STR-CON-ORG-CI-002-0
OREGON PARK
METHOD STATEMENT FOR
WATERPROOFING
09/03/2015
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
REVISION
Rev.
Date Issue,
Modification
Prepared
Checked
Approved
By Sika
Function
QM
RMSI
Name
Constantin Murgan
Sorin Lupu
Surname
Signature
RTE :
Approved
FLORIN DUMITRASCU
Engineer
Project Manager
Josef Schmuck
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
TABLE OF CONTENTS
1.
2.
2.1
2.2
2.3
3
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Scope
System Description
References
Certificates & Approvals
Level of performance
Schedule of Technical information
Review and approval processes of the technical design
Obligation/requirement of the Main Contractor to the Specialist
Storage and Handling
Schedule of materials and components
Application and execution
Work Operatives
Specific details
Protection during execution
Backfilling and compaction, including material specification
Supervision and monitoring
Procedure in case of damage
Testing and sign-off
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
1. Scope
This Method Statement describes the system and installation procedure of the SikaProof-A membrane
waterproofing system implemented for project ,,OREGON PARK
Tehnical Specification
1 Description
1.1 SikaProof A Membranes are embossed flexible polyolefin (FPO) pre-applied sheet materials with a grid pattern
of sealant, a non-woven reinforced polypropylene fleece on the upper face and a self-adhesive strip along one edge.
The membranes are available in three grades; SikaProof A05, SikaProof A08 and SikaProof A12.
1.2 The nominal characteristics of the membranes are given in Table 1:
Table 1 Nominal characteristics
Characteristics (units)
A05
Grade
A08
A12
0.5
0.8
1.2
30
25
20
0.9
1.1
1.5
Width* (m)
1, 2
Thickness* (mm)
Length* (m)
-2
24, 48
1, 2
28.7, 57.5
1, 2
30, 60
250
250
400
375
675
550
300
500
450
500
475
550
275
400
550
Watertightness*
Pass
Pass
Pass
0.75 - 0.95
0.75 - 0.95
0.75 - 0.95
>20
>20
>20
-25
-25
-25
1.3
Ancillary materials for use with the products and included in the scope of this Certificate are:
- SikaProof A08/A12 Edge preformed SikaProof A for use at perimeter edges and terminations
- SikaProof Tape-150 a butyl rubber-based self-adhesive tape used for sealing membrane joints on the
fleece side
- SikaProof ExTape-150 a butyl rubber-based self-adhesive tape used for sealing membrane joints
- SikaProof Patch-200 a self-adhesive patch consisting of SikaProof A05 and SikaMelt adhesive covered
with release film.
1.4
Other ancillary materials for use with the products but outside the scope of this Certificate are:
- SikaProof Fix Tape-50 a double-sided butyl rubber-based adhesive tape used for repairing temporary
3
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
Manufacture
2.1
The products are manufactured by conventional manufacturing processes of mixing, extrusion, coating and
lamination.
2.2
As part of the assessment and ongoing surveillance of product quality, the BBA has:
- agreed with the manufacturer the quality control procedures and product testing to be undertaken
- assessed and agreed the quality control operated over batches of incoming materials
- monitored the production process and verified that it is in accordance with the documented process
- evaluated the process for management of nonconformities
- checked that equipment has been properly tested and calibrated
- undertaken to carry out the above measures on a regular basis through a surveillance process, to verify
that the specifications and quality control operated by the manufacturer are being maintained.
2.3
The quality management systems of the manufacturing sites in Switzerland and Germany have been assessed
and registered as meeting the requirements of BS EN ISO 9001 : 2008 by SQS (Certificate 31982) and TUV Nord
Cert
GmbH (Certificate 44 100 101403).
2.4 The environmental management system of the manufacturing site in Switzerland has been assessed and
registered as meeting the requirements of BS EN ISO 14001 : 2004 by SQS (Certificate 31982).
3 Delivery and site handling
3.1 The products are supplied in rolls wrapped in yellow polythene film with a self-adhesive label bearing the
Certificate holder's name and traceability information. The rolls have a shelf life of 12 months from the date of
production.
