GRENOBLE STADIUM

ETI Design Office


150

Grenoble, France
PROJECT DESCRIPTION
Location: Grenoble, France
Architecture office: Chaix & Morel Associs, Paris
Dimensions: 144m x 191m
Specifications: 20 000 sitting capacity,
13,000 square meters of offices,
65,000 square meters of extracted ground

THE SOLUTION

Create joints between curved welded and

tapered beams.

Precise and fast 3D modeling of the utter


structure.

Get workshop drawings and NC-DSTV files

Easy creation of DSTV files.

from these elements.

"Advance Steel was very useful thanks to


the collision detection tool that enabled us
to check nothing came between the
various roof structure elements
Mr Berger,
ETI Project Manager

USERS BENEFITS
Structural modeling achieved in a 3-month period
Fast and easy DSTV files creation

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

SKI JUMP
150
Bitschnau
GmbH

Nenzing, Austria
PROJECT DESCRIPTION
Location: Garmisch-Partenkirchen, Germany
Contracting authority: Markt Garmisch
Partenkirchen
Dimensions: total height of 149 meters
Specifications: 655 tons total weight
35 meters height

THE SOLUTION

The structure is made of curved and folded

Increase in productivity

beams

Profile libraries

Production of workshop drawings

Intelligent connections function

90% of fundamental beams are welded


beams

"Advance Steel has increased our


productivity and therefore our efficiency.
The software was excellent when
designing the jump platform, especially
regarding all the constructive challenges.
Mr. Huber,
Factory Manager of Bitschnau GmbH

USERS BENEFITS
Increased productivity by the modeling of curved beams and creation of workshop drawings
Libraries provided a wide range of profiles

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

MUGAM EVI MUSIC HOUSE


NCA Container und Anlagenbau GmbH
150

St Paul, Austria
PROJECT DESCRIPTION
Location: Baku, Azerbaijan
Contracting authority: Government of Azerbaijan
Weight: 500 tons of steel
Specifications: steel construction with 3D rolled
pipes

THE SOLUTION

The construction mainly consists of 3D


rolled pipes

Entire information processing from the


3D model

Each single pipe has elliptical-shaped radii

Easy creation of documents

on two levels

Conformity of all drawings and


documents

"The fact that Advance Steel processes all


information
from
the
3D
model
automatically leads to the easy creation of
the documents and enables the conformity
of all drawings and documents.
Mr. Dohr,
Construction Engineer

USERS BENEFITS
3D modeling saved a lot of time
Advance Steel prepares double offsets

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

WRTHERSEE STADIUM
NCA
150 Container- und Anlagenbau GmbH
St. Paul, Austria
PROJECT DESCRIPTION
Location: Klagenfurt, Austria
Contracting authority: Capital Klagenfurt
2

Dimensions: total area of 32,000 m , roof


2,

area of 32,000 m , 8,000 m playing field,


height of 32.5 m
Specifications: 32,000 seats capacity
(12,000 seats after deconstruction in 2009)
Approximately 4.000 tons of steel

THE SOLUTION

Tight deadlines to get the stadium ready

3D modeling

for UEFA Euro 2008

Simple and rapid creation of the model

Realisation of the structural requirements

Reduced error rate

Realisation of the rebuild planning

Differently arranged purlins

"With the automatic production of the


drawings and collision control which is
carried out regularly, we were able to
significantly reduce errors. These features
also saved us a lot of time.
Mr. Schrammel,
Department Manager for Steel

USERS BENEFITS
Reduction of errors by automatic drawing creation and collisions control
3D-modeling saved a lot of time

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

BICYCLE AND PEDESTRIAN


PEDESTRIAN BRIDGE
Planungsbro
Heuer
150
Hattingen, Germany
PROJECT DESCRIPTION
Location: Leichlingen, Germany
Contracting authority: city of Leichlingen
Dimensions: total length of 42.6 meters,
width of 4.475 meters
Specifications: a span of 42 meters
between the support axes.
A width of 3 meters between the railings
of the bridge.

THE SOLUTION

Bridge made of conical parts and cables

3D CAD system

Need to have the parts unreeled as a

Automatic functions to get conical parts

sheet metal construction

All workshop drawings

"Advance Steel allowed us to process the


entire 3D model data, accelerate the
creation of all documents and insured an
all-around
drawing
consistency
Mr. Heuer,
Construction Engineer

USERS BENEFITS
Efficient and precise 3d modeling
Easy-to-learn and easy-to-handle solution
Special sheet metal functions

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

NIEDERWARTHA BRIDGE
Plauen
Stahl Technologie GmbH
150
Germany
PROJECT DESCRIPTION
Location: Meien, Germany
Contracting authority: Road Construction
Office Meien-Dresden
Dimensions: 366 meters long with a main span
of 192 meters
Specifications: 1232 tons of steel

Creation of welding preparation and

THE SOLUTION

folded plates

Creation of the bridge model in modular


form

Exact creation of the geometry of single

Clash detection tool

components

Specific commands for automatic creation

Bridge made of complex 3D girders

of 3D plates

"The use of Advance Steel was a complete


success for our work since the creation of
models, BOMs and DStV-NC-data can be
set in a modular way.
Mr. Streit,
Construction Engineer

USERS BENEFITS
Low error rate at workshop and at site
Drawings that update after modifications

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

ARS ELECTRONICA CENTER


CENTER
150
Grmer
Stahl GmbH

Obersterreich, Austria
PROJECT DESCRIPTION
Location: Linz, Austria
Architecture Office: Treusch Architecture ZT
GmbH
Contracting authority: Immobilien Linz GmbH &
Co.KG
2

Dimensions: 5.000 m sheathing of the building,


2

1.100 m grating
Specifications: 200 tons of steel, 1.100 glass

THE SOLUTION

Very specific geometry of the center

The steel glass faade had to match the 3D

creation of the faade to be done with a

geometry of the building

3D CAD system like Advance Steel

The specific geometry required the

Processing of the entire 3D model data

"Advance Steel processes the entire 3D


model data, accelerates all document
creation and ensures all-around drawing
consistency.
Mr. Moser,
Project Manager

USERS BENEFITS
3D modeling
Intelligent connections and NC-files
Ease of use and short learning curve

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

TRESORER II
150 Design Office
SAI

Massy, France
PROJECT DESCRIPTION
Localisation : Massy, France
Matrise douvrage : GE
Dimensions : 10m x 5m
Spcifications : Surface, 50 m, Weight : 1500 kg

THE SOLUTION

Reduce time for workshop drawings and

Compatibility and use of AutoCAD

manufacturing files

"Advance Steel enabled us to save a lot of

time during the design phase and frames


manufacturing. This is a very reactive
software solution in case of modifications
of the project.
Mr. Fenix,
Draftsman

USERS BENEFITS
Reduce project time
20% productivity gains

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

REVAMP OF CAT CRACKER


CRACKER
VIRO
150 engineering
Hengelo, The Netherlands
PROJECT DESCRIPTION

Location: Venezuela
Engineering Office: VIRO engineering
Dimensions: 6.6 km of piping
Specifications: 240 tons of steel

Equipment and primary steel to be created

Bi-directional SDNF file format exchange

in PDMS.

Use Advance Steels automatic stairs and

Primary steel imported in to Advance

railings macros

Steel

THE SOLUTION

Automatic workshop drawings

Create all secondary and tertiary steel


(stairs and railings)

Clash check results between the


equipment and steel structure

"Advance Steel is a great solution thanks


to its stairs & railings macros and also for
the automatic detailing of the complete
steel structure
Mr Kampen,
Manager Engineering of VIRO engineering

USERS BENEFITS
Only one 3D model for detailed steel and shop drawings
High quality workshop drawings
Excellent bi-directional link between Advance Steel and PDMS

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

CANOPY FOR SHEREMETYEVO


SHEREMETYEVO INTERNATIONAL AIRPORT
AIRPORT
Heinrich Lamparter Stahlbau & Co. KG GmbH
Kassel,
Germany
150

PROJECT DESCRIPTION
Location: Moscow, Russia
Architecture Office: Pshenichnikov & Partners
Dimensions: 92m wide x 125m long x 16m high
Specifications: 1200 tons of steel, 50 tons
tension members until DN 130, 2000m steel
cable until DN 75 and approximatively 20 tons of
screws until M48

THE SOLUTION

Needed a Multilanguage solution

Create steel elements to the compulsory

Observation of geometric boundary

Drawings with 3D views and 3D details for


easy understanding at site

conditions for the assembly

and detailing software

maximum unit weight.

Use Advance Steel, a 3D steel modeling

Workshop drawings automatically created


by Advance Steel

The need to create compensatory


tolerances that could appear during the
assembly

"In Advance Steel the model is created


with real dimensions thus making it
possible to easily deal with complex
situations that can occur during the
assembly phase
Mr. Linge,
Manager of the Engineering Department

USERS BENEFITS
3D modeling
Ability to create the roof construction ready for fabrication
Do the 3D model within the German GUI and automatically get all the drawings containing

Russian annotations

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

VERIFIED 3D MODEL OF STEEL STRUCTURE OF


PRUNEROV II POWER PLANT
PLANT
150

Noving Ltd
Vitkovice, Czech Republic
PROJECT DESCRIPTION
Location: Prunerov II, Czech Republic
Architecture office: Viktovice Power Engineering
Contracting authority: CEZ
Dimensions: 250 x 80 x 80m
Specifications: 25.000 tons of steel structure

THE SOLUTION

Need to measure, check and create the

Successful import of parts

model from more than 30.000 elements

Measured by optical methods using

(beams, columns, bracing)

Size of the task

geodetic total station

In modeling, the total model was broken


into logical parts linked together as
AutoCAD external references xref

"The project required to combine our own


measurement evaluation software with
Advance Steel. Without Advance Steel we
would not have been able to handle the
whole project.
Mr. Novotny,
Managing Director

USERS BENEFITS
Reduction of errors
Possibility to share full objects data across platform
Ease of design changes

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

AIR INTAKE
Planungsbro Heuer
150

Hattingen, Germany
PROJECT DESCRIPTION
Location: Canada
Contracting authority: Shell Canada
Dimensions: 1,200 mm wide x 3,800 mm
high compensator connection, pieces of
channel with a rectangle cross section of
4,200 mm (width) x 5,100 mm (height)
Specifications: rectangular pieces of channels
with a diameter of 3,400 mm

THE SOLUTION

Need to have the parts unreeled as a

3D CAD system

sheet metal construction

Automatic functions to get conical parts

All workshop drawings

"Advance Steel allowed us to process the


entire 3D model data, accelerate the
creation of all documents and ensured an
all-around
drawing
consistency
Mr. Heuer,
Construction Engineer

USERS BENEFITS
Efficient and precise 3d modeling
Easy-to-learn and easy-to-handle solution
Special sheet metal functions

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

FRAMEWORK FOR A FILTER


FILTER SYSTEM
AHP Arikan Ibrahim Konstruktionsbro
fr
150Stahlbau
Untermeitlingen, Germany
PROJECT DESCRIPTION

Location: Frankfurt, Germany


Specifications: Total weight of 10 tons

THE SOLUTION

Frame placed in a building that pokes out

of the roof.

