Académique Documents
Professionnel Documents
Culture Documents
Submitted by
Aqeel Sabir Ali
(11-NTU-004)
Haseeb Ahmad
(11-NTU-009)
Mian M. Arsalan
(11-NTU-015)
(11-NTU-037)
Zaheer Abbas
(11-NTU-042)
Submitted To
Contents
Spin Plan in AASML.....................................................................................................
1.1 Auto Cone.............................................................................................................
1.2 Ring Frame...........................................................................................................
1.3 Roving Frame........................................................................................................
1.4 Draw Frame Finisher.............................................................................................
1.5 Comber.................................................................................................................
1.6 Lap Former...........................................................................................................
1.7 Breaker Drawing Frame........................................................................................
1.8 Card....................................................................................................................
900m/min
Efficiency
70%
Production
No of spindles
Winding rate*1.0936*60*24*eff.
=
1784*40*840
900*1.0936*60*24*0.70
60.41
61
No of spindle/frame
=
Waste %age
Input
61/60
1.02 = 1 frames
=
1%
output * 100/100-w
1784*100/99
1802 lb/day
1802 lbs/day
Efficiency
97%
Spindle speed
T.M
4.2
T.P.I
26
Production =
no.spindles * 0.97
21500rpm
1802
No of spindles
=
=
No of frames
Input
1802*26*36/21500*1448*0.97
1887
=
output * 100/100-w
1802* 100/100-2
1839 lbs/day
1839lbs/day
Spindle speed
1100rpm
Hank roving
1.22
T.P.I
Production=
1.5
0.93x60x24x0.90
No of spindles
speed*60*24*0.90
=
1839*15*36*840*1.22/spindle
70
No of spindles/frame
60
No of frames
70/60
1.1
Waste%
0.5
Input
output * 100/100-w
1839 * 100/100-0.5
1848lbs/day
1848lbs/day
Delivery speed
405m/min
Sliver count
60gr/yd
Efficiency
85
Production
deliveries*eff.
delivery rate*1.0936*w*60*24*no of
7000
No of deliveries
1848*7000/405*1.0936*60*24*.85
0.39
0.5
output * 100/1001-w
1848 * 100/100-0.5
1857lbs/day
1.5 Comber
Production
Nipping rate
Amount of feed
1857lbs/day
=
375
5.2mm
Comber noil
19%
Coming head
Efficiency
92%
Production
deliveries/
=375*5.2*(100-19)*60*24*8*1050*0.92*no of
100*1000*7000*0.914
No of deliveries
Waste
Input
0.7 = 1
=
0.5%
1857 * 100/100-0.5
1866lbs/day
1866lbs/day
Delivery speed
100m/min
Lap weight
1050gr/yd
Efficiency
70%
Production
machines
No of machines
0.11 = 1
Waste
Input
0.5%
output * 100/100-w
1866 * 100/100-0.5
1875lbs/day
1875lbs/day
Delivery speed
400m/min
Sliver weight
62gr/yd
Efficiency
85%
Production
machines
No of machines
0.39 = 1
Waste
Input
0.5%
output * 100/100-w
1875 * 100/100-0.5
1884lbs/day
1.8 Card
Production
1884lbs/day
Delivery speed
130m/min
Sliver weight
62gr/yd
Efficiency
80%
Production
cards
No of cards
1.3 = 2
Waste
Input
6.5%
output * 100/100-w
1884 * 100/100-6.5
2015lbs/day
Summary: It is the output of blow room per day for 18 bags of 40/s
compact combed from Pakistani cotton.