Vous êtes sur la page 1sur 5

Project: Singapore Beijing Embassy

Subject: HVAC Duct Size Check & AHU Evaluation


Method: Based on DI designed X-section
Written By: EK Goh
Date: 21/2/2001
For:

M-A-01 First Storey

Main Branch A

Sub-Program for Co-eff of Friction Evaluation


Wye Fitting
Elbow
Qc =
870
Deg
45
Qs =
220
WxD
0.6
Qb =
650
D/W
0.33
(WxD)c
0.4
0.2
Ce =
0.37667
(WxD)s
0.3
0.12
(WxD)b
0.3
0.15
Transition
Ac =
0.08 Qs/Qc
0.25 deg
45
As =
0.036 Qb/Qc
0.75 (WxD)i
400
Ab =
0.045 Cs =
0.63 (WxD)o
300
As/Ac =
Ab/Ac =

0.45 Cb =

0.45 Ao/Ai

0.5625

Ct

Node
B
0.2 A1
A1'
A2
A11
A111
A14
200 A21
120 A211

Cs
-0.01
-0.04
-0.011
0.005
1.47
0.067

0.24

Cb Elbow
deg
Ce
800x400
90
1.3
3.654 750x300
45
0.374
3.378 600x200
90.0
1.3
1.424 600x200
45.0
0.377
0.537 300x250
45
0.3533
0.45 250x250
90
1.2
1.2 200x200
90
1.233
1.2
0.743

0.45

A212

0.24

0.48

0.06

A213

-0.055

0.89

A213'
0.1
0.46
Based on ASHRAE eqn for Qrect=Qcir and same Press drop rate, Deq = 1.302(Power(WD,0.625)/Power((W+D),0.25))
Density=
1.2 m3/Kg
Section
Flow
Size (m)
X-Area Act-Vel
Deq
Unit PfL L (m)
PfL
Pv
m3/h m3/s W
A213' to A214
220 0.061
A213' to A2131
350 0.097
A213 to A2132
300 0.083
A21 to A213
870 0.242
A212 to A2122
250 0.069
A212 to A2121
250 0.069
A211 to A212
500 0.139
A211 to A2111
300 0.083
A21 to A211
800 0.222
A2 to A21
1670 0.464
A111 To A112
550 0.153
A111 To A1111
550 0.153
A11 to A111
1100 0.306
A12 to A13
600 0.167
A11 to A12
600 0.167
A1 to A11
1700 0.472
A14 to A141
450 0.125
A14 to A142
450 0.125
A1' to A14
900 0.250
A1 to A1'
8795 2.443
A1' to A2
7895 2.193
A2 to C
6225 1.729
B to A1
10495 2.915
A to B
14755 4.099

D
0.30
0.30
0.20
0.40
0.20
0.30
0.40
0.20
0.40
0.60
0.25
0.20
0.30
0.25
0.35
0.35
0.30
0.30
0.40
0.80
0.80
0.75
0.80
0.80

0.12
0.15
0.20
0.20
0.20
0.12
0.20
0.20
0.20
0.20
0.25
0.20
0.25
0.25
0.30
0.30
0.20
0.20
0.20
0.40
0.40
0.30
0.40
0.40

Evaluating Highest Press loss Branch


A to A112
294.607
A ro A1111
293.482
A to A13
282.529
A to A142
249.509
A to A141
249.309
A to A214
263.253
A to A2131
264.174
A to A2132
264.879
A to A2111
264.556
A to A212
264.924
A to A2121
264.032
A to C
251.965

Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa

Max B,C branch


max(B to B11)
max(C to C2132)
A to B11
A to C2132

Pa
Pa
Pa
Pa

76.128
60.658
204.086
312.623

m2
(m/s)
(m)
(Pa/m)
0.036
1.698
0.203
0.180
0.045
2.160
0.229
0.300
0.040
2.083
0.219
0.250
0.080
3.021
0.305
0.350
0.040
1.736
0.219
0.200
0.036
1.929
0.203
0.300
0.080
1.736
0.305
0.170
0.040
2.083
0.219
2.500
0.080
2.778
0.305
0.300
0.120
3.866
0.366
0.200
0.063
2.444
0.274
0.300
0.040
3.819
0.219
0.900
0.075
4.074
0.300
0.650
0.063
2.667
0.274
0.350
0.105
1.587
0.355
0.140
0.105
4.497
0.355
0.700
0.060
2.083
0.267
0.200
0.060
2.083
0.267
0.200
0.080
3.125
0.305
0.400
0.320
7.635
0.610
0.800
0.320
6.853
0.610
0.750
0.225
7.685
0.506
0.850
0.320
9.110
0.610
1.400
0.320
12.808
0.610
2.400