Possibilities of fast modifications and


adjustments

Need to plan a waterproof sealing for the

Fast drawing derivation

roof covering

Collisions check

Frame above the roof to be encased

Need to create bay rails

"Advance Steel increased our productivity by


75% thanks to the possibilities of fast
modifications and adjustments along with the
fast drawing derivation and the collisions
check that allowed us to finish the construction
in a short time.
Mr. Arikan,
Managing Director

USERS BENEFITS
Productivity increased by 75%
Fast modelling with joints
Collisions check
Fast drawing derivation

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

THEATRE ROYAL MODERNIZATION


TSI Structures Ltd
150

Norwich, Norfolk, UK
PROJECT DESCRIPTION
Location: Norwich, Norfolk, UK
Architecture Office: Tim Foster Architects
Main Contractor: R.G Carter Ltd
Structural Engineer: Price & Myers
Dimensions: Extension of the circular balcony by
3 metres
Specifications: Modernization program of the
Theatre Royal of Norwich, built in the 1390s

Complicated extension of the circular

THE SOLUTION

balcony

Detailed in small sections to allow better


handling

Avoid double work by recreating the


existing environment

Start working directly on the AutoCAD


DWG file provided by the architect

"Advance Steel was a key element in


enabling us to achieve the required
delivery, due to its ease of use and
modeling qualities that we require."
Mr. Nick Thompson,
Director

USERS BENEFITS
Advance Steel is easy to use
The speed at which complicated models can be detailed
It is simple to add custom objects into the system

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

TOP OF TYROL VIEWING


VIEWING PLATFORM
Bitschnau GmbH
150
Nenzing,
Austria

PROJECT DESCRIPTION
Location: Stubaier galcier, Austria
Contracting authority: Wintersport Tirol AG
Dimensions: 3200 m above sea level, anchors of
14 m in the glacier
Specifications: 39 tons of weather-proof steel,
2

80 m gratings

THE SOLUTION

The entire construction consists of curved

Increase in productivity

and rolled steel beams

Unfolded sheet metal function

Laying of sheet metal along

Creating files from unfolded plates for the

3-dimensional twisted polylines and

CNC machines

splines

Assembly of most of the pre-fabricated


units at the top of the mountain

The fast and easy drawing creation


enabled us to save a lot of time.
Mr. Pfister,
Project Manager

USERS BENEFITS
3-D Modeling
Very exact unfolded sheet metal
Very fast and easy drawing creation

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

CANTILEVER CARRIAGE
150Zblin AG
Ed.

Stuttgart, Germany
PROJECT DESCRIPTION
Location: Abu Dhabi, United Emirate
Contracting authority: Tourism Development and
Investment Company
Specifications: a cantilever carriage has a weight
of 68 tons and consists of 3000 single units

THE SOLUTION

Use of 12 cantilever carriages at the same

time

the 3D model

One cantilever carriage has to hold a


bridge segment which has a weight of 200
tons

Link between 2D workshop drawings and


Automatic control of the model and
drawings

Compatibility between Advance Steel and


AutoCAD

"Advance Steel enabled us to complete


the work by the deadline. I especially want
to put emphasis on the 3D function, the
comprehensive
functionality
when
creating workshop drawings, and the
automatic collision control that checks the
3D
model
continuously.

Mr. Jger,
Project Engineer

USERS BENEFITS
3D Modeling
Comprehensive possibilities during the creation of workshop drawings
Collision control

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

M.O.A.B. OFFSHORE PLATFORM


PLATFORM
Overdick GmbH & Co. KG
150
Hamburg,
Germany

PROJECT DESCRIPTION
Location: offshore Congo, Africa
Dimensions: total height of 63m, dimension of
the deck 30m x 31m x 6m
Specifications: located 55 m below the water
surface and 8 m above the water surface; a total
weight of 2750 tons; 1650 tons of steel were
created with Advance steel

THE SOLUTION

Self-transporting and self-installing


platform

Automatic creation, control and updating


of the drawings

Sub-construction as a steel tube

Increase in productivity

framework with 4 integrated cylindrical


footing elements

"The fast and easy drawing creation


enabled us to save a lot of time.
Mrs. Ebert,
Construction Engineer

USERS BENEFITS
Creation of lists
Fast drawing creation
Many possibilities for selection and sorting

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

UNIVERSITY OF LJUBLJANA
LJUBLJANA
ELEA IC
150

Ljubljana, Slovenia
PROJECT DESCRIPTION
Location: Ljubljana, Slovenia
Project: New building at the Faculty of
chemistry
Structure weight: 783 tons
Building dimensions: 59.30 m 26.20 m
16.00 m

THE SOLUTION

Elliptical roof shape

Curved beams 3D modeling

All columns are inclined

Automatic connections used between

Obtaining precise drawings for fabrication

straight and inclined beams

Automatic workshop drawings

"Advance Steel has increased our


productivity and even made it possible to
model the complex geometry of this
structure in the first place. We especially
appreciate
its
automatic
detailing
capabilities and easy manual adjustments
to shop drawings.
Mr. Marko PAVLINJEK,
ELEA iC - Structural engineer

USERS BENEFITS
Study of this challenging structure was possible using 3D modeling
Clear drawings for accurate fabrication

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

U2 360 TOUR STAGE


STAGECO
150

Tildonk, Belgium
PROJECT DESCRIPTION
Location: worldwide concert tour
Structure type: stage for the U2 360 Tour
Art design: Willie Williams (U2 production
manager) and Mark Fisher
STAGECO R&D project designer: Koen Peeters
Structure weight: 240 tons per touring system

THE SOLUTION

Study this complex structure "spaceship-

on-four-legs" in 3D

Get clear drawings for easy erection

Fabricate the steel structure without any


risk of errors

Use Advance Steel, a 3D steel modeling


and detailing software

Drawings with 3D views and 3D details for


easy understanding at site

Workshop drawings automatically created


by Advance Steel

"The use of Advance Steel and its easy-touse 3D modeling has significantly
contributed to the success of fabricating
and delivering the steel structure on time
and without errors at site."
Mr. Koen Peeters,
STAGECO R&D project designer

USERS BENEFITS
Advance Steel 3D drawings were much more illustrative than 2D drawings
Information for an accurate fabrication

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

INTERIOR STAIRS
150 Serrurerie
ABC

St Geours de Maremne, France


PROJECT DESCRIPTION
Location: Dax, France
Customer: Mr. & Mrs. Da Silva
Dimensions: Height to climb: 3m
Specifications: Interior steel stairs (inside a
private new house) with the railing treads and top
handrail made from wood

Designed for an exact fit to the existing

THE SOLUTION

concrete structure

slab opening) in 3D

Stairs with double turn consisting of

several different slopes

Modeling of surrounding objects (walls,


Exact details of the different treads with
their rise and height.

Create clear and precise drawings for an

accurate fabrication without errors

Workshop drawings with side and 3D


views for an easier understanding

General arrangement drawings with 2D


and 3D details

"This is one of my first projects using Advance


Steel, which allowed me to design the stairs
that were not simple; the visualization in 3D
and in render mode was a great help, and the
3D and 2D details on drawings were useful for
fabrication and erection at site.
Mr. Bordas,
Detailer within the company

USERS BENEFITS

Easy design by working in 3D and render mode


Representation of the stairs in its final environment
Better understanding of the parts to be fabricated by the workshop

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

MAGNUM BOILER
CSM
150

Hamont-Achel, Belgium
PROJECT DESCRIPTION
Main contractor: NEM, Netherlands
Location: Eemshaven, Netherlands
Dimensions: Boiler=36m x 13m x 40m
Stack = diameter of 7m x 35m height
Specifications: Part of a Power Plant which has a
production capacity of 1200 Mega watts.

THE SOLUTION

Get all components within the model and


drawings in connection with the placement of

Create their own profiles and purchase


articles like flanges

additional items such as welding neck flanges,

It is easy to select an assembly part to

blind flanges, pipe couplings, etc.

define frames for transporting the panels

Export model to a DWG file for use in AutoCAD

to the site

Provide drawings that can be opened in

AutoCAD to the customer

Possible to explode the Advance Steel 3D


model to ACIS solids

Drawings created in DWG file format

"The use of Advance Steel is very easy and


you can, with few clicks, create all types of
elements such as folded plates, curved
plates or curved beams."
Mr. Ludo Plessers
CSM Project Engineer

USERS BENEFITS
Advance Steel is fully integrated in AutoCAD
All elements including mechanical parts are part of the unique model
Precise workshop drawings with correct dimensions and BOMs

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

GOLDEN TERRACES
Waagner-Biro
150

Warsaw
PROJECT DESCRIPTION
Location: Warsaw
Architecture office: architecture for Warsaw city
center
Design architect: The Jerde Partnership
Skylight contractor: Waagner Biro
General contractor: Skanska
Dimensions: 116m X 100m (Atrium roof plan size)
Specifications: Shopping center having the
biggest glass dome in Europe

The atrium roof is a double curvature

THE SOLUTION

geometry meaning all glass panels are


different

Complex three-dimensionally columns

Detailed 3D modeling for get precise


panels workshop drawings

Modeling in 3D was necessary to design


this complex shape

which look like trees

"Advance Steel increased our productivity


due to the automatic output of the NC-files
and the automatic creation of bills of
materials."
Mr. Schmidt,
Design Coordinator

USERS BENEFITS
Based on AutoCAD
Time savings
Efficiency gains

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

FIRE ESCAPE
SPRL Lardinois
150

Gosselies, Belgique
PROJECT DESCRIPTION
Location: Waure, Belgium
Architecture Office: ASSAR
Contracting Authority: GSK
Dimensions: 13m high x 5,4m wide
Specifications: Multi-level fire escape

THE SOLUTION

The complexity of the project made it


impossible to implement it manually or using

balustrades)

AutoCAD

Library already including stairs (steps,


More accurate views with 3D modeling

Move the already mounted fire escape to


the building site for quick mounting on site

"Advance Steel is a very good solution for


industrial detailing. In addition, the software
has a short learning curve for professionals
who already use AutoCAD.
Mr Barillet,
Draftsman

USERS BENEFITS
Easier and quicker implementation
Significant time savings with automatic joints and workshop drawings

More projects on www.graite


www.graitec.com
c.com

ADVANCE STEEL

THE CHALLENGE

BUSINESS CENTER
LAUNET Design Office
150

Beauvais, France
PROJECT DESCRIPTION
Location: Douains, France
Architecture Office: A.A.C.D
Contracting authority: Communaut
dagglomration des Portes de lEure
Dimensions: single sloped halls, 18m span and
lean-to buildings
2

Specifications: hall of 1000 m , offices of 180 m ,


53 tons in total

THE SOLUTION

Show the architect a realistic 3D insight of

Quick structure 3D modeling

the project

High manufacturing file quality

Need to easily start workshop

Send NC-DSTV files to the workshop

manufacturing

Automatic joints for curved bars

Create a building with curved/arched


exterior faades

"The biggest advantage was the file


transfer to the manufacturing site.
Advance Steel offers a high manufacturing
quality which is due to significant error
minimization and easy mounting
at site.
Mr Vielle,
Manager of Launet Design Office

USERS BENEFITS
30% faster in design studies
Direct link with production tools
Easy understanding of workshop drawings

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

TROPICAL CENTER
Sager design CAD
150

Horn TG, Switzerland


PROJECT DESCRIPTION
Location: Wolhusen, Switzerland
Dimensions: Adventure center: total area of
2
2100 m ; length of 85 m x width of 30 m x height
2
of 14 m. Production center: total area of 5200 m
Specifications: The buildings are located 661 m
above sea level. Inside, a production plant for the
production of tropical fruits and fishes and an
adventure center which consists of 105 tons of
steel, 107 tons of glass and 15 tons of aluminum

THE SOLUTION

A very filigree 3-dimensional construction

that is located on slight, partly fixed


columns and which is created as three

Detailed planning of the joints by using the


comprehensive possibilities of connections

Special profiles and end plates are easy to

glass waves

create and very helpful when creating

Because of the hillside situation, the

complex constructions

individual footing has different height


indications.

The three glass waves had to be


constructed to each other in a staggered
way to fit into the landscape.

Advance Steel enabled me to get fast and


useful results. Especially when planning the
details, I was able to save a lot of time by
using the standardized and comprehensive
possibilities of connections.
Mr. Sager,
Construction engineer

USERS BENEFITS
Easy and efficient creation of the 3D model
Many automatic functions support the construction
Very good cost/performance ratio

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

TRANSMISSION TOWER
KD Consulting & Biuro Inynierskie
150

Micha Nowicki
Poland
PROJECT DESCRIPTION

Location: Poland
Engineering office: Biuro Inynierskie Micha
Nowicki
Dimensions: Survey project of transmission
tower Height 76m

Tight deadlines for the creation of the

THE SOLUTION

survey project of a transmission tower

Prepare model of existing structure

Propose new geometry solutions and

Additional verification of the


constructions mass set up during the
calculation of the resistance

prepare complete documentation

Possibility of preparing proper


documentation all necessary technical
drawings as well as axiomatic views of
complex elements of the construction
readable for site engineers.