3.2 The rolls should be stacked in a horizontal position, in dry conditions and at temperatures between 5C and
30C. They must be protected from direct sunlight, rain, snow and ice.
Design Considerations
4
Use
4.1
SikaProof A Membranes are satisfactory for use as damp-proofing and waterproofing membranes for solid
concrete floors, underground structures and for internally and externally applied tanking below ground in
accordance with the relevant clauses of CP 102 : 1973, Section 3, and all grades of basement constructions as
defined in Table 2 of BS 8102 : 2009, provided they are fully supported and protected.
4.2
SikaProof A08 and SikaProof A12 membranes will also restrict the ingress of radon into buildings from
naturally- occurring sources.
4.3
The products are compatible with concrete, smooth brickwork and blockwork or screeded substrates, and
are resistant to those chemicals likely to be present in normal service conditions. Care must be taken to prevent
contact with mould, oils and hydrocarbons.
Practicability of installation
The products should only be installed by installers who have been trained and approved by the Certificate holder.
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
6.1
The products, including joints, when completely sealed and consolidated, will adequately resist the
passage of moisture from the ground into the structure and will enable a structure to comply with the requirements
of the national Building Regulations:
England and Wales Approved Document C, Requirement C2(a), Section 4.7
Scotland Mandatory Standard 3.4, clauses 3.4.1, 3.4.2 and 3.4.5 to 3.4.7
Northern Ireland Regulation 28(a).
6.2
The products are impervious to water and will give a waterproof layer capable of accepting minor structural
movements without damage.
Resistance to radon
7.1
SikaProof A08 and SikaProof A12 membranes, including joints, are capable of restricting the ingress of
radon into a building.
7.2
Tests on the membranes gave the following results:
Table 2 Gas resistance properties
Grade
---------------------------------------------A08
A12
Characteristics (units)
Radon diffusion coefficient (m2-s-1)
2 x 10-12
5.3 x 10-12
7.3
Buildings in areas of risk from radon should be constructed in accordance with the recommendations of:
- BREReport211 : 2007 Radon: Guidance on protective measures for new buildings
- BRE Report 212 : 1991 Construction of new building on gas-contaminated land
- BRE Report 376 : 1999 Radon : Guidance on protective measures for new buildings in Scotland
- BRE Report 413 : 2001 Radon : Guidance on protective measures for new buildings in
7.4 When installed in accordance with BRE Report 414 the membranes will be compliant with the
recommendations made in CIRIA C665 : 2007 Assessing risks posed by hazardous ground gases to building, BS
8485 : 2007, BRE
Report 211 and NHBC Standards. Guidance is given in the Ground Gas Handbook, 2009 and the Certificate
holder's technical literature.
8.1
When installed, the membranes are capable of accommodating the minor movements likely to occur under
normal service conditions.
8.2
Results of tests indicate that the products can accept the limited foot traffic and light loads associated with
installation and maintenance.
8.3
The membrane can be damaged by sharp objects, and care should be taken particularly when the membrane is exposed during construction and back filling or screeding operations.
8.4
Provided sufficient care is taken, the membrane will not be damaged by normal foot traffic during
construction.
Results of tests indicate that the adhesion of the membranes to the substrate and their joints, as described in this
Certificate, is satisfactory. The membranes' properties allow them, under normal service conditions, to
accommodate
minor movements likely to occur in the structure in which they are incorporated.
10
Effect of temperature
The membranes are not adversely affected by temperatures likely to occur during installation and in service.
11
Maintenance
As the products are confined and have suitable durability, maintenance is not required. Any damage occurring during
5
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
12
Durability
Installation
13
General
13.1
SikaProof A Membranes must be installed in accordance with the relevant requirements of BS 8102 : 2009,
BS 8000-4 : 1989, CP 102 : 1973, Section 3, this Certificate and the Certificate holder's instructions.
