Requirements:
1. Square Bars-4 nos.
2. Hydro test Needle Valves-8 nos.
3. Pressure Indicators Range-200 kg/cm2(Shell side) & 100
kg/cm2(Tube side) 2 nos. each.
4. Pr. Transducer 100 kg/cm2 1no.
5. Hydro test Pump 2 nos.(working should be tested in advance)
6. Hydro test Hose pipes-4 nos.
7. Water sump for water storage.
8. Submersible pump.
9. PPM Testing kit-2 nos.
10.Blind Flanges as per Drg. 121601-51 R0.
11.Water pumping unit-Pump with 4 hose pipe 15 m length.
12.Torquing unit RSL-4 & RSL-8 in working condition-2 nos.
13.Required size Box Spanners & Fixed spanners.
14.Dummy piping [3 or 4] arrangement to increase Noz O1 elevation
up to 2.6m wrto center line of vessel.
15.Hydro test Fasteners & Gaskets as per Drg. 121601-51 R0.
16.Chemical additives.
Noz. Qty Size
1(2) 36x300
#
T1-9 9
2x900#
5109/1
00
5101
5111
612+3/64
2 UN8
Torqu
e
Kg-m
495
5110
5/8UNC
13
D1- 4
4
E1-3 3
2x900#
5105
5104
7/8UNC
41
42x900#
30x300
#
2x900#
5113
5116
5/8UNC
13
5112
5108
5102+3/7
2
5106+7/4
8
5114+5/2
4
124+5/28
324
820
823
821+2/8
1 3/4
8UN
7/88UN
T.Gu
n
PAGE 1 OF 5
41
PROCEDURE: 121601-Hydro R0
L1-4 4
M
1
M1
2x900#
32x300
#
20
820
106
823
109
821+2/8
107+8/28
242CAP
5105
V12
S6
2x900#
5104
1(2) 8x900#
814
5106+7/4
8
812+3/24
C6
2(2) 6x900#
817
815+6/24
7/88UN
1
7/88UN
-
41
375
-
7/8UNC
41
1
3/88UN
1
1/88UN
275
PAGE 2 OF 5
200
PROCEDURE: 121601-Hydro R0
Procedure:
PAGE 3 OF 5
PROCEDURE: 121601-Hydro R0
PROCEDURE: 121601-Hydro R0
PROCEDURE: 121601-Hydro R0
PAGE 6 OF 5