Max req

Overall max required Head

3.000
1.500
0.500
1.000
1.000
3.000
1.500
0.500
1.000
16.500
3.00
0.50
15.50
4.00
13.00
1.00
1.00
2.00
14.00
0.50
1.00
5.00
17.00
1.50

(Pa)
(Pa)
0.540
1.729
0.450
2.801
0.125
2.604
0.350
5.475
0.200
1.808
0.900
2.233
0.255
1.808
1.250
2.604
0.300
4.630
3.300
8.966
0.900
3.585
0.450
8.753
10.075
9.959
1.400
4.267
1.820
1.512
0.700 12.136
0.200
2.604
0.400
2.604
5.600
5.859
0.400 34.972
0.750 28.181
4.250 35.437
23.800 49.798
3.600 98.429

T-Cf
0.160
0.460
0.890
1.200
1.473
0.480
0.240
0.743
1.200
3.478
1.287
0.450
1.244
2.450
1.470
3.654
1.200
1.200
3.378
-0.040
-0.011
0.753
1.330
1.300

Transitn

deg

Ct
45
45
45
45
45
45
45

800x400-750x300
300x250-250x250
350x300-250x250
400x200-300x120
1200x400x800x400

0.04
0.02
0.05
0.06
0.04

Pff

Height Hstatic

(Pa)

(m)
0.277
1.288
2.318
6.570
2.664
1.072
0.434
1.935
5.556
31.185
4.614
3.939
12.385
10.453
2.222
44.344
3.125
3.125
19.793
-1.399
-0.310
26.684
66.231
127.958

T-Ploss

(Pa)
(Pa)
0.000
0.817
0.000
1.738
0.000
2.443
0.000
6.920
0.000
2.864
0.000
1.972
0.000
0.689
0.000
3.185
0.000
5.856
0.000
34.485
0.000
5.514
0.000
4.389
0.000
22.460
0.000
11.853
0.000
4.042
0.000
45.044
0.000
3.325
0.000
3.525
0.000
25.393
0.000
-0.999
0.000
0.440
0.000
30.934
0.000
90.031
0.000
131.558

Project: Singapore Beijing Embassy


Subject: HVAC Duct Size Check & AHU Evaluation
Method: Based on DI designed X-section
Written By: EK Goh
Date: 21/2/2001
For:

M-A-01 First Storey

Main Branch A

Sub-Program for Co-eff of Friction Evaluation


Wye Fitting
Elbow
Qc =
870
Deg
45
Qs =
220
WxD
600
Qb =
650
D/W
0.33
(WxD)c
0.4
0.2
Ce =
0.37667
(WxD)s
0.3
0.12
(WxD)b
0.3
0.15
Transition
Ac =
0.08 Qs/Qc
0.25 deg
45
As =
0.036 Qb/Qc
0.75 (WxD)i
400
Ab =
0.045 Cs =
0.63 (WxD)o
300
As/Ac =
Ab/Ac =

0.45 Cb =

0.45 Ao/Ai

0.5625

Ct

Node
B
200 A1
A1'
A2
A11
A111
A14
200 A21
120 A211

Cs
-0.01
-0.04
-0.011
0.005
1.47
0.067

0.24

Cb Elbow
deg
Ce
800x400
90
1.3
3.654 750x300
45
0.374
3.378 600x200
90.0
1.3
1.424 600x200
45.0
0.377
0.537 300x250
45
0.3533
0.45 250x250
90
1.2
1.2 200x200
90
1.233
1.2
0.743

