
0.91
0.95
0.67
1.00
1.00
0.98
0.93
0.91
0.95
0.79
1.00
1.00
0.0%
0.1%
13.1%
0.0%
-0.1%
17.4%
0.1%
0.1%
HIDROLOGA BAJA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
INCREMEN
SIN
CON
INCREMEN
COCINAS COCINAS
TO
COCINAS COCINAS
TO
Lneas de Transmisin
S/E S R - SANLQ
S ROSA INGA 230 1
S ROSA INGA 230 2
SE CHILIBULO - S/E ESPEJO
MULALO - NOVACERO
CENCA - GUALACEO
VICENTINA - CUMBAYA
POLICENTRO - PASCUALES 1
POLICENTRO - PASCUALES 2
S JUAN - S GREGORIO 1
S JUAN - S GREGORIO 2
SELVA ALEGRE - S/E SANTA
ROSA
PORTOVIEJO - DPERIPA 1
PORTOVIEJO - DPERIPA 1(1)
SHORAY - SININCAY
POSORJA - L CHONGON
CUENCA - PAUTE 1
CUENCA - PAUTE 2
SE CHILIBULO - S/E SANTA
ROSA
CUMBARATZA - LOJA
CUMBAYA - AEROPUERTO
DCR - ORQIDEAS 1
DCR - ORQIDEAS 2
Nivel
de
(%) De
Tensi Cargabilid
n (KV)
ad
46
0.96
230
0.97
230
0.97
138
0.95
138
0.96
138
0.96
138
0.99
138
0.94
138
0.94
230
0.95
230
0.95
(%) De
Cargabilid
ad
0.96
0.95
0.95
0.95
0.96
0.96
0.94
0.94
0.94
0.95
0.95
(%) DE
INCREMEN
TO
-0.1%
-1.8%
-1.8%
0.2%
0.0%
0.0%
-5.5%
-0.2%
-0.2%
-0.1%
-0.1%
(%) De
Cargabilid
ad
0.97
0.97
0.97
0.96
0.96
0.96
1.00
0.96
0.96
0.96
0.96
(%) De
Cargabilid
ad
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
0.96
(%) DE
INCREMEN
TO
-0.2%
-1.0%
-1.0%
0.2%
0.0%
0.0%
-3.6%
-0.7%
-0.7%
-0.1%
-0.1%
138
138
138
230
138
138
138
0.95
0.98
0.98
0.75
0.95
0.79
0.79
0.95
0.97
0.97
0.91
0.95
0.96
0.96
0.0%
-0.6%
-0.6%
20.6%
0.0%
21.4%
21.4%
0.95
0.98
0.98
0.83
0.95
0.09
0.09
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.0%
-2.7%
-2.7%
14.4%
0.0%
929.8%
929.8%
138
138
46
138
138
0.94
0.94
0.94
0.95
0.95
0.94
0.95
0.94
0.94
0.94
-0.1%
0.5%
0.0%
-0.2%
-0.2%
0.95
0.91
0.94
0.95
0.95
0.95
0.95
0.94
0.94
0.94
-0.2%
4.0%
0.0%
-0.2%
-0.2%
212
SIN
COCINAS
MNIMA
CON
COCINAS
INCREMEN
TO
(%) De
Cargabilid
ad
0.94
0.95
0.99
1.00
0.64
1.00
0.94
0.94
0.00
0.00
1.00
(%) De
Cargabilid
ad
0.95
0.95
0.99
1.00
0.67
1.00
0.94
0.94
0.00
0.00
1.00
(%) DE
INCREMEN
TO
0.9%
0.0%
-0.1%
0.1%
5.3%
0.0%
0.3%
0.3%
0.0%
0.0%
0.0%
0.96
0.96
1.00
1.00
0.99
0.99
0.93
0.0%
0.0%
0.2%
0.2%
-0.6%
-0.6%
-1.6%
0.93
0.97
0.98
0.97
0.81
-1.6%
-2.6%
-0.1%
0.0%
-16.9%
0.96
0.96
1.00
1.00
1.00
1.00
0.95
0.95
1.00
0.98
0.97
0.98
HIDROLOGA BAJA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
INCREMEN
SIN
CON
INCREMEN
COCINAS COCINAS
TO
COCINAS COCINAS
TO
Nivel
de
(%) De
Tensi Cargabilid
Lneas de Transmisin
n (KV)
ad
POMASQUI - ZAMBIZA
138
0.95
POMASQUI - SAN ANTONIO
138
0.93
S ROSA POMASQUI 230 1
230
0.88
S ROSA POMASQUI 230 2