"Advance Steel does not only give the opportunity


to create complete workshop documentation, it also
provides a lot of very useful information for the
design and construction process. Professional
technical support is a big advantage especially in
the phase of the software implementation and
regular work afterward.
Mr Nowicki,
Designer

USERS BENEFITS
Easy way to create any connection between steel elements
Easy creation of spatial geometry of truss

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

PLATFORMS & STAIRCASES


STAIRCASES
BGN
150 (Bar Grolleau Nivault)
Niort, France
PROJECT DESCRIPTION

Location: Niort, France


Specifications: Building renovation of the Council
of a French department with the implementation of
stairs and railings

THE SOLUTION

Use of solid, delicate/brittle and expensive

materials which do not allow for incorrect

of the entire project

material ordering

Minimization of errors due to the modeling


Get a BOM with correct quantities

Implementation of stairs and railings with


glass panels

"Advance Steel enabled me to create


documents with greater confidence; this is
why I will never go back to working in 2D!"
Mr Fays,
Projector in Steel

USERS BENEFITS
Easy understanding with the 3D view
Correction of the majority of the conception, fabrication and assembly problems
Flexibility of the available modeling tools

More projects on w ww.graitec.com

ADVANCE STEEL

THE CHALLENGE

CONVEYING SYSTEM
150
Breetec
International NV

Steenweg, Belgium
PROJECT DESCRIPTION
Location: Ham, Belgium
Contracting authority: Sleurs
Dimensions: Transport belt width 1m length 25m
Platforms around Conveyor belt + Stairs + Ladder
+ Railing = approximately 3500kg
Specifications: This installation consists of feeding
a reactor tank.

THE SOLUTION

Biggest challenge: put together different

parts that were drawn outside Advance

Creation of the conveying system done in


3D with Advance Steel

Steel (building around the installation


drawn in X-Steel, but a few points had to
come together).

Special parts like drive, gear, bearing,

An entire 3D model, which accelerated all

transport belt parts, electrical switches

document creation and insured all-around

had to be connected to Advance Steel

drawing consistency.

objects

"Advance Steel made it possible to easily


and quickly create the conveying system
thanks to the advanced 3D modeling
function.
Mr. Verstraten,
Design and Welding Engineer

USERS BENEFITS
3D modeling to better visualize
Huge library of intelligent connections
Automatic NC files creation

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

THE UFO ZOETERMEER PROJECT


PROJECT
150
CSM

Netherlands
PROJECT DESCRIPTION
Location: Netherlands
Architecture office: Designed by Frits van
Dongen of the Netherlands
Dimensions: 290 tons, 35m in diameter, 12m in
height
Specifications: Part of the Spazio Shopping
Centre in Zoetermeer and known as The UFO

THE SOLUTION

Complex geometry for this structure made

of several curved beams

3D structure modeling with handling of


curved elements

Specific custom joints to connect elements

Available tools to create custom joints

together

Automatic creation of fabrication drawings

"This project let us see the huge


possibilities offered by Advance Steel:
modeling of the complex geometry, curved
beams, specific user defined joints, etc.
One can see clearly the complexity of the
design entirely done in Advance."
Eddy Vrolix,
Draftsman

USERS BENEFITS
Modeling of the complex geometry
Curved beams
Specific user defined beams

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

NEW EXHIBITION CENTRE


CENTRE HALL
OKF,
150 s.r.o.
Brno, Czech Republic
PROJECT DESCRIPTION
Location: Brno, Czech Republic
Architecture office: Arch Design, s.r.o.
Contracting authority: BVV Brno, a.s.
Dimensions: 220,3m x 89,5m
Specifications: The new hall P in the Brno exhibition
centre
Description: The exhibition part of pavilion P is designed
as a two-aisle, one-storey hall with the possibility to parcel
into separate parts.

THE CHALLENGE
Manufacturing The biggest problem with

Tube diagonals were manufactured

this building was the intersections of tube

directly from the 3D model exploded to

diagonals with the upper/lower strip of

ACIS solids

truss beams/girder and welding


preparations.

"With Advance Steel, the 3D modeling of steel


frameworks of "Pavilion P enabled the realization of the
model complexity and the detail control in the workshop
documentation. To expedite the tube structure fabrication,
the information from the 3D model was directly used for
the fabrication of particular elements. Using Advance Steel
improved the demanding deadlines both for the project
and for the steel structure delivery period."
Vladimr Dank, Michal Rudolf, OKF s.r.o,
Technical designers

USERS BENEFITS
Error reduction controlling the model in 3D
BOMs derived from the model
Manufacturing directly from the 3D model

More projects on www.g


www.graitec.com
raitec.com

ADVANCE STEEL

THE SOLUTION

RESTORATION OF WASTE INCINERATOR


Aciercon
s.r.o.
150
Kosice, Slovakia
PROJECT DESCRIPTION
Location: Brno, Czech Republic
Architecture office: Aciercon s.r.o, Brno
Contracting authority: PSG a.s., Zlin
Dimensions: W=30 m, l=30 m, h=30 m
Specifications: Steel Frame Structures for Heavy
Technological Equipment
Description: Total weight = 530 tons. It contains main carrier
construction for the kettles.

Multi-floors steel structure

Very complicated spatial relationships


between steel structures and

THE SOLUTION

Display the complete 3D structure of


only selected floors

Easy-to-use solution using collision


detection within the final checking.

technological equipment

"Advance steel is suitable for such a


complicated structure and was the perfect
solution for this waste incinerator."
Ing. Oldrich Balsinek,
Managing Director

USERS BENEFITS
Simple verification using the 3D rendered view
Workshop drawing generated in line

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

WEATHER RADAR TOWER


150
Conferdo
GmbH

Esterwegen, Germany
PROJECT DESCRIPTION
Location: Bermuda
Dimensions: 20 m high steel framework tower
Specifications: Weather radar built to withstand
hurricane velocity winds up to 300 km per hour;
total weight of 32 tons

THE SOLUTION

Assembly overseas

Bearing framework

Each single unit had to be under 6 m long

Precise and automatic derivation of Bills of


materials for the construction

Sending NC files through a fiber optic cable

for transportation

from the construction to the fabrication

"Graitecs Advance Steel does a great job


in automating and updating all part lists."
Rainer Bach and Georg Stichternath,
Managers

USERS BENEFITS
Collision control on screen
Virtual snapshots of the assembly for construction personnel
3D Modeling

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

OFFICE STAIRS
150 J-C FASSLER
Ets

Ste Marie aux Mines, France


PROJECT DESCRIPTION
Location: Chatenois (dept 67), France
Architecture office: Cabinet WACH
Dimensions: Straight parallel stairs with 2
intermediate platforms
Specifications: Railing and handrail attached to
the wall for the Hartmanns company
headquarters

THE SOLUTION

Creating railings and handrails attached to

a concrete wall

possibility to create a 3D solid

Architectural railings with filled panels

Tight deadlines due to the delay of

the desired architectural result

project
Manufacturing all plates using CNC
workshop machines

Use of the automatic railing macro


followed by specific adjustments to get

previous companies working on this

Representation of the concrete due to the

Time saver due to all drawings and BOMs


created automatically

NC-DSTV files automatically created for all


plates

"I was forced to change the entire 3D model


(because of a modification on the concrete)
while everything was finished, but this has
been very easy and fast thanks to Advance
Steels functionalities."
Olivier RASQUIER,
Draftsman, Ets J-C FASSLER

USERS BENEFITS
Time saver for the modeling of the entire staircase + railings
Changes are possible and easy
Respected deadlines for the manufacturing and delivery at site

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

INTERIOR STAIRS
150 J-C FASSLER
Ets

Ste Marie aux Mines, France


PROJECT DESCRIPTION
Location: Villers-les-Nancy, France
Engineering office: BECSI-EIC
Contracting authority: MADE Agencement
Dimensions: Height to climb: 3.8 m
Specifications: Turning stairs with double quarter
turns for a bank agency of Caisse dEpargne
Lorraine Champagne Ardennes in the city of
Villers-les Nancy

THE CHALLENGE

Steel stairs with double quarter turn with

Modeling in 3D with rendered mode

steel support for wood steps

enabled to see clearly the particular

Respect dimensions by following drawings

specificities of the stairs

provided by the engineering office

Direct opening of the DWG in AutoCAD

Represent steel without seeing it within

Manage behavior of Advance Steel

BOM and workshop drawings

elements to take them into consideration


for automatically created documents

"Without Advance Steel, it would have


been more difficult to design such a stair
where most of the parts are different
because of the stairs complexity".
Olivier RASQUIER,
Draftsman, Ets J-C FASSLER

USERS BENEFITS
Easier job due to rendered 3D view
Tool to convert construction lines and polylines to polygonal plates
General arrangement drawing with labeled 3D view easy to understand

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

WIND POWER PLANT


150
Conferdo
GmbH & Co. KG

Esterwegen, Germany
PROJECT DESCRIPTION
Location: Esterwegen, Germany
Dimensions: 111.5 m high steel grille framework
connection
2

Specifications: basic size of the footing = 30m

per corner bar; 4 individual footings; approx. 1300


bars; approx. 10500 bolted connections; king pin
angle = 18m; weight = 140000 kg; diameter of
the rotor = 77m

THE SOLUTION

Bearing framework

Intelligent connections

Sloped columns

Automatic connections between straight

Drawings for fabrication

and sloped beams

Automatic creation of the workshop


drawings and the saw list

"We have been using Advance Steel for many


years and we are very satisfied with the
software."
Rainer Bach and Georg Stichternath,
Managing Director at Conferdo GmbH & Co. KG

USERS BENEFITS
Easy 3D Modeling
Quick Connection with Design
Precise workshop drawings with exact dimensions and Bills of Materials

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

DUISBURG CASINO CANOPY


CANOPY
150
Innovations-Verbund-Systeme
GmbH

Duisburg, Germany
PROJECT DESCRIPTION
Location: Duisburg, Germany
Dimensions: 50 tons, height of 10 meters, front
span of 30 meters
Specifications: The canopy looks like a funnel. It is
Germany's most up-to-date casino, with 19
American roulette tables, 8 blackjack tables and 24
multi-roulette clients for classic gambling as well as
400 slot machines

THE SOLUTION

Funnel-shaped canopy

Modeling of specific profiles

Symmetrical modification in flange shape

User friendly software which allows


handling of straight and curved elements

Easy to create custom profiles and to store


them in a library for a later reuse

Working in 3D makes the conception


easier

"We are very satisfied with the ease of use


of the Access database of Advance Steel.
We were also convinced by the excellent
customer support, the easy operation of
the software and last but not least by the
good price-performance ratio."
Mr. Peter Mertens,
Structural Engineer
Project Manager

USERS BENEFITS
Simple to use
Good price/performance investment ratio

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

COKE OVEN GAS DESULPHURIZATION


DESULP HURIZATION
HUTNI
PROJEKT Frydek-Mistek a.s.
150
Kosice, Slovakia
PROJECT DESCRIPTION
Location: Kosice, Slovakia
Architecture office: Hutni Projekt FM
Contracting authority: U.S. Steel Kosice, s.r.o
Dimensions: Coke oven gas desulphurization: 44X22,5X36 m,
Regeneration of washing liquids: 7X21X29 m, Modified
sulphur production unit: 21X28X12 m
Specifications: Total tonnage of steel structures : 965 tons
Description: The subject of the project is designing different
steel platforms, constructions under technological devices,
pipeline bridges, and canopies for tanks, etc.

THE CHALLENGE
Handle a huge structure and a run a clash

check verification between supporting

parts imported from different applications

steel parts and equipments

Advance Steel provides efficient

The structure contains many platforms

automatic macros to create railings, stairs,

with railings, stairs and cage ladders which

etc.

must be designed in a short time

The Advance Steel clash checks works on

Exchange the model with Plant Design

Many file format exchange options


allowing the exchange of the 3D model

software

Using Advance Steel, we were able to


model together steel elements with
equipments and check the interference
between them.
Roman Lisnik,
Designer Engineer

USERS BENEFITS
Collisions between steel parts and equipments
Visualization in 3D rendered mode
Efficient creation of stairs and railings

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

TONGON GOLD PROJECT


150
Dantu
Drafting

Ivory Coast, West Africa


PROJECT DESCRIPTION
Location: Ivory Coast, West Africa
Specifications: Bin Capacity: 150 Tons (live load)
Steel work mass: 108.505 Tons
Bin plate work mass: 67.074 Tons
Chute plate work mass: 28.630 Tons
Total mass: 204.209 Tons
Description: The Roll-Off Material tip consists of
a bin which is fed raw material by a D777 dump
truck, from here an Apron feeder extracts the
material.