0.45

A212

0.24

0.48

0.06

A213

-0.055

0.89

A213'
0.1
0.46
Based on ASHRAE eqn for Qrect=Qcir and same Press drop rate, Deq = 1.302(Power(WD,0.625)/Power((W+D),0.25))
Density=
1.2 m3/Kg
Section
Flow
Size (m)
X-Area Act-Vel
Deq
Unit PfL L (m)
PfL
Pv
m3/h
A213' to A214
A213' to A2131
A213 to A2132
A21 to A213
A212 to A2122
A212 to A2121
A211 to A212
A211 to A2111
A21 to A211
A2 to A21
A111 To A112
A111 To A1111
A11 to A111
A12 to A13
A11 to A12
A1 to A11
A14 to A141
A14 to A142
A1' to A14
A1 to A1'
A1' to A2
A2 to C
B to A1
A to B

220
350
300
870
250
250
500
300
800
1670
550
550
1100
600
600
1700
450
450
900
8795
7895
6225
10495
14755

m3/s
0.061
0.097
0.083
0.242
0.069
0.069
0.139
0.083
0.222
0.464
0.153
0.153
0.306
0.167
0.167
0.472
0.125
0.125
0.250
2.443
2.193
1.729
2.915
4.099

D
0.30
0.30
0.20
0.40
0.20
0.30
0.40
0.20
0.40
0.60
0.25
0.20
0.30
0.25
0.35
0.35
0.30
0.30
0.40
0.80
0.80
0.75
0.80
0.80

m2
0.12
0.15
0.20
0.20
0.20
0.12
0.20
0.20
0.20
0.20
0.25
0.20
0.25
0.25
0.30
0.30
0.20
0.20
0.20
0.40
0.40
0.30
0.40
0.40

Evaluating Highest Press loss Branch


A to A112
294.607
A ro A1111
293.482
A to A13
282.529
A to A142
249.509
A to A141
249.309
A to A214
263.253
A to A2131
264.174
A to A2132
264.879
A to A2111
264.556
A to A212
264.924
A to A2121
264.032
A to B
131.558
A to C
251.965

Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa

Computing Entire Sys Max Ploss


Max B,C branch
max(B to B511)
143.178
max(C to C2132)
65.71141
A to B511
274.737
A to C2132
317.676

Pa
Pa
Pa
Pa

0.036
0.045
0.040
0.080
0.040
0.036
0.080
0.040
0.080
0.120
0.063
0.040
0.075
0.063
0.105
0.105
0.060
0.060
0.080
0.320
0.320
0.225
0.320
0.320

(m/s)
1.698
2.160
2.083
3.021
1.736
1.929
1.736
2.083
2.778
3.866
2.444
3.819
4.074
2.667
1.587
4.497
2.083
2.083
3.125
7.635
6.853
7.685
9.110
12.808

(m)

(Pa/m)
0.203
0.229
0.219
0.305
0.219
0.203
0.305
0.219
0.305
0.366
0.274
0.219
0.300
0.274
0.355
0.355
0.267
0.267
0.305
0.610
0.610
0.506
0.610
0.610

0.180
0.300
0.250
0.350
0.200
0.300
0.170
2.500
0.300
0.200
0.300
0.900
0.650
0.350
0.140
0.700
0.200
0.200
0.400
0.800
0.750
0.850
1.400
2.400

Max req

Overall max required Head

(Pa)
3.000
1.500
0.500
1.000
1.000
3.000
1.500
0.500
1.000
16.500
3.00
0.50
15.50
4.00
13.00
1.00
1.00
2.00
14.00
0.50
1.00
5.00
17.00
1.50

0.540
0.450
0.125
0.350
0.200
0.900
0.255
1.250
0.300
3.300
0.900
0.450
10.075
1.400
1.820
0.700
0.200
0.400
5.600
0.400
0.750
4.250
23.800
3.600

T-Cf

(Pa)
1.729
2.801
2.604
5.475
1.808
2.233
1.808
2.604
4.630
8.966
3.585
8.753
9.959
4.267
1.512
12.136
2.604
2.604
5.859
34.972
28.181
35.437
49.798
98.429

0.160
0.460
0.890
1.200
1.473
0.480
0.240
0.743
1.200
3.478
1.287
0.450
1.244
2.450
1.470
3.654
1.200
1.200
3.378
-0.040
-0.011
0.753
1.330
1.300

Transitn

deg

Ct
45
45
45
45
45
45
45

800x400-750x300
300x250-250x250
350x300-250x250
400x200-300x120
1200x400x800x400

0.04
0.02
0.05
0.06
0.04

Pff

Height Hstatic

T-Ploss

(Pa)

(m)

(Pa)

