Académique Documents
Professionnel Documents
Culture Documents
E1/Bandwidth Requirement
3G
HSPA
WiMax
GSM 900
GSM 1800
Project 8
PLDT Munoz Reloc
Bago Bantay
2
2
2
3
3
3
5
5
5
20 Mbps
20 Mbps
20 Mbps
Project 6 (HUB)
Cattleya
Congressional Village
2
2
3
3
Total
12
18
LTE
Broadband
40Mbps
40Mbps
40Mbps
100Mbps
100Mbps
100Mbps
30Mbps
40Mbps
40Mbps
20 Mbps
40Mbps
100Mbps
20Mbps
5
5
20 Mbps
20 Mbps
40Mbps
40Mbps
100Mbps
100Mbps
40Mbps
40Mbps
30
120Mbps
240Mbps
600Mbps
210Mbps
200 Mbps x
1E1
2 Mbps
= 100E1
Computation for LTE
=
500 Mbps x
1E1
2 Mbps
= 250E1
Computation for Broadband
=
190 Mbps x
1E1
2 Mbps
= 95E1
Total E1 (HUB not included) = GSM 900 + GSM 1800 + 3G + HSPA + WiMax
+ LTE + Broadband
Total E1 = 10 + 15 + 25 + 50 + 100 + 250 + 95
= 545 E1
Therefore, STM 16 will be used because the required transmission
system exceeds that of STM 4
Power Budget
Transmit Power
Receiver
Sensitivity
FOC Loss
Connector Loss
-27dB
-58dB
0.35 dB/Km
1 dB/connector
Power
Power
Power
Power
Budget
Budget
Budget
Budget
=
=
=
=
0.3 dB/splice
3dB
Segment 1:
PLDT Munoz-Reloc to Project 8
Fade Margin = 3 dB
Total Link Loss = 0.378 dB + 2 dB + 0.9 dB + 3 dB
Segment 2:
Project 8 to Sta. Rita Village/Congressional Village
Fade Margin = 3 dB
Total Link Loss = 0.371 dB + 2 dB + 0.9 dB + 3 dB
Segment 3:
Sta. Rita/Congressional Village to Cattleya
Fade Margin = 3 dB
Total Link Loss = 0.369 dB + 2 dB + 0.9 dB + 3 dB
Segment 4:
Cattleya to Project 6
Fade Margin = 3 dB
Total Link Loss = 0.258 dB + 2 dB + 0.6 dB + 3 dB
Segment 5:
Project 6 to Bago Bantay
Fade Margin = 3 dB
Total Link Loss = 0.351 dB + 2 dB + 0.9 dB + 3 dB
Segment 6:
Bago Bantay to PLDT Munoz-Reloc
Fade Margin = 3 dB
Total Link Loss = 0.538 dB + 2 dB + 1.2 dB + 3 dB
Pole #
Distanc
e to
Next
Pole
A.1 (BTS
33.9m
1)
Owner
PLDT
A.2
45.5m
PLDT
A.3
66.3m
PLDT
A.4
42.5m
PLDT
A.5
48.2m
PLDT
A.6
32.7m
Meralc
o
Type of
Pole
Extensio
n Arm
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
10 pin
alley
10 pin
alley
Side
Guy
Sidewal
k Guy
87.8m
PLDT
A.8
61.7m
PLDT
A.9
26.9m
Meralc
o
Concre
te
Concre
te
A.10
52.5m
Wood
A.11
23.6m
Meralc
o
A.12
20.9m
PLDT
A.13
46m
Meralc
o
Concre
te
Concre
te
Concre
te
A.14
44.4m
PLDT
Wood
A.15
37.2m
A.16
28.5m
A.17
33.4m
Meralc
o
Meralc
o
Meralc
o
Concre
te
Concre
te
Concre
te
Proposed
Compone
nt
Yes
Yes
Yes
Concrete
Pole,
Ground
Concrete
Pole
Concre
te
A.7
Groun
d
Yes
Yes
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
Ground
Yes
41.7m
PLDT
A.19
31.2m
Meralc
o
Concre
te
Concre
te
A.20
54.2m
PLDT
Wood
A.21
49.5m
PLDT
Wood
A.22
41.7m
A.23
32.3m
A.24
32.1m
A.25
32.5m
A.26
32.2m
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
BTS 2
33.5m
Yes
10 pin
alley
10 pin
alley
10 pin
alley
Yes
Ground
B.1
Distanc
e to
Owner
Next
Pole
36.1m
PLDT
B.2
39.6m
B.3
32.7m
B.4
32.2m
Meralc
o
Meralc
o
PLDT
B.5
32.6m
PLDT
Wood
B.6
35.5m
PLDT
Wood
B.7
38.8m
PLDT
Wood
Pole #
Type of
Pole
Extensi
on Arm
Concre
te
Concre
te
Concre
te
Wood
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
Side
Guy
Sidewa
lk Guy
Proposed
Ground Compone
