Académique Documents
Professionnel Documents
Culture Documents
SECTION I
Introduction to
Environmental Issues
SECTION II
Environmental Management
in PCSB Sarawak Operations
Objective 1
Objective 2
INTRODUCTION TO ENVIRONMENTAL
ISSUES
ENVIRONMENTAL MANAGEMENT IN
PCSB SARAWAK OPERATIONS
4/16/2012
What is Environment?
SECTION I
Introductionto
Environmental Issues
SECTION I
Introductionto
Environmental Issues
ENVIRONMENT is defined as
Surroundings in which an organization
operates, including air, water, land, natural
resources, flora, fauna, humans and their
interrelations
Ozone
Depletion
Trans
boundary
movement
Marine
Pollution
Deforestation
SECTION I
Introductionto
Environmental Issues
What are
Greenhouse
gases??
Algae bloom
Loss of habitat
Extinction of flora & fauna
4/16/2012
SECTION I
Introductionto
Environmental Issues
Water Quality
Effluent
discharge
Ozone Hole
SECTION I
Introductionto
Environmental Issues
Land
Degradation
Burning
Chemical
Spill
Land
development
City of Beijing
Agricultural
activities
Industrial
operation
Industrial
operation
Motor vehicle
Domestic waste
Open burning
Marine
Life/Habitat
Oil Spill
Deforestation
Oil/Chemical
spill
Industrial
waste disposal
Los Angeles
SECTION II
Environmental Management in
PCSB SKO
EMISSION TO AIR
Gas venting
Gas flaring
SECTION II
Environmental Management in
PCSB SKO
Gas flaring
Exhausts fumes
Gas venting
Exhausts
Industrial air
pollutants
Well testing
Fugitive / Leaks
Fugitive / Leaks
Industrial toxic
waste
CONTAMINATION TO
LAND
Drilling
waste
Oil spill
Chemical
spill
Effluent
discharge
Engineering
waste
Effluent
discharge
Solid
waste
Drilling
waste
POLLUTION TO WATER
11
Oil spill
Chemical spill
POLLUTION TO
WATER
12
4/16/2012
SECTION II
Environmental Management in
PCSB SKO
INTRODUCTION TO ENVIRONMENTAL
ISSUES
ENVIRONMENTAL MANAGEMENT IN
PCSB SARAWAK OPERATIONS
Production / Process
Maintenance
Drilling
Construction
Catering
Medical
Unit
Support Vessels
Offices
Laboratory
Accommodation
13
SECTION II
Environmental Management in
PCSB SKO
SECTION II
Environmental Management in
PCSB SKO
4/16/2012
EXTERNAL RECOGNITION
NO
SECTION II
Environmental Management in
PCSB SKO
Malaysian Laws
SECTION II
Environmental Management in
PCSB SKO
ENFORCEMENT AUTHORITY
Fisheries/Port/Police/Custom
Department of Environment
10
11
Fishery Department
12
Museum Department
13
SECTION II
Environmental Management in
PCSB SKO
5. MANAGEMENT
REVIEW
4. CHECKING AND
CORRECTIVE
ACTION
1. POLICY
CONTINUAL IMPROVEMENT
3. IMPLEMENTATION
AND OPERATION
2. PLANNING
4/16/2012
HSEMS ELEMENTS
ENVIRONMENTAL POLICY
POLICY
PLANNING
ORGANISATION
RISK MANAGEMENT
SECTION II
Environmental Management in
PCSB SKO
SECTION II
Environmental Management in
PCSB SKO
SECTION II
Environmental Management in
PCSB SKO
Environmental Documents
Level 1
Level 2
Level 3
Level 4
SKO
Tenorm Mgmt Guide
MY SKO S 08 002
EFFLUENT
DISCHARGE
MANAGEMENT
MCOT/AP1
Env Manual
MY SKO S 07 015
WASTE MGMT,
CHEMICAL
HANDLING
RECORDS MGMT,
AIR EMISSION
EFFLUENT
DISCHARGE,
SLUDGE FARM
AMBIENT NOISE
RECORDS MGMT
WASTE MGMT,
CHEMICAL
HANDLING
SUMP MGMT
AIR EMISSION
CHEMICAL
HANDLING,
WASTE MGMT,
RECORDS MGMT
SLUDGE FARM
MANAGEMENT
WASTE
MANAGEMENT
RECORDS
MANAGEMENT
ENVIRONMENTAL
WORK INSTRUCTIONS
Onshore Crude Oil Terminals
Supply Bases
Offshore Installations
AIR EMISSIONS
MANAGEMENT
CHEMICAL
HANDLING
AMBIENT
NOISE MGMT
SUMP MGMT
4/16/2012
SECTION II
Environmental Management in
PCSB SKO
SECTION II
Environmental Management in
PCSB SKO
Exercise!
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
Thank You
28
4/16/2012
On site, the focal person that is responsible for waste management is the
Operation Supervisor and his related duties are to ensure his operation
team to conduct the followings:
Substitution
Increased preference
Reduction
Reuse
Recycle
Treatment
Disposal
Figure 1: Hierarchy of preferred waste management methods
4/16/2012
Therefore, they must be tightly controlled within a site and this responsibility
falls to several people, i.e.:
- Site HSE Officer
To ensure full implementation of this procedure at sites/ facilites.
Maintaining / updating the Registry of Chemicals and report to BSE
as and when required..
- Contract Administrator
Shall ensure that all procurement of new chemicals will include
training package on the chemical usage and handling by the
chemical vendor.
Reception
All chemicals arriving on
site must be properly
packed (labeled, not
leaking etc.)
The chemicals CSDS
must be either supplied or
available
Chemical
Handling
Handling
The chemical to be
used must be properly
identified before use
Packing must still be in
good condition
Chemical drums
handled carefully
Containment
Containment must be regularly inspected
In case of spill; block source, contain, clean
4/16/2012
Weekly
Consistent?
Yes
No
responsible for managing, controlling and improving the overall effluent quality.
Monitoring the Water Treatment Plant (WTP) performance and ensuring that
the quality of discharged effluent is within PCSB stipulated limits.
Ensure preventive or corrective maintenance related to effluent discharge
e.g. sumps, basins, drains etc.
Any non
conformity?
No
Yes
10