230
0.88
SID - NACHALA 138 1
138
0.97
SID - NACHALA 138 2
138
0.97
ALANGASI - EL CARMEN
138
0.92
STO. DOMINGO - BABA
230
0.94
MACAS - CUENCA
138
0.90
SE S ROSA - EL CARMEN
138
0.81
POMASQUI - POMASQUI EEQ 138
0.92
ESMERALDAS - STO DOM 2
138
0.39
SININCAY - CUENCA
69
0.39
S/E 18 - ZAMBIZA
138
0.90
POMASQUI - S/E 19
138
0.91
CHAVEZPAMBA - IBARRA
138
0.92
STO. DOMINGO - QUEVEDO
230
0.90
VICENTINA - GUANGOPOLO
138
0.96
BAOS - AGOYAN 1
138
0.77
BAOS - AGOYAN 2
138
0.77
LVC - NUEVA PROSPERINA 1
230
0.92
L CHONGON - EQUIL 1
138
0.30
L CHONGON - EQUIL 2
138
0.30
ZAMBIZA - CUMBAYA
138
0.62
ESMERALDAS- QUININDE
138
0.33
(%) De
Cargabilid
ad
0.96
0.93
0.88
0.88
0.96
0.96
0.92
0.95
0.88
0.90
0.93
0.73
0.78
0.86
0.90
0.91
0.92
0.86
0.65
0.65
0.91
0.23
0.23
0.25
0.42
(%) DE
INCREMEN
TO
1.3%
-0.4%
-0.1%
-0.1%
-1.2%
-1.2%
0.4%
1.2%
-2.3%
10.2%
0.6%
86.4%
100.6%
-4.4%
-0.6%
-1.4%
2.0%
-10.9%
-14.8%
-14.8%
-1.9%
-20.7%
-20.7%
-59.0%
27.0%
(%) De
Cargabilid
ad
0.91
0.94
0.94
0.94
0.99
0.99
0.92
0.93
0.66
0.81
0.89
0.84
0.46
0.93
0.90
0.88
0.87
0.98
0.93
0.93
0.89
0.92
0.92
0.99
0.35
213
(%) De
Cargabilid
ad
0.94
0.93
0.93
0.93
0.93
0.93
0.93
0.92
0.92
0.91
0.91
0.90
0.90
0.89
0.89
0.86
0.86
0.85
0.83
0.83
0.83
0.81
0.81
0.79
0.78
(%) DE
INCREMEN
TO
3.2%
-0.5%
-0.3%
-0.3%
-5.9%
-5.9%
0.6%
-0.5%
38.8%
12.9%
1.3%
7.9%
95.4%
-4.1%
-0.6%
-1.6%
-1.1%
-13.2%
-10.5%
-10.5%
-6.8%
-11.5%
-11.5%
-20.4%
119.4%
SIN
COCINAS
MNIMA
CON
COCINAS
INCREMEN
TO
(%) De
Cargabilid
ad
1.00
0.67
0.94
0.95
0.94
0.50
0.94
0.64
0.98
0.95
0.99
0.99
0.99
0.76
1.00
1.00
1.00
0.91
0.91
0.76
0.80
1.00
0.99
0.99
0.83
(%) De
Cargabilid
ad
1.00
0.67
0.97
0.96
0.98
0.63
0.94
1.00
0.98
0.97
0.99
1.00
1.00
0.89
1.00
1.00
1.00
0.92
0.92
0.79
0.87
1.00
1.00
1.00
0.80
(%) DE
INCREMEN
TO
0.2%
0.0%
3.3%
1.8%
4.2%
26.3%
0.2%
55.8%
-0.1%
2.5%
0.3%
0.6%
0.4%
16.1%
0.1%
0.1%
0.1%
0.9%
0.9%
4.1%
7.8%
0.0%
0.0%
0.0%
-3.8%
HIDROLOGA BAJA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
INCREMEN
SIN
CON
INCREMEN
COCINAS COCINAS
TO
COCINAS COCINAS
TO
Lneas de Transmisin
PUYO - TENA
PASCUALES - LAGO
CHONGON 1
PASCUALES - LAGO
CHONGON 2
BABA - QUEVEDO
SANGLOQUI PASOCHOA
TOTORAS - QUEVEDO 1
TOTORAS - QUEVEDO 2
PORTOVIEJO - S GREGORIO
COCA - TENA
NUEVA LOJA - COCA
YAHUACHI - PASCUALES 1
YAHUACHI - PASCUALES 2
YAHUACHI - PASCUALES 3
YAHUACHI - PASCUALES 3(1)
BAOS - TOTORAS 1
BAOS - TOTORAS 2
SAN ANTONIO - S/E 18
ESM 230 - STO DOM 1
ESM 230 - STO DOM 1(1)
DAULE PERIPA - QUEVEDO 1
DAULE PERIPA - QUEVEDO 2
VICENTINA - MULALO
