No.
Contents
1
1
x
x
1
3
5.50
5.70
0.23
0.23
1.10
1.10
1.39
4.33
B9-B13
2.85
0.23
1.10
2.88
D3-C4
3.27
0.23
1.10
0.83
C4-C6
2.94
0.23
1.10
0.74
C6-C7
2.16
0.23
1.10
0.55
E3-E6
6.51
0.23
1.10
1.65
E6-E7
2.08
0.23
1.10
0.53
2.85
0.23
1.10
11.54
F3-F5, G3-G5
3.90
0.23
1.10
1.97
F5-F7, G5-G7
4.87
0.23
1.10
2.46
2.70
0.23
1.10
4.10
H4-H6
3.76
0.23
1.10
0.95
H6-H7
2.21
0.23
1.10
0.56
I3-I4 to x 3- x 4
x 13
2.50
0.23
1.10
8.22
J4-J7 to x 4- x 7
x 12
6.20
0.23
1.10
18.82
6.23
0.23
1.10
4.73
4.39
0.23
1.10
6.66
B13-E13
C9-E9
1
1
x
x
2
1
4.30
2.37
0.23
0.23
1.10
1.10
2.18
0.60
C7-E7
2.47
0.23
1.10
0.62
2.40
0.23
1.10
1.82
3.00
0.23
1.10
6.83
3.05
0.23
1.10
0.77
F3-G3, F5-G5
5.65
0.23
1.10
2.86
F7-G7 to F13-G13
5.70
0.23
1.10
10.09
OTS
2.85
0.23
1.10
0.72
Sl.
No
Description of work
No.
Contents
G3-I3
4.25
0.23
1.10
1.08
G7-H7 to G13-H13
2.10
0.23
1.10
3.72
H4-I4
2.00
0.23
1.10
1.01
x 11
3.00
0.23
1.10
25.05
4.00
0.23
1.10
2.02
A5-A7
S3-T2, R3-Q2
1
1
x
x
1
2
5.50
2.83
0.23
0.23
1.10
1.10
1.39
1.43
Q2-Q1, T2-T1
2.70
0.23
1.10
1.37
Q2-T2, Q1-T1
4.00
0.23
1.10
2.02
Sundries
1.50
140.00 m3
Name of work : Construction of Combined Court Buildings and Quarters for Additional
District Munsif at Tiruchendur in Thoothukudi District
Abstract
Item
No
1
Quantity
Description of works
Rate
Unit
Amount
1890.00 Cum
264600
Total
264600
Name of work : Construction of Combined Court Buildings and Quarters for Additional
District Munsif at Tiruchendur in Thoothukudi District
DATA for the Year 2010- 2011.
Sl.
No
I
Quantity
DESCRIPTION OF WORK
UNIT AMOUNT.
MORTAR
Cement Mortar 1:6
0.240 MT Cement
1.00 Cum Sand for Mortar
1.00 Cum Mixing charge
RATE
4700.00
225.30
32.65
1MT
1Cum
1Cum
Total
1128.00
225.30
32.65
1385.95
3568.63
981.25
1632.00
6181.88
2182.85
2182.85
2182.85
3142.75
981.25
1235.00
5359.00
1892.30
1892.30
1892.30
Name of work : Construction of Combined Court Buildings and Quarters for Additional District Munsif at Tiruchendur in
Thoothukudi District
LEAD STATEMENT for the YEAR 2010 - 2011
Sl.
No.
SOURCE
LEAD
IN KM
UNIT
1 CEMENT
Local.
MT
4700.00
Korgai
23
Cum.
110.00
115.30
225.30
Thoothukudi
41
1000Nos
2480.00
265.10
2745.10
Mukkani
20
1000Nos
2330.00
87.50
2417.50
MATERIALS
8 3/4 " X 4
COST
Lead
Charges
-
TOTAL
4700.00
1 Certified that the Lead for the materials given above have been verified and found to be correct and shortest to the best of
my knowledge and belief.
2 Certified that the rates of materials adopted based on P.W.D current schedule of rates ( 2010-11.)
3 Certified that sufficient quantity of required quality of materials available in the sources as adopted above at the time of
preparation of this estimate.
4 Certified that the sand quarry adopted is functioning at the time of preparation of this estimate.
Page 5
Sl. No.
Description of Work
Unit
Mason I Class
Rs. 195 /Each.
Nos.
Amount
Mason II Class
Rs. 175 / Each.
Nos.
Amount
Mazdoor I Class
Mazdoor I Class
Rs. 123 /Each.
Rs. 111 /Each.
Nos.
Amount
Nos.
Total
Nos. Amount
1
2
1 Brick works using III Class Country bricks
3
2.832M3
1.00
195.00
2.00
350.00
2.00
246.00
4.00
444.00
9
1235.00
2.832M3
1.00
195.00
3.00
525.00
2.00
246.00
6.00
666.00
1632.00
Amount
Stone cutter I
class.
Rs.150/Each..
Agt.Value: Rs.23236073/-
Agt.No:20SE / 2010-2011.
item
No.