nt
Yes
Yes
Ground
Yes
50.9m
B.9
40.6m
B.10
38.9m
B.11
71m
B.12
46.4m
B.13
41.9m
B.14
22.2m
B.15
39.5m
B.16
25.4m
B.17
34.2m
B.18
37.1m
B.19
29.7m
B.20
47.4m
B.21
33.4m
B.22
31.1m
B.23
27m
B.24
31.7m
B.25
31.6m
B.26
32.7m
B.27
31.3m
Meralc
o
Meralc
o
Meralc
o
Meralc
o
PLDT
Meralc
o
Meralc
o
PLDT
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Wood
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
PLDT
Wood
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Wood
Wood
Wood
10 pin
alley
10 pin
alley
Yes
Yes
Yes
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
Concre
te
Wood
Concrete
Pole
Ground
Yes
Yes
Yes
Yes
Ground
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
Yes
35.4m
BTS 3
36.1m
Meralc
o
Concre
te
10 pin
alley
Yes
C.10
Distanc
e to
Owner
Next
Pole
36.5m
Meralc
o
27.1m
Meralc
o
25.6m
Meralc
o
28.5m
Meralc
o
35.4m
Meralc
o
30.7m
Meralc
o
29.7m
Meralc
o
33.5m
Meralc
o
35.6m
Meralc
o
34m
PLDT
C.11
37m
PLDT
C.12
27.1m
PLDT
C.13
28.2m
PLDT
C.14
55.8m
PLDT
C.15
38.8m
Meralc
Pole
#
C.1
C.2
C.3
C.4
C.5
C.6
C.7
C.8
C.9
Type of
Pole
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
Extensio
n Arm
10 pin
alley
10 pin
alley
Side
Guy
Yes
Sidewal
k Guy
Groun
d
Proposed
Compone
nt
Ground
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
Ground
10 pin
alley
Yes
10 pin
e
Concret
e
Concret
e
Concret
e
C.16
37m
PLDT
C.17
36.6m
PLDT
C.18
31.5m
PLDT
C.19
50.3m
PLDT
C.20
52.7m
PLDT
C.21
32.3m
C.22
32.2m
C.23
44.9m
C.24
32.5m
C.25
46.6m
C.26
40.1m
C.27
39.5m
C.28
38.9m
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
PLDT
BTS 4
38.5m
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Concret
e
Wood
alley
10 pin
alley, 44
44
Ground
10 pin
alley
26
Yes
10 pin
alley
10 pin
alley
10 pin
alley
Yes
10 pin
alley
Yes
Yes
Yes
Ground
58.7m
Owner
Type of Extensio
Pole
n Arm
Meralc
o
Concre
te
10 pin
alley
Side
Guy
Sidewal
Ground
k Guy
Yes
Proposed
Compone
nt
29.3m
Meralc
o
D.3
41.5m
Piltel
D.4
38m
Piltel
D.5
44.9m
D.6
31.7m
D.7
43.1m
D.8
38.9
D.9
46.5m
D.10
49m
D.11
40.1m
D.12
43.3m
D.13
23.8m
D.14
48.8m
D.15
D.16
D.17
24.8m
24.2m
22.7m
D.18
26.4m
D.19
23.7m
BTS 5
48.9m
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Piltel
Meralc
o
Meralc
o
Meralc
o
Piltel
Meralc
o
PLDT
PLDT
PLDT
Meralc
o
Meralc
o
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Wood
Wood
Wood
Concre
te
Concre
te
10 pin
alley
Yes
Yes
10 pin
alley
10 pin
alley
Yes
Ground
10 pin
alley
Yes
10 pin
alley
10 pin
alley
44
Ground
Yes
10 pin
alley
10 pin
alley
Yes
Distanc
e to
Next
Owner
Type of
Pole
Extensi
on Arm
Side
Guy
Sidewa
lk Guy
Groun
d
Proposed
Compone
nt
Pole
22.7m
E.2
39.9m
Meralc
o
Piltel
E.3
43.3m
PLDT
E.4
49.2m
PLDT
E.5
34.7m
PLDT
E.6
55.8m
PLDT
E.7
32.7m
PLDT
E.8
36.3m
PLDT
E.9
47.7m
PLDT
E.10
39.8m
PLDT
E.11
33m
PLDT
E.12
39.2m
PLDT
E.13
32.9m
PLDT
E.14
32.6m
PLDT
E.15
22.2m
PLDT
E.16
47.6m
PLDT
E.17
25.1m
E.18
24.2m
E.19
25m
E.20
46.9m
Meralc
o
Meralc
o
Meralc
o
Meralc
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Wood
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Wood