L CHOGON - ST ELENA 1
Nivel
de
(%) De
Tensi Cargabilid
n (KV)
ad
138
0.82
(%) De
Cargabilid
ad
0.82
138
0.80
0.74
138
0.80
0.74
230
46
230
230
138
138
69
230
230
230
230
138
138
138
230
230
138
138
138
138
0.82
0.68
0.69
0.69
0.97
0.73
0.01
0.92
0.92
0.92
0.92
0.08
0.08
1.00
0.47
0.47
0.95
0.95
0.33
0.71
0.84
0.68
0.24
0.24
0.99
0.63
0.01
0.84
0.84
0.84
0.84
0.23
0.23
0.99
0.14
0.14
0.96
0.96
0.20
0.66
(%) DE
INCREMEN
TO
0.1%
(%) De
Cargabilid
ad
0.75
(%) De
Cargabilid
ad
0.76
0.85
0.75
0.85
0.75
0.76
0.67
0.91
0.91
0.82
0.74
0.63
0.74
0.74
0.74
0.74
0.75
0.72
0.73
0.10
0.10
0.52
0.52
0.76
0.22
0.73
0.68
0.66
0.66
0.64
0.60
0.55
0.48
0.48
0.48
0.48
0.39
0.37
0.34
0.31
0.31
0.27
0.27
0.21
0.19
-7.4%
-7.4%
2.6%
0.2%
-65.7%
-65.7%
2.6%
-14.2%
-16.1%
-8.8%
-8.8%
-8.8%
-8.8%
195.3%
192.0%
-1.2%
-70.0%
-70.0%
0.6%
0.6%
-37.9%
-7.1%
214
(%) DE
INCREMEN
TO
2.2%
-11.2%
-11.2%
-3.7%
0.2%
-28.1%
-28.1%
-21.4%
-19.2%
-13.0%
-35.7%
-35.7%
-35.7%
-35.7%
-47.5%
-48.5%
-53.6%
207.3%
207.3%
-47.9%
-47.9%
-72.5%
-14.7%
SIN
COCINAS
MNIMA
CON
COCINAS
INCREMEN
TO
(%) De
Cargabilid
ad
0.96
(%) De
Cargabilid
ad
0.95
(%) DE
INCREMEN
TO
-0.4%
0.92
0.93
1.00
1.00
1.00
0.99
0.99
0.99
0.99
1.00
0.65
0.65
0.98
0.89
0.92
1.00
1.00
1.00
1.00
0.99
0.99
0.22
0.80
0.81
1.00
1.00
1.00
0.99
0.99
1.00
0.53
0.53
0.98
0.92
0.94
1.00
1.00
1.00
1.00
0.99
0.99
0.41
0.81
0.92
0.4%
0.0%
0.0%
1.4%
1.4%
-0.6%
-0.6%
0.0%
-18.0%
-18.0%
-0.1%
2.4%
2.1%
0.2%
-0.1%
-0.1%
0.2%
0.6%
0.6%
88.1%
1.8%
14.6%
HIDROLOGA BAJA
DEMANDA MXIMA
DEMANDA MEDIA
SIN
CON
INCREMEN
SIN
CON
INCREMEN
COCINAS COCINAS
TO
COCINAS COCINAS
TO
Lneas de Transmisin
L CHOGON - ST ELENA 2
JAMONDINO - POMASQUI 1
220
JAMONDINO - POMASQUI 2
220
JAMONDINO - POMASQUI 3
220
JAMONDINO - POMASQUI 4
220
CHONE - SEVERINO
REF PACIF - S JUAN 1
REF PACIF - S JUAN 2
Nivel
de
(%) De
Tensi Cargabilid
n (KV)
ad
138
0.71
(%) De
Cargabilid
ad
0.66
230
0.76
0.71
230
0.76
0.71
230
0.76
0.71
230
0.76
0.71
138
230
230
0.00
0.00
0.00
0.00
0.00
0.00
(%) DE
INCREMEN
TO
-7.1%
(%) De
Cargabilid
ad
0.22
(%) De
Cargabilid
ad
0.19
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.00
0.00
0.00
0.00
0.00
0.00
-6.6%
-6.6%
-6.6%
-6.6%
0.0%
1.4%
1.4%
215
(%) DE
INCREMEN
TO
-14.7%
-6.2%
-6.2%
-6.2%
-6.2%
0.0%
0.0%
0.0%
SIN
COCINAS
MNIMA
CON
COCINAS
INCREMEN
TO
(%) De
Cargabilid
ad
0.82
(%) De
Cargabilid
ad
0.59
(%) DE
INCREMEN
TO
-28.2%
0.76
0.68
0.76
0.68
0.76
0.68
0.76
0.68
0.99
0.99
0.79
0.99
0.99
0.67
-10.6%
-10.6%
-10.6%
-10.6%
0.2%
0.2%
-15.1%