THE CHALLENGE

Complete Roll-Off Material tips were

Modeling the complete Roll-Off Material

required with no workshop pre-assembly

tip while using clash detection eliminated

time provided

any errors

The bin plate work forms part of the

By using Advance steels plate work

structure to be able to withstand the

modeling functions, the bin was easily

relevant forces

made.

"We found that the speed and ease of


modeling in Advance Steel was unmatched by
any other package in the current market place.
The transformation from AutoCAD to Advance
steel can be done within a short period of time
thus making the change quick and
inexpensive."
Clinton Dantu
Draftsman

USERS BENEFITS
Speed and ease of modeling
. Standard connections
Standard member sizes
Creating bill of materials

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

WAREHOUSE FOR CONCRETE AND


TOWER FOR MACHINERY
150

S.C. PAVIAL S.R.L


Constana, Romania
PROJECT DESCRIPTION
Location: Constana, Romania

Dimensions:
- Warehouse: 38 x 60m and height of 6m
- Tower: 5 levels (height of approximately
24m); a main area of 9 x 8.1m (houses the main
technological activity) and another area of 9 x
3.9m (which comprises vertical movement of
personnel and concrete).

THE CHALLENGE

THE SOLUTION

Controlling the influence of vibration


developed by the cumulative weight of

Design tools

machinery and concrete

Temporary dynamic analysis using Advance


The line position of similar joints was kept

Changes due to technological basis

due to a multiple-connections configuration

modification

available in Advance Steel

Beneficiary requirements were strict


about the cost and material consumption

Quick and easy analysis of variables, due to


available tools such as steel expert or
measurement tools

"Import, export and synchronization functions of


Advance Steel software have made possible the
inclusion of the two models, tower and hall, in a
single model, in which, with the help of 3D
orientation made possible the examination of
slopes and continuity of joints for the entire
building."
Panait Alexandru,
General Manager

USERS BENEFITS
Significantly time saving assigned to calculation
Optimized synchronization of models using 3D visualization
Reducing costs and material consumption

More projects on www.graitec.com

ADVANCE STEEL & ADVANCE DESIGN

Architecture office: S.C. PAVIAL S.R.L

THE NEW MILANO FAIR


Emmerling
GmbH
150
Amberg, Germany
PROJECT DESCRIPTION
Location: Milano, Italy
Dimension: 2 million square meters
Specifications: The fair consists of 10 exhibition halls
which are connected through a 1.3 km long axis. The
axis is roofed by a freeform lattice roof construction,
reminiscent of the Alps. The guests get an open-air
experience without being exposed to wind and rain.
This impression was reached using only 190 tree
columns supporting the VELA.

THE CHALLENGE

THE SOLUTION

All 190 tree columns are unique

The drawing must be created according

Automatic drawing creation and modeling


of the tree columns in 3D

to contractor requirements

"First of all, Advance is an application based on


AutoCAD, the worldwide construction CAD
standard. Furthermore, Advance is a young,
extremely capable product that has proved itself
on the market. The unique evolving project
requirements on Advance were met by fast
software development on the part of Graitec and
we have come to realize the immense potential
the solution still has in terms of headroom for
future development.
Mr ING G.E Nestor,
General Manager, N-CAD Proiect

USERS BENEFITS
3D modeling of the structure
Time saving of 60 %

More projects on www.graitec.com

ADVANCE STEEL

WAREHOUSE FOR EXPLOSIVE


EXPLOSIVE PRODUCTS
N-CAD
Proiect
150
Slobozia, Romania
PROJECT DESCRIPTION

Location: Romania
Specifications: The roof of this warehouse has an
arc steel structure, with a 72m span

THE SOLUTION

Arc structure built from straight beams

3D joint modeling

Sliding roof

Automated drawing creation

Bolted connections on site

"From my point of view, designing such a


structure in less than 3 weeks is a success
achieved entirely due to Advance Steel. It
would be almost impossible to handle such a
project without dedicated software like
Advance Steel."
Mr ING G.E Nestor,
General Manager, N-CAD Proiect

USERS BENEFITS
3D modeling greatly simplified the structure design
Reduction of errors
Time savings

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

ARCHITECTURAL RAILING
150
BROGLI
Constructions Mtalliques

Bex, Suisse
PROJECT DESCRIPTION
Location: Villars-sur-Ollon (Switzerland)
Engineering office : Jean-Daniel Berset
Ingnieurs-Conseils SA
Owner: Fire station at Ollon
Dimensions: Railing with a total length of 32m
fixed on top of a concrete slab at a height of 5m
Specifications: Establishment of a railing all
around a terrace on the top of a fire station

THE CHALLENGE

Design a railing on a concrete terrace


having a slope and without any

then input of the different level values in

perpendicular sides

Site survey of the existing terrace slab,


the 3D Advance Steel model

Architectural railing containing sloped

Numerous Advance Steel functionalities to

tubular filling and special posts

model all steel elements and then to cut

Avoid any adjustment at site due to the

and drill them as required

fact that the railing is galvanized and then


thermo lacquered

Automatic numbering of the different


parts and workshop drawings
automatically dimensioned and labeled

"The easy modeling in 3D environment


allowed me to realize this railing which is
not standard and to limit at the minimum
the risks of errors during fabrication, which
I could not achieve with a 2D steel
detailing software."
Daniel BROGLI,
BROGLI CM Managing Director

USERS BENEFITS
Representation of the environment in concrete on which the railing will be fixed
Much better understanding with the 3D modeling
Automatic numbering of identical or different elements

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

HELICOPTER BASE FOR TRIER HOSPITAL


STAHLBAU ZIEMANN GmbH
150

Wittlich, Germany
PROJECT DESCRIPTION
Contracting authority: Barmherzige Brder Trier

Location: Hospital in Trier, Germany


Dimensions: 32m height tower with a 28m large
circular landing platform
Specifications: Helicopter base connected a special
elevator to the emergency room. Total weight:
approximately 310 tons for the steel construction

THE CHALLENGE

The steel structure consists of a light

With its capabilities of working and

tower with a height of 32m, and a circular

navigating through the model in 3D,

deck supported by 4 main columns

Advance Steel is the right 3D steel detailing

This steel tower must be connected to the

system to model complex connections

concrete tower, which contains the

between plate girders and standard rolled

elevator that provides access to the

sections.

different tower levels.

Advance Steel provides a complete library of


automatic macros for stairs & railings to
speed up the modeling of the different steel
walkways and handrails.

"With its excellent functions Advance Steel


supported us in fulfilling all these
necessary and challenging demands for
this special helicopter base."
Mr. Matthias Thul,
Construction engineer
Stahlbau Ziemann GmbH

USERS BENEFITS
Real 3D graphical presentation of the model
Automatic user friendly macros for stairs and railings
Connection of the derived documents to the model

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

HOUSE STANDING ON ITS


ITS ROOF
HUSMANN STAHLBAU GmbH
150

Firrell, Germany
PROJECT DESCRIPTION
Contracting authority: Pirateninsel Rgen
Location: Ruegen Island, Germany
Dimensions: 12m long x 8.90m wide x 8.5m high
Specifications: New addition to the indoor
playground Pirateninsel Rgen. Total weight of
the steel structure: 61.1 tons

THE SOLUTION

The steel frames consist of 35 tons of

steel.

the NC files created by Advance Steel

The construction has a bent at 4 in the

longitudinal direction and in the cross

Automatic tools for the creation of the


necessary details of single drawings and

direction.

Direct activation of the machines by using

The house stands on the chimney, which is

drawings of structural components

substituted by two massive steel columns

"Without the use of Advance Steel with its


3D functions, the realization of this project
would not have been possible for us."
Mr. Moenter,
Construction Engineer at Husmann
Stahlbau GmbH

USERS BENEFITS
Easy 3D modeling of the steel structure
Automatic creation of NC-DSTV files

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

HOUSE MADE OF STEEL


METAL ADOUR
150

Anglet, France
PROJECT DESCRIPTION
Location: Dax
Main Contractor: Mr. CAUDRON
Dimensions: 15m x 10m x 7m height
Specifications: Steel structure of a house since
termites are the biggest problem in this area with
wooden houses

THE SOLUTION

Model a steel house easily and in the most


efficient way

Need for more productivity: the company


had efficiency issues due to numerous

Huge library of automatic connections

Creation of directly usable drawings

Automatic generation of DXF files for


metal plates: they can be produced

back and forth trips to the workshop and

simultaneously

repeated tasks

Requires DXF and DSTV files for automatic

NC-DFX and NC-DSTV files created with


one click from the precise 3D model

fabrication at workshops

"I appreciate the easy modeling Advance


Steel enables, the smartness of automated
dimensioning and the easy modification of
dimensions for the customization of our
drawings. The use of Advance Steel is easy
for someone who already knows a 3D
Steel detailing tool.
Mathieu Rouss,
Draftsman

USERS BENEFITS
User friendly 3D structural steel detailing
Increased productivity with the automated functions
Easy modifications with automatic update of all documents

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

EXTENSION OF THE UNIVERSITY


UNIVERSITY OF LEIPZIG
Architektur- und Konstruktionsbro
Dipl.-Ing
Eduardo Cerda
150
Leipzig, Germany
PROJECT DESCRIPTION
Location: Leipzig, Germany
Customer: Staatsbetrieb Schsisches Immobilienund Baumanagement Niederlassung Leipzig
Architect: Erick van Egeraat (EEA)
Specifications: Total weight of the steel roof
construction: 50 tons; 3 different architectonical
buildings in one building (main building, bell
tower, auditorium); total surface: 9200 m

THE SOLUTION

The building is divided into 3 parts, each

Fast and exact 3D modeling

part having its own specific roof.

Automatic joints for the fast modeling of

Get exact quantities and weights in BOMs.

assembly connections

Fast and correct update of BOMs

"Without using Advance Steel with its


excellent functions for such demanding
objects, I would not have been able to
realize this project.
Mr. Eduardo Cerda, Manager and
construction engineer of the
Architektur- und Konstruktionsbro
Dipl.-Ing. Eduardo Cerda

USERS BENEFITS
Fast 3D modeling
Advance steel enables easy navigation in complex models
Automatic drawing derivation from the 3D model

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

SUBWAY AND BUS STATION


STATION ROOF
Bitschnau Stahl & Anlagenbau GmbH
150
Bitschnau
project gmbh

Nenzing, Austria
PROJECT DESCRIPTION
Location: Munich, Germany
Customer: Stadtwerke Mnchen GmbH
Architect: RPM Architekten GmbH, OX2 Architekten
Dimensions: 73 m long, 31 m wide
2

total area: 1540 m

Specifications: total weight of the steel roof


construction: 420 tons

THE CHALLENGE

Star-shaped openings on the roof at the


top of the columns

twisted plates in 3D

Creation of the roof as a pentagonal


surface with rounded edges created from
three dimensional modeled steel plates

Design of advanced shapes, folded and


Creation of NC-DSTV and DFX files for the
monitoring of CNC machinery

User friendly functions and complete

Creation of 18 similar columns. Each

international catalogs for more efficiency

column consists of similar vertical single

and time saving

elements.

"Advance Steel is an excellent


program for complex steel
constructions. We appreciate the
time saving and the rise in
productivity."
Mr. Manfred Ammann,
Manager of the Construction and
Project office at Bitschnau GmbH

USERS BENEFITS
Fast 3D Modeling
Automatic derivation of workshop drawings
Fast and easy drawing creation

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

TONGTONG-YU FACTORY
I JIA Construction Co Ltd
150

New Taipei City, Taiwan


PROJECT DESCRIPTION
Architecture office: Kuo Xiong Ming architectural
firm
Contracting authority: Tong-Yu
Location: Hsin Chu, Taiwan
Dimensions: 3073 m
Specifications: 540-ton steel structure of a
factory building

THE CHALLENGE

Hip and valley purlins are difficult to

Display the complete structural model in

handle in 2D

3D for easier understanding of all

Have all workshop drawings done as

complex connections of purlins.

quick as possible

Advance Steel provides efficient


automatic macros for hip and valley

purlins connections.
Save more time in the drawing process
with automatic drawing creation.