Wood
Wood
10 pin
alley
Yes
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
Yes
Ground
Yes
Yes
Yes
Yes
Ground
Yes
10 pin
alley
10 pin
alley
Yes
Yes
10 pin
alley
10 pin
Yes
37m
E.22
32.3m
E.23
22.5m
E.24
30.3m
E.25
39.1m
E.26
30.2m
E.27
33m
BTS
33.6m
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
PLDT
Meralc
o
Meralc
o
Wood
Wood
Concre
te
Concre
te
Concre
te
Wood
Wood
alley
10 pin
alley
10 pin
alley
10 pin
alley
Ground
Yes
10 pin
alley
10 pin
alley
Yes
Yes
F.1
Distan
ce to
Next
Pole
27.6m
F.2
42.4m
F.3
31.4m
F.4
31.7m
F.5
26.7m
F.6
52m
F.7
48.7m
F.8
48.4m
Meralc
o
PLDT
F.9
39m
PLDT
Pole #
Owner
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
PLDT
Type of
Pole
Extensi
on Arm
Concre
te
Concre
te
Concre
te
Wood
10 pin
alley
Concre
te
Concre
te
Concre
te
Concre
te
Concre
Side
Guy
Sidewa
lk Guy
Groun
d
Proposed
Compone
nt
Ground
Yes
10 pin
alley
10 pin
alley
10 pin
alley
Yes
Yes
Yes
42.4m
PLDT
F.11
30.6m
PLDT
F.12
39.7m
F.13
41.6m
F.14
39.4m
F.15
38.9m
F.16
44.5m
F.17
54m
F.18
23.2m
F.19
34.2m
F.20
39.8m
F.21
40.3m
F.22
56.2m
F.23
26.9m
F.24
35.1m
F.25
48.9m
F.26
23.1m
F.27
49.3m
F.28
39.5m
F.29
27.9m
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
te
Wood
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Wood
Concre
te
Concre
te
Concre
te
Wood
Concre
10 pin
alley
Yes
Yes
10 pin
alley
Ground
10 pin
alley
10 pin
alley
Yes
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
Ground
Yes
Yes
Yes
Yes
Ground
10 pin
28.6m
F.31
31.3m
F.32
59.9m
F.33
51.3m
F.34
37.9m
F.35
36.6m
F.36
30.4m
F.37
29.3m
F.38
36.7m
F.39
38.7m
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
Meralc
o
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Concre
te
Wood
alley
10 pin
alley
Yes
10 pin
alley
10 pin
alley
10 pin
alley
10 pin
alley
Ground
10 pin
alley
10 pin
alley
10 pin
alley
Yes
BTS 1
Bill of Materials
Item
Description
Picture
Qty
Unit
Ericsson
Concentric
Core Loose
Tube 24
144 Fibers
TOL 403
2008 ADSS
GRHSLLDV
dielectric
(Single Mode,
non-metallic)
Fiber Access
Terminal,
NCD 518
1200
48
connections
(Optical
Distribution
Frame)
Patch Cord,
High Grade
Angled
Polished
Connectors,
TSR 392
(Ericsson)
ZXMP S385
SDH-Based
Multi-Service
Node
equipment
(SDH
Equipment,
STM-16
capable)
6480
meter
sets
36
sets
sets
Proposed
Materials
Ground
20
sets
Concrete Pole
pcs
Attachments
Brochures
ZXMP S385 SDH-Based Multi-Service Node equipment
Upswing of services poses a gigantic challenge for network bandwidth. On request
by transport network evolution, multi-service transport equipments featuring large
capacity, flexible dispatch, high reliability, elastic bandwidth and upgradeability are
needed to handle service delivery in the core
network.
Considering service diversity and variation of
network architecture, inheriting ZTEs technology
patents and experience in the field of SDH and
implanting new technological contents in SDH
equipments,
ZTE
launches
ZXMP
S385,
an
network
backbone
layer
or
large-
and
Ethernet
virtual
private
LAN
(EVPLAN)
services,
addressing
Outstanding scalability