0.277
1.288
2.318
6.570
2.664
1.072
0.434
1.935
5.556
31.185
4.614
3.939
12.385
10.453
2.222
44.344
3.125
3.125
19.793
-1.399
-0.310
26.684
66.231
127.958

(Pa)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.817
1.738
2.443
6.920
2.864
1.972
0.689
3.185
5.856
34.485
5.514
4.389
22.460
11.853
4.042
45.044
3.325
3.525
25.393
-0.999
0.440
30.934
90.031
131.558

Project: Singapore Beijing Embassy


Subject: HVAC Duct Size Check & AHU Evaluation
Method: Based on DI designed X-section
Written By: EK Goh
Date: 21/2/2001
For:

M-A-01 First Storey

Branch B

Sub-Program for Co-eff of Friction Evaluation


Wye Fitting
Elbow
Qc =
14750
Deg
45
Qs =
10490
WxD
0.3
Qb =
4260
D/W
0.83
(WxD)c
1.2
0.4
Ce = 0.37667
(WxD)s
0.8
0.4
Transition
(WxD)b

0.5

0.3

deg

Node
B51
B5
B33
B31
0.25 B3
B2
B311
B1

45

Ac =

0.48 Qs/Qc

0.711186 (WxD)i

300

250

As =

0.32 Qb/Qc

0.288814 (WxD)

300

150

Ab =

0.15 Cs =

0.625259 Ao/Ai

0.6

As/Ac =

0.6667 Cb =

Ab/Ac =

0.3125

0.447644 Ct

Cs
0.24
3.054
0.067
0.114
1.56
-0.06
0.032
-0.049
-0.01

Cb
0.64
0.468
0.7
1.084
0.522
5.585
0.433
7.714

Elbow deg
0.5x0.3
0.25x0.2
0.2x0.25
0.3x0.2
0.3x0.25

0.551 Cs

Ce
90
90
90
90
45

Transitn

1.26
1.2
1.15
1.233
0.353

500x300-300x300
300x250-250x250
300x350-300x250

Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa

0.05
0.02
0.03

Cb

0.06

Based on ASHRAE eqn for Qrect=Qcir and same Press drop rate, Deq = 1.302(Power(WD,0.625)/Power((W+D),0.25))
Density=
1.2 m3/Kg
Section
Flow
Size (m)
X-Area Act-Vel
Deq
Unit PfL L (m)
PfL
Pv
T-Cf
Pff
m3/h m3/s W
D
m2
(m/s)
(m)
(Pa/m)
(Pa)
(Pa)
(Pa)
B6-B61
300 0.083
0.20 0.25
0.050
1.667
0.244
0.200
14.500 2.900
1.667
2.300
B2-B21
600 0.167
0.25 0.25
0.063
2.667
0.274
0.300
15.000 4.500
4.267
7.985
B1-B11
600 0.167
0.25 0.25
0.063
2.667
0.274
0.300
15.000 4.500
4.267
10.114
B51-B511
380 0.106
0.20 0.25
0.050
2.111
0.244
0.220
2.500 0.550
2.674
2.940
B51-B52
380 0.106
0.25 0.25
0.063
1.689
0.274
0.170
3.000 0.510
1.711
1.440
B5-B51
760 0.211
0.25 0.25
0.063
3.378
0.274
0.500
2.500 1.250
6.846
14.054
B33-B34
550 0.153
0.25 0.25
0.063
2.444
0.274
0.300
3.000 0.900
3.585
1.287
B33-B331
550 0.153
0.20 0.25
0.050
3.056
0.244
0.500
0.500 0.250
5.602
0.700
B32-B33
1100 0.306
0.30 0.25
0.075
4.074
0.300
0.700
3.000 2.100
9.959
0.736
B31-B32
1100 0.306
0.30 0.35
0.105
2.910
0.355
0.300
13.000 3.900
5.081
0.114
B311-B312
450 0.125
0.30 0.20
0.060
2.083
0.267
0.200
2.00 0.400
2.604
1.265
B311-B3111
450 0.125
0.30 0.20
0.060
2.083
0.267
0.200
1.00 0.200
2.604
1.666
B31-B311
900 0.250
0.30 0.25
0.075
3.333
0.300
0.450
15.50 6.975
6.667
1.790
B3-B31
2000 0.556
0.30 0.35
0.105
5.291
0.355
0.900
1.50 1.350 16.797
0.522
B5-B6
300 0.083
0.30 0.30
0.090
0.926
0.328
0.170
0.50 0.085
0.514
3.054
B4-B5
1060 0.294
0.30 0.30
0.090
3.272
0.328
0.400
1.00 0.400
6.422
0.150
B3-B4
1060 0.294
0.50 0.30
0.150
1.963
0.421
0.120
1.00 0.120
2.312
1.560
B2-B3
3060 0.850
0.50 0.30
0.150
5.667
0.421
0.700
0.50 0.350 19.267
-0.060
B1-B2
3660 1.017
0.50 0.30
0.150
6.778
0.421
1.300
2.00 2.600 27.563
-0.049
B-B1
4260 1.183
0.50 0.30
0.150
7.889
0.421
1.600
7.00 11.200 37.341
0.551
Evaluating Highest Press loss Branch
B to B11
79.428
B to B21
71.593
B to B61
45.697
B to B3111
65.783
B to B312
64.939
B to B331
60.416
B to B34
61.759
B to B511
143.178
B to B52
137.741