13.2
Concrete or screeded surfaces must have a smooth and uniform finish, be dry and be free from looselyadhering material, sharp protrusions, dust, oil and grease.
13.3
Vertical surfaces of brickwork, blockwork and, if necessary, masonry should be rendered to provide an even
surface.
Brickwork or blockwork not rendered must be flush pointed to give a smooth surface without sudden changes in
level.
13.4
Installation should not be carried out during inclement weather (eg rain, fog, snow). When the temperature
is below 5C, suitable precautions against surface condensation must be taken.
14
Procedure
14.1
The pre-formed SikaProof A Edge sheet is installed at perimeters, edges, terminations and/or connections,
then applied to corners and adhered using SikaProof ExTape-150 on the external side and SikaProof Tape-150 on the
internal side.
14.2
The SikaProof A Membranes are laid horizontally and/or vertically. Each sheet is laid onto the self-adhesive
strip of the adjacent membrane, to a minimum overlap of 90 mm, and a pressure roller is used to ensure bonding. A
minimum of 5 mm of the self-adhesive strip must remain visible.
14.3
Longitudinal joints are adhered with the self-adhesive strips for the products. For transverse joints SikaProof
Tape-150 and SikaProof ExTape-150 should be used, with the membrane overlapping to a minimum of 50 mm.
SikaProof ExTape-150 is adhered externally to the membrane side, and SikaProof Tape-150 to the fleece on the
inside.
14.4
The reinforcement is fixed after the membrane system has been applied, the concrete poured and the walls
backfilled.
14.5
Special protection sheets must be used during backfilling to prevent damage to the membranes.
14.6
For all existing details, such as pipe penetrations, shaft connections, pits, pile heads, expansion joints and
any other details, the Certificate holder's advice must be sought.
14.7
The installation of SikaProof A08 and SikaProof A12 membranes for gas-resistance applications may be
subject to third-party independent validation in accordance with the Ground Gas Handbook, 2009.
Horizontal applications
14.8
Application to horizontal surfaces is made according to the procedure given in sections 14.1 to 14.7.
Vertical applications
14.9
The membranes can be laid in a horizontal or vertical direction.
14.10 From horizontal to vertical areas, the membrane sheet should overlap the starter bars by a minimum of 300
mm or overlap the slab by a minimum of 50 mm.
14.11 Joints in vertical areas should point downwards.
6
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
14.12 Temporary fixings, as advised by the Certificate holder, are used to fix the membrane.
Detailing and service penetrations
14.13 Consideration must be given to detailing and all service penetrations in tanking installations. The advice of
the Certificate holder must be sought.
15
Repair
15.1
Any damage to the membrane can be sealed on the external side of the membrane with SikaProof Patch200.
15.2
Any repairs to the system must be done prior to the application of backfilling. The advice of the Certificate
holder must be sought.
15.3
If required by the local authority, repair work on SikaProof A08 and SikaProof A12 membranes for gasresistance applications should be confirmed by an independent validation report, as all gas membrane installation
should be subject to third-party validation in accordance with the Ground Gas Handbook, 2009.
Technical Investigations
16
Tests
16.1
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
17
Investigations
17.1
An evaluation of a site in progress was made to assess the practicability of installation.
17.2
The manufacturing process was evaluated, including methods adopted for quality control, and details were
obtained of the quality and composition of the materials used.
2. System Description
SikaProof A is a fully and permanently bonded, flexible sheet membrane waterproofing system. It consists of an
embossed flexible polyolefin (FPO) membrane (1) laminated with a unique polyolefin (PO) sealant (2) applied in a
fine grid pattern and a non-woven, strengthened polypropylene (PP) fleece (3).
The SikaProof A system is a cold- and pre-applied waterproofing system that is designed for installation before the
steel reinforcement is fixed and the structural concrete is poured. The concrete is poured directly onto the
SikaProof A membrane system, the fresh concrete is embedded completely into the fleece and creates a
permanent mechanical bond.
The mechanical bond together with the sealant grid (Sika Grid Seal Technology) prevents any lateral water
underflow between the SikaProof A membrane system and the hardened reinforced concrete of the structure.