Supplemental Agreement
Rate
'Rs.'
Qty
140m
Amount
Per
'Rs.'
2182.85 m
Rate
'Rs.'
Qty
140m
Amount
Per
1890.00 m
'Rs.'
264600
Net increase
(or)
Decrease
'Rs.'
Decrease
40999.00
Remarks
Est.Amt.Rs.260.60 Lakhs.
SUPPLEMENTAL PROPOSALS
PROFORMA - II
Name of work : Construction of Combined Court Buildings and Quarters for Additional District Munsif at Tiruchendur in Thoothukudi District.
Est.Amt.Rs.260.60 Lakhs.
CER.No:197 / 2009-2010.
Agt.Value: Rs.23236073/-
Agt.No:20SE / 2010-2011.
Qty
Rate
(Rs.)
Amount
(Rs.)
Agre
Authorised Omission
ement Description of work Original Unit
No.
item
9.(a)
Qty
Rate
(Rs.)
Amount
(Rs.)
Excess Savings
40999.00
Schedule-A
CONSENT STATEMENT
To:
Superintending Engineer, PWD.,
Buildings(C&M) Circle,
Thoothukudi.
(Through Proper Channel )
Sub: Construction of Combined Court Buildings and Quarters for Additional District
Munsif at Tiruchendur in Thoothukudi District.
Ref: Agt.No: 20SE / 2010 - 2011.
------------I agree to execute the following items of works at the rates mentioned against each, under
supplemental agreement item.
TNDSS
No.
Sl.No
Description of work
1.
a.
Qty in
Figures &
Words
Rates both in
figures and
works
140.00 M3
Rs.1890.00
(One
(Rupees One
hundred and thousand Eight
forty Cubic
hundred and
meter)
Ninety only per
one cubic metre)
10
Proforma for Additional / Substitute Items of Work Fairly Contingent on the Main Work to
be Entrusted to the Contractor.
1. a) Name of Work
b.
c.
d.
e.
f.
: Thiru.G.R.Thanasekar,
Arumuganeri,
Thoothukudi District.
Class in which he has been registered : Class I Contractor.
Value of contract entrusted to him
: Rs.23236073/Form of Agreement
: L.S.Agreement
Agreement accepted by
: Superintending Engineer, PWD.,
Buildings (C&M) Circle,
Thoothukudi.
Date fixed for completion of work as : 2.11.2011
per agreement
: Yes
: Yes
3. a)Additional / Substitute items of work if any already entrused to him for which approval of the
competent authority had been obtained.
Sl.No Description of work
Qty
Rate
Amount
Rs.
---------- Nil ---------b) Additional / Substitute item of work if any already proposed to be entrusted to him for which
approval of the competent authority has been sought for separately.
Sl.No
Description of work
Qty
Rate
11
Amount
Rs.
c) Additional / Substitute of works now proposed to be entrused to the main contractor for which
approval is sought for
Sl.No
Description of work
Qty
140m3
12
Rate
Amount
Rs.
1890.00 264600.00
Remarks
4.
: No
ii) If not, state how the cost is proposed to be met : Substitute item with decrease in rate.
with.
c) Why these items of works were not contemplated : Country bricks sufficiently available at
at the time of settling the contract.
the time of preparing the estimate.
5.
: Yes
: No
6.
a) Whether the rates for these additional items of works have been
: Yes
approved by the superintending Engineer and accepted by the contractor.
b) Whether the sanctioned estimate is likely to be exceeded and if so the
excess involved on account of these additional items of work.
13
: No
Proforma for Additional Items of Work Fairly Contingent on the Main Work to be Entrusted
to the Contractor.
1.
a) Name of Work
:
Providing internal and external electrification to
the Uzhavar Maiyam at Thoothukudi
a.
c.
CER.No:
CR.No.6 SE/201314
DR./
2.
M/s.Shri.K.R.Electricals,
Thoothukudi
b.
c.
d.
e.
:
:
:
:
f.
g.
:
:
Yes
h.
Yes
13.
for which
b) Additional / Substitute item of work if any already proposed to be entrusted to him for which
approval of the competent authority has been sought for separately. Amount Reference No. and
Sl.No
Description of work
Qty
Rate
date in which
Rs.
approved
---------- Nil ----------
c) Additional / Substitute of works now proposed to be entrused to the main contractor for which
approval is sought for
Amount
Sl.No
Description of work
Qty
Rate
Remarks
Rs.
1. Fly ash Brick work in
140m3
1890.00
###
Cement Mortar 1 :6 using
fly ash bricks of size 230
x 110 x 70mm ( 9" x
43/8" x 2 3/4")
4.
5.
a)
b)
c)
d)
: Yes
: Yes
: No
: Not Required
6.
a) Whether the rates for these additional items of works have been approved by
the superintending Engineer and accepted by the contractor.
k to be Entrusted
electrification to
ukudi
e(AP1) Department
D.,
for which
pply of country
e item with
nbricks
rate. sufficiently
at the time of
uired
: Yes