"Advance Steel is very easy to use; it


was quick to learn. We could find the
design issues in the model and discuss
the changes. Advance Steel allowed us
to reduce the construction cost losses."
Chris Liu,
Main structural shop drawing engineer

USERS BENEFITS
Easy understanding for users through clear representation
All possible collisions can be found at an early stage
Time saving

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

ICE AND SWIMMING STADIUM


STADIUM
150
Stahlhallen
und Baustoffe Janneck GmbH

Molbergen, Germany
PROJECT DESCRIPTION
Location: Cologne, Germany
Architecture office: Schulitz GmbH
Dimensions: 10.50 m high, 80 m wide and long
Specifications: Total weight of 400 tons
Description: new stadium with three different
areas (ice stadium, swimming pool and locker
rooms/restaurants area), and an ice rink going
st

around the building as a 1 floor

THE SOLUTION

Triangular shape of the building

Comprehensive modeling tools

Diamond-shaped arrangement of the

Library of intelligent connections

roof girders

Automatic creation of workshop

Different spans of roof girders in the

drawings with customized layout

single areas

"Without the use of Advance Steel


with its many excellent functions,
especially the 3D ability, the
realization of this project would not
have been possible for us."
Mr. Manfred Drge,
Construction engineer

USERS BENEFITS
3D modeling
Automatic creation of documents
Easy to use software with a very good cost/performance ratio

More projects on www.graitec.c


www.graitec.com
om

ADVANCE STEEL

THE CHALLENGE

SUNSUN-SHADING STRUCTURE
METALLERIE DU CAMBRESSIS
150

Fontaine Notre Dame, France


PROJECT DESCRIPTION
Architecture office: URBANA LINEA
Contracting authority: NACARAT
Location: Villeneuve dAscq, France
Dimensions: 12m high
Description: Installation of a shading steel
structure on the faade of an office building

THE CHALLENGE

Create a shading steel structure on an

Model the existing faade using separate

existing insulated concrete structure

layers for miscellaneous materials

Fix the upper part on a parapet with

(concrete, insulating material, parapet top,

triangular end plates

etc.)

Precisely install the wooden slats

according to the architects drawing


Provide the customer with a general

Navigation tools in the 3D model that


enable easy design

Creation of the trapezoid shape of the


slats and use of copying functions to

arrangement drawing for the final

distribute it as expected

agreement

Automatic creation of 2D and 3D views of


the general arrangement drawing

"This project was not very complicated, but


Advance Steel allowed me to design the fixing
details of the structure with the rendered and 3D
navigation."
Mehdi BRENNE,
Draftsman, METALLERIE DU CAMBRESIS

USERS BENEFITS
3D viewing for easier designing
Easy browsing in the model for better comprehension of the design details
Clear and precise general arrangement drawings for the architect

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

VALENCIENNES STADIUM
ETI
150

Echirolles, France
PROJECT DESCRIPTION
Location: Valenciennes, France
Dimensions: L: 180m; W: 145m; H: 23m
Specifications: The steel structure supports
prefabricated concrete bleachers. The stadium has
a capacity of 25000 spectators.
Description: A new stadium that is dedicated to
Valenciennes Football Club games.

THE CHALLENGE

The structure consists of tapered box


beams made of Y-shaped welded plates

and plates edges for easy welding at site

The architects main constraint was that

Automatic collision detection

no bolt should remain visible

Realistic 3D model and clear 2D and 3D

The weight of the steel elements makes it


difficult to transport them and assemble

Modeling of all weld preparation on beams

assembly views

DSTV files are generated from the

them

Advance Steel model for the monitoring of

Need to display precise details in 3D for

the CNC machinery

easy understanding by the architect

"We did not receive a single phone


call from the site foreman to report
any error!"
Mr Stphane Dottori,
Project Manager, ETI

USERS BENEFITS
Precise 3D modeling
No errors at site
Create DSTV files for the fabrication of complex elements

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

HEADFRAME
ROULEAU-DESAULNIERS
150

St-Etienne-des-Gres, Canada
PROJECT DESCRIPTION
Location: Ontario, Canada
Dimensions: 23.77m x 22.25m x 25.29m
Specifications: Two braced-back legs are used to
resist the lateral loads from the sheave at the top
of the structure. Total weight: ~140 tons
Description: New extension of an existing
headframe building for a mining company.

THE SOLUTION

The connections of the braced-back legs


with the two-way slope are very complex.

The new structure needs to be connected

Appropriate automatic connections were


used from the Advance Steel library

Easy modeling of the existing structure

on the existing columns and beams.

along with the new structure to avoid any

A great number of site work details (site

interference

drills and site welded connections are


required).

Use of special compound beams for easy


modeling of the back legs

"The fact that Advance Steel is based on


AutoCAD made the 3D modeling of the
project easy. This is necessary to avoid any
interference between the mechanical
equipment and the structural and
miscellaneous elements."
Marc DESAULNIERS,
Project Manager, ROULEAU-DESAULNIERS

USERS BENEFITS
Easy 3D modeling
Large library of automatic connections
Low margin of error

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

INDIANAPOLIS PLANT
GD Drafting
150

Los Angeles, USA


PROJECT DESCRIPTION
Location: Indianapolis, USA
Dimensions: 202m long x 39.2m large x 56m
high
Specifications: 4 levels; total weight: 145 tons
Description: Additions to an existing industrial
plant

THE CHALLENGE

Connection of vertical bracings to


horizontal members

3D modeling of the project for better


understanding of the project concept

Find correct spacing of guardrails posts not

Avoid interferences between vertical

to interfere with beam-to-beam

bracing and other members, and collisions

connection where guardrails are attached

of guardrail vertical post connections with


beams below in walking areas

"The Advance Steel 3D model


helped us to find and solve the
connection problems before
submittal and fabrication; it also
helped the erector to visualize
the concept of the entire
project."
Griogo DANESHVAR,
Owner of GD Drafting

USERS BENEFITS
Clear overview of the project with 3D model
Easy detection of collisions
Limited margin of error on site

More projects on www.graite


www.graitec.com
c.com

ADVANCE STEEL

THE SOLUTION

INDUSTRIAL PLANT
ROULEAU-DESAULNIERS
150

St-Etienne-des-Gres, Canada
PROJECT DESCRIPTION
Location: East Coast, USA
Dimensions: 26.55m x 31m
Specifications: Total weight: ~340 tons. More
than 1350 shop drawings prepared
Description: Additional equipment supports
access platforms for a new engineered wood
factory

THE CHALLENGE

3D modeling of the mechanical


equipment and duct

AutoCAD 3D solids and Advance Steel

The mechanical equipment provider

elements

uses metric units and the shop drawings

Easy modeling with a combination of

Transfer of the 3D model between metric

need to be prepared in imperial units.

and imperial units is made easy with

Preparation of the engineering drawings

Advance Steel.

from the 3D model

Shop drawings and engineering drawings


are automatically generated.

"The fact that Advance Steel is based on


AutoCAD made the 3D modeling of the
mechanical equipment and ducting easy.
This is necessary to avoid any interference
between the mechanical equipment and
the
structural
and
miscellaneous
elements."
Marc DESAULNIERS,
Project Manager, ROULEAU-DESAULNIERS

USERS BENEFITS
Import AutoCAD 3D solids in Advance Steel
Automatic creation of shop and engineering drawings
Single-click switch between metric and imperial units

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

SEASONS 52 RESTAURANT
RESTAURANT
LIBERTY STEEL
150

Fyffe, USA
PROJECT DESCRIPTION

Location: Indianapolis, USA


Dimensions: 35.66m x 41.14m
Specifications: Total weight: 76 tons

THE CHALLENGE

Tight deadlines for the completion of


detailing.

connections

Get DXF files for all plates and bars to be

burnt.

Details are created automatically for shop


fabrication

Fabricate the steel structure without any


risk of errors.

Use of Advance Steel templates for

Creation of 3D views for a better


understanding at site

"Advance Steel increases our production


by getting to the jobsite on schedule. The
learning curve was very easy and Advance
Steel has helped us a great deal."
Daniel Miller,
Detailing Manager, LIBERTY STEEL

USERS BENEFITS
Time saving and increased productivity
Low margin of error
Short learning curve

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

VICTORIA HALL WEMBLEY


WEMBLEY
E.C.S. Engineering Services ltd
150

Nottingham, UK
PROJECT DESCRIPTION
Architecture office: E.C.S.
Engineering Services ltd
Location: Victoria Hall Wembley
Specifications: Spiral roof from
8th floor level upto 19th floor
Level

THE SOLUTION

Drawing Curved roof that spirals up the

3D allowed us to easily see the path of the

building.

curved beams.

NC Data allowed faster more accurate


manufacturing.

Advance Steel has allowed us to


manufacture complex steel structures
we would never have attempted in 2D
AutoCAD and moving to Advance steel
was easy as we are all from an AutoCAD
background.
Rob Pitchford, Drawing office manager
ECS Engineering Service

USERS BENEFITS
More Complex Structures can be produced
Faster Manufacturing with NC Data
Better accuracy in manufacture

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

TECHNICAL STAIRCASE
METALLERIE DU CAMBRESIS
150

Fontaine Notre Dame, France


PROJECT DESCRIPTION
Architecture office: Agence Hennequart
Contracting authority: Airbus Meaulte
Location: Meaulte, France
Dimensions: 11 m high
Specifications: Staircase with middle landings
Description: Staircase to an existing building on
Airbus Meaulte site

THE CHALLENGE

Model the whole existing environment


(MEP, equipments) to avoid collisions with

automatic collision numbering tool

the steel staircase to be inserted in the


building

Possibility to easily define a C type


shape and make it available in the

Create an access staircase with a C type

automatic Stairs macro

stringer specifically fabricated in the


workshop

Easy and fast 3D modeling, with an

Know the weight and the center of gravity


of an assembly at any time

Fabricate elements whose weight do not


exceed a maximum limit so that they can

Automatic creation of all assembly


drawings

be easily carried inside the building

"The easy modeling of the steel staircase


and its landings coupled with a quick 3D
modeling of the existing environment
allowed us to avoid any problem when
assembling the steel parts at site."
Vincent DENDIEN,
Construction Engineer,
METALLERIE DU CAMBRESIS

USERS BENEFITS
Modeling is eased with the automatic macros
User-friendly software enabling the insertion of customized profiles
Guarantee to deliver at site assemblies that can be carried by a worker

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

AUDIS NEW PRODUCTION


PRODUCTION HALL N24
STAHLBAU WEGSCHEID GmbH
150

Wegscheid, Germany
PROJECT DESCRIPTION
Location: Inglostadt, Germany
Dimensions: 5750m; 20m high
Specifications: A roof structure made from
single bars and joints and an additional
technical room created with trusses. The
structure weighs approximately 550 tons.

THE SOLUTION

Adaptating to the software (this was

Get clear 3D views of the model with a

Stahlbau Wegscheids first project with

colored rendered result

Advance Steel)

Avoid collisions with automatic numbering

Complexity of the project

Manual changes are automatically

Need to work with an unlimited number of

updated in all technical documents

parts

"The excellent 3D modeling, the automatic


updates of manual changes in all technical
documents
and
the
good
priceperformance ratio of this software
convinced us."
Andreas OBERMAIER,
EDP Manager, STAHLBAU WEGSCHEID

USERS BENEFITS
Easy 3D modeling with user-friendly and customizable settings
Low error rate
Time saving

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

SCULPTURAL MAST
FLECK IMET
150

Ballymena, Northern Ireland


PROJECT DESCRIPTION
Location: Belfast, Northern Ireland
Dimensions: 16m high; ~3.5 tons each
Specifications: Galvanized Steel tubular curved frame
clad with 5mm galvanized steel plates, to create five
sided surface for copper cladding, with ply backing.
Description: 8 feature lighting masts erected in the
streets of Belfast, each one bearing the name of a
significant ship built in the city.