To seal and bond the overlap joints and detail connections of the SikaProof A system, special SikaProof
adhesive
tapes are used, no heat welding is required.
To adhere and seal the overlaps of the membrane sheets in a longitudinal direction, use the integral selfadhesive
strip on one side of the sheet and to adhere and seal transverse joints or detailing joints/connections use the two
special SikaProof detailing tapes, SikaProof Tape-150 and SikaProof ExTape-150.
USES
Damp-proofing, waterproofing and concrete protection for basements and other below ground concrete
structures against ground water:
Below ground reinforced concrete slabs
Below ground reinforced concrete walls with both single and double -faced formwork
Extensions and reconstruction works
8
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
CHARACTERISTICS/ ADVANTAGES
Cold-applied (no pre-heating or open flames) and pre-applied, before the reinforcement is fixed
and the concrete is poured
Fully and permanently bonded to the reinforced concrete of the structure
No lateral water underflow or migration between the concrete structure and the membrane system
High water tightness tested according to many different standards
Easy to install with fully adhered joints (no welding required)
Temporary weathering and UV-resistant during the installation / construction works
Resistant to ageing
High flexibility and crack-bridging abilities
Resistant to aggressive natural mediums in ground water and soil
Can be combined with other approved Sika waterproofing systems including:
Sikaplan WT membranes, FPO-based sheet waterproofing membranes
Sikadur-Combiflex SG system, FPO-based joint sealing system
2.1
REFERENCES
Europe
Product Declaration EN 13967 - Flexible sheets for waterproofing (type A&T), CE Certificate No.
1349-CPD-065
German function tests for system and standard details - Test lab Wissbau Beratende Ing.-GmbH
German allgemeines bauaufsichtliches Prufzeugnis" (abP), MPA NRW No. P-22-MPANRW-8600
BBA, British Board of Agrement technical approval for construction, Agrement Certificate 13/5075
Cahier des Charges, French approval CCT 57 by Enquete de Technique Nouvelle Socotec No.
EAD9247/2
2.2
CERTIFICATES & APPROVALS
Europe
Product Declaration EN 13967 - Flexible sheets for waterproofing
CE Certificate No. 1349-CPD-065, 16.08.2011
German function tests, test institute Wissbau Beratende Ing.-GmbH
Function test report No. 2010-212 for SikaProof A-08, 03.05.2011
Function test report No. 2010-212-6 for penetrations, 25.11.2011
Function test report No. 2012-212-7 for pile head, 25.11.2011
German abP (allgemeines bauaufsichtliches Prufzeugnis), tested with SikaProof A-08,
Material Test Institute MPA NRW approval abP No. P-22-MPA NRW-8600, 26.05.2011
German abP, "Bauartenzulassung" according DIN 20000-202 standard,
Material Test Institute MPA NRW:
-Tested with SikaProof'A-08, approval abP No. P-22-MPANRW-8945-1, 08.08.2013
-Tested with SikaProof' A-12 approval abP No. P-22-MPANRW-8945-2, 08.08.2013
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
BBA, British Board of Agrement technical approval for construction, Agrement Certificate 13/5075,
16.12.2013
Cahier des Charges, French approval CCT 57 by Enquete de Technique Nouvelle Socotec
No. EAD9247/2, 31.12.2013
Radon permeability, Slovak Medical University
For area of SikaProof A-08, test report No. E-214/2011, 07.11.2011
For area of SikaProof A-12, test report No. E-215/2011, 15.11.2011
For overlap joints with self-adhesive strip of SikaProof A-08, test report No. E-225/2012,
12.03.2013
For overlap joints with detailing tapes of SikaProof A-08, test report No. E-226/2012,
12.03.2013
Root resistance according to CEN/TS 14416, test institute SKZ
For overlap joints with self-adhesive strip of SikaProof A-08, test report No. 107615/13-I,
10.12.2013
For overlap joints with detailing tapes of SikaProof A-08, test report No. 107615/13-II,
10.12.2013
1.3
Level of performance
The document regarding that SikaProof-A compliance requirements meet at least Grade 2 level of
performance to BS8102:2009 Code of practice for the protection of below ground structures
against water from the ground, is attached to the present Method Statement.