deg
Ct
45
45
45

Max req

3.833
34.069
43.153
7.862
2.464
96.208
4.614
3.921
7.330
0.579
3.294
4.339
11.933
8.768
1.571
0.963
3.607
-1.156
-1.351
20.575

Height Hstatic
T-Ploss
(m)
(Pa)
(Pa)
0.000
6.733
0.000
38.569
0.000
47.653
0.000
8.412
0.000
2.974
0.000
97.458
0.000
5.514
0.000
4.171
0.000
9.430
0.000
4.479
0.000
3.694
0.000
4.539
0.000
18.908
0.000
10.118
0.000
1.656
0.000
1.363
0.000
3.727
0.000
-0.806
0.000
1.249
0.000
31.775

Project: Singapore Beijing Embassy


Subject: HVAC Duct Size Check & AHU Evaluation
Method: Based on DI designed X-section
Written By: EK Goh
Date: 21/2/2001

Node

Cs

Cb Elbow

deg

Ce

Transitn

deg

Ct

C11

-0.036

2.21 650x300

90

1.3

450x250x350x250

45

0.03

C31

-0.044

0.67 350x250

90

1.214

300x250-250x250

45

0.02

C32

-0.017

0.371 300x250

90

1.2

300x250x300x150

45

0.05

Sub-Program for Co-eff of Friction Evaluation

C33

0.043

0.31 300x200

90

1.233

350x250x200x250

45

0.05

Wye Fitting

C21

0.05

1.435 300x150

90

1.3

300x200x300x150

45

0.03

C211

0.005

0.314 300x120

90

1.3

For:

M-A-01 First Storey

Branch C

Elbow

Qc =

6225

Deg

90

Qs =

5555

WxD

300

Qb =

670

D/W

0.83

(WxD)c

0.65

0.3

Ce =

0.37667

(WxD)s

0.65

0.3

Transition

(WxD)b

0.3

0.2

deg

250 C1

-0.02

5.847 200x250

90

1.15

C213

0.05

1.343 200x120

90

1.26

C5

0.05

0.583

C51

0.24

0.533

45

C53

0.14

0.616

Ac =

0.195 Qs/Qc

0.892369 (WxD)i

300

250 C54

7.022

0.434

As =

0.195 Qb/Qc

0.107631 (WxD)o

300

150 C2

-0.095

2.287

Ab =

0.06 Cs =

0.625259 Ao/Ai

0.6

C3

0.417

0.51

As/Ac =
Ab/Ac =

1 Cb =

0.447644 Ct

0.06

0.3077

Based on ASHRAE eqn for Qrect=Qcir and same Press drop rate, Deq = 1.302(Power(WD,0.625)/Power((W+D),0.25))
Density=
1.2 m3/Kg
Section
Flow
Size (m)
X-Area Act-Vel
Deq
Unit PfL L (m)
PfL
Pv
T-Cf
Pff
m3/h m3/s W
D
m2
(m/s)
(m)
(Pa/m)
(Pa)
(Pa)
(Pa)
C51-C52
445 0.124
0.30 0.25
0.075
1.648
0.300
0.170
3.000
0.510
1.630
1.440
C5-C51
890 0.247
0.30 0.25
0.075
3.296
0.300
0.550
1.000
0.550
6.519
0.633
C51-C511
445 0.124
0.20 0.20
0.040
3.090
0.219
0.600
1.500
0.900
5.730
0.533
C5-C53
970 0.269
0.30 0.25
0.075
3.593
0.300
0.600
1.000
0.600
7.744
0.633
C53-C531
445 0.124
0.20 0.20
0.040
3.090
0.219
0.550
1.500
0.825
5.730
0.616
C53-C54
525 0.146
0.30 0.25
0.075
1.944
0.300
0.180
2.000
0.360
2.269
0.140
C54-C541
445 0.124
0.20 0.20
0.040
3.090
0.219
0.550
1.500
0.825
5.730
0.434
C54-C56
80 0.022
0.30 0.15
0.045
0.494
0.229
0.100
4.000
0.400
0.146
7.072
C4-C5
1860 0.517
0.55 0.25
0.138
3.758
0.398
0.350
2.000
0.700
8.472
0.200
C3-C4
1860 0.517
0.65 0.30
0.195
2.650
0.475
0.170
13.500
2.295
4.212
0.417
C33-C34
475 0.132
0.20 0.25
0.050
2.639
0.244
0.350
4.00
1.400
4.178
2.393
C33-C331
475 0.132
0.20 0.15
0.030
4.398
0.189
1.400
1.50
2.100 11.606
0.310
C32-C33
950 0.264
0.35 0.25
0.088
3.016
0.323
0.380
3.50
1.330
5.457
1.197
C32-C321
475 0.132
0.20 0.15
0.030
4.398
0.189
1.400
1.00
1.400 11.606
0.371
C31-C32
1425 0.396
0.45 0.25
0.113
3.519
0.363
0.450
1.50
0.675
7.428
-0.014
C31-C311
710 0.197
0.45 0.15
0.068
2.922
0.274
0.400
3.00
1.200
5.122
0.670
C3-C31
2135 0.593
0.75 0.20
0.150
3.954
0.403
0.400
15.00
6.000
9.379
0.510
C2-C3
3995 1.110
0.65 0.30
0.195
5.691
0.475
0.700
1.00
0.700 19.432
-0.095
C21-C212
390 0.108
0.20 0.25
0.050
2.167
0.244
0.300
6.00
1.800
2.817
3.835
C213-C2132
150 0.042
0.20 0.12
0.024
1.736
0.168
0.300
4.50
1.350
1.808
3.913
C213-C2131
510 0.142
0.20 0.25
0.050
2.833
0.244
0.500
0.50
0.250
4.817
1.393
C211-C213
660 0.183
0.25 0.25
0.063
2.933
0.274
0.410
2.00
0.820
5.163
0.025
C211-C2111
510 0.142
0.20 0.25
0.050
2.833
0.244
0.500
0.50
0.250
4.817
0.314
C21-C211
1170 0.325
0.35 0.25
0.088
3.714
0.323
0.500
1.00
0.500
8.278
1.435
C2-C21
1560 0.433
0.45 0.25
0.113
3.852
0.363
0.450
14.00
6.300
8.902
2.287
C1-C2
5555 1.543
0.65 0.30
0.195
7.913
0.475
1.400
5.00
7.000 37.570
-0.020
C11-C12
370 0.103
0.30 0.15
0.045
2.284
0.229
0.300
3.50
1.050
3.130
1.294
C11-C112
150 0.042
0.30 0.12
0.036
1.157
0.203
0.100
4.50
0.450
0.804
4.810
C11-C111
150 0.042
0.30 0.12
0.036
1.157
0.203
0.100
1.00
0.100
0.804
2.210
C1-C11
670 0.186
0.30 0.20
0.060
3.102
0.267
0.450
14.50
6.525
5.773
7.080
C-C1
6225 1.729
0.65 0.30
0.195
8.868
0.475
1.700
6.50
11.050 47.180
0.000
Evaluating Highest Press loss Branch
C to C112
62.763
C to C111
60.323
C to C12
63.547
C to C2132
65.711
C to C2131
64.245
C to C2111
58.098
C to C212
56.560
C to C311
31.568
C to C321
33.213
C to C331
41.067
C to C34
46.768
C to C52
30.132
C to C511
31.229
C to C531
32.455
C to C541
32.090
C to C56
30.213

Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa
Pa

Max req

2.347
4.127
3.054
4.902
3.530
0.318
2.487
1.035
1.694
1.756
9.999
3.598
6.532
4.306
-0.104
3.432
4.783
-1.846
10.802
7.076
6.710
0.129
1.512
11.878
20.359
-0.751
4.050
3.866
1.776
40.872
0.000

Height Hstatic
T-Ploss
(m)
(Pa)
(Pa)
0.000
2.857
0.000
4.677
0.000
3.954
0.000
5.502
0.000
4.355
0.000
0.678
0.000
3.312
0.000
1.435
0.000
2.394
0.000
4.051
0.000
11.399
0.000
5.698
0.000
7.862
0.000
5.706
0.000
0.571
0.000
4.632
0.000
10.783
0.000
-1.146
0.000
12.602
0.000
8.426
0.000
6.960
0.000
0.949
0.000
1.762
0.000
12.378
0.000
26.659
0.000
6.249
0.000
5.100
0.000
4.316
0.000
1.876
0.000
47.397
0.000
11.050

For Elbow
0 deg
20
30
45
60
75
90

0.25
0.080
0.180
0.380
0.600
0.890
1.300

0.50
0.080
0.170
0.370
0.590
0.870
1.300

0.75
0.080
0.170
0.360
0.570
0.840
1.200

45

0.250
0.380

D/W
0.333
0.377

0.500
0.370

Deg

1.00
0.070
0.160
0.340
0.550
0.810
1.200

1.25
0.070
0.155
0.335
0.535
0.790
1.150

1.50
0.070
0.150
0.330
0.520
0.770
1.100

1.75
0.070
0.150
0.320
0.505
0.750
1.100

20
45
90
120
150
0.05
0.07
0.19
0.29
0.37
0.04
0.05
0.18
0.28
0.36
0.04
0.06
0.17
0.27
0.35
0.05
0.06
0.14
0.20
0.26
0.00
0.00
0.00
0.00
0.00
0.60
1.40
1.52
1.48
1.44
3.52
9.60
11.20
11.04
10.72
36.00 69.00
93.00
93.00
92.00
102.40 181.76 256.00 253.44 250.88

180
0.43
0.42
0.41
0.27
1.00
1.40
10.56
91.00
258.88

For Transition
Ao/Ai
0.10
0.17
0.25
0.50
1.00
2.00
4.00
10.00
16.00

10
0.05
0.05
0.05
0.06
0.00
0.56
2.72
24.00
66.56

0.250
0.450
0.500

45
0.06
0.06
0.06

2.00
0.070
0.150
0.310
0.490
0.730
1.100

2.25
0.068
0.145
0.303
0.483
0.715
1.070

2.50
0.065
0.140
0.295
0.475
0.700
1.040

2.75
0.063
0.135
0.288
0.468
0.685
1.010

3.00
0.060
0.130
0.280
0.460
0.670
0.980

3.25
0.060
0.130
0.278
0.453
0.660
0.965

3.50
0.060
0.130
0.275
0.445
0.650
0.950

3.75
0.060
0.130
0.273
0.438
0.640
0.935

D/W
4.00
0.060
0.130
0.270
0.430
0.630
0.920

4.25
0.058
0.128
0.268
0.425
0.625
0.913

4.50
0.055
0.125
0.265
0.420
0.620
0.905

4.75
0.053
0.123
0.263
0.415
0.615
0.898

5.00
0.050
0.120
0.260
0.410
0.610
0.890

5.25
0.050
0.120
0.258
0.405
0.603
0.880

5.50
0.050
0.120
0.255
0.400
0.595
0.870

5.75
0.050
0.120
0.253
0.395
0.588
0.860

6.00
0.050
0.120
0.250
0.390
0.580
0.850

6.25
0.050
0.119
0.249
0.389
0.579
0.848

6.50
0.050
0.118
0.248
0.388
0.578
0.845

6.75
0.050
0.116
0.246
0.386
0.576
0.843

7.00
0.050
0.115
0.245
0.385
0.575
0.840

7.25
0.050
0.114
0.244
0.384
0.574
0.838

7.50
0.050
0.113
0.243
0.383
0.573
0.835

7.75
0.050
0.111
0.241
0.381
0.571
0.833

8.00
0.050
0.110
0.240
0.380
0.570
0.830

Vous aimerez peut-être aussi