THE CHALLENGE
Each mast is of identical construction,

comprising 3 tubes tapering and curved

Advance Steel was of benefit in obtaining

towards the top. The tubes are clad in

each plate outline, and being able to

5mm steel plates, forming 5 flat sides,

collate plates automatically for profiling.

gradually reducing to 4 as the structure is

The creation of twisted folded plates in

The ability to extract notching information

thinned at 14m above ground level.

from the generated drawings is essential

Creating the profiles for 5mm steel plates,

for the manufacturing of the internal

without having to physically manufacture

ladder bracings

templates beforehand

Finding the centre of mass of the structure


to aid the final lift into position

"Advance Steel gave us the ability and


confidence to handle this complex structure,
which saved on time and materials."
Christopher Drummond,
Draftsman, FLECK IMET

USERS BENEFITS

Clash detection and automatic updating for easy dimensioning and management of
drawings

Easy understanding of generated drawings, with 3D views, sections & close-ups

The ability to work out the finer details within AutoCAD once the steelwork was completed

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

CIRCULAR BAR TABLES


Advanced
Draughting Services Ltd
150
Dublin, Ireland
PROJECT DESCRIPTION
Master builder: Ellickson International
Location: Waterford, Ireland
Dimensions: Height: 1100mm, Width: 915mm
Description: Ellicksons new draft table, a
circular table for pub customers to pour their own
beer while seated at the table

THE CHALLENGE
All of the manufacturing was done with

CNC machines with tolerance of 0.5mm.

files by email to manufacturing company.

Client needed to be able to view a fully

rendered model from any pc with no

Fully rendered 3D model could be linked to


ADSL website for viewing by potential

special software.

Send flat plate developments & NC-DSTV

clients without downloading software.

To be able to import & clash check 3D

Possible to import & clash check 3D blocks

blocks of components manufactured by

from external suppliers and then produce

external suppliers.

a material list for procurement

"Once the model was complete


production needed to start straight away
without prototypes. We felt that
Advance Steel would be the only
software that could create drawings with
this speed and accuracy required."
Garreth Sloan,
Managing Director, ADS Ltd

USERS BENEFITS
Manufacturing directly from the 3D model
BOMs with external components derived from the model
Capable of producing drawings with a 0.5mm accuracy

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

DIXON COURT
AS FABRICATIONS (UK) LTD
150

Liversedge, England
PROJECT DESCRIPTION
Preliminary Design: Consul
Design, Manufacture and Installation: AS
Fabrications
Building Contractor: Mulalley
Location: London, England
Dimensions: 4490mm long, 565mm wide,
1430mm above floor level
Specifications: Refurbishment of balcony

THE SOLUTION

Variations of many balconies in

Advance Steels ability to copy a model

accordance with site surveys

with all the drawings for manufacture and

Logistics of controlling the many parts that

once this new model was modified, the

made up each balcony

drawings simultaneously updated too

The many hours detailing each welded sub


assembly for manufacture

The automatic part enabler used in 2D and


Isometric views

" Advance Steel helped me massively


with the detail drawing side as there
were a few variations of these balconies
and Advance Steel allowed me to do
these quickly and efficiently."
Dan Coates,
Draftsman, AS FABRICATIONS

USERS BENEFITS
Controlling the model in an easy to use interface
BOMs derived in conjunction with the model
Reduced drawing time

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

STAINLESS STEEL CANOPY


CANOPY
AS
150FABRICATIONS (UK) LTD
Liversedge, England
PROJECT DESCRIPTION
Architecture Office: MJF Architects
Design Office: AS Fabrications
Building Contractor: Jay Tee Construction
Location: Leeds, England
Dimensions: 4455mm long, 1100mm wide
Specifications: Stainless steel canopy with glass
top over entrance for new build apartments

THE SOLUTION

To create a canopy that followed the

Create curved beams in Advance Steel

curvature of the front of the building

Produce accurate detailed drawings of

Creating manufacturing drawings with

these curved beams ready for

complex profiles that were easy to

manufacture

understand

In the model, the connection vault tool

Connecting the assembly to existing

helped to create suitable connections to

steelwork on the front of the building

the existing fixings and when necessary, it


was possible to adjust these with ease

Advance Steel allowed me to create


reliable and accurate working models
with ease as well as controlling all
design documentation effectively.
Dan Coates,
Draftsman, AS FABRICATIONS

USERS BENEFITS
Easy to use interface when modeling
Automatic creation of manufacturing drawings that are updated in conjunction with the model
Extensive material section library

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

CORNER BALUSTRADE
ETS J.-C. FASSLER
150

Sainte-Marie-aux-mines, France
PROJECT DESCRIPTION
Contracting authority: SCI Les Dahlias
Location: Colmar, France
Dimensions: L 8.5m; W 3m; H 1m
Description: A balustrade for the balcony of a
pyramidal residential building.
Specifications: The balustrade is at the corner of
the building, and has filling plates made of glass.

THE CHALLENGE

Include glass clips to fix the glass panels


on the railing posts

an online library and could be imported as

Some parts had to be designed and

special parts in the Advance Steel 3D

fabricated especially for this project.

Special glass clips were downloaded from

model.

A major modification was made during the

Model specific parts in Advance Steel and

design process: the filling plates were

generate DXF files from the model for CNC

changed from perforated plates to glass

machinery.

plates.

Flexibility of Advance Steel tools to


modify, move, and stretch any element,
any time.

"The balustrade required special clips for


the glass panels that I had to download
from an online library as DWG solids files
that I could integrate into the 3D model
with the exact quantity and reference
number on BOMs."
Olivier Rasquier,
Draftsman, ETS J.-C. FASSLER

USERS BENEFITS
Import external solids as special parts in Advance Steel
Integrate imported parts reference to lists and BOMs
Create DXF files for CNC machines at workshop

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

LYON COMMERCIAL & LEISURE


LEISURE CENTER
ETS BEMMA
150

Bourg-en-Bresse, France
PROJECT DESCRIPTION
Architect: Jean-Paul Viguier
Master builder: Unibail Radamco
Location: Lyon, France
Dimensions: Surface: 63000m
Description: 15 outdoor access and escape stairs
designed for the Commerce & Leisure Centre within
the Lyon Confluence urban renewal project

THE CHALLENGE

A large project, with many variations


between the staircases and an

their environment, then automatic

environment that must be taken into

detection of collisions from the 3D model

account (masonry, pipes, the buildings

Exportation of 3D model as a DWG file and

front, etc.)

automatic creation of DSTV and DXF files

Design office joined the project during its

for fabrication

development and had to collaborate

3D modeling of every stairs integrating

3-day GRAITEC training for Advance Steel,

efficiently with the other companies

plus a week to get familiar with the

working on the project

software

First project with Advance Steel

"We could easily collaborate with the other


companies linked to the project and ease their
work. Advance Steel appeared to be satisfying
regarding everything that deals with metalwork
details and fabrication. We went from 2D to 3D
overnight with Advance Steel; it is very easy to
use. "
Mr Weil, co-owner
BEMMA

USERS BENEFITS
Low error rate at site
Interoperability and easy cooperation
Short learning curve and fast familiarization

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

ICE RINK IN LUXEMBOURG


LUXEMBOURG
150
SST-Ing.-Bro
fr Stahlbau

Cham, Germany
PROJECT DESCRIPTION
Location: Beaufort, Luxembourg
Client: Patinoire de Beaufort
Architect: Kiefer. Textile Architektur
Dimensions: 65 m wide x 70 m long x 18 m high
Specifications: total weight of the 5 Pylons = 60 tons;
weight of the framework = 20 tons; roofed area = 2400m,
Approx. 90 tons sectional steel for the supporting structure

THE CHALLENGE

THE SOLUTION

With its 3D approach and its BIM

Get the textile membrane successfully

interoperability facilities, it was easy to

imported in the 3D model

get the tensile roof inserted into the

Creation of a curved triangle truss

Advance Steel Model

Generation of special sheet metal plates

Fast creation of a curved triangle truss

Provide drawings to the workshop for an

Excellent function: plate treatment

accurate fabrication of all pipes

Exact unfolding (using inner and/or outer


contour) of all circular tubes

"With such a complex project, I would have


expected problems, but Advance Steel solved
all the issues before manufacture and as it
was the first time we used Advance Steel, I
was very impressed with the software.
Mrs. Margarete Theuerkauf,
Manager and constructionengineer
of SST Ing.-Bro fr Stahlbau

USERS BENEFIT`S
Fast and easy 3D modeling
Easy creation of weld preparation on plates
Automatic unfolding display for all pipes

More projects on www.graitec.com

ADVANCE STEEL

WOODED CLASSROOM
150
PLANUNGSBRO
HEUER

Hattingen, Germany
PROJECT DESCRIPTION
Location: Witbank, South-Africa
Client: Entwicklungshilfe
Dimensions: Size of the classroom= 6.5 x 6.5 m;
2

total area = 100 m

Specifications: Classroom made of wood rafters and


columns compatible with the environment, on piles
for a better view and erected on a concrete slab.

THE CHALLENGE

Creation of a room being framed with

functions for creating a timber house

wood.

including all wood connections.

Responsible for the whole basic design


and detailed design.

Modeling a wood structure with software


usually used for steel constructions.

Advance Steel includes all necessary

Comprehensive library with different lists.

Automatic creation of 2D documentation


from the model and creation of NC files.

"I have been working with Advance Steel since


November 2000 and I am still very satisfied
with the software. I especially appreciate that
Advance Steel provides all necessary lists and
NC files that the manufacturers are used to
working with.
Mr. Gnther Heuer, manager and
construction engineer at
PLANUNGSBRO HEUER

USERS BENEFITS
Fast and easy 3D Modeling
Creation of different lists and NC files
Low error rate due to automatic clash detection

More projects on www.graitec.


www.graitec.com
com

ADVANCE STEEL

THE SOLUTION

5 STARS HOTEL LOBBY


150

Architektur- und Konstruktionsbro Cerda


Leipzig, Germany
PROJECT DESCRIPTION
Location: Leipzig, Germany
Client: SBP Bauprojekt GmbH
Specifications: Weight: 20 tons
Short description: Roofing the Lobby of
the hotel Steigenberger Grandhotel
Handelshof with a steel-glass construction.

THE SOLUTION

It is a perfect solution for architectonical

Fast modeling of rough drafts.

and structural engineered objects.

With the possible use of the multi-profiles in

Modeling of Faade profiles and beam

Advance Steel, the profile structure of the

profiles in a short time

faades could be modeled in an efficient way

Design a steel-glass roof made of different

The collision check leads to precise and


reliable constructions with Advance Steel.

roofs

Fast adjustment of the model and the


drawings after modifications.

"The project would not have been realized


without Advance Steel."
Mr. Eduardo Cerda, manager and
construction engineer at Architektur- und
Konstruktionsbro Dipl.-Ing. Eduardo Cerda

USERS BENEFITS
Intuitive use
Short introduction
Precise construction

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

SPIRAL STAIRCASE
Ets FASSLER
150

Sainte Marie aux Mines, France


PROJECT DESCRIPTION
Client: SIAT Braun
Location: Urmatt (67), France
Description: Spiral staircase between 2 levels of
offices, with wooden steps fixed on metal
supports in steel plate supports including a
stainless steel railing and also 2 intermediate
landings with wooden coverage.

THE CHALLENGE

Create a staircase in a reduced space and

Using the Spiral Staircase automatic

design the structure for an easy

macro to quickly create the central

transportation at site

columns, the stringers and folded plate

Provide accurate drawings to the

supports; stringers made in 3 distinct parts

subcontractor in charge of fabricating the

with a splice by milling of the twisted

twisted rails of the stainless railing

stringer plate for the setting up of a bolted

Cut plates following a precise shape to

plate

obtain pieces as stringers and help the


workshop for the fabrication of all pipes.

Automatic creation of detailed and


dimensioned drawing with the unwrap
display of pipes

"As a former user of Solidworks software, I can


assure you that Advance Steel is much more
adapted to the miscellaneous steel and
allowed me to drastically save time in the
design of a project like this one."
Olivier RASQUIER,
Dessinateur-projeteur chez les Ets J-C
FASSLER

USERS BENEFITS
Time savings with the Spiral Staircase automatic macro
Accurate manufacturing with the CN-DSTV files for the cut of stringers by laser machine
Transportable pieces by a worker thanks to pieces weight controlled from the 3D model

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

BREGENZ FESTIVAL STAGE


STAGE
Bitschnau Stahl &Anlagenbau GmbH,
150

Nenzing, Austria
PROJECT DESCRIPTION
Location: Bregenz (Lake of Constance), Austria
Client: Bregenzer Festspiele
Architect: Bregenzer Festspiele
Dimensions: 17 m long, 15 m wide, 15 m high
Specifications: Stage for the 2011/2012 Bregenz
Festival; Weight: 65 tons; the head goes backwards over
55 along the line at the neck.

THE CHALLENGE
Exact representation of the head of Jean-

Paul Marat.

the project explorer for easy check in and

Interaction between hydraulic, steel and

check out of different model views.

geometry.

Very good organization of the model using

Creation of a steel construction including


specific prefabricated parts on which the
perfect picture of the head is realized.

Hydraulic elements displayed as special parts


in the model and on drawings.

Hydraulic elements taken into consideration


by the clash check function.

"Advance Steel is the perfect solution for the


creation of steel constructions with a complex
geometry. Advance Steel processes the entire 3D
model data, accelerates all document creation and
insures all-around drawing consistency. We
especially appreciate the saving of time and the
increase of productivity. Today we would again
choose Advance Steel."
Mr. Manfred Ammann, construction engineer
at Bitschnau GmbH

USERS BENEFITS
3D modeling
Comprehensive profile base
Clash detection to more easily find conflicts over multidiscipline parts

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

NEALE WADE COMMUNITY COLLEGE


NIGEL BOWLEY DRAUGHTSMAN SERVICES
150

Coventry, United Kingdom


PROJECT DESCRIPTION
Project: Neale Wade Community College, Cambridgeshire
Contractor: Gallifordtry
Architects: R H Partnership Architects
Design: Ramboll Group
Fabricators: MQM Ltd
Specification: Structural steelwork model. 410 tons of
steelwork split into two Phases and 2No Staircases with
Mesh Enclosures and Gates

THE SOLUTION

1st Fix Structural Steel & 2No Staircases

Very tight program for Design & Detailing

Shear studs welded to top of each beam

Easily Modeled in Advance Steel

DWG and DWF Formats aided for a quick


approval process

Complex Fabrications drawings created


with ease

I would not have been able to complete


this project on time without Advance
Steels unique properties and ease of use,
16No Lots broken down into around 25
tons per Lot, to aid in fabrication and
erection.
Nigel Bowley

USERS BENEFITS

All work in dwg format


Easy transfer of information

Ability to import engineers 2D drawings and convert lines directly to correct beams

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

BREN
BRENTWORTH SIXTH FORM CENTRE
CENTRE
TSI STRUCTURES LTD
150

NORWICH, UK
PROJECT DESCRIPTION
. Architecture office: Cottrell & Vermeulen
. Engineering: Haskins Robinson Waters Engineers
. Main Contractor: Hutton Construction Ltd
. Location: Brentwood, England
. Specifications: A classroom block that consists of
a steel/concrete hybrid design with a very
complicated roof, and an assembly hall with a
complex box section truss design

THE CHALLENGE

Model all elements of the project and create

Interactive 3D modeling of connections;

drawings.

almost every connection of roof beams

Collision areas between the gutters and steel

down to concrete being unique.

parts.

Use of automatic clash detection on

The Assembly hall was very complex with a

imported solids to determine the vertical

box section truss design. The trusses were

drop dimensions of steels that do not follow

tilted over so the internals formed valley

the slope of the roof.

rafters; this was restrained by the large UC

This was an extremely complex project.

ridge beams supported on dormer frames at

Nearly all of the connections are

the gable ends.

interactively modeled, and almost every


connection of roof beams, down to concrete
for the classroom block was unique.

The ability to import AutoCAD drawings and convert these


lines into Advance Steel objects was essential. Without this
command many extra drawing office hours would have
been spent modeling the new concrete steel structure and
the existing building
Adrian Betts
TSI Structures LTD

USERS BENEFITS

Interactive 3D modeling
Creation of complex designs

Ability to model and clash check 3D solids to steels

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

FIRE ESCAPE
AS FABRICATIONS LTD
150

Liversedge, England
PROJECT DESCRIPTION
Contracting authority: Harrogate General Hospital
Location: Harrogate, England
Designer: Dan Coates
Description: Balustrade on a fire escape staircase
in Harrogate General Hospital
Specifications: The steel balustrade is mounted on
concrete stairs. Weight: ~990kg

THE SOLUTION

Create a construction that consisted of


panels with no welding on site due to PPC
finish.

Create many different drawings for


manufacture in relation to the many
different balustrade panels required

Producing accurate BOMs

Changes to the design adapted with ease

Automatic dimensioning and creation of


drawings ready to issue for manufacture

Automatic material and bolt list creation


derived from the 3D model to send to
purchasing

Due to the size of the stair, Advance


Steel enabled me to achieve fast and
effective results when issuing the job to
manufacture. The ability of automatically
creating accurate BOMs ready to issue to
purchasing controlled our production
requirements."
Dan Coates,
Draftsman, AS FABRICATIONS

USERS BENEFITS
Ease of producing the 3D model in accurate detail
Time reduced when producing drawings and BOMs for manufacture
Automatic adaptability when altering the design to both 3D model and update of drawings

More projects on www.graitec.com

ADVANCE STEEL

THE CHALLENGE

GREENPOWER CENTRE
FORDINGBRIDGE
PLC
150
Arundel, England
PROJECT DESCRIPTION
Location: Fontwell, England
Dimensions: 22m long arch
Specifications: High specification and low emission
building with a timber frame and a mezzanine floor inside
Description: New headquarters for Greenpower ImechE,
an organization that promotes engineering to the youth
through a sustainable and innovative approach

THE CHALLENGE

To design a laminated timber frame

Using Advanced Steels Curved beam

building with a curved roof design

from line feature to easily create Glulam

High specification, low emission building in

timber beams including the correct

a short time frame

material

Numerous one off designs of hidden

connection details to tight tolerances.

Automatic drawing generation and simple


modeling greatly reducing design time

Section creation allowing infinite profile


possibilities and completely adaptable
plate configurations for an easy
connection design

"Advanced steel has reduced time spent on


drawings through easy modeling and automatic
drawing generation, but the best feature being
the clash checking and integrated BOMs saving
on mistakes and ensuring projects are both cost
effective and delivered on time."
Spencer Bell,
Draftsman, FORDINGBRIDGE PLC

USERS BENEFITS
Easy transition for AutoCAD users
Numerous automated features
Seamless production with outside suppliers thanks to various output formats

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

BRIDGE
NCA
Container- und Anlagenbau GmbH
150
St. Paul, Austria
PROJECT DESCRIPTION
Location: Bruck, Austria
Client: Land Steiermark
Dimensions: Height of the steel arch: 32m; span: 70m;
Diameter of the rope: 56m
Specifications: Weight: ca. 380 tons
Description: The Bridge consists of a steel framework with a
welded steel arch. The cantilever construction is carried by
22 ropes which are connected to the steel arch.

THE CHALLENGE

Cambered curves in all 3 axes with

Advance Steel was able to put out the

elliptical axis line and trapezoid section.

actual lengths of all sheet metal parts

Cutted plates in the arch, which have a

after having integrated cambered curves.

different slope and which are adjusted to


the three-dimensional cambered curves.

"Without using 3D Software like Advance Steel,


the project could not have been achieved. We
especially benefited from Advance Steels 3Dability, the AutoCAD compatibility and the
automatic creation of workshop drawings and
bills of materials."
Mr. Stefan Dohr, construction engineer at NCA
Container- und Anlagenbau GmbH

USER`S BENEFITS
3D-modelling
Automatic creation of workshop drawings and bills of materials
AutoCAD compatibility

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

HELICOPTER BASE FOR HOSPITAL


Bitschnau Stahl & Anlagenbau GmbH,
150
Bitschnau
project gmbh

Nenzing, Austria
PROJECT DESCRIPTION
Location: Karlsbad, Germany
Client: SRH Holding (SdbR), Germany
Architect: Donnig + Unterstab Architekten und
Innenarchitekten, Germany
Specifications: Diameter of the landing place: 28,6m;
size of the access way: 44 x 2,9 m; Steel weight: 145
tons; weight of aluminium: 35 tons

THE CHALLENGE
To ensure the accurate utilization of steel,

the constructive steel structure was

assembly and single part drawings.

realised as welded beams in the main


supporting axle.

Automatic and configurable creation of all


Easy creation and modification of curved
beams and end plates.

Circular beams were created as a welded

Created NC-data from folded plates according

construction.

to the requirements of the machine-

Assembly concept: The main beams are

developer.

separated to reduce the part weights.

"Advance Steel is the perfect solution for the creation of


steel constructions with a complex geometry. Advance
Steel processes the entire 3D model data, accelerates all
document creation and insures global drawing
consistency. We benefited hugely from the saving of time
and the increase of productivity. Today we would still
choose Advance Steel for our projects.

Mr. Manfred Ammann, construction engineer


at Bitschnau GmbH

USERS BENEFITS
3D-modelling
Exact sheet metal work
Comprehensive profile data base

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

OFFICE BUILDING
Peneder
Service-Consulting GmbH
150
Atzbach, Austria
PROJECT DESCRIPTION
Location: Atzbach, Austria
Client: Peneder Immobilien GmbH
Specifications: approx. 600 tons of steel;
2

Total area: 5.700m ; used area: 14.800m

Short description: An office building with


integrated training rooms, a restaurant and a
hotel.

THE CHALLENGE

THE SOLUTION

Combination of steel, concrete and glass.

High demands of the architecture, of the

Design, - reinforcement- for steel


constructions

physics and of the fabrication.

Provide machine data files for automating the


fabrication

Consistency of data: model; bill of materials,


drawing derivation, machine data.

Without Advance Steel this project


could not have been achieved in this
space of time.
Mr. Andreas Spiessberger,
Production developer
at Peneder Service-Consulting GmbH

USERS BENEFITS
Consistency of data
Machine date for the fabrication
Several excellent functions like NC-files

More projects on www.graitec.com

ADVANCE STEEL

supporting structure, of the building

STAIRS & PLATFORMS FOR


FOR ARCELOR MITTAL STEEL
STEEL
UZINSIDER ENGINEERING
150

Galati, Romania
PROJECT DESCRIPTION
Architecture office: Uzinsider Engineering
Location: Arcelor Mittal Steel Plant, Galati,
Romania
Project Details: The project consisted of the
assembly of new elements (stairs, railings,
platforms) on an existing structure - the dust bag
for the 5th furnace of the Arcelor Mittal Steel
Plant

THE CHALLENGE

Assembly of new elements (stairs, railings,

The 3D view mode, user joints & advanced

platforms) on an existing structure

feature set for stairs, railings, allowed the

To design the stairs, railings, platforms and

engineers to finish the project in only

grills without errors

three weeks

Stairs, railings, platforms & grills designed


without any errors using the stairs &
railings set

"I have been working with AutoCAD, especially in


3D view, for a very long time now. I think it is safe
to say that it would have been very difficult for us
to model the entire structure in AutoCAD. The main
structure has a cylinder shape, and the platforms
and the stairs are placed around it, at 360. Without
Advance Steel, the execution would have taken too
long."
Gheorghe CEPRAGA
Engineer
Uzinsider Engineering

USERS BENEFITS
Fast learning curve
3D view mode
Stairs and Railings set

More projects on www.graitec.com

Advance Steel

THE SOLUTION

FEATURE STAIRCASE
PETER MARSHALL STEEL STAIRS LTD
150

Leeds, United Kingdom


PROJECT DESCRIPTION
Architecture office: Atkins Consultants Limited
Master builder: Mifflin Construction
Location: Brompton Barracks, the Royal School of
Military Engineering
Dimensions: 6m x 10m x 13m high
Specifications: 18 tons double flight staircase and
support structure

THE SOLUTION

Large independent staircase structure

Erection sequencing checked in the model

Radiused landings and balustrade system

Complex stair geometry easily modeled in

Complex tread and landing grating system

Advance Steel

Open mesh decking successfully and


realistically created in the model

This Staircase presented a design challenge that


involved fabrication of four large sections of the
main support frame each weighing two tons. The
sections were trial erected before delivery to the
site to ensure accuracy after fabrication and
galvanizing.
Marcus Barlow
Drawing Office Manager
At Peter Marshall Steel Stairs Ltd