10
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
Sector 2, RO Bucharest
Tel.: +40 21 403 4331
Fax: +40 21 403 4330
OREGON PARK
Method statement for waterproofing
ad
The BBA has awarded this Certificate to the company named above for the products described herein. These
products have been assessed by the BBA as being fit for their intended use provided they are installed, used
and maintained as set out in this Certificate.
On behalf of the British Board of Agrement
Simon Wroe
Claire Curtis-Thomas
11
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
12
CE marking
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
CE marking
The Certificate holder has taken the responsibility of CE marking the products in accordance with harmonised
European Standard BS EN 13967 : 2012. An asterisk (*) appearing in this Certificate indicates that data shown are
Given in the manufacturers Declaration of Performance.
13
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
14
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
15
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
16
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
17
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
18
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
19
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
20
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
21
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
22
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
23
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
After the inspection, regarding the quality of blinding concrete substrates, a protocol named ,,PV predareprimire front de lucru will be signed between the Main Contractor and Specialist Contractor.
In this protocol after inspection, if the substrate is properly according to the specifications, wil be mentioned
that the execution of waterproofing Sika System ( SikaProof A-12; AF-24;A-19) can start.
24
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
25
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
Suitable substrates:
- Concrete blinding with a smooth surface finish (an additional
geotextile layer is recommended, > 300g/m2 dependent on the
blinding)
- Formwork
- Rigid thermal insulation Plywood
- Compacted soil/fill with geotextile > 500g/m2
(only for limited requirements)
If there is an uneven, rough surface or ponding water, then an additional
protection or drainage layer is required, e.g.
- Sikaplan WT Protection sheet
- Sikaplan W Tundrain
- Sikaplan W Felts or Geotextile > 500g/m2
26
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
27
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
28
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
29
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
30
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
31
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
32
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
33
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
34
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
35
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
36
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
37
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
38
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
39
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
40
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
41
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
42
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
43
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
44
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
45
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
46
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
9. Work Operatives
47
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
48
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
49
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
50
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
51
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
52
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
53
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
Detail 7
54
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
Note:
In the construction joint between slab /wall will be used Sika Swell S2
(see detail no. 06).
55
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
56
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
57
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
58
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
Before backfilling the structure, the SikaProof A membrane has to be protected with geotextile.
59
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
b) Monitoring
From time to time whenever the supplier considers necessary a Sika Specialist will be present in the
job site for technical assistance and monitoring.
60
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
In case the site inspector or the engineer find a deficiency or a potential risk in the waterproofing
execution shall notify that to the Main Contractor.
The works in this area will be stopped if its necessary and Specialist Contractor together with the Supplier
(if its required) shall repair the waterproofing according to specifications.
61
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
a) Testing
63
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
b) Sign-off
At the completion of water proofing works a final protocol will be issued between
Main Contractor and Specialist Contractor.
64
STRABAG SRL
HOCHBAU EUROPA
DIREKTION NT / Bereich BB
Calea 13 Septembrie, nr. 90, Sector 5
RO-Bucuresti
Reg.J40/13563/1994, CUI:
RO6891914
OREGON PARK
Method statement for waterproofing
Crt.No.
Reference documents
Who controls
the verification
Protocol prepared
0
B.11
B.11.1
1
WATERPROOFING
Material reception
Arrival on site
-quality certificate
provider
-quality acceptance
protocol for material
Handover front work
protocol
Quality acceptance
protocol for substrate/PVLA
Quality acceptance
protocol at completion
of the works
C56/85;
Supplier instructions
B.11.2
Check substrates
B.11.3
Check substrates
B.11.4
Aplication
C56/85
Supplier instructions
C56/85
C56/85;
Execution details;
Supplier instructions
1
E;Specialist
E;B
E;B