USERS BENEFITS
Clash checking in the model eliminates errors before manufacture
DWG format enabled importing of engineers building and base details directly into the model
Wrap around templates for diagonal CHS bracing members

More projects on www.graitec.com

Advance Steel

THE CHALLENGE

KAHNOOJ
150

INNOSPIN AG
Wettingen, Switzerland
PROJECT DESCRIPTION
Location: Iran
Constructor: MAPNA
Dimensions: 87m x 53 m x 36 m high
Weight: 1473,614 to
Short description: The project is an air-cooled
capacitor. The steel construction was created by
INNOSPIN AG with Advance Steel

THE CHALLENGE

Huge and complex project with tight

user tool at the same time on this project

deadlines

Several designers worked with the multi

Short time slot for engineering and

The project explorer allows the designers

detailing

to split the model in several groups for

Numerous different construction sections

visibility depth

with different bracing systems

The amount of bracing joints in Advance


Steel and their wide range of flexibility are
also responsible for the quick model
creation

"Working with Advance Steel with its


fascinating joint library allowed us to build
up the construction in the customer's time
slot. With Advance Steel we boosted our
efficiency to 100%.
Mr. Marcel Volkart, Senior Design Engineer
at INNOSPIN AG
USER`S BENEFITS
Multi-user mode to speed up the modeling phase
Permanent control of the model during the design phase
Automatic joints and drawing creation

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

NEXT RETAIL
150
AS
FABRICATIONS

Wakefield, UK
PROJECT DESCRIPTION
Contracting owner: Next clothing company
Location: Gateshead, England
Weight: Approx 1620kg
Specifications: Mild steel galvanized ramp & canopy frame,
durbar plate ramp, canopy roof cladding, key clamp
balustrade
Project description: Ramp with balustrade, canopy with
guttering system for back of Next shop in Gateshead

THE CHALLENGE

Create a steel ramp onto an angled block

Automatic material and bolt list creation

paving

derived from the 3D model to send to

Design a construction that was easy to

purchasing

assemble on site

Producing accurate BOMs and drawings

ready for manufacture


Adapting the model to various revisions

Automatic dimensioning and creation of


drawings ready to issue for manufacture

Changes to the design adapted with


ease

the design underwent


Advance Steel enabled me to achieve fast and
effective results when adapting the design to
various changes. The automatic creation of
accurate BOMs ready to issue to purchasing
controlled our production requirements. Advance
Steels extensive library of many sections and
connections relevant to all current standards
allowed me to adjust and tweak many variations
of the design with ease.
Dan Coates,
Draftsman, AS FABRICATIONS

USERS BENEFITS
Easy 3D modeling of the project in accurate detail
Divide one single model into cost centers to aid sales and production
Simultaneous updating of model and drawings

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

OBSERVATION DECK
150

BFI Stahlbausysteme GmbH & CO. KG


Warburg, Germany
PROJECT DESCRIPTION
Location: Hxter, Germany
Constructor: Thomas & Bkamp Ingenieurgesellschaft GmbH
Dimensions: Total length: 19.38m; Width of level 1: 6.6m; Width
of level 2: 8.10m; Total area: 70m
Description: the skywalk is located on a rock at a height of
80m, 2 levels (1 above and 1 over the rock spur), the railings
are created with a handrail made out of steel wire ropes

THE CHALLENGE
The Weser skywalk had to be constructed

Automatic calculation of the center of

at a height of 80m with the use of a

gravity for each assembly to help the

specific crane

erection at site

Exact clarification of details with the

Optimization of the prefabricated part

The main beams are created as a box

construction company using the 3D -

girder, made of plates welded together at

modeling

the workshop

Tools to easily create plates of shape


including weld preparation

"Advance Steel increased our productivity by


50%. We especially appreciated the easy
balance point calculation of the construction by
crane and the detailed arrangement with the
building company due to excellent 3D Modeling.
It saved us a lot of time.
Mr. Mario Fischer
Construction engineer
at BFI Stahlbausysteme GmbH & Co. KG

USERS BENEFITS
Easy and fast 3D modeling
Fast generation of lists and drawings for fabrication
Automatic calculation of the center of gravity

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

PRODUCTION UNIT
STRUBAT Ingnierie
150

Albertville, France
PROJECT DESCRIPTION
Contracting authority: BELLET Industrie
Architecture Office: OAP Architecture
Location: Hermillon, Savoie
Dimensions: Main hall=65m x 40m with total height on
upper side rail of 9.5m
Description: Production unit with a double hall, office
building with raw plugged roofing and up against the wall
Total weight: 270 tons of steel structure

THE CHALLENGE

Create a main hall (with crane tracks and

including folded pieces over the hip valley

secondary framework) and an office

and the hall skylights

structure partly curved including a hip

valley receiving purlins

Represent the environment in concrete

Separate the whole project in different

Assign a phase number to each element in


order to isolate and group them together,
and get documents per phase

several steps

Provide GA and workshop drawings

Automatically produce high quality


drawings from customized drawing styles

allowing a clear understanding at the


workshop and at site

Creation tool of concrete type elements


(wall, slab, etc.)

phases in order to launch the production in

3D modeling of the steel structure

by STRUBAT Engineering

"The precise dimensioning and according to my


preferences on the drawings, as well as the
management of the automatic update of the documents
provides me with confidence regarding the success of
the assembly phase on site."
Jean-Louis RICHARD,
Detailer
at STRUBAT Engineering manager

USERS BENEFITS
Software adapted to the conception and drawing/layout of industrial type building
Easy customization by the user (adding bolts, adaptations of drawing styles, etc.)
Automatic update of all documents in case of 3D model modifications

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

PEDESTRIANS AND CYCLES FOOTBRIDGE


LEGRAND
150

r
Annonay,
FRANCE

PROJECT DESCRIPTION
Architecture office: LEGRAND
Location: Annonay, Ardche, FRANCE
Dimensions: Straight span = 40.30m; Strut bar in
HEA 200 every 3.40m; 32 tons
Specifications: Straight span footbridge with a
mixed steel/wood structure, a concrete floor
with 2 arches in glue-laminated timber

THE CHALLENGE

Customization of Advance Steel to match

Customized drawing styles with a user-

Ets LEGRAND working methods

defined toolbar to produce the required

Footbridge with mixed structure in

drawings with dimension styles, line

steel/wood, wooden railing

thickness, etc.

Precise realization and design of different


folded parts and supports

Interoperability due to a bidirectional link


to exchange the 3D model with the
company in charge of the wood parts

Configuration of the unfolded steel plate


based on the criteria of the workshop
bender machine

Advance Steel allowed us to completely move on


to 3D design which gave us new opportunities and
solutions to architects complex requirements. In
addition, the produced documents perfectly match
the needs of the workshop and our clients."
Jean-Sbastien COURIVAUD,
Design office Manager at LEGRAND

USERS BENEFITS
Great modeling performances despite the presence of curved elements
Time savings in the drawings creation
Permanent link between 3D model and all generated documents

More projects on www.grait


www.graitec.com
ec.com

ADVANCE STEEL

THE SOLUTION

BOAT MOLD STRUCTURE


WESTBURY PARK ENGINEERING LTD
150

Westbury, England
PROJECT DESCRIPTION
Client: UK based boat building company
Dimensions: 35-40m long
Specifications: Turning a mold following
manufacture in order to release the boat
from the mold
Description: Steel structure for sustaining a
fiber glass boat mold

THE CHALLENGE

Ensure the stiffness of the mold in the


steel structure

3D model completed in three days and all


the drawings within a week to test the

Avoid cracking of the fiberglass

Numerous persons involved for the

resistance of the structure

Manageable sub-assemblies building

installation in situ with the former

parts and bolted joints to avoid any

software

welding on site

Fast assembly time and respect of the


deadlines

The steelwork for the project was designed and


built around a 3D surface model supplied by our
client and converted for AutoCAD by GRAITEC. Once
the construction lines were in place the remaining
structure was a breeze using Advance Steel.
Nial BALL,
Engineer at Westbury Park Engineering

USERS BENEFITS
A series of AutoCAD construction lines from key points on the surface model using XEDGES
Fast creation of drawings
Interoperability of the 3D model

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

TESCO SUPERSTORE
TSI STRUCTURES LTD
150

Norwich, UK
PROJECT DESCRIPTION
Architecture office: Sheppard Robson Architects
Structural Engineer: Walsh Associates
Master builder: Willmott Dixon
Location: London, Woolwich
Dimensions: 180m x 85m x 52m
Specification: 80,000 sq ft Tesco superstore, various
other retail units and 259 homes over 17 stories.
Total Build Cost: Woolwich Central - Phase 1 & 2
400m

THE CHALLENGE
To model a 17 story post tensioned concrete

structure for connecting secondary steel

Advance Steel now has the ability to model


concrete slab, walls and beams

To produce drawings for elements cast into

We were able to model the cast in channels

the concrete structure

and using Advance Steel meant these

Tesco store opening date set before

elements came across onto the drawings

construction started, very tight programme

DWGs aided in the approval process

"We would not have been able to produce this building in


3D without Advance Steels ability to model external
elements such as concrete. We were the only member of
the construction team with the ability, software resources
and technical knowhow, to fully model the enormous
concrete structure in three dimensions. Our model and the
3D drawings were used by the Architect for client
presentations. With the AutoCAD base this enabled us to
add different material renders to the concrete surfaces
creating a more realistic and aesthetically pleasing model.
Adrian Betts,
TSI Structures Limited

USERS BENEFITS
Ability to import design team DWGs to model external elements
Quick production of G.As over 130 general arrangement drawings were produced for this project
Clash check between steel and concrete elements

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

469 FLARE STACK


WESTBURY PARK ENGINEERING
150

Westbury, England
PROJECT DESCRIPTION
Architecture office: Design and build by Westbury
Park Engineering

Master builder: Westbury Park Engineering


Location: Southampton, Hampshire, UK
Dimensions: 46m High
Description: Replacement Flare Stack for the
petro-chemical industry

THE CHALLENGE

To replace the original 1950s chimney


with new incorporating current

ladders made light work of the assembly

specifications

Create automatic construction and

The flare stack had to be designed for

assembly drawings from the Advance

easy installation as removal of the old and

Steel 3D model

replacement of the new had to take place

Avoid collisions with the automatic


collision control tools

during a three day shutdown period

Use of ladder macros extensively for CAT

Collision control was key we knew the


chimney would fit together prior to
delivering to site

"The model makes use of the ladder tools


extensively and being able to calculate weights
of assemblies was perfect for producing lift
plans. Thanks to the collision control tools
erection went without a hitch and the old stack
was removed and replaced in a weekend."
Nial Ball
Project Engineer
Westbury Park Engineering Ltd

USERS BENEFITS
Efficient preset tools
Reduced error rate
Production time saved

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

RUTHIN PLATFORM
WESTBURY PARK ENGINEERING
150

Westbury, England
PROJECT DESCRIPTION

Location: Ruthin, North Wales


Architecture Office: ABBE International Ltd
Dimensions: 9.0m x 4.0m x 7.0m High
Description: A concrete batching plant in North
Wales for the manufacture of brick paving

THE CHALLENGE

A model with stairs, ladders, hand railings


and hoppers

Use of automatic macros for stairs,


ladders, hand railings etc

During modeling, collisions were identified

Collision areas of the model were

in the initial drawings. These however,

automatically highlighted and could be

were quickly overcome in Advance Steel

re-designed quickly

Another company was in charge of the

Assembly drawings and lists of


components are generated automatically

installation, which needed up-to-date


assembly drawings

The design included four complex hoppers


for concrete discharge not a problem for
Advance Steel

It was a joy to draw and quick! The model was


completed in a week. Thanks to the accurate
collision control feature of Advance Steel,
assembly drawings and lists identifying each
component, including what bolts went where,
the structure was erected well inside a week.
Nial Ball
Project Engineer
Westbury Park Engineering Ltd

USERS BENEFITS
Easy 3D modeling
Low error rate
Drawing and installation time saved

More projects on www.graitec.com

ADVANCE STEEL

THE SOLUTION

Vous aimerez